CN106874191A - Intelligence database performs method and system - Google Patents

Intelligence database performs method and system Download PDF

Info

Publication number
CN106874191A
CN106874191A CN201710001948.2A CN201710001948A CN106874191A CN 106874191 A CN106874191 A CN 106874191A CN 201710001948 A CN201710001948 A CN 201710001948A CN 106874191 A CN106874191 A CN 106874191A
Authority
CN
China
Prior art keywords
test
script
test script
project
intelligence database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710001948.2A
Other languages
Chinese (zh)
Other versions
CN106874191B (en
Inventor
陈萌萌
惠晓辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dashu Xinke Technology Co ltd
Original Assignee
Shanghai Feixun Data Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Feixun Data Communication Technology Co Ltd filed Critical Shanghai Feixun Data Communication Technology Co Ltd
Priority to CN201710001948.2A priority Critical patent/CN106874191B/en
Publication of CN106874191A publication Critical patent/CN106874191A/en
Application granted granted Critical
Publication of CN106874191B publication Critical patent/CN106874191B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

Method and system is performed the present invention relates to a kind of intelligence database.The method is comprised the following steps:S1:Start test, judge to whether there is executive plan in execution step;S2:If there is executive plan, perform step and obtain required test script by the way that the script acquisition methods based on mapping relations are automatic from the test script collection of project;If not existing executive plan, the test script for needing is selected from the test script collection of project;S3:According to the test script obtained in step S2, test script is performed;In step S2, comprise the following steps again:S2.1:The test script for belonging to executive plan is concentrated to enter line flag test script;S2.2:When there is executive plan, performing step and directly running the test script for having indicated.Advantage is:The present invention has the advantages of being easy to maintenance, durability and efficiency high.

Description

Intelligence database performs method and system
Technical field
Method and system is performed the invention belongs to software test field, more particularly to a kind of intelligence database.
Background technology
Automatic test is, a kind of process that machine execution is converted into the artificial behavioral test for driving, to be used according to test The description of example is performed step by step, the comparing of actual result and expected result is obtained, it is necessary to manual operation is carried out in test process Intervene test, efficiency is very low.
In order to solve the above problems, test run efficiency is improved, people have carried out long-term exploration, for example, Chinese patent Disclose a kind of storage card test device [application number:CN200810215712.X], it includes:One main frame, is used to access one and deposits Card storage;One database, is used to safeguard multiple test script files, wherein, each test script file includes an at least test item Mesh and a communications protocol, the test event depend on a test system corresponding to a device discre value, and the communications protocol with The storage card is associated;One processing unit, is coupled to the database, among a test script file, selection one is tested Project;And an interface, the processing unit and the main frame are connected to, according to the test event, to make the main frame to the storage Card performs at least one and stores card command, wherein, the processing unit is by comparing a test result and the test pin of the storage card Presents, is used to be confirmed whether to have completed the test event.
For another example, a kind of regression test automatic system and method [application number:CN200810135124.5], including test wrapper Border unit, the test environment unit includes equipment under test and test instrumentation, it is characterised in that also perform list including test and management Unit and test database, the test and management execution unit include:Test case management module, test suite management module, test Environment Management module, regression test management module, test run scheduler and test run engine;The test database bag Include:Test plan storehouse, test case library, regression test storehouse and operating statistic storehouse;
Wherein, the test case management module is used for management service test case, and according to test suite management module Request, the test case in test case library is sent to test suite management module;The test suite management module be used for from Regression test management module obtains test suite and builds framework, builds test suite construction strategy, is passed through according to test suite construction strategy Test case management module extracts test case from test case library, builds regression test set and submits to regression test storehouse;It is described Test environment management module is used to manage test environment unit, the configuration of generation test environment and environment topology and store to arrive to return to survey In examination storehouse;And the distribution for test equipment resource and scheduling;The regression test management module is tested for management configuration Plan storehouse, test plan framework is extracted from test plan storehouse, and generation test suite builds framework and is stored in test plan storehouse, and will The test suite builds framework and is sent to test suite management module;It is additionally operable to detect test plan, starts test run scheduler; The test run scheduler is used to notify that test environment management module detects test environment, application test resource;It is additionally operable to lead to Test suite management module scheduling regression test set is crossed, and test run is started according to the instruction of regression test management module and drawn Hold up;The test run engine is used to perform the regression test set, and exports test execution result to operation result statistics storehouse.
In this test process of such scheme, artificial action is reduced, test script is voluntarily mainly installed by machine and is held OK, such automatic test can save substantial amounts of human resources.
Test script has very important low level to automatic test, determines the efficiency of test run, but above-mentioned Two schemes sometimes need to carry out testing mobile phone shape during test according to project (mobile phone model classification) or handset capability State, but, in both cases, the test script between them has repetition, and tester normally writes test respectively During script, belong to respectively in each project or under handset capability list;The script so write is more complicated, and repeatability is high not It is good to safeguard, as shown in figure 1, test script is stored in below the path of project and executive plan respectively, but, test script in fact Content of the content of collection 1 comprising test script 1, the content of the content comprising test script 2 of test script collection 2, test script collection 3 Content of the content comprising test script 3, can so cause test script various, bad arrangement with safeguard, testing efficiency is inadequate It is high.
The content of the invention
Regarding the issue above, the present invention provides a kind of intelligence database that can improve script testing efficiency is performed Method.
It is another object of the present invention to regarding to the issue above, there is provided a kind of intelligent number of the use that can improve script testing efficiency The system that method is performed according to storehouse.
To reach above-mentioned purpose, present invention employs following technical proposal:
Intelligence database of the invention performs method, comprises the following steps:
S1:Start test, judge to whether there is executive plan in execution step;
S2:If there is executive plan,
Perform step and obtain institute by the way that the script acquisition methods based on mapping relations are automatic from the test script collection of project Need test script;
If not existing executive plan,
The test script for needing is selected from the test script collection of project;
S3:According to the test script obtained in step S2, test script is performed.
In above-mentioned intelligence database execution method, in step s 2, the script acquisition side based on mapping relations Method is comprised the following steps:
S2.1:The test script for belonging to executive plan is concentrated to enter line flag test script;
S2.2:When there is executive plan, performing step and directly running the test script for having indicated.
In above-mentioned intelligence database execution method, in step S2.1, the method for test script mark includes:Pass through Concentrated in test script before the test script for belonging to executive plan plus at least one flag bit.
In above-mentioned intelligence database execution method, in step S2.2, when there is executive plan, step is performed straight Connect and operate in the test script containing flag bit before it, other test scripts for not containing flag bit do not run.
In above-mentioned intelligence database execution method, in step s 2, when in the absence of executive plan, tester passes through Manual mode concentrates the test script of selection needs from the test script of project.
In above-mentioned intelligence database execution method, the project include functional test project, compatibility test project, Cross-beta project, install unloading test event and pressure test project in any one or more.
In above-mentioned intelligence database execution method, before step S1, test script is first placed on the road of project In test script collection under footpath.
In above-mentioned intelligence database execution method, in step s 2, the test script includes linear script, structure Change any one or more combination in script, shared script, data-driven script and crucial word drive script.
In above-mentioned intelligence database execution method, described linear script includes keystroke, function key, arrow, control Any one or more combination in the operating key of test software and the numerical key of input data.
The invention also discloses a kind of intelligence database execution system that method is performed using above-mentioned intelligence database.
The present invention has easy to operate compared to prior art, safeguards that durability is high beneficial to script, the advantages of efficiency high.
Brief description of the drawings
Fig. 1 is that prior art database performs method schematic diagram;
Fig. 2 is the flow chart of the embodiment of the present invention one.
Specific embodiment
The following is the preferred embodiments of the present invention and with reference to accompanying drawing, technical scheme is further described, But the present invention is not limited to these embodiments.
Embodiment one
Intelligence database of the invention performs method and comprises the following steps:
S1:Start test, judge to whether there is executive plan in execution step;
S2:If there is executive plan,
Perform step and obtain institute by the way that the script acquisition methods based on mapping relations are automatic from the test script collection of project Need test script;
If not existing executive plan,
The test script for needing is selected from the test script collection of project;
Wherein, the executive plan method of inquiry storage sentence in the project includes following sentence:
S3:According to the test script obtained in step S2, test script is performed.
And in step s 2, the script acquisition methods based on mapping relations are comprised the following steps:
S2.1:The test script for belonging to executive plan is concentrated to enter line flag test script;
S2.2:When there is executive plan, performing step and directly running the test script for having indicated.
Specifically, in step S2.1, the method for test script mark includes:Belong to execution by being concentrated in test script Before the test script of plan plus at least one flag bit, that is to say, that can add two flag bits or three flag bits etc. with Mark accuracy is improved, but the present embodiment is in order to simplify script test case, directly uses a flag bit.
Further, when there is executive plan, performing step and running directly in the test script containing flag bit before it, Other test scripts for not containing flag bit do not run.It is now automatic test course.
And when not existing executive plan, tester manually concentrates what selection needed from the test script of project Test script.Now just switch to manual test process from automatic testing process, script is searched by staff manually, according to oneself Judgement directly using script or enter edlin change after tested.
The present embodiment will manually with combined automatically, some are basic, logicality it is weak operate with automatic test, than Such as regression test, secondly, automatic test is operated with by some manual testings realization difficulty or relatively costly, this Generic operation is the test script with flag bit, is had using automatic test simple to operate, it is to avoid script repeats to write, preferably Using resource, testing efficiency is improved, reduce the input of manual testing, it is to avoid the advantages of mistake occurs;Which is specifically described below The more applicable automation mechanized operation of a little situations:
1st, stablize relatively for some of project module, and the very big situation of certain module demand shift, can be to phase Module to stabilization carries out automatic test, and it is still to test by hand to change larger;
2nd, the project cycle is more long, due to determination, the design of automated test frame, the test script of automatic test demand To write be required to debugging and complete for quite a long time.Inherently one exploitation of test software of such process Journey is, it is necessary to longer time is completed.If the period ratio of project is shorter, no time enough goes to support such a mistake Journey, then automatic test just loses the meaning of its script.
3rd, automatic test script is reusable, and specifically, the reuse of automatic test script will be from three Aspect is considered, between the project on the one hand tested whether very big otherness (such as difference of C/S systems and B/S systems); Whether selected testing tool adapts to this species diversity;Finally, whether tester has the ability to develop and adapts to this species diversity Automated test frame.
The stability of test script determines the maintenance cost of automatic test, if software requirement changes excessively frequently, Tester needs to update the test script of test case and correlation according to the demand for changing, and the maintenance of script is inherently It is a process for code development, it is necessary to change, debug, the framework of automatic test is also changed when necessary, if institute The cost of cost is not less than the testing cost using its saving, then automatic test is failure, now just needs to keep It is manual testing.
In addition, the stronger operation of some logicalities is then left for and is manually tested, and it is suitable manually to search in the project Test script directly or through test operation is carried out after editor, can be pondered a problem from different angles in test process.
The present embodiment, by the way of both combine, can accomplish 100% covering software function, reduce cost of labor, will Some cycle times are long, and reusability is high, and metastable test script gives full play to it conveniently, quickly, efficiently, accurate Effect is really waited, while the advantage of manual testing can be played again.
In above-mentioned intelligence database execution method, the project include functional test project, compatibility test project, Cross-beta project, any one or more for installing in unloading test event and pressure test project, in order to ensure what is tested Integrality, the project of the present embodiment includes foregoing all items, wherein,
Functional test project:Refer to the function items of analytic function module, test whether each function items can be realized, specifically Say that exactly flow of the corresponding function according to test cases (Test Case) or software in itself is surveyed one by one to concrete function point in ground Examination, it is ensured that each point can correctly realize corresponding function;
Compatibility test project:Refer to that installing application to the equipment of in the market main flow performs test, it is ensured that can normally run, While different brands mobile phone, heterogeneous networks, the compatible survey between different brands and the SIM/PIM cards of different capabilities size Examination, by taking short message as an example:The Personal Handyphone System of China Telecom receives the short message sent from China Mobile or CHINAUNICOM GSM, connects Receive, whether display and recovery function normal etc.;
Cross-beta project:Event or conflict test are called, the test event is extremely important, can find to be dived in many applications Performance issue, specifically refer to during One function is carrying out, while another event or operation are entered to the process The test of row interference.Short message or noisy to ring for example is received in communication process, it should will not lead with the collision event for performing interference The serious problems such as mobile phone crashes or flower shields are caused, for the application being currently running, if being responded into other softwares such as short message, phones Situation, do not interfere with and test application, and can ensure using can correctly run.
Unloading test event is installed:Refer to ensure to apply correctly pacify loading, unloading, and can correctly run (including application Upgrading test:The state of application before and after upgrading);
Pressure test project:Boundary value tolerating measure or limit load test are called, i.e., in test process, have reached certain The utmost carrying ability of the maximum capacity of one software function, boundary value or maximum, still carries out associative operation, especially to customer volume to it Greatly, interactivity interface applications high mouthful perform pressure test, it is ensured that applying can normally run in the case where large user measures, for example The reception and transmission of short message are carried out continuously, more than the maximum bar number that inbox and PIM cards may store, short message is still carried out Reception or transmission, can performance with inspection software under the conditions of hypernormal receive assessing user.
Move back problem certainly for the very big application sudden strain of a muscle of the occurrence probability on mobile phone, or the present embodiment test event, Backward reference certain module (module that data are constantly obtained), switching application repeats to submit to, incoming call interaction etc. is all to dodge to move back probability Big the reason for, improve test breadth and depth.
Further, before step S1, in the test script collection that first test script is placed under a destination path.
And in step s 2, the test script includes linear script, structuring script, shared script, data-driven pin Originally any one or more combination and in crucial word drive script, and the test script of the present embodiment uses all foregoing pin This set, wherein,
Linear script:Refer to record the script that the test case for performing by hand is obtained;
Structuring script:Similar to Structured Programming, containing the instruction of control script formulation in structuring script, this It is a little to instruct or for control structure or to call structure;
Shared script:Script may be used by multiple test cases;
Data-driven script:By test input storage in independent file, without being stored in script;
Crucial word drive script:The logical extension of more complicated data driven technique.
Described linear script includes the number of keystroke, function key, arrow, the operating key of control test software and input data Any one or more combination in keyboard, in order to ensure the range of test, linear script is by foregoing keystroke, work(for the present embodiment In the numerical key of energy key, arrow, the operating key of control test software and input data is all contained in.
Embodiment two
The present embodiment is the intelligence database execution system of a kind of intelligence database execution method in use embodiment one, The database execution system includes item Path module, executive plan module, automatic test module and manual test module, wherein Containing multiple test script collection modules in item Path module, while containing multiple test script lists in each set of scripts module Unit, and belong to the test script unit of executive plan module and include flag bit, the database execution system of the present embodiment only has Item Path module contains test script unit, when there is executive plan, it is only necessary to searched in item Path module The test script unit belonged in executive plan module with flag bit, is automatically brought into operation if finding, can Reusable script is fully used, and improves testing efficiency;The artificial operation if not finding.With easy to operate, Test reuse and efficiency high, the advantages of safeguarding and resource can be better profited from beneficial to script.
Specific embodiment described herein is only to the spiritual explanation for example of the present invention.Technology neck belonging to of the invention The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from spirit of the invention or surmount scope defined in appended claims.
Although more having used the terms such as set of scripts, flag bit, executive plan project herein, it is not precluded from using it The possibility of its term.It is used for the purpose of more easily describing and explaining essence of the invention using these terms;They are solved Any additional limitation is interpreted into all to be disagreed with spirit of the present invention.

Claims (10)

1. a kind of intelligence database performs method, it is characterised in that including:
S1:Start test, judge to whether there is executive plan in execution step;
S2:If there is executive plan, step is performed by the script acquisition methods based on mapping relations from the test script of project It is automatic in collection to obtain required test script;
If not existing executive plan, the test script for needing is selected from the test script collection of project;
S3:According to the test script obtained in step S2, test script is performed.
2. intelligence database according to claim 1 performs method, it is characterised in that in step s 2, described based on reflecting The script acquisition methods for penetrating relation are comprised the following steps:
S2.1:The test script for belonging to executive plan is concentrated to enter line flag test script;
S2.2:When there is executive plan, performing step and directly running the test script for having indicated.
3. intelligence database according to claim 2 performs method, it is characterised in that in step S2.1, test script The method of mark includes:Concentrated before the test script for belonging to executive plan plus at least one flag bit by test script.
4. intelligence database according to claim 3 performs method, it is characterised in that in step S2.2, is held when existing During row plan, perform step and run directly in the test script containing flag bit before it, other do not contain the test script of flag bit Do not run.
5. the intelligence database according to claim any one of 1-4 performs method, it is characterised in that in step s 2, when In the absence of executive plan, manually the test script of selection needs is concentrated from the test script of project.
6. intelligence database according to claim 5 performs method, it is characterised in that the project includes functional test Mesh, compatibility test project, cross-beta project, install unloading test event and pressure test project in any one or it is many Kind.
7. intelligence database according to claim 5 performs method, it is characterised in that before step S1, first will test Script is placed in the test script collection under a destination path.
8. intelligence database according to claim 7 performs method, it is characterised in that in step s 2, the test pin This includes any one in linear script, structuring script, shared script, data-driven script and crucial word drive script Or multiple combination.
9. intelligence database according to claim 8 performs method, it is characterised in that described linear script includes hitting Any one or more combination in the numerical key of key, function key, arrow, the operating key of control test software and input data.
10. the intelligence database described in a kind of use claim any one of 1-9 performs the intelligence database execution system of method.
CN201710001948.2A 2017-01-03 2017-01-03 Intelligent database execution method and system Active CN106874191B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710001948.2A CN106874191B (en) 2017-01-03 2017-01-03 Intelligent database execution method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710001948.2A CN106874191B (en) 2017-01-03 2017-01-03 Intelligent database execution method and system

Publications (2)

Publication Number Publication Date
CN106874191A true CN106874191A (en) 2017-06-20
CN106874191B CN106874191B (en) 2020-07-14

Family

ID=59164514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710001948.2A Active CN106874191B (en) 2017-01-03 2017-01-03 Intelligent database execution method and system

Country Status (1)

Country Link
CN (1) CN106874191B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109960645A (en) * 2017-12-22 2019-07-02 迈普通信技术股份有限公司 Script testing method, device and script test macro
CN113852516A (en) * 2021-08-27 2021-12-28 苏州浪潮智能科技有限公司 Method, system, terminal and storage medium for generating switch diagnostic program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023861A (en) * 2010-12-08 2011-04-20 中兴通讯股份有限公司 Method and system for generating test script and test suite
CN103077109A (en) * 2009-12-28 2013-05-01 中兴通讯股份有限公司 Method and system for scheduling test plan
CN103500102A (en) * 2013-10-16 2014-01-08 迈普通信技术股份有限公司 Service calling method and device for providing service calling
CN104516908A (en) * 2013-09-29 2015-04-15 华为技术有限公司 Database access method and device
US20160179657A1 (en) * 2014-09-22 2016-06-23 International Business Machines Corporation Auto-deployment and testing of system application test cases in remote server environments

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103077109A (en) * 2009-12-28 2013-05-01 中兴通讯股份有限公司 Method and system for scheduling test plan
CN102023861A (en) * 2010-12-08 2011-04-20 中兴通讯股份有限公司 Method and system for generating test script and test suite
CN104516908A (en) * 2013-09-29 2015-04-15 华为技术有限公司 Database access method and device
CN103500102A (en) * 2013-10-16 2014-01-08 迈普通信技术股份有限公司 Service calling method and device for providing service calling
US20160179657A1 (en) * 2014-09-22 2016-06-23 International Business Machines Corporation Auto-deployment and testing of system application test cases in remote server environments

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
洛兰相遇: "02JSP脚本标识", 《HTTPS//BLOG.CSDN.NET/QQ_29662713/ARTICLE/DETAILS/53966580》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109960645A (en) * 2017-12-22 2019-07-02 迈普通信技术股份有限公司 Script testing method, device and script test macro
CN109960645B (en) * 2017-12-22 2022-10-18 迈普通信技术股份有限公司 Script test method and device and script test system
CN113852516A (en) * 2021-08-27 2021-12-28 苏州浪潮智能科技有限公司 Method, system, terminal and storage medium for generating switch diagnostic program

Also Published As

Publication number Publication date
CN106874191B (en) 2020-07-14

Similar Documents

Publication Publication Date Title
CN101930400B (en) SDK (Software Development Kit) automatic test system and method
CN102722440B (en) A kind of debugging apparatus of embedded system executable code, adjustment method and embedded system
CN106991040A (en) Data-interface method of testing and device
CN106033393B (en) A kind of applied program testing method and system and mobile terminal
CN105183630B (en) Applied program testing method and device
CN102681938B (en) Memory leakage detecting method and device
CN109710508A (en) Test method, test device, test equipment and computer readable storage medium
CN105404585A (en) Method and apparatus for acquiring code coverage rate
CN107861876A (en) Method of testing, device, computer equipment and readable storage medium storing program for executing
CN109840206A (en) Data test method, apparatus, terminal and storage medium
CN106294134A (en) The collapse localization method of code and device
CN107957956A (en) Test method, device and the readable storage medium storing program for executing of software differences coverage rate
CN108156181A (en) A kind of vulnerability detection method and its vulnerability scanning system based on the association asynchronous IO of journey
CN102110053A (en) Random testing method based on Android
CN101226502B (en) Automatization test method and system
CN110502366A (en) Case executes method, apparatus, equipment and computer readable storage medium
CN108959067A (en) Test method, device and the computer readable storage medium of search engine
CN107204898A (en) Production test method, system and the storage device of intelligent appliance, mobile terminal
CN104899140B (en) A kind of method of testing of mobile terminal component
CN106874191A (en) Intelligence database performs method and system
CN108920353A (en) A kind of test method, device and electronic equipment
CN104516817A (en) Memory leak detection method and device
CN103064780A (en) Software testing method and device thereof
CN104182348A (en) Software test method and device
CN106407800A (en) A hook method and a terminal device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 201616 Shanghai city Songjiang District Sixian Road No. 3666

Applicant after: PHICOMM (SHANGHAI) Co.,Ltd.

Address before: 201616 Shanghai City, Songjiang District Road No. 3666

Applicant before: PHICOMM (SHANGHAI) Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200408

Address after: 318015 no.2-3167, zone a, Nonggang City, no.2388, Donghuan Avenue, Hongjia street, Jiaojiang District, Taizhou City, Zhejiang Province

Applicant after: Taizhou Jiji Intellectual Property Operation Co.,Ltd.

Address before: 201616 Shanghai city Songjiang District Sixian Road No. 3666

Applicant before: Phicomm (Shanghai) Co.,Ltd.

TA01 Transfer of patent application right

Effective date of registration: 20200605

Address after: 518000 Guangdong city of Shenzhen province Qianhai Shenzhen Hong Kong cooperation zone before Bay Road No. 1 building 201 room A (located in Shenzhen Qianhai business secretary Co. Ltd.)

Applicant after: SHENZHEN QIANHAI DASHU FINANCE SERVICE Co.,Ltd.

Address before: 318015 no.2-3167, zone a, Nonggang City, no.2388, Donghuan Avenue, Hongjia street, Jiaojiang District, Taizhou City, Zhejiang Province

Applicant before: Taizhou Jiji Intellectual Property Operation Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518000 Room 201, building A, No. 1, Qian Wan Road, Qianhai Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong (Shenzhen Qianhai business secretary Co., Ltd.)

Patentee after: Shenzhen Dashu Xinke Technology Co.,Ltd.

Address before: 518000 Room 201, building A, No. 1, Qian Wan Road, Qianhai Shenzhen Hong Kong cooperation zone, Shenzhen, Guangdong (Shenzhen Qianhai business secretary Co., Ltd.)

Patentee before: SHENZHEN QIANHAI DASHU FINANCE SERVICE Co.,Ltd.

CP01 Change in the name or title of a patent holder