CN106885335A - The automatically updating method and system of air-conditioner - Google Patents
The automatically updating method and system of air-conditioner Download PDFInfo
- Publication number
- CN106885335A CN106885335A CN201710072492.9A CN201710072492A CN106885335A CN 106885335 A CN106885335 A CN 106885335A CN 201710072492 A CN201710072492 A CN 201710072492A CN 106885335 A CN106885335 A CN 106885335A
- Authority
- CN
- China
- Prior art keywords
- air
- conditioner
- upgrading data
- server
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
Abstract
The invention discloses a kind of automatically updating method of air-conditioner, comprise the following steps:Server obtains the current operational factor of the first air-conditioner, and the operational factor that will be got is sent to Evaluation Before Upgrade device;When operational factor is received, Evaluation Before Upgrade device determines whether the first air-conditioner meets default promotion condition based on operational factor;When the first air-conditioner meets default promotion condition, Evaluation Before Upgrade device obtains the corresponding first upgrading data of operational factor, and by the first upgrading data is activation to server;When the first upgrading data are received, server is by the first upgrading data is activation to the first air-conditioner.The invention also discloses a kind of automatic updating system of air-conditioner.The present invention realizes air-conditioner is upgraded according to the operational factor of air-conditioner, and then realize the automatic upgrading of air-conditioner, solve artificial air-conditioning mainboard of changing come the low technical problem of efficiency by way of updating air conditioner operation parameters, substantially increase the liter stage efficiency of air-conditioner.
Description
Technical field
The present invention relates to air-conditioner technical field, more particularly to a kind of air-conditioner automatically updating method and system.
Background technology
With the development of air conditioner controlling technology, current most of air-conditioner sets using electronic memory chip (such as ROM) come
Operational factor to air-conditioner set is stored, such as when air-conditioner set dispatches from the factory, the operational factor that technical staff configures is consolidated
Change in the ROM of air-conditioner set.
The refrigeration system of the air-conditioning system such as air-conditioning system, especially multi-connected air conditioning system, large centrifugal unit, module unit
System, control system etc. are extremely complex, and the upgrading of air-conditioning system is often faced with needs professional and technical personnel to visit renewal air-conditioning system
System, realizes the upgrading of air-conditioning system, but, it is this less efficient by way of artificial regeneration air-conditioning system.For example, in air-conditioning
When system there is a problem and need to update, because the parts such as electronic chip, the controller of air-conditioner set are all fixed on air conditioner
On the mainboard of group, technical staff needs the mainboard of integral replacing air-conditioner set to change electronic memory chip, so as to realize air-conditioning
The renewal of unit operation parameter, so not only process cycle is more long, and causes the waste on cost.
The content of the invention
The present invention provides the automatically updating method and system of a kind of air-conditioner, it is intended to solve to pass through artificial regeneration air-conditioning system
The less efficient technical problem of mode.
To achieve the above object, the present invention provide a kind of air-conditioner automatically updating method, the air-conditioner it is automatic
Upgrade method is comprised the following steps:
Server obtains the current operational factor of the first air-conditioner, and the operational factor that will be got is sent to upgrading
Apparatus for evaluating;
When the operational factor is received, the Evaluation Before Upgrade device determines that described first is empty based on the operational factor
Adjust whether device meets default promotion condition;
When first air-conditioner meets default promotion condition, the Evaluation Before Upgrade device obtains the operational factor pair
The the first upgrading data answered, and described first will upgrade data is activation to the server;
When the first upgrading data are received, the server described first will upgrade data is activation to described first
Air-conditioner, updating operation is carried out so that first air-conditioner is based on the described first upgrading data.
Preferably, the Evaluation Before Upgrade device determines whether first air-conditioner meets default based on the operational factor
The step of promotion condition, includes:
The Evaluation Before Upgrade device obtains default corresponding to the design temperature and environment temperature of first air-conditioner
Parameter;
The Evaluation Before Upgrade device determines that the operational factor determines that first air-conditioner is based on the parameter preset
It is no to meet default promotion condition.
Preferably, the server by described first upgrading data is activation to first air-conditioner the step of include:
The server obtains the performance parameter of first air-conditioner;
The performance parameter that the server is based on getting determines the first upgrading data and first air-conditioning
Whether device matches;
Described first upgrading data match with first air-conditioner when, the server by described first upgrading data
Send to first air-conditioner.
Preferably, the automatically updating method of the air-conditioner also includes:
When customization upgrade request is received, it is corresponding to be upgraded that the server obtains the customization upgrade request
Parameter, and the parameter described to be upgraded that will be got sent to Evaluation Before Upgrade device;
When the parameter to be upgraded is received, the Evaluation Before Upgrade device is based on preset rules to the parameter to be upgraded
Carry out verification operation;
When the Verification to be upgraded passes through, the Evaluation Before Upgrade device obtains the parameter to be upgraded corresponding the
Two upgrading data, and described second will upgrade data is activation to the server;
When the second upgrading data are received, the server described second will upgrade data is activation to described second
Air-conditioner, is upgraded so that second air-conditioner is based on the described second upgrading data.
Preferably, the server by described second upgrading data is activation to second air-conditioner the step of include:
The server obtains the performance parameter of second air-conditioner;
The performance parameter that the server is based on getting determines the second upgrading data and second air-conditioning
Whether device matches;
Described second upgrading data match with second air-conditioner when, the server by described second upgrading data
Send to second air-conditioner.
Additionally, to achieve the above object, the present invention also provides a kind of automatic updating system of air-conditioner, the air-conditioner
Automatic updating system includes:Server and Evaluation Before Upgrade device;Wherein,
The server includes:
First acquisition module, the operational factor current for obtaining the first air-conditioner, and the operation ginseng that will be got
Number is sent to Evaluation Before Upgrade device;
First sending module, for when the first upgrading data are received, data is activation being upgraded extremely by described first
First air-conditioner, updating operation is carried out so that first air-conditioner is based on the described first upgrading data;
The Evaluation Before Upgrade device includes:
Determining module, for when the operational factor is received, first air-conditioning being determined based on the operational factor
Whether device meets default promotion condition;
Second acquisition module, for when first air-conditioner meets default promotion condition, obtaining the operational factor
Corresponding first upgrading data, and described first will upgrade data is activation to the server.
Preferably, the determining module includes:
First acquisition unit, it is default corresponding to the design temperature and environment temperature of first air-conditioner for obtaining
Parameter;
First determining unit, for determining that the operational factor determines that first air-conditioner is based on the parameter preset
It is no to meet default promotion condition.
Preferably, first sending module includes:
Second acquisition unit, the performance parameter for obtaining first air-conditioner;
Second determining unit, for determining the first upgrading data and described the based on the performance parameter for getting
Whether one air-conditioner matches;
First transmitting element, for when the described first upgrading data are matched with first air-conditioner, by described first
Upgrading data is activation is to first air-conditioner.
Preferably, the server also includes:
3rd acquisition module, for when customization upgrade request is received, obtaining the customization upgrade request correspondence
Parameter to be upgraded, and the parameter described to be upgraded that will be got sent to Evaluation Before Upgrade device;
Second sending module, for when the second upgrading data are received, data is activation being upgraded extremely by described second
Second air-conditioner, is upgraded so that second air-conditioner is based on the described second upgrading data;
The Evaluation Before Upgrade device also includes:
Authentication module, for when the parameter to be upgraded is received, being entered to the parameter to be upgraded based on preset rules
Row verification operation;
4th acquisition module, for when the Verification to be upgraded passes through, obtaining the parameter to be upgraded corresponding
Second upgrading data, and described second will upgrade data is activation to the server.
Preferably, second sending module includes:
3rd acquiring unit, the performance parameter for obtaining second air-conditioner;
3rd determining unit, for determining the second upgrading data and described the based on the performance parameter for getting
Whether two air conditioner matches;
Second transmitting element, for when the described second upgrading data are matched with second air-conditioner, by described second
Upgrading data is activation is to second air-conditioner.
The present invention obtains the current operational factor of the first air-conditioner by server, and the operational factor that will be got sends
To Evaluation Before Upgrade device, then Evaluation Before Upgrade device determines whether the first air-conditioner meets default upgrading bar based on operational factor
Part, then when the first air-conditioner meets default promotion condition, Evaluation Before Upgrade device obtains corresponding first upgrading of operational factor
Data, and by the first upgrading data is activation to server, then server is by the first upgrading data is activation to the first air-conditioner, with
Being based on the first upgrading data for the first air-conditioner carries out updating operation, realizes air-conditioner is entered according to the operational factor of air-conditioner
Row upgrading, and then the automatic upgrading of air-conditioner is realized, solve by artificial replacing air-conditioning mainboard to update operation of air conditioner ginseng
The low technical problem of several mode efficiency, substantially increases the liter stage efficiency of air-conditioner.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the automatically updating method first embodiment of air-conditioner of the present invention;
Fig. 2 be air-conditioner of the present invention automatically updating method second embodiment in Evaluation Before Upgrade device be based on it is described operation ginseng
Number determines whether first air-conditioner meets the refinement schematic flow sheet of default promotion condition step;
Fig. 3 be air-conditioner of the present invention automatically updating method 3rd embodiment described in server by first ascending series
According to the refinement schematic flow sheet sent to the first air-conditioner step;
Fig. 4 is the schematic flow sheet of the automatically updating method fourth embodiment of air-conditioner of the present invention;
Fig. 5 be air-conditioner of the present invention the embodiment of automatically updating method the 5th described in server by second ascending series
According to the refinement schematic flow sheet sent to the second air-conditioner step;
Fig. 6 is the high-level schematic functional block diagram of the automatic updating system first embodiment of air-conditioner of the present invention;
Fig. 7 be air-conditioner of the present invention automatic updating system second embodiment in determining module refinement functional module illustrate
Figure;
Fig. 8 be air-conditioner of the present invention automatic updating system 3rd embodiment in the first sending module refinement functional module
Schematic diagram;
Fig. 9 is the high-level schematic functional block diagram of the automatic updating system fourth embodiment of air-conditioner of the present invention;
Figure 10 be air-conditioner of the present invention the embodiment of automatic updating system the 5th in the second sending module refinement function mould
Block schematic diagram.
The realization of the object of the invention, functional characteristics and advantage will be described further referring to the drawings in conjunction with the embodiments.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of automatically updating method of air-conditioner.Reference picture 1, Fig. 1 is the automatic liter of air-conditioner of the present invention
The schematic flow sheet of level method first embodiment.
In the present embodiment, the automatically updating method of the air-conditioner includes:
Step S10, server obtains the current operational factor of the first air-conditioner, and the operational factor hair that will be got
Deliver to Evaluation Before Upgrade device;
In the present embodiment, server can in real time after the current operation ginseng of each air-conditioner for communicating with of timing acquisition
Count, the environment temperature, the air-conditioner residing for operational mode of the operational factor including air-conditioner, design temperature, the air-conditioner
The data such as operating pressure, the running temperature of the air-conditioner, the running current of the air-conditioner.
Server can be Cloud Server using remote server, be communicated by between real-time performance and air-conditioner, with
Obtain the current operational factor of air-conditioner.
In the present embodiment, when the operational factor of the first air-conditioner is got, server by the operational factor send to
Evaluation Before Upgrade device, so that the Evaluation Before Upgrade device judges whether first air-conditioner can currently upgrade based on the operational factor
Whether meet default promotion condition.
Step S20, when the operational factor is received, the Evaluation Before Upgrade device determines institute based on the operational factor
State whether the first air-conditioner meets default promotion condition;
In the present embodiment, when the current operational factor of the first air-conditioner is received, Evaluation Before Upgrade device is based on the fortune
Line parameter determines whether first air-conditioner meets default promotion condition, and specifically, Evaluation Before Upgrade device is by current operation
Parameter obtains the current design temperature of first air-conditioner and environment temperature, then obtains the design temperature and environment temperature
Whether the parameter preset of corresponding air-conditioner, is then contrasted parameter preset with operational factor, determines the first air-conditioner
Meet default promotion condition;For example, operational factor is the operating pressure of the first air-conditioner, then parameter preset be design temperature and
The pre-set pressure range of the operating pressure of the first air-conditioner corresponding to environment temperature, in the operating pressure of current first air-conditioner
When outside the pre-set pressure range, determine that the first air-conditioner meets default promotion condition;Or, operational factor is the first air-conditioning
The running temperature of device, then the running temperature of first air-conditioner of the parameter preset corresponding to design temperature and environment temperature is pre-
If temperature range, current first air-conditioner running temperature outside the preset temperature range when, determine that the first air-conditioner is expired
The default promotion condition of foot;Or, operational factor is the running current of the first air-conditioner, then parameter preset be design temperature and
The predetermined current scope of the running current of the first air-conditioner corresponding to environment temperature, in the running temperature of current first air-conditioner
When outside the preset temperature range, determine that the first air-conditioner meets default promotion condition;Certainly, Evaluation Before Upgrade device gets
The current operational factor of air-conditioner be not limited to above-mentioned parameter, and above-mentioned parameters can be combined and use, for example, operational factor bag
Include operating pressure, the running temperature of the air-conditioner, the running current of the air-conditioner of the air-conditioner, if can by wherein certain
One parameter determination default promotion condition of first air-conditioner satisfaction, then judge that current first air-conditioner meets and preset upgrading bar
Part.
Step S30, when first air-conditioner meets default promotion condition, the Evaluation Before Upgrade device obtains the fortune
The corresponding first upgrading data of line parameter, and described first will upgrade data is activation to the server;
In the present embodiment, Evaluation Before Upgrade device can directly generate the first upgrading data according to the operational factor, certainly,
Evaluation Before Upgrade device in advance according to the corresponding various operational factor generation upgrading data of first air-conditioner, and this can also be upgraded
In data storage to local data base or server, when first air-conditioner meets default promotion condition, Evaluation Before Upgrade
Device can search corresponding first upgrading data according to the operational factor in local data base or server.Getting
During one upgrading data, Evaluation Before Upgrade device described first will upgrade data is activation to the server.
Step S40, when the first upgrading data are received, the server upgrades data is activation extremely by described first
First air-conditioner, updating operation is carried out so that first air-conditioner is based on the described first upgrading data.
In the present embodiment, when the first upgrading data are got, server by the first upgrading data is activation to this
One air-conditioner, the first air-conditioner carries out updating operation when the first upgrading data are received based on the first upgrading data, should
Updating operation includes updating the parameter of the first air-conditioner, and then realizes the automatic upgrading of the first air-conditioner.
It is emphasized that Evaluation Before Upgrade device can be arranged on server, or single terminal.In this reality
Apply in example, to improve the accuracy of air-conditioner upgrading, can determine that the first air-conditioner meets default upgrading bar in Evaluation Before Upgrade device
During part, assessed again according to information such as the operational factors of first air-conditioner by expert group, to ensure first air-conditioner
It is current to need upgrading really, it is to avoid to cause air-conditioner to be risen because of the operational factor that the first air-conditioner is operated under special state
Level.
In the present embodiment, for that cannot send the operational factor of itself to the air-conditioner of server, it is impossible to according to connecing
The the first upgrading data for receiving carry out the air-conditioner of automatic upgrading, or cannot to receive the air-conditioner of the first upgrading data etc. existing
Air-conditioner, for the ease of the automatic upgrading of above-mentioned air-conditioner, corresponding automatic update device can be installed in above-mentioned air-conditioner,
The automatic update device can be with the operational factor of Real-time Collection air-conditioner, and server obtains the sky that the automatic update device is collected
The operational factor of device is adjusted, and by the first upgrading data is activation to the automatic update device, the automatic update device is receiving the
During one upgrading data, updating operation is carried out according to the first upgrading data control air-conditioner.
The automatically updating method of the air-conditioner that the present embodiment is proposed, the current operation of the first air-conditioner is obtained by server
Parameter, and the operational factor that will be got sent to Evaluation Before Upgrade device, then Evaluation Before Upgrade device is determined based on operational factor
Whether the first air-conditioner meets default promotion condition, then when the first air-conditioner meets default promotion condition, Evaluation Before Upgrade dress
The corresponding first upgrading data of acquisition operational factor are put, and by the first upgrading data is activation to server, then server is by the
One upgrading data is activation to the first air-conditioner, updating operation is carried out so that the first air-conditioner is based on the first upgrading data, is realized
Operational factor according to air-conditioner is upgraded to air-conditioner, and then realizes the automatic upgrading of air-conditioner, is solved by people
Work changes the air-conditioning mainboard technical problem low to update the mode efficiency of air conditioner operation parameters, substantially increases the upgrading of air-conditioner
Efficiency.
The second embodiment of the automatically updating method of air-conditioner of the present invention, reference picture 2, at this are proposed based on first embodiment
In embodiment, step S20 includes:
Step S21, design temperature and the environment temperature institute that the Evaluation Before Upgrade device obtains first air-conditioner is right
The parameter preset answered;
In the present embodiment, when the current operational factor of the first air-conditioner is got, Evaluation Before Upgrade device is by current
Operational factor obtain the current design temperature of the first air-conditioner and environment temperature, then obtain the design temperature and environment
The parameter preset of the first air-conditioner corresponding to temperature, wherein, parameter preset includes the default of the operating pressure of the first air-conditioner
The default electricity of the running current of pressure limit, the preset temperature range of the running temperature of the first air-conditioner and/or the first air-conditioner
Stream scope.
Step S22, the Evaluation Before Upgrade device determines that the operational factor determines described first based on the parameter preset
Whether air-conditioner meets default promotion condition.
In the present embodiment, when parameter preset is got, it is described that Evaluation Before Upgrade device is based on parameter preset determination
Operational factor determines whether first air-conditioner meets default promotion condition.Specifically, parameter preset is entered with operational factor
Row contrast, determines whether the first air-conditioner meets default promotion condition;For example, operational factor is the operation pressure of the first air-conditioner
Power, then parameter preset is the preset pressure model of the operating pressure of design temperature and the first air-conditioner corresponding to environment temperature
Enclose, current first air-conditioner operating pressure outside the pre-set pressure range when, determine that the first air-conditioner meets default liter
Level condition;Or, operational factor is the running temperature of the first air-conditioner, then parameter preset is design temperature and environment temperature institute
The preset temperature range of the running temperature of corresponding first air-conditioner, current first air-conditioner running temperature in the default temperature
When outside degree scope, determine that the first air-conditioner meets default promotion condition;Or, operational factor is the operation of the first air-conditioner
Electric current, then parameter preset is the predetermined current model of the running current of design temperature and the first air-conditioner corresponding to environment temperature
Enclose, current first air-conditioner running temperature outside the preset temperature range when, determine that the first air-conditioner meets default liter
Level condition;Certainly, the current operational factor of the first air-conditioner is not limited to above-mentioned parameter, and above-mentioned parameters can be combined and use,
For example, operating pressure of the operational factor including first air-conditioner, the running temperature of first air-conditioner, first air-conditioner
Running current, as long as default promotion condition can be met by wherein some air-conditioner of parameter determination first, then judges current
First air-conditioner meets default promotion condition.
The automatically updating method of the air-conditioner that the present embodiment is proposed, first air-conditioner is obtained by Evaluation Before Upgrade device
Design temperature and environment temperature corresponding to parameter preset, then the Evaluation Before Upgrade device be based on the parameter preset it is true
The fixed operational factor determines whether first air-conditioner meets default promotion condition, realizes and is joined according to the operation of air-conditioner
Number and parameter preset accurately determine whether air-conditioner meets default promotion condition, and then improve the accurate of air-conditioner upgrading
Property, improve the efficiency of air-conditioner upgrading.
The 3rd embodiment of the automatically updating method of air-conditioner of the present invention, reference picture 3, at this are proposed based on first embodiment
In embodiment, step S40 includes:
Step S41, the server obtains the performance parameter of first air-conditioner;
In the present embodiment, when the first upgrading data are got, server obtains the performance parameter of first air-conditioner,
Wherein, minimum temperature and maximum temperature of the performance parameter under the rated power, refrigeration mode of first air-conditioner etc..
Step S42, the server be based on the performance parameter that gets determine the first upgrading data with it is described
Whether the first air-conditioner matches;
In the present embodiment, when the performance parameter of the first air-conditioner is got, server is based on the property for getting
Whether the first upgrading data match with first air-conditioner described in energy parameter determination, specifically, for example, in the first upgrading data
Including under the first air-conditioner refrigeration mode during the regulation information of peak power, if the corresponding peak power of regulation information is less than
The rated power of first air-conditioner, it is determined that the first upgrading data are matched with first air-conditioner.
Step S43, when the described first upgrading data are matched with first air-conditioner, the server is by described first
Upgrading data is activation is to first air-conditioner.
In the present embodiment, when the described first upgrading data are matched with first air-conditioner, server is by described the
One upgrading data is activation in order to the first air-conditioner when the first upgrading data are received, is based on to first air-conditioner
The first upgrading data carry out updating operation, and then realize the automatic upgrading of air-conditioner.
The automatically updating method of the air-conditioner that the present embodiment is proposed, the performance of first air-conditioner is obtained by server
Parameter, the performance parameter that then server is based on getting determines that the first upgrading data are with first air-conditioner
No matching, then described first upgrading data match with first air-conditioner when, server by described first upgrading data
Send to first air-conditioner, realize the first upgrading data is activation when the first upgrading data are matched with the air-conditioner
To first air-conditioner, so that the first air-conditioner carries out updating operation, and then ensure that first air-conditioner after upgrading
The operation that can stablize, it is to avoid the situation that the first air-conditioner cannot run after upgrading occurs, and further increases air-conditioner liter
The efficiency of level.
The fourth embodiment of the automatically updating method of air-conditioner of the present invention, reference picture 4, at this are proposed based on first embodiment
In embodiment, the automatically updating method of the air-conditioner also includes:
Step S50, when customization upgrade request is received, the server obtains the customization upgrade request correspondence
Parameter to be upgraded, and the parameter described to be upgraded that will be got sent to Evaluation Before Upgrade device;
In the present embodiment, when the method for operation of air-conditioner of personalized customization is needed in user, for example, regulation air-conditioner
The remote control of wind speed corresponding to wind speed or maximum wind velocity or adjustment air-conditioner under refrigeration mode corresponding to minimum windspeed
Corresponding instruction of button etc., user can be edited user by the terminal editing customized upgrade request such as remote control, air-conditioner
Upgrade request is customized to send to server, or, user by mobile terminal editing customized upgrade request, and can control to move
The customization upgrade request that dynamic terminal edits user is sent to server.
In the present embodiment, when customization upgrade request is received, it is corresponding that server obtains customization upgrade request
Parameter to be upgraded, for example, in the wind speed corresponding to minimum windspeed under user's regulation air-conditioner refrigeration mode, the parameter to be upgraded
Including amended minimum windspeed, etc..
Step S60, when the parameter to be upgraded is received, the Evaluation Before Upgrade device is treated based on preset rules to described
Upgrade parameter carries out verification operation;
In the present embodiment, when parameter to be upgraded is got, Evaluation Before Upgrade device is waited to rise based on preset rules to described
Level parameter carries out verification operation, to determine that customize corresponding second air-conditioner of upgrade request is risen according to parameter to be upgraded
After level, can normally run, for example, because the temperature range under generally air-conditioner refrigeration mode is 16 DEG C to 30 DEG C,
If the personalized customization of user is that the maximum temperature under air-conditioner refrigeration mode is set into 33 DEG C, corresponding to the personalized customization
Parameter to be upgraded it is not verified, if the personalized customization of user is to be set to the maximum temperature under air-conditioner refrigeration mode
28 DEG C, then the parameter to be upgraded corresponding to personalized customization can be by checking.
Step S70, when the Verification to be upgraded passes through, the Evaluation Before Upgrade device obtains the parameter to be upgraded
Corresponding second upgrading data, and described second will upgrade data is activation to the server;
Step S80, when the second upgrading data are received, the server upgrades data is activation extremely by described second
It is described to customize corresponding second air-conditioner of upgrade request, carried out so that second air-conditioner is based on the described second upgrading data
Upgrading.
In the present embodiment, when Verification to be upgraded passes through, Evaluation Before Upgrade device obtains the parameter pair to be upgraded
The second upgrading data answered, and described second will upgrade data is activation to the server, server is by second ascending series
According to the second air-conditioner corresponding to the customization upgrade request is sent, so that second air-conditioner is based on the described second upgrading
Data are upgraded.
The automatically updating method of the air-conditioner that the present embodiment is proposed, by when customization upgrade request is received, servicing
Device is obtained and customizes the corresponding parameter to be upgraded of upgrade request, and parameter to be upgraded is sent to Evaluation Before Upgrade device, is then existed
When receiving parameter to be upgraded, the Evaluation Before Upgrade device carries out verification operation based on preset rules to the parameter to be upgraded,
Then when Verification to be upgraded passes through, Evaluation Before Upgrade device obtains the corresponding second upgrading data of the parameter to be upgraded,
And by the described second upgrading data is activation to the server, finally when the second upgrading data are received, server will
The second upgrading data is activation customizes corresponding second air-conditioner of upgrade request to described, for the second air-conditioner base
Upgraded in the described second upgrading data, realize second is upgraded according to the corresponding parameter to be upgraded of customization upgrade request
Data is activation is to the second air-conditioner, so that the second air-conditioner is upgraded, and then can carry out operation of the user to air-conditioner
Personalized customization, improves Consumer's Experience.
The 5th embodiment of the automatically updating method of air-conditioner of the present invention, reference picture 5, at this are proposed based on fourth embodiment
In embodiment, step S80 includes:
Step S81, the server obtains the performance parameter of second air-conditioner;
In the present embodiment, when the second upgrading data are got, server obtains the performance parameter of second air-conditioner,
Wherein, minimum temperature and maximum temperature of the performance parameter under the rated power, refrigeration mode of second air-conditioner etc..
Step S82, the server be based on the performance parameter that gets determine the second upgrading data with it is described
Whether the second air-conditioner matches;
In the present embodiment, when the performance parameter of the second air-conditioner is got, server is based on the property for getting
Whether the second upgrading data match with second air-conditioner described in energy parameter determination, specifically, for example, in the second upgrading data
Including under the second air-conditioner refrigeration mode during the regulation information of peak power, if the corresponding peak power of regulation information is less than
The rated power of second air-conditioner, it is determined that the second upgrading data are matched with second air-conditioner.
Step S83, when the described second upgrading data are matched with second air-conditioner, the server is by described second
Upgrading data is activation is to second air-conditioner.
In the present embodiment, when the described second upgrading data are matched with second air-conditioner, server is by described the
Two upgrading data is activations in order to the second air-conditioner when the second upgrading data are received, are based on to second air-conditioner
The second upgrading data carry out updating operation, and then realize the automatic upgrading of air-conditioner.
The automatically updating method of the air-conditioner that the present embodiment is proposed, second air-conditioner is obtained by the server
Performance parameter, the performance parameter that then server is based on getting determines the second upgrading data and described second
Whether air-conditioner matches, and then when the described second upgrading data are matched with second air-conditioner, the server will be described
Second upgrading data is activation is realized first when the second upgrading data are matched with the air-conditioner to second air-conditioner
Upgrading data is activation so that air-conditioner carries out updating operation, and then ensure that the air-conditioner after upgrading to the air-conditioner
The operation that can stablize, it is to avoid the situation that air-conditioner cannot run after upgrading occurs, and further increases Consumer's Experience.
The present invention further provides a kind of automatic updating system of air-conditioner.Reference picture 6, Fig. 6 is air-conditioner of the present invention
The high-level schematic functional block diagram of automatic updating system first embodiment.
In the present embodiment, the automatic updating system of the air-conditioner includes:Server 100 and Evaluation Before Upgrade device 200;Its
In,
Server 100 includes:
First acquisition module 110, the operational factor current for obtaining the first air-conditioner, and the operation that will be got
Parameter is sent to Evaluation Before Upgrade device;
In the present embodiment, the first acquisition module 110 can in real time after each air-conditioner for communicating with of timing acquisition work as
Preceding operational factor, environment temperature residing for the operational mode of the operational factor including air-conditioner, design temperature, the air-conditioner,
The data such as the operating pressure of the air-conditioner, the running temperature of the air-conditioner, the running current of the air-conditioner.
Server 100 can be Cloud Server using remote server, be communicated by between real-time performance and air-conditioner,
The operational factor current to obtain air-conditioner.
In the present embodiment, when the operational factor of the first air-conditioner is got, the first acquisition module 110 joins the operation
Number is sent to Evaluation Before Upgrade device, for the Evaluation Before Upgrade device be based on the operational factor judge first air-conditioner currently whether
Can upgrade and whether meet default promotion condition.
First sending module 120, for when the first upgrading data are received, by the described first upgrading data is activation
To first air-conditioner, updating operation is carried out so that first air-conditioner is based on the described first upgrading data;
In the present embodiment, when the first upgrading data are got, the first sending module 120 sends out the first upgrading data
First air-conditioner is delivered to, the first air-conditioner is risen when the first upgrading data are received based on the first upgrading data
Level operation, the updating operation includes updating the parameter of the first air-conditioner, and then realizes the automatic upgrading of the first air-conditioner.
Evaluation Before Upgrade device 200 includes:
Determining module 210, for when the operational factor is received, determining that described first is empty based on the operational factor
Adjust whether device meets default promotion condition;
In the present embodiment, when the current operational factor of the first air-conditioner is received, determining module 210 is based on the operation
Whether parameter determination first air-conditioner meets default promotion condition, and specifically, Evaluation Before Upgrade device is joined by current operation
Number obtains the current design temperature of first air-conditioner and environment temperature, then obtains the design temperature and environment temperature institute
The parameter preset of corresponding air-conditioner, is then contrasted parameter preset with operational factor, determines whether the first air-conditioner is full
The default promotion condition of foot;For example, operational factor is the operating pressure of the first air-conditioner, then parameter preset is design temperature and ring
The pre-set pressure range of the operating pressure of the first air-conditioner corresponding to the temperature of border, exists in the operating pressure of current first air-conditioner
When outside the pre-set pressure range, determine that the first air-conditioner meets default promotion condition;Or, operational factor is the first air-conditioner
Running temperature, then parameter preset is the default of the running temperature of design temperature and the first air-conditioner corresponding to environment temperature
Temperature range, current first air-conditioner running temperature outside the preset temperature range when, determine that the first air-conditioner meets
Default promotion condition;Or, operational factor is the running current of the first air-conditioner, then parameter preset is design temperature and ring
The predetermined current scope of the running current of the first air-conditioner corresponding to the temperature of border, exists in the running temperature of current first air-conditioner
When outside the preset temperature range, determine that the first air-conditioner meets default promotion condition;Certainly, Evaluation Before Upgrade device gets
The current operational factor of air-conditioner is not limited to above-mentioned parameter, and above-mentioned parameters can be combined and use, for example, operational factor includes
The operating pressure of the air-conditioner, the running temperature of the air-conditioner, the running current of the air-conditioner, as long as can be by wherein a certain
The default promotion condition of individual parameter determination first air-conditioner satisfaction, then judge that current first air-conditioner meets and preset upgrading bar
Part.
Second acquisition module 220, for when first air-conditioner meets default promotion condition, obtaining the operation ginseng
The corresponding first upgradings data of number, and described first will upgrade data is activation to the server.
In the present embodiment, the second acquisition module 220 can directly generate the first upgrading data according to the operational factor, when
So, the second acquisition module 220 also can generate upgrading data according to the corresponding various operational factors of first air-conditioner in advance, and will
In the upgrading data storage to local data base or server, when first air-conditioner meets default promotion condition, the
Two acquisition modules 220 can search corresponding first upgrading data according to the operational factor in local data base or server.
When the first upgrading data are got, the second acquisition module 220 is by the described first upgrading data is activation to the server.
The automatic updating system of the air-conditioner that the present embodiment is proposed, the first air-conditioner is obtained by the first acquisition module 110
Current operational factor, and the operational factor that will be got sent to Evaluation Before Upgrade device, then determining module 210 is based on operation
Whether the air-conditioner of parameter determination first meets default promotion condition, then when the first air-conditioner meets default promotion condition, the
Two acquisition module 220 obtains the corresponding first upgrading data of operational factor, and by the first upgrading data is activation to server, then
First sending module 120 by the first upgrading data is activation to the first air-conditioner, so that the first air-conditioner is based on the first upgrading data
Carry out updating operation, realize air-conditioner is upgraded according to the operational factor of air-conditioner, so realize air-conditioner from
Dynamic upgrading, solves artificial air-conditioning mainboard of changing come the low technical problem of efficiency by way of updating air conditioner operation parameters, greatly
The big liter stage efficiency that improve air-conditioner.
The second embodiment of the automatic updating system of air-conditioner of the present invention, reference picture 7, at this are proposed based on first embodiment
In embodiment, determining module 210 includes:
First acquisition unit 211, for obtaining corresponding to the design temperature and environment temperature of first air-conditioner
Parameter preset;
In the present embodiment, when the current operational factor of the first air-conditioner is got, first acquisition unit 211 is by working as
Preceding operational factor obtains the current design temperature of the first air-conditioner and environment temperature, then obtains the design temperature and ring
The parameter preset of the first air-conditioner corresponding to the temperature of border, wherein, parameter preset includes the pre- of the operating pressure of the first air-conditioner
If the running current of pressure limit, the preset temperature range of the running temperature of the first air-conditioner and/or the first air-conditioner is default
Current range.
First determining unit 212, for determining that the operational factor determines first air-conditioning based on the parameter preset
Whether device meets default promotion condition.
In the present embodiment, when parameter preset is got, the first determining unit 212 determines institute based on the parameter preset
State operational factor and determine whether first air-conditioner meets default promotion condition.Specifically, by parameter preset and operational factor
Contrasted, determined whether the first air-conditioner meets default promotion condition;For example, operational factor is the operation pressure of the first air-conditioner
Power, then parameter preset is the preset pressure model of the operating pressure of design temperature and the first air-conditioner corresponding to environment temperature
Enclose, current first air-conditioner operating pressure outside the pre-set pressure range when, determine that the first air-conditioner meets default liter
Level condition;Or, operational factor is the running temperature of the first air-conditioner, then parameter preset is design temperature and environment temperature institute
The preset temperature range of the running temperature of corresponding first air-conditioner, current first air-conditioner running temperature in the default temperature
When outside degree scope, determine that the first air-conditioner meets default promotion condition;Or, operational factor is the operation of the first air-conditioner
Electric current, then parameter preset is the predetermined current model of the running current of design temperature and the first air-conditioner corresponding to environment temperature
Enclose, current first air-conditioner running temperature outside the preset temperature range when, determine that the first air-conditioner meets default liter
Level condition;Certainly, take the current operational factor of the first air-conditioner and be not limited to above-mentioned parameter, and above-mentioned parameters can be combined and make
With for example, operational factor includes operating pressure, the running temperature of first air-conditioner, first air-conditioning of first air-conditioner
The running current of device, as long as default promotion condition can be met by wherein some air-conditioner of parameter determination first, then judges
Current first air-conditioner meets default promotion condition.
The automatic updating system of the air-conditioner that the present embodiment is proposed, obtains described first empty by first acquisition unit 211
The parameter preset corresponding to the design temperature and environment temperature of device is adjusted, then the first determining unit 222 is based on the default ginseng
Number determines that the operational factor determines whether first air-conditioner meets default promotion condition, realizes the fortune according to air-conditioner
Line parameter and parameter preset accurately determine whether the first air-conditioner meets default promotion condition, and then improve air-conditioner upgrading
Accuracy, improve air-conditioner upgrading efficiency.
The 3rd embodiment of the automatic updating system of air-conditioner of the present invention, reference picture 8, at this are proposed based on first embodiment
In embodiment, the first sending module 120 includes:
Second acquisition unit 121, the performance parameter for obtaining first air-conditioner;
In the present embodiment, when the first upgrading data are got, second acquisition unit 121 obtains first air-conditioner
Performance parameter, wherein, minimum temperature under the rated power, refrigeration mode of the performance parameter including first air-conditioner and most
High-temperature etc..
Second determining unit 122, for determining the first upgrading data and the institute based on the performance parameter for getting
State whether the first air-conditioner matches;
In the present embodiment, when the performance parameter of the first air-conditioner is got, the second determining unit 122 is based on getting
The performance parameter determine it is described first upgrading data whether matched with first air-conditioner, specifically, for example, first
When upgrading data packet includes the regulation information of peak power under the first air-conditioner refrigeration mode, if the corresponding maximum of regulation information
Rated power of the power less than first air-conditioner, it is determined that the first upgrading data are matched with first air-conditioner.
First transmitting element 123, for when the described first upgrading data are matched with first air-conditioner, by described the
One upgrading data is activation is to first air-conditioner.
In the present embodiment, when the described first upgrading data are matched with the air-conditioner, the first transmitting element 123 is by institute
The first upgrading data is activation to the air-conditioner is stated, in order to air-conditioner when the first upgrading data are received, based on described
First upgrading data carry out updating operation, and then realize the automatic upgrading of air-conditioner.
The automatic updating system of the air-conditioner that the present embodiment is proposed, obtains described first empty by second acquisition unit 121
The performance parameter of device is adjusted, then the second determining unit 122 determines first ascending series based on the performance parameter for getting
Whether matched according to first air-conditioner, then when the described first upgrading data are matched with first air-conditioner, first
Transmitting element 123 by described first upgrading data is activation to first air-conditioner, realize first upgrading data with it is described
By the first upgrading data is activation to first air-conditioner when first air-conditioner is matched, so that the first air-conditioner carries out upgrading behaviour
Make, and then ensure that the operation that the air-conditioner can be stablized after upgrading, it is to avoid the feelings that air-conditioner cannot run after upgrading
Condition occurs, and further increases the efficiency of air-conditioner upgrading.
The fourth embodiment of the automatic updating system of air-conditioner of the present invention, reference picture 9, at this are proposed based on first embodiment
In embodiment, server 100 also includes:
3rd acquisition module 130, for when customization upgrade request is received, obtaining the customization upgrade request pair
The parameter to be upgraded answered, and the parameter described to be upgraded that will be got sent to Evaluation Before Upgrade device;
In the present embodiment, when the method for operation of air-conditioner of personalized customization is needed in user, for example, regulation air-conditioner
The remote control of wind speed corresponding to wind speed or maximum wind velocity or adjustment air-conditioner under refrigeration mode corresponding to minimum windspeed
Corresponding instruction of button etc., user can be edited user by the terminal editing customized upgrade request such as remote control, air-conditioner
Upgrade request is customized to send to server, or, user by mobile terminal editing customized upgrade request, and can control to move
The customization upgrade request that dynamic terminal edits user is sent to server.
In the present embodiment, when customization upgrade request is received, the 3rd acquisition module 130 is obtained to customize to upgrade and asked
Corresponding parameter to be upgraded is sought, for example, in the wind speed corresponding to minimum windspeed under user's regulation air-conditioner refrigeration mode, this is treated
Upgrade parameter includes amended minimum windspeed, etc..
Second sending module 140, for when the second upgrading data are received, by the described second upgrading data is activation
To second air-conditioner, upgraded so that second air-conditioner is based on the described second upgrading data;
In the present embodiment, when Verification to be upgraded passes through, the 4th acquisition module 240 obtains the parameter to be upgraded
Corresponding second upgrading data, and by the described second upgrading data is activation to the server, the second sending module 140 will be described
Second upgrading data is activation customizes corresponding second air-conditioner of upgrade request to described, so that second air-conditioner is based on institute
The second upgrading data are stated to be upgraded.The Evaluation Before Upgrade device 200 also includes:
Authentication module 230, for when the parameter to be upgraded is received, based on preset rules to the parameter to be upgraded
Carry out verification operation;
In the present embodiment, when parameter to be upgraded is got, authentication module 230 is based on preset rules to described to be upgraded
Parameter carries out verification operation, to determine that customize corresponding second air-conditioner of upgrade request is upgraded according to parameter to be upgraded
Afterwards, can normally run, for example, because the temperature range under generally air-conditioner refrigeration mode is 16 DEG C to 30 DEG C, if
The personalized customization of user is that the maximum temperature under air-conditioner refrigeration mode is set into 33 DEG C, corresponding to the personalized customization
Parameter to be upgraded is not verified, if the personalized customization of user is that the maximum temperature under air-conditioner refrigeration mode is set into 28
DEG C, then the parameter to be upgraded corresponding to personalized customization can be by checking.
4th acquisition module 240, for when the Verification to be upgraded passes through, obtaining the parameter correspondence to be upgraded
The second upgrading data, and described second will upgrade data is activation to the server.
The present embodiment propose air-conditioner automatic updating system, by receive customize upgrade request when, the 3rd
Acquisition module 130 is obtained and customizes the corresponding parameter to be upgraded of upgrade request, and parameter to be upgraded is sent to Evaluation Before Upgrade dress
Put, then when parameter to be upgraded is received, authentication module 230 carries out checking behaviour based on preset rules to the parameter to be upgraded
Make, then when Verification to be upgraded passes through, the 4th acquisition module 240 obtains corresponding second upgrading of the parameter to be upgraded
Data, and by the described second upgrading data is activation to the server, finally when the second upgrading data are received, second
Described second upgrading data is activation is customized corresponding second air-conditioner of upgrade request by sending module 140 to described, for institute
State the second air-conditioner to be upgraded based on the described second upgrading data, realize corresponding to be upgraded according to upgrade request is customized
Second upgrading data is activation to the second air-conditioner, so that the second air-conditioner is upgraded, and then can be made user to sky by parameter
Adjusting the operation of device carries out personalized customization, improves Consumer's Experience.
5th embodiment of the automatic updating system based on fourth embodiment proposition air-conditioner of the present invention, reference picture 10,
In the present embodiment, the second sending module 140 includes:
3rd acquiring unit 141, the performance parameter for obtaining second air-conditioner;
In the present embodiment, when the second upgrading data are got, the 3rd acquiring unit 81 obtains second air-conditioner
Performance parameter, wherein, minimum temperature under the rated power, refrigeration mode of the performance parameter including second air-conditioner and most
High-temperature etc..
3rd determining unit 142, for determining the second upgrading data and the institute based on the performance parameter for getting
State whether the second air-conditioner matches;
In the present embodiment, when the performance parameter of the second air-conditioner is got, the 3rd determining unit 82 is based on getting
The performance parameter determine it is described second upgrading data whether matched with second air-conditioner, specifically, for example, second
When upgrading data packet includes the regulation information of peak power under the second air-conditioner refrigeration mode, if the corresponding maximum of regulation information
Rated power of the power less than second air-conditioner, it is determined that the second upgrading data are matched with second air-conditioner.
Second transmitting element 143, for when the described second upgrading data are matched with second air-conditioner, by described the
Two upgrading data is activations are to second air-conditioner.
In the present embodiment, when the described second upgrading data are matched with second air-conditioner, server is by described the
Two upgrading data is activations in order to the second air-conditioner when the second upgrading data are received, are based on to second air-conditioner
The second upgrading data carry out updating operation, and then realize the automatic upgrading of air-conditioner.
The automatic updating system of the air-conditioner that the present embodiment is proposed, second air-conditioning is obtained by the 3rd acquiring unit 81
The performance parameter of device, then the 3rd determining unit 82 based on the performance parameter for getting determine the second upgrading data with
Whether second air-conditioner matches, and then when the described second upgrading data are matched with second air-conditioner, second sends
Unit 83 to second air-conditioner, realizes empty with described second in the second upgrading data the described second upgrading data is activation
By the first upgrading data is activation to second air-conditioner when adjusting device to match, so that the second air-conditioner carries out updating operation, and then
Ensure that the operation that second air-conditioner can be stablized after upgrading, it is to avoid the feelings that the second air-conditioner cannot run after upgrading
Condition occurs, and further increases Consumer's Experience.
The preferred embodiments of the present invention are these are only, the scope of the claims of the invention is not thereby limited, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of automatically updating method of air-conditioner, it is characterised in that the automatically updating method of the air-conditioner includes following step
Suddenly:
Server obtains the current operational factor of the first air-conditioner, and the operational factor that will be got is sent to Evaluation Before Upgrade
Device;
When the operational factor is received, the Evaluation Before Upgrade device determines first air-conditioner based on the operational factor
Whether satisfaction presets promotion condition;
When first air-conditioner meets default promotion condition, it is corresponding that the Evaluation Before Upgrade device obtains the operational factor
First upgrading data, and described first will upgrade data is activation to the server;
When the first upgrading data are received, the server described first will upgrade data is activation to first air-conditioning
Device, updating operation is carried out so that first air-conditioner is based on the described first upgrading data.
2. the automatically updating method of air-conditioner as claimed in claim 1, it is characterised in that the Evaluation Before Upgrade device is based on institute
State operational factor and determine that the step of whether first air-conditioner meets default promotion condition includes:
The Evaluation Before Upgrade device obtains the parameter preset corresponding to the design temperature and environment temperature of first air-conditioner;
The Evaluation Before Upgrade device determines that the operational factor determines whether first air-conditioner is full based on the parameter preset
The default promotion condition of foot.
3. the automatically updating method of air-conditioner as claimed in claim 1, it is characterised in that the server is by described first liter
The step of DBMS is sent to first air-conditioner includes:
The server obtains the performance parameter of first air-conditioner;
The performance parameter that the server is based on getting determines that the first upgrading data are with first air-conditioner
No matching;
Described first upgrading data match with first air-conditioner when, the server by described first upgrading data is activation
To first air-conditioner.
4. the automatically updating method of the air-conditioner as described in any one of claims 1 to 3, it is characterised in that the air-conditioner
Automatically updating method also includes:
When customization upgrade request is received, the server obtains the corresponding ginseng to be upgraded of the customization upgrade request
Count, and the parameter described to be upgraded that will be got is sent to Evaluation Before Upgrade device;
When the parameter to be upgraded is received, the Evaluation Before Upgrade device is carried out based on preset rules to the parameter to be upgraded
Verification operation;
When the Verification to be upgraded passes through, it is corresponding second liter that the Evaluation Before Upgrade device obtains the parameter to be upgraded
DBMS, and by the described second upgrading data is activation to the server;
When the second upgrading data are received, the server rises the described second upgrading data is activation to described customization
Corresponding second air-conditioner of level request, is upgraded so that second air-conditioner is based on the described second upgrading data.
5. the automatically updating method of air-conditioner as claimed in claim 4, it is characterised in that the server is by described second liter
The step of DBMS is sent to second air-conditioner includes:
The server obtains the performance parameter of second air-conditioner;
The performance parameter that the server is based on getting determines that the second upgrading data are with second air-conditioner
No matching;
Described second upgrading data match with second air-conditioner when, the server by described second upgrading data is activation
To second air-conditioner.
6. a kind of automatic updating system of air-conditioner, it is characterised in that the automatic updating system of the air-conditioner includes:Server
And Evaluation Before Upgrade device;Wherein,
The server includes:
First acquisition module, the operational factor current for obtaining the first air-conditioner, and the operational factor hair that will be got
Deliver to Evaluation Before Upgrade device;
First sending module, for when the first upgrading data are received, described first will upgrade data is activation to described
First air-conditioner, updating operation is carried out so that first air-conditioner is based on the described first upgrading data;
The Evaluation Before Upgrade device includes:
Determining module, for when the operational factor is received, determining that first air-conditioner is based on the operational factor
It is no to meet default promotion condition;
Second acquisition module, for when first air-conditioner meets default promotion condition, obtaining the operational factor correspondence
The first upgrading data, and described first will upgrade data is activation to the server.
7. the automatic updating system of air-conditioner as claimed in claim 6, it is characterised in that the determining module includes:
First acquisition unit, for obtaining the default ginseng corresponding to the design temperature and environment temperature of first air-conditioner
Number;
First determining unit, for determining that the operational factor determines whether first air-conditioner is full based on the parameter preset
The default promotion condition of foot.
8. the automatic updating system of air-conditioner as claimed in claim 6, it is characterised in that first sending module includes:
Second acquisition unit, the performance parameter for obtaining first air-conditioner;
Second determining unit, it is empty with described first for determining the first upgrading data based on the performance parameter for getting
Adjust whether device matches;
First transmitting element, for when the described first upgrading data are matched with first air-conditioner, by the described first upgrading
Data is activation is to first air-conditioner.
9. the automatic updating system of the air-conditioner as described in any one of claim 6 to 8, it is characterised in that the server is also
Including:
3rd acquisition module, for receive customize upgrade request when, obtain and described customize that upgrade request is corresponding treats
Upgrade parameter, and the parameter described to be upgraded that will be got sent to Evaluation Before Upgrade device;
Second sending module, for when the second upgrading data are received, described second will upgrade data is activation to described
Second air-conditioner, is upgraded so that second air-conditioner is based on the described second upgrading data;
The Evaluation Before Upgrade device also includes:
Authentication module, for when the parameter to be upgraded is received, being tested the parameter to be upgraded based on preset rules
Card operation;
4th acquisition module, for when the Verification to be upgraded passes through, obtaining the parameter to be upgraded corresponding second
Upgrading data, and described second will upgrade data is activation to the server.
10. the automatic updating system of air-conditioner as claimed in claim 9, it is characterised in that second sending module includes:
3rd acquiring unit, the performance parameter for obtaining second air-conditioner;
3rd determining unit, it is empty with described second for determining the second upgrading data based on the performance parameter for getting
Adjust whether device matches;
Second transmitting element, for when the described second upgrading data are matched with second air-conditioner, by the described second upgrading
Data is activation is to second air-conditioner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710072492.9A CN106885335B (en) | 2017-02-09 | 2017-02-09 | Automatic upgrading method and system for air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710072492.9A CN106885335B (en) | 2017-02-09 | 2017-02-09 | Automatic upgrading method and system for air conditioner |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106885335A true CN106885335A (en) | 2017-06-23 |
CN106885335B CN106885335B (en) | 2020-01-14 |
Family
ID=59179573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710072492.9A Active CN106885335B (en) | 2017-02-09 | 2017-02-09 | Automatic upgrading method and system for air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106885335B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107957879A (en) * | 2017-12-15 | 2018-04-24 | 中广热点云科技有限公司 | A kind of auto upgrading system and method based on internet interaction |
CN109491680A (en) * | 2017-09-11 | 2019-03-19 | 美的智慧家居科技有限公司 | Customize method and apparatus, server and the household electrical appliance of upgrading household electrical appliance |
CN109510847A (en) * | 2017-09-14 | 2019-03-22 | 美的智慧家居科技有限公司 | For controlling method and apparatus, server and the household electrical appliance of household electrical appliance |
CN112283867A (en) * | 2020-10-16 | 2021-01-29 | 海信(山东)空调有限公司 | Air conditioner and upgrading control method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007078221A (en) * | 2005-09-13 | 2007-03-29 | Daikin Ind Ltd | Air conditioning control system |
CN101178235A (en) * | 2006-11-08 | 2008-05-14 | 乐金电子(天津)电器有限公司 | Air conditioning system and method of operating same |
CN101241364A (en) * | 2007-02-08 | 2008-08-13 | Lg电子株式会社 | Local controller, remote management controller and method for automatically updating the local controller of an air conditioner system |
CN103047739A (en) * | 2012-12-28 | 2013-04-17 | 无锡博欧节能科技有限公司 | Intelligent central ventilation system and remote automatic batch software updating method |
US20160153677A9 (en) * | 2009-09-02 | 2016-06-02 | Optimum Energy Llc | Environmental control for hvac system |
-
2017
- 2017-02-09 CN CN201710072492.9A patent/CN106885335B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007078221A (en) * | 2005-09-13 | 2007-03-29 | Daikin Ind Ltd | Air conditioning control system |
CN101178235A (en) * | 2006-11-08 | 2008-05-14 | 乐金电子(天津)电器有限公司 | Air conditioning system and method of operating same |
CN101241364A (en) * | 2007-02-08 | 2008-08-13 | Lg电子株式会社 | Local controller, remote management controller and method for automatically updating the local controller of an air conditioner system |
US20160153677A9 (en) * | 2009-09-02 | 2016-06-02 | Optimum Energy Llc | Environmental control for hvac system |
CN103047739A (en) * | 2012-12-28 | 2013-04-17 | 无锡博欧节能科技有限公司 | Intelligent central ventilation system and remote automatic batch software updating method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109491680A (en) * | 2017-09-11 | 2019-03-19 | 美的智慧家居科技有限公司 | Customize method and apparatus, server and the household electrical appliance of upgrading household electrical appliance |
CN109510847A (en) * | 2017-09-14 | 2019-03-22 | 美的智慧家居科技有限公司 | For controlling method and apparatus, server and the household electrical appliance of household electrical appliance |
CN107957879A (en) * | 2017-12-15 | 2018-04-24 | 中广热点云科技有限公司 | A kind of auto upgrading system and method based on internet interaction |
CN112283867A (en) * | 2020-10-16 | 2021-01-29 | 海信(山东)空调有限公司 | Air conditioner and upgrading control method |
CN112283867B (en) * | 2020-10-16 | 2021-11-09 | 海信(山东)空调有限公司 | Air conditioner and upgrading control method |
Also Published As
Publication number | Publication date |
---|---|
CN106885335B (en) | 2020-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106885335A (en) | The automatically updating method and system of air-conditioner | |
CN103940049B (en) | Air-conditioner set control method, apparatus and system | |
CN102901180B (en) | A kind of method and system controlling air-conditioning | |
CN109360564B (en) | Method and device for selecting language identification mode and household appliance | |
CN104883377B (en) | Control method, control system and the social network server of air-conditioning | |
CN105546756A (en) | Air conditioner control method and device | |
CN104713200A (en) | Control method and control device for air conditioner | |
CN109445819A (en) | The online upgrading control method and appliance system of appliance system | |
CN104729004A (en) | Air conditioner and control method and control terminal thereof | |
CN105352133A (en) | Air-conditioning control method, air-conditioning control system and air conditioner | |
CN101872185A (en) | Intelligent matrix electric energy control system | |
CN108759031A (en) | A kind of air-conditioning system method for noise reduction control and air-conditioning system | |
CN106354527A (en) | Method for air-conditioner software online updating, controlling device and air-conditioners | |
CN107178877A (en) | Air-conditioning and its control method, terminal and system, air-conditioner controller | |
CN109270848A (en) | Recommended method, server, household appliance and the storage medium of contextual model | |
CN112130458A (en) | Target device control method and device, storage medium and electronic device | |
CN109059176A (en) | Air regulator and its control method and control device | |
CN103733570A (en) | Method for assisting in the installation of a home automation system, and related installation driver package | |
CN109408884A (en) | Information processing method for central air-conditioning system Automated Design | |
CN108006925A (en) | Air-conditioning stress test method, computer installation, computer-readable recording medium | |
CN105182811A (en) | User intelligent service method and system based on operation of electrical equipment | |
CN112017074A (en) | Energy collaborative management system based on machine learning | |
CN110909036A (en) | Functional module recommendation method and device | |
CN116859768A (en) | Energy scheduling method and device applied to smart home | |
CN110309551A (en) | A kind of Wind turbines temperature control system for generator and method based on data analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |