CN106869139A - Ecological demolition construction method for reinforced concrete inner support - Google Patents
Ecological demolition construction method for reinforced concrete inner support Download PDFInfo
- Publication number
- CN106869139A CN106869139A CN201710213841.4A CN201710213841A CN106869139A CN 106869139 A CN106869139 A CN 106869139A CN 201710213841 A CN201710213841 A CN 201710213841A CN 106869139 A CN106869139 A CN 106869139A
- Authority
- CN
- China
- Prior art keywords
- quiet
- booster
- inner support
- reinforced concrete
- waste material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/207—Securing of slopes or inclines with means incorporating sheet piles or piles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to a construction method for ecologically dismantling a reinforced concrete inner support, which is characterized by comprising the following construction steps of: (1) preparing five static blasting tubes, and uniformly forming a plurality of static blasting agent seepage holes; (2) respectively arranging five static blasting tubes at the upper part, the middle part and the lower part in the inner support, and inserting a prestressed lacing wire into the static blasting tube at the lower part; (3) applying prestress to the prestressed lacing wire after concrete pouring and strengthening and anchoring the prestressed lacing wire at the end part of the prestressed lacing wire; (4) after the foundation pit is finished, a waste collecting tank is arranged below the inner support, and a waste recovery tank is arranged below the inner support; (5) when the steel pipe is dismantled, the prestress of the prestressed reinforcing steel bar is released firstly and then the steel pipe is taken out; (6) static blasting agents are injected into the five static blasting tubes from one end of the five static blasting tubes at the same time, and the static blasting agents stop flowing out from the other end of the five static blasting tubes; (7) when the waste collecting tank is full, the waste is removed and falls into a waste recycling tank; (8) after the waste materials are full, the demolished waste materials are moved to other transportation equipment to be transported away; the pollution of inner support dismantling can be reduced, and the work load of waste recovery can be reduced.
Description
Technical field
The invention belongs to building engineering field, and in particular to a kind of reinforced concrete inner support ecology Demolition Construction method.
Background technology
Traditional reinforced concrete inner support method for dismounting has pneumatic pick to cut two kinds of method and blasting procedure, is that pneumatic pick cuts method sound
Sound reaches more than 100 decibels, and noise is big.Implement demolition blasting, to shift to an earlier date and be sent to notice to reassure the public to each household resident around, or even arrange
Temporarily withdraw and close a road to traffic, can just implement.The noise vibration and dust formed in demolishing process influence huge to nearby residents, also
There is static mechanical patterning method:By reinforced concrete inner support be segmented into " disc saw " or " chain saw " cut-out, the construction technology with
Construction noise is small, but generally requires to set up supporting row frame at reinforced concrete support beam bottom, as support bracket, construction costs compared with
Height, it is strict to construction machinery requirement.
In sum, traditional reinforced concrete inner support method for dismounting can usually produce larger noise pollution, influence
Building surrounding enviroment;Though Novel static machine cuts method can effectively reduce construction noise, auxiliary stand need to be set up under beam, applied
Work cost is higher.It is worthy of note that, garbage collection intractability is big after existing reinforced concrete inner support is removed, and engineering is built
If the duration can produce certain influence.
In consideration of it, being actually needed based on current engineering, urgently invent that a kind of not only can effectively to reduce environment dirty at present
Dye, and site operation efficiency can be improved, the reinforced concrete inner support ecology Demolition Construction of construction costs can also be reduced
Method.
The content of the invention
It is an object of the invention to provide a kind of reinforced concrete inner support ecology Demolition Construction method, not only difficulty of construction
Low and efficiency high, shortens the duration of a project, and cost is saved and environmental pollution is low, will not produce the pollution of the aspects such as noise, sewage, energy
It is convenient to collect treatment dismounting waste material, reduce subsequent construction difficulty.
To realize above-mentioned technical purpose, major technique solution of the invention is to provide a kind of reinforced concrete inner support
Ecological Demolition Construction method, it is characterised in that including following construction procedure:
(1) before the reinforced concrete inner support casting concrete of excavation pit, main quiet booster, two tops are prepared
Quiet booster and two bottoms are aided in aid in quiet booster, then in main quiet booster, two tops auxiliary quiet booster and two bottoms
Quiet booster is aided in all uniformly to open up multiple quiet detonator bleeding holes, and to filling flexible inserts in quiet detonator bleeding holes;
(2) quiet booster, a main quiet booster and two bottoms are aided in aid in quiet booster on two tops in step (1)
The upper, middle and lower in the reinforced concrete inner support for needing the later stage to remove is separately positioned on, and is aided in two bottoms quiet
Prestressing force lacing wire is inserted in booster;
(3) reinforced concrete inner support concreting is carried out, after concrete forms intensity, prestressing force lacing wire is applied
Prestressing force, and anchored by prestressed bolt in prestressing force lacing wire end;
(4) after the completion of excavation of foundation pit, garbage collection groove is set by fixed mechanism below reinforced concrete inner support, is given up
Material collecting tank opens up waste material downcast hole, and waste material downcast hole sets the leakage-stopping board of closing waste material downcast hole, and waste material downcast hole lower section sets
Waste recovery case is put, the collection box base of adjustment height is set in waste recovery bottom portion, waste recovery case sets shedding mechanism;
(5) when reinforced concrete inner support is removed, the prestressing force that bottom aids in prestressing force lacing wire in quiet booster is first discharged, then
Prestressing force lacing wire is aided in from bottom to be taken out in quiet booster;
(6) from main quiet booster, top aid in quiet booster and bottom aid in one end of quiet booster simultaneously to main quiet booster,
Top aids in quiet booster and bottom to aid in the quiet detonator of pressure injection in quiet booster, when main quiet booster, top aid in quiet booster and bottom
Aid in the other end of quiet booster and stop pressure injection when thering is quiet detonator to flow out, quiet detonator hardening, volumetric expansion, branch in armored concrete
Support is risen brokenly and is dropped in garbage collection groove;
(7) after the dismounting waste material in garbage collection groove reaches certain amount, the leakage-stopping board of waste material downcast hole bottom is opened,
Dismounting waste material is set to be freely fallen into waste recovery case from waste material downcast hole;
(8) after waste recovery case is full, will be removed during waste material moves to other transporting equipments by shedding mechanism and transport construction
Place;
The main quiet booster, top aid in quiet booster and bottom to aid in quiet booster to be arcuate shape convex downwards, and
Plastic flexible pipe, and two adjacent quiet detonator bleeding holes are, one of them is at the top of pipe, and another is so quiet in bottom of the tube
Detonator is exuded in reinforced concrete inner support more uniform, and flexible inserts is artificial cotton-wool.
The fixed mechanism includes the hitch and supporting mechanism that garbage collection groove two ends are equipped with, and supporting mechanism includes
Lower support bar, lower support plate and the spacing jack being sequentially connected from down to up, hitch are included from down to up successively
The bottom bearing plate of connection, U-shaped connecting rod and top connecting plate, two ends of U-shaped connecting rod with top connecting plate screw thread
Connection forms the hollow hanging ring of closure, and hanging ring is set on reinforced concrete inner support and garbage collection groove simultaneously, waste material
Collecting tank is supported on the bottom of U-shaped connecting rod, and bottom bearing plate is supported on spacing jack, and the fixed mechanism includes two
Set hitch and supporting mechanism, a set of hitch and supporting mechanism act on garbage collection groove one end, another set of suspension machine
Structure and supporting mechanism act on the garbage collection groove other end, and lower support plate is welded to connect with lower support bar, in lower support
Spacing jack is placed on plate, bottom bearing plate, the lower support plate are set between spacing jack and garbage collection groove
Rectangular steel plates are with bottom bearing plate, lower support bar is steel pipe or shaped steel, and garbage collection groove is adjusted by spacing jack
Height.
The quiet booster position of bottom auxiliary is identical with the steel bar stress position of reinforced concrete inner support bottom, and bottom is auxiliary
Help quiet booster simultaneously as prestressing force lacing wire and the separation layer of reinforced concrete inner support.
The garbage collection groove is formed by garbage collection trough floor and garbage collection groove plate-side plate welding, and its cross section is in square
Shape, garbage collection groove is shaped as convex arc downwards, and waste material downcast hole is located in the middle of garbage collection trough floor, garbage collection groove
Base plate is provided with anchor hole, connecting bolt and with the leakage-stopping board through hole, and leakage-stopping board is sequentially passed through through hole by connecting bolt
It is connected at waste material downcast hole with anchor hole, leakage-stopping board is rectangular steel plates, loosening connecting bolt can release leakage-stopping board under waste material
Fall the sealing process in hole.
The waste recovery case includes the casing being made up of four waste recovery case side plates and a collection box base plate, wherein
Stripper rotating shaft of one waste recovery case side plate as stripper by being located at collection box base plate is hinged on collection box base plate
Shedding mechanism is constituted, stripper top is provided with spacing bar jack, and waste recovery case side plate is provided with gag lever post rotating shaft and passes through
Gag lever post rotating shaft is hinged on the gag lever post on waste recovery case side plate, and gag lever post end is connected with and inserting that spacing bar jack coordinates
Post, the fixation and upset of stripper can be realized by inserting column with the cooperation of spacing bar jack, so that convenient collect and unload useless
Material.
Beneficial effect of the present invention:
(1) the quiet booster of a main fourth officer has been preset along longitudinal direction, has been capable of achieving to reinforced concrete inner support Fast synchronization explosion,
Shorten the duration of a project;
(2) it is quiet it is quick-fried during by longitudinal prestressing lacing wire take out, can effectively reduce reinforced concrete inner support dismounting difficulty
Degree;
(3) in reinforced concrete inner support demolishing process, at garbage collection groove and the collection in time of waste recovery case
Reason removes waste material, reduces subsequent construction difficulty;
(4) engineering construction will not produce the pollution of the aspects such as noise, sewage without heavy construction equipment in work progress.
Brief description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention,
Fig. 2 is the attachment structure schematic diagram of the garbage collection groove with reinforced concrete inner support of Fig. 1 embodiments,
Fig. 3 is the structural representation of the waste recovery case with collection box base of Fig. 1 embodiments,
In figure:1. reinforced concrete inner support;2. main quiet booster;3. top aids in quiet booster;4. bottom auxiliary is quiet quick-fried
Pipe;5. quiet detonator bleeding holes;6. flexible inserts;7. prestressing force lacing wire;8. prestressed bolt;9. garbage collection groove;10. reclaim
Bottom plate;11.U type connecting rods;12. top connecting plates;13. spacing jack;14. waste recovery casees;15. waste material downcast holes;
16. collection box bases;17. remove waste material;18. leakage-stopping boards;19. gag lever posts;20. strippers;21. garbage collection trough floors;22.
Garbage collection groove side plate;23. anchor holes;24. pass through hole;25. connecting bolts;26. lower support plates;27. lower support bars;
28. bottom bearing plates;29. waste recovery case side plates;30. stripper rotating shafts;31. spacing bar jacks;32. gag lever post rotating shafts;33.
Foundation pit enclosure stake, 34. inserting columns.
Specific embodiment
Embodiments of the invention are described in further detail below in conjunction with brief description of the drawings, but the present embodiment is not used to limit
The system present invention, every is similar structure of the invention and its similar change, all should list protection scope of the present invention in.
Main quiet booster design and construction technical requirements, top aid in quiet booster design and construction technical requirements, bottom auxiliary
Help quiet booster design and construction technical requirements, quiet detonator construction technical requirement, concrete pouring construction technical requirements, structure welding
Construction technical requirement, the requirement of presstressed reinforcing steel anchoring construction technology etc., repeat no more in present embodiment, and emphasis illustrates that the present invention is related to
And the implementation method of method.
Shown in 1~Fig. 3 of reference picture, a kind of reinforced concrete inner support ecology Demolition Construction method described in the present embodiment,
It is characterized in that including following construction procedure:
(1) excavation pit prepares on a main quiet booster 2, two before the casting concrete of reinforced concrete inner support 1
Portion aids in quiet booster 3 and two bottoms to aid in quiet booster 4, then aids in quiet booster 3 and two on main 2, two tops of quiet booster
Bar bottom aids in quiet booster 4 all uniformly to open up multiple quiet detonator bleeding holes 5, and is filled to filling flexible in quiet detonator bleeding holes 5
Material 6;
(2) aid in the quiet main quiet booster 4 of booster 3, and two bottom auxiliary quiet quick-fried on two tops in step (1)
Pipe 5 is separately positioned on the upper, middle and lower in the reinforced concrete inner support 1 for needing the later stage to remove, and auxiliary to two bottoms
Help insertion prestressing force lacing wire 7 in quiet booster 4;
(3) concreting is carried out to the reinforced concrete inner support 1 in step (2), it is right after concrete forms intensity
Prestressing force lacing wire 7 applies prestressing force, and is anchored by prestressed bolt 8 in the end of prestressing force lacing wire 7;
(4) after the completion of excavation of foundation pit, garbage collection groove 9 is set by fixed mechanism below reinforced concrete inner support 1,
Garbage collection groove 9 opens up waste material downcast hole 15, and waste material downcast hole 15 sets the leakage-stopping board 18 of closing waste material downcast hole 15, under waste material
The lower section of hole 15 that falls sets waste recovery case 14, and the collection box base 16 of adjustment height, waste material are set in the bottom of waste recovery case 14
Collection box 14 sets shedding mechanism;
(5) when reinforced concrete inner support 1 is removed, first discharge bottom and aid in the pre- of prestressing force lacing wire 7 in quiet booster 4 to answer
Power, then prestressing force lacing wire 7 is aided in from bottom to be taken out in quiet booster 4;
(6) quiet booster 3 and bottom is aided in aid in one end of quiet booster 4 simultaneously to main quiet quick-fried from main quiet booster 2, top
Pipe 2, top aids in quiet booster 3 and bottom to aid in the quiet detonator of pressure injection in quiet booster 4, when main quiet booster 2, top aids in quiet booster
3 and bottom stop pressure injection when aiding in the other end of quiet booster 4 to there is quiet detonator to flow out, quiet detonator hardening, volumetric expansion mixes reinforcing bar
Solidifying soil inner support 1 rises brokenly and drops in garbage collection groove 9;
(7) after the dismounting waste material in garbage collection groove 9 reaches certain amount, the leak-stopping of lower 15 of waste material downcast hole is opened
Plate 18, makes dismounting waste material be freely fallen into waste recovery case 14 from waste material downcast hole 15;
(8) after waste recovery case 14 is full, waste material will be removed by shedding mechanism to move to transport in other transporting equipments and apply
Workshop ground;
The main quiet booster 2, top aids in quiet booster 3 and bottom to aid in quiet booster 4 to be arcuate shape convex downwards,
And be plastic flexible pipe, and two adjacent quiet detonator bleeding holes 5, one of them at the top of pipe, another in bottom of the tube, so
Quiet detonator is exuded to more uniform, the interior flexible inserts 6 of filling of quiet detonator bleeding holes 5 in reinforced concrete inner support 1, soft
Property inserts 6 be artificial cotton-wool.
The bottom aids in the position of quiet booster 4 identical with the position of the bottom steel bar stress of reinforced concrete inner support 1, under
Portion aids in quiet booster 4 simultaneously as prestressing force lacing wire 7 and the separation layer of reinforced concrete inner support 1, and the two ends of prestressing force lacing wire 7 are equal
It is provided with prestressed bolt 8.
The garbage collection groove 9 is welded by garbage collection trough floor 21 and garbage collection groove side plate 22, its cross section
Rectangular, garbage collection groove 9 is shaped as convex arc downwards, and waste material downcast hole 15 is located in the middle of garbage collection trough floor 21,
Garbage collection trough floor 21 is provided with anchor hole 23, connecting bolt 25 and with the leakage-stopping board 18 through hole 24, and leakage-stopping board 18 passes through
Connecting bolt 25 is sequentially passed through and is connected at waste material downcast hole 15 through hole 24 and anchor hole 23, and leakage-stopping board 18 is rectangular steel plates,
Loosening connecting bolt 25 can release sealing process of the leakage-stopping board 18 to waste material downcast hole 15.
The fixed mechanism includes the hitch and supporting mechanism that the two ends of garbage collection groove 9 are equipped with, supporting mechanism bag
Lower support bar 27, lower support plate 26 and the spacing jack 13 being sequentially connected from down to up are included, hitch is included under
To the bottom bearing plate 28, U-shaped connecting rod 11 and top connecting plate 12 that are above sequentially connected, two ends of U-shaped connecting rod 11 are equal
It is threadedly coupled with top connecting plate 12 and forms the hollow hanging ring of closure, hanging ring is set in reinforced concrete inner support 1 simultaneously
On garbage collection groove 9, garbage collection groove 9 is supported on the inwall bottom of U-shaped connecting rod 11, and bottom bearing plate 28 is supported in limit
On the jack 13 of position, the fixed mechanism includes two sets of hitches and supporting mechanism, and a set of hitch and supporting mechanism are made
For the one end of garbage collection groove 9, another set of hitch and supporting mechanism act on the other end of garbage collection groove 9, lower support
Plate 26 is welded to connect with lower support bar 27, and spacing jack 13 is placed on lower support plate 26, spacing jack 13 with
Bottom bearing plate 28 is set between garbage collection groove 9, and the lower support plate 26 and bottom bearing plate 28 are rectangular steel plates, under
Portion's support bar 27 is steel pipe or shaped steel.
The bottom of waste recovery case 14 is provided with collection box base 16, and waste recovery case 14 is included by four waste recovery casees
The casing that side plate 29 and a collection box base plate 10 are constituted, one of waste recovery case side plate 29 is as stripper 20 by setting
It is hinged on collection box base plate 10 in the stripper rotating shaft 30 of collection box base plate 10, the top of stripper 20 is provided with spacing bar jack
31, waste recovery case side plate 29 is provided with gag lever post rotating shaft 32 and is hinged on waste recovery case side plate 29 by gag lever post rotating shaft 32
On gag lever post 19, the end of gag lever post 19 be connected with spacing bar jack 31 coordinate inserting column 34, by inserting column 34 and gag lever post
The cooperation of jack 31 can realize the fixation and upset of stripper 20, so that convenient collect and unloading waste material.
The present invention has preset the quiet booster of a main fourth officer along longitudinal direction, is capable of achieving quick-fried to reinforced concrete inner support Fast synchronization
It is broken, shorten the duration of a project;It is quiet it is quick-fried during by longitudinal prestressing lacing wire take out, can effectively reduce reinforced concrete inner support and tear open
The difficulty removed;In reinforced concrete inner support demolishing process, processed by garbage collection groove and the collection in time of waste recovery case
Waste material is removed, subsequent construction difficulty is reduced;Engineering construction will not be produced without heavy construction equipment, in work progress noise,
The pollution of the aspects such as sewage.
The 6m long of the reinforced concrete inner support 1, sectional dimension is 300mm × 600mm, and concrete strength is C35, in steel
Reinforced concrete inner support bottom sets two prestressing force lacing wires 7;Prestressing force lacing wire 7 is 7m long, the spiral of a diameter of 32mm.
The size of prestressed bolt 8 is corresponding with prestressing force lacing wire 7, is made up of anchorage and intermediate plate.
The main quiet booster 2, top aids in quiet booster 3 and bottom to aid in quiet booster 4 to be PVC plastic expects pipe, wherein main
The a diameter of 50mm of quiet booster 2, top is wanted to aid in a diameter of 30mm of quiet booster 3 and bottom to aid in a diameter of 30mm of quiet booster 4;
Main quiet booster 2, top aids in quiet booster 3 and bottom to aid in quiet booster 4 to be respectively provided with arc convex downwards, and amount of deflection is 1%, edge
Main quiet booster 2, top aids in quiet booster 3 and bottom to aid in the length direction of quiet booster 4 to be oozed out in the quincunx quiet detonator of laying
Hole 5, laying spacing is 0.5m, and the length of quiet detonator bleeding holes 5 is 30mm.
By thickness 5mm, strength grade by the steel plate of Q235 is made, its length is 5000mm to the garbage collection groove 9, and setting is in
Downward convex arc, amount of deflection is 10%;Garbage collection trough floor 21 width 400mm, a height of 200mm of garbage collection groove side plate 22;It is useless
The size for expecting downcast hole 15 is to be threaded in 200mm × 400mm, anchor hole 23, the coarse groove bolt connection with diameter 20mm.
The bottom bearing plate 28 is that thickness 5mm, strength grade are 300mm × 300mm's for the steel plate of Q235 is made size
It is square.Lower support plate 26 is that thickness 10mm, strength grade are the square of 500mm × 500mm for the steel plate of Q235 is made size.
Four lower support bars 27 of lower weld of lower support plate 26, lower support bar 27 is the steel pipe of a diameter of 100mm.
The U-shaped connecting rod 11 is made up of the reinforcing bar of diameter 20mm, its a height of 700mm, clear span 400mm, top connecting plate
12 is 500mm long, width 150mm, thickness 10mm, the steel plate that strength grade is Q235.
The waste recovery case 14 is thickness 10mm, the steel plate of strength grade Q235 is prefabricated forms, waste recovery case side plate 29
500mm high, 1000mm long;Gag lever post rotating shaft is the loose-leaf rotating shaft of diameter 10mm;Gag lever post 19 is thickness 5mm, width 20mm, intensity etc.
Level is made up of the steel plate of Q235;The gag lever post insertion width of hole position 31 8mm, 30mm long, positioned at the top of stripper 20;Stripper 20 is
Thick 20mm, strength grade Q235 steel plate it is prefabricated form, its a height of 500mm, a length of 500mm.Stripper rotating shaft 30 is diameter
The loose-leaf rotating shaft of 20mm.
The leakage-stopping board 18 is that size is the rectangular steel plates of 300mm × 600mm, is 30mm, connecting bolt through hole 24
25 is the coarse-pitch thread bolt of a diameter of 20mm.
The collection box base 16 is that the shaped steel that strength grade is Q235 is welded, and it is highly 1000mm.
The waste material 17 of removing is the broken concrete of reinforced concrete inner support 1.
The foundation pit enclosure stake 33 is the cement mixing pile of diameter 900mm, a length of 7000mm of stake.
Claims (4)
1. a kind of reinforced concrete inner support ecology Demolition Construction method, it is characterised in that including following construction procedure:
(1) excavation pit prepares main 2, two tops of quiet booster auxiliary before the casting concrete of reinforced concrete inner support 1
Quiet booster 3 and two bottoms are helped to aid in quiet booster 4, then in the case where main 2, two tops of quiet booster aid in quiet booster 3 and two
Portion aids in quiet booster 4 all uniformly to open up multiple quiet detonator bleeding holes 5, and to filling flexible inserts 6 in quiet detonator bleeding holes 5;
(2) the quiet main quiet booster 4 of booster 3, and two bottoms are aided in aid in quiet booster 5 on two tops in step (1)
The upper, middle and lower in the reinforced concrete inner support 1 for needing the later stage to remove is separately positioned on, and is aided in two bottoms quiet
Insertion prestressing force lacing wire 7 in booster 4;
(3) concreting is carried out to the reinforced concrete inner support 1 in step (2), after concrete forms intensity, in advance should
Power lacing wire 7 applies prestressing force, and is anchored by prestressed bolt 8 in the end of prestressing force lacing wire 7;
(4) after the completion of excavation of foundation pit, garbage collection groove 9, waste material are set by fixed mechanism below reinforced concrete inner support 1
Collecting tank 9 opens up waste material downcast hole 15, and waste material downcast hole 15 sets the leakage-stopping board 18 of closing waste material downcast hole 15, waste material downcast hole
15 lower sections set waste recovery case 14, and the collection box base 16 of adjustment height, waste recovery are set in the bottom of waste recovery case 14
Case 14 sets shedding mechanism;
(5) when reinforced concrete inner support 1 is removed, the prestressing force that bottom aids in prestressing force lacing wire 7 in quiet booster 4 is first discharged, then
Prestressing force lacing wire 7 is aided in from bottom to be taken out in quiet booster 4;
(6) from main quiet booster 2, top aid in quiet booster 3 and bottom aid in one end of quiet booster 4 simultaneously to main quiet booster 2,
Top aids in quiet booster 3 and bottom to aid in the quiet detonator of pressure injection in quiet booster 4, when main quiet booster 2, top aids in the quiet and of booster 3
Bottom stops pressure injection, quiet detonator hardening, volumetric expansion, reinforced concrete when aiding in the other end of quiet booster 4 to there is quiet detonator to flow out
Native inner support 1 rises brokenly and drops in garbage collection groove 9;
(7) after the dismounting waste material in garbage collection groove 9 reaches certain amount, the leakage-stopping board of lower 15 of waste material downcast hole is opened
18, dismounting waste material is freely fallen into waste recovery case 14 from waste material downcast hole 15;
(8) after waste recovery case 14 is full, will be removed during waste material moves to other transporting equipments by shedding mechanism and transport construction field
Ground;
The main quiet booster 2, top aids in quiet booster 3 and bottom to aid in quiet booster 4 to be arcuate shape convex downwards, and
It is plastic flexible pipe, bottom aids in quiet booster 4 as prestressing force lacing wire 7 and the separation layer of reinforced concrete inner support 1, and prestressing force draws
The two ends of muscle 7 are equipped with prestressed bolt 8, hitch and branch that the fixed mechanism is equipped with including the two ends of garbage collection groove 9
Support mechanism, supporting mechanism includes the lower support bar 27, lower support plate 26 and the spacing jack 13 that are sequentially connected from down to up,
Hitch includes the bottom bearing plate 28, U-shaped connecting rod 11 and the top connecting plate 12 that are sequentially connected from down to up, U-shaped connection
Two ends of bar 11 are threadedly coupled with top connecting plate 12 and form the hollow hanging ring of closure, and hanging ring is set in steel simultaneously
In reinforced concrete inner support 1 and garbage collection groove 9, garbage collection groove 9 is supported on the inwall bottom of U-shaped connecting rod 11, bottom
Bearing plate 28 is supported on spacing jack 13.
2. reinforced concrete inner support according to claim 1 ecology Demolition Construction method, it is characterised in that the waste material
Collecting tank 9 is welded by garbage collection trough floor 21 and garbage collection groove side plate 22, and its cross section is rectangular, garbage collection groove
9 are shaped as convex arc downwards, and waste material downcast hole 15 is located in the middle of garbage collection trough floor 21, garbage collection trough floor 21 sets
There are anchor hole 23, connecting bolt 25 and with the leakage-stopping board 18 through hole 24, leakage-stopping board 18 is sequentially passed through by connecting bolt 25
It is connected at waste material downcast hole 15 through hole 24 and anchor hole 23, leakage-stopping board 18 is rectangular steel plates, loosening connecting bolt 25 can solve
Except leakage-stopping board 18 is to the sealing process of waste material downcast hole 15.
3. reinforced concrete inner support according to claim 1 ecology Demolition Construction method, it is characterised in that the bottom
Supporting plate 26 and bottom bearing plate 28 are rectangular steel plates, and lower support bar 27 is steel pipe or shaped steel.
4. reinforced concrete inner support according to claim 1 ecology Demolition Construction method, it is characterised in that waste recovery
Case 14 includes the casing being made up of four waste recovery case side plates 29 and a collection box base plate 10, one of waste recovery case
Stripper rotating shaft 30 of the side plate 29 as stripper 20 by being located at collection box base plate 10 is hinged on collection box base plate 10 and constitutes
Shedding mechanism, the top of stripper 20 is provided with spacing bar jack 31, and waste recovery case side plate 29 is provided with the He of gag lever post rotating shaft 32
Gag lever post 19 on waste recovery case side plate 29 is hinged on by gag lever post rotating shaft 32, the end of gag lever post 19 is connected with and gag lever post
The inserting column 34 that jack 31 coordinates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710213841.4A CN106869139B (en) | 2017-04-01 | 2017-04-01 | Ecological demolition construction method for reinforced concrete inner support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710213841.4A CN106869139B (en) | 2017-04-01 | 2017-04-01 | Ecological demolition construction method for reinforced concrete inner support |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106869139A true CN106869139A (en) | 2017-06-20 |
CN106869139B CN106869139B (en) | 2019-01-11 |
Family
ID=59159710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710213841.4A Active CN106869139B (en) | 2017-04-01 | 2017-04-01 | Ecological demolition construction method for reinforced concrete inner support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106869139B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110438911A (en) * | 2019-07-22 | 2019-11-12 | 安徽省交通建设股份有限公司 | The construction method of the ecological dismounting structure in Urban Bridge part |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5295803A (en) * | 1976-02-09 | 1977-08-11 | Jet Research Center | Method of and device for releasing loaded substance |
CN101718094A (en) * | 2009-11-10 | 2010-06-02 | 朱奎 | Construction method for retaining and protecting foundation pit of building with basemen |
CN102733399A (en) * | 2012-07-04 | 2012-10-17 | 江苏省华建建设股份有限公司 | Method for removing internal support concrete by static expansion |
CN103233476A (en) * | 2013-04-03 | 2013-08-07 | 巨匠建设集团有限公司 | Deep foundation pit supporting structure as well as construction method and demolishing method thereof |
CN203188220U (en) * | 2013-04-03 | 2013-09-11 | 巨匠建设集团有限公司 | Deep foundation pit supporting structure |
CN105155553A (en) * | 2015-09-09 | 2015-12-16 | 杭州江润科技有限公司 | Green dismantling construction method combining concrete support static crush and splitting method |
-
2017
- 2017-04-01 CN CN201710213841.4A patent/CN106869139B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5295803A (en) * | 1976-02-09 | 1977-08-11 | Jet Research Center | Method of and device for releasing loaded substance |
CN101718094A (en) * | 2009-11-10 | 2010-06-02 | 朱奎 | Construction method for retaining and protecting foundation pit of building with basemen |
CN102733399A (en) * | 2012-07-04 | 2012-10-17 | 江苏省华建建设股份有限公司 | Method for removing internal support concrete by static expansion |
CN103233476A (en) * | 2013-04-03 | 2013-08-07 | 巨匠建设集团有限公司 | Deep foundation pit supporting structure as well as construction method and demolishing method thereof |
CN203188220U (en) * | 2013-04-03 | 2013-09-11 | 巨匠建设集团有限公司 | Deep foundation pit supporting structure |
CN105155553A (en) * | 2015-09-09 | 2015-12-16 | 杭州江润科技有限公司 | Green dismantling construction method combining concrete support static crush and splitting method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110438911A (en) * | 2019-07-22 | 2019-11-12 | 安徽省交通建设股份有限公司 | The construction method of the ecological dismounting structure in Urban Bridge part |
Also Published As
Publication number | Publication date |
---|---|
CN106869139B (en) | 2019-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022033503A1 (en) | Construction method for dismantling concrete supports of prefabricated subway station | |
CN101560771A (en) | Reclaimable foundation pit bracing system and construction method thereof | |
CN107806101A (en) | Construction method of the bar shaped foundation ditch cast-in-place concrete to the prefabricated linking beam of support | |
CN109139049B (en) | Construction method for secondary lining buckling arch of underground excavation station of subway | |
CN208072415U (en) | Deep foundation pit reinforced concrete support part changes structure | |
CN113089491A (en) | Construction method of large cantilever prestressed concrete bent cap | |
CN106869139B (en) | Ecological demolition construction method for reinforced concrete inner support | |
CN111074950B (en) | Pre-closed advanced water stop post-cast strip for basement outer wall and construction method | |
CN116241101B (en) | Construction method for removing continuous wall of connecting section of main body and auxiliary structure of subway station | |
CN105625199B (en) | Processing method and repairing structure for variable cross-section continuous box beam bottom plate cracking area | |
CN202247938U (en) | Wedge-shaped foundation bolt preformed hole core formwork device | |
CN111778990A (en) | Permanent-temporary combined assembly type inner support system and construction method | |
CN112030995A (en) | Construction method for quickly taking out of ground for supporting and disassembling in advance for main building of super high-rise building | |
CN206635775U (en) | A kind of reinforced concrete inner support ecology dismounting structure | |
CN113818352B (en) | Soft foundation high pier curve cast-in-situ box girder bridge and construction method thereof | |
CN103758122A (en) | Environment-friendly modular concrete tubular column and construction method thereof | |
CN211499326U (en) | Synchronous construction structures of concrete infilled wall and cast-in-place structure | |
CN217581421U (en) | Post-cast strip braced system | |
CN207484749U (en) | Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls | |
RU2230157C2 (en) | Control method for settled foundation settlement | |
CN215857913U (en) | Active retaining wall disease foam concrete repair structure | |
CN219973248U (en) | Construction structure of profile steel stiff pile retaining wall | |
CN210002416U (en) | temporary structure for stage construction of large-span deep foundation pit basement | |
CN216866719U (en) | Unilateral formwork support of shield working well inner wall concrete structure | |
CN114294050B (en) | Safe and quick drop shaft section plugging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220523 Address after: 615000 No. 1, floor 9, block a, Kanghong international, beibifu Road, Xichang City, Liangshan Yi Autonomous Prefecture, Sichuan Province Patentee after: SICHUAN ROAD & BRIDGE SHENGTONG BUILDING ENGINEERING Co.,Ltd. Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang. Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd. |