CN106870867B - A kind of method for maintaining for complex condition deep-buried pipeline - Google Patents
A kind of method for maintaining for complex condition deep-buried pipeline Download PDFInfo
- Publication number
- CN106870867B CN106870867B CN201710165986.1A CN201710165986A CN106870867B CN 106870867 B CN106870867 B CN 106870867B CN 201710165986 A CN201710165986 A CN 201710165986A CN 106870867 B CN106870867 B CN 106870867B
- Authority
- CN
- China
- Prior art keywords
- deep
- buried pipeline
- steel sleeve
- maintaining
- local failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/168—Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
Abstract
The present invention relates to the technical field of construction of deep-buried pipeline maintenance, especially a kind of method for maintaining for complex condition deep-buried pipeline, it is characterised in that:The method for maintaining at least includes the following steps:The spinning steel sleeve at the local failure of deep-buried pipeline, using the steel sleeve to being cut at the local failure of the deep-buried pipeline;It equipment is grabbed using punching takes and screw out the steel sleeve to the top of the deep-buried pipeline upwards after soil;Assembled retaining wall is transferred in the steel sleeve, then pipeline is subjected to reinforcement recovery.It is an advantage of the invention that:On construction ground in the case where anxiety, the influence that " zip mode " constructs to urban highway traffic is avoided, and saves a large amount of constructions and goes along with sb. to guard him expense;Construction technology is mature, and occupied ground is small, environmental pollution is small, has great engineering popularization and application foreground.
Description
Technical field
The present invention relates to the technical field of construction of deep-buried pipeline maintenance, especially a kind of to be used for complex condition deep-buried pipeline
Method for maintaining.
Background technique
" zip mode " construction of pipeline is all the time by denouncing in city, when, but the crowd is dense, closes on and builds in traffic
When building the deep-buried pipeline local failure of the complex conditions such as object, especially buried depth greater than 4m, open-cut is also carried out, is needed a large amount of
Construction protection measure, not only increase construction risk and project cost, also result in environmental pollution.
Summary of the invention
The purpose of the present invention is provide a kind of for complex condition deep-buried pipeline according to above-mentioned the deficiencies in the prior art
Method for maintaining, by using spinning steel sleeve to deep-buried pipeline carry out fixed point cutting repair, realize " minimally-invasive " maintenance, subtract
Small scope of construction item and cost reduce construction risk.
The object of the invention realization is completed by following technical scheme:
A kind of method for maintaining for complex condition deep-buried pipeline, it is characterised in that:The method for maintaining includes at least
Following steps:The spinning steel sleeve at the local failure of deep-buried pipeline, using the steel sleeve to the part of the deep-buried pipeline
It is cut at destruction;It equipment is grabbed using punching takes and screw out the steel sleeve to the top of the deep-buried pipeline upwards after soil;?
Assembled retaining wall is transferred in the steel sleeve, then pipeline is subjected to reinforcement recovery.
After cutting at local failure of the steel sleeve to the deep-buried pipeline, the lower section assembled shield
Wall, the assembled retaining wall is to progress enclosing at the local failure of the deep-buried pipeline.
Positioning steel pile casting is buried at the local failure of the deep-buried pipeline, the steel sleeve is from the positioning steel pile casting
Spinning.
The caliber of the steel sleeve is at least not less than the area at the local failure of the deep-buried pipeline.
Jagged cutter head is inlayed in the bottom of the steel sleeve.
It is an advantage of the invention that:On construction ground in the case where anxiety, avoids " zip mode " construction and urban road is handed over
Logical influence, and save a large amount of constructions and go along with sb. to guard him expense;Construction technology is mature, and occupied ground is small, environmental pollution is small, has very big
Engineering popularization and application foreground.
Detailed description of the invention
Fig. 1 is construction process elevation of the invention;
Fig. 2 is construction process plan view of the invention.
Specific embodiment
Feature of present invention and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, so as to
In the understanding of technical staff of the same trade:
As shown in Figs. 1-2,1-4 is marked to be expressed as in figure:Steel sleeve 1, deep-buried pipeline 2, native 3, assembled retaining wall 4.
Embodiment:It is used for for the method for maintaining of complex condition deep-buried pipeline to generation local failure in the present embodiment
Deep-buried pipeline repairs, and deep-buried pipeline is located at the complex conditions such as soft clay area, Nearby Structure.
Method for maintaining includes the following steps:
1)Preparation of construction
Including organizing, arranging construction human eye, goods and materials, material, equipment prepare, and construction site arrangement, mechanical equipment is assembled, peace
Entirely, it all preparations before construction such as confides a technological secret.
2)It measures deep-buried pipeline and destroys dot center, embedded positioning steel pile casting
According to field lofting coordinate, the i.e. embedded positioning steel pile casting before hardened ground.Position the burial place position of steel pile casting
Top at deep-buried pipeline local failure, for playing the role of positioning to subsequent steel sleeve circumgyration incision drilling.
3)Full-rotating drill positioning
Roadbed paving plate, full-rotating drill telephone-moving positioning, adjusts the horizontal and vertical degree of drilling machine, the steel bushing for configuring drilling machine
Tube hub is consistent with the positioning steel pile casting center buried.
4)Steel sleeve circumgyration incision cutting drilling, using punching crawl soil
Full-rotating drill drives steel sleeve to be rotated down cutting cutting drilling from the center of positioning steel pile casting and sinks to.Such as
In Fig. 1 and Fig. 2(a)Shown, the drilling depth of steel sleeve 1 is until it is located at 2 or less 0.5m of deep-buried pipeline.In steel sleeve 1
During rotary drilling, to being cut at the local failure of deep-buried pipeline 2.As shown in figure 1(a)Shown, steel sleeve 1 is boring
It grabs equipment using punching into soil 3 in the process to take out, state after taking-up is as shown in figure 1(b)It is shown.
5)The decentralization of assembled retaining wall
As shown in figure 1(c)It is shown, steel sleeve 1 is threaded to the pipeline top 0.15m of deep-buried pipeline 2 upwards, for subsequent decentralization
4 reserved space of assembled retaining wall.Assembled retaining wall 4 is transferred in steel sleeve 1, assembled retaining wall forms the enclosing area of maintenance
Domain, the i.e. soil body of 2 surrounding of enclosing deep-buried pipeline are located at the region of 4 enclosings of assembled retaining wall at the local failure being removed
It is interior.
6)Spreading reinforcement recovery is carried out to deep-buried pipeline 2 in the enclosing region of assembled retaining wall 4.
7)As shown in figure 1(d)With(e)It is shown, assembled retaining wall 4 is taken out out of steel sleeve 1, backfill in steel sleeve 1, it
Steel sleeve 1 is screwed out afterwards.
The present embodiment is in the specific implementation:In order to improve the stock-removing efficiency and drilling effect of steel sleeve, at the bottom of steel sleeve
End can inlay jagged cutter head, during the rotary drilling of steel sleeve, cutter head under the driving of full-rotating drill with
Steel sleeve rotation, cuts the soil body in drilling process, while cutting to deep-buried pipeline.Titanium alloy can be selected in cutter head
It is made.
In Fig. 2(a),(b),(c)Or(d)Shown, the caliber of steel sleeve 1 is at least not less than the part of deep-buried pipeline 2
Area at destruction avoids cutting off not clean feelings to guarantee to be cut completely at the local failure on deep-buried pipeline 2 by steel sleeve 1
Condition occurs.
Although above embodiments are elaborated referring to conception and embodiment of the attached drawing to the object of the invention, this
Field those of ordinary skill will recognize, still can be right in the case where no disengaging claim limits the precondition of range
The present invention makes various modifications and variations, shape, size such as steel sleeve 1;The structure etc. of assembled retaining wall 4, thus it is different herein
One repeats.
Claims (4)
1. a kind of method for maintaining for complex condition deep-buried pipeline, it is characterised in that:The method for maintaining include at least with
Lower step:The spinning steel sleeve at the local failure of deep-buried pipeline is broken using part of the steel sleeve to the deep-buried pipeline
Harm is cut;It equipment is grabbed using punching takes and screw out the steel sleeve to the top of the deep-buried pipeline upwards after soil;Institute
It states and transfers assembled retaining wall in steel sleeve, then pipeline is subjected to reinforcement recovery;It is buried at the local failure of the deep-buried pipeline
Position steel pile casting, steel sleeve spinning from the positioning steel pile casting.
2. a kind of method for maintaining for complex condition deep-buried pipeline according to claim 1, it is characterised in that:Work as institute
After steel sleeve is stated to cutting at the local failure of the deep-buried pipeline, the assembled retaining wall, the assembled are transferred
Retaining wall is to progress enclosing at the local failure of the deep-buried pipeline.
3. a kind of method for maintaining for complex condition deep-buried pipeline according to claim 1, it is characterised in that:It is described
The caliber of steel sleeve is at least not less than the area at the local failure of the deep-buried pipeline.
4. a kind of method for maintaining for complex condition deep-buried pipeline according to claim 1, it is characterised in that:Institute
Inlay jagged cutter head in the bottom for stating steel sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710165986.1A CN106870867B (en) | 2017-03-17 | 2017-03-17 | A kind of method for maintaining for complex condition deep-buried pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710165986.1A CN106870867B (en) | 2017-03-17 | 2017-03-17 | A kind of method for maintaining for complex condition deep-buried pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106870867A CN106870867A (en) | 2017-06-20 |
CN106870867B true CN106870867B (en) | 2018-11-20 |
Family
ID=59171602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710165986.1A Active CN106870867B (en) | 2017-03-17 | 2017-03-17 | A kind of method for maintaining for complex condition deep-buried pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106870867B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201344314Y (en) * | 2008-10-12 | 2009-11-11 | 韩天智 | Pipeline first-aid repair supporting rack |
CN102644275A (en) * | 2012-05-22 | 2012-08-22 | 中国建筑第二工程局有限公司 | Rotary-digging combined pile-forming construction method in complicated geological conditions |
CN103133007A (en) * | 2013-03-01 | 2013-06-05 | 中铁三局集团有限公司 | Shield ground compartment opening method |
CN105155516A (en) * | 2015-08-14 | 2015-12-16 | 江苏省华建建设股份有限公司 | Method for constructing cast-in-situ bored pile before comprehensively removing underground barriers |
CN106049502A (en) * | 2016-07-07 | 2016-10-26 | 中铁三局集团广东建设工程有限公司 | Protection device for underground pipeline digging exploring cutting and digging exploring cutting method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4250131B2 (en) * | 2004-09-16 | 2009-04-08 | カナフレックスコーポレーション株式会社 | Drainage pipe repair method |
-
2017
- 2017-03-17 CN CN201710165986.1A patent/CN106870867B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201344314Y (en) * | 2008-10-12 | 2009-11-11 | 韩天智 | Pipeline first-aid repair supporting rack |
CN102644275A (en) * | 2012-05-22 | 2012-08-22 | 中国建筑第二工程局有限公司 | Rotary-digging combined pile-forming construction method in complicated geological conditions |
CN103133007A (en) * | 2013-03-01 | 2013-06-05 | 中铁三局集团有限公司 | Shield ground compartment opening method |
CN105155516A (en) * | 2015-08-14 | 2015-12-16 | 江苏省华建建设股份有限公司 | Method for constructing cast-in-situ bored pile before comprehensively removing underground barriers |
CN106049502A (en) * | 2016-07-07 | 2016-10-26 | 中铁三局集团广东建设工程有限公司 | Protection device for underground pipeline digging exploring cutting and digging exploring cutting method |
Also Published As
Publication number | Publication date |
---|---|
CN106870867A (en) | 2017-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9677339B2 (en) | Method for developing oil and gas fields using high-power laser radiation for more complete oil and gas extraction | |
CN107989551A (en) | The broken rock reaming bit of pile sinking and the construction method of pile sinking | |
CN103291308A (en) | Boom-type roadheader for tunnel construction and tunnel construction method | |
CN107476301A (en) | A kind of full casing follow-up step construction method of bridge pile foundation | |
CN106978807A (en) | Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area | |
CN110409461A (en) | A kind of base pit stand construction based on assembled large-diameter tubular pile | |
CN108505935A (en) | Rectangle pile foundation drilling construction equipment and construction method | |
CN107620600A (en) | A kind of MJS engineering methods and pipe-roof method combined supporting big cross section small interval tunneling engineering method | |
CN110512588B (en) | Protection method for tension fracture belt type protection zone crossing mine surface | |
CN106761787A (en) | The variable spoke type shield cutter in outline excavation face and its construction method | |
CN106870867B (en) | A kind of method for maintaining for complex condition deep-buried pipeline | |
CN106761422A (en) | A kind of staged Percusion spiral drill head | |
CN102662198B (en) | Water jetting geophysical prospecting construction process applying drill special for geophysical prospecting | |
CN206487407U (en) | A kind of percussive drill suitable for karst area | |
CN105002891B (en) | A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method | |
CN102995507A (en) | Method for scraping arch of ballastless track | |
CN102678058B (en) | Special drill for geophysical prospecting | |
JPH0274792A (en) | Tunnel construction method with no blasting | |
CN107044080B (en) | A kind of concrete panel crack steel plate sewing method | |
CN206570811U (en) | Existing bridge pile pulling device is passed through in weak soil shield driving area | |
CN104389515A (en) | Impact hammer for hydraulic drilling rig | |
JPS60184128A (en) | Sinking method for caisson | |
CN106593438A (en) | Drilling hydraulic mining downhole excavating robot | |
CN210195658U (en) | Tunnel working face tunneling construction hole group structure | |
CN207715085U (en) | The broken rock reaming bit of pile sinking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||