CN106874189A - A kind of implementation method of the automatization test system of real-time data of power grid storehouse system - Google Patents
A kind of implementation method of the automatization test system of real-time data of power grid storehouse system Download PDFInfo
- Publication number
- CN106874189A CN106874189A CN201611261682.7A CN201611261682A CN106874189A CN 106874189 A CN106874189 A CN 106874189A CN 201611261682 A CN201611261682 A CN 201611261682A CN 106874189 A CN106874189 A CN 106874189A
- Authority
- CN
- China
- Prior art keywords
- test
- service
- server
- beta version
- execution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
Abstract
The invention discloses a kind of implementation method of the automatization test system of real-time data of power grid storehouse system, tester's configuration testing task simultaneously submits beta version to;Web and application server are uploaded in beta version to configuration admin service, while the test assignment of beta version is saved in into database server;Test main frame uploading activity test result is to controlling server;Finally control server sends test report to the mail server, calls Mail Server Interface to send test report to tester;The inventive method is specifically designed for the feature of Guo Wang states net real-time dataBase system, and design one kind is satisfied with automatization test system, realizes automatic download beta version, automatic distributing and execution test assignment, automatic to collect test result and generate the functions such as test report;Cross-platform automatic deployment environment is realized, cross-platform test automation is realized, different platform, the automatic cooperation deployment of different Framework Softwares is realized.
Description
Technical field
The invention belongs to the automatization testing technique field of real-time data of power grid storehouse system, a kind of power network reality is specifically related to
When Database Systems automatization test system implementation method.
Background technology
State's net real-time dataBase system function point is various, and version iteration speed is fast, when each product is issued, to it is cross-platform,
The test request more and more higher of function point all standing.
It is, therefore, desirable to provide a kind of new automatization test system for state's net real-time dataBase system.
The content of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention to provide a kind of real-time data of power grid storehouse system
The implementation method of the automatization test system of system, realizes different platform, the automatic cooperation deployment of different Framework Softwares, so as to reach
To testing time and hardware resource is made full use of, shorten test period, save the purpose of human resources.
Technical scheme:To achieve the above object, the automatic test system of a kind of real-time data of power grid storehouse system of the invention
A kind of implementation method of system, there is provided automatization test system, the automatization test system includes web and application server, control
Control server, SVN servers, database server, some test main frames and mail server;
The web and application server, for disposing test management platform, there is provided the test and management service at interface;
The control server, the control service for disposing test system, there is provided background test task simultaneously performs service;
The SVN servers, the configuration pipe for providing beta version, test case program, system under test (SUT) deployment information
Reason service;
The database server, for disposing database, there is provided the storage service of test and management data;
The test main frame, the execution service for disposing test system, there is provided the specific of background test task performs clothes
Business;
The mail server, for providing test report mail transmission/reception service;
The described method comprises the following steps:
S1 tester's configuration testing tasks simultaneously submit beta version and test assignment to the web and application server to;
Web described in S2 and application server are uploaded in beta version to the configuration admin service of the SVN servers, while
The test assignment of beta version is saved in the database server by the web and the service of application server test and management;
Controlled described in S3 server controls service listen in database have the beta version being not carried out after obtain the SVN
Beta version and obtain and be saved in test assignment in the database server in server, generation test order simultaneously sets up survey
Examination flow instance;
If S4 workflow engines drive the Ganlei's active flow journey in testing process, and according to the database server content
If the work order program of generation Ganlei's activity;
After the work order for the treatment of needed for worksheet program is listened in test main frame described in S5, operation needed for performing is some
Platform test main frame independent operation;The test main frame updates execution state and sends to the database service execution state
Device;The test main frame uploading activity test result is to the control server;
After S6 testing process examples terminate, the control server controls service activity test result, and update test times
Business state;
Control server to send test report to the mail server described in S7, call the Mail Server Interface to send out
Send test report to tester.
Further, the automatization test system include order placement service, test resource management service, workflow service,
Work order is serviced, performs service, virtual machine service, network service, agency service, test report service, log services and P2M clothes
Business;
The order placement service, the global configuration of task configuration and test event according to beta version, generation test order
Information;
The test resource management service, the test set configuration associated by the test machine, test assignment according to distribution is raw
Into test order attributes information;
The workflow service, the workflow instance of beta version is generated according to Order Type, workflow template;
The work order service, all kinds of corresponding test work order and the attribute informations of activity generation in workflow instance;
It is described to perform service, performed according to test work order type and attribute information;
The virtual machine service, the access interface of corresponding operating system virtual machine is encapsulated according to virtual machine configuration;
The network service, according to the access interface of network service between each test equipment of address configuration packages;
The agency service, the access interface acted on behalf of between encapsulating each test equipment according to proxy configurations;
The test report service, according to the access interface that test report template configuration packages test report is generated;
The log services, according to the access interface that the daily record of daily record configuration packages is generated;
The P2M services, according to the access interface that database configuration provides encapsulation of data storehouse operates.
Further, updating execution state includes updating four execution states of entity, and four entities are respectively test
Version, order, workflow instance process model and work order, wherein workflow instance process model are used to describe workflow instance;
Update four execution states of entity and meet four kinds of rules:
Rule 1:Beta version driver is after newly-built beta version information, if detecting the presence of test assignment rule,
Then by beta version state by etc. it is to be migrated in execution;It is synchronous if detecting beta version correlation order status to complete
Beta version state is completion;
Rule 2:Order-driven market program listen to beta version state for perform in when, newly-built sequence information, if detection
To exist test resource rule, then by order status by etc. it is to be migrated in execution;If there is exception, migration order status are
Exception is simultaneously returned to waiting for;If detecting workflow process model state to complete, synchronous order status are completion;
Rule 3:Workflow process model driver listen to order status for perform in when, newly-built workflow process
Model, if in detecting process model activity exist meet workflow engine rule, by the active state by etc. it is to be migrated
For in execution;If there is exception, the active state is migrated for exception and is returned to waiting for;If activity is in detecting process model
Complete, then synchronizing process model state is completion;
Rule 4:Work order driver is newly-built when there is active state in listening to workflow process model in performing
Work order information, if the work order is polled to by corresponding treatment service, by the state of the work order by etc. it is to be migrated for execution in,
And perform the work order;If work order implementation procedure is errorless, by the state of the work order by being migrated in execution to complete;If occurring different
Often, then the work order state is migrated for exception and is returned to waiting for.
Beneficial effect:The present invention compared with the prior art, this have the advantage that:The inventive method is specifically designed for Guo Wang states net
The feature of real-time dataBase system, design one kind is satisfied with automatization test system, realizes automatic download beta version, automatically
Distribution and execution test assignment, automatic test result of collecting simultaneously generate the functions such as test report;Realize cross-platform automatic deployment ring
Border, realizes cross-platform test automation, realizes different platform, the automatic cooperation deployment of different Framework Softwares, is filled so as to reach
Divide using testing time and test hardware resource, shorten test period, save human resources, testing cost reduces significantly, test
The purpose that resource is fully utilized;Interface function point all standing is realized, regression test is no longer manual to cross interface function point.
Brief description of the drawings
Fig. 1 is the structural representation of automatization test system proposed by the present invention.
Fig. 2 is automatization test system DFD proposed by the present invention;
Fig. 3 is automatization test system entity state transition graph.
Fig. 4 is the structural representation of test job flow model 1.
Fig. 5 is the structural representation of test job flow model 2.
Fig. 6 is the structural representation of test job flow model 3.
Specific embodiment
The present invention is further described below in conjunction with the accompanying drawings.
Before the inventive method is proposed, automation process is modeled with Work flow model first, designed is automatic
Changing test system can realize the automatic business processing of test process, in testing process processing procedure, according to one group of place for defining
Related information, file or task, can be delivered to another movable participant by reason rule from a participant, and incited somebody to action
Journey and the data abstraction of activity are order and work order, and treatment rule is defined as follows:
The set that 1 test job stream example is n test job stream process model and workflow engine is defined, is expressed as:
{ n the set of test job stream process model, test job stream engine }, wherein n is positive integer;
It refers to the relation between test activity, test activity to define 2 test job stream process models, is expressed as:{ test is lived
Dynamic, test activity incidence relation }
It is a four-tuple, activity to define 3 test activities:={ id, status, pre, next }, wherein id are living
Dynamic unique mark, status be activity state, pre be forerunner activity id, when forerunner's activity has multiple with comma every
Open, next is the id of follow-up activities, is separated with comma when follow-up activities have multiple;
It refers to be closed according to the state of test activity and test activity forerunner and follow-up activities to define 4 test job stream engines
System, drives the program circulated between test activity;
Define 5 and test the set that order is the attribute specification and data of test job stream example;
The set of the attribute specification and data of test activity when defining 6 test work order;
Test job stream process model 1 describes the universal process model that test process starts/terminates, as shown in figure 4, process
Two sub- process models are included in model 1,5 nodes are had, each node represents an activity, is followed successively by:
0:Version test starts;
x:Branch's activity, the activity mark being flexibly connected with x in other procedure models;
y:Merger activity, the activity mark being flexibly connected with y in other process models;
16:Filing sequence information;
1:Version test terminates.
Client-side/server-side is the process model of heterogeneous platform during process model 2 describes test process, as shown in Figure 5:Cross
Journey model 2 has 18 nodes, and each node represents an activity, is followed successively by:
x:Branch's activity, the activity mark being flexibly connected with x in other process models;
4:Sub- order waits test resource;
17:Test file downloads (heterogeneous platform client)
18:Test file downloads (heterogeneous platform service end)
19:Check test resource (heterogeneous platform client)
20:Check test resource (heterogeneous platform service end)
21:Send test file (heterogeneous platform client)
22:Send test file (heterogeneous platform service end);
9:Deploying client test environment;
10:Deployment services end test environment;
11:Implementation of test cases program;
12:Send test result file;
25:Cleaning test environment (heterogeneous platform client);
26:Cleaning test environment (heterogeneous platform service end);
27:Release test resource (heterogeneous platform client);
28:Release test resource (heterogeneous platform service end);
2:File sub- order;
y:Merger activity, the activation flag being flexibly connected with y in other process models;
Client-side/server-side is the process model of isomorphism platform during process model 3 describes test process, as shown in fig. 6,
Process model 3 has 13 nodes, and each node represents an activity, is followed successively by:
x:Branch (fork) activity, the activity mark being flexibly connected with x in other process models;
4:Sub- order waits test resource;
5:Test file downloads (isomorphism platform);
6:Check test resource (isomorphism platform);
7:Send test file (isomorphism platform);
9:Deploying client test environment;
10:Deployment services end test environment;
11:Implementation of test cases program;
12:Send test result file;
13:Cleaning test environment;
14:Release test resource;
2:File sub- order;
y:Merge (join) activity, the activity mark with y active links in other process models.
Be can be seen that from thought set forth above, although test job stream process model 2 and test job stream process model 3
It is directed to the modeling of different test process, the treatment thread of movable { 4,9,10,11,12,2 } can be direct multiplexing, activity
{ 5,17,18 }, movable { 6,19,20 }, movable { 7,21,22 }, movable { 13,25,26 }, the treatment thread of movable { 14,27,28 }
Execution logic is consistent, can be by what the heavily loaded mode of parametrization was multiplexed;
With above-mentioned three class processes model template, can be by { 1 process model template 1, n process model template 2, n
Individual process model template 3 } example combinations of (n is positive integer) dissolve the parallel of various test assignment for beta version and hold
OK;
DFD is the instrument used in structural workflow net, and it describes data and flows in systems and process
Process, has reacted system logic function, and DFD is applied in automatization test system, as shown in Fig. 2 being surveyed in automation
During the workflow logic nets of test system, it is necessary first to supporting as shown in table 1:
Table 1
Table 1 is all kinds of service introductions of automatization test system.
In automatic test course, there are four migrations of entity existence, be respectively beta version, order, work
There is certain relevance in stream example procedure model and work order, the state of four entities, this enables the entity in system
Sequentially circulation simultaneously by drive perform, entity state migration as shown in figure 3,
Regular 1 beta version driver is after " newly-built " beta version information, if detecting the presence of test assignment rule,
It is " in execution " that then beta version state is migrated by " wait ";If it is " completion " to detect beta version correlation order status,
Then synchronism detection release status are " completion ".
Regular 2 order-driven market programs when it is " in execution " to listen to beta version state, " newly-built " sequence information, if inspection
Measure and there is test resource rule, then it is " in execution " order status to be migrated by " wait ";If there is exception, order is migrated
State is "abnormal" and returns " wait ";If detecting workflow process model state for " completion ", synchronous order status are
" completion ".
Regular 3 workflow process model drivers when it is " in execution " to listen to order status, " newly-built " workflow
Process model, if the activity in detecting process model is present meets workflow engine rule, by the active state by " etc.
Treat " migrate as " in execution ";If there is exception, the active state is migrated for "abnormal" and is returned " wait ";If detecting
" completion ", then synchronizing process model state is " completion " for activity in journey model.
Regular 4 work order drivers are " new when there is active state in listening to workflow process model is " in execution "
Build " work order information, if the work order is polled to by corresponding treatment service, be by " wait " migration by the state of the work order
" in execution ", and perform the work order;If work order implementation procedure is errorless, it is " complete that the state of the work order is migrated by " in execution "
Into ";If there is exception, the work order state is migrated for "abnormal" and is returned " wait ".
Introduced by above-mentioned definition rule, below to the automatic test of real-time data of power grid storehouse proposed by the present invention system
The implementation method of system describes in detail:A kind of automatization test system of real-time data of power grid storehouse system is first proposed,
As shown in figure 1, the automatization test system includes web and application server, control server, SVN servers, database service
Device, some test main frames (test main frame 1 ..., test main frame n) and mail server;
Web and application server, for disposing test management platform, there is provided the test and management service at interface;
Control server, the control service for disposing test system, there is provided background test task simultaneously performs service;
SVN servers, the configuration management clothes for providing beta version, test case program, system under test (SUT) deployment information
Business;
Database server, for disposing database, there is provided the storage service of test and management data;
Test main frame, the execution service for disposing test system, there is provided the specific execution service of background test task;
Mail server, for providing test report mail transmission/reception service;
Method proposed by the present invention is comprised the following steps:
Tester's configuration testing task simultaneously submits beta version and test assignment to web and application server to;
Web and application server are uploaded in beta version to the configuration admin service of SVN servers, while web and application
The test assignment of beta version is saved in database server by server test management service;
Control server controls service is listened in database to have after the beta version being not carried out obtained and survey in SVN servers
Test run sheet simultaneously obtains the test assignment being saved in database server, and generation test order simultaneously sets up testing process example;
If workflow engine drives the Ganlei's active flow journey in testing process, and if according to the generation of database server content
The work order program of Ganlei's activity;
After the work order for the treatment of needed for worksheet program is listened in test main frame, operation needed for performing, some tests
Main frame independent operation;Test main frame updates execution state and sends to database server execution state;Test main frame is uploaded
Activity test result is to controlling server;
After testing process example terminates, server controls service activity test result is controlled, and update test assignment state;
Finally control server sends test report to the mail server, calls Mail Server Interface to send test
Report to tester.
The inventive method designs one kind and is satisfied with automation survey specifically designed for the feature of Guo Wang states net real-time dataBase system
Test system, realizes automatic download beta version, automatic distributing and execution test assignment, automatic to collect test result and generate survey
The functions such as examination report;Cross-platform automatic deployment environment is realized, cross-platform test automation is realized, different platform, difference is realized
The automatic cooperation deployment of Framework Software.
The above is only the preferred embodiment of the present invention, it should be pointed out that:Come for those skilled in the art
Say, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be regarded as
Protection scope of the present invention.
Claims (3)
1. the implementation method of the automatization test system of a kind of real-time data of power grid storehouse system, it is characterised in that:There is provided one kind certainly
Dynamicization test system, the automatization test system includes web and application server, control server, SVN servers, data
Storehouse server, some test main frames and mail server;
The web and application server, for disposing test management platform, there is provided the test and management service at interface;
The control server, the control service for disposing test system, there is provided background test task simultaneously performs service;
The SVN servers, the configuration management clothes for providing beta version, test case program, system under test (SUT) deployment information
Business;
The database server, for disposing database, there is provided the storage service of test and management data;
The test main frame, the execution service for disposing test system, there is provided the specific execution service of background test task;
The mail server, for providing test report mail transmission/reception service;
The described method comprises the following steps:
S1 tester's configuration testing tasks simultaneously submit beta version and test assignment to the web and application server to;
Web described in S2 and application server are uploaded in beta version to the configuration admin service of the SVN servers, while described
The test assignment of beta version is saved in the database server by web and the service of application server test and management;
Server controls service is controlled to listen in database to have after the beta version being not carried out and obtain the SVN and service described in S3
Beta version and obtain and be saved in test assignment in the database server in device, generation test order simultaneously sets up test stream
Journey example;
If S4 workflow engines drive the Ganlei's active flow journey in testing process, and are generated according to the database server content
If the work order program of Ganlei's activity;
After the work order for the treatment of needed for worksheet program is listened in test main frame described in S5, operation needed for performing, some surveys
Examination main frame independent operation;The test main frame updates execution state and sends to the database server execution state;Institute
State test main frame uploading activity test result to the control server;
After S6 testing process examples terminate, the control server controls service activity test result, and update test assignment shape
State;
Control server to send test report to the mail server described in S7, call the Mail Server Interface to send and survey
Examination is reported to tester.
2. the implementation method of the automatization test system of real-time data of power grid storehouse according to claim 1 system, its feature
It is:The automatization test system includes order placement service, test resource management service, workflow service, work order service, execution
Service, virtual machine service, network service, agency service, test report service, log services and P2M service;
The order placement service, the global configuration of task configuration and test event according to beta version, generation test sequence information;
The test resource management service, the test set configuration associated by the test machine, test assignment according to distribution, generation is surveyed
Trial order attribute information;
The workflow service, the workflow instance of beta version is generated according to Order Type, workflow template;
The work order service, all kinds of corresponding test work order and the attribute informations of activity generation in workflow instance;
It is described to perform service, performed according to test work order type and attribute information;
The virtual machine service, the access interface of corresponding operating system virtual machine is encapsulated according to virtual machine configuration;
The network service, according to the access interface of network service between each test equipment of address configuration packages;
The agency service, the access interface acted on behalf of between encapsulating each test equipment according to proxy configurations;
The test report service, according to the access interface that test report template configuration packages test report is generated;
The log services, according to the access interface that the daily record of daily record configuration packages is generated;
The P2M services, according to the access interface that database configuration provides encapsulation of data storehouse operates.
3. the implementation method of the automatization test system of real-time data of power grid storehouse according to claim 1 system, its feature
It is:Updating execution state includes updating four execution states of entity, and four entities are respectively beta version, order, work
Make stream example procedure model and work order, wherein workflow instance process model is used to describe workflow instance;Update four entities
Execution state meet four kinds of rules:
Rule 1:Beta version driver is after newly-built beta version information, if detecting the presence of test assignment rule, will
Beta version state by etc. it is to be migrated in execution;If detecting beta version correlation order status to complete, synchronism detection
Release status are completion;
Rule 2:Order-driven market program listen to beta version state for perform in when, newly-built sequence information, if detect depositing
Test resource rule, then by order status by etc. it is to be migrated in execution;If there is exception, migration order status are abnormal
And return to waiting for;If detecting workflow process model state to complete, synchronous order status are completion;
Rule 3:Workflow process model driver listen to order status for perform in when, newly-built workflow process mould
Type, if the activity in detecting process model is present meets workflow engine rule, by the active state by etc. to be migrated be
In execution;If there is exception, the active state is migrated for exception and is returned to waiting for;If activity is complete in detecting process model
Into then synchronizing process model state is completion;
Rule 4:Work order driver exist in listening to workflow process model active state for perform in when, newly-built work order
Information, if the work order is polled to by corresponding treatment service, by the state of the work order by etc. it is to be migrated for execution in, and hold
The capable work order;If work order implementation procedure is errorless, by the state of the work order by being migrated in execution to complete;If there is exception,
The work order state is migrated for exception and is returned to waiting for.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611261682.7A CN106874189B (en) | 2016-12-30 | 2016-12-30 | Method for realizing automatic test system of power grid real-time database system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611261682.7A CN106874189B (en) | 2016-12-30 | 2016-12-30 | Method for realizing automatic test system of power grid real-time database system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106874189A true CN106874189A (en) | 2017-06-20 |
CN106874189B CN106874189B (en) | 2020-11-24 |
Family
ID=59164300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611261682.7A Active CN106874189B (en) | 2016-12-30 | 2016-12-30 | Method for realizing automatic test system of power grid real-time database system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106874189B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108228438A (en) * | 2017-12-29 | 2018-06-29 | 广州品唯软件有限公司 | The performance test methods and device of a kind of mobile terminal |
CN108804307A (en) * | 2018-04-19 | 2018-11-13 | 北京炎黄盈动科技发展有限责任公司 | process automation test method and device |
CN109298996A (en) * | 2018-07-13 | 2019-02-01 | 万达百汇科技(深圳)有限公司 | A kind of test method, device and terminal device |
CN109672790A (en) * | 2018-09-20 | 2019-04-23 | 平安科技(深圳)有限公司 | Traffic request drainage method, device, equipment and readable storage medium storing program for executing |
CN110046098A (en) * | 2019-04-03 | 2019-07-23 | 许继集团有限公司 | A kind of real-time library test method and system |
CN110086841A (en) * | 2018-01-26 | 2019-08-02 | 广东亿迅科技有限公司 | Construct the method and device of MPP public cloud and local private clound |
CN110580216A (en) * | 2018-06-08 | 2019-12-17 | 北京京东尚科信息技术有限公司 | application extraction and detection method and device |
CN113568791A (en) * | 2021-07-14 | 2021-10-29 | 麒麟软件有限公司 | Automatic testing tool and method for server operating system based on multi-CPU architecture |
CN117234951A (en) * | 2023-11-13 | 2023-12-15 | 建信金融科技有限责任公司 | Function test method and device of application system, computer equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100318969A1 (en) * | 2009-06-16 | 2010-12-16 | Lukas Petrovicky | Mechanism for Automated and Unattended Process for Testing Software Applications |
CN102799508A (en) * | 2012-07-09 | 2012-11-28 | 深圳市共进电子股份有限公司 | Automatic test system and method |
CN103441900A (en) * | 2013-08-27 | 2013-12-11 | 上海新炬网络技术有限公司 | Centralization cross-platform automated testing system and control method thereof |
CN103488712A (en) * | 2013-09-10 | 2014-01-01 | 迈普通信技术股份有限公司 | Automatized testing method and automatized testing system |
-
2016
- 2016-12-30 CN CN201611261682.7A patent/CN106874189B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100318969A1 (en) * | 2009-06-16 | 2010-12-16 | Lukas Petrovicky | Mechanism for Automated and Unattended Process for Testing Software Applications |
CN102799508A (en) * | 2012-07-09 | 2012-11-28 | 深圳市共进电子股份有限公司 | Automatic test system and method |
CN103441900A (en) * | 2013-08-27 | 2013-12-11 | 上海新炬网络技术有限公司 | Centralization cross-platform automated testing system and control method thereof |
CN103488712A (en) * | 2013-09-10 | 2014-01-01 | 迈普通信技术股份有限公司 | Automatized testing method and automatized testing system |
Non-Patent Citations (1)
Title |
---|
李梁 等: "一种工业自动化测试流程的建立方法", 《现代电子技术》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108228438A (en) * | 2017-12-29 | 2018-06-29 | 广州品唯软件有限公司 | The performance test methods and device of a kind of mobile terminal |
CN110086841A (en) * | 2018-01-26 | 2019-08-02 | 广东亿迅科技有限公司 | Construct the method and device of MPP public cloud and local private clound |
CN110086841B (en) * | 2018-01-26 | 2022-02-22 | 广东亿迅科技有限公司 | Method and device for constructing MPP public cloud and local private cloud |
CN108804307A (en) * | 2018-04-19 | 2018-11-13 | 北京炎黄盈动科技发展有限责任公司 | process automation test method and device |
CN110580216A (en) * | 2018-06-08 | 2019-12-17 | 北京京东尚科信息技术有限公司 | application extraction and detection method and device |
CN110580216B (en) * | 2018-06-08 | 2024-04-05 | 北京京东尚科信息技术有限公司 | Application lifting method and device |
CN109298996A (en) * | 2018-07-13 | 2019-02-01 | 万达百汇科技(深圳)有限公司 | A kind of test method, device and terminal device |
CN109672790A (en) * | 2018-09-20 | 2019-04-23 | 平安科技(深圳)有限公司 | Traffic request drainage method, device, equipment and readable storage medium storing program for executing |
CN109672790B (en) * | 2018-09-20 | 2021-10-01 | 平安科技(深圳)有限公司 | Traffic request drainage method, device, equipment and readable storage medium |
CN110046098A (en) * | 2019-04-03 | 2019-07-23 | 许继集团有限公司 | A kind of real-time library test method and system |
CN110046098B (en) * | 2019-04-03 | 2022-12-13 | 河南源网荷储电气研究院有限公司 | Real-time library testing method and system |
CN113568791A (en) * | 2021-07-14 | 2021-10-29 | 麒麟软件有限公司 | Automatic testing tool and method for server operating system based on multi-CPU architecture |
CN117234951A (en) * | 2023-11-13 | 2023-12-15 | 建信金融科技有限责任公司 | Function test method and device of application system, computer equipment and storage medium |
CN117234951B (en) * | 2023-11-13 | 2024-01-30 | 建信金融科技有限责任公司 | Function test method and device of application system, computer equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN106874189B (en) | 2020-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106874189A (en) | A kind of implementation method of the automatization test system of real-time data of power grid storehouse system | |
CN104317642B (en) | Software deployment method and apparatus under cloud computing environment | |
CN102693183B (en) | Method and system for realizing automatic software testing | |
CN104915259A (en) | Task scheduling method applied to distributed acquisition system | |
CN103905258B (en) | A kind of method of testing and device of client data upload function | |
CN108243012B (en) | Charging application processing system, method and device in OCS (online charging System) | |
CN107608901B (en) | Jmeter-based testing method and device, storage medium and electronic equipment | |
CN102012840A (en) | Batch data scheduling method and system | |
CN110138876B (en) | Task deployment method, device, equipment and platform | |
CN111984390A (en) | Task scheduling method, device, equipment and storage medium | |
CN107807815A (en) | The method and apparatus of distributed treatment task | |
CN111651365B (en) | Automatic interface testing method and device | |
CN104268056A (en) | Complex event processing based real-time monitoring system and method for CPS (Cyber-Physical Systems) applications | |
CN100407663C (en) | Universal testing system and method for telecommunication intelligent service | |
CN106294121A (en) | Aircraft embedded real-time diagnosis reasoning algorithm test method | |
CN112260883A (en) | Satellite test report generation method, device, equipment and storage medium | |
CN106295809A (en) | Aircraft embedded real-time diagnosis reasoning algorithm pilot system | |
CN103678488B (en) | Distributed mass dynamic task engine and method for processing data with same | |
WO2019117767A1 (en) | Method, function manager and arrangement for handling function calls | |
CN104836831B (en) | A kind of object method of servicing for Internet of Things | |
CN105704253A (en) | Method for acquiring host resources and device and system thereof | |
CN103631594B (en) | Asynchronous scheduling method and asynchronous scheduling system for general flow | |
CN106294037A (en) | Strike-machine method of testing and device | |
CN110868330B (en) | Evaluation method, device and evaluation system for CPU resources which can be divided by cloud platform | |
Li | Design and Implementation of Software Testing Platform for SOA-Based System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |