CN104899140B - A kind of method of testing of mobile terminal component - Google Patents
A kind of method of testing of mobile terminal component Download PDFInfo
- Publication number
- CN104899140B CN104899140B CN201510300476.1A CN201510300476A CN104899140B CN 104899140 B CN104899140 B CN 104899140B CN 201510300476 A CN201510300476 A CN 201510300476A CN 104899140 B CN104899140 B CN 104899140B
- Authority
- CN
- China
- Prior art keywords
- test
- mobile terminal
- functional unit
- interface
- control end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010998 test method Methods 0.000 title claims abstract description 14
- 238000012360 testing method Methods 0.000 claims abstract description 189
- 230000009471 action Effects 0.000 claims description 37
- 238000000034 method Methods 0.000 claims description 23
- 230000008569 process Effects 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 6
- 239000003550 marker Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 4
- 230000006870 function Effects 0.000 description 9
- 238000004422 calculation algorithm Methods 0.000 description 5
- 238000012546 transfer Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 239000002253 acid Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011990 functional testing Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012956 testing procedure Methods 0.000 description 1
Landscapes
- Mobile Radio Communication Systems (AREA)
- Telephone Function (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention discloses a kind of method of testing of mobile terminal component, comprise the step of:S1. the control end obtains all functional units of the current operation interface of the mobile terminal, and the corresponding test path is selected according to a functional unit without test, the mechanical arm is controlled to carry out test operation to the functional unit, to jump to next operation interface;S2. the control end judges whether include the functional unit corresponding with the test path in next operation interface;If so, then continuing to control the mechanical arm to carry out the test operation to the corresponding functional unit, to jump to next operation interface, the step S2 is then returned to.The present invention can be tested voluntarily the functional unit in test mobile terminal, reached the effect for saving human resources, while can analog subscriber the problem of may occur when in use, the testing efficiency of lifting automatic test.
Description
Technical field
The present invention relates to technical field of mobile terminals, more particularly to a kind of method of testing of mobile terminal component.
Background technology
In the prior art, the automatic test for mobile terminal is typically to simulate use using the mode of socket communication
The key-press input at family, touch-screen is inputted, the operation such as gesture input, the duration for detection device normal work.Due to
When application simulation device or equipment operation automatic test program, random pulses can be produced to trigger test software, therefore would generally
Using the simulation triggering user's operation of automatic test program, for example, trigger:Click on, touch, the operation such as gesture or some systems
The trigger event of rank.
The existing automatic test for mobile terminal generally using software simulation manual action triggering key-press event, leads to
The means for crossing pure software simulation to carry out automatic test to mobile terminal.Whenever the test environment of mobile terminal changes,
It is required for tester to record test case again, and needs tester to carry out the software test of repeatability, and records test
Problem.Therefore existing automated testing method needs to consume substantial amounts of human resources, and the testing time is long, and cost is high.
The content of the invention
The above mentioned problem existed for the automated testing method of existing mobile terminal, now providing one kind, aim at can
The method of testing of the automatic mobile terminal component continually and steadily tested the component in mobile terminal.
Concrete technical scheme is as follows:
A kind of method of testing of mobile terminal component, a mechanical arm is controlled using a control end according to default test path
Functional unit in mobile terminal is tested, one test path of each functional unit correspondence, the control
End is connected with the mobile terminal;
The method of testing comprises the steps:
S1. the control end obtains all functional units of the current operation interface of the mobile terminal, and according to
One functional unit without test selects the corresponding test path, controls the mechanical arm to the function group
Part carries out test operation, to jump to next operation interface;
S2. the control end judges whether include the work(corresponding with the test path in next operation interface
Can component;
If so, then continuing to control the mechanical arm to carry out the test operation to the corresponding functional unit, to redirect
To next operation interface, the step S2 is then returned to;
In the step S2, if the mechanical arm is carried out after the test operation to the functional unit, the movement
Terminal does not jump to next operation interface, then judges to test the current test path completing, and returns to a upper behaviour
Make interface, while returning to the step S1;
When the control end is equal to all functional units in all operation interfaces in the mobile terminal
After the completion of traversing operation, whole test process is completed.
It is preferred that, the control end is according to the corresponding functional unit of corresponding component numerals identification, each work(
Can component numerals described in component correspondence one.
It is preferred that, to being marked by the operation interface and/or the functional unit of test operation, and according to institute
State the corresponding operation interface of marker for judgment and/or the functional unit passes through test operation.
It is preferred that, after the completion of every test path test, the last action interface is returned to, last action circle is obtained
All functional units in face, contrast whether all functional units access the last action interface with the last time
In the functional unit it is consistent, obtain comparing result;
If judging that the last action interface that the mobile terminal is returned is accessed with last according to the comparing result
The last action interface it is inconsistent, then it represents that to the corresponding test path test crash;
If judging that the last action interface that the mobile terminal is returned is accessed with last according to the comparing result
The last action interface it is consistent, then it represents that the corresponding test path is successfully tested.
It is preferred that, the control end issues ADB to the mobile terminal and instructed, to realize between the mobile terminal
Data communication.
It is preferred that, the control end is used to send instructions under UART protocol, to control the mechanical arm to carry out test operation.
It is preferred that, the system software release of the mobile terminal is associated with to store using a server;
The control end is connected with the Server remote;
The control end intercepts whether the system software release stored in the server passes through test, downloads
And store not yet by the system software release tested, the system software release is pushed into the mobile terminal and entered
Row is installed;
The control end is on the mobile terminal for having installed the system software release, according to the default survey
Try path and perform the corresponding test operation.
It is preferred that, the control end is communicated using File Transfer Protocol with the server.
It is preferred that, an operating unit is set in the mechanical arm, the mobile terminal held to simulate manual action
Row clicking operation;
One first control unit is set in the mechanical arm, to control the operating unit to carry out relative to the behaviour
Make the movement of the X-direction at interface;
One second control unit is set in the mechanical arm, to control the operating unit to carry out relative to the behaviour
Make the movement of the Y-direction at interface.
It is preferred that, in the step S2, if not including in the operation interface corresponding with the test path described
Functional unit, then return to the last action interface, not yet passes through test with what is included according to the last action interface
The functional unit selects the next test path not yet by test to be tested, and returns to the step S1.
It is preferred that, the control end obtains the test for being associated with the test path feedback knot that the mobile terminal is sent
Fruit simultaneously stores.
It is preferred that, a plurality of test path is integrated in a test event;
In the step S1, the control end selects a corresponding test event, and according to selected described
The test path that test event includes is tested the mobile terminal.
The beneficial effect of above-mentioned technical proposal:
, can be voluntarily to the function in test mobile terminal using the method for testing of mobile terminal component in the technical program
Component carries out continual and steady test, has reached the effect for saving human resources, at the same can analog subscriber when in use may hair
Raw the problem of, lift the testing efficiency of automatic test.
Brief description of the drawings
Fig. 1 is a kind of method flow diagram of embodiment of the method for testing of mobile terminal component of the present invention;
Fig. 2 is a kind of a kind of module map of embodiment of the test system of the method for testing based on mobile terminal component;
Fig. 3 is the structure chart of mechanical arm of the present invention;
Fig. 4 is Topologically ergodic algorithm schematic diagram of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art obtained on the premise of creative work is not made it is all its
His embodiment, belongs to the scope of protection of the invention.
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases
Mutually combination.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but not as limiting to the invention.
In the prior art, it is extremely complex for the automatic test of mobile terminal, for example, existing mobile terminal of checking
The testing procedure process of " internal release information " is usually:
The script that step 1. is opened on PC ends records software, obtains interface of mobile terminal:
Step 2. mouse clicks on " dialing ", records X of " dialing " central point on interface of mobile terminal, Y-coordinate, and carry out
Sectional drawing is to preserve current interface picture;
Step 3. enters dialing interface, and mouse order clicks on " * ", " # ", " 2 ", " 0 ", " 1 ", " 1 ", " # ", and records respectively
X of each position central point on the interface of mobile terminal 3, Y-coordinate, while carrying out sectional drawing to preserve current interface picture;
Step 4. enters " internal release information " interface, carries out sectional drawing and preserves current interface picture;
The X of record, Y-coordinate dot sequency are imported text and preserved by step 5.;
Step 6. opens test device runnable interface control software, imports X, and Y-coordinate text clicks on operation;
The script file that step 7. test device is recorded before is run, and sectional drawing enters with the interface images that preserve before
Row contrast, is successfully tested if similarity reaches more than 90%, carries out next step test action;If similarity be not up to 90% with
On, then test crash, test device is out of service, and records test result.
As mentioned above it is possible, the existing method of testing of mobile terminal 3 needs to carry out script recording before test, by than
Mode compared with sectional drawing similarity obtains the poor universality of test result, testing time length and script.
Based on the above-mentioned problems in the prior art, the present invention provides a kind of method of testing of mobile terminal component, purport
The script recording work before simplifying test is being realized, is accelerating test process and result output, and increase the versatility of script.
As depicted in figs. 1 and 2, a kind of method of testing of mobile terminal component, using a control end 2 according to default test
The mechanical arm 4 of path clustering one is tested the functional unit in mobile terminal 3, each one test road of functional unit correspondence
Footpath, control end 2 is connected with mobile terminal 3;
Method of testing comprises the steps:
S1. control end 2 obtains all functional units of the current operation interface of mobile terminal 3, and according to one without
The functional unit of test selects corresponding test path, and control machinery arm 4 carries out test operation to functional unit, to jump to down
One operation interface;
S2. control end 2 judges whether include functional unit corresponding with test path in next operation interface;
If so, then continuing the corresponding functional unit of 4 pairs of control machinery arm carries out test operation, to jump to next operation circle
Face, is then returned to step S2;
In step s 2, if mechanical arm 4 is carried out after test operation to functional unit, mobile terminal 3 does not jump to next behaviour
Make interface, then judge to test current test path completing, and return to last action interface, while return to step S1;
After the completion of control end 2 is to the equal traversing operation of all functional units in all operation interfaces in mobile terminal 3,
Complete whole test process.
Specifically, exemplified by calling " internal release information " functional unit, control end 2 is according to " internal release information " function
The corresponding test path of component, finds corresponding functional unit in the interface of current mobile terminal 3, is carried out by mechanical arm 4
Clicking operation enters dialing interface;Mechanical arm 4 is often performed after a step click action, and control end 2 can all compare current operation interface
All functional units or character whether belong to the last functional unit accessed in the operation interface and match, obtain corresponding
Matching result, and corresponding matching result is preserved.
In the present embodiment, the script recording work before test is simplified using the method for testing of mobile terminal component,
Accelerate the output of test process result, and add the versatility of script.This method can be voluntarily to the work(in test mobile terminal 3
Energy component is tested, and voluntarily records corresponding test result, and testing functional unit for sustainable stabilization reaches
Save the effect of human resources, at the same can analog subscriber the problem of may occur when in use, lift the test of automatic test
Efficiency.
In a preferred embodiment, control end 2 recognizes corresponding functional unit, each function according to corresponding component numerals
Component one component numerals of correspondence.
In the present embodiment, control end 2 recognizes corresponding functional unit by component numerals, with the basis of control machinery arm 4
Corresponding component numerals carry out test operation to corresponding functional unit.
In a preferred embodiment, to being marked by the operation interface and/or functional unit of test operation, and according to
The corresponding operation interface of marker for judgment and/or functional unit pass through test operation.
In the present embodiment, by the way that the operation interface crossed by test operation is marked and quickly test path can be entered
Row test;By the way that the functional unit crossed by test operation is marked and quickly functional unit can be tested, and side
Just locating function component.
In a preferred embodiment, after the completion of every test path test, last action interface is returned to, last action is obtained
Whether all functional units in interface, all functional units of contrast access the function group in last action interface with the last time
Part is consistent, obtains comparing result;
If judging last action circle that the last action interface that mobile terminal 3 is returned is accessed with the last time according to comparing result
Face is inconsistent, then it represents that to corresponding test path test crash;
If judging last action circle that the last action interface that mobile terminal 3 is returned is accessed with the last time according to comparing result
Face is consistent, then it represents that corresponding test path is successfully tested.
In the present embodiment, by taking Topologically ergodic algorithm as an example, what the functional unit in mobile terminal 3 was tested is specific
Process is as follows:
Test program in control end 2 takes each functional unit in the current interface of mobile terminal 3 and corresponding by catching
Component numerals, (started using choosing the minimum corresponding functional unit of component numerals in current component numbering as this test
Functional unit), clicked to enter by control machinery arm 4, carry out test operation, to jump to next operation interface, obtained and work as
The corresponding functional unit of minimum component numerals in the preceding page, to carry out test operation, until current interface only has unique one
Individual functional unit, the test function associated with functional unit is then obtained according to current functional unit, mould is carried out using mechanical arm 4
Intend test, last action interface is retracted after the completion of test, compare current all functional units and advance into this operation interface therewith
When functional unit it is whether consistent, if unanimously, then it represents that current functional unit is successfully tested, record test result;If inconsistent,
Test crash is then represented, the functional unit of test crash is recorded, and enter the functional test of next functional unit.
In a preferred embodiment, control end 2 issues ADB to mobile terminal 3 (Android Debug Bridge, is pipe
Manage a debugging acid of Android simulator or equipment) instruction, to realize the data communication between mobile terminal 3.
In a preferred embodiment, control end 2 is using UART (Universal Asynchronous Receiver/
Transmitter, universal asynchronous receiving-transmitting transmitter) send instructions under agreement, test operation is carried out with control machinery arm 4.
UART host-host protocols are a kind of asynchronous receiving-transmitting host-host protocols, can pass data between serial communication and parallel communications
Defeated conversion, can be used as the host-host protocol that parallel input is converted to Serial output.
In a preferred embodiment, the system software release of mobile terminal 3 is associated with to store using a server 1;
Control end 2 is remotely connected with server 1;
Control end 2 intercepts whether the system software release stored in server 1 passes through test, downloads and stores not yet
By the system software release of test, system software release is pushed into mobile terminal 3 and installed;
Control end 2 is performed corresponding on the mobile terminal 3 of installation system software version according to default test path
Test operation.
In the present embodiment, control end 2 constantly intercepts on far-end server 1 whether have soft without the system of test operation
Part version (new version software), when there is new version software, the memory cell that control end 2 is specified is downloaded to by new version software
Latest edition software, is pushed in mobile terminal 3 and is installed, control end 2 is run by middle (not shown) using ADB instructions
Corresponding test program, Topologically ergodic algorithm is performed to each work(on mobile terminal 3 by UART protocol control machinery arm 4
Energy component is tested and recorded, so as to reach the purpose of the automatic new version software inquired about and tested.
In a preferred embodiment, control end 2 is communicated using File Transfer Protocol with server 1.
In the present embodiment, whether control end 2 is constantly intercepted on server 1 by File Transfer Protocol and had without test operation
System software release (new version software), to reach the purpose of the automatic new version software inquired about and tested.
In a preferred embodiment, an operating unit is set in mechanical arm 4, to simulate manual action to mobile terminal
3 perform clicking operation;
One first control unit is set in mechanical arm 4, the X side relative to operation interface is carried out to control operation unit
To movement;
One second control unit is set in mechanical arm 4, the Y side relative to operation interface is carried out to control operation unit
To movement.
In the present embodiment, the first control unit is the first linear module 41, and the second control unit is the second linear module
42, operating unit is cylinder 43, as shown in figure 3, mechanical arm 4 includes the first linear module 41, the second linear module 42, cylinder
43rd, test zone 44 and emergency stop switch 45.In test, mobile terminal 3 is positioned over test zone 44;First linear module 41
Carry the movement that cylinder 43 carries out X-direction;Second linear module 42 carries the movement that cylinder 43 carries out Y-direction;Cylinder 43 can mould
Anthropomorphic work performs click action in the current interface of mobile terminal 3, to carry out corresponding test operation;Emergency stop switch 45 can be tight
Power operation is carried out to mechanical arm 4 in the case of urgency.
In a preferred embodiment, in step s 2, if not including function group corresponding with test path in operation interface
Part, then return to last action interface, under being selected with the functional unit not yet by test included according to last action interface
One test path not yet by test is tested, and return to step S1.
As shown in figure 4, by taking " the internal release information " of checking mobile terminal 3 as an example:
The component numerals of " dialing " are 100;
The component numerals of " dialing interface " are 110, other and component numerals of " dialing interface " component on same interface
It is followed successively by:120,130 ..., 170;
The component numerals of " internal release information " are 111, and other and " internal release information " component is on same interface
Component numerals are followed successively by:111,112 ..., 118.
" internal release information " functional unit tested as needed obtains corresponding test path, and mechanical arm 4 is first clicked on
Test program in teaching good " homepage key ", completion click action, control end 2 is caught by ADB instructions takes each work(of current interface
The corresponding component numerals of energy component, if each component numerals can be matched with the software main interface component numerals of this beta version,
Search in current interface with the presence or absence of " dialing " functional unit that component numerals are 100;If nothing, screen sliding is continued to search for, until
Untill finding;Find after 100 " dialing " component numerals, it is 110 to click to enter " dialing interface " component numerals, is inputted " * ",
" # ", " 2 ", " 0 ", " 1 ", " 1 ", " # " is further continued for judging whether current component numbering is 111, if so, then the functional unit is tested
Pass through;If it is not, the then functional unit test crash, clicks on " return key " by mechanical arm 4 and falls back on the behaviour that component numerals are 110
Make interface, then it is 100 operation interface to click on " return key " to fall back on component numerals.Next test path is continued to run with, is searched
Corresponding assembly is numbered, and is then down run from level to level, if the test process exception occurs and can not find the group that should have on the interface
Part is numbered, then clicks on " return key " by mechanical arm 4 and return to upper directory, by that analogy.
In the present embodiment, control end 2 can be current to mobile terminal 3 according to Topologically ergodic algorithm by control machinery arm 4
There is functional unit on interface to be tested, until finding no longer there is the functional unit not being tested in current interface,
Then up test in layer, is eventually returned in initial main interface.Can be quickly to function group using Topologically ergodic algorithm
Part is tested, and easy-to-look-up functional unit.
In a preferred embodiment, control end 2 obtains the test for the being associated with test path feedback knot that mobile terminal 3 is sent
Fruit simultaneously stores, and to realize the purpose of automatic record test result, has reached the effect of release human resources.
In a preferred embodiment, a plurality of test path can be integrated in a test event;
In step S1, the one corresponding test event of selection of control end 2, and include according to selected test event
Test path is tested mobile terminal 3.
In the present embodiment, test event may include the corresponding test road of all functional units in current operation interface
Footpath, when a certain functional unit is tested, if in the current interface of mobile terminal 3 and in the absence of the functional unit, can be by adopting
Carry out searching corresponding test event with the mode at mechanical arm slide interface, by searching the test matched with functional unit
The mode of project searches corresponding functional unit.
In the present embodiment, functional unit is tested successively according to the order of test path in test event, tested
Efficiency high and easy-to-look-up corresponding functional unit and test result.
Preferred embodiments of the present invention are the foregoing is only, embodiments of the present invention and protection model is not thereby limited
Enclose, to those skilled in the art, should can appreciate that made by all utilization description of the invention and diagramatic content
Scheme obtained by equivalent substitution and obvious change, should be included in protection scope of the present invention.
Claims (11)
1. a kind of method of testing of mobile terminal component, it is characterised in that using a control end according to default test path control
Make a mechanical arm to test the functional unit in mobile terminal, each one test road of functional unit correspondence
Footpath, the control end is connected with the mobile terminal;
The method of testing comprises the steps:
S1. the control end obtains all functional units of the current operation interface of the mobile terminal, and according to one
Without the corresponding test path of functional unit selection of test, the mechanical arm is controlled to enter the functional unit
Row test operation, to jump to next operation interface;
S2. the control end judges whether include the function corresponding with the test path in next operation interface
Component;
If so, then continuing to control the mechanical arm to carry out the test operation to the corresponding functional unit, to jump to down
One operation interface, is then returned to the step S2;
In the step S2, if the mechanical arm is carried out after the test operation to the functional unit, the mobile terminal
Next operation interface is not jumped to, then judges to test the current test path completing, and return to last action circle
Face, while returning to the step S1;
When the control end is traveled through to all functional units in all operation interfaces in the mobile terminal
After the completion of operation, whole test process is completed;
After the completion of every test path test, the last action interface is returned to, obtains all in the last action interface
Whether the functional unit, all functional units of contrast access the work(in the last action interface with the last time
Energy component is consistent, obtains comparing result;
If judging the institute that the last action interface that the mobile terminal is returned is accessed with the last time according to the comparing result
State last action interface inconsistent, then it represents that to the corresponding test path test crash;
If judging the institute that the last action interface that the mobile terminal is returned is accessed with the last time according to the comparing result
State last action interface consistent, then it represents that the corresponding test path is successfully tested.
2. the method for testing as described in claim 1, it is characterised in that the control end is recognized according to corresponding component numerals
The corresponding functional unit, component numerals described in each functional unit correspondence one.
3. the method for testing as described in claim 1, it is characterised in that to the operation interface by test operation and/
Or the functional unit is marked, and according to the corresponding operation interface of the marker for judgment and/or the functional unit
Pass through test operation.
4. the method for testing as described in claim 1, it is characterised in that the control end issues ADB to the mobile terminal
Instruction, to realize the data communication between the mobile terminal.
5. the method for testing as described in claim 1, it is characterised in that the control end is used to send instructions under UART agreements,
To control the mechanical arm to carry out test operation.
6. the method for testing as described in claim 1, it is characterised in that the shifting is associated with to store using a server
The system software release of dynamic terminal;
The control end is connected with the Server remote;
The control end intercepts whether the system software release stored in the server passes through test, downloads and deposits
The system software release of the storage not yet by test, pushes to the mobile terminal by the system software release and is pacified
Dress;
The control end is on the mobile terminal for having installed the system software release, according to the default test road
Footpath performs the corresponding test operation.
7. method of testing as claimed in claim 6, it is characterised in that the control end is using FTP agreements and the service
Device is communicated.
8. the method for testing as described in claim 1 a, it is characterised in that operating unit is set in the mechanical arm, is used
Clicking operation is performed to the mobile terminal to simulate manual action;
One first control unit is set in the mechanical arm, to control the operating unit to carry out relative to operation circle
The movement in the X directions in face;
One second control unit is set in the mechanical arm, to control the operating unit to carry out relative to operation circle
The movement in the Y directions in face.
9. the method for testing as described in claim 1, it is characterised in that in the step S2, if in the operation interface
Do not include the functional unit corresponding with the test path, then the last action interface is returned to, with according to described upper one
The functional unit not yet by test that operation interface includes selects the next test road not yet by test
Footpath is tested, and returns to the step S1.
10. the method for testing as described in claim 1, it is characterised in that the control end obtains the mobile terminal and sent
The test feedback result for being associated with the test path and store.
11. the method for testing as described in claim 1, it is characterised in that a plurality of test path is integrated in a test
In project;
In the step S1, the control end selects a corresponding test event, and according to the selected test
The test path that project includes is tested the mobile terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510300476.1A CN104899140B (en) | 2015-06-03 | 2015-06-03 | A kind of method of testing of mobile terminal component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510300476.1A CN104899140B (en) | 2015-06-03 | 2015-06-03 | A kind of method of testing of mobile terminal component |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104899140A CN104899140A (en) | 2015-09-09 |
CN104899140B true CN104899140B (en) | 2017-08-25 |
Family
ID=54031815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510300476.1A Expired - Fee Related CN104899140B (en) | 2015-06-03 | 2015-06-03 | A kind of method of testing of mobile terminal component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104899140B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106126425B (en) * | 2016-06-30 | 2018-11-30 | 北京视觉世界科技有限公司 | Function traversal method and system based on Android automated test frame |
CN108710570B (en) * | 2018-05-11 | 2021-10-29 | 创新先进技术有限公司 | View function testing method, device and equipment |
CN111143188B (en) * | 2018-11-02 | 2023-09-22 | 中移(杭州)信息技术有限公司 | Method and equipment for automatically testing application |
CN113032268B (en) * | 2021-03-30 | 2022-02-22 | 深圳市腾讯信息技术有限公司 | Software testing method, device and storage medium |
CN114780321A (en) * | 2022-05-11 | 2022-07-22 | 富赛汽车电子有限公司 | Detection method and detection device for control function on display screen and electronic equipment |
CN115314927B (en) * | 2022-07-29 | 2023-04-07 | 广州通则康威智能科技有限公司 | Method and device for processing abnormal operation of communication module |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1377080A1 (en) * | 2002-06-26 | 2004-01-02 | Rohde & Schwarz GmbH & Co. KG | Method and device for measuring of the picture quality of the display of a mobile telephone |
JP2008244688A (en) * | 2007-03-27 | 2008-10-09 | Nec Corp | Automatic testing device and automatic testing method for portable terminal equipment |
CN102314386A (en) * | 2011-09-05 | 2012-01-11 | 百度在线网络技术(北京)有限公司 | Method and equipment for testing mobile terminal |
CN102904996A (en) * | 2012-10-16 | 2013-01-30 | 深圳创维数字技术股份有限公司 | Method, device and system for testing performance of mobile phone touch screen |
CN104035867A (en) * | 2014-06-04 | 2014-09-10 | 重庆泰凯科技有限公司 | Android-based application function traverse test method |
CN104050076A (en) * | 2013-03-12 | 2014-09-17 | 阿里巴巴集团控股有限公司 | Testing method, device and system of application software on mobile terminal |
-
2015
- 2015-06-03 CN CN201510300476.1A patent/CN104899140B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1377080A1 (en) * | 2002-06-26 | 2004-01-02 | Rohde & Schwarz GmbH & Co. KG | Method and device for measuring of the picture quality of the display of a mobile telephone |
JP2008244688A (en) * | 2007-03-27 | 2008-10-09 | Nec Corp | Automatic testing device and automatic testing method for portable terminal equipment |
CN102314386A (en) * | 2011-09-05 | 2012-01-11 | 百度在线网络技术(北京)有限公司 | Method and equipment for testing mobile terminal |
CN102904996A (en) * | 2012-10-16 | 2013-01-30 | 深圳创维数字技术股份有限公司 | Method, device and system for testing performance of mobile phone touch screen |
CN104050076A (en) * | 2013-03-12 | 2014-09-17 | 阿里巴巴集团控股有限公司 | Testing method, device and system of application software on mobile terminal |
CN104035867A (en) * | 2014-06-04 | 2014-09-10 | 重庆泰凯科技有限公司 | Android-based application function traverse test method |
Also Published As
Publication number | Publication date |
---|---|
CN104899140A (en) | 2015-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104899140B (en) | A kind of method of testing of mobile terminal component | |
CN103338290B (en) | A kind of method of automatic test Android phone touch screen performance | |
CN105512023B (en) | A kind of Monkey test method and device | |
CN105550252B (en) | File positioning method and device and electronic equipment | |
CN106066826A (en) | Automatic testing method and device for buried point and terminal | |
CN104866465A (en) | Sensitive text detection method and device | |
CN104598380A (en) | Method and system for automatic testing based on control | |
CN104239313A (en) | Method for searching for characters displayed in screen and based on mobile terminal and mobile terminal | |
CN110493812B (en) | Distribution network test processing method, device and system, processor and master control equipment | |
CN109783351A (en) | Interface detection method, apparatus and computer readable storage medium | |
CN105183630A (en) | Method and device for testing application program | |
CN112148579B (en) | User interface testing method and device | |
CN108959067A (en) | Test method, device and the computer readable storage medium of search engine | |
CN103051496A (en) | Monitoring method and device of monitoring point server | |
CN106855881A (en) | A kind of method and apparatus of many Map Switchs based on mobile device | |
CN109766273A (en) | Localization method, device, computer equipment and the storage medium of endless loop | |
CN105516321A (en) | Data acquisition method and device | |
CN104536874A (en) | Client collapse locating method and device | |
CN106021101A (en) | Method and device for testing mobile terminal | |
CN102222021A (en) | Input method panel switching method and device | |
CN105050038A (en) | Method, apparatus, and system for monitoring position information of mobile terminal | |
CN105354189A (en) | Method and system for searching for software applicationst | |
CN102567367B (en) | Associated method and system are set in a kind of communication interface | |
CN107122291A (en) | Mobile terminal software stability test method and apparatus | |
CN105138458A (en) | Method and system for recording automatic testing scripts by combining intelligent terminal and computer terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20180313 Granted publication date: 20170825 |
|
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20210313 Granted publication date: 20170825 |
|
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20210313 Granted publication date: 20170825 |
|
PD01 | Discharge of preservation of patent | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20240313 Granted publication date: 20170825 |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170825 |