CN106871960A CN201710036307.0A CN201710036307A CN106871960A CN 106871960 A CN106871960 A CN 106871960A CN 201710036307 A CN201710036307 A CN 201710036307A CN 106871960 A CN106871960 A CN 106871960A
Authority
CN
China
Prior art keywords
module
data
acquisition
frequency conversion
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710036307.0A
Other languages
Chinese (zh)
Inventor
何钦
董松
毛吉化
赖伯舟
苏瑞明
阮园园
李建锋
刘毓玲
张记峰
唐胡乐
邝婧雯
卢金赟
李均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING LRK SCIENCE & TECHNOLOGY Co.,Ltd.
Guangzhou Guangjian Construction Engineering Testing Center Co.,Ltd.
Original Assignee
Beijing Union Technology Co Ltd Guangzhou Branch
GUANGZHOU CONSTRUCTION QUALITY & SAFETY TESTING CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Union Technology Co Ltd Guangzhou Branch, GUANGZHOU CONSTRUCTION QUALITY & SAFETY TESTING CENTER filed Critical Beijing Union Technology Co Ltd Guangzhou Branch
Priority to CN201710036307.0A priority Critical patent/CN106871960A/en
Publication of CN106871960A publication Critical patent/CN106871960A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of building intelligence wireless monitor system and method, optical monitoring module, Sensor monitoring module, video surveillance module, frequency conversion acquisition module, wake-up circuit, wireless transport module and data processing module are included.Frequency conversion of the present invention by data processing module to optical monitoring module, Sensor monitoring module, video surveillance module is gathered, three kinds of fusions of measurement pattern are realized in the way of single-point is controlled, control mode can flexibly be set, the accurately mate to site operation process is realized, the accuracy of monitoring system data analysis is improved;Being wirelessly transferred for data is realized by wireless transport module simultaneously, installation work when system is installed is reduced, and ensures the integrality of data transfer by data buffer storage.The present invention can be widely applied to building safety monitoring field as a kind of building intelligence wireless monitor system and method.

Description

A kind of building intelligence wireless monitor system and method
Technical field
The present invention relates to building safety monitoring field, especially a kind of building intelligence wireless monitor system and method.
Background technology
According to the portion's of building regulation is lived, dangerous larger part-to-item project need to work out special scheme, and special scheme should be included Safety monitoring during construction and monitoring, such as form work engineering and support system, hoisting and hanging and installing/dismounting engineering, scaffolding work, Demolition blasting engineering, building curtain wall installing engineering and steel construction, rack and cable-membrane analysis installing engineering etc..
Above-mentioned project danger includes:(1) duration is shorter, and attention degree is low:Such engineering construction cycle is short, is as short as several small When, can complete within long to 2~3 days, site operation often less payes attention to such engineering.(2) environment is complicated, and influence factor is more:Should Class Effects on Engineering factor is more, and load, support system, operational method, external environment condition are Safety Influence Factors.(3) accident is levied Million lack, and the crash time is short:Before such engineering accident occurs, there is not larger obvious accident sign, when engineering accident occurs, it is impossible to Effectively take emergency escape measure.(4) escape rate is low, the easy dead group's wound of group:Because environment is complicated, the crash time is few, operating personnel Escape rate is extremely low in accident generation, and such engineering often convergence amount operating personnel, easily cause the dead group of group and hinder considerable safety Accident.
The engineering larger for above-mentioned danger, the basic blank of specification of existing specific implementation, monitoring parameter, monitoring set Standby, measuring point lays principle and monitoring frequency etc. clear stipulaties, and field monitoring major part is voluntarily completed by unit in charge of construction, respectively Unit is implemented by experience substantially, and monitoring is not implemented completely without unified standard, or even part engineering.
And existing monitoring technology means have many defects, such as traditional optical instrument monitoring is limited to relatively low Personal monitoring's frequency, the degree of scatter of sensor causes wiring complexity, fault rate high, and used according to previous experiences in engineering Different monitoring instruments cause monitoring parameter it is imperfect, monitoring result is not inconsistent with actual conditions;Because some engineering parts are because building Construction area is more closed and remote in itself to build thing, there is the not good situation of network signal, it is impossible to complete monitoring resultses in time;It is existing The monitoring frequency of each monitoring modular is certain in monitoring pattern, and by same control, external condition is received in certain monitoring modular Under the influence of cause each monitoring modular of whole monitoring system to need to resurvey data or abandon using, therefore cannot basis The concrete condition flexible operating of engineering construction, causes the wasting of resources and monitors the unstable of analysis result.
The content of the invention
In order to solve the above-mentioned technical problem, the purpose of the present invention is:There is provided in a kind of Building Construction according to tool The intelligent radio monitoring system that body construction situation is realized.
In order to solve the above-mentioned technical problem, it is another object of the present invention to:Root in a kind of Building Construction is provided According to the intelligent radio monitoring method that Specific construction situation is realized.
The technical solution adopted in the present invention is:A kind of building intelligence wireless monitor system, include optical monitoring module, Sensor monitoring module, video surveillance module, frequency conversion acquisition module, wake-up circuit, wireless transport module and data processing module, The output end of the optical monitoring module, Sensor monitoring module and video surveillance module is connected to the number of frequency conversion acquisition module According to input, the output end of the wake-up circuit is connected to the reset terminal of frequency conversion acquisition module, the frequency conversion acquisition module and nothing Line transport module is connected, and the output end of the wireless transport module is connected to the input of wake-up circuit, described to be wirelessly transferred mould Block is connected with data processing module.
Further, the output end of the optical monitoring module, Sensor monitoring module and video surveillance module is connected respectively To the different acquisition port of frequency conversion acquisition module data input pin.
Further, the optical monitoring module includes automatic total instruments, and the Sensor monitoring module includes inclination angle Instrument and axle power meter, the video surveillance module include camera.
Further, construction stage identification submodule is provided with the data processing module.
Further, it is provided with data cache module in the frequency conversion acquisition module.
Further, early warning circuit is also included, the data processing module is connected with early warning circuit.
Further, the early warning circuit includes warning indicator light and SMS transmission module.
Another technical scheme of the present invention is:A kind of building intelligence wireless monitoring method, includes following steps:
Data processing module sends wake-up signal and data acquisition is believed according to current Construction stage by wireless transport module Number, the data acquisition signal includes acquisition time section, gathered data type and frequency acquisition;
Wake-up circuit starts frequency conversion Acquisition Circuit according to the wake-up signal for receiving;
Frequency conversion Acquisition Circuit gathers corresponding data according to data acquisition signal, and is sent to data by wireless transport module Reason module, is then shut off frequency conversion Acquisition Circuit.
Further, if frequency conversion Acquisition Circuit sends data failure by wireless transport module, the signal that will be collected is deposited Storage closes frequency conversion Acquisition Circuit to data cache module, and when wake-up circuit next time starts frequency conversion Acquisition Circuit by data The data of cache module are sent to data processing module by wireless transport module, and data buffer storage mould is emptied if sending successfully Block.
Further, the Construction stage includes pre-pressing stage, pours the stage and the pre-hardening stage;The acquisition time When section is in pre-pressing stage, frequency acquisition is 10 minutes/time;Acquisition time section is in the stage that pours and the pre-hardening stage the When in one hour, frequency acquisition is 1-5 seconds/time;When the acquisition time section is after pre-hardening first hour of stage, adopt Collection frequency is 5 minutes/time.
The beneficial effects of the invention are as follows:Present system passes through optical monitoring module, Sensor monitoring module, video surveillance Module and data processing module realize three kinds of measurement patterns to three kinds of frequency conversion collections of monitoring modular in the way of single-point is controlled Fusion, control mode can flexibly set, and realize the accurately mate to site operation process, improve monitoring system data analysis Accuracy;Being wirelessly transferred for data is realized by wireless transport module simultaneously, installation work when system is installed is reduced, and pass through Data buffer storage ensures the integrality of data transfer.
Another beneficial effect of the invention is:The inventive method is by data processing module to optical monitoring module, sensing Device monitoring modular, video surveillance module frequency conversion collection, three kinds of fusions of measurement pattern, controlling party are realized in the way of single-point is controlled Formula can flexibly be set, and realize the accurately mate to site operation process, improve the accuracy of monitoring system data analysis;It is simultaneously logical Cross wireless transport module and realize being wirelessly transferred for data, reduce installation work when system is installed, and ensure by data buffer storage The integrality of data transfer.
Brief description of the drawings
Fig. 1 is the structured flowchart of present system.
Specific embodiment
Specific embodiment of the invention is described further below in conjunction with the accompanying drawings:
A kind of reference picture 1, building intelligence wireless monitor system includes optical monitoring module, Sensor monitoring module, video prison Survey module, frequency conversion acquisition module, wake-up circuit, wireless transport module and data processing module, the optical monitoring module, sensing The output end of device monitoring modular and video surveillance module is connected to the data input pin of frequency conversion acquisition module, the wake-up circuit Output end be connected to the reset terminal of frequency conversion acquisition module, the frequency conversion acquisition module is connected with wireless transport module, the nothing The output end of line transport module is connected to the input of wake-up circuit, and the wireless transport module is connected with data processing module.
It is further used as preferred embodiment, the optical monitoring module, Sensor monitoring module and video surveillance mould The output end of block is respectively connecting to the different acquisition port of frequency conversion acquisition module data input pin, and the frequency conversion acquisition module is controllable The different collection port of system independently carries out data acquisition.
The data processing module is the control centre of the system, can be by the software monitors of setting in data processing module Platform management is arranged at each monitoring modular of job site, sends command signal, receives and process upload data, generation and derive Data sheet etc..
It is further used as preferred embodiment, the optical monitoring module includes automatic total instruments, the sensor Monitoring modular includes inclinator, axle power meter and displacement meter, and the video surveillance module includes camera.
By automatic total instruments and displacement meter, can horizontal displacement monitoring and vertical displacement data, inclinator and axle power are scored Not Jian Ce gradient and axle power, the video surveillance module can captured in real-time live view.
It is further used as preferred embodiment, data cache module is provided with the frequency conversion acquisition module.
Because the data volume of video surveillance generation is big and redundancy is high, therefore by setting data buffer storage in present system Module, only preserves the video data in nearest certain hour, and early warning circuit can be coordinated to realize when analyze data has abnormal Ability transmitting video data is further analyzed;More close and remote construction area simultaneously for being arranged in the system Part, the data transfer of gathered data may be influenceed by network condition, in order to avoid loss of data, therefore use data The failed data for uploading of cache module caching.
It is further used as preferred embodiment, construction stage identification submodule is provided with the data processing module.
Present system recognizes that submodule can obtain the corresponding relation of each construction stage and time, and root by the construction stage According to the different construction properties of construction stage, corresponding control and monitoring are set, and according to equipment endurance using corresponding monitoring Frequency.
Because the present invention is using the pattern of frequency conversion collection, therefore the power consumption that system is produced is larger, is further used as preferred Implementation method, in order to further enhance the endurance of equipment, the frequency conversion acquisition module includes process chip, internal high frequency Crystal oscillator, switching switch and external low frequency crystal oscillator, the optical monitoring module, Sensor monitoring module and video surveillance module it is defeated Go out the data input pin that end is connected to process chip, the process chip is connected with wireless transport module, the process chip Internal high frequency crystal oscillator and external low frequency crystal oscillator are connected respectively by switching switch, and the output end of the wake-up circuit is connected to treatment The reset terminal of chip.
The working frequency of above-mentioned internal high frequency crystal oscillator and external low frequency crystal oscillator is respectively 24.5MHz and 32kHz, when frequency conversion is adopted When collection module receives the wake-up signal of wake-up circuit, the internal high frequency of 24.5MHz is switched to by the external low frequency crystal oscillator of 32kHz Crystal oscillator works, and carries out data acquisition according to the signal of wireless transport module, has gathered and data are sent out by wireless transport module Data processing module is delivered to, and switches back into the external low frequency crystal oscillator of 32kHz and worked, the next wake-up for waiting wake-up circuit to send Signal, realizes the standby of super low-power consumption before circuit is waken up, and improves the cruising time of system;System is average when not waking up Electric current is about 72uA, and one piece of capacity is the lithium battery of 5000mAh, according to available capacity for 3000mAh is calculated, can be with standby 1736 My god, approximate time is 4.5 years.
It is further used as preferred embodiment, also including early warning circuit, the data processing module and early warning circuit Connection.
It is further used as preferred embodiment, the early warning circuit includes warning indicator light and SMS transmission module.
Early warning circuit not only passes through data processing module and wireless transport module to frequency conversion when analyze data has abnormal Acquisition module sends the instruction of collection vision signal, while also pointing out scene respectively by warning indicator light and SMS transmission module Administrative staff and flexecutive, it is ensured that abnormal conditions obtain real-time processing.
A kind of building intelligence wireless monitoring method, includes following steps:
Data processing module sends wake-up signal and data acquisition is believed according to current Construction stage by wireless transport module Number, the data acquisition signal includes acquisition time section, gathered data type and frequency acquisition;
Wake-up circuit starts frequency conversion Acquisition Circuit according to the wake-up signal for receiving;
Frequency conversion Acquisition Circuit gathers corresponding data according to data acquisition signal, and is sent to data by wireless transport module Reason module, is then shut off frequency conversion Acquisition Circuit.
It is further used as preferred embodiment, if frequency conversion Acquisition Circuit sends data failure by wireless transport module, The signal that will then collect is stored to data cache module, closes frequency conversion Acquisition Circuit, and start change in wake-up circuit next time The data of data cache module are sent to data processing module by wireless transport module during frequency Acquisition Circuit, if sending successfully Then empty data cache module.
It is further used as preferred embodiment, because the data volume of video surveillance generation is big and redundancy is high, therefore this Inventive method sends collection vision signal by early warning circuit, data processing module and wireless transport module to frequency conversion acquisition module Instruction, while also point out site administrator and flexecutive respectively by warning indicator light and SMS transmission module, Ensure that abnormal conditions obtain real-time processing.
Existing Sensor monitoring mode monitoring frequency is usually constant, it is impossible to according to different engineerings, construction stage Neatly controlled;Data acquisition signal includes acquisition time section, gathered data type and collection frequency in the inventive method Rate, by the flexible setting to above-mentioned data, each collection moment sequence or scattered for gathering monitoring modular according to fixed intervals Moment composite sequence or knockdown pattern.0 can for example be set:00:00 starts to 23:59:59 seconds start, every 1s collections Automatic total instruments data;0 can also be set:00:00 to 08:00:Between 00, counted every inclinator of 1s and axle power According to;08:00:01 to 10:00:00 does not gather any data;10:00:01 to 23:59:59, gather once automatic whole station every 5s Instrument, inclinator and axle power are counted;Can also the monitoring modular data that need of certain several set time points collection.By in setting Acquisition time section, gathered data type and frequency acquisition, so as to realize VFC, can be carried out more with site operation process It is effectively matched.
It is further used as preferred embodiment, by taking high-formwork construction as an example, its Construction stage includes precompressed rank Section, pour stage and pre-hardening stage;When the acquisition time section is in pre-pressing stage, frequency acquisition is 10 minutes/time;It is described to adopt The collection time period is in when in the stage that pours and pre-hardening first hour of stage, and frequency acquisition is 1-5 seconds/time;During the collection Between section when being in after pre-hardening first hour of stage, frequency acquisition is 5 minutes/time.
Above is preferable implementation of the invention is illustrated, but the invention is not limited to the implementation Example, those of ordinary skill in the art can also make a variety of equivalents or replace on the premise of without prejudice to spirit of the invention Change, these equivalent deformations or replacement are all contained in the application claim limited range.

Claims (10)

1. a kind of building intelligence wireless monitor system, it is characterised in that:Include optical monitoring module, Sensor monitoring module, Video surveillance module, frequency conversion acquisition module, wake-up circuit, wireless transport module and data processing module, the optical monitoring mould The output end of block, Sensor monitoring module and video surveillance module is connected to the data input pin of frequency conversion acquisition module, described The output end of wake-up circuit is connected to the reset terminal of frequency conversion acquisition module, and the frequency conversion acquisition module connects with wireless transport module Connect, the output end of the wireless transport module is connected to the input of wake-up circuit, the wireless transport module and data processing Module is connected.
2. a kind of building intelligence wireless monitor system according to claim 1, it is characterised in that:The optical monitoring mould The output end of block, Sensor monitoring module and video surveillance module is respectively connecting to the difference of frequency conversion acquisition module data input pin Collection port.
3. a kind of building intelligence wireless monitor system according to claim 1 and 2, it is characterised in that:The optical monitoring Module includes automatic total instruments, and the Sensor monitoring module includes inclinator, axle power meter and displacement meter, the video prison Survey module and include camera.
4. a kind of building intelligence wireless monitor system according to claim 1, it is characterised in that:The data processing module Inside it is provided with construction stage identification submodule.
5. a kind of building intelligence wireless monitor system according to claim 1, it is characterised in that:The frequency conversion acquisition module Inside it is provided with data cache module.
6. a kind of building intelligence wireless monitor system according to claim 1, it is characterised in that:Also include early warning electricity Road, the data processing module is connected with early warning circuit.
7. a kind of building intelligence wireless monitor system according to claim 1, it is characterised in that:The early warning circuit includes There are warning indicator light and SMS transmission module.
8. a kind of building intelligence wireless monitoring method, it is characterised in that include following steps:
Data processing module sends wake-up signal and data acquisition is believed according to current Construction stage by wireless transport module Number, the data acquisition signal includes acquisition time section, gathered data type and frequency acquisition;
Wake-up circuit starts frequency conversion Acquisition Circuit according to the wake-up signal for receiving;
Frequency conversion Acquisition Circuit gathers corresponding data according to data acquisition signal, and is sent to data by wireless transport module Reason module, is then shut off frequency conversion Acquisition Circuit.
9. a kind of building intelligence wireless monitoring method according to claim 8, it is characterised in that:If frequency conversion Acquisition Circuit is led to Cross wireless transport module and send data failure, then the signal that will be collected is stored to data cache module, close frequency conversion collection electricity Road, and the data of data cache module are sent out by wireless transport module when wake-up circuit next time starts frequency conversion Acquisition Circuit Data processing module is delivered to, data cache module is emptied if sending successfully.
10. a kind of building intelligence wireless monitoring method according to claim 8, it is characterised in that:The engineering construction rank Section includes pre-pressing stage, pours the stage and the pre-hardening stage;When the acquisition time section is in pre-pressing stage, frequency acquisition is 10 Minute/time;When acquisition time section is within the stage that pours and pre-hardening first hour of stage, frequency acquisition is 1-5 seconds/ It is secondary;When the acquisition time section is after pre-hardening first hour of stage, frequency acquisition is 5 minutes/time.
CN201710036307.0A 2017-01-17 2017-01-17 A kind of building intelligence wireless monitor system and method Pending CN106871960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710036307.0A CN106871960A (en) 2017-01-17 2017-01-17 A kind of building intelligence wireless monitor system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710036307.0A CN106871960A (en) 2017-01-17 2017-01-17 A kind of building intelligence wireless monitor system and method

Publications (1)

Publication Number Publication Date
CN106871960A true CN106871960A (en) 2017-06-20

Family

ID=59158682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710036307.0A Pending CN106871960A (en) 2017-01-17 2017-01-17 A kind of building intelligence wireless monitor system and method

Country Status (1)

Country Link
CN (1) CN106871960A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798935A (en) * 2019-01-29 2019-05-24 上海无线通信研究中心 A kind of Multiple Source Sensor synergic monitoring method for early warning and system for curtain wall
CN110243340A (en) * 2019-05-09 2019-09-17 上海潮旅信息科技有限公司 A kind of inclination sedimentation monitoring system based on surveying and mapping technology and obliquity sensor
CN112414557A (en) * 2021-01-21 2021-02-26 南京微鲤科技有限公司 Temperature detection system and method of smart phone
CN113432650A (en) * 2021-07-07 2021-09-24 苏州瑞茨柏工程监测技术有限公司 Monitoring system of high and large formwork supporting system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070090945A1 (en) * 2005-10-20 2007-04-26 Hoogenboom Christopher L Power conserving mode for a sensor for monitoring the structural integrity of a building
CN102137476A (en) * 2010-01-21 2011-07-27 广州市香港科大霍英东研究院 Method for realizing low power consumption of portable wireless monitoring terminal
CN102587986A (en) * 2012-03-12 2012-07-18 西安建筑科技大学 Tunnel construction informatization dynamic monitoring system and monitoring method thereof
CN202403738U (en) * 2012-01-10 2012-08-29 北京铁科工程检测中心 Dynamic data acquisition device
CN102866242A (en) * 2012-10-19 2013-01-09 程培峰 Rock and soil humidity testing system and method for achieving rock and soil humidity monitoring by adopting same
CN103208173A (en) * 2013-03-14 2013-07-17 天津市建筑科学研究院有限公司 Embedded wireless intelligent sensor for geotechnical engineering monitoring
CN205449930U (en) * 2015-12-21 2016-08-10 北京博大光通物联科技股份有限公司 Atmospheric pollutants on -line monitoring equipment and system based on wireless cloud sensing net
CN206596120U (en) * 2017-01-17 2017-10-27 广州市建设工程质量安全检测中心 A kind of building intelligence wireless monitoring device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070090945A1 (en) * 2005-10-20 2007-04-26 Hoogenboom Christopher L Power conserving mode for a sensor for monitoring the structural integrity of a building
CN102137476A (en) * 2010-01-21 2011-07-27 广州市香港科大霍英东研究院 Method for realizing low power consumption of portable wireless monitoring terminal
CN202403738U (en) * 2012-01-10 2012-08-29 北京铁科工程检测中心 Dynamic data acquisition device
CN102587986A (en) * 2012-03-12 2012-07-18 西安建筑科技大学 Tunnel construction informatization dynamic monitoring system and monitoring method thereof
CN102866242A (en) * 2012-10-19 2013-01-09 程培峰 Rock and soil humidity testing system and method for achieving rock and soil humidity monitoring by adopting same
CN103208173A (en) * 2013-03-14 2013-07-17 天津市建筑科学研究院有限公司 Embedded wireless intelligent sensor for geotechnical engineering monitoring
CN205449930U (en) * 2015-12-21 2016-08-10 北京博大光通物联科技股份有限公司 Atmospheric pollutants on -line monitoring equipment and system based on wireless cloud sensing net
CN206596120U (en) * 2017-01-17 2017-10-27 广州市建设工程质量安全检测中心 A kind of building intelligence wireless monitoring device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798935A (en) * 2019-01-29 2019-05-24 上海无线通信研究中心 A kind of Multiple Source Sensor synergic monitoring method for early warning and system for curtain wall
CN110243340A (en) * 2019-05-09 2019-09-17 上海潮旅信息科技有限公司 A kind of inclination sedimentation monitoring system based on surveying and mapping technology and obliquity sensor
CN112414557A (en) * 2021-01-21 2021-02-26 南京微鲤科技有限公司 Temperature detection system and method of smart phone
CN113432650A (en) * 2021-07-07 2021-09-24 苏州瑞茨柏工程监测技术有限公司 Monitoring system of high and large formwork supporting system

Similar Documents

Publication Publication Date Title
CN106871960A (en) A kind of building intelligence wireless monitor system and method
CN107317396A (en) Dynamic real-time monitor system in a kind of transformer station's computer room
CN107634995A (en) A kind of charging pile management method and management platform based on Internet of Things
CN204615507U (en) Storage batteries of transformer substation remote core to be discharged attending device to property
CN207742563U (en) A kind of integrated prefabricated pumping plant long-distance management system
CN201846430U (en) Network video monitoring device
CN101382457A (en) Mass concrete temperature monitoring system and method based on GPRS
CN105573257A (en) Remote monitoring method for sewage treatment
CN103234520A (en) Controller area network (CAN) bus-based settlement deformation monitoring system
CN205540218U (en) Equipment operation and maintenance management system suitable for industrial enterprise
CN112886683A (en) Storage battery monitoring system
CN111186771A (en) Remote tower crane intelligent control system
CN210776268U (en) Airport navigation equipment centralized monitoring system with high anti-interference performance
CN202231875U (en) Power transmission line monitoring base station and system
CN203561865U (en) A distributed comprehensive early warning monitored data acquiring system
CN207113930U (en) A kind of bridge security and maintenance monitoring system based on Internet of Things
CN206596120U (en) A kind of building intelligence wireless monitoring device
CN103017824A (en) Monitoring system using measurement robot
CN210719269U (en) Real-time online monitoring system of water supply pipe network
CN105243804A (en) Wireless-network-based fixed-point push type extended alarm system and alarm method thereof
CN104617668A (en) System and method for remotely monitoring transformer substation storage battery
CN105262915B (en) The mobile phone maintenance system and its maintaining method of a kind of fault detector
CN106292451A (en) A kind of data acquisition based on vibrating wire sensor and transmission system and method for work
CN104216367B (en) A kind of tippler real-time remote monitoring system
CN203154690U (en) Fire-fighting remote control system for intelligent substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210201

Address after: 510000 No. 5 Lane three North Lane, Yuexiu District Temple Road, Guangzhou, Guangdong

Applicant after: Guangzhou Guangjian Construction Engineering Testing Center Co.,Ltd.

Applicant after: BEIJING LRK SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: 510600 No.5, Lane 3, North 1st Street, siyouxin Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant before: GUANGZHOU CONSTRUCTION QUALITY & SAFETY TESTING CENTER

Applicant before: BEIJING LRK SCIENCE & TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620

RJ01 Rejection of invention patent application after publication