CN106884527A - Construction intelligent overload control device and control method - Google Patents

Construction intelligent overload control device and control method Download PDF

Info

Publication number
CN106884527A
CN106884527A CN201510928531.1A CN201510928531A CN106884527A CN 106884527 A CN106884527 A CN 106884527A CN 201510928531 A CN201510928531 A CN 201510928531A CN 106884527 A CN106884527 A CN 106884527A
Authority
CN
China
Prior art keywords
guide rail
main frame
control device
fall
overload control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510928531.1A
Other languages
Chinese (zh)
Inventor
张丽梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Saint High Technology Co Ltd
Original Assignee
Harbin Saint High Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Saint High Technology Co Ltd filed Critical Harbin Saint High Technology Co Ltd
Priority to CN201510928531.1A priority Critical patent/CN106884527A/en
Publication of CN106884527A publication Critical patent/CN106884527A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of construction intelligent overload control device and control method.Control device only needs to set up certain altitude and be attached in engineering structure, by itself jacking equipment and device, can successively be climbed with structure construction, successively declines again during operation, traditional console mode scaffold, it is impossible to realize Integral lifting device, automatically control.Present invention composition includes : Main frame( 5 ), described main frame and elevating mechanism( 1 )Connection, hoisting mechanism anti-fall device is provided with described main frame side uprights( 2 ), described hoisting mechanism anti-fall device side and guide rail back plate( 8 )Connection, described guide rail back plate passes through bolt and guide rail( 4 )Connection, support meanss are provided with described guide rail( 3 ), described support meanss top passes through bolt and pedal( 9 )Connection, described support meanss top is provided with tensioning mechanism( 10 ).The present invention is for construction intelligent overload control device.

Description

Construction intelligent overload control device and control method
Technical field:
The present invention relates to a kind of construction intelligent overload control device and control method.
Background technology:
Integral lifting device only needs to set up certain altitude and be attached in engineering structure, by itself jacking equipment and device, can successively be climbed with structure construction, successively decline again during fitment operation, compared with traditional console mode scaffold, this scaffold has huge economic benefit, traditional console mode scaffold, Integral lifting device can not be realized, height is automatically controlled.
With the rapidly increase of high-rise, high-rise building, this technology is developed rapidly, and its structural shape and species are more and more, but its feature is " attachment " on the beam or wall of building, can not only climb and can decline, therefore be referred to as attached lifting scaffold.
The content of the invention:
It is an object of the invention to provide a kind of construction intelligent overload control device and control method.
Above-mentioned purpose is realized by following technical scheme:
A kind of construction intelligent overload control device, its composition includes:Main frame, described main frame is connected with elevating mechanism, hoisting mechanism anti-fall device is installed in described main frame side uprights, described hoisting mechanism anti-fall device side is connected with guide rail back plate, described guide rail back plate is connected by bolt with guide rail, support meanss are installed, described support meanss top is connected by bolt with pedal, and described support meanss top is provided with tensioning mechanism on described guide rail.
Described construction intelligent overload control device, described hoisting mechanism anti-fall device top has connecting plate, and check lock lever is provided with by bolt on described connecting plate, and described check lock lever is connected with frame coupling mechanism.
Described construction intelligent overload control device, described main frame is quadra welding structure, and running-board bracket is provided between described two columns in main frame lower section A , running-board bracket is installed between described two, main frame centre position column B , pedal is installed between described two columns in main frame top C
Described construction intelligent overload control device, has guide-track groove on described guide rail, described guide-track groove is H Shape, by described slide, described frame coupling mechanism is arranged on the column of described main frame described support meanss, described frame coupling mechanism and described pedal C It is bolted.
A kind of construction intelligent overload control device and control method, the method comprise the following steps:First it is that step-by-step movement lowering or hoisting gear is controlled using synchronous hydraulic cylinder, control is synchronized to multi-disc lifting, it is ensured that the synchronization between different hoist points and different pieces, it is to avoid electronic integral hoisting scaffold suspension centre is more, and Synchronization Control difficulty is big;
It is controlled using two-stage anti-drop system, the anti-fall use hydraulic pressure self-locking circuit of the first order and the anti-fall mechanism of latch;The anti-fall use cam rocker arm mechanism in the second level as scaffold the anti-fall mechanism of independence, its braking distance depends on the design size of mechanism, have the advantages that sensitive, reliability, braking distance be accurate, controllable braking, prevented the major accident that electrical equipment failure is likely to result in;
Using adaptive directed anti-tilt device, utilize H The roller of type guide rail, attaching type sliding block and main frame adaptive connection, eliminates the possibility that support body in work progress topples, while considering the movement interference problem of the elastic deformation to scaffold of guide rail;
Using intelligent overload control device, overload operating mode is diagnosed first by sensor, and make alarm and shutdown inspection treatment, Import computer PLC Control, each mechanism action in connection system for guide rail is coordinated and beat is by program setting, and the change to execution conditions only need to be by reprogramming, you can realize optimum control and operation.
Beneficial effect:
1. There is the construction technology level that improve skyscraper external scaffolding in step-by-step movement lowering or hoisting gear of the invention, solve the problems, such as that console mode scaffold high cost, outrigger scaffold and suspended scaffold are unable to automatic lifting, hanging basket and cannot be used for Structural Engineering construction, both there is outrigger scaffold, overcoming outrigger scaffold again needs to take repeatedly the shortcoming torn open, as the construction equipment for being suitable for high-rise, high-rise building for tallying with the national condition.
2. The present invention is that integral elevating scaffold only needs to set up certain altitude and be attached in engineering structure, by itself jacking equipment and device, can successively be climbed with structure construction, is successively declined again during fitment operation.Compared with traditional console mode scaffold, this scaffold has huge economic benefit.
3. The present invention breaches the various up-down modes of existing elevating scaffold, The function of hydraulic double-acting oil cylinder is taken full advantage of, hydraulic lifting is effectively realized.
4. The present invention is that step-by-step movement lowering or hoisting gear is controlled using synchronous hydraulic cylinder first, and control is synchronized to multi-disc lifting, it is ensured that the synchronization between different hoist points and different pieces, it is to avoid electronic integral hoisting scaffold suspension centre is more, the big shortcoming of Synchronization Control difficulty.
5. The present invention is controlled using two-stage anti-drop system, the anti-fall use hydraulic pressure self-locking circuit of the first order and the anti-fall mechanism of latch;The anti-fall use cam rocker arm mechanism in the second level as scaffold the anti-fall mechanism of independence, its braking distance depends on the design size of mechanism, have the advantages that sensitive, reliability, braking distance be accurate, controllable braking, prevented the major accident that electrical equipment failure is likely to result in.
6. The present invention uses adaptive directed anti-tilt device, utilizes H The roller of type guide rail, attaching type sliding block and main frame adaptive connection, eliminates the possibility that support body in work progress topples, while considering the movement interference problem of the elastic deformation to scaffold of guide rail.
7. The present invention utilizes intelligent overload control device, and overload operating mode is diagnosed first by sensor, and makes alarm and shutdown inspection treatment, Import computer PLC Control, each mechanism action in connection system for guide rail is coordinated and beat is by program setting, and the change to execution conditions only need to be by reprogramming, you can realize optimum control and operation.
Brief description of the drawings:
Accompanying drawing 1 It is structural representation of the invention.
Specific embodiment:
Embodiment 1
A kind of construction intelligent overload control device, its composition includes : Main frame 5 , described main frame and elevating mechanism 1 Connection, hoisting mechanism anti-fall device is provided with described main frame side uprights 2 , described hoisting mechanism anti-fall device side and guide rail back plate 8 Connection, described guide rail back plate passes through bolt and guide rail 4 Connection, support meanss are provided with described guide rail 3 , described support meanss top passes through bolt and pedal 9 Connection, described support meanss top is provided with tensioning mechanism 10
Embodiment 2
Embodiment 1 Described construction intelligent overload control device, described hoisting mechanism anti-fall device top has connecting plate, and check lock lever is provided with by bolt on described connecting plate 11 , described check lock lever and frame coupling mechanism 12 Connection.
Embodiment 3
Embodiment 1 Or 2 Described construction intelligent overload control device, described main frame is quadra welding structure, and running-board bracket is provided between described two columns in main frame lower section A6 , running-board bracket is installed between described two, main frame centre position column B7 , pedal is installed between described two columns in main frame top C13
Embodiment 4
Embodiment 1 Or 2 Described construction intelligent overload control device, has guide-track groove on described guide rail, described guide-track groove is H Shape, by described slide, described frame coupling mechanism is arranged on the column of described main frame described support meanss, described frame coupling mechanism and described pedal C It is bolted.
Embodiment 9
A kind of construction intelligent overload control device and control method, it is that step-by-step movement lowering or hoisting gear is controlled using synchronous hydraulic cylinder that this method is first, control is synchronized to multi-disc lifting, ensure the synchronization between different hoist points and different pieces, avoid that electronic integral hoisting scaffold suspension centre is more, Synchronization Control difficulty is big;
It is controlled using two-stage anti-drop system, the anti-fall use hydraulic pressure self-locking circuit of the first order and the anti-fall mechanism of latch;The anti-fall use cam rocker arm mechanism in the second level as scaffold the anti-fall mechanism of independence, its braking distance depends on the design size of mechanism, have the advantages that sensitive, reliability, braking distance be accurate, controllable braking, prevented the major accident that electrical equipment failure is likely to result in;
Using adaptive directed anti-tilt device, utilize H The roller of type guide rail, attaching type sliding block and main frame adaptive connection, eliminates the possibility that support body in work progress topples, while considering the movement interference problem of the elastic deformation to scaffold of guide rail;
Using intelligent overload control device, overload operating mode is diagnosed first by sensor, and make alarm and shutdown inspection treatment, Import computer PLC Control, each mechanism action in connection system for guide rail is coordinated and beat is by program setting, and the change to execution conditions only need to be by reprogramming, you can realize optimum control and operation.

Claims (5)

1. a kind of construction intelligent overload control device, its composition includes:Main frame, it is characterized in that:Described main frame is connected with elevating mechanism, hoisting mechanism anti-fall device is installed in described main frame side uprights, described hoisting mechanism anti-fall device side is connected with guide rail back plate, described guide rail back plate is connected by bolt with guide rail, support meanss are installed on described guide rail, described support meanss top is connected by bolt with pedal, and described support meanss top is provided with tensioning mechanism.
2. construction according to claim 1 intelligent overload control device, it is characterized in that:Described hoisting mechanism anti-fall device top has connecting plate, and check lock lever is provided with by bolt on described connecting plate, and described check lock lever is connected with frame coupling mechanism.
3. construction according to claim 1 intelligent overload control device, it is characterized in that:Described main frame is quadra welding structure, and running-board bracket A is provided between described two columns in main frame lower section, and running-board bracket B is provided between described two, main frame centre position column, and pedal C is provided between described two columns in main frame top.
4. construction according to claim 1 and 2 intelligent overload control device, it is characterized in that:There is guide-track groove on described guide rail, described guide-track groove is H shape, described support meanss are arranged on the column of described main frame by described slide, described frame coupling mechanism, and described frame coupling mechanism is bolted with described pedal C.
5. one of a kind of claim 1-4 described construction intelligent overload control device and control method, it is characterized in that:The method comprises the following steps:
First it is that step-by-step movement lowering or hoisting gear is controlled using synchronous hydraulic cylinder, control is synchronized to multi-disc lifting, it is ensured that the synchronization between different hoist points and different pieces, it is to avoid electronic integral hoisting scaffold suspension centre is more, and Synchronization Control difficulty is big;
It is controlled using two-stage anti-drop system, the anti-fall use hydraulic pressure self-locking circuit of the first order and the anti-fall mechanism of latch;The anti-fall use cam rocker arm mechanism in the second level as scaffold the anti-fall mechanism of independence, its braking distance depends on the design size of mechanism, have the advantages that sensitive, reliability, braking distance be accurate, controllable braking, prevented the major accident that electrical equipment failure is likely to result in;
Using adaptive directed anti-tilt device, using the roller of H types guide rail, attaching type sliding block and main frame adaptive connection, the possibility that support body in work progress topples is eliminated, while considering the movement interference problem of the elastic deformation to scaffold of guide rail;
Using intelligent overload control device; overload operating mode is diagnosed first by sensor; and make alarm and shutdown inspection treatment; Import computer PLC is controlled; each mechanism action in connection system for guide rail coordinates and beat is by program setting; change to execution conditions, only need to be by reprogramming, you can realize optimum control and operation.
CN201510928531.1A 2015-12-15 2015-12-15 Construction intelligent overload control device and control method Pending CN106884527A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510928531.1A CN106884527A (en) 2015-12-15 2015-12-15 Construction intelligent overload control device and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510928531.1A CN106884527A (en) 2015-12-15 2015-12-15 Construction intelligent overload control device and control method

Publications (1)

Publication Number Publication Date
CN106884527A true CN106884527A (en) 2017-06-23

Family

ID=59175069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510928531.1A Pending CN106884527A (en) 2015-12-15 2015-12-15 Construction intelligent overload control device and control method

Country Status (1)

Country Link
CN (1) CN106884527A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107500178A (en) * 2017-09-28 2017-12-22 郑菁清 A kind of micro computer overload protection device of building construction hoist
CN109594786A (en) * 2018-12-29 2019-04-09 杨洪 Attached lifting scaffold catching device
CN112062026A (en) * 2020-09-09 2020-12-11 厦门安科科技有限公司 Synchronous lifting device for construction safety operation
CN112096044A (en) * 2020-11-09 2020-12-18 山东新活新材料科技有限公司 Bottom pedal of climbing frame
CN115095127A (en) * 2022-06-23 2022-09-23 周用婷 Climbing scaffold lifting system with monitoring and alarming functions
CN115355879A (en) * 2022-08-08 2022-11-18 广州吉祥设备租赁有限公司 Steel pipe climbing frame stability detection equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107500178A (en) * 2017-09-28 2017-12-22 郑菁清 A kind of micro computer overload protection device of building construction hoist
CN109594786A (en) * 2018-12-29 2019-04-09 杨洪 Attached lifting scaffold catching device
CN109594786B (en) * 2018-12-29 2023-08-08 杨洪 Falling protector for attaching lifting scaffold
CN112062026A (en) * 2020-09-09 2020-12-11 厦门安科科技有限公司 Synchronous lifting device for construction safety operation
CN112096044A (en) * 2020-11-09 2020-12-18 山东新活新材料科技有限公司 Bottom pedal of climbing frame
CN112096044B (en) * 2020-11-09 2021-01-29 山东新活新材料科技有限公司 Bottom pedal of climbing frame
CN115095127A (en) * 2022-06-23 2022-09-23 周用婷 Climbing scaffold lifting system with monitoring and alarming functions
CN115095127B (en) * 2022-06-23 2023-12-29 广东万晟建筑科技股份有限公司 Climbing scaffold lifting system with monitoring and alarming functions
CN115355879A (en) * 2022-08-08 2022-11-18 广州吉祥设备租赁有限公司 Steel pipe climbing frame stability detection equipment
CN115355879B (en) * 2022-08-08 2023-08-08 广州吉祥设备租赁有限公司 Steel pipe climbing frame stability detection equipment

Similar Documents

Publication Publication Date Title
CN106884527A (en) Construction intelligent overload control device and control method
CN200999456Y (en) Safety self-locking electric up-down scaffold
EP3992393B1 (en) Anti-falling structure of attached lifting scaffold
CN203684637U (en) Automatic scaffold locating and anti-falling device
CN205077885U (en) Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs
CN103758335A (en) Falling prevention device for guide-rail-type hydraulic attached lifting scaffold
CN104989111B (en) Steel construction high level construction method for hanging
CN104878918A (en) Rock-climbing type robot protective screen
CN102530782A (en) Hydraulic synchronous lifting hoisting technology and equipment for ultra-large members
CN103010943B (en) Large wind turbine generator system variable pitch speed reducer hanger and use method thereof
CN203640254U (en) Guide rail type hydraulic falling prevention device for attachment type lifting scaffolds
CN105804382A (en) Step type ascending and descending device used in civil engineering construction and ascending and descending method
CN204510775U (en) Construction of High-rise elevating safety protecting screen
CN107013013A (en) A kind of steel structure lift shaft standard knot hoisting fixture and technique
CN204645669U (en) Vestibule truss Steel Structure promotes ground tackle
CN102704666B (en) Lifting elevation difference control device for attached lift scaffold
CN202465086U (en) Landing detector for outrigger of construction machine
CN108298400A (en) Safety protection apparatus for elevator and guard method
CN205558308U (en) Integrated form platform of unloading
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN205204556U (en) Lift for construction
CN205259573U (en) A hanging flower basket hangs mechanism for high -rise roofing transformation
CN202081630U (en) Anti-leaning and anti-falling mechanism of attaching elevating scaffold for building construction
CN208617251U (en) A kind of adjustable anti-overturning devices of assembled for column crane mast section dismounting
CN108373102A (en) Lift-on/Lift-off System in enclosure space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170623

WD01 Invention patent application deemed withdrawn after publication