CN106875084A - Patrol and examine later stage task creation method and system - Google Patents

Patrol and examine later stage task creation method and system Download PDF

Info

Publication number
CN106875084A
CN106875084A CN201611234796.2A CN201611234796A CN106875084A CN 106875084 A CN106875084 A CN 106875084A CN 201611234796 A CN201611234796 A CN 201611234796A CN 106875084 A CN106875084 A CN 106875084A
Authority
CN
China
Prior art keywords
task
index
priority
equipment
response
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611234796.2A
Other languages
Chinese (zh)
Inventor
瀛d腹
季丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yuanxin Science and Technology Co Ltd
Original Assignee
Beijing Yuanxin Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yuanxin Science and Technology Co Ltd filed Critical Beijing Yuanxin Science and Technology Co Ltd
Priority to CN201611234796.2A priority Critical patent/CN106875084A/en
Publication of CN106875084A publication Critical patent/CN106875084A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work

Abstract

This application discloses later stage task creation method and system are patrolled and examined, wherein methods described includes:Server is received and patrols and examines data;Analysis is compared one by one to the data of patrolling and examining according to index evaluation standard is patrolled and examined;One or more Indexes Abnormalities in response to determining an equipment, obtain the corresponding index priority of each abnormal index and determine the limit priority in these index priority;For the equipment create maintenance task, wherein, using the limit priority as created task processing priority.The present invention can automatically determine the processing priority of task so that task can be completed timely and effectively, so that improve production efficiency.

Description

Patrol and examine later stage task creation method and system
Technical field
The application is related to electric digital data processing field, more particularly to patrols and examines later stage task creation method and system.
Background technology
It is the regular or casual inspection carried out to circuit, status of equipment etc. in equipment running process to patrol and examine, to send out as early as possible Existing hidden danger is simultaneously processed, it is to avoid the generation of accident, ensures that enterprise runs well.In current cruising inspection system, according to patrolling and examining knot The later stage task that fruit the produces such as processing sequence of maintenance and/or maintenance task is sorted according to the creation time of task.For Some need the situation of emergent management, and existing cruising inspection system cannot make corresponding task obtain priority treatment.Additionally, for will mistake The task of phase, cannot complete according to normal task processor within the prescribed time-limit, and now existing system cannot also cause it Can process in time.
The content of the invention
In order to overcome the deficiencies in the prior art, the technical problem to be solved in the present invention to be to provide one kind and patrol and examine the later stage Task creation method and system, its processing priority that can automatically determine task so that task can be completed timely and effectively, so that Relevant device is set to return to normal production as early as possible.
In order to solve the above technical problems, the present invention patrols and examines later stage task creation method, including:
Server is received and patrols and examines data;
Analysis is compared one by one to the data of patrolling and examining according to index evaluation standard is patrolled and examined;
One or more Indexes Abnormalities in response to determining an equipment, obtain the corresponding index priority of each abnormal index And determine the limit priority in these index priority;
Maintenance task is created for the equipment, wherein, the treatment of the limit priority as created task is excellent First level.
Used as the improvement of the method for the invention, the index evaluation standard of patrolling and examining is including under index ID or title, index Limit value, index higher limit and index priority.
As the further improvement of the method for the invention, index evaluation standard is patrolled and examined described, for same index, Different index lower limits different index priority corresponding with index higher limit scope.
Improved as the another kind of the method for the invention, it is described to include for equipment establishment maintenance task:It is determined that Warping apparatus record in whether the existing equipment;The existing equipment is recorded in response to the warping apparatus, it is determined that Whether the maintenance time of equipment is less than the corresponding uplink time for patrolling and examining data of the equipment described in the warping apparatus record; The uplink time is less than in response to the maintenance time, is that the equipment creates new maintenance task.
Used as another improvement of the method for the invention, methods described also includes:In response to user to server request Task data, server is checked each unfinished task;Will be expired in response to a task, improve the place of the task Reason priority.
In order to solve the above technical problems, the present invention patrols and examines later stage task creation system, including:
Receiver module, data are patrolled and examined for receiving server;
Analysis module, patrols and examines index evaluation standard and is compared analysis one by one to the data of patrolling and examining for basis;
Priority Determination module, for one or more Indexes Abnormalities in response to determining an equipment, obtains each exception The corresponding index priority of index simultaneously determines the limit priority in these index priority;
Task creation module, for creating maintenance task for the equipment, wherein, using the limit priority as institute The processing priority of establishment task.
Used as the improvement of system of the present invention, the task creation module includes:Record search submodule, for determining Warping apparatus record in whether the existing equipment;Time comparison sub-module, in response to warping apparatus record The existing equipment, determines whether the maintenance time of equipment described in the warping apparatus record is corresponding less than the equipment Patrol and examine the uplink time of data;Task creation submodule, is institute for being less than the uplink time in response to the maintenance time State equipment and create new maintenance task.
Improved as the another kind of system of the present invention, the system also includes:Task check module, in response to User is checked each unfinished task to server request task data, server;Priority improves module, is used for Will be expired in response to a task, improve the processing priority of the task.
In order to solve the above technical problems, tangible computer computer-readable recording medium of the invention, including for performing of the invention patrolling Examine the computer program code of later stage task creation method.
In order to solve the above technical problems, the present invention provides a kind of device, including at least one processor;And at least one deposit Reservoir, containing computer program code, at least one memory and the computer program code are configured to, with institute At least one processor is stated so that described device performs at least part of step for patrolling and examining later stage task creation method of the invention.
According to the present invention, the corresponding priority for patrolling and examining index can be automatically determined according to result is patrolled and examined, it is then determined that create Later stage maintenance or the processing priority of maintenance task so that staff can complete later stage task according to priority, and priority be got over Task high is more first completed, and farthest to reduce the influence that hidden trouble of equipment, failure etc. are produced to enterprise, improves production effect Rate.Additionally, for task that will be expired, can suitably adjust its processing priority so that task can be completed in time, reduce The generation of task of reexamining.
After the detailed description of embodiment of the present invention is read in conjunction with the figure, other features of the invention and advantage will become more Plus it is clear.
Brief description of the drawings
Fig. 1 is the flow chart of the embodiment according to the inventive method.
Fig. 2 is the structural representation of the embodiment according to present system.
For clarity, these accompanying drawings are figure that is schematic and simplifying, and they are only gived for understanding institute of the present invention Necessary details, and omit other details.
Specific embodiment
Embodiments of the present invention and embodiment are described in detail with reference to the accompanying drawings.
By detailed description given below, the scope of application of the invention will be evident that.It will be appreciated, however, that detailed While thin description and specific example show the preferred embodiment of the present invention, they are given only for illustration purpose.
In this manual, index refers to the equipment item Index for examination patrolled and examined, such as device temperature, equipment noise.
In cruising inspection system, mission mode includes two kinds:Common task and patrol and examine exception item task.Common task is directed to solid Some equipment creates task, and patrols and examines exception item task and be directed to the exception item establishment task patrolled and examined in result.
Term " maintenance " refers to maintenance, maintenance or any other equipment is recovered normal processing mode.
With reference to flow chart shown in Fig. 1 to each step of the embodiment for patrolling and examining later stage task creation method of the invention It is specifically described.
Server end can provide the function of user configuring task grade in web interface.User is according to respective situation, configuration Task processes grade, for example, promptly, it is ordinary emergency, common, or represent priority level respectively with numeral 0123 ..., it is several Word is bigger, and priority level is higher.Alternately, server end also can pre-set criteria grade classification, user is according to the standard Grade is carried out the work.
Server end also presets patrols and examines index evaluation standard.Patrolling and examining index evaluation standard at least includes index ID or name Title, index lower limit, index higher limit and index priority.The standard can be embodied by the tables of data of index evaluation standard scale. For example, index evaluation standard scale has following structures:
Index ID or title:The equipment item Index for examination (such as device temperature, equipment noise) added during patrol task
Lower limit:The corresponding lower limit of a certain grade
Higher limit:The higher limit of a certain grade correspondence index
Grade or grade ID:The lower limit and the corresponding priority level of higher limit scope or grade ID
Server end also presets warping apparatus record sheet, and user preserves exception item information, and its data structure is for example such as Under:
DeviceID:Device id
Grade:Grade ID
Whether maintain:Acquiescence is no
Whether repair:Acquiescence is no
Service time:Acquiescence 1970-01-01
Maintenance time:Acquiescence 1970-01-01
In step S102, what each inspection terminal of server reception was uploaded patrols and examines data, such as current temperature of equipment, noise Deng.
In step S104, server patrols and examines data with corresponding assessment to what is received one by one according to index evaluation standard is patrolled and examined Standard is compared analysis, it is determined whether there is Indexes Abnormality.For example, part index number evaluation criteria is as follows:
Receive to patrol and examine data for example as follows:
Data i.e. index 003 is patrolled and examined for Article 3 above, because desired value " 20 " is in the limiting value of corresponding index Outside scope 30-60, show that index 003 is normal.And the desired value " 60 " of index 002 is in corresponding limits 31-100 It is interior, show that the index 002 is present abnormal.Equally, index 001 there is also exception.
In step S106, one or more Indexes Abnormalities in response to determining an equipment obtain each abnormal index correspondence Index priority and determine the limit priority in these index priority.Referring to above example, equipment 1 is determined (device1) index 001 and 002 is abnormal, and its corresponding priority is respectively 2 and 3, therefore after " 3 " are defined as into equipment 1 The processing priority of phase maintenance task.
In step S108, maintenance task is created for equipment 1, wherein, the limit priority that step S106 is determined as The processing priority of created task.In the above example, the processing priority of equipment 1 is " 3 ".
So as to, in patrol task, evaluation criteria is formulated by patrolling and examining an index item to each, server end is on user The data of patrolling and examining for passing are analyzed, and are compared according to evaluation criteria one by one for the abnormal index item for patrolling and examining item, therefrom obtain Highest grade as the equipment item priority.During establishment task, using in the equipment item of task choosing highest ranking as appoint The priority level of business.So as to task can be processed according to priority, the equipment item under task can also be according to preferential grading Row treatment, reaches the purpose that task is timely and effectively processed.
According to a kind of implementation method of the inventive method, index evaluation standard is patrolled and examined described, for same index, no Same index lower limit different index priority corresponding with index higher limit scope, assists in in the case of Indexes Abnormality Need the degree of emergent management.For example, in the above example, the corresponding priority of 51-80 scopes of index 001 is 2, and 81- The 100 corresponding priority level of scope is 3.
It is described to include for equipment establishment maintenance task according to the another embodiment of the inventive method:It is determined that Whether there is the record of the equipment (in the above example, being equipment 1) of exception in warping apparatus record, if not In the presence of warping apparatus item is inserted into warping apparatus table.Conversely, the presence is abnormal in determining warping apparatus record setting Whether standby maintenance/maintenance time accordingly patrols and examines the uplink time of data less than it, if maintenance/maintenance time is less than on described The biography time, it is determined that the equipment needs to safeguard (maintenance is repaired), then by " whether having maintained " in warping apparatus record sheet/ Whether the value of " having repaired " field is revised as "No", and creates new maintenance task for this has abnormal equipment.If maintenance/ Maintenance time is more than the uplink time, it is determined that the equipment had just been safeguarded, without creating later maintenance task.This can be effective Avoid repeating to create later stage task, improve production efficiency.
According to another implementation method of the inventive method, except combining shown in Fig. 1 and in addition to described step, methods described Also include:In response to user to server request task data, server is checked each unfinished task;If really A fixed task will be expired, such as the reminder time according to the task determines, if the task reminder time to when still Do not complete, that is, being considered as it will be expired, and the processing priority of the task now is improved into one or more levels, allow a user in time Task is completed.
Fig. 2 shows the schematic diagram of the embodiment for patrolling and examining later stage task creation system of the invention, the system bag Include:Receiver module 210, data are patrolled and examined for receiving server;Analysis module 220, index evaluation standard is patrolled and examined for basis Analysis is compared one by one to the data of patrolling and examining, wherein the index evaluation standard of patrolling and examining includes index ID or title, index Lower limit, index higher limit and index priority, and for same index, different index lower limit and index higher limit scope The different index priority of correspondence;Priority Determination module 230, for different in response to determining one or more indexs of an equipment Often, obtain the corresponding index priority of each abnormal index and determine the limit priority in these index priority;Task is created Modeling block 240, for creating maintenance task for the equipment, wherein, using the limit priority as created task Processing priority.
A kind of implementation method of system according to the invention, the task creation module includes:Record search submodule, is used for It is determined that warping apparatus record in whether the existing equipment;Time comparison sub-module, in response to the warping apparatus The existing equipment is recorded, determines the maintenance time of equipment described in the warping apparatus record whether less than the equipment The corresponding uplink time for patrolling and examining data;Task creation submodule, for being less than the uplink time in response to the maintenance time, For the equipment creates new maintenance task.
The another embodiment of system according to the invention, except combine Fig. 2 shown in and described module in addition to, the system Also include:Task checks module, in response to user, to server request task data, server to be appointed to each unfinished Business is checked;Priority improves module, for will be expired in response to a task, improves the processing priority of the task.
Multiple difference embodiments described herein or its special characteristic, structure or characteristic can be at one of the invention or many It is appropriately combined in individual implementation method.In addition, in some cases, if suitably, in flow chart and/or stream treatment description step Rapid order can be changed, and accurately must not necessarily be performed in the described sequence.In addition, multiple different aspects of the invention can be used Software, hardware, firmware or its other computer-implemented modules or device for combining and/or performing the function carry out reality Apply.Software implementation of the invention may include to be stored in computer-readable medium and by holding that one or more processors are performed Line code.Computer-readable medium may include computer hard disc driver, ROM, RAM, flash memory, pocket computer storage medium such as CD-ROM, DVD-ROM, flash disc drives and/or such as other devices with USB (USB) interface, and/or appoint What its appropriate tangible or non-of short duration computer-readable medium or executable code can be preserved thereon and by computing device Computer storage.The present invention can be used with reference to any appropriate operating system.
Unless explicitly stated otherwise, singulative as used herein " ", " being somebody's turn to do " include plural reference (i.e. with " at least one " The meaning).It will be further understood that terminology used herein " having ", " including " and/or "comprising" show to exist it is described Feature, step, operation, element and/or part, but do not preclude the presence or addition of one or more other features, step, behaviour Work, element, part and/or its combination.Term "and/or" as used in this includes one or more relevant items enumerated Any and all combination.
Some currently preferred embodiments of the present invention is foregoing described, it should be emphasized, however, that the present invention is not limited to these Embodiment, and can be the other manner realization in the range of present subject matter.Those skilled in the art can be in the technology of the present invention The inspiration of design and do not depart from various changes and modifications are made to the present invention on the basis of present invention, these deformations or change Still fall within protection scope of the present invention.

Claims (10)

1. one kind patrols and examines later stage task creation method, it is characterised in that methods described includes:
Server is received and patrols and examines data;
Analysis is compared one by one to the data of patrolling and examining according to index evaluation standard is patrolled and examined;
One or more Indexes Abnormalities in response to determining an equipment, obtain the corresponding index priority of each abnormal index simultaneously really Limit priority in fixed these index priority;
For the equipment create maintenance task, wherein, using the limit priority as created task processing priority.
2. method according to claim 1, it is characterised in that the index evaluation standard of patrolling and examining includes index ID or name Title, index lower limit, index higher limit and index priority.
3. method according to claim 2, it is characterised in that index evaluation standard is patrolled and examined described, for same finger Mark, different index lower limits different index priority corresponding with index higher limit scope.
4. method according to claim 1, it is characterised in that described to create maintenance task for the equipment and include:
It is determined that warping apparatus record in whether the existing equipment;
The existing equipment is recorded in response to the warping apparatus, the maintenance of equipment described in the warping apparatus record is determined Whether the time is less than the corresponding uplink time for patrolling and examining data of the equipment;
The uplink time is less than in response to the maintenance time, is that the equipment creates new maintenance task.
5. according to any described methods of claim 1-4, it is characterised in that methods described also includes:
In response to user to server request task data, server is checked each unfinished task;
Will be expired in response to a task, improve the processing priority of the task.
6. one kind patrols and examines later stage task creation system, it is characterised in that the system includes:
Receiver module, data are patrolled and examined for receiving server;
Analysis module, patrols and examines index evaluation standard and is compared analysis one by one to the data of patrolling and examining for basis;
Priority Determination module, for one or more Indexes Abnormalities in response to determining an equipment, obtains each abnormal index Corresponding index priority simultaneously determines the limit priority in these index priority;
Task creation module, for creating maintenance task for the equipment, wherein, using the limit priority as being created The processing priority of task.
7. system according to claim 6, it is characterised in that the index evaluation standard of patrolling and examining includes index ID or name Title, index lower limit, index higher limit and index priority.
8. system according to claim 7, it is characterised in that index evaluation standard is patrolled and examined described, for same finger Mark, different index lower limits different index priority corresponding with index higher limit scope.
9. system according to claim 6, it is characterised in that the task creation module includes:
Record search submodule, for determine warping apparatus record in whether the existing equipment;
Time comparison sub-module, for recording the existing equipment in response to the warping apparatus, determines the warping apparatus Whether the maintenance time of equipment described in record is less than the corresponding uplink time for patrolling and examining data of the equipment;
Task creation submodule, is that the equipment establishment is new for being less than the uplink time in response to the maintenance time Maintenance task.
10. according to any described systems of claim 6-9, it is characterised in that the system also includes:
Task checks module, in response to user, to server request task data, server to be to each unfinished task Checked;
Priority improves module, for will be expired in response to a task, improves the processing priority of the task.
CN201611234796.2A 2016-12-28 2016-12-28 Patrol and examine later stage task creation method and system Pending CN106875084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611234796.2A CN106875084A (en) 2016-12-28 2016-12-28 Patrol and examine later stage task creation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611234796.2A CN106875084A (en) 2016-12-28 2016-12-28 Patrol and examine later stage task creation method and system

Publications (1)

Publication Number Publication Date
CN106875084A true CN106875084A (en) 2017-06-20

Family

ID=59164074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611234796.2A Pending CN106875084A (en) 2016-12-28 2016-12-28 Patrol and examine later stage task creation method and system

Country Status (1)

Country Link
CN (1) CN106875084A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108346001A (en) * 2018-02-10 2018-07-31 杭州后博科技有限公司 A kind of steel tower regular visit project order method of adjustment and system
CN108616668A (en) * 2018-04-09 2018-10-02 平安科技(深圳)有限公司 Method, electronic device and the computer readable storage medium of task are dialed in monitoring
CN110497331A (en) * 2018-05-16 2019-11-26 李迪 Hidden danger is assisted to identify crusing robot
CN111722977A (en) * 2020-05-29 2020-09-29 北京宝兰德软件股份有限公司 System inspection method and device and electronic equipment
CN113516391A (en) * 2021-07-15 2021-10-19 环球车享汽车租赁有限公司 Method for processing vehicle inspection task, computing device and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617110A (en) * 2013-11-11 2014-03-05 国家电网公司 Server device condition maintenance system
CN103824340A (en) * 2014-03-07 2014-05-28 山东鲁能智能技术有限公司 Intelligent inspection system and inspection method for electric transmission line by unmanned aerial vehicle

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617110A (en) * 2013-11-11 2014-03-05 国家电网公司 Server device condition maintenance system
CN103824340A (en) * 2014-03-07 2014-05-28 山东鲁能智能技术有限公司 Intelligent inspection system and inspection method for electric transmission line by unmanned aerial vehicle

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108346001A (en) * 2018-02-10 2018-07-31 杭州后博科技有限公司 A kind of steel tower regular visit project order method of adjustment and system
CN108616668A (en) * 2018-04-09 2018-10-02 平安科技(深圳)有限公司 Method, electronic device and the computer readable storage medium of task are dialed in monitoring
CN108616668B (en) * 2018-04-09 2020-12-04 平安科技(深圳)有限公司 Method for monitoring dialing task, electronic device and computer readable storage medium
CN110497331A (en) * 2018-05-16 2019-11-26 李迪 Hidden danger is assisted to identify crusing robot
CN111722977A (en) * 2020-05-29 2020-09-29 北京宝兰德软件股份有限公司 System inspection method and device and electronic equipment
CN113516391A (en) * 2021-07-15 2021-10-19 环球车享汽车租赁有限公司 Method for processing vehicle inspection task, computing device and storage medium

Similar Documents

Publication Publication Date Title
CN106875084A (en) Patrol and examine later stage task creation method and system
US20200302710A1 (en) Automobile trouble diagnosis method, automobile trouble diagnosis apparatus, and electronic device
EP2854053A1 (en) Defect prediction method and device
CN108664480B (en) Multi-data-source user information integration method and device
US20140046945A1 (en) Indicating documents in a thread reaching a threshold
CN108170566A (en) Product failure information processing method, system, equipment and collaboration platform
CN105488185B (en) A kind of optimization method and device of knowledge base
US9904967B1 (en) Automated secondary linking for fraud detection systems
CN107679089B (en) Cleaning method, device and system for power sensing data
Jin et al. Efficient board-level functional fault diagnosis with missing syndromes
JP5200970B2 (en) Quality control system, quality control device and quality control program
US9881045B2 (en) System and method for processing data
CN109542737A (en) Platform alert processing method, device, electronic device and storage medium
KR101331452B1 (en) Method for providing database management and the database management server there of
CN114429256A (en) Data monitoring method and device, electronic equipment and storage medium
WO2019019429A1 (en) Anomaly detection method, device and apparatus for virtual machine, and storage medium
CN112558461B (en) Output signal voting method for redundancy unmanned aerial vehicle airplane management computer
CN104933077A (en) Rule-based multi-file information analysis method
CN104503982B (en) A kind of method that CMDB configuration items reconcile
CN104539449A (en) Handling method and related device for fault information
US10860781B2 (en) Event detection based on text streams
CN106649584A (en) Index processing method and device in master-slave database system
US20190333294A1 (en) Detecting fault states of an aircraft
CN115941441A (en) System link automation monitoring operation and maintenance method, system, equipment and medium
WO2022265884A8 (en) Data governance systems and methods

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620