CN106877266B - The bright cable duct of assembled - Google Patents

The bright cable duct of assembled Download PDF

Info

Publication number
CN106877266B
CN106877266B CN201710246630.0A CN201710246630A CN106877266B CN 106877266 B CN106877266 B CN 106877266B CN 201710246630 A CN201710246630 A CN 201710246630A CN 106877266 B CN106877266 B CN 106877266B
Authority
CN
China
Prior art keywords
cable duct
cable
cushion cap
assembled
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710246630.0A
Other languages
Chinese (zh)
Other versions
CN106877266A (en
Inventor
张若玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Future Talent Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710246630.0A priority Critical patent/CN106877266B/en
Publication of CN106877266A publication Critical patent/CN106877266A/en
Application granted granted Critical
Publication of CN106877266B publication Critical patent/CN106877266B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
    • H02G9/025Coverings therefor, e.g. tile

Abstract

The present invention provides a kind of bright cable duct of assembled, the fixed powerful connection mode of construction, sealing structure, bucketing screw of its industry type, along with the corresponding underground foundation measure that adaptation to local conditions is taken, prevent from often occurring tilting using cable duct soon, settle, deform, ponding the problems such as.The bright cable duct of assembled includes underground foundation facility, cable duct assembly, and cable bearer is set in cable duct, ability of swimming cover board of setting up defences above cable duct, it is characterized in that:Cable duct assembly is located in the ground infrastructure the upper surface of;The cable duct assembly is embedded in U-shaped sealing element between cable duct and cable duct or between cable duct and intercommunication cable duct, be connected after the fixation of bucketing screw.

Description

The bright cable duct of assembled
Technical field
The present invention relates to a kind of assembly type cable slots.
Background technology
Cable duct has brick, armored concrete cable respectively according to buried depth, load, level of ground water situation at present The types such as ditch, with the continuous development of power engineering, the requirement to duration, safety construction is continuously improved, both above electricity The defects of cable ditch, is gradually notable.
1) above two cable duct Contraction in Site program is various, and long in time limit, resource cost is larger, causes live confusion Increase with security risk, management difficulty increases, and is unfavorable for the development of safety construction.
2) cost of above two cable duct is above prefabricated assembled cable trench, calculates according to 1 meter of cable duct, brick table About 700 yuan/meter of cost of face plastering ditch body, about 900 yuan/meter of armored concrete cable duct cost.
3) in comparison, brick cable duct due to the technological requirement of brick plastering it is higher, the quality of plastering is generally relatively low, hold Easily there is common quality defect;Cast-in-situ steel reinforced concrete cable duct is then difficult there are formwork, and ditch body concrete surface smoothness is difficult to protect Card.
4) above two cable duct due to resource cost it is more, and situ wet operation program is more, long in time limit, security civilization is applied Work is poor, does not adapt to the needs of current power engineering development." amphitypy one is changed " is advocated according to Guo Wang companies, i.e., it is resource-effective Type, environmentally friendly, industrialized requirement, it will be following developing direction to carry out prefabricated assembled cable trench.
5) for current prefabricated assembled cable trench since floor space is less than normal and width is partially narrow, overall stability is poor, because Often there is the problems such as inclination, sedimentation, deformation in ground variation;Especially itself Anti-inclining scarce capacity near rivers, is constructed and is opened It is more serious that larger its problem of location is flowed in the locations such as digging, i.e. underground.
6)Since ground changes, using cable duct ditch bottom surface soon often out-of-flatness and ponding, this is also current Cable duct common fault.
Therefore, on the basis of existing cable ditch, research and development is also needed to be resistant to tilt, settle, local deformation, the cable of ponding Ditch.
The content of the invention
For it is above-mentioned the problem of, the present invention provides a kind of bright cable duct of assembled, the construction of its industry type, sealing structure, right The fixed powerful connection mode of screw is struck, along with the corresponding underground foundation measure that adaptation to local conditions is taken, prevents from using soon The problems such as cable duct often occurs tilting, settles, deforms, ponding.
What the present invention was realized in:The bright cable duct of assembled includes underground foundation facility, cable duct assembly, in cable duct If cable bearer, ability of swimming cover board of setting up defences above cable duct, it is characterized in that:Cable duct assembly is located in the ground infrastructure the upper surface of; The cable duct assembly, embedded U-shaped sealing element between cable duct and cable duct or between cable duct and intercommunication cable duct, through pair It strikes after screw is fixed and is connected;
The cable duct, prefabricated cable duct be in industry type, the stent for ability of swimming cover board of setting up defences in it, its peripheral hardware anti-settling, Inclined extension edge, anti-settling, the both ends of inclined extension edge set three arms of angle and the body of cable duct connects;
The underground foundation facility, it includes mountain type cushion cap, rectangle cushion cap;Stake is set below the strip board of mountain type cushion cap Head is Anti-inclining pile crown among it;The corner pile crown of the rectangle frame cushion cap of rectangle cushion cap, the under-filled stone of rectangle cushion cap, Rubble, coarse sand are filled above, it is smooth after being then compacted.
Stent in cable duct is embedded type, and water-proof type cover board is embedded in above the stent of cable duct.
The bottom of cable duct sets rhone.
In the good location of geological state, cancel underground foundation facility in order to cost-effective, cable duct assembly is directly arranged in Above processed ground.
The present invention effect be:
1. prefabricated cable duct is constructed in industry type, since floor space is larger and wider, overall stability is much better, prevents Tilt capability increases substantially, and along with sealing structure, the fixed powerful connection mode of bucketing screw, makes its Anti-inclining, sinks Drop, deformability significantly improve;In the good location of geological state, cancel underground foundation facility, cable duct in order to cost-effective Assembly is laid immediately on above processed ground.
It 2., can be according to geological state adaptation to local conditions pointedly including mountain type cushion cap, the underground foundation facility of rectangle cushion cap Take, especially near rivers, the undergrounds such as construction and excavation flow larger location, can effectively set up defences.
3. assembly type cable slot solves existing brick plastering formula and armored concrete formula cable duct wet construction program is numerous and diverse The problem of, have the characteristics that the construction period is extremely short, saves resource, is easy for construction.
4. assembly type cable slot bottom of trench surfacing, the bottom of cable duct sets many places rhone again, is conducive to exclude product Water has well solved the common fault of bottom of trench ponding.
5. assembly type cable slot integral strength is high, durability is good.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is one of stereoscopic schematic diagram of the bright cable duct of assembled of the present invention.
Fig. 2 is the two of the stereoscopic schematic diagram of the bright cable duct of assembled of the present invention.
In figure:1. mountain type cushion cap, 2. cable ducts, 3. extension edges, 4. intercommunication cable ducts, 5. cable beareves, 6. Head, 7. rectangle cushion caps, 8. 4 jiaos of pile crowns.
Specific embodiment
As shown in the figure, the bright cable duct of assembled it include underground foundation facility, cable duct assembly, cable duct assembly is located at ground Lower infrastructure the upper surface of.Between cable duct 2 and cable duct 2 in cable duct assembly or between cable duct 2 and intercommunication cable duct 4 Embedded U-shaped sealing element is connected after the fixation of bucketing screw;Cable bearer 5 is set in cable duct 2, for supporting cable;Cable Ditch 2 is set up defences ability of swimming cover board above.
Prefabricated cable duct 2 is in industry type, the stent for ability of swimming cover board of setting up defences in it, its peripheral hardware anti-settling, inclined extension edge 3, anti-settling, the both ends of inclined extension edge 3 set three arms of angle and are connected with the body of cable duct 2, the end faces of three arms of angle set connecting groove, U-shaped seal channel, mounting hole;Stent in cable duct 2 is embedded type, and water-proof type cover board is embedded in above the stent of cable duct 2;Electricity The bottom of cable ditch 2 sets rhone, and is connected with sump, drainage system.
Underground foundation facility includes mountain type cushion cap 1, rectangle cushion cap 7;Pile crown 6 is set below the strip board of mountain type cushion cap 1, wherein Between for Anti-inclining pile crown, play that increasing is steady, even if the appearance such as ground construction excavation of both sides are substantially fluctuated, it will not sink very much Drop and inclination, just more it is over after on ground, backfill is restored.The corner pile crown 8 of the rectangle frame cushion cap of rectangle cushion cap 7, rectangle cushion cap 7 under-filled stone fills rubble, coarse sand above, smooth after being then compacted, non-since its good integrity, bearing-surface are again big Often it is suitable near rivers, the location for the geological stability difference that level of ground water is high.
In the good location of geological state, cancel underground foundation facility in order to cost-effective, cable duct assembly is directly laid with On processed ground.
The structure of the present invention is not limited to form described in embodiment, and those of ordinary skill in the art make according to the present invention Further expand each fall within protection scope of the present invention.
The bright cable duct of assembled of the present invention can implement mechanized construction, and short time limit, long lifespan, effect are good, to operating environment Almost without influence.

Claims (2)

1. a kind of bright cable duct of assembled, it includes underground foundation facility, cable duct assembly, cable duct(2)Inside set cable bearer (5), cable duct(2)It sets up defences above ability of swimming cover board, it is characterized in that:Cable duct assembly is located in the ground infrastructure the upper surface of;It is described Cable duct assembly, cable duct(2)With cable duct(2)Between, cable duct(2)With intercommunication cable duct(4)Between embedded U-shaped sealing Part is connected after the fixation of bucketing screw;Cable duct(2)Bottom set rhone;
The cable duct(2), prefabricated cable duct(2)In industry type, the stent for ability of swimming cover board of setting up defences in it, its peripheral hardware is anti-settling Drop, inclined extension edge(3), anti-settling, inclined extension edge(3)Both ends set three arms of angle and cable duct(2)Body connection;
The underground foundation facility, it includes mountain type cushion cap(1), rectangle cushion cap(7);Mountain type cushion cap(1)Strip board below If pile crown(6), it is Anti-inclining pile crown among it;Rectangle cushion cap(7)Rectangle frame cushion cap corner pile crown(8), rectangle cushion cap(7) Under-filled stone, above fill rubble, coarse sand, then be compacted after it is smooth.
2. the bright cable duct of assembled according to claim 1, it is characterized in that:Cable duct(2)Interior stent is embedded type, is prevented Ability of swimming cover board is embedded in cable duct(2)Stent above.
CN201710246630.0A 2017-04-16 2017-04-16 The bright cable duct of assembled Expired - Fee Related CN106877266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710246630.0A CN106877266B (en) 2017-04-16 2017-04-16 The bright cable duct of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710246630.0A CN106877266B (en) 2017-04-16 2017-04-16 The bright cable duct of assembled

Publications (2)

Publication Number Publication Date
CN106877266A CN106877266A (en) 2017-06-20
CN106877266B true CN106877266B (en) 2018-05-18

Family

ID=59163146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710246630.0A Expired - Fee Related CN106877266B (en) 2017-04-16 2017-04-16 The bright cable duct of assembled

Country Status (1)

Country Link
CN (1) CN106877266B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111463738A (en) * 2020-06-01 2020-07-28 合肥智瑞工程科技有限公司 Cable trench structure based on assembled
CN111463739B (en) * 2020-06-01 2021-03-30 徐成晓 Assembly type structure based on cable trench

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NZ544950A (en) * 2003-07-30 2009-12-24 Prysmian Cavi Sistemi Energia Shielding the magnetic field of a power transmission line using ferromagnetic elements creating a surrounding chamber
CN203787920U (en) * 2014-04-10 2014-08-20 江苏神马电力股份有限公司 Composite material cable trench
CN203983929U (en) * 2014-07-23 2014-12-03 新疆拓源节能技术开发有限责任公司 Assemble type underground cable ditch based on city integrated wiring
CN205610169U (en) * 2016-05-20 2016-09-28 温州电力设计有限公司 Cable trough box
CN205863876U (en) * 2016-08-10 2017-01-04 上海国孚电力设计工程股份有限公司 Steel cable duct device
CN206004274U (en) * 2016-09-12 2017-03-08 广州电力设计院 Cable groove structure and cabling arrangements
CN106558861A (en) * 2016-11-04 2017-04-05 安徽华电工程咨询设计有限公司 A kind of multi-functional cable ditch

Also Published As

Publication number Publication date
CN106877266A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN104088295B (en) The embedded connecting structure of enclosure wall and middle plate and construction method thereof in covered back-digging
KR100970766B1 (en) Process for reinforcing base and preventing wash-out of earth under the bridges
Grantz Immersed tunnel settlements. Part 1: nature of settlements
CN103981898A (en) Integral open-excavation node top-down underground engineering construction method
CN105672451A (en) Method for laying percolation type rainwater drainage pipes in Sponge City Construction
CN107151950A (en) The construction method of desert area railway underground water route moat
CN106877266B (en) The bright cable duct of assembled
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN106816848B (en) The dark cable duct of assembled
CN105544622A (en) Floating resisting device, and seepage insulation device and drainage path checking device thereof for underground building
CN102995601B (en) Municipal flood control integrated engineering construction technology for strong flushing embankment
CN107288120A (en) A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash
CN104846837B (en) The construction method of ultra-deep well in a kind of bright draining foundation ditch
CN205617396U (en) Close on existing railway line construction protection structure
CN103114605B (en) Anti-seepage drainage layer structure and construction method
CN114150628B (en) Rock-fill dam top spillway chute and construction method thereof
CN105673933A (en) Waterproof sealing device for post-through-wall pipeline and construction method
CN102296620A (en) Curtain water-stop slope wall and construction method thereof
CN211849240U (en) Overflow structure with combined water retaining wall and drainage ditch
CN210288414U (en) Supporting structure for building foundation pit
CN107217725A (en) A kind of hand excavation rides well and its construction method
CN204435321U (en) A kind of steam power station water intaking open channel
CN203144914U (en) Urban canal-bridge-and-culvert structure
CN106013238B (en) A kind of big earthing open trench tunnel subsidence control method of soft stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211227

Address after: 250000 west side of 3rd floor, Shandong building, No. 2-1, Ma'anshan Road, Lixia District, Jinan City, Shandong Province

Patentee after: Shandong linruiqi Education Technology Co.,Ltd.

Address before: 315040, room 24, Lane 165, Lane 1001, rainbow North Road, Jiangdong District, Zhejiang, Ningbo

Patentee before: Zhang Ruowei

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: Room 1428-A, High-tech Innovation Center, No. 67 Huiyuan Street, Laiwu High-tech Zone, Jinan City, Shandong Province, 250000

Patentee after: Shandong Future Talent Technology Co.,Ltd.

Address before: 250000 west side of 3rd floor, Shandong building, No. 2-1, Ma'anshan Road, Lixia District, Jinan City, Shandong Province

Patentee before: Shandong linruiqi Education Technology Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

CF01 Termination of patent right due to non-payment of annual fee