A kind of construction site Novel wall rig
Technical field
The present invention relates to a kind of rig, more particularly to a kind of construction site Novel wall rig.
Background technology
Hole is processed drilling on solid material with drill bit.The hole machined of various parts, removes a part by car, boring, milling
Complete outer Deng lathe, completed using drilling machine and boring bar tool (drill bit, reamer, reamer etc.) by pincers worker.
When being drilled on drilling machine, generally, drill bit should simultaneously complete two motions;Main motion, i.e. drill bit are transported around the rotation of axis
Dynamic (cutting movement);Synkinesia, i.e. drill bit along axis direction against workpiece linear motion (feed motion), during drilling,
Mainly due to shortcoming present on drill bit structure, influence crudy, machining accuracy typically below IT10 grades, surface roughness
It is Ra12.5 μm or so, category roughing.
At present when the wall to construction site drills, major part is to wall using man-hour manually hand-held rig
Wall is drilled, but is so had the drawback that and be difficult to accomplish more accurately drilling to wall, because artificial hand
Hold rig and have very big shake, and during drilling, be also easy to the injury for occurring to workman, such as
Being short of physical strength in boring procedure causes the on slippery ground rig of workman.
Therefore need research and development one kind badly and more can accurately be drilled, the dangerous smaller, boring procedure of boring procedure is saved
When labour-saving construction site overcome with Novel wall rig it is artificial at present carry out that drilling is present to wall cannot more essence
True carrying out drills, boring procedure has the shortcomings that danger higher, boring procedure waste time and energy.
The content of the invention
(1)The technical problem to be solved
The present invention in order to overcome it is artificial at present wall is carried out drilling exist more cannot accurately be drilled, boring procedure has
Have the shortcomings that danger higher, boring procedure waste time and energy, the technical problem to be solved in the present invention is to provide can be more smart
A kind of construction site that true carrying out drills, the boring procedure smaller, boring procedure of danger is time saving and energy saving is drilled with Novel wall
Equipment.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a construction site Novel wall rig, including
There are base plate, the first guide rail, the first guide pin bushing, screw rod, briquetting, supporting plate, the first slide rail, the first sliding block, the first fixed plate, the first electricity
Machine and drill bit, middle part is provided with the first guide rail by way of welding on base plate, and slidingtype is connected with first and leads on the first guide rail
Set, the first guide pin bushing lower right-hand side is provided with screwed hole, and screw rod is placed with screwed hole, and screw rod coordinates with screwed hole, the rotation of screw rod left end
Rotatable to be connected with the first briquetting, the first guide pin bushing front side is provided with supporting plate by way of welding, and supporting plate upside left passes through
The mode of welding is provided with the first slide rail, and the first slide rail inner sliding type is connected with the first sliding block, and the first upper end of slide block is by welding
Mode the first fixed plate is installed, the mode that the first fixed plate upside is bolted is provided with the first motor, the first electricity
First motor output shaft of machine left end is connected with drill bit by shaft coupling.
Preferably, connecting plate, coolant pipe, block, contiguous block, spring and shower nozzle are also included, is led in the first fixed plate
The mode for crossing welding is provided with connecting plate, and connecting plate upside is provided with through hole, and coolant pipe, coolant pipe left side are placed with through hole
Top is connected with block, and coolant pipe left end is connected with contiguous block, and contiguous block right side is provided with spring, bullet by way of welding
Spring right-hand member is connected to connecting plate left side by way of welding, and on the outside of coolant pipe, contiguous block lower end is connected with spray to spring housing
Head.
Preferably, whirligig is also included, whirligig includes the second slide rail, the second sliding block, the second fixed plate, axle
Bearing, bull stick, first gear, the second motor and second gear, supporting plate are provided with whirligig, spiral shell are passed on left in supporting plate
Tether the mode for connecing and the second slide rail is installed, the second slide rail inner sliding type is connected with the second sliding block, and the second upper end of slide block is by weldering
The mode for connecing is provided with the mode that middle part is bolted in the second fixed plate, the second fixed plate, the second fixed plate and is provided with
Bull stick is installed by way of interference is connected, bull stick upper end is provided with first by way of welding in bearing block, bearing block
Fixed plate, the mode that bull stick upside is bolted is provided with right side in first gear, the second fixed plate and is bolted
Mode the second motor is installed, the second motor output shaft of the second motor upper end is connected with second gear by shaft coupling,
Two gears are engaged with first gear.
Preferably, the 3rd motor, the 3rd gear and the first tooth bar are also included, the second sliding block front side is bolted
Mode is provided with the 3rd motor, and the 3rd motor output shaft on front side of the 3rd motor is connected with the 3rd gear by shaft coupling, and second
The mode that slide rail inner underside is bolted is provided with the first tooth bar, and the 3rd gear is engaged with first.
Preferably, feed arrangement is also included, feed arrangement includes the 3rd slide rail, the second tooth bar, the 3rd sliding block, the 4th
Motor, the 4th gear, the first push rod, the 3rd fixed plate, motion bar and the second push rod, the first fixed plate are provided with feed arrangement,
The mode being bolted in first fixed plate is provided with the 3rd slide rail, and the 3rd slide rail upside is provided with by way of welding
3rd fixed plate, the mode being bolted in the 3rd fixed plate is provided with the first slide rail, and the 3rd slide rail inner underside passes through spiral shell
Tether the mode for connecing and the second tooth bar is installed, the 3rd slide rail inner sliding type is connected with the 3rd sliding block, and the 3rd sliding block front side passes through spiral shell
Tether the mode for connecing and the 4th motor is installed, the 4th motor output shaft on front side of the 4th motor is connected with the 4th tooth by shaft coupling
Wheel, the 4th gear is engaged with the second tooth bar, and the 3rd sliding block right-hand member is provided with the first push rod by way of welding, and the first push rod is right
End is provided with portable plate by way of welding, and portable plate upside left is provided with the second push rod, second by way of welding
Push rod left end is arranged on the first sliding block right-hand member by way of welding.
Preferably, the second guide pin bushing, the second guide rail, the 3rd tooth bar, the 5th motor and the 5th gear, the first guide pin bushing are also included
Front side is provided with the second guide pin bushing by way of welding, and the second guide pin bushing inner sliding type is connected with the second guide rail, the second guide rail left end
Supporting plate is installed by way of welding, the mode that the second guide rail upside is bolted is provided with the 3rd tooth bar, second
The mode that guide pin bushing right side top is bolted is provided with the 5th motor, and the 5th motor the 5th motor output shaft of front side is by connection
Axle device is connected with the 5th gear, and the 5th gear is engaged with the 3rd tooth bar.
Preferably, the material of base plate is stainless steel.
Preferably, the material of supporting plate is Q235 steel.
Preferably, the first motor, the second motor, the 3rd motor, the 4th motor and the 5th motor are servomotor.
Operation principle:When user needs to drill the wall in construction site, user can move the equipment
The position for needing drilling is moved, the first guide pin bushing is then moved, the first guide pin bushing drives supporting plate to move up and down, and supporting plate drives first
Slide rail and the first sliding block are moved up and down, so as to drive the first motor and drill bit to move up and down, are moved on the point of selected drilling, rotation
Turn the first screw rod, screw rod is by the way that in the guide pin bushing of cooperation precession first with screwed hole, screw rod promotes briquetting, briquetting to push down first and lead
Rail, so as to the first guide pin bushing to be fixed on this position on the first guide rail, then moves the first motor, and the first motor passes through first
Sliding block is moved and moved in the first slide rail, while opening the first motor, the first motor drives bit, so as to enter to wall
Row is bored.
Because also including connecting plate, coolant pipe, block, contiguous block, spring and shower nozzle, by weldering in the first fixed plate
The mode for connecing is provided with connecting plate, and connecting plate upside is provided with through hole, and coolant pipe, coolant pipe left side top are placed with through hole
Block is connected with, coolant pipe left end is connected with contiguous block, and contiguous block right side is provided with spring by way of welding, and spring is right
End is connected to connecting plate left side by way of welding, and on the outside of coolant pipe, contiguous block lower end is connected with shower nozzle to spring housing, when
User need when being cooled down to wall and drill bit during drilling, can by coolant by coolant pipe convey into
Come, then sprayed against wall and drill bit during drilling, and when drill bit gos deep into wall, contiguous block will connect
Wall is contacted, contiguous block will be promoted to move right, contiguous block compression spring, spring restores to the original state when drill bit is departed from wall
State promotes contiguous block to be moved to the left enables shower nozzle to be cooled down to it against drill bit all the time, protects drill bit, and block will keep off
Firmly coolant pipe will not be ejected directly.
Because also including whirligig, whirligig includes the second slide rail, the second sliding block, the second fixed plate, bearing
Seat, bull stick, first gear, the second motor and second gear, supporting plate are provided with whirligig, bolt are passed on left in supporting plate
The mode of connection is provided with the second slide rail, and the second slide rail inner sliding type is connected with the second sliding block, and the second upper end of slide block is by welding
Mode the second fixed plate is installed, the second fixed plate, the mode that middle part is bolted in the second fixed plate is provided with axle
Bull stick is installed by way of interference is connected, bull stick upper end is provided with first by way of welding and consolidated in bearing, bearing block
Fixed board, the mode that bull stick upside is bolted is provided with what right side in first gear, the second fixed plate was bolted
Mode is provided with the second motor, and the second motor output shaft of the second motor upper end is connected with second gear, second by shaft coupling
Gear is engaged with first gear, when user is needed to getting out angled hole, or pair is difficult to drill with some
When the angle of work is drilled, user can move the second sliding block and be moved on the second slide rail, and the second sliding block drives second to consolidate
Fixed board is moved, and when required position is moved to, opens the second motor, and the second motor drives second gear rotation, second gear band
Dynamic first gear rotation, first gear drives bull stick rotation, and bull stick drives the rotation of the first fixed plate, so that the first motor and brill
Head rotation, so that the angle of drill bit there occurs changes, also can just get out the hole of different angles also can be pair it is difficult to drill
Place drilled.
Because also including the 3rd motor, the 3rd gear and the first tooth bar, the side that the second sliding block front side is bolted
Formula is provided with the 3rd motor, and the 3rd motor output shaft on front side of the 3rd motor is connected with the 3rd gear by shaft coupling, and second slides
The mode that rail inner underside is bolted is provided with the first tooth bar, and the 3rd gear is engaged with first, and user can open the 3rd
Motor, the 3rd motor drives the rotation of the 3rd gear, and the 3rd gear is rotated on the first tooth bar, so as to drive the second sliding block second
Moved in slide rail.
Because also including feed arrangement, feed arrangement includes the 3rd slide rail, the second tooth bar, the 3rd sliding block, the 4th electricity
Machine, the 4th gear, the first push rod, the 3rd fixed plate, motion bar and the second push rod, the first fixed plate are provided with feed arrangement, the
The mode being bolted in one fixed plate is provided with the 3rd slide rail, and the 3rd slide rail upside is provided with the by way of welding
Three fixed plates, the mode being bolted in the 3rd fixed plate is provided with the first slide rail, and the 3rd slide rail inner underside passes through bolt
The mode of connection is provided with the second tooth bar, and the 3rd slide rail inner sliding type is connected with the 3rd sliding block, and the 3rd sliding block front side passes through bolt
The mode of connection is provided with the 4th motor, and the 4th motor output shaft on front side of the 4th motor is connected with the 4th tooth by shaft coupling
Wheel, the 4th gear is engaged with the second tooth bar, and the 3rd sliding block right-hand member is provided with the first push rod by way of welding, and the first push rod is right
End is provided with portable plate by way of welding, and portable plate upside left is provided with the second push rod, second by way of welding
Push rod left end is arranged on the first sliding block right-hand member by way of welding, and user can open the 4th motor when drilling, the
Four motors drive the 4th gear rotate counterclockwise, the 4th gear rotate counterclockwise on the second tooth bar, so as to drive the 3rd sliding block
It is moved to the left in the 3rd slide rail, the 3rd sliding block is moved to the left will drive the first push rod to be moved to the left with motion bar, motion bar
The second push rod will be promoted to be moved to the left, so that drive the first sliding block to be moved to the left in the first slide rail, so that the first motor belt motor
Drill bit to be moved to the left and then drill wall.
Because the second guide pin bushing, the second guide rail, the 3rd tooth bar, the 5th motor and the 5th gear are also included, before the first guide pin bushing
Side is provided with the second guide pin bushing by way of welding, and the second guide pin bushing inner sliding type is connected with the second guide rail, and the second guide rail left end leads to
The mode for crossing welding is provided with supporting plate, and the mode that the second guide rail upside is bolted is provided with the 3rd tooth bar, and second leads
The mode that set right side top is bolted is provided with the 5th motor, and the 5th motor output shaft of the 5th motor front side passes through shaft coupling
Device is connected with the 5th gear, and the 5th gear is engaged with the 3rd tooth bar, when user needs to drill farther wall, but
When wall lower section there are many reluctant debris, the 5th motor can be opened, the 5th motor drives the 5th gear clockwise
Rotation, the 5th gear turns clockwise on the 3rd tooth bar, so that drive the second guide rail to be moved to the left in the second guide pin bushing, second
Guide rail drives supporting plate to be moved to the left.
Because the material of base plate is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture service life.
Because the material of supporting plate is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device more
It is long.
Because the first motor, the second motor, the 3rd motor, the 4th motor and the 5th motor are servomotor, overload-resistant energy
Power is strong, and high speed performance is good, can be precisely controlled its rotating speed.
(3)Beneficial effect
Invention achieves more can accurately being drilled, the boring procedure smaller, boring procedure of danger it is time saving and energy saving
Effect, by way of automatic motion is carried out to drill bit using whirligig and feed arrangement, is not only able to safer wall
Wall is drilled, additionally it is possible to which the flexibility to drilling has larger lifting, that is to say, that more place can be drilled
Operation.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is second main structure diagram of the invention.
Fig. 3 is the first main structure diagram of whirligig of the present invention.
Fig. 4 is second main structure diagram of whirligig of the present invention.
Fig. 5 is the main structure diagram of feed arrangement of the present invention.
Fig. 6 is the third main structure diagram of the invention.
Mark in accompanying drawing for:1- base plates, the guide rails of 2- first, the guide pin bushings of 3- first, 4- screwed holes, 5- screw rods, 6- briquettings, 7-
Supporting plate, the slide rails of 8- first, the sliding blocks of 9- first, the fixed plates of 10- first, the motors of 11- first, 12- drill bits, 101- connecting plates,
102- through holes, 103- coolant pipes, 104- blocks, 105- contiguous blocks, 106- springs, 107- shower nozzles, 70- whirligigs, 701-
Second slide rail, the sliding blocks of 702- second, the fixed plates of 703- second, 704- bearing blocks, 705- bull sticks, 706- first gears, 707-
Two motors, 708- second gears, the motors of 7021- the 3rd, the gears of 7022- the 3rd, the tooth bars of 7023- first, 80- feed arrangements,
The slide rails of 801- the 3rd, the tooth bars of 802- second, the sliding blocks of 803- the 3rd, the motors of 804- the 4th, the gears of 805- the 4th, 806- first is pushed away
Bar, the fixed plates of 807- the 3rd, 808- motion bars, the push rods of 809- second, the guide pin bushings of 31- second, the guide rails of 32- second, the teeth of 33- the 3rd
Bar, the motors of 34- the 5th, the gears of 35- the 5th.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction site Novel wall rig, as shown in figures 1 to 6, includes base plate 1, the first guide rail 2, the first guide pin bushing
3rd, screw rod 5, briquetting 6, supporting plate 7, the first slide rail 8, the first sliding block 9, the first fixed plate 10, the first motor 11 and drill bit 12, bottom
Middle part is provided with the first guide rail 2 by way of welding on plate 1, and slidingtype is connected with the first guide pin bushing 3, first on the first guide rail 2
The lower right-hand side of guide pin bushing 3 is provided with screwed hole 4, screwed hole 4 and is placed with screw rod 5, and screw rod 5 coordinates with screwed hole 4, the rotation of the left end of screw rod 5
Rotatable to be connected with the first briquetting 6, the front side of the first guide pin bushing 3 is provided with supporting plate 7, the upside left of supporting plate 7 by way of welding
The first slide rail 8 is installed by way of welding, the inner sliding type of the first slide rail 8 is connected with the first sliding block 9, the upper end of the first sliding block 9
First fixed plate 10 is installed by way of welding, the mode that the upside of the first fixed plate 10 is bolted is provided with first
Motor 11, the output shaft of the first motor 11 of the left end of the first motor 11 is connected with drill bit 12 by shaft coupling.
Embodiment 2
A kind of construction site Novel wall rig, as shown in figures 1 to 6, includes base plate 1, the first guide rail 2, the first guide pin bushing
3rd, screw rod 5, briquetting 6, supporting plate 7, the first slide rail 8, the first sliding block 9, the first fixed plate 10, the first motor 11 and drill bit 12, bottom
Middle part is provided with the first guide rail 2 by way of welding on plate 1, and slidingtype is connected with the first guide pin bushing 3, first on the first guide rail 2
The lower right-hand side of guide pin bushing 3 is provided with screwed hole 4, screwed hole 4 and is placed with screw rod 5, and screw rod 5 coordinates with screwed hole 4, the rotation of the left end of screw rod 5
Rotatable to be connected with the first briquetting 6, the front side of the first guide pin bushing 3 is provided with supporting plate 7, the upside left of supporting plate 7 by way of welding
The first slide rail 8 is installed by way of welding, the inner sliding type of the first slide rail 8 is connected with the first sliding block 9, the upper end of the first sliding block 9
First fixed plate 10 is installed by way of welding, the mode that the upside of the first fixed plate 10 is bolted is provided with first
Motor 11, the output shaft of the first motor 11 of the left end of the first motor 11 is connected with drill bit 12 by shaft coupling.
Also include connecting plate 101, coolant pipe 103, block 104, contiguous block 105, spring 106 and shower nozzle 107, first
Connecting plate 101 is installed by way of welding, the upside of connecting plate 101 is provided with through hole 102, through hole 102 puts in fixed plate 10
Coolant pipe 103 is equipped with, the left side of coolant pipe 103 top is connected with block 104, and the left end of coolant pipe 103 is connected with contiguous block
105, the right side of contiguous block 105 is provided with spring 106 by way of welding, and the right-hand member of spring 106 is connected to by way of welding
The left side of connecting plate 101, spring 106 is enclosed within the outside of coolant pipe 103, and the lower end of contiguous block 105 is connected with shower nozzle 107.
Embodiment 3
A kind of construction site Novel wall rig, as shown in figures 1 to 6, includes base plate 1, the first guide rail 2, the first guide pin bushing
3rd, screw rod 5, briquetting 6, supporting plate 7, the first slide rail 8, the first sliding block 9, the first fixed plate 10, the first motor 11 and drill bit 12, bottom
Middle part is provided with the first guide rail 2 by way of welding on plate 1, and slidingtype is connected with the first guide pin bushing 3, first on the first guide rail 2
The lower right-hand side of guide pin bushing 3 is provided with screwed hole 4, screwed hole 4 and is placed with screw rod 5, and screw rod 5 coordinates with screwed hole 4, the rotation of the left end of screw rod 5
Rotatable to be connected with the first briquetting 6, the front side of the first guide pin bushing 3 is provided with supporting plate 7, the upside left of supporting plate 7 by way of welding
The first slide rail 8 is installed by way of welding, the inner sliding type of the first slide rail 8 is connected with the first sliding block 9, the upper end of the first sliding block 9
First fixed plate 10 is installed by way of welding, the mode that the upside of the first fixed plate 10 is bolted is provided with first
Motor 11, the output shaft of the first motor 11 of the left end of the first motor 11 is connected with drill bit 12 by shaft coupling.
Also include connecting plate 101, coolant pipe 103, block 104, contiguous block 105, spring 106 and shower nozzle 107, first
Connecting plate 101 is installed by way of welding, the upside of connecting plate 101 is provided with through hole 102, through hole 102 puts in fixed plate 10
Coolant pipe 103 is equipped with, the left side of coolant pipe 103 top is connected with block 104, and the left end of coolant pipe 103 is connected with contiguous block
105, the right side of contiguous block 105 is provided with spring 106 by way of welding, and the right-hand member of spring 106 is connected to by way of welding
The left side of connecting plate 101, spring 106 is enclosed within the outside of coolant pipe 103, and the lower end of contiguous block 105 is connected with shower nozzle 107.
Whirligig 70 is also included, whirligig 70 includes the second slide rail 701, the second sliding block 702, the second fixed plate
703rd, bearing block 704, bull stick 705, first gear 706, the second motor 707 and second gear 708, supporting plate 7 are provided with rotation
Bolted mode is passed on left in device 70, supporting plate 7 second slide rail 701 is installed, the inner sliding type of the second slide rail 701 connects
The second sliding block 702 is connected to, the upper end of the second sliding block 702 is provided with the second fixed plate 703, the second fixed plate by way of welding
703, the mode that middle part is bolted in the second fixed plate 703 is provided with and passes through interference in bearing block 704, bearing block 704
The mode of connection is provided with bull stick 705, and the upper end of bull stick 705 is provided with the first fixed plate 10 by way of welding, on bull stick 705
The mode that side is bolted is provided with first gear 706, and the mode that right side is bolted in the second fixed plate 703 is pacified
Equipped with the second motor 707, the output shaft of the second motor 707 of the upper end of the second motor 707 is connected with second gear by shaft coupling
708, second gear 708 is engaged with first gear 706.
Embodiment 4
A kind of construction site Novel wall rig, as shown in figures 1 to 6, includes base plate 1, the first guide rail 2, the first guide pin bushing
3rd, screw rod 5, briquetting 6, supporting plate 7, the first slide rail 8, the first sliding block 9, the first fixed plate 10, the first motor 11 and drill bit 12, bottom
Middle part is provided with the first guide rail 2 by way of welding on plate 1, and slidingtype is connected with the first guide pin bushing 3, first on the first guide rail 2
The lower right-hand side of guide pin bushing 3 is provided with screwed hole 4, screwed hole 4 and is placed with screw rod 5, and screw rod 5 coordinates with screwed hole 4, the rotation of the left end of screw rod 5
Rotatable to be connected with the first briquetting 6, the front side of the first guide pin bushing 3 is provided with supporting plate 7, the upside left of supporting plate 7 by way of welding
The first slide rail 8 is installed by way of welding, the inner sliding type of the first slide rail 8 is connected with the first sliding block 9, the upper end of the first sliding block 9
First fixed plate 10 is installed by way of welding, the mode that the upside of the first fixed plate 10 is bolted is provided with first
Motor 11, the output shaft of the first motor 11 of the left end of the first motor 11 is connected with drill bit 12 by shaft coupling.
Also include connecting plate 101, coolant pipe 103, block 104, contiguous block 105, spring 106 and shower nozzle 107, first
Connecting plate 101 is installed by way of welding, the upside of connecting plate 101 is provided with through hole 102, through hole 102 puts in fixed plate 10
Coolant pipe 103 is equipped with, the left side of coolant pipe 103 top is connected with block 104, and the left end of coolant pipe 103 is connected with contiguous block
105, the right side of contiguous block 105 is provided with spring 106 by way of welding, and the right-hand member of spring 106 is connected to by way of welding
The left side of connecting plate 101, spring 106 is enclosed within the outside of coolant pipe 103, and the lower end of contiguous block 105 is connected with shower nozzle 107.
Whirligig 70 is also included, whirligig 70 includes the second slide rail 701, the second sliding block 702, the second fixed plate
703rd, bearing block 704, bull stick 705, first gear 706, the second motor 707 and second gear 708, supporting plate 7 are provided with rotation
Bolted mode is passed on left in device 70, supporting plate 7 second slide rail 701 is installed, the inner sliding type of the second slide rail 701 connects
The second sliding block 702 is connected to, the upper end of the second sliding block 702 is provided with the second fixed plate 703, the second fixed plate by way of welding
703, the mode that middle part is bolted in the second fixed plate 703 is provided with and passes through interference in bearing block 704, bearing block 704
The mode of connection is provided with bull stick 705, and the upper end of bull stick 705 is provided with the first fixed plate 10 by way of welding, on bull stick 705
The mode that side is bolted is provided with first gear 706, and the mode that right side is bolted in the second fixed plate 703 is pacified
Equipped with the second motor 707, the output shaft of the second motor 707 of the upper end of the second motor 707 is connected with second gear by shaft coupling
708, second gear 708 is engaged with first gear 706.
The 3rd motor 7021, the 3rd gear 7022 and the first tooth bar 7023 are also included, the front side of the second sliding block 702 passes through spiral shell
Tether the mode for connecing and the 3rd motor 7021 is installed, the output shaft of the 3rd motor 7021 of the front side of the 3rd motor 7021 passes through shaft coupling
The 3rd gear 7022 is connected with, the mode that the inner underside of the second slide rail 701 is bolted is provided with the first tooth bar 7023, the 3rd
Gear 7022 is engaged with first.
Feed arrangement 80 is also included, feed arrangement 80 includes the 3rd slide rail 801, the second tooth bar 802, the 3rd sliding block
803rd, the 4th motor 804, the 4th gear 805, the first push rod 806, the 3rd fixed plate 807, the push rod 809 of motion bar 808 and second,
First fixed plate 10 is provided with feed arrangement 80, and the mode being bolted in the first fixed plate 10 is provided with the 3rd slide rail
801, the upside of the 3rd slide rail 801 is provided with the 3rd fixed plate 807 by way of welding, and bolt is passed through in the 3rd fixed plate 807
The mode of connection is provided with the first slide rail 8, and the mode that the inner underside of the 3rd slide rail 801 is bolted is provided with the second tooth bar
802, the inner sliding type of the 3rd slide rail 801 is connected with the 3rd sliding block 803, and the mode that the front side of the 3rd sliding block 803 is bolted is pacified
Equipped with the 4th motor 804, the output shaft of the 4th motor 804 of the front side of the 4th motor 804 is connected with the 4th gear by shaft coupling
805, the 4th gear 805 is engaged with the second tooth bar 802, and the right-hand member of the 3rd sliding block 803 is provided with the first push rod by way of welding
806, the right-hand member of the first push rod 806 is provided with portable plate by way of welding, and portable plate upside left is pacified by way of welding
Equipped with the second push rod 809, the left end of the second push rod 809 is arranged on the right-hand member of the first sliding block 9 by way of welding.
Also include the second guide pin bushing 31, the second guide rail 32, the 3rd tooth bar 33, the 5th motor 34 and the 5th gear 35, first
The front side of guide pin bushing 3 is provided with the second guide pin bushing 31 by way of welding, and the inner sliding type of the second guide pin bushing 31 is connected with the second guide rail 32, the
The left end of two guide rail 32 is provided with supporting plate 7 by way of welding, and the mode that the upside of the second guide rail 32 is bolted is installed
There is the 3rd tooth bar 33, the mode that the right side of the second guide pin bushing 31 top is bolted is provided with the 5th motor 34, the 5th motor 34
The output shaft of the 5th motor of front side 34 is connected with the 5th gear 35 by shaft coupling, and the 5th gear 35 is engaged with the 3rd tooth bar 33.
The material of base plate 1 is stainless steel.
The material of supporting plate 7 is Q235 steel.
First motor 11, the second motor 707, the 3rd motor 7021, the 4th motor 804 and the 5th motor 34 are servo electricity
Machine.
Operation principle:When user needs to drill the wall in construction site, user can move the equipment
The position for needing drilling is moved, the first guide pin bushing 3 is then moved, the first guide pin bushing 3 drives supporting plate 7 to move up and down, and supporting plate 7 drives
First slide rail 8 and the first sliding block 9 are moved up and down, so as to drive the first motor 11 and drill bit 12 to move up and down, move to selected brill
On the point in hole, the first screw rod 5 is rotated, screw rod 5 is by the way that in the first guide pin bushing of cooperation precession 3 with screwed hole 4, screw rod 5 promotes briquetting
6, briquetting 6 pushes down the first guide rail 2, so as to the first guide pin bushing 3 to be fixed on this position on the first guide rail 2, then moves first
Motor 11, the first motor 11 is moved by the first sliding block 9 and moved in the first slide rail 8, while opening the first motor 11, first
Motor 11 drives drill bit 12 to rotate, so as to carry out boring to wall.
Because also including connecting plate 101, coolant pipe 103, block 104, contiguous block 105, spring 106 and shower nozzle 107,
Connecting plate 101 is installed by way of welding, the upside of connecting plate 101 is provided with through hole 102, through hole 102 in first fixed plate 10
Coolant pipe 103 is inside placed with, the left side of coolant pipe 103 top is connected with block 104, and the left end of coolant pipe 103 is connected with
Block 105 is connect, the right side of contiguous block 105 is provided with spring 106 by way of welding, and the right-hand member of spring 106 is connected by way of welding
Be connected on the left side of connecting plate 101, spring 106 is enclosed within the outside of coolant pipe 103, and the lower end of contiguous block 105 is connected with shower nozzle 107, when with
Family needs, when wall and drill bit 12 is cooled down during drilling, coolant can be conveyed by coolant pipe 103
Come in, then sprayed against wall and drill bit 12 during drilling, and when drill bit 12 gos deep into wall, connection
Block 105 will promote contiguous block 105 to move right into contact with wall, and the compression spring 106 of contiguous block 105 makes drill bit 12 depart from wall
The reinstatement state of spring 106 promotes contiguous block 105 to be moved to the left when wall enables shower nozzle 107 right against drill bit 12 all the time
It is cooled down, and protects drill bit 12, and block 104 will block coolant pipe 103 and will not directly eject.
Because also including whirligig 70, whirligig 70 includes the second slide rail 701, the second sliding block 702, second and consolidates
Fixed board 703, bearing block 704, bull stick 705, first gear 706, the second motor 707 and second gear 708, supporting plate 7 are provided with
Bolted mode is passed on left in whirligig 70, supporting plate 7 second slide rail 701 is installed, slided in the second slide rail 701
Formula is connected with the second sliding block 702, and the upper end of the second sliding block 702 is provided with the second fixed plate 703 by way of welding, and second fixes
Plate 703, the mode that middle part is bolted in the second fixed plate 703 is provided with bearing block 704, bearing block 704 and passed through
The mode of connection of being full of is provided with bull stick 705, and the upper end of bull stick 705 is provided with the first fixed plate 10, bull stick 705 by way of welding
The mode that upside is bolted is provided with first gear 706, the mode that right side is bolted in the second fixed plate 703
Second motor 707 is installed, the output shaft of the second motor 707 of the upper end of the second motor 707 is connected with second gear by shaft coupling
708, second gear 708 is engaged with first gear 706, when user need to getting out angled hole when, or pair and one
A bit it is difficult to when the angle for carrying out boring work is drilled, user can move the second sliding block 702 and be moved on the second slide rail 701
Dynamic, the second sliding block 702 drives the second fixed plate 703 to move, and when required position is moved to, opens the second motor 707, the second electricity
Machine 707 drives second gear 708 to rotate, and second gear 708 drives first gear 706 to rotate, and first gear 706 drives bull stick
705 rotations, bull stick 705 drives the first fixed plate 10 to rotate, so that the first motor 11 and drill bit 12 rotate, so that drill bit 12
Angle there occurs change, also can just get out the hole of different angles also can pair place for being difficult to be drilled drill.
Because also including the 3rd motor 7021, the 3rd gear 7022 and the first tooth bar 7023, the front side of the second sliding block 702 is logical
Cross bolted mode and the 3rd motor 7021 is installed, the output shaft of the 3rd motor 7021 of the front side of the 3rd motor 7021 is by connection
Axle device is connected with the 3rd gear 7022, and the mode that the inner underside of the second slide rail 701 is bolted is provided with the first tooth bar 7023,
3rd gear 7022 is engaged with first, and user can open the 3rd motor 7021, and the 3rd motor 7021 drives the 3rd gear 7022
Rotation, the 3rd gear 7022 is rotated on the first tooth bar 7023, so as to drive the second sliding block 702 to be moved in the second slide rail 701.
Because also including feed arrangement 80, feed arrangement 80 includes the 3rd slide rail 801, the second tooth bar 802, the 3rd cunning
Block 803, the 4th motor 804, the 4th gear 805, the first push rod 806, the 3rd fixed plate 807, the push rod of motion bar 808 and second
809, the first fixed plate 10 is provided with feed arrangement 80, and the mode being bolted in the first fixed plate 10 is provided with the 3rd cunning
Rail 801, the upside of the 3rd slide rail 801 is provided with the 3rd fixed plate 807 by way of welding, and spiral shell is passed through in the 3rd fixed plate 807
Tether the mode for connecing and the first slide rail 8 is installed, the mode that the inner underside of the 3rd slide rail 801 is bolted is provided with the second tooth bar
802, the inner sliding type of the 3rd slide rail 801 is connected with the 3rd sliding block 803, and the mode that the front side of the 3rd sliding block 803 is bolted is pacified
Equipped with the 4th motor 804, the output shaft of the 4th motor 804 of the front side of the 4th motor 804 is connected with the 4th gear by shaft coupling
805, the 4th gear 805 is engaged with the second tooth bar 802, and the right-hand member of the 3rd sliding block 803 is provided with the first push rod by way of welding
806, the right-hand member of the first push rod 806 is provided with portable plate by way of welding, and portable plate upside left is pacified by way of welding
Equipped with the second push rod 809, the left end of the second push rod 809 is arranged on the right-hand member of the first sliding block 9 by way of welding, and user is in drilling
When, can open the 4th motor 804, the 4th motor 804 drives the rotate counterclockwise of the 4th gear 805, and the 4th gear 805 is the
Rotate counterclockwise on two tooth bars 802, so that drive the 3rd sliding block 803 to be moved to the left in the 3rd slide rail 801, the 3rd sliding block 803
Being moved to the left will drive the first push rod 806 to be moved to the left with motion bar 808, and motion bar 808 will promote the second push rod 809 to the left
It is mobile, so as to drive the first sliding block 9 to be moved to the left in the first slide rail 8 so that the first motor 11 with drill bit 12 to moving to left
It is dynamic that then wall is drilled.
Because also including the second guide pin bushing 31, the second guide rail 32, the 3rd tooth bar 33, the 5th motor 34 and the 5th gear 35,
The front side of first guide pin bushing 3 is provided with the second guide pin bushing 31 by way of welding, and the inner sliding type of the second guide pin bushing 31 is connected with the second guide rail
32, the left end of the second guide rail 32 is provided with supporting plate 7, the mode that the upside of the second guide rail 32 is bolted by way of welding
3rd tooth bar 33 is installed, the mode that the right side of the second guide pin bushing 31 top is bolted is provided with the 5th motor 34, the 5th electricity
The front side of machine 34 output shaft of the 5th motor 34 is connected with the 5th gear 35 by shaft coupling, and the 5th gear 35 is nibbled with the 3rd tooth bar 33
Close, when user needs to drill farther wall, but wall lower section is when there are many reluctant debris, can be with
The 5th motor 34 is opened, the 5th motor 34 drives the 5th gear 35 to turn clockwise, and the 5th gear 35 is suitable on the 3rd tooth bar 33
Hour hands rotate, so as to drive the second guide rail 32 to be moved to the left in the second guide pin bushing 31, the second guide rail 32 drives supporting plate 7 to moving to left
It is dynamic.
Because the material of base plate 1 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture the use longevity
Life.
Because the material of supporting plate 7 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device more
It is long.
Because the first motor 11, the second motor 707, the 3rd motor 7021, the 4th motor 804 and the 5th motor 34 are servo
Motor, anti-overload ability is strong, and high speed performance is good, can be precisely controlled its rotating speed.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.