CN106894449A - A kind of structure type of immersed tube tunnel final joint - Google Patents

A kind of structure type of immersed tube tunnel final joint Download PDF

Info

Publication number
CN106894449A
CN106894449A CN201710070498.2A CN201710070498A CN106894449A CN 106894449 A CN106894449 A CN 106894449A CN 201710070498 A CN201710070498 A CN 201710070498A CN 106894449 A CN106894449 A CN 106894449A
Authority
CN
China
Prior art keywords
sides
long joint
face
joint
adjacent long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710070498.2A
Other languages
Chinese (zh)
Inventor
贺维国
范国刚
邢永辉
洪开荣
吕洋
刘庆方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201710070498.2A priority Critical patent/CN106894449A/en
Publication of CN106894449A publication Critical patent/CN106894449A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • E02D29/073Tunnels or shuttering therefor assembled from sections individually sunk onto, or laid on, the water-bed, e.g. in a preformed trench
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of structure type of immersed tube tunnel final joint, it is related to technical field of traffic transportation;The adjacent long joint in both sides is provided with blinding layer, jack pushing tow system is provided with the adjacent long joint in both sides, one side end face of the adjacent long joint in both sides is wedge shape, another side end face is perpendicular end surface, and both sides end face is mounted on firm end housing, and one side wedge is inserted between the both sides end face of the adjacent long joint in both sides;The both sides end face of the adjacent long joint in described both sides is provided with the first firm end housing, and the periphery of the first firm end housing is provided with GINA waterstops, end seal wall is provided with the adjacent long joint in both sides;The both sides of described one side wedge are provided with the second firm end housing.Immersed tube final joints structure size of the present invention is small, and prefabricated convenience, construction quality is easily guaranteed that;One side wedge shape, difficulty of construction is small, it is easy to which waterstop compresses, and FS final spice block is difficult to be extruded by water pressure;Prefabricated components underwater mating, speed of application is fast.

Description

A kind of structure type of immersed tube tunnel final joint
Technical field
The present invention relates to technical field of traffic transportation, and in particular to a kind of structure type of immersed tube tunnel final joint.
Background technology
China is vast in territory, and seashore line length, river, river, lake and island are numerous, many using to environment, landscape shadow in recent years The small submerged tunnel mode of sound, wherein quite a few submerged tunnel all use immersed tunnelling method construction.
Immersed tunnelling method tunnel FS final spice is the important attachment structure for realizing the final insertion in tunnel, is also whole engineering key work Emphasis link in sequence.Conventional submerged tunnel FS final spice construction is often utilized in joint surrounding and installs water-stopping steel shrouding under water Afterwards, the cast-in-place joint reinforced concrete structure then inside shrouding, complicated construction technique, the cycle is more long, and steel shrouding installs companion under water With prolonged artificial underwater operation.Quick, the convenient construction of immersed tunnelling method tunnel FS final spice how are realized, is always that tunnel sinks One of direction that plumber's method is explored.
The content of the invention
Defect and deficiency it is an object of the invention to be directed to prior art, there is provided a kind of construction quality is easily guaranteed that, applies The structure type of the immersed tube tunnel final joint that work difficulty is small, speed of application is fast.
To achieve the above object, the technical solution adopted by the present invention is:It comprising blinding layer, jack pushing tow system, The adjacent long joint in both sides, end seal wall, the first firm end housing, one side wedge, GINA waterstops, the second firm end housing;Described basis The adjacent long joint in both sides is provided with bed course, jack pushing tow system, the adjacent length in both sides are provided with the adjacent long joint in both sides One side end face of tube coupling is wedge shape, and another side end face is perpendicular end surface, and both sides end face is mounted on firm end housing, the adjacent length in both sides One side wedge is inserted between the both sides end face of tube coupling;It is firm that the both sides end face of the adjacent long joint in described both sides is provided with first End housing, the periphery of the first firm end housing is provided with GINA waterstops, and end seal wall is provided with the adjacent long joint in both sides;Described list The both sides of face wedge are provided with the second firm end housing.
Preferably, described one side wedge long joint top adjacent with both sides, base plate, pouring in the connection cavity of side wall There is shearing concrete.
Preferably, setting slip casting between the FS final spice bottom of the adjacent long joint in described both sides and blinding layer.
Preferably, described one side wedge is using prefabricated.
Operation principle of the invention is:Long joint end face is provided with waterstop, by the deadweight of one side wedge and very heavy Top pushing tow is close to the wedge-shaped end face occlusion of one side wedge long joint adjacent with both sides, and compression waterstop reaches water-stagnating effect.
After said structure, what the present invention was produced has the beneficial effect that:A kind of immersed tube tunnel final of the present invention connects The structure type of head, immersed tube final joints structure size is small, and prefabricated convenience, construction quality is easily guaranteed that;One side wedge shape, construction is difficult Degree is small, it is easy to which waterstop compresses, and FS final spice block is difficult to be extruded by water pressure;Prefabricated components underwater mating, speed of application is fast, pole The difficulty of construction of artificial underwater operation workload and final structure is reduced greatly, there is very big promotional value.
Brief description of the drawings
Fig. 1 is FS final spice docking structure figure of the invention;
Fig. 2 is one side wedge sinking figure of the present invention;
Fig. 3 is tunnel teardown end seal wall connected graph of the present invention;
Fig. 4 is ttom of pipe slip casting of the present invention, construction appurtenant work figure;
Fig. 5 is A node drawings in Fig. 4;
Fig. 6 is B node drawing in Fig. 4.
Description of reference numerals:
The adjacent long joint 3 of blinding layer 1, jack pushing tow system 2, both sides, end seal wall 4, the first firm end housing 5, one side wedge 6th, GINA waterstops 7, the second firm end housing 8, shearing concrete 9, slip casting 10.
Specific embodiment
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also Other accompanying drawings are obtained with according to these accompanying drawings.
Referring to such as Fig. 1 --- shown in Fig. 6, this specific embodiment is adopted the following technical scheme that:It comprising blinding layer 1, The adjacent long joint 3 of jack pushing tow system 2, both sides, end seal wall 4, the first firm end housing 5, one side wedge 6, GINA waterstops 7, Second firm end housing 8;The adjacent long joint 3 in both sides is provided with described blinding layer 1, is provided with the adjacent long joint 3 in both sides Jack pushing tow system, a side end face of the adjacent long joint 3 in both sides is wedge shape, and another side end face is perpendicular end surface, and two side ends Face is mounted on firm end housing 5, and one side wedge 6 is inserted between the both sides end face of the adjacent long joint 3 in both sides;Described both sides phase The both sides end face of adjacent long joint 3 is provided with the first firm end housing 5, and the periphery of the first firm end housing 5 is provided with GINA waterstops 7, both sides End seal wall 4 is provided with adjacent long joint 3;The both sides of described one side wedge 6 are provided with the second firm end housing 8.
Preferably, described one side wedge 6 long joint 3 adjacent with both sides is pushed up, poured in the connection cavity of base plate, side wall Shearing concrete 9 is built.
Preferably, setting slip casting between the FS final spice bottom of the adjacent long joint 3 in described both sides and blinding layer 1 10。
Preferably, described one side wedge 6 is using prefabricated.
The operation principle of this specific embodiment is:Long joint end face is provided with waterstop, by one side wedge 6 Deadweight and jack pushing tow are close to the wedge-shaped end face occlusion of the long joint 3 adjacent with both sides of one side wedge 6, and compression waterstop reaches To water-stagnating effect.
During present invention operation:
1st, it is when the adjacent long joint 3 in both sides is prefabricated, the two ends bearing of jack pushing tow system 2 is simultaneously prefabricated;
2nd, the adjacent end face of tube coupling 3 in both sides installs GINA waterstops 7, and the adjacent long joint 3 in sinking FS final spice both sides determines end face number According to one side wedge 6 is transported in place;
3rd, the progressively sinking of one side wedge 6, dynamic adjustment positioning precision and tube coupling attitude, the sinking of one side wedge 6 is in place.
4th, using the self gravitation and the thrust of jack pushing tow system 2 of one side wedge 6, by one side wedge 6 and two The adjacent faying face of long joint 3 in side is adjacent to, waterstop compression sealing.
4th, binding cavity draining in one side wedge 6, forms dry construction condition;
5th, connector portions welding rigid connection head, connection internal injection pours shearing concrete 9;
6th, end seal wall 4 is removed, jack pushing tow system 2 is removed;
7th, ttom of pipe grouting behind shaft or drift lining 10;
8th, backfill protection, pipe auxiliary engineering construction.
After said structure, what this specific embodiment was produced has the beneficial effect that:Described in this specific embodiment one The structure type of immersed tube tunnel final joint is planted, immersed tube final joints structure size is small, and prefabricated convenience, construction quality is easily protected Card;One side wedge shape, difficulty of construction is small, it is easy to which waterstop compresses, and FS final spice block is difficult to be extruded by water pressure;Prefabricated components are under water Docking, speed of application is fast, significantly reduces the difficulty of construction of artificial underwater operation workload and final structure, there is very big promotion price Value.
General principle of the invention and principal character and advantages of the present invention has been shown and described above.The skill of the industry Art personnel it should be appreciated that the present invention is not limited to the above embodiments, the simply explanation described in above-described embodiment and specification Principle of the invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and Its equivalent thereof.

Claims (4)

1. a kind of structure type of immersed tube tunnel final joint, it is characterised in that:It includes blinding layer, jack pushing tow system System, the adjacent long joint in both sides, end seal wall, the first firm end housing, one side wedge, GINA waterstops, the second firm end housing;Described base The adjacent long joint in both sides is provided with plinth bed course, jack pushing tow system is provided with the adjacent long joint in both sides, both sides are adjacent One side end face of long joint is wedge shape, and another side end face is perpendicular end surface, and both sides end face is mounted on firm end housing, and both sides are adjacent One side wedge is inserted between the both sides end face of long joint;The both sides end face of the adjacent long joint in described both sides is provided with first Firm end housing, the periphery of the first firm end housing is provided with GINA waterstops, end seal wall is provided with the adjacent long joint in both sides;Described The both sides of one side wedge are provided with the second firm end housing.
2. the structure type of a kind of immersed tube tunnel final joint according to claim 1, it is characterised in that:Described one side Wedge long joint top adjacent with both sides, base plate, shearing concrete is poured in the connection cavity of side wall.
3. the structure type of a kind of immersed tube tunnel final joint according to claim 1, it is characterised in that:Described both sides Slip casting is set between the FS final spice bottom of adjacent long joint and blinding layer.
4. the structure type of a kind of immersed tube tunnel final joint according to claim 1, it is characterised in that:Described one side Wedge is using prefabricated.
CN201710070498.2A 2017-02-09 2017-02-09 A kind of structure type of immersed tube tunnel final joint Pending CN106894449A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710070498.2A CN106894449A (en) 2017-02-09 2017-02-09 A kind of structure type of immersed tube tunnel final joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710070498.2A CN106894449A (en) 2017-02-09 2017-02-09 A kind of structure type of immersed tube tunnel final joint

Publications (1)

Publication Number Publication Date
CN106894449A true CN106894449A (en) 2017-06-27

Family

ID=59198599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710070498.2A Pending CN106894449A (en) 2017-02-09 2017-02-09 A kind of structure type of immersed tube tunnel final joint

Country Status (1)

Country Link
CN (1) CN106894449A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476343A (en) * 2017-08-31 2017-12-15 中交第二航务工程局有限公司 Rigid connection head grouting construction method
CN107524169A (en) * 2017-09-01 2017-12-29 中交第航务工程局有限公司 FS final spice installation method
CN107587522A (en) * 2017-08-30 2018-01-16 中交公路规划设计院有限公司 A kind of connection supports system and play movement support adjusting method
CN107676104A (en) * 2017-11-03 2018-02-09 中交公路规划设计院有限公司 Integrated immersed tube tube coupling and its installation method, the installation closure method of immersed tube tube coupling
CN108240001A (en) * 2018-01-29 2018-07-03 中交第航务工程局有限公司 Immersed tube tunnel final connector and its docking construction method
CN108560596A (en) * 2018-06-28 2018-09-21 中交第航务工程局有限公司 Reversible immersed tube tunnel final connector and its docking construction method
CN108755763A (en) * 2018-06-28 2018-11-06 上海市隧道工程轨道交通设计研究院 A kind of jacking segmentation immersed tube tunnel final joints structure and its construction method
CN111424717A (en) * 2020-03-31 2020-07-17 中交第三航务工程局有限公司 Artificial island pipe joint self-supply system for relay extension of suspended tunnel
CN112012242A (en) * 2020-05-07 2020-12-01 中交公路规划设计院有限公司 Push-out type final joint crimping method for immersed tube tunnel
CN112726652A (en) * 2020-12-16 2021-04-30 中交公路规划设计院有限公司 Box type foundation device for controlling tunnel push-out type joint settlement and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH261572A (en) * 1948-12-14 1949-05-31 Mueller Gerhard Process for the production of an underwater tunnel with exchangeable sections and a tunnel produced according to this process.
JPH0544395A (en) * 1991-08-13 1993-02-23 Penta Ocean Constr Co Ltd Final connection method of submerged box
JPH0544396A (en) * 1991-08-13 1993-02-23 Penta Ocean Constr Co Ltd Flexible connection method of final connection part of submerged box
JPH0579289A (en) * 1991-09-18 1993-03-30 Penta Ocean Constr Co Ltd Final connection for buried box
JP2009127259A (en) * 2007-11-22 2009-06-11 Penta Ocean Construction Co Ltd Method of finally connecting submerged caisson by key element method
CN202689040U (en) * 2012-05-25 2013-01-23 中铁十八局集团有限公司 Steel end seal wall structure for large immersed tunnel
CN105780812A (en) * 2016-05-16 2016-07-20 苏州大学 Immersed tunnel joint device and mounting method thereof
CN207160082U (en) * 2017-02-09 2018-03-30 中铁隧道勘测设计院有限公司 A kind of structure type of immersed tube tunnel final joint

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH261572A (en) * 1948-12-14 1949-05-31 Mueller Gerhard Process for the production of an underwater tunnel with exchangeable sections and a tunnel produced according to this process.
JPH0544395A (en) * 1991-08-13 1993-02-23 Penta Ocean Constr Co Ltd Final connection method of submerged box
JPH0544396A (en) * 1991-08-13 1993-02-23 Penta Ocean Constr Co Ltd Flexible connection method of final connection part of submerged box
JPH0579289A (en) * 1991-09-18 1993-03-30 Penta Ocean Constr Co Ltd Final connection for buried box
JP2009127259A (en) * 2007-11-22 2009-06-11 Penta Ocean Construction Co Ltd Method of finally connecting submerged caisson by key element method
CN202689040U (en) * 2012-05-25 2013-01-23 中铁十八局集团有限公司 Steel end seal wall structure for large immersed tunnel
CN105780812A (en) * 2016-05-16 2016-07-20 苏州大学 Immersed tunnel joint device and mounting method thereof
CN207160082U (en) * 2017-02-09 2018-03-30 中铁隧道勘测设计院有限公司 A kind of structure type of immersed tube tunnel final joint

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587522A (en) * 2017-08-30 2018-01-16 中交公路规划设计院有限公司 A kind of connection supports system and play movement support adjusting method
CN107476343A (en) * 2017-08-31 2017-12-15 中交第二航务工程局有限公司 Rigid connection head grouting construction method
CN107524169A (en) * 2017-09-01 2017-12-29 中交第航务工程局有限公司 FS final spice installation method
CN107676104A (en) * 2017-11-03 2018-02-09 中交公路规划设计院有限公司 Integrated immersed tube tube coupling and its installation method, the installation closure method of immersed tube tube coupling
CN108240001A (en) * 2018-01-29 2018-07-03 中交第航务工程局有限公司 Immersed tube tunnel final connector and its docking construction method
CN108240001B (en) * 2018-01-29 2024-02-02 中交第一航务工程局有限公司 Final joint for immersed tube tunnel and butt joint construction method thereof
CN108755763A (en) * 2018-06-28 2018-11-06 上海市隧道工程轨道交通设计研究院 A kind of jacking segmentation immersed tube tunnel final joints structure and its construction method
CN108755763B (en) * 2018-06-28 2023-11-28 上海市隧道工程轨道交通设计研究院 Final joint structure of immersed tube tunnel by jacking segment method and construction method of final joint structure
CN108560596A (en) * 2018-06-28 2018-09-21 中交第航务工程局有限公司 Reversible immersed tube tunnel final connector and its docking construction method
CN108560596B (en) * 2018-06-28 2024-02-02 中交第一航务工程局有限公司 Reversible immersed tube tunnel final joint and butt joint construction method thereof
CN111424717A (en) * 2020-03-31 2020-07-17 中交第三航务工程局有限公司 Artificial island pipe joint self-supply system for relay extension of suspended tunnel
CN111424717B (en) * 2020-03-31 2021-06-01 中交第三航务工程局有限公司 Artificial island pipe joint self-supply system for relay extension of suspended tunnel
CN112012242A (en) * 2020-05-07 2020-12-01 中交公路规划设计院有限公司 Push-out type final joint crimping method for immersed tube tunnel
CN112012242B (en) * 2020-05-07 2022-06-03 中交公路规划设计院有限公司 Push-out type final joint crimping method for immersed tube tunnel
CN112726652A (en) * 2020-12-16 2021-04-30 中交公路规划设计院有限公司 Box type foundation device for controlling tunnel push-out type joint settlement and construction method

Similar Documents

Publication Publication Date Title
CN106894449A (en) A kind of structure type of immersed tube tunnel final joint
CN106894448A (en) For the final joints structure form of immersed tube tunnel
CN106988346A (en) Immersed tube tunnel final joint and method for prefabricating, installation method
CN103835283B (en) Full wet joint prefabricated prestressed underground continuous wall and construction method thereof
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN102061710B (en) Diaphragm wall joint and manufacturing method of diaphragm wall
CN101956388A (en) Novel clamp device and fixing method for grouting risers of ocean platform
CN108035337B (en) The construction method of a kind of diaphram wall and applied to the connector in this method
CN103924581B (en) Prefabricated concrete-filled steel tube combining structure diaphragm wall and construction method thereof
CN207538837U (en) Integrated immersed tube tube coupling
CN205776157U (en) Assembled underground continuous wall
CN207160082U (en) A kind of structure type of immersed tube tunnel final joint
CN103122642A (en) Construction method of vertical post support change
CN207436107U (en) For the final joints structure form of immersed tube tunnel
CN108222656A (en) The construction method of Prefabricated enclosure wall
CN104314048A (en) Manufacturing and construction method of air bag type concrete engineering deformation joint water stop type cavity die
CN208039313U (en) A kind of immersed tube tunnel FS final spice
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall
CN110130667A (en) A kind of method of the pre-buried pipeline finished product protection of flooring
CN213776657U (en) Multiple sealed reinforced concrete pipe culvert with steel joint at socket end
CN110284527A (en) Underground anti-seepage connector and underground anti-seepage device
CN110984237A (en) Deformation joint composite leaking stoppage sealing system and construction method thereof
CN2613530Y (en) Intermediate set grout injection waterstop
CN110284528A (en) Underground anti-seepage film connector and underground anti-seepage film attachment device
CN204080870U (en) A kind of concrete work swaging die skeleton

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190213

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Applicant after: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

Address before: No. 1 Hebei street, Hongqiao District, Tianjin City, Tianjin

Applicant before: CHINA RAILWAY TUNNEL SURVEY & DESIGN INSTITUTE Co.,Ltd.

Applicant before: CHINA RAILWAY LIUYUAN GROUP Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627