CN106869196B CN201510929799.7A CN201510929799A CN106869196B CN 106869196 B CN106869196 B CN 106869196B CN 201510929799 A CN201510929799 A CN 201510929799A CN 106869196 B CN106869196 B CN 106869196B
Authority
CN
China
Prior art keywords
anchor slab
screw rod
rectification
pilot tunnel
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510929799.7A
Other languages
Chinese (zh)
Other versions
CN106869196A (en
Inventor
马博恒
王哲英
李森林
葛玉祥
侯惠锦
田占云
许立斌
邢跃杰
许范强
李晓鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGKAN GEOTECHNICAL INVESTIGATION DESIGN RESEARCH INSTITUTE Co Ltd
Original Assignee
ZHONGKAN GEOTECHNICAL INVESTIGATION DESIGN RESEARCH INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGKAN GEOTECHNICAL INVESTIGATION DESIGN RESEARCH INSTITUTE Co Ltd filed Critical ZHONGKAN GEOTECHNICAL INVESTIGATION DESIGN RESEARCH INSTITUTE Co Ltd
Priority to CN201510929799.7A priority Critical patent/CN106869196B/en
Publication of CN106869196A publication Critical patent/CN106869196A/en
Application granted granted Critical
Publication of CN106869196B publication Critical patent/CN106869196B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Abstract

The screw rod that the invention discloses a kind of for anchor slab basis jacks rectification and reinforcement of building method, and in particular to buildings or structures foundation is integral inclined or the rectification and reinforcement of building field of foundation settlement.Present invention determine that steel anchor slab rectification region and pilot tunnel position, drilling, fill in prefabricated girder steel, screw rod and nut are installed, dial gauge is installed, subregion recycles step by step screws in screw rod at a slow speed steadily from top to bottom, so that the classification of steel anchor slab is gradually raised to the jacking amount of production engineering specifications upwards;Pilot tunnel mouth is blocked using high-strength cement mortar, one of fine-stone concrete sealing ring is set around steel anchor slab outer rim, the pore grout region between anchor slab and basis carries out injecting treatment, that is, completes.The present invention reduces ground beneath excavated volumes, save a large amount of Reinforced Concrete Materials, and speed of application is fast, and operability and controllability are preferable, and the influence to superstructure is small, and securely and reliably, consolidation effect is preferable;High-strength bolt is in addition to tool jacks function, the stress that also serves as supporting arrangement, without resilience after processing.

Description

Screw rod for anchor slab basis jacks rectification and reinforcement of building method
Technical field
The present invention relates to buildings or structures foundation is integral inclined or the rectification and reinforcement of building field of foundation settlement, and in particular to A kind of screw rod jacking rectification and reinforcement of building method for anchor slab basis.
Background technique
Rectification and reinforcement of building is suitable for the integral inclined value of existing buildings or structures foundation or adjacent pillars foundation settlement difference is more than Permissible value as defined in existing national standards " Code for design of building " GB50007, and influence normal use or safety Existing buildings or structures rectification.And lifting inclination-correcting is then one such rectification and reinforcement of building method, suitable for the whole of buildings or structures Body sedimentation or differential settlement are larger, and the not applicable buildings or structures rectification using forced-landing tilt correcting.Existing lifting inclination-correcting It is the structure underpinning technology by armored concrete or masonry, by the basis of buildings or structures and superstructure along a certain spy Positioning, which is set, to be separated, and is reinforced using armored concrete, is segmented jacking transform beams (column) system for underpining, being formed, then set Several supporting points that can support entire buildings or structures are set, the Lifting Equipments (generally jack) of these supporting points is passed through Starting, makes buildings or structures make Plane Rotation along a certain straight line (point), and inclination buildings or structures can be made to be corrected.Wherein close Key is to establish jacking transform beams (column) system (i.e. foundation beam and transform beams (column) this to upper and lower stress system) and apply to push up Lift.
In existing tradition lifting inclination-correcting design scheme jacking transform beams (column) system mostly use greatly reinforced concrete structure by Power beam body system, and apply top lift and use Lifting Equipment (such as jack generally between upper and lower reinforced beam stress system Deng) apply top lift from bottom to top.Its maximum defect is: due to reinforced concrete structured beam stress system and jack etc. Lifting Equipment is taken up too much space, therefore when progress lifting inclination-correcting, it builds under (structure) object basis and sufficiently large working space is needed to be arranged The Lifting Equipments such as upper and lower reinforced beam stress system and placement jack, this makes the lower available spaces in some bases narrow Inclination buildings or structures can not implement rectification and reinforcement of building processing.
Summary of the invention
Technical problem to be solved by the invention is to provide one kind to be different from the prior art, and substitutes being used for for the prior art The screw rod on anchor slab basis jacks rectification and reinforcement of building method, it is intended to solve due to reinforced concrete structured beam stress system and jack etc. Lifting Equipment is taken up too much space, and when causing to carry out lifting inclination-correcting, upper and lower steel can not be arranged in the working space built under (structure) object basis Available space is narrow under the problem of Lifting Equipments such as Concrete Beam Reinforced stress system and placement jack and some bases inclines The problem of oblique buildings or structures can not implement rectification and reinforcement of building processing.
In order to solve the above technical problems, the technical solution used in the present invention is: a kind of screw top for anchor slab basis Rise rectification and reinforcement of building method, characterized by the following steps:
A, the flatness of Fundamentals of Measurement upper steel anchor slab determines steel anchor slab rectification region and pilot tunnel according to production engineering specifications Position;
B, it in the high-strength grouting bed course between steel anchor slab and basis, is used according to the length of production engineering specifications and diameter The method of horizontal drilling drills to form horizontal pilot tunnel, and clears up pilot tunnel at the pilot tunnel position that step a is determined, fills in pre-manufactured steel Beam;
C, the steel anchor slab tapping according to production engineering specifications aperture right above pilot tunnel, forms several tapping holes, then Screw rod matched with tapping hole is installed and the girder steel in the pilot tunnel of lower part is withstood in nut, screw rod bottom;
D, dial gauge is installed at steel anchor slab top corresponding flatness measuring point position according to production engineering specifications;
E, the dial gauge of moment monitoring step d shows data, and subregion recycles step by step revolves screw rod at a slow speed steadily from top to bottom Enter, so that the classification of steel anchor slab is gradually raised to the jacking amount of production engineering specifications upwards;
F, after use high-strength cement mortar to block pilot tunnel mouth after the completion of step e, and the height and width of production engineering specifications are pressed One of fine-stone concrete sealing ring is arranged around steel anchor slab outer rim in degree;
G, after fine-stone concrete sealing ring intensity reaches production engineering specifications, the pore region between anchor slab and basis is carried out Injecting treatment completes.
A further technical solution lies in the process that step b clears up pilot tunnel is to rinse pilot tunnel to dry up.
A further technical solution lies in the circles of the rigidity that, the prefabricated girder steel is production engineering specifications, length and diameter Steel, cross section are mostly round;
A further technical solution lies in the tapping centerline hole is overlapped with lower section pilot tunnel middle line.
A further technical solution lies in must be zeroed before the dial gauge installation.
A further technical solution lies in step e carries out subregion to screw rod using hydraulic wrench and recycles application step by step Torque screws in screw rod at a slow speed steadily from top to bottom.
A further technical solution lies in step g injecting treatment is using high-strength cement mortar as injecting paste material, first in rectification The hole in region carries out slip casting, to the slip casting of rectification region after, then injecting treatment is carried out to other regions.
Further technical solution also resides in, and the high-strength cement mortar is mixed with early strength agent.
The beneficial effects of adopting the technical scheme are that the present invention makes original basis upper steel anchor slab and processing The girder steel of work passes through active force and reaction between high-strength bolt, steel anchor slab and girder steel three as upper and lower stress system is jacked Power cleverly applies top lift to steel anchor slab, and it is occupied in the case where building (structure) object basis to greatly reduce entire lifting inclination-correcting system Space, solve using conventional method, can not to ground beneath narrow space building (structure) object carry out lifting inclination-correcting reinforcing at The problem of reason;The method reduce ground beneath excavated volumes, save a large amount of Reinforced Concrete Materials, and speed of application is fast, can grasp The property made and controllability are preferable, and the influence to superstructure is small, and securely and reliably, consolidation effect is preferable;High-strength bolt is except tool jacking function Can be outer, also serve as permanent stress supporting arrangement, substantially without resilience after processing.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is high-strength bolt lifting inclination-correcting device profile of the present invention;
Fig. 2 is high-strength bolt lifting inclination-correcting setting plane of the present invention;
Fig. 3 is the prefabricated girder steel cross-sectional view of the present invention;
Fig. 4 is pre-manufactured steel beam plan view of the present invention;
Wherein: 1, screw rod and nut;2, prefabricated girder steel;3, pilot tunnel;4, steel anchor slab;5, high-strength grouting bed course;6, hole fills Starch region;7, fine-stone concrete sealing ring;8, datum line beam;9, dial gauge;10, basic;11, tapping hole.
Specific embodiment
With reference to the attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, but the present invention can be with Implemented using other than the one described here other way, those skilled in the art can be without prejudice to intension of the present invention In the case of do similar popularization, therefore the present invention is not limited by the specific embodiments disclosed below.
As shown, specific implementation step of the present invention are as follows:
A, 10 upper steel anchor slab of Fundamentals of Measurement, 4 flatness understands fully the plane configuration feature of 4 differential settlement of steel anchor slab, from And determine 4 rectification region of steel anchor slab and 3 position of pilot tunnel;
B, it in the high-strength grouting bed course 5 between steel anchor slab 4 and basis 10, using the method for horizontal drilling, is wanted by design The length and diameter asked form horizontal pilot tunnel 3, and rinse drying cleaning pilot tunnel 3, fill in prefabricated girder steel 2.Wherein, prefabricated girder steel 2 Using the round steel by the rigidity of design requirement, length and diameter, a part is pruned at the top of it to form circle flat-top shape mostly Girder steel, i.e. its cross section are mostly round;
C, 4 tapping of steel anchor slab right above pilot tunnel 3, and guarantee that 11 center line of tapping hole is overlapped with 3 middle line of lower section pilot tunnel. Several tapping holes 11 are formed by design aperture requirement, then matched high-strength bolt and nut 1 are installed, screw rod bottom is withstood down Prefabricated girder steel 2 in portion's pilot tunnel 3;
D, according to design requirement, the dial gauge 9 for requiring range is installed and designed at the corresponding measuring point position in 4 top of steel anchor slab, It must be zeroed before installation, and guarantee that dial gauge 9 is firm, does not shake;
E, subregion is carried out to high-strength bolt using hydraulic wrench and recycles application torque step by step, keep screw rod steady from top to bottom Step screw at a slow speed, since prefabricated girder steel 2 is withstood in screw rod bottom, so that with the screw-in of screw rod, prefabricated girder steel 2 will make screw rod generate to On counter-force, which passes through screw thread bite force between screw rod and steel anchor slab 4, forms upward top lift to steel anchor slab 4 so that Steel anchor slab 4 is classified the jacking amount for being gradually raised to design requirement upwards, its deformation is allowed slowly to restore.During jacking, Ying Yan Lattice control jacking rate, moment monitor the jacking amount and superstructure deformation at each measuring point position, guarantee the safety of superstructure;
F, the deformation of steel anchor slab 4 to all rectification regions is able to after being restored to design requirement, using high-strength cement mortar (mixing early strength agent) blocks each 3 mouthfuls of pilot tunnel, and presses the height and width of design requirement, thin together around the setting of 4 outer rim of steel anchor slab Stone concrete sealing ring 7;
G, after above-mentioned 7 intensity of fine-stone concrete sealing ring reaches design requirement, the hole between steel anchor slab 4 and basis 10 is filled It starches region 6 and carries out injecting treatment.It constructs in strict accordance with injecting paste material selected by grouting design and equipment, such as injecting paste material For cement mortar (mixing early strength agent), grouting equipment is checked and debugged, slip casting nozzle is installed in 4 injected hole of steel anchor slab, first in rectification The hole in region carries out slip casting, to the slip casting of rectification region after, then injecting treatment is carried out to other regions.
The present invention passes through height using the girder steel of original basis upper steel anchor slab and processing and fabricating as upper and lower stress system is jacked Active force and reaction force between strong screw rod, steel anchor slab and girder steel three, cleverly apply top lift to steel anchor slab, greatly reduce Entire lifting inclination-correcting system occupied space in the case where building (structure) object basis, solves using conventional method, can not be to basis Lower space it is narrow build (structure) object carry out lifting inclination-correcting consolidation process the problem of;The method reduce ground beneath excavated volume, A large amount of Reinforced Concrete Materials is saved, speed of application is fast, and operability and controllability are preferable, and the influence to superstructure is small, Securely and reliably, consolidation effect is preferable;High-strength bolt is in addition to tool jacks function, and also serve as permanent stress supporting arrangement, processing Afterwards substantially without resilience.

Claims (7)

1. a kind of screw rod for anchor slab basis jacks rectification and reinforcement of building method, characterized by the following steps:
A, the flatness of Fundamentals of Measurement upper steel anchor slab determines steel anchor slab rectification region and pilot tunnel position according to production engineering specifications It sets;
B, in the high-strength grouting bed course between steel anchor slab and basis, according to the length of production engineering specifications and diameter using horizontal The method of drilling drills to form horizontal pilot tunnel, and clears up pilot tunnel at the pilot tunnel position that step a is determined, fills in prefabricated girder steel;
C, according to the tapping hole aperture of production engineering specifications, tapping on the steel anchor slab right above pilot tunnel forms several tapping Then hole installs screw rod matched with tapping hole and the girder steel in the pilot tunnel of lower part is withstood in nut, screw rod bottom;
D, dial gauge is installed at steel anchor slab top corresponding flatness measuring point position according to production engineering specifications;
E, the dial gauge of moment monitoring step d shows data, and subregion recycles step by step screws in screw rod at a slow speed steadily from top to bottom, makes Obtain the jacking amount that the classification of steel anchor slab is gradually raised to production engineering specifications upwards;
F, after use high-strength cement mortar to block pilot tunnel mouth after the completion of step e, and the height and width of production engineering specifications are pressed, enclosed Around steel anchor slab outer rim, one of fine-stone concrete sealing ring is set;
G, after fine-stone concrete sealing ring intensity reaches production engineering specifications, the pore grout region between anchor slab and basis is carried out Injecting treatment completes.
2. the screw rod according to claim 1 for anchor slab basis jacks rectification and reinforcement of building method, it is characterised in that: step b The process for clearing up pilot tunnel is to rinse pilot tunnel to dry up.
3. the screw rod according to claim 1 for anchor slab basis jacks rectification and reinforcement of building method, it is characterised in that: described to attack Wire hole center line is overlapped with lower section pilot tunnel middle line.
4. the screw rod according to claim 1 for anchor slab basis jacks rectification and reinforcement of building method, it is characterised in that: described hundred It must be zeroed before dividing table installation.
5. the screw rod according to claim 1 for anchor slab basis jacks rectification and reinforcement of building method, it is characterised in that: step e Subregion is carried out to screw rod using hydraulic wrench and recycles application torque step by step, screws in screw rod at a slow speed steadily from top to bottom.
6. the screw rod according to claim 1 for anchor slab basis jacks rectification and reinforcement of building method, it is characterised in that: step g Injecting treatment is using high-strength cement mortar as injecting paste material, and first the hole in rectification region carries out slip casting, to the slip casting of rectification region After, then injecting treatment is carried out to other regions.
7. the screw rod for anchor slab basis according to claim 1 or 6 jacks rectification and reinforcement of building method, it is characterised in that: institute High-strength cement mortar is stated mixed with early strength agent.
CN201510929799.7A 2015-12-14 2015-12-14 Screw rod for anchor slab basis jacks rectification and reinforcement of building method Active CN106869196B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510929799.7A CN106869196B (en) 2015-12-14 2015-12-14 Screw rod for anchor slab basis jacks rectification and reinforcement of building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510929799.7A CN106869196B (en) 2015-12-14 2015-12-14 Screw rod for anchor slab basis jacks rectification and reinforcement of building method

Publications (2)

Publication Number Publication Date
CN106869196A CN106869196A (en) 2017-06-20
CN106869196B true CN106869196B (en) 2019-04-23

Family

ID=59239587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510929799.7A Active CN106869196B (en) 2015-12-14 2015-12-14 Screw rod for anchor slab basis jacks rectification and reinforcement of building method

Country Status (1)

Country Link
CN (1) CN106869196B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1807827B (en) * 2006-02-09 2012-05-23 北京发研工程技术有限公司 Method and apparatus for high precision horizontal drilling on reinforced concrete
JP5000734B2 (en) * 2010-02-15 2012-08-15 有限会社坂井家起こし Press-in method of reinforcing pile
CN103292116A (en) * 2012-02-27 2013-09-11 扬州诚德钢管有限公司 Anchor bolt with T-type head
CN102864795B (en) * 2012-10-19 2014-11-26 重庆大学 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN203870838U (en) * 2014-06-12 2014-10-08 北京汽车股份有限公司北京分公司 Self-tapping buckle replaceable apparatus and workbench
CN203960895U (en) * 2014-07-16 2014-11-26 新疆金风科技股份有限公司 Anchor slab bolt assembly and tower foundation assembly

Also Published As

Publication number Publication date
CN106869196A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN206205908U (en) A kind of channel-section steel bow member joist for preventing tunnel subsidence to deform
CN107143358B (en) Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof
CN106320737B (en) A kind of integral jacking method of heritage buildings
CN102042019A (en) Two-stair five-step excavation construction method for shallow-buried large-span soft plastic clay tunnel
CN102747735A (en) Treatment method for abnormal deformation of deep foundation pit concrete support piling
CN111779510B (en) Primary support invasion limit arch changing method for high liquid limit red clay surrounding rock tunnel
CN109138011B (en) Foundation reinforcing and deviation rectifying method for existing building
CN109610881A (en) Prestressed girder underpins disconnected column construction method in a kind of existing tier building transformation
CN105714683A (en) Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN107044142B (en) Adjustable reinforcement deviation correcting method and structure for reducing uneven settlement of house
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN114215042A (en) Miniature steel pipe pile for reinforcing foundation and construction method thereof
CN112411610A (en) Pile foundation underpinning construction method
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN109680737A (en) A kind of foundation of wind-driven generator unit drift correction construction method
RU2436899C1 (en) Correction method of inclination and non-uniform settlement of large high-rise structure and its foundation
CN104452775B (en) Pre-loaded support struts and construction method for foundation ditch
KR101387954B1 (en) Mehod for constructing underground wall in extension of undergound parking lot
CN106869196B (en) Screw rod for anchor slab basis jacks rectification and reinforcement of building method
CN110318559B (en) Rescue reinforcement device and method for cultural relics and buildings
JPH0464620A (en) Construction method for open caisson and its device
CN104711981A (en) Foundation pit soil nail retaining and protecting structure and method
CN108951684B (en) Construction method of turnover type steel reinforced concrete construction elevator foundation
CN204626398U (en) A kind of foundation pit soil nailing structure
CN210622366U (en) Underpinning processing device for damaged reinforced concrete column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant