CN106869880B - A kind of sandstone reservoir acidization tool - Google Patents

A kind of sandstone reservoir acidization tool Download PDF

Info

Publication number
CN106869880B
CN106869880B CN201510921016.0A CN201510921016A CN106869880B CN 106869880 B CN106869880 B CN 106869880B CN 201510921016 A CN201510921016 A CN 201510921016A CN 106869880 B CN106869880 B CN 106869880B
Authority
CN
China
Prior art keywords
acidification
grade
sandstone reservoir
reservoir
diverting agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510921016.0A
Other languages
Chinese (zh)
Other versions
CN106869880A (en
Inventor
邹国庆
彭建新
王磊
徐国伟
张杨
张安治
杨双宝
朱良根
肖桂林
徐力群
刘金龙
张涛
贾红军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201510921016.0A priority Critical patent/CN106869880B/en
Publication of CN106869880A publication Critical patent/CN106869880A/en
Application granted granted Critical
Publication of CN106869880B publication Critical patent/CN106869880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of sandstone reservoir acidization tool, comprising: according to the well-log information of sandstone reservoir, carries out acidification classification to sandstone reservoir;According to the thickness of the sandstone reservoir of each acidification grade, the dosage of the acid solution of the sandstone reservoir of each acidification grade is determined;According to the perforation quantity and preforation tunnel parameter of the sandstone reservoir of each acidification grade, the dosage of the diverting agent of the sandstone reservoir of each acidification grade is determined;Diverting agent is degradable under preset temperature;Prepad fluid, acid solution and displacement fluid are implanted sequentially according to the sandstone reservoir that the sequence of acidification grade from high to low is each acidification grade, and when the next stage sandstone reservoir of the sandstone reservoir for each acidification grade injects prepad fluid, sandstone reservoir for each acidification grade injects diverting agent, so that diverting agent fills the partial completion eyelet of the sandstone reservoir of each acidification grade.Sandstone reservoir acidization tool provided by the invention can carry out homogeneous acidification to sandstone reservoir, and can reduce the cost of sandstone reservoir acidification.

Description

A kind of sandstone reservoir acidization tool
Technical field
The present invention relates to oil exploitation technology more particularly to a kind of sandstone reservoir acidization tools.
Background technique
Currently, improving the transformation degree of the sandstone reservoir near oil/gas well, common transformation side to improve Oil & Gas Productivity Method has acidification transformation, fracturing reform.Existing acidification transformation method used is machine tool separate layer acid treatment, the machine tool point Layer acidification specifically: after being classified to sandstone reservoir, set at the oil pipe corresponding to the depth location of every grade of sandstone reservoir Downhole tool is set, such as: packer, bridge plug etc. are acidified step by step to separate sandstone reservoir not at the same level.
However, when stating machine tool separate layer acid treatment in use and being acidified to sandstone reservoir, due to needing in oil well Downhole tool is set on oil pipe, so that the higher cost of sandstone reservoir acidification, efficiency are lower.
Summary of the invention
The present invention provides a kind of sandstone reservoir acidization tool, to solve the cost of the acidification of sandstone reservoir in the prior art compared with Height, the lower problem of efficiency.
In order to achieve the above objectives, the embodiment of the present invention adopts the following technical scheme that
First aspect present invention provides a kind of sandstone reservoir acidization tool, comprising:
According to the well-log information of sandstone reservoir, acidification classification is carried out to the sandstone reservoir;Wherein, each adjacent two is acidified The difference of the horizontal minimum principal stress of the sandstone reservoir of grade is more than or equal to the first preset threshold;
According to the thickness of the sandstone reservoir of each acidification grade, the acid solution of the sandstone reservoir of each acidification grade is determined Dosage;
According to the perforation quantity and preforation tunnel parameter of the sandstone reservoir of each acidification grade, each acid is determined Change the dosage of the diverting agent of the sandstone reservoir of grade;Wherein, the preforation tunnel parameter includes preforation tunnel diameter and Perforation Eye depth, the diverting agent are degradable under preset temperature;
According to the dosage of the acid solution of the sandstone reservoir of each acidification grade, according to the sequence of acidification grade from high to low It is implanted sequentially prepad fluid, acid solution and displacement fluid for the sandstone reservoir of each acidification grade, and according to described each acidification etc. The dosage of the diverting agent of the sandstone reservoir of grade, in the next stage sandstone reservoir injection of the sandstone reservoir for each acidification grade When prepad fluid, the sandstone reservoir for each acidification grade injects diverting agent, so that the diverting agent fills each acid Change the partial completion eyelet of the sandstone reservoir of grade, the partial completion eyelet is the perforation that liquid absorption amount is greater than the second preset threshold Eyelet.
As described above, the well-log information according to sandstone reservoir, carries out acidification classification to the sandstone reservoir, it is specific to wrap It includes:
According to the well-log information of the sandstone reservoir, each horizontal minimum principal stress of the sandstone reservoir is determined, and to every A horizontal minimum principal stress carries out static and dynamic correction, the horizontal minimum principal stress after obtaining each correction;
According to the well-log information of the sandstone reservoir, each perforation layer position of the sandstone reservoir is determined;
According to after each correction horizontal minimum principal stress and perforation layer position, determine each perforation layer position Horizontal minimum principal stress after the corresponding correction of the sandstone reservoir at place;
Horizontal minimum principal stress after the corresponding correction of sandstone reservoir where each perforation layer position and described First preset threshold carries out acidification classification to the sandstone reservoir.
As described above, the perforation quantity and preforation tunnel parameter of the sandstone reservoir according to each acidification grade, The dosage for determining the diverting agent of the sandstone reservoir of each acidification grade, specifically includes:
According to the preforation tunnel diameter, the diameter of the first diverting agent is determined, and according to the sand of each acidification grade The perforation quantity of rock reservoir and preset coefficient determine the number of the first diverting agent of the sandstone reservoir of each acidification grade Amount;
According to the diameter of the preforation tunnel diameter and first diverting agent, the diameter of the second diverting agent, and root are determined According to the preforation tunnel diameter, the first diverting agent of the sandstone reservoir of the preforation tunnel depth, each acidification grade The bulk density of quantity, second diverting agent determines the matter of the second diverting agent of the sandstone reservoir of each acidification grade Amount;
According to the preforation tunnel diameter, the diameter of the diameter of first diverting agent and second diverting agent, determine The diameter of third diverting agent, and according to the preforation tunnel diameter, the sand of the preforation tunnel depth, each acidification grade The quality of second diverting agent of the sandstone reservoir of the quantity of the first diverting agent of rock reservoir, each acidification grade, described the The real density of the real density of two diverting agents, the third diverting agent determines the sandstone reservoir of each acidification grade The quality of third diverting agent.
As described above, first diverting agent, second diverting agent are identical with the material of the third diverting agent.
As described above, the thickness of the sandstone reservoir according to each acidification grade, determines each acidification grade The dosage of the acid solution of sandstone reservoir, specifically includes:
According to the thickness of the sandstone reservoir of each acidification grade, before determining each acidification grade sandstone reservoir Set the dosage of the dosage of acid solution, the dosage of main body acid solution and postposition acid solution.
As described above, the dosage of the acid solution of the sandstone reservoir according to each acidification grade, according to acidification grade Sequence from high to low is that the sandstone reservoir of each acidification grade is implanted sequentially prepad fluid, acid solution and displacement fluid, specific to wrap It includes:
According to the dosage of preposition acid solution, the dosage of main body acid solution and the postposition acid of the sandstone reservoir of each acidification grade The dosage of liquid, be followed successively by it is described it is each acidification grade sandstone reservoir be injected separately into prepad fluid, preposition acid solution, main body acid solution, after Set acid solution and displacement fluid.
As described above, the dosage of the diverting agent of the sandstone reservoir according to each acidification grade, is being described every When the next stage sandstone reservoir of the sandstone reservoir of a acidification grade injects prepad fluid, for the sandstone reservoir of each acidification grade Diverting agent is injected, is specifically included:
According to the quantity of the first diverting agent of sandstone reservoir of each acidification grade, the quality of the second diverting agent and the The quality of three diverting agents, for it is described it is each acidification grade sandstone reservoir next stage sandstone reservoir inject prepad fluid when, be The sandstone reservoir of each acidification grade is implanted sequentially the first diverting agent, the second diverting agent, third diverting agent.
As described above, the sandstone reservoir is divided into the sandstone reservoir of the first acidification grade and the sandstone storage of the second acidification grade Layer;
Then the sandstone reservoir for being followed successively by each acidification grade is injected separately into prepad fluid, preposition acid solution, main acid Liquid, postposition acid solution and displacement fluid, specifically include:
Sandstone reservoir for the first acidification grade is injected separately into prepad fluid, preposition acid solution, main body acid solution, postposition acid solution And displacement fluid, complete the acidification of the sandstone reservoir of the first acidification grade;
After completing the acidification of sandstone reservoir of the first acidification grade, for the sandstone reservoir note of the second acidification grade Enter prepad fluid, wherein it is described be the second acidification grade sandstone reservoir injection prepad fluid in include it is described first acidification grade Sandstone reservoir the first diverting agent, it is described first acidification grade sandstone reservoir the second diverting agent, it is described first acidification etc. The third diverting agent of the sandstone reservoir of grade;
When the pressure of oil well reaches third predetermined threshold value, the sand reservoir for being acidified grade for described second is injected separately into preposition Acid solution, main body acid solution, postposition acid solution and displacement fluid complete the acidification of the sandstone reservoir of the second acidification grade.
Sandstone reservoir acidization tool provided by the invention, by it is each acidification grade sandstone reservoir acidification after, The big preforation tunnel of liquid absorption amount in the sandstone reservoir of each acidification grade is subjected to temporarily stifled mode with diverting agent, is realized to sand The separate layer acid treatment of rock reservoir reduces the process of sandstone reservoir acidification, improves the efficiency of sandstone reservoir acidification, and is improving While oily well capacity, the cost of sandstone reservoir acidification is reduced.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow chart of sandstone reservoir acidization tool embodiment one provided by the invention;
Fig. 2 is the flow chart of sandstone reservoir acidization tool embodiment two provided by the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Acidization tool provided by the invention can carry out homogeneous acidification to the sandstone reservoir near oil well, to improve oil well Production capacity, be particularly suitable for the strong oil well of heterogeneity, it is intended to solve in the prior art sandstone reservoir acidification higher cost, effect Rate is lower, is acidified non-uniform problem.
Technical solution of the present invention is described in detail with specifically embodiment below.These specific implementations below Example can be combined with each other, and the same or similar concept or process may be repeated no more in some embodiments.
Fig. 1 is the flow chart of sandstone reservoir acidization tool embodiment one provided by the invention, and what is involved is such as the present embodiment What is according to the well-log information of sandstone reservoir, and to the detailed process that sandstone reservoir is acidified, the method for the present embodiment is suitable for oil Well need to use the sandstone reservoir of acidification, the sandstone reservoir strong especially suitable for heterogeneity, can reduce the acidification of sandstone reservoir at This.As shown in Figure 1, this method may include:
S101, the well-log information according to sandstone reservoir carry out acidification classification to sandstone reservoir;Wherein, each adjacent two acid The difference for changing the horizontal minimum principal stress of the sandstone reservoir of grade is more than or equal to the first preset threshold.
Specifically, after oil well finishing drilling, so that it may according to the well-log information of sandstone reservoir (referred to as: reservoir), to reservoir into Row acidification classification, when it is implemented, can according in the well-log information of reservoir minimum horizontal principal stress parameter and reservoir on Each perforating site, determine the horizontal minimum principal stress of the reservoir where each perforation layer position, and then according to arbitrary neighborhood Difference between the horizontal minimum principal stress of reservoir where two perforation layer positions, two by difference less than the first preset threshold Reservoir division where perforation layer position is to be acidified grade with level-one, and difference is greater than or equal to two perforations of the first preset threshold Reservoir division where layer position is different acidification grades.As the reservoir where each perforation layer position, corresponding horizontal minimum master is answered Power have characterize the reservoir the consistent characteristic of physical property, therefore, it is above-mentioned be classified in this way by way of, can physical property is identical or Similar reservoir division is in same level-one, and then the reservoir that physical property can be allowed same or similar is acidified simultaneously, to reach To the purpose for carrying out homogeneous acidification to reservoir.Wherein, above-mentioned first preset threshold can be according to the physical property and user demand of reservoir It determines.
S102, according to it is each acidification grade sandstone reservoir thickness, determine it is each acidification grade sandstone reservoir acid The dosage of liquid.
Specifically, after carrying out acidification classification to reservoir, so that it may according to the classification, determine the storage of each acidification grade Layer thickness, and then can according to the thickness, determine it is each acidification grade reservoir acid solution dosage, wherein how basis The thickness of reservoir determines the dosage of the acid solution of reservoir, may refer to the prior art.
S103, according to it is each acidification grade sandstone reservoir perforation quantity and preforation tunnel parameter, determine each acidification The dosage of the diverting agent of the sandstone reservoir of grade;Wherein, preforation tunnel parameter includes preforation tunnel diameter and preforation tunnel depth, Diverting agent is degradable under preset temperature.
Specifically, after carrying out acidification classification to reservoir, so that it may according to the classification, determine the storage of each acidification grade The perforation quantity of layer, and then the temporary of each reservoir for being acidified grade can be determined according to the perforation quantity and preforation tunnel parameter The dosage of blocking agent, when it is implemented, can determine each acidification grade according to the perforation quantity of the reservoir of each acidification grade The quantity of perforation temporarily stifled required for reservoir, meanwhile, the volume of preforation tunnel can be determined according to preforation tunnel parameter, in this way, The perforation quantity that can be temporarily blocked up according to required for the reservoir of the volume of preforation tunnel and each acidification grade, determines each acid Change the dosage of the diverting agent of the reservoir of grade, wherein the Perforation that the preforation tunnel that above-mentioned needs temporarily block up can be big for liquid absorption amount Eye, the corresponding reservoir of the big perforation of these liquid absorption amounts are the interval of good penetrability in the reservoir of each acidification grade.
In the present embodiment, above-mentioned diverting agent can be filled in the reservoir of each acidification grade in a manner of being fully populated with The big preforation tunnel of liquid absorption amount in, to realize the temporary closure of the interval of good penetrability in the reservoir to each acidification grade. Wherein, above-mentioned diverting agent can according to the actual temperature of the reservoir of required acidification determine, simultaneously as above-mentioned diverting agent be Degradable diverting agent under preset temperature, does not need the individually row of returning, therefore, it is possible to reduce the preparatory process of Reservoir Acidization improves The efficiency of Reservoir Acidization.
It should be noted that since above-mentioned diverting agent is that the liquid absorption amount of each reservoir for being acidified grade is big to be penetrated for temporarily blocking up Hole eyelet, to avoid when to next stage Reservoir Acidization, perforated zone corresponding to the big preforation tunnel of the liquid absorption amount can will be used In the acid solution sucking of acidification next stage reservoir, the perforated zone is caused to be acidified excessive situation.When to the last one acidification grade Reservoir be acidified after, since the reservoirs again without other acidification grades need to be acidified, can not have to temporarily block up last The reservoir of a acidification grade, that is to say, that the dosage of the diverting agent of the reservoir of the last one acidification grade is 0.
S104, the dosage according to the acid solution of the sandstone reservoir of each acidification grade, according to acidification grade from high to low suitable Sequence is implanted sequentially prepad fluid, acid solution and displacement fluid for the sandstone reservoir of each acidification grade, and according to the sand of each acidification grade The dosage of the diverting agent of rock reservoir, when the next stage sandstone reservoir of the sandstone reservoir for each acidification grade injects prepad fluid, Sandstone reservoir for each acidification grade injects diverting agent, so that diverting agent fills the part of the sandstone reservoir of each acidification grade Preforation tunnel, partial completion eyelet are the preforation tunnel that liquid absorption amount is greater than the second preset threshold.
Specifically, after determining the dosage of acid solution and the dosage of diverting agent of reservoir of each acidification grade, so that it may According to the sequence of acidification grade from high in the end, i.e., according to the corresponding average level minimum principal stress of reservoir of every level-one acidification grade Sequence from small to large first injects prepad fluid, acid solution and displacement fluid for the smallest level-one reservoir of average level minimum principal stress, with It is acidified, that is to say, that level-one reservoir first best to physical property is acidified.
After the level-one reservoir (i.e. acidification grade highest level-one reservoir) best to physical property is acidified, to the grade While next stage reservoir (i.e. average level minimum principal stress take second place level-one reservoir) injection prepad fluid after reservoir, for this Grade reservoir injects diverting agent, temporarily to block up the preforation tunnel that liquid absorption amount in this grade of reservoir is greater than the second preset threshold, i.e., temporarily blocks up the grade The interval of good penetrability in reservoir does not block up the preforation tunnel of liquid absorption amount difference in this grade of sandstone reservoir temporarily, i.e., does not block up this grade of reservoir temporarily The interval of middle poor permeability, so that the interval of poor permeability can continue to carry out again with next stage reservoir in this grade of reservoir Acidification, and so on, until completing acidification to elementary level-one reservoir is acidified.Wherein, above-mentioned second preset threshold can be with It is determined according to the physical property of reservoir and user demand.
It by way of the interval of this temporarily stifled good penetrability, can inhale that hyper acid to avoid the interval of good penetrability, cause Acidification is excessive, and hypoacidity for the suction of the interval of poor permeability, causes to be acidified halfway problem, to realize to the uniform of reservoir Acidification, and then the connectivity of oil well and reservoir is improved, improve oily well capacity.
In the prior art, when carrying out stage acidizing to reservoir using machine tool separate layer acid treatment, the oil in oil well is needed Downhole tool is set on pipe, so that the higher cost of Reservoir Acidization, efficiency are lower.And sandstone reservoir acidification provided in this embodiment Method, by it is each acidification grade Reservoir Acidization after, only with diverting agent by it is each acidification grade reservoir liquid absorption amount Big preforation tunnel carries out temporarily stifled mode, so that it may realize to the layering homogeneous acidification of reservoir, reduce the standard of Reservoir Acidization Standby process reduces the cost of Reservoir Acidization while improving oily well capacity.
Sandstone reservoir acidization tool provided by the invention, by only using after the Reservoir Acidization to each acidification grade The big preforation tunnel of liquid absorption amount in the reservoir of each acidification grade is carried out temporarily stifled mode by diverting agent, so that it may be realized to reservoir Layering homogeneous acidification, reduce the preparatory process of Reservoir Acidization, improve the efficiency of Reservoir Acidization, in the production for improving oil well While energy, the cost of Reservoir Acidization is reduced.
Sandstone reservoir acidization tool provided by the present invention will be carried out using a specific embodiment below specific Illustrate, in the present embodiment, the span of reservoir to be acidified is 113m, i.e., the vertical thickness of reservoir is 113m, should be to be acidified Reservoir is divided into two-stage, the reservoir of the reservoir of the respectively first acidification grade and the second acidification grade;Above-mentioned diverting agent includes: First diverting agent, the second diverting agent and third diverting agent.It is embodied before this method, needs to make some preparations, these Preparation may include: the well-log information for obtaining sandstone reservoir.Fig. 2 is sandstone reservoir acidization tool provided by the invention implementation The flow chart of example two, as shown in Fig. 2, this method may include:
S201, the well-log information according to sandstone reservoir determine each horizontal minimum principal stress of sandstone reservoir, and to each water Flat minimum principal stress carries out static and dynamic correction, the horizontal minimum principal stress after obtaining each correction.
Specifically, the above-mentioned each horizontal minimum principal stress for how determining reservoir, and how to horizontal minimum principal stress into Action static correction, the horizontal minimum principal stress after being corrected may refer to the prior art.
S202, the well-log information according to sandstone reservoir determine each perforation layer position of sandstone reservoir.
Specifically, it is above-mentioned how according to the well-log information of reservoir, it determines each perforation layer position of reservoir, may refer to existing skill Art.
Illustratively, it is assumed that determined according to well-log information, the perforation segment length 44m of the reservoir in the present embodiment then can root According to the porosity and permeability on the reservoir of this 44m, each perforation layer position of the reservoir is determined.
S203, according to after each correction horizontal minimum principal stress and perforation layer position, where determining each perforation layer position Horizontal minimum principal stress after the corresponding correction of sandstone reservoir.
S204, according to the horizontal minimum principal stress and first after the corresponding correction of sandstone reservoir where each perforation layer position Preset threshold carries out acidification classification to sandstone reservoir.
Specifically, after horizontal minimum principal stress after the corresponding correction of reservoir where obtaining each perforation layer position, Between horizontal minimum principal stress after being assured that the corresponding correction of reservoir where two perforation layer positions of arbitrary neighborhood Difference will be poor by difference less than the reservoir division where two perforation layer positions of the first preset threshold to be acidified grade with level-one Reservoir division where value is greater than or equal to two perforation layer positions of the first preset threshold is different acidification grades, to ensure object The same or similar reservoir division of property is in same level-one, and then the reservoir that physical property can be allowed same or similar carries out acid simultaneously Change, to achieve the purpose that carry out homogeneous acidification to reservoir.It should be noted that in order to further increase the accuracy of classification, on It states when carrying out acidification classification to reservoir, it can also be with reference to the porosity of the reservoir where each perforation layer position in well-log information And permeability.
With continued reference to the example of above-mentioned S202, in the present embodiment, it is above-mentioned first acidification grade reservoir with a thickness of 23 Rice, second acidification grade reservoir with a thickness of 21 meters, wherein every meter has 16 preforation tunnels.Wherein, above-mentioned first acidification etc. The difference between horizontal minimum principal stress after the correction of the reservoir of grade and the reservoir of the second acidification grade is greater than or equal to 3 megapascal (i.e. the first preset threshold is 3 megapascal), the horizontal minimum principal stress after the correction of the reservoir of the first acidification grade is less than the second acid Horizontal minimum principal stress after changing the correction of the reservoir of grade, that is to say, that the acidification grade of the reservoir of the first acidification grade is high, The acidification grade of the reservoir of second acidification grade is low.
S205, according to it is each acidification grade sandstone reservoir thickness, determine it is each acidification grade sandstone reservoir it is preposition The dosage of the dosage of acid solution, the dosage of main body acid solution and postposition acid solution.
Specifically, with continued reference to the example of above-mentioned S204, after the fractionation, so that it may according to above-mentioned first acidification grade The thickness of reservoir determines the dosage of preposition acid solution of the first acidification grade reservoir, the use of the dosage of main body acid solution and postposition acid solution Amount;According to the thickness of the reservoir of above-mentioned second acidification grade, dosage, the main body of the preposition acid solution of the second acidification grade reservoir are determined The dosage of acid solution and the dosage of postposition acid solution.Wherein, how according to the thickness of reservoir, determine the preposition acid solution of reservoir dosage, The dosage of main body acid solution and the dosage of postposition acid solution, may refer to the prior art.
S206, according to preforation tunnel diameter, determine the diameter of the first diverting agent, and store up according to the sandstone of each acidification grade The perforation quantity of layer and preset coefficient determine the quantity of the first diverting agent of the sandstone reservoir of each acidification grade.
Specifically, above-mentioned first diverting agent is the port being located in reservoir for temporarily blocking up preforation tunnel, therefore, above-mentioned first The diameter of diverting agent can be slightly less than preforation tunnel diameter, so that the first diverting agent can enter inside preforation tunnel, to penetrating The port that hole eyelet is located in reservoir is temporarily blocked up, and will not be sucked into the runner inside reservoir.When it is implemented, can be with According to preforation tunnel diameter, the diameter of the first diverting agent is determined, and according to the perforation quantity of the reservoir of each acidification grade and in advance If coefficient, determine it is each acidification grade reservoir the first diverting agent quantity, wherein above-mentioned preset coefficient can basis The physical property of user demand and reservoir is determined.
With continued reference to the example of above-mentioned S204, it is assumed that above-mentioned preforation tunnel diameter is 9mm, then the diameter of the first diverting agent can To be slightly less than 9mm, in this example, the diameter of the first diverting agent is 8mm.It, should by taking the reservoir of above-mentioned first acidification grade as an example First acidification grade reservoir with a thickness of 23 meters, wherein every meter has 16 preforation tunnels, then it is above-mentioned first acidification grade storage The perforation quantity of layer is 368, it is assumed that above-mentioned preset coefficient is 0.5, it is determined that the first of the reservoir of above-mentioned first acidification grade The quantity of diverting agent is 184.
S207, according to the diameter of preforation tunnel diameter and the first diverting agent, determine the diameter of the second diverting agent, and according to penetrating Hole eye diameter, preforation tunnel depth, the quantity of the first diverting agent of the sandstone reservoir of each acidification grade, the second diverting agent Bulk density determines the quality of the second diverting agent of the sandstone reservoir of each acidification grade.
Specifically, above-mentioned second diverting agent be for filling inside preforation tunnel, therefore, the diameter of above-mentioned second diverting agent Can be slightly less than or equal to preforation tunnel diameter half, and be greater than difference between preforation tunnel diameter and the first diverting agent diameter Value, so that the effect inside the second diverting agent filling preforation tunnel is preferable, and can be temporarily stifled from first to avoid the second diverting agent It is flowed into gap between agent and preforation tunnel in the runner of reservoir.When it is implemented, can be according to preforation tunnel diameter, first The diameter of diverting agent determines the diameter of the second diverting agent, with continued reference to the example of above-mentioned S206, it is assumed that above-mentioned preforation tunnel diameter For 9mm, the diameter of the first diverting agent is 8mm, then the diameter of above-mentioned second diverting agent can be greater than 1mm, and be less than 4.5mm, then In this example, the diameter of above-mentioned second diverting agent is 3mm.
After the diameter for determining the second diverting agent, so that it may the preforation tunnel inputted according to preforation tunnel diameter, user Quantity, the bulk density of the second diverting agent of first diverting agent of the reservoir of depth, each acidification grade, determine each acidification etc. The quality of second diverting agent of the reservoir of grade.By taking the reservoir of the first acidification grade in above-mentioned example as an example, it is assumed that preforation tunnel Diameter is ΦPerforation, preforation tunnel depth is h, and the quantity of the first diverting agent of the sandstone reservoir of the first acidification grade is Q1, second The bulk density of diverting agent is ρAccumulation, the quality of the second diverting agent of the sandstone reservoir of the first acidification grade is M2, then can basis Formula (1) determines the mass M of the second diverting agent of the sandstone reservoir of the first acidification grade2, the formula (1) is specific as follows:
S208, according to preforation tunnel diameter, the diameter of the diameter of the first diverting agent and the second diverting agent, determine that third is temporarily blocked up The diameter of agent, and according to preforation tunnel diameter, first diverting agent of the sandstone reservoir of preforation tunnel depth, each acidification grade Quantity, the quality of the second diverting agent of the sandstone reservoir of each acidification grade, the real density of the second diverting agent, third diverting agent Real density, determine it is each acidification grade sandstone reservoir third diverting agent quality.
Specifically, above-mentioned third diverting agent be for filling the gap in preforation tunnel inside between the second diverting agent, because This, the diameter of above-mentioned third diverting agent can be slightly less than or the half of the diameter equal to the second diverting agent, and is more than or equal to perforation Difference between eye diameter and the first diverting agent diameter, so that third diverting agent is filled in the gap between the second diverting agent Effect it is preferable, and the stream of reservoir can be flowed into from the gap between the first diverting agent and preforation tunnel to avoid third diverting agent In road.When it is implemented, can according to preforation tunnel diameter, the diameter of the first diverting agent, the second diverting agent diameter, determine The diameter of three diverting agents, with continued reference to the example of above-mentioned S207, it is assumed that above-mentioned preforation tunnel diameter is 9mm, the first diverting agent Diameter is 8mm, and the diameter of the second diverting agent is 3mm, then the diameter of above-mentioned third diverting agent can be less than 1.5m, is greater than or equal to 1mm, in this example, the diameter of above-mentioned third diverting agent are 1mm.
After the diameter for determining third diverting agent, so that it may according to preforation tunnel diameter, preforation tunnel depth, each acid Change the quantity and the quality of the second diverting agent, the real density of the second diverting agent and the of the first diverting agent of the sandstone reservoir of grade The real density of three diverting agents determines the quality of the third diverting agent of the reservoir of each acidification grade.With in above-mentioned example For the reservoir of one acidification grade, it is assumed that preforation tunnel diameter is ΦPerforation, preforation tunnel depth is h, the storage of the first acidification grade The quantity of first diverting agent of layer is Q1, the quality of the second diverting agent of the reservoir of the first acidification grade is M2, the second diverting agent Real density is ρ2, the real density of third diverting agent is ρ3, the mass M of the third diverting agent of the reservoir of the first acidification grade3, The mass M of the third diverting agent of the reservoir of the first acidification grade can be then determined according to formula (2)3, the formula (2) is specific such as Under:
It should be noted that the material of above-mentioned first diverting agent, the second diverting agent and third diverting agent can be identical, it can also With difference, but volume and bulk density are different, can specifically be determined according to the physical property for the reservoir being acidified.
Dosage, the dosage and postposition of main body acid solution of the preposition acid solution of S209, the sandstone reservoir for being acidified grade according to first The dosage of acid solution, the sandstone reservoir for the first acidification grade are injected separately into prepad fluid, preposition acid solution, main body acid solution, postposition acid solution And displacement fluid, complete the acidification of the sandstone reservoir of the first acidification grade.
Specifically, with continued reference to above-mentioned example, when the dosage and diverting agent of the acid solution for the reservoir for determining each acidification grade Dosage after, so that it may according to acidification grade sequence from high to low, for each acidification grade reservoir be implanted sequentially it is preposition Liquid, acid solution and displacement fluid.In this example, the acidification grade of the reservoir of the first acidification grade is high, the reservoir of the second acidification grade Acidification grade it is low, then can first according to the dosage of preposition acid solution of reservoir of the first acidification grade, the dosage of main body acid solution and The dosage of postposition acid solution, the reservoir for the first acidification grade are injected separately into prepad fluid, preposition acid solution, main body acid solution, postposition acid solution And displacement fluid, to complete the acidification of the reservoir of the first acidification grade.Wherein, the reservoir for how being acidified grade for first injects preposition Liquid, preposition acid solution, main body acid solution, postposition acid solution and displacement fluid, may refer to the prior art.
S210, prepad fluid is injected for the sandstone reservoir of the second acidification grade, wherein for the sandstone reservoir of the second acidification grade It include the sandstone storage of the first diverting agent, the first acidification grade of the sandstone reservoir of the first acidification grade in the prepad fluid of injection Layer the second diverting agent, first acidification grade sandstone reservoir third diverting agent.
Specifically, while injecting prepad fluid to the reservoir of the second acidification grade, according to fixed first acidification etc. The dosage of the diverting agent of the reservoir of grade, i.e., according to the quantity of the first diverting agent, the quality of the second diverting agent and third diverting agent Quality is injected in prepad fluid in the sandstone reservoir for the second acidification grade, is injected separately into the first diverting agent, the second diverting agent, the Three diverting agents.Wherein, the first diverting agent and the second diverting agent can be injected separately into preset interval time, the second diverting agent and Three diverting agents can inject simultaneously, which can determine according to the demand of user.
It is introduced into oil well in this way, the first diverting agent can inject prepad fluid with the reservoir for the second acidification grade, and As the direction of prepad fluid flowing enters in the reservoir of the first acidification grade in the eyelet of the big perforation of each liquid absorption amount, temporarily to block up the The big preforation tunnel of liquid absorption amount is located at the port in reservoir in the reservoir of one acidification grade, secondly, again by the second diverting agent and the Three diverting agents are injected in the prepad fluid of reservoir injection of the second acidification grade, imbibition in the reservoir temporarily to block up the first acidification grade Measure the inside of big preforation tunnel.
S211, when the pressure of oil well reaches third predetermined threshold value, for second acidification grade sand reservoir be injected separately into before Acid solution, main body acid solution, postposition acid solution and displacement fluid are set, the acidification of the sandstone reservoir of the second acidification grade is completed.
Specifically, after the big preforation tunnel of liquid absorption amount temporarily blocks up in the reservoir to the first acidification grade, when passing through oil well When the pressure of well head knows that the pressure of oil well reaches third predetermined threshold value, that is, second acidification grade reservoir imbibition pressure When value, then the dosage of preposition acid solution, the dosage of the dosage of main body acid solution and postposition acid solution of the reservoir for being acidified grade according to second, Reservoir for the second acidification grade is injected separately into preposition acid solution, main body acid solution, postposition acid solution and displacement fluid, to complete the second acidification The acidification of the reservoir of grade.
After having executed S211, the acidification of the reservoir is just completed, until after the temperature recovery of the reservoir after being acidified, The first diverting agent, the second diverting agent, the degradation of third diverting agent in the preforation tunnel of the reservoir of injection the first acidification grade, and lose It goes after temporarily blocking up ability, drive a well open flow, has just reached the connectivity for improving the reservoir of oil well and near wellbore zone, and then improve the oil well Production capacity purpose.
Sandstone reservoir acidization tool provided by the invention, by only using after the Reservoir Acidization to each acidification grade The big preforation tunnel of liquid absorption amount in the reservoir of each acidification grade is carried out temporarily stifled mode by diverting agent, so that it may be realized to reservoir Layering homogeneous acidification, reduce the preparatory process of Reservoir Acidization, improve the efficiency of Reservoir Acidization, in the production for improving oil well While energy, the cost of Reservoir Acidization is reduced.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above-mentioned each method embodiment can lead to The relevant hardware of program instruction is crossed to complete.Program above-mentioned can be stored in a computer readable storage medium.The journey When being executed, execution includes the steps that above-mentioned each method embodiment to sequence;And storage medium above-mentioned include: ROM, RAM, magnetic disk or The various media that can store program code such as person's CD.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (7)

1. a kind of sandstone reservoir acidization tool characterized by comprising
According to the well-log information of the sandstone reservoir, each horizontal minimum principal stress of the sandstone reservoir is determined, and to each water Flat minimum principal stress carries out static and dynamic correction, the horizontal minimum principal stress after obtaining each correction;
According to the well-log information of the sandstone reservoir, each perforation layer position of the sandstone reservoir is determined;
According to after each correction horizontal minimum principal stress and perforation layer position, where determining each perforation layer position The corresponding correction of sandstone reservoir after horizontal minimum principal stress;
The horizontal minimum principal stress and first after the corresponding correction of sandstone reservoir where each perforation layer position is preset Threshold value carries out acidification classification to the sandstone reservoir;Wherein, the level of the sandstone reservoir of each adjacent two acidification grade is minimum main The difference of stress is more than or equal to the first preset threshold;
According to the thickness of the sandstone reservoir of each acidification grade, the use of the acid solution of the sandstone reservoir of each acidification grade is determined Amount;
According to the perforation quantity and preforation tunnel parameter of the sandstone reservoir of each acidification grade, described each acidification etc. is determined The dosage of the diverting agent of the sandstone reservoir of grade;Wherein, the preforation tunnel parameter includes that preforation tunnel diameter and preforation tunnel are deep Degree, the diverting agent are degradable under preset temperature;
It is institute according to the sequence of acidification grade from high to low according to the dosage of the acid solution of the sandstone reservoir of each acidification grade The sandstone reservoir for stating each acidification grade is implanted sequentially prepad fluid, acid solution and displacement fluid, and according to each acidification grade The dosage of the diverting agent of sandstone reservoir, it is preposition in the next stage sandstone reservoir injection of the sandstone reservoir for each acidification grade It is that the upper level of the next stage sandstone reservoir is acidified the sandstone reservoir injection diverting agent of grade, so that the diverting agent when liquid Fill the partial completion eyelet of the sandstone reservoir of the upper level acidification grade of the next stage sandstone reservoir, the partial completion hole Eye is the preforation tunnel that liquid absorption amount is greater than the second preset threshold.
2. the method according to claim 1, wherein the sandstone reservoir according to each acidification grade Perforation quantity and preforation tunnel parameter determine the dosage of the diverting agent of the sandstone reservoir of each acidification grade, specifically include:
According to the preforation tunnel diameter, the diameter of the first diverting agent is determined, and stored up according to the sandstone of each acidification grade The perforation quantity of layer and preset coefficient determine the quantity of the first diverting agent of the sandstone reservoir of each acidification grade, institute The first diverting agent is stated for temporarily blocking up the port that the preforation tunnel is located in reservoir;
According to the diameter of the preforation tunnel diameter and first diverting agent, the diameter of the second diverting agent is determined, and according to institute State preforation tunnel diameter, the preforation tunnel depth, it is described it is each acidification grade sandstone reservoir the first diverting agent quantity, The bulk density of second diverting agent determines the quality of the second diverting agent of the sandstone reservoir of each acidification grade, institute The second diverting agent is stated for filling inside the preforation tunnel;
According to the preforation tunnel diameter, the diameter of the diameter of first diverting agent and second diverting agent, third is determined The diameter of diverting agent, and stored up according to the sandstone of the preforation tunnel diameter, the preforation tunnel depth, each acidification grade The quality of second diverting agent of the sandstone reservoir of the quantity of the first diverting agent of layer, each acidification grade, described second are temporarily The real density of the real density of blocking agent, the third diverting agent determines the third of the sandstone reservoir of each acidification grade The quality of diverting agent, the third diverting agent are used to fill the sky between the second diverting agent described in the preforation tunnel inside Gap.
3. according to the method described in claim 2, it is characterized in that, first diverting agent, second diverting agent and described The material of third diverting agent is identical.
4. according to the method described in claim 3, it is characterized in that, the thickness of the sandstone reservoir according to each acidification grade Degree determines the dosage of the acid solution of the sandstone reservoir of each acidification grade, specifically includes:
According to the thickness of the sandstone reservoir of each acidification grade, the preposition acid of each acidification grade sandstone reservoir is determined The dosage of the dosage of liquid, the dosage of main body acid solution and postposition acid solution.
5. according to the method described in claim 4, it is characterized in that, the sandstone reservoir according to each acidification grade The dosage of acid solution is implanted sequentially preposition according to the sandstone reservoir that the sequence of acidification grade from high to low is each acidification grade Liquid, acid solution and displacement fluid, specifically include:
According to the dosage of preposition acid solution of the sandstone reservoir of each acidification grade, the dosage of main body acid solution and postposition acid solution Dosage, the sandstone reservoir for being followed successively by each acidification grade are injected separately into prepad fluid, preposition acid solution, main body acid solution, postposition acid Liquid and displacement fluid.
6. according to the method described in claim 5, it is characterized in that, the sandstone reservoir according to each acidification grade The dosage of diverting agent, when the next stage sandstone reservoir of the sandstone reservoir for each acidification grade injects prepad fluid, for institute The sandstone reservoir injection diverting agent for stating each acidification grade, specifically includes:
It is temporary according to the quantity of the first diverting agent, the quality of the second diverting agent and third of the sandstone reservoir of each acidification grade The quality of blocking agent is described when the next stage sandstone reservoir of the sandstone reservoir for each acidification grade injects prepad fluid It is temporary that the sandstone reservoir of the upper level acidification grade of next stage sandstone reservoir is implanted sequentially the first diverting agent, the second diverting agent, third Blocking agent.
7. according to the method described in claim 6, it is characterized in that, the sandstone reservoir is divided into the sandstone storage of the first acidification grade The sandstone reservoir of layer and the second acidification grade;
Then the sandstone reservoir for being followed successively by each acidification grade be injected separately into prepad fluid, preposition acid solution, main body acid solution, after Acid solution and displacement fluid are set, is specifically included:
Sandstone reservoir for the first acidification grade is injected separately into prepad fluid, preposition acid solution, main body acid solution, postposition acid solution and top For liquid, the acidification of the sandstone reservoir of the first acidification grade is completed;
After completing the acidification of sandstone reservoir of the first acidification grade, before the sandstone reservoir injection for the second acidification grade Set liquid, wherein it is described be the second acidification grade sandstone reservoir injection prepad fluid in include it is described first acidification grade sand First diverting agent of rock reservoir, the second diverting agent of the sandstone reservoir of the first acidification grade, the first acidification grade The third diverting agent of sandstone reservoir;
When the pressure of oil well reaches third predetermined threshold value, the sand reservoir for the second acidification grade is injected separately into preposition acid Liquid, main body acid solution, postposition acid solution and displacement fluid complete the acidification of the sandstone reservoir of the second acidification grade.
CN201510921016.0A 2015-12-11 2015-12-11 A kind of sandstone reservoir acidization tool Active CN106869880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510921016.0A CN106869880B (en) 2015-12-11 2015-12-11 A kind of sandstone reservoir acidization tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510921016.0A CN106869880B (en) 2015-12-11 2015-12-11 A kind of sandstone reservoir acidization tool

Publications (2)

Publication Number Publication Date
CN106869880A CN106869880A (en) 2017-06-20
CN106869880B true CN106869880B (en) 2019-08-02

Family

ID=59177416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510921016.0A Active CN106869880B (en) 2015-12-11 2015-12-11 A kind of sandstone reservoir acidization tool

Country Status (1)

Country Link
CN (1) CN106869880B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502586B (en) * 2019-09-10 2022-02-01 中国石油天然气股份有限公司 Reservoir transformation system and reservoir transformation method
CN111472739A (en) * 2020-04-09 2020-07-31 中国石油天然气股份有限公司 Staged fracturing production-increasing transformation method for 3-inch semi-solid well completion shaft of sidetracking horizontal well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102775980A (en) * 2012-07-17 2012-11-14 大庆井升伟业油田技术服务有限公司 Acidizing block remover suitable for complex lithologic reservoir
CN103857877A (en) * 2011-08-05 2014-06-11 普拉德研究及开发股份有限公司 Method of fracturing multiple zones within a well
CN104314547A (en) * 2014-08-18 2015-01-28 北京运嘉普泰石油天然气技术发展有限公司 HAFD segmented optimization method and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7011703B1 (en) * 2004-08-30 2006-03-14 Kerr-Mcgee Chemical Llc Surface-treated pigments

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103857877A (en) * 2011-08-05 2014-06-11 普拉德研究及开发股份有限公司 Method of fracturing multiple zones within a well
CN102775980A (en) * 2012-07-17 2012-11-14 大庆井升伟业油田技术服务有限公司 Acidizing block remover suitable for complex lithologic reservoir
CN104314547A (en) * 2014-08-18 2015-01-28 北京运嘉普泰石油天然气技术发展有限公司 HAFD segmented optimization method and system

Also Published As

Publication number Publication date
CN106869880A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN101952544B (en) Method of hydraulic fracturing of horizontal wells, resulting in increased production
CN105626006B (en) Low-permeability oil deposit CO2Drive technical limit well space and determine method
CN104632154B (en) The complex oil displacing experimental method of gel and polymer solution is alternately injected after a kind of poly- drive of water drive
CN105569613B (en) A kind of middle high-order coal CBM Drainage mining method
CN103437746A (en) Volume fracturing method for multiple cracks in multiple sections of horizontal well
CN104847341A (en) Correction method for reasonable productivity prediction of underground gas storage well
CN112392472B (en) Method and device for determining integrated development mode of shale and adjacent oil layer
CN104675371B (en) It is a kind of it is poly- drive plus subsequent waterflooding after alternately inject gel and polymer solution complex oil displacing experimental method
CN103670350B (en) A kind of variable intensity water injection exploitation method for carbonate fracture-cavity oil reservoir
CN108843291A (en) A kind of recovery method and device of low pressure densification oil reservoir
CN105317407B (en) A kind of development approach of ultra-high water cut stage Untabulated reservoirs
US9194222B2 (en) System and method for improved propped fracture geometry for high permeability reservoirs
CN103306659A (en) Fracturing technology for implementing ultrahigh flow conductivity
CN107630686A (en) Interlock between net horizontal section the fine and close oily energy supplement method of displacement and the imbibition displacement of reservoir oil
CN106437642A (en) Fractured reservoir horizontal well injection-production asynchronous exploitation method
CN107218024A (en) The method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern
CN111749658A (en) Carbon dioxide huff and puff oil production method and device
EP3006538B1 (en) Method for improving co2 injectivity by reducing irreducible water saturation around wellbore in underground gas storage layer
CN110259421A (en) A kind of broken up compact oil reservoir water filling supplement ENERGY METHOD
CN104594869A (en) Reservoir reforming method
CN104481473B (en) A kind of gas-drive pool note mining method and device
CN106869880B (en) A kind of sandstone reservoir acidization tool
CN104675370B (en) Combinational flooding testing method capable of implementing gel injection and polymer solution injection alternately after water flooding
CN208057104U (en) The well pattern structure of deep layer bulk fractured reservoir is developed for gas drive
CN115099062A (en) Design method for energy storage fracturing process parameters of tight oil reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant