CN106870867B - A kind of method for maintaining for complex condition deep-buried pipeline - Google Patents

A kind of method for maintaining for complex condition deep-buried pipeline Download PDF

Info

Publication number
CN106870867B
CN106870867B CN201710165986.1A CN201710165986A CN106870867B CN 106870867 B CN106870867 B CN 106870867B CN 201710165986 A CN201710165986 A CN 201710165986A CN 106870867 B CN106870867 B CN 106870867B
Authority
CN
China
Prior art keywords
deep
buried pipeline
steel sleeve
maintaining
local failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710165986.1A
Other languages
Chinese (zh)
Other versions
CN106870867A (en
Inventor
吴志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN201710165986.1A priority Critical patent/CN106870867B/en
Publication of CN106870867A publication Critical patent/CN106870867A/en
Application granted granted Critical
Publication of CN106870867B publication Critical patent/CN106870867B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe

Abstract

The present invention relates to the technical field of construction of deep-buried pipeline maintenance, especially a kind of method for maintaining for complex condition deep-buried pipeline, it is characterised in that:The method for maintaining at least includes the following steps:The spinning steel sleeve at the local failure of deep-buried pipeline, using the steel sleeve to being cut at the local failure of the deep-buried pipeline;It equipment is grabbed using punching takes and screw out the steel sleeve to the top of the deep-buried pipeline upwards after soil;Assembled retaining wall is transferred in the steel sleeve, then pipeline is subjected to reinforcement recovery.It is an advantage of the invention that:On construction ground in the case where anxiety, the influence that " zip mode " constructs to urban highway traffic is avoided, and saves a large amount of constructions and goes along with sb. to guard him expense;Construction technology is mature, and occupied ground is small, environmental pollution is small, has great engineering popularization and application foreground.

Description

A kind of method for maintaining for complex condition deep-buried pipeline
Technical field
The present invention relates to the technical field of construction of deep-buried pipeline maintenance, especially a kind of to be used for complex condition deep-buried pipeline Method for maintaining.
Background technique
" zip mode " construction of pipeline is all the time by denouncing in city, when, but the crowd is dense, closes on and builds in traffic When building the deep-buried pipeline local failure of the complex conditions such as object, especially buried depth greater than 4m, open-cut is also carried out, is needed a large amount of Construction protection measure, not only increase construction risk and project cost, also result in environmental pollution.
Summary of the invention
The purpose of the present invention is provide a kind of for complex condition deep-buried pipeline according to above-mentioned the deficiencies in the prior art Method for maintaining, by using spinning steel sleeve to deep-buried pipeline carry out fixed point cutting repair, realize " minimally-invasive " maintenance, subtract Small scope of construction item and cost reduce construction risk.
The object of the invention realization is completed by following technical scheme:
A kind of method for maintaining for complex condition deep-buried pipeline, it is characterised in that:The method for maintaining includes at least Following steps:The spinning steel sleeve at the local failure of deep-buried pipeline, using the steel sleeve to the part of the deep-buried pipeline It is cut at destruction;It equipment is grabbed using punching takes and screw out the steel sleeve to the top of the deep-buried pipeline upwards after soil;? Assembled retaining wall is transferred in the steel sleeve, then pipeline is subjected to reinforcement recovery.
After cutting at local failure of the steel sleeve to the deep-buried pipeline, the lower section assembled shield Wall, the assembled retaining wall is to progress enclosing at the local failure of the deep-buried pipeline.
Positioning steel pile casting is buried at the local failure of the deep-buried pipeline, the steel sleeve is from the positioning steel pile casting Spinning.
The caliber of the steel sleeve is at least not less than the area at the local failure of the deep-buried pipeline.
Jagged cutter head is inlayed in the bottom of the steel sleeve.
It is an advantage of the invention that:On construction ground in the case where anxiety, avoids " zip mode " construction and urban road is handed over Logical influence, and save a large amount of constructions and go along with sb. to guard him expense;Construction technology is mature, and occupied ground is small, environmental pollution is small, has very big Engineering popularization and application foreground.
Detailed description of the invention
Fig. 1 is construction process elevation of the invention;
Fig. 2 is construction process plan view of the invention.
Specific embodiment
Feature of present invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, so as to In the understanding of technical staff of the same trade:
As shown in Figs. 1-2,1-4 is marked to be expressed as in figure:Steel sleeve 1, deep-buried pipeline 2, native 3, assembled retaining wall 4.
Embodiment:It is used for for the method for maintaining of complex condition deep-buried pipeline to generation local failure in the present embodiment Deep-buried pipeline repairs, and deep-buried pipeline is located at the complex conditions such as soft clay area, Nearby Structure.
Method for maintaining includes the following steps:
1)Preparation of construction
Including organizing, arranging construction human eye, goods and materials, material, equipment prepare, and construction site arrangement, mechanical equipment is assembled, peace Entirely, it all preparations before construction such as confides a technological secret.
2)It measures deep-buried pipeline and destroys dot center, embedded positioning steel pile casting
According to field lofting coordinate, the i.e. embedded positioning steel pile casting before hardened ground.Position the burial place position of steel pile casting Top at deep-buried pipeline local failure, for playing the role of positioning to subsequent steel sleeve circumgyration incision drilling.
3)Full-rotating drill positioning
Roadbed paving plate, full-rotating drill telephone-moving positioning, adjusts the horizontal and vertical degree of drilling machine, the steel bushing for configuring drilling machine Tube hub is consistent with the positioning steel pile casting center buried.
4)Steel sleeve circumgyration incision cutting drilling, using punching crawl soil
Full-rotating drill drives steel sleeve to be rotated down cutting cutting drilling from the center of positioning steel pile casting and sinks to.Such as In Fig. 1 and Fig. 2(a)Shown, the drilling depth of steel sleeve 1 is until it is located at 2 or less 0.5m of deep-buried pipeline.In steel sleeve 1 During rotary drilling, to being cut at the local failure of deep-buried pipeline 2.As shown in figure 1(a)Shown, steel sleeve 1 is boring It grabs equipment using punching into soil 3 in the process to take out, state after taking-up is as shown in figure 1(b)It is shown.
5)The decentralization of assembled retaining wall
As shown in figure 1(c)It is shown, steel sleeve 1 is threaded to the pipeline top 0.15m of deep-buried pipeline 2 upwards, for subsequent decentralization 4 reserved space of assembled retaining wall.Assembled retaining wall 4 is transferred in steel sleeve 1, assembled retaining wall forms the enclosing area of maintenance Domain, the i.e. soil body of 2 surrounding of enclosing deep-buried pipeline are located at the region of 4 enclosings of assembled retaining wall at the local failure being removed It is interior.
6)Spreading reinforcement recovery is carried out to deep-buried pipeline 2 in the enclosing region of assembled retaining wall 4.
7)As shown in figure 1(d)With(e)It is shown, assembled retaining wall 4 is taken out out of steel sleeve 1, backfill in steel sleeve 1, it Steel sleeve 1 is screwed out afterwards.
The present embodiment is in the specific implementation:In order to improve the stock-removing efficiency and drilling effect of steel sleeve, at the bottom of steel sleeve End can inlay jagged cutter head, during the rotary drilling of steel sleeve, cutter head under the driving of full-rotating drill with Steel sleeve rotation, cuts the soil body in drilling process, while cutting to deep-buried pipeline.Titanium alloy can be selected in cutter head It is made.
In Fig. 2(a),(b),(c)Or(d)Shown, the caliber of steel sleeve 1 is at least not less than the part of deep-buried pipeline 2 Area at destruction avoids cutting off not clean feelings to guarantee to be cut completely at the local failure on deep-buried pipeline 2 by steel sleeve 1 Condition occurs.
Although above embodiments are elaborated referring to conception and embodiment of the attached drawing to the object of the invention, this Field those of ordinary skill will recognize, still can be right in the case where no disengaging claim limits the precondition of range The present invention makes various modifications and variations, shape, size such as steel sleeve 1;The structure etc. of assembled retaining wall 4, thus it is different herein One repeats.

Claims (4)

1. a kind of method for maintaining for complex condition deep-buried pipeline, it is characterised in that:The method for maintaining include at least with Lower step:The spinning steel sleeve at the local failure of deep-buried pipeline is broken using part of the steel sleeve to the deep-buried pipeline Harm is cut;It equipment is grabbed using punching takes and screw out the steel sleeve to the top of the deep-buried pipeline upwards after soil;Institute It states and transfers assembled retaining wall in steel sleeve, then pipeline is subjected to reinforcement recovery;It is buried at the local failure of the deep-buried pipeline Position steel pile casting, steel sleeve spinning from the positioning steel pile casting.
2. a kind of method for maintaining for complex condition deep-buried pipeline according to claim 1, it is characterised in that:Work as institute After steel sleeve is stated to cutting at the local failure of the deep-buried pipeline, the assembled retaining wall, the assembled are transferred Retaining wall is to progress enclosing at the local failure of the deep-buried pipeline.
3. a kind of method for maintaining for complex condition deep-buried pipeline according to claim 1, it is characterised in that:It is described The caliber of steel sleeve is at least not less than the area at the local failure of the deep-buried pipeline.
4. a kind of method for maintaining for complex condition deep-buried pipeline according to claim 1, it is characterised in that:Institute Inlay jagged cutter head in the bottom for stating steel sleeve.
CN201710165986.1A 2017-03-17 2017-03-17 A kind of method for maintaining for complex condition deep-buried pipeline Active CN106870867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710165986.1A CN106870867B (en) 2017-03-17 2017-03-17 A kind of method for maintaining for complex condition deep-buried pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710165986.1A CN106870867B (en) 2017-03-17 2017-03-17 A kind of method for maintaining for complex condition deep-buried pipeline

Publications (2)

Publication Number Publication Date
CN106870867A CN106870867A (en) 2017-06-20
CN106870867B true CN106870867B (en) 2018-11-20

Family

ID=59171602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710165986.1A Active CN106870867B (en) 2017-03-17 2017-03-17 A kind of method for maintaining for complex condition deep-buried pipeline

Country Status (1)

Country Link
CN (1) CN106870867B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201344314Y (en) * 2008-10-12 2009-11-11 韩天智 Pipeline first-aid repair supporting rack
CN102644275A (en) * 2012-05-22 2012-08-22 中国建筑第二工程局有限公司 Rotary-digging combined pile-forming construction method in complicated geological conditions
CN103133007A (en) * 2013-03-01 2013-06-05 中铁三局集团有限公司 Shield ground compartment opening method
CN105155516A (en) * 2015-08-14 2015-12-16 江苏省华建建设股份有限公司 Method for constructing cast-in-situ bored pile before comprehensively removing underground barriers
CN106049502A (en) * 2016-07-07 2016-10-26 中铁三局集团广东建设工程有限公司 Protection device for underground pipeline digging exploring cutting and digging exploring cutting method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4250131B2 (en) * 2004-09-16 2009-04-08 カナフレックスコーポレーション株式会社 Drainage pipe repair method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201344314Y (en) * 2008-10-12 2009-11-11 韩天智 Pipeline first-aid repair supporting rack
CN102644275A (en) * 2012-05-22 2012-08-22 中国建筑第二工程局有限公司 Rotary-digging combined pile-forming construction method in complicated geological conditions
CN103133007A (en) * 2013-03-01 2013-06-05 中铁三局集团有限公司 Shield ground compartment opening method
CN105155516A (en) * 2015-08-14 2015-12-16 江苏省华建建设股份有限公司 Method for constructing cast-in-situ bored pile before comprehensively removing underground barriers
CN106049502A (en) * 2016-07-07 2016-10-26 中铁三局集团广东建设工程有限公司 Protection device for underground pipeline digging exploring cutting and digging exploring cutting method

Also Published As

Publication number Publication date
CN106870867A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
US9677339B2 (en) Method for developing oil and gas fields using high-power laser radiation for more complete oil and gas extraction
CN107989551A (en) The broken rock reaming bit of pile sinking and the construction method of pile sinking
CN103291308A (en) Boom-type roadheader for tunnel construction and tunnel construction method
CN107476301A (en) A kind of full casing follow-up step construction method of bridge pile foundation
CN106978807A (en) Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN108505935A (en) Rectangle pile foundation drilling construction equipment and construction method
CN107620600A (en) A kind of MJS engineering methods and pipe-roof method combined supporting big cross section small interval tunneling engineering method
CN110512588B (en) Protection method for tension fracture belt type protection zone crossing mine surface
CN106761787A (en) The variable spoke type shield cutter in outline excavation face and its construction method
CN106870867B (en) A kind of method for maintaining for complex condition deep-buried pipeline
CN106761422A (en) A kind of staged Percusion spiral drill head
CN102662198B (en) Water jetting geophysical prospecting construction process applying drill special for geophysical prospecting
CN206487407U (en) A kind of percussive drill suitable for karst area
CN105002891B (en) A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method
CN102995507A (en) Method for scraping arch of ballastless track
CN102678058B (en) Special drill for geophysical prospecting
JPH0274792A (en) Tunnel construction method with no blasting
CN107044080B (en) A kind of concrete panel crack steel plate sewing method
CN206570811U (en) Existing bridge pile pulling device is passed through in weak soil shield driving area
CN104389515A (en) Impact hammer for hydraulic drilling rig
JPS60184128A (en) Sinking method for caisson
CN106593438A (en) Drilling hydraulic mining downhole excavating robot
CN210195658U (en) Tunnel working face tunneling construction hole group structure
CN207715085U (en) The broken rock reaming bit of pile sinking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant