CN106868525A - Al alloy parts are surface-treated experimental technique - Google Patents
Al alloy parts are surface-treated experimental technique Download PDFInfo
- Publication number
- CN106868525A CN106868525A CN201710176737.2A CN201710176737A CN106868525A CN 106868525 A CN106868525 A CN 106868525A CN 201710176737 A CN201710176737 A CN 201710176737A CN 106868525 A CN106868525 A CN 106868525A
- Authority
- CN
- China
- Prior art keywords
- alkali cleaning
- pickling
- passivation
- shower
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23G—CLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
- C23G5/00—Cleaning or de-greasing metallic material by other methods; Apparatus for cleaning or de-greasing metallic material with organic solvents
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C22/00—Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
- C23C22/05—Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using aqueous solutions
- C23C22/06—Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals using aqueous solutions using aqueous acidic solutions with pH less than 6
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23G—CLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
- C23G1/00—Cleaning or pickling metallic material with solutions or molten salts
- C23G1/02—Cleaning or pickling metallic material with solutions or molten salts with acid solutions
- C23G1/12—Light metals
- C23G1/125—Light metals aluminium
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23G—CLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
- C23G1/00—Cleaning or pickling metallic material with solutions or molten salts
- C23G1/14—Cleaning or pickling metallic material with solutions or molten salts with alkaline solutions
- C23G1/22—Light metals
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23G—CLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
- C23G3/00—Apparatus for cleaning or pickling metallic material
Landscapes
- Chemical & Material Sciences (AREA)
- General Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)
Abstract
The present invention relates to Al alloy parts technical field of surface, more particularly to a kind of Al alloy parts surface treatment experimental technique.Experimental technique uses the experimental provision for including alkali cleaning equipment, the first rinsing equipment, pickler, the second rinsing equipment, paralysis facility, the 3rd rinsing equipment, drying plant, pipeline and actuator to perform successively:Alkali cleaning, rinsing, pickling, rinsing, passivation, rinsing, drying.Above-mentioned experimental technique creates the surface treatment flow of alkali cleaning rinsing pickling-rinsing passivation rinsing drying, can be studied based on the surface treatment of the surface treatment flow to Al alloy parts, and obtain a set of suitable, preferable technological parameter for different special aluminum alloy workpiece research, in for actual process production, directive significance is strong.And then, the experimental technique has filled up the blank in the experiment field of the surface treatments of Al alloy parts such as research body of a motor car plate.
Description
Technical field
It is real the present invention relates to Al alloy parts technical field of surface, more particularly to a kind of surface treatment of Al alloy parts
Proved recipe method.
Background technology
Aluminium alloy is most widely used class non-ferrous metal structural material in industry, in Aeronautics and Astronautics, automobile, machinery
Widely applied in manufacture, ship and chemical industry.For the aluminium alloy of structural metallic materials, metal erosion is common
And the problem that must be faced.
Specifically, metal erosion can be attributed to the electrochemical reaction between metal and water phase, and metallic atom is oxidized
Into metal cation M+, produce the oxidation current IA that solution is flowed to by metal;Simultaneously in solution, charged ion receives from gold
The electronics that symbolic animal of the birth year is transmitted, chemically reacts, and causes the ion to be separated out from solution, produces the negative electrode electricity that metal is flowed to by solution
Stream IK.Aluminium alloy is acted on and corroded by surrounding medium, and chemistry or electrochemistry heterogeneous reaction occur on the interface of aluminium, is transferred to Al
Oxidation (ion) state, can significantly reduce the mechanical properties such as intensity, plasticity, the toughness of aluminium.Exist to suppress Al alloy parts
Corrode in storage transportation, and improve its performance, carry out surface treatment imperative.
The surface treatment method for using at present is chemical conversion treatment, and it is in the case of no power, by spray, dipping
Or the mode such as brush, and aluminium surface is chemically reacted with oxidizing solution, there is certain adhesive force in its Surface Creation and matrix
Insoluble conversion film, be a kind of chemical oxidation treatment.Above-mentioned conversion film is than anode oxide film much thinner, therefore its protection
Performance is not so good as anode oxide film, has crossed after the protection period it may happen that corrosion.But this method have many advantages, such as it is as follows:Operation
Convenience, simple equipments, cost be not high, process time is short, production efficiency is high, low to base material quality requirements, thus suitable for large quantities of
Amount production, not only solves the organic polymer films problem not strong with the tack of alloy matrix aluminum, and contribute to resistance to
The raising of corrosion.
Wherein, the chemical conversion treatment of early stage is generally chromate process, because chromium is to environmentally undesirable, is phased out,
Particularly prohibitted the use of in Europe, so chemical conversion treatment must be changed to the conversion processing of Chrome-free.
It is body of a motor car plate (ABS) as example using Al alloy parts, as country is more next to the energy, pedestrains safety etc.
More pay attention to, automotive light weight technology is imperative.And automobile calorize is the important channel of automotive light weight technology, the research and development of body of a motor car plate
Strategic importance is very great.In raising, its is corrosion proof simultaneously for aluminium alloy plate surface treatment, increases the adhesive force to coating, while
Sheet resistance is reduced, is that body of a motor car plate produces indispensable critical process beneficial to downstream welding assembly.Current Automobile
The surface treatment core process and key technology of body plate are monopolized by developed countries, and independent development will be helpful to Automobile
Body plate localization, scientific research value and remarkable in economical benefits.
Correspondingly, the experimental technique for being used to study the surface treatments of Al alloy parts such as body of a motor car plate in laboratory is several
Do not have, a small number of simple experimental methods and corresponding experimental provision cause that experimental result is given birth to actual industrial because it is excessively simple
The directiveness for producing application is not strong, therefore, need badly a kind of has at the Al alloy parts surface of guiding significance to actual industrial production
Reason experimental technique, to fill up the blank in the experiment field of the surface treatment of the Al alloy parts such as research body of a motor car plate.
The content of the invention
(1) technical problem to be solved
It is an object of the invention to provide a kind of Al alloy parts surface treatment experimental technique, the experimental technique is to actual work
Industry production has guiding significance.
(2) technical scheme
In order to achieve the above object, the main technical schemes that the present invention is used include:
The present invention provides a kind of Al alloy parts surface treatment experimental technique, and the experimental provision that the experimental technique is used includes
It is alkali cleaning equipment, the first rinsing equipment, pickler, the second rinsing equipment, paralysis facility, the 3rd rinsing equipment, drying plant, defeated
Line sending and actuator, wherein, pipeline sequentially pass through alkali cleaning equipment, the first rinsing equipment, pickler, second rinsing set
Standby, paralysis facility, the 3rd rinsing equipment and drying plant;Actuator drives pipeline to drive Al alloy parts to travel forward, and
Step is handled as follows successively to Al alloy parts:S1, alkali cleaning equipment carry out alkali cleaning to Al alloy parts;S2, the first rinsing
Equipment is rinsed to the Al alloy parts after alkali cleaning;Al alloy parts after S3, pickler are rinsed to alkali cleaning carry out pickling;
S4, the second rinsing equipment are rinsed to the Al alloy parts after pickling;S5, paralysis facility are to the aluminium alloy work after pickling-rinsing
Part is passivated;S6, the 3rd rinsing equipment are rinsed to the Al alloy parts after passivation;S7, drying plant are rinsed to passivation
Al alloy parts afterwards are dried.
According to the present invention, experimental provision also includes central controller;Alkali cleaning equipment includes alkali cleaning spray groove, alkali cleaning shower, alkali
Nozzle, alkali cleaning circulating tank, alkali cleaning water pump, alkali cleaning head tank and alkali cleaning deionization water pot are washed, alkali cleaning shower is fixed on alkali cleaning spray
Drench on groove, alkali cleaning nozzle is fixed on alkali cleaning shower and is connected with alkali cleaning shower, and bottom and the alkali cleaning of alkali cleaning spray groove are followed
The entrance connection of ring tank, the entrance of alkali cleaning shower is by alkali cleaning water pump and the outlet of alkali cleaning circulating tank, alkali cleaning circulating tank
With alkali cleaning head tank and alkali cleaning deionization water pot respectively by the first alkali cleaning switch and the second alkali cleaning switch it is selectable connect,
Alkali cleaning conductivity meter is provided with the bottom of alkali cleaning spray groove, alkali cleaning conductivity meter is connected with central controller communication, central controller and first
Alkali cleaning is switched and the second alkali cleaning switch communication connection;In step sl, alkali cleaning, alkali cleaning are carried out by the way of alkali wash water is sprayed
Cheng Zhong, the electrical conductivity of the alkali wash water after alkali cleaning conductivity meter real-time detection spray, and the electrical conductivity is delivered to central controller, at this
When electrical conductivity is higher than setting range, central controller controls the second alkali cleaning switch open to control the first alkali cleaning switch to close simultaneously, at this
When electrical conductivity is less than setting range, central controller controls the first alkali cleaning switch open to control the second alkali cleaning switch to close simultaneously, at this
Electrical conductivity is located at when in setting range, and central controller controls the first alkali cleaning switch and the second alkali cleaning switch to be turned off.
According to the present invention, pickler includes pickling spray groove, pickling shower, pickling nozzle, pickling circulating tank, pickling
Water pump, pickling head tank and pickling deionization water pot, pickling shower are fixed on pickling spray groove, and pickling nozzle is fixed on acid
Connected on washing and spraying pipe and with pickling shower, the bottom of pickling spray groove connects with the entrance of pickling circulating tank, pickling spray
The entrance of pipe is by pickling water pump and the outlet of pickling circulating tank, pickling circulating tank and pickling head tank and pickling deionization
Water pot respectively by the first pickling switch and the second pickling switch it is selectable connect, be provided with the bottom of pickling spray groove
Line fluorine ion instrument, online fluorine ion instrument is connected with central controller communication, and central controller leads to the first pickling switch and the second pickling switch
News connection;In step s3, pickling is carried out by the way of spray acid washing lotion, in acid cleaning process, online fluorine ion instrument is real-time
The fluorinion concentration of the pickle after detection spray, and the fluorinion concentration is delivered to central controller, it is high in the fluorinion concentration
When setting range, central controller controls the first pickling switch open to control the second pickling switch to close simultaneously, in fluorinion concentration
During less than setting range, central controller controls the second pickling switch open to control the first pickling switch to close simultaneously, dense in fluorine ion
Degree is located at when in setting range, and central controller controls the first pickling switch and the second pickling switch to be turned off.
According to the present invention, paralysis facility includes passivation spray groove, passivation shower, passivation nozzle, passivation cycle tank, passivation
Water pump, passivation head tank and passivation deionization water pot, passivation shower are fixed on passivation spray groove, and passivation nozzle is fixed on blunt
Change on shower and connected with passivation shower, the bottom for being passivated spray groove connects with the entrance of passivation cycle tank, passivation spray
The entrance of pipe passivation cycle tank and passivation head tank and is passivated deionization by being passivated the outlet of water pump and passivation cycle tank
Water pot is connected by the way that the first passivation switch is selectable with the second passivation switch respectively;Wherein, in the bottom of passivation spray groove
Passivation conductivity meter is provided with, passivation conductivity meter is connected with central controller communication, central controller and the first passivation switch and second are passivated
Switch communication connection;In step s 5, it is passivated by the way of passivating solution is sprayed, in passivating process, is passivated conductivity meter
The electrical conductivity of the passivating solution after real-time detection spray, and the electrical conductivity is delivered to central controller, in the electrical conductivity higher than setting model
When enclosing, central controller control second is passivated switch open and controls the first passivation switch to close simultaneously, in the electrical conductivity less than setting model
When enclosing, central controller control first is passivated switch open and controls the second passivation switch to close simultaneously, and setting model is located in the electrical conductivity
When enclosing interior, central controller control the first passivation switch and the second passivation switch are turned off.
According to the present invention, raw material of the alkali wash water comprising following weight parts:20 parts of potassium hydroxide, 25 parts of sodium tripolyphosphates, 10
Part anhydrous sodium metasilicate, 5 parts of natrium carbonicum calcinatums, 5 parts of triethanolamines, 2 parts of neopelexes;Pickle includes following weight
The raw material of part:30 portions of sulfuric acid, 45 portions of nitric acid, 10 portions of ammonium acid fluorides, 1 portion of APES, 1 portion of carboxycellulose salt.
According to the present invention, in alkali cleaning equipment, equidistant 6-8 roots alkali cleaning spray is respectively set above and below pipeline
Pipe, the alkali cleaning nozzle of top alkali cleaning shower is fixed downward, and the alkali cleaning nozzle of lower section alkali cleaning shower is fixed upward,
The distance of adjacent two alkali cleaning showers is 2-3cm, the alkali cleaning nozzle spaced set on every alkali cleaning shower, alkali cleaning nozzle
Outlet a diameter of 0.5-0.6cm, the distance between two neighboring alkali cleaning nozzle is 2-3cm, and being exported to for alkali cleaning nozzle is defeated
The distance of line sending is located at 30-45cm;In pickler, equidistant 4-6 roots pickling is respectively set above and below pipeline
Shower, the pickling nozzle of top pickling shower is fixed downward, and the pickling nozzle of lower section pickling shower is upward
Fixed, the distance of adjacent two pickling showers is 3-4cm, the pickling nozzle spaced set on every pickling shower, acid
The distance between a diameter of 0.6-0.7cm of the outlet of nozzle, two neighboring pickling nozzle are washed for 3-4cm, pickling nozzle goes out
Mouth to the distance of pipeline is located at 30-45cm.
According to the present invention, alkali cleaning equipment, pickler and paralysis facility also include temperature sensor, heater and can
Control silicon thermoregulating system, temperature sensor and heater are arranged on the bottom of corresponding spray groove, and temperature sensor and heating are filled
Put and be connected with controllable silicon thermoregulating system.
According to the present invention, alkali cleaning equipment, pickler and paralysis facility also include pressure sensor, pressure regulator valve, PLC controls
System processed, pressure sensor and pressure regulator valve are arranged on the pipeline that corresponding water pump is connected with corresponding shower, PLC controls system
System is connected with pressure sensor and pressure regulator valve;Alkali cleaning equipment, pickler and paralysis facility also include flowmeter and frequency converter,
Alkali cleaning water pump, pickling water pump, passivation water pump are variable frequency pump, and flowmeter is connected with frequency converter, frequency converter and corresponding water pump
Connection, flowmeter is arranged on the pipeline that corresponding circulating tank is connected with corresponding shower.
According to the present invention, experimental provision also includes roll coating apparatus, and roll coating apparatus are located at the downstream of drying plant, and pipeline is worn
Roll coating apparatus are crossed, wherein, roll coating apparatus include feeding roller, the coating roller positioned at feeding roller downstream, determining positioned at coating roller downstream
Deflector roll and the support roller below coating roller;Following steps are performed after step S7:S8, roll coating apparatus are after the drying
The surface of Al alloy parts forms lube layer.
According to the present invention, the pH value of alkali wash water in the range of 8-12, temperature in the range of 30-80 DEG C, the alkali cleaning time
In the range of 2-10s, spray pressure is in the range of 2-6bar;In the range of 1-5, temperature is in 30- for the pH value of pickle
In the range of 80 DEG C, in the range of 1-7s, spray pressure is in the range of 2-6bar for pickling time;The pH value of passivating solution is in 2-
In the range of 6, in the range of 10-70 DEG C, passivation time is in the range of 2-15s for temperature.
(3) beneficial effect
The beneficial effects of the invention are as follows:
Al alloy parts surface treatment experimental technique of the invention creates alkali cleaning-rinsing-pickling-rinsing-passivation-drift
The surface treatment flow washed-dry, can be studied based on the surface treatment of the surface treatment flow to Al alloy parts, and pin
A set of suitable, preferable technological parameter is obtained to different special aluminum alloy workpiece (such as body of a motor car aluminium sheet) research, with
In being produced for actual process, directive significance is strong.And then, the experimental technique has filled up the aluminium alloy works such as research body of a motor car plate
The blank in the experiment field of the surface treatment of part.
Brief description of the drawings
Fig. 1 is a part for the experimental provision of the experimental technique application that embodiment one is provided in following specific embodiment
Structural representation;
Fig. 2 is another portion of the experimental provision of the experimental technique application that embodiment one is provided in following specific embodiment
Separation structure schematic diagram;
Fig. 3 is the schematic flow sheet of the experimental technique that embodiment one is provided in following specific embodiment;
Fig. 4 is the pattern micro-organization chart of the passivating film formed after step S1 to S7 in the experimental technique provided in Fig. 1.
【Description of reference numerals】
In figure:
1:Electrical system;2:Pipeline;3:Actuator;4:Alkali cleaning equipment;5:First rinsing equipment;6:Pickler;7:
Second rinsing equipment;8:Paralysis facility;9:3rd rinsing equipment;10:Drying plant;11:Roll coating apparatus;12:Alkali cleaning nozzle;
13:Alkali cleaning water pump;14:Heater;15:Infrared heater;16:Stirring blower fan;17:Feeding roller;18:Coating roller;19:Branch
Support roller;20:Determine deflector roll;21:Motor;22:Nozzle;23:Water pump;24:Pickling nozzle;25:Pickling water pump;26:Passivation nozzle;
27:Passivation water pump.
Specific embodiment
In order to preferably explain the present invention, in order to understand, below in conjunction with the accompanying drawings, by specific embodiment, to this hair
It is bright to be described in detail.
Embodiment one
Referring to figs. 1 to Fig. 3, introduce first and a kind of Al alloy parts surface treatment experimental technique institute is provided in the present embodiment
The experimental provision of use, the experimental provision include alkali cleaning equipment 4, the first rinsing equipment 5, pickler 6, the second rinsing equipment 7,
Paralysis facility 8, the 3rd rinsing equipment 9, drying plant 10, pipeline 2 and actuator 3, wherein, pipeline 2 is closed for conveying aluminum
Metal working part, along conveying direction (i.e. from the direction of upstream toward downstream), pipeline 2 sequentially passes through alkali cleaning equipment 4, the first rinsing equipment
5th, pickler 6, the second rinsing equipment 7, paralysis facility 8, the 3rd rinsing equipment 9, drying plant 10.
In experimentation, actuator 3 drives pipeline 2 to drive Al alloy parts to travel forward, and to Al alloy parts
Step is handled as follows successively:
S1, alkali cleaning equipment 4 carry out alkali cleaning to Al alloy parts;
S2, the first rinsing equipment 5 are rinsed to the Al alloy parts after alkali cleaning;
Al alloy parts after S3, pickler 6 are rinsed to alkali cleaning carry out pickling;
S4, the second rinsing equipment 7 are rinsed to the Al alloy parts after pickling;
S5, paralysis facility 8 are passivated to the Al alloy parts after pickling-rinsing;
Al alloy parts after S6, the 9 pairs of passivation of the 3rd rinsing equipment are rinsed;
Al alloy parts after S7,10 pairs of passivation rinsings of drying plant are dried.
Specifically, 4 and first rinsing equipment of alkali cleaning equipment 5 constitutes alkali wash section, and step S1 and the main effects of step S2 are
The greasy dirt and solid particle (aluminium powder etc.) on removal Al alloy parts surface.For example, being passed through for making the aluminium strip of body of a motor car aluminium sheet
After crossing the techniques such as rolling, aluminium strip surface can be stained with the greasy dirts such as ROLLING OIL, base oil, antioxidant, EP agent, and also exist
Physical aluminium powder and other particles, are that subsequent chemistry conversion processing (being passivated) brings strong influence, and alkali cleaning and rinsing are exactly
These impurity are removed by alkaline solution and is rinsed.
Specifically, 6 and second rinsing equipment of pickler 7 constitutes pickling section, and step S3 and the main effects of step S4 are
Insoluble alloying element (Si, Mg, Mn etc.) and residual oxide layer on removal Al alloy parts.
Specifically, 8 and second rinsing equipment of paralysis facility 7 constitutes passivation section, and step S5 and the main effects of step S6 are
It is anticorrosion, anti-oxidation, slow down the generation of oxide layer, protection Al alloy parts surface.Also, because being passivated the passivating film for generating very
Thin, resistivity is low, so Al alloy parts sheet resistance is minimized.Additionally, for needing the aluminium of welding to close in downstream process
For metal working part, can enable aluminum alloy to workpiece has good welding performance, beneficial to downstream welding assembly.In addition, also closing aluminium
Metal working part has good adhesive property, and increases the adhesive force to coating (paint).
Thus, the Al alloy parts surface treatment experimental technique of the present embodiment creates alkali cleaning-rinsing-pickling-rinsing-blunt
Change-rinsing-drying surface treatment flow simultaneously realized via the experimental provision for createing, the surface treatment flow pair can be based on
The surface treatment of Al alloy parts is studied, and is studied for different special aluminum alloy workpiece (such as body of a motor car aluminium sheet)
A set of suitable, preferable technological parameter is obtained, in being produced for actual process, directive significance is strong.And then, the experimental technique
The blank in the experiment field of the surface treatments of Al alloy parts such as research body of a motor car plate is filled up.
Specifically, alkali cleaning equipment 4 is sprinkling equipment, and alkali cleaning equipment 4 specifically includes alkali cleaning spray groove, alkali cleaning shower, alkali
Nozzle 12, alkali cleaning circulating tank, alkali cleaning water pump 13 (preferably centrifugal water pump) are washed, alkali cleaning shower is fixed on alkali cleaning spray groove,
Alkali cleaning nozzle 12 is fixed on alkali cleaning shower and is connected with alkali cleaning shower, and alkali is respectively provided with above and below pipeline 2
Washing and spraying pipe, the alkali cleaning nozzle 12 of top alkali cleaning shower is fixed downward, the court of alkali cleaning nozzle 12 of lower section alkali cleaning shower
Fix upward, with to two surface injection alkali wash waters up and down of the Al alloy parts on pipeline 2.Alkali cleaning spray trench bottom leads to
Cross pipeline to be connected with the entrance of alkali cleaning circulating tank, the entrance of alkali cleaning water pump 13 passes through the outlet of pipeline and alkali cleaning circulating tank,
The entrance of alkali cleaning shower is by pipeline and the outlet of alkali cleaning water pump 13.Thus, alkali wash water is sprayed by alkali cleaning shower,
Alkali cleaning spray trench bottom is fallen into after ejection, alkali cleaning circulating tank is entered by pipeline from alkali cleaning spray trench bottom, then circulated by alkali cleaning
Tank is pumped to alkali cleaning shower by alkali cleaning water pump 13, and formation is recycled.
Preferably, in alkali cleaning equipment 4, equidistant 6-8 roots alkali cleaning spray is respectively set above and below pipeline 2
Pipe, the alkali cleaning nozzle 12 of top alkali cleaning shower is fixed downward, and the alkali cleaning nozzle 12 of lower section alkali cleaning shower is upward
Fixed, the distance of adjacent two alkali cleaning showers is 2-3cm, the spaced set of alkali cleaning nozzle 12 on every alkali cleaning shower,
The distance between a diameter of 0.5-0.6cm of the outlet of alkali cleaning nozzle 12, two neighboring alkali cleaning nozzle 12 are 2-3cm, alkali cleaning spray
The distance for being exported to pipeline 2 of mouth 12 is located at 30-45cm.So plant the setting of nozzle and shower, it is ensured that spray is close
Collection is uniform and cleaning strength is moderate, can improve cleaning performance.
Further, alkali cleaning equipment 4 also includes alkali cleaning head tank, and alkali cleaning head tank is used to store alkali wash water stoste, and alkali cleaning is former
The outlet of batch can is connected with alkali cleaning circulating tank, supply alkali wash water stoste in alkali cleaning circulating tank is thought, to adjust the alkali cleaning for spraying out
PH value of liquid etc..Wherein, the first alkali cleaning switch, the first alkali are provided with the pipeline between alkali cleaning circulating tank and alkali cleaning head tank
Washing switch can select the connection of the two and disconnect.
Further, alkali cleaning equipment 4 also includes alkali cleaning deionization water pot, and deionized water is stored in alkali cleaning deionization water pot,
Alkali cleaning deionization water pot is connected with alkali cleaning circulating tank, to be thought and feed deionized water in alkali cleaning circulating tank.In alkali cleaning circulating tank and alkali
Wash away and the second alkali cleaning switch is provided with the pipeline between ion water pot, the second alkali cleaning switch can select the company's through and off of the two
Open.
Further, experimental provision also includes central controller, and the central controller is switched and above-mentioned second alkali with above-mentioned first alkali cleaning
Switch communication connection is washed, to control the opening and closing of the two.
Further, alkali cleaning conductivity meter is provided with the bottom of the alkali cleaning spray groove of alkali cleaning equipment 4, for real-time detection alkali
The electrical conductivity of the alkali wash water of washing and spraying trench bottom, alkali cleaning conductivity meter is connected with central controller communication.
Further, alkali wash water contains potassium hydroxide, sodium tripolyphosphate and the surfactant (surface for mixing according to a certain percentage
Activating agent can select neopelex), certainly, can also contain other additives.In the present embodiment, alkali wash water is included
The raw material of following weight parts:20 parts of potassium hydroxide, 25 parts of sodium tripolyphosphates, 10 parts of anhydrous sodium metasilicates, 5 parts of natrium carbonicum calcinatums, 5 parts
Triethanolamine, 2 parts of neopelexes.The washing force of this alkali wash water is strong, and to Al alloy parts without unnecessary damage.Can manage
Solution, the proportioning of above-mentioned alkali wash water namely the proportioning of alkali wash water stoste, may be identical between alkali wash water and alkali wash water stoste, it is also possible to
It is only that the content of deionized water is different, in most cases, it is necessary to form alkali after alkali wash water stoste is added into deionized water dilution
Washing lotion.
With reference to the above-mentioned description to alkali cleaning equipment, in step sl, alkali cleaning is carried out with alkali wash water using spray mode, sprayed
Pressure is in the range of 2-6bar.The pH value of alkali wash water is in the range of 8-12.Additionally, the temperature of alkali wash water is at 30-80 DEG C
In the range of, the alkali cleaning time is in the range of 2-10s.
Further, in alkaline cleaning procedure, the electrical conductivity of the alkali wash water after alkali cleaning conductivity meter real-time detection spray, and should
Electrical conductivity is delivered to central controller, and when the electrical conductivity is higher than setting range, central controller controls the second same time control of alkali cleaning switch open
The first alkali cleaning switch is made to close, to add alkali wash water stoste in alkali wash water, when the electrical conductivity is less than setting range, central controller
The first alkali cleaning switch open is controlled to control the second alkali cleaning switch to close simultaneously, to add deionized water in alkali wash water, in the electricity
Conductance is located at when in setting range, and central controller controls the first alkali cleaning switch and the second alkali cleaning switch to be turned off.Thus, real-time monitoring
The electrical conductivity of the alkali wash water after spray, keeps electrical conductivity within the specific limits, is higher or lower than such as the scope, can change alkali wash water
Concentration (deionized water is added i.e. in alkali wash water or alkali wash water stoste is added), it is and then clear according to the overall control of " free alkali "
Quality is washed, cleaning performance can be improved.Also, it is both convenient by central controller control, and accurately, further ensure cleaning effect
Really.
Specifically, the first rinsing equipment 5 is sprinkling equipment, and sprinkling equipment includes spray groove, shower, nozzle 22, circulation
Tank, water pump 23 (preferably centrifugal water pump), shower is fixed on spray groove, and nozzle 22 is fixed on shower and and shower
Connection, is respectively provided with shower above and below pipeline 2, and the nozzle 22 of top shower is fixed downward, lower section spray
The nozzle 22 of shower pipe is fixed upward, with to two surface injection deionized waters up and down of the Al alloy parts on pipeline 2.
Spray trench bottom is connected by pipeline with the entrance of circulating tank, and the entrance of water pump 23 passes through the outlet of pipeline and circulating tank,
The entrance of shower is by pipeline and the outlet of water pump 23.Thus, deionized water is sprayed by shower, is fallen into after ejection
Spray trench bottom, enters circulating tank, then be pumped to shower, shape by water pump 23 by circulating tank from spray trench bottom by pipeline
Into recycling.Sprinkling equipment also includes head tank, and deionized water is stored in head tank, and outlet and the circulating tank of head tank connect
It is logical, to think and feed deionized water in circulating tank.
Corresponding to above-mentioned first rinsing equipment 5, in step s 2, rinsed with deionized water using spray mode, during rinsing
Between in the range of 0.5-5s, ensure Al alloy parts surface oil-free without solid particle after alkali cleaning and rinsing, in an experiment, can be with
Visually observe Al alloy parts surface.
Further, pickler 6 is sprinkling equipment, and pickler 6 includes pickling spray groove, pickling shower, pickling spray
Mouth 24, pickling circulating tank, pickling water pump 25 (preferably centrifugal water pump), pickling shower is fixed on pickling spray groove, pickling
Nozzle 24 is fixed on pickling shower and is connected with pickling shower, and pickling spray is respectively provided with above and below pipeline 2
Shower pipe, the pickling nozzle 24 of top pickling shower is fixed downward, and the pickling nozzle 24 of lower section pickling shower is towards upper
Side is fixed, with to two surface injection pickles up and down of the Al alloy parts on pipeline 2.Pickling spray trench bottom is by pipe
Road connects with the entrance of pickling circulating tank, and the entrance of pickling water pump 25 is by pipeline and the outlet of pickling circulating tank, pickling
The entrance of shower is by pipeline and the outlet of pickling water pump 25.Thus, pickle is sprayed by pickling shower, is sprayed
After fall into pickling spray trench bottom, pickling circulating tank is entered by pipeline from pickling spray trench bottom, then led to by pickling circulating tank
Overpickling water pump 25 is pumped to pickling shower, and formation is recycled.
Preferably, in pickler 6, equidistant 4-6 roots pickling spray is respectively set above and below pipeline 2
Pipe, the pickling nozzle 24 of top pickling shower is fixed downward, and the pickling nozzle 24 of lower section pickling shower is upward
Fixed, the distance of adjacent two pickling showers is 3-4cm, the spaced set of pickling nozzle 24 on every pickling shower,
The distance between a diameter of 0.6-0.7cm of the outlet of pickling nozzle 24, two neighboring pickling nozzle 24 are 3-4cm, pickling spray
The distance for being exported to pipeline 2 of mouth 24 is located at 30-45cm.The setting of such shower and nozzle, is capable of achieving intensive uniform
Ground spray and spraying intensity are moderate, are favorably improved cleaning performance.
Further, pickler 6 also includes pickling head tank, and pickle stoste is stored in pickling head tank, and pickling is former
The outlet of batch can is connected with pickling circulating tank, supply pickle stoste in pickling circulating tank is thought, to adjust the pH value of pickle
Deng.Wherein, the first pickling switch is provided with the pipeline between pickling circulating tank and pickling head tank, the first pickling switch can
To select the connection of the two and disconnect.
Further, pickler 6 also includes pickling deionization water pot, pickling deionization water pot oil in reserve deionized water, acid
Wash away ion water pot to be connected with pickling circulating tank, to think and feed deionized water in pickling circulating tank.In pickling circulating tank and pickling
The second pickling switch is provided with pipeline between deionization water pot, the second pickling switch can select the company's through and off of the two
Open.
Further, central controller is switched with above-mentioned first pickling and above-mentioned second pickling switch communication is connected, to control the two
Opening and closing.
Further, online fluorine ion instrument is set in the bottom of the pickling spray groove of pickler 6, after detecting spray
The fluorinion concentration of pickle, online fluorine ion instrument is connected with central controller communication.
Further, pickle sulfur acid and/or nitric acid, also contain fluoride and surfactant.Preferably, pickling liquid-based
This composition is mixed by a certain percentage by sulfuric acid, nitric acid, fluoride and surfactant, certainly, can also be added some other
Additive.In the present embodiment, raw material of the pickle comprising following weight parts:30 parts of sulfuric acid, 45 parts of nitric acid, 10 parts of hydrogen fluoride
Ammonium, 1 portion of APES, 1 portion of carboxycellulose salt.The washing force of this pickle is strong, and to Al alloy parts without many
Remaining damage.It is understood that the proportioning of the proportioning of above-mentioned pickle namely pickle stoste, may between pickle and pickle stoste
It is identical, it is also possible to be only that the content of deionized water is different, in most cases, it is necessary to add deionized water dilute pickle stoste
Pickle is formed after releasing.
With reference to the above-mentioned description to pickler, in step s3, pickling is carried out with pickle using spray mode, sprayed
Pressure is in the range of 2-6bar.The pH value of the pickle for spraying out is in the range of 1-5.Additionally, the temperature of pickle exists
In the range of 30-80 DEG C, pickling time is in the range of 1-7s.
Further, acid cleaning process can produce certain etching to Al alloy parts surface, be detected by online fluorine ion instrument
The fluorinion concentration of the pickle after spray, control fluorinion concentration in setting range, so as to control etching speed.Example
Such as, the fluorinion concentration of the pickle after spray is too high, illustrates that etching speed is slower, then can improve the concentration (example of pickle
Such as to addition pickle stoste in pickle);The fluorinion concentration of the pickle after spray is too low, illustrates that etching speed is very fast,
The concentration (such as to add deionized water in pickle) of pickle can then be reduced.
Specifically, the fluorinion concentration of the pickle after line fluorine ion instrument real-time detection spray, and by the fluorine ion
Concentration is delivered to central controller, and when the fluorinion concentration is higher than setting range, central controller controls the first pickling switch open simultaneously
Control the second pickling to switch to close, with to pickle stoste is added in pickle, when fluorinion concentration is less than setting range, in
Control device controls the second pickling switch open to control the first pickling switch to close simultaneously, with to adding deionized water in pickle,
Fluorinion concentration is located at when in setting range, and central controller controls the first pickling switch and the second pickling switch to be turned off.
Thus, etching speed is controlled by the monitoring and regulation of fluorinion concentration, improves cleaning quality, it is ensured that cleaning is dry
The damage to Al alloy parts is avoided in the case of net as far as possible.Also, it is both convenient using central controller control, and accurately, contribute to
The raising of cleaning quality.
Certainly, also fluorinion concentration can be controlled by changing spray rate.All it is able in etching speed and pickling time
In the case of control, etch amount is also controlled.Also, spray mode is not limited to, pickling can also use impregnation method.
Further, the second rinsing equipment 7 is sprinkling equipment, with the first rinsing equipment 5, be will not be repeated here.In step S4
In, being rinsed with deionized water using spray mode, the surface of Al alloy parts has relatively low resistance after pickling and rinsing, rinses
Time ensures the pickle for not having residual on the Al alloy parts after rinsing in the range of 1-9s.
Further, specifically, paralysis facility 8 is sprinkling equipment, and paralysis facility 8 specifically includes passivation spray groove, passivation spray
Shower pipe, passivation nozzle 26, passivation cycle tank, passivation water pump 27 (preferably centrifugal water pump), passivation shower are fixed on passivation spray
Drench on groove, passivation nozzle 26 is fixed on passivation shower and is connected with passivation shower, above and below pipeline 2
Passivation shower is set, and the passivation nozzle 26 of top passivation shower is fixed downward, the passivation spray of lower section passivation shower
Mouth 26 is fixed upward, with to two surface injection passivating solutions up and down of the Al alloy parts on pipeline 2.Passivation spray groove
Bottom is connected by pipeline with the entrance of passivation cycle tank, is passivated the entrance of water pump 27 by the outlet of pipeline and passivation cycle tank
Connection, is passivated the entrance of shower by pipeline and the outlet for being passivated water pump 27.Thus, passivating solution is by being passivated shower
Spray, passivation spray trench bottom is fallen into after ejection, passivation cycle tank is entered by pipeline from passivation spray trench bottom, then by being passivated
Circulating tank is pumped to passivation shower by being passivated water pump 27, and formation is recycled.
Further, paralysis facility 8 also includes passivation head tank, and passivating solution stoste is stored in passivation head tank, and passivation is former
The outlet of batch can is connected with passivation cycle tank, supply passivating solution stoste in passivation cycle tank is thought, to adjust the concentration of passivating solution
Deng.Wherein, the first passivation switch is provided with the pipeline between passivation cycle tank and passivation head tank, the first passivation switch can
To select the connection of the two and disconnect.
Further, passivating solution is Zr-Ti passivator, and Zr-Ti passivator main component is that inorganic basal liquid compounds organic matter
Additive, inorganic basal liquid is the inorganic solution containing zirconium and titanium ion, and organics additive selects organosilicon, certainly, Zr-Ti
Other compositions can also be contained in passivator.It is understood that the proportioning of the proportioning of above-mentioned passivating solution namely passivating solution stoste, passivating solution and
May be identical between passivating solution stoste, it is also possible to be only that the content of deionized water is different, in most cases, it is necessary to by passivating solution
Stoste forms passivating solution after adding deionized water dilution.
Further, paralysis facility 8 also includes passivation deionization water pot, and deionized water is stored in passivation deionization water pot,
Passivation deionization water pot is connected with passivation cycle tank, to be thought and feed deionized water in passivation cycle tank.In passivation cycle tank and blunt
Change and the second passivation switch is provided with the pipeline between deionization water pot, the second passivation switch can select the company's through and off of the two
Open.Central controller is connected with the first passivation switch and the second passivation switch communication, to control the opening and closing of the two.
Further, conductivity meter is provided with the bottom of the passivation spray groove of paralysis facility 8, conductivity meter is used for real-time detection
The electrical conductivity of the passivating solution of passivation spray trench bottom, passivation conductivity meter is connected with central controller communication.
With reference to the above-mentioned description to paralysis facility, in step s 5, it is passivated by the way of passivating solution is sprayed, is sprayed
Pressure is in the range of 1-5bar.The pH value of the passivating solution for spraying out is in the range of 2-6.Additionally, the temperature of passivating solution is in 10-
In the range of 70 DEG C, passivation time is in the range of 2-15s.
Further, in passivating process, the electrical conductivity of the passivating solution after real-time monitoring spray keeps electrical conductivity in certain model
It is higher or lower than such as the scope in enclosing, (passivating solution raw material that will be in head tank imports circulating tank can to change the concentration of passivating solution
Or to water filling in circulating tank), and then control passivating film formation speed, in the case of certain passivation time, and then be used for
Thickness to passivating film is controlled, and improves passivation quality.
Specifically, the electrical conductivity of the passivating solution after passivation conductivity meter real-time detection spray, and the electrical conductivity is conveyed
To central controller, when the electrical conductivity is higher than setting range, central controller control second is passivated switch open and controls first to be passivated simultaneously
Switch is closed, and with to deionized water is added in passivating solution, when the electrical conductivity is less than setting range, central controller control first is passivated
Switch open controls the second passivation switch to close simultaneously, to add passivating solution stoste in passivating solution, is located in the electrical conductivity and set
Determine when in scope, central controller control the first passivation switch and the second passivation switch are turned off.The control of central controller, not only convenient but also standard
Really, the raising of passivation quality is contributed to.
Certainly, in other embodiments, passivation can also use impregnation method or roll coating model, use roll coating model
When, passivating solution can directly be used without dilution, and the roller coat time is less than or equal to 5s, and can be equipped with offline sheet resistance detector is carried out
Offline selective examination detection.Roll coating model is very high for the shape of Al alloy parts, the surface quality of paint roller, installation accuracy requirement, easily
There is holiday, apply irregular situation, and need regular roll change, roll change trouble.Advantage is that to save consumption, equipment size small, but just
Beginning, investment is high, and maintenance requirement is high.Therefore, passivation is preferably by the way of spray and dipping.
Further, the 3rd rinsing equipment 9 is sprinkling equipment, with the first rinsing equipment 5, be will not be repeated here.In step S6
In, being rinsed with deionized water using spray mode, rinsing time ensures the aluminium alloy work after rinsing in the range of 0.5-5s
The passivating solution of noresidue on part.
Further, in the present embodiment, the fuselage of drying plant 10 uses carbon steel sheet plastic-spraying, and drying plant 10 includes infrared
Line heater 15 (such as quartz infrared cooker fluorescent tube) and stirring blower fan 16, stirring blower fan 16 cause the quick of aluminium alloy surrounding air
Flowing, infrared heater 15 is heated to air, and thus the surface to Al alloy parts is dried.
In the step s 7, drying temperature is in the range of 50-150 DEG C, it is preferred to use infrared heater 15 and stirring wind
Machine 16 realizes drying, that is, stir the quick flowing that blower fan 16 causes aluminium alloy surrounding air, and infrared heater 15 enters to air
Row heating, thus the surface to Al alloy parts is dried, and stirring blower fan 16 is centrifugal blower, and power is 370W, and rotating speed is
2800r/min, is 26.7m/s in the wind speed at air outlet 10cm, and frequency setting is peak frequency 50Hz, and blast is
0.96KPa, drying time ensures the surface of the Al alloy parts after drying without washmarking in 5-15s.Meanwhile, it is equipped with offline table
Surface resistance detector carries out offline selective examination detection.
Further, more specifically, the nozzle in alkali cleaning equipment 4, pickler 6 and paralysis facility 8 is fast disassembly type nozzle,
Form fan-spray, maximum rational in infrastructure.Nozzle in three rinsing equipments uses the small nozzles of PVC, forms fan
Shape is sprayed.
More specifically, the bottom land of the spray groove in each sprinkling equipment be it is inclined, can raffinate in emptying groove, it is convenient
Cleaning.
Further, as alkali cleaning equipment 4, the first rinsing equipment 5, pickler 6, the second rinsing equipment 7, paralysis facility 8
Also include temperature sensor, heater (to mark " 14 " to show) and controllable silicon with the sprinkling equipment of the 3rd rinsing equipment 9
Thermoregulating system, temperature sensor and heater are arranged on the bottom of corresponding spray groove, temperature sensor and heater with
Controllable silicon thermoregulating system is connected.The temperature of the controllable treatment fluid of controllable silicon thermoregulating system meets the requirement of respective handling step, example
Such as, in alkali cleaning equipment 4, controllable silicon thermoregulating system controls the constant a certain value in the range of 30-80 DEG C of temperature of alkali wash water;Acid
Wash in equipment 6, controllable silicon thermoregulating system controls the constant a certain value in the range of 30-80 DEG C of temperature of pickle;Passivation sets
In standby 8, controllable silicon thermoregulating system controls the constant a certain value in the range of 10-70 DEG C of temperature of passivating solution.
Further, as alkali cleaning equipment 4, the first rinsing equipment 5, pickler 6, the second rinsing equipment 7, paralysis facility 8
Sprinkling equipment with the 3rd rinsing equipment 9 also includes pressure sensor, pressure regulator valve, PLC control system, pressure sensor and tune
Pressure valve is arranged on the pipeline that corresponding water pump is connected with corresponding shower, PLC control system and pressure sensor and pressure regulation
Valve is connected, and the controllable spray pressure of PLC control system meets the requirement of respective handling step, for example, in alkali cleaning equipment 4, PLC controls
System processed controls the constant a certain value in the range of 2-6bar of spray pressure.In pickler 6, PLC control system control spray
Drench the constant a certain value in the range of 2-6bar of pressure;In paralysis facility 8, PLC control system control spray pressure it is constant
A certain value in the range of 1-5bar.
Wherein it is preferred to, pressure sensor uses PP diaphragms, makes pressure more accurate reliable.
Further, in the present embodiment, set as alkali cleaning equipment 4, the first rinsing equipment 5, the rinsing of pickler 6, second
Standby 7, the sprinkling equipment of the rinsing equipment 9 of paralysis facility 8 and the 3rd also includes flowmeter and frequency converter, and flowmeter connects with frequency converter
Connect, frequency converter is connected with corresponding water pump, flowmeter is arranged on the pipeline that corresponding circulating tank is connected with corresponding shower,
Thus can control the flow for the treatment of fluid (alkali wash water/pickle/passivating solution/deionized water).
Further, in the present embodiment, set as alkali cleaning equipment 4, the first rinsing equipment 5, the rinsing of pickler 6, second
Standby 7, the sprinkling equipment of the rinsing equipment 9 of paralysis facility 8 and the 3rd also includes multiple filtration system, and multiple filtration system can be connected
In any position for the treatment of fluid circulation line, it is used to protect corresponding water pump and corresponding nozzle, prevents from blocking.
Further, in the present embodiment, the fuselage of roll coating apparatus 11 uses high-quality square tube, and cover is stainless steel plate.Roller coat sets
Standby 11 include feeding roller 17, determine deflector roll 20 and in application in the coating roller 18 in the downstream of feeding roller 17, in the downstream of coating roller 18
The support roller 19 of the lower section of roller 18.Wherein, coating roller 18 is rubber roll, preferably ethylene-propylene-diene monomer rubber roll;Feeding roller 17 and determine deflector roll
20 is steel rider.Coating roller 18 is isometrical with support roller 19, and support roller 19 sets up frictional force to Al alloy parts jointly with coating roller 18,
The application of gentle support coating roller 18, can up and down adjust the distance between coating roller 18 and support roller 19, to adapt to different aluminum alloys
The thickness of workpiece.Roll coating apparatus 11 also include motor 21, to provide power, it is preferable that motor 21 is variable-frequency motor.Experimental technique
Also include step S8, i.e., the surface of Al alloy parts after the drying forms lube layer, and Main Function is in Al alloy parts
Its surface is protected in storage and transportation, the mutual gouging abrasion of two neighboring Al alloy parts is prevented, paper is saved and is taken out, reduce behaviour
Workmanship works out, and and coefficient of friction suitable with the performance of punching oil is evenly, so as to improve punching press rate, reduces mould consumption.
Above-mentioned lube layer uses roll coating model, wherein, the raw material for forming lube layer is in fluorated solvent mixing perfluoro polyether oil
The liquid fluorine element lubricant that addition Ultra-low molecular weight polytetrafluoroethylgranule granule is formed, lube layer is used without surface contamination problem
Weakly alkaline solution can just be cleaned to surface.
Further, above-mentioned experimental technique is particularly suited for aluminium alloy plate, and the size requirement of aluminium alloy plate is:Width is less than
Equal to 300mm, length is less than or equal to 300mm, and thickness is in the range of 0.3-20mm.
Further, in the present embodiment, pipeline 2 is rollgang, and actuator 3 is motor 21, preferably band encoder
Variable-frequency motor.Rollgang is using transmission motor, bevel gear transmission, it is ensured that intensity, wear-resisting, corrosion-resistant and transmission uniformity.
Pipeline 2 can be continuous, or be spaced apart, i.e., one or adjacent multiple equipment correspond to an independent conveying roller
Road, sets an actuator 3 corresponding to each rollgang certainly.
Further, in the present embodiment, emergency stop switch is respectively arranged with the front-end and back-end of pipeline 2, so as to tight
Under anxious state, all fronts fast braking.
Further, in the present embodiment, experimental provision also includes electrical system 1, to each the electric device in experimental provision
Part provides remote control, for example, electrical system 1 is connected with the communication of motor 21, to control the transporting velocity of Al alloy parts.By
This, whole experimental provision can fully automatically carry out multi-functional process of surface treatment, possess flexible operating process and wide in range
Process conditions.
It is as follows, the one group of experiment done using above-mentioned experimental technique is discussed in detail:
S0, using 1 remote control actuator of electrical system 3 drive pipeline 2 conveying Al alloy parts;
S1, Al alloy parts are reached at alkali cleaning equipment 4, and alkali cleaning water pump 13 persistently drives alkali wash water to be sprayed from alkali cleaning nozzle 12
Go out, the pH value of alkali wash water is 10, the temperature of controllable silicon thermoregulating system control alkali wash water is constant in 60 DEG C, PLC control system control
Spray pressure is 2.5bar, and the electrical conductivity of the alkali wash water of alkali cleaning conductivity meter real-time detection spray trench bottom simultaneously passes through central controller control
Make the first alkali cleaning switch and be maintained at electrical conductivity in setting range by the second alkali cleaning switch, the control Al alloy parts of pipeline 2
Time in alkali cleaning equipment 4 is 6s;
After S2, alkali cleaning, Al alloy parts are reached at the first rinsing equipment 5, and water pump persistently drives deionized water to be sprayed from nozzle
Go out, it is 3s that pipeline 2 controls time of the Al alloy parts in the first rinsing equipment 5;
After S3, rinsing, Al alloy parts are reached at pickler 6, and pickling water pump 25 persistently drives pickle to be sprayed from pickling
Mouth 24 sprays, and the pH value of pickle is 2, and the temperature of controllable silicon thermoregulating system control pickle is constant in 65 DEG C, PLC control system
Spray pressure is controlled for 2.5bar, online fluorine ion instrument is detected and controls the first pickling to switch by central controller and opened with the second pickling
Close and control fluorinion concentration, be controlled to 0.1g/m from and then by etch amount2, pipeline 2 control Al alloy parts set in pickling
Time in standby 6 is 4s;
After S4, pickling, Al alloy parts are reached at the second rinsing equipment 7, and water pump persistently drives deionized water to be sprayed from nozzle
Go out, it is 5s that pipeline 2 controls time of the Al alloy parts in the second rinsing equipment 7;
After S5, rinsing, Al alloy parts are reached at paralysis facility 8, and passivation water pump 27 persistently drives passivating solution to be sprayed from nozzle
Go out, the pH value of passivating solution is 4, the temperature of controllable silicon thermoregulating system control passivating solution is constant in 35 DEG C, PLC control system control spray
Pouring pressure is 1.5bar, is detected by conductivity meter and controls the first passivation switch and the second passivation switch to control by central controller
The thickness of passivating film processed, it is 5mg/m to control the Ti contents in passivating film2, offline sheet resistance detector enter detection, control resistance
It is 20 μ Ω, it is 6s that pipeline 2 controls time of the Al alloy parts in paralysis facility 8;
After S6, passivation, Al alloy parts are reached at the 3rd rinsing equipment 9, and water pump persistently drives deionized water to be sprayed from nozzle
Go out, it is 2.5s that pipeline 2 controls time of the Al alloy parts in the 3rd rinsing equipment 9;
After S7, rinsing, Al alloy parts are reached at drying plant 10, and pipeline 2 controls Al alloy parts in drying plant
Time in 10 is 9s;
S8, after drying, Al alloy parts reach roll coating apparatus 11, and lube layer is formed on the surface of Al alloy parts.
In order to study the effect of above-mentioned experimental procedure surface treatment, experiment for the first time is only completed step S1-S7, is performing step
After rapid S7, Al alloy parts are taken down from pipeline 2 and is observed, after step S1-S7 is surface-treated, Al alloy parts
Surface passivated membrane pattern microscopic structure is as shown in Figure 4;Al alloy parts are hung over into interior, after 100 days, passivating film is without substantially change
Color;To be passivated aluminium alloy using the method for electrochemistry carries out corrosion-resistant test, the corrosion current on Al alloy parts surface before passivation
Density is 4.28 μ Acm-2, the corrosion electric current density on Al alloy parts surface is 0.49 μ Acm after Passivation Treatment-2, corrosion resistance obtains
Significantly to improve, the raising of corrosion resistance mainly has benefited from the thoroughly cleaning of alkali cleaning in order and pickling.
Second experiment completes Overall Steps and successively carries out twice, obtaining two aluminium alloys processed through step S1-S8
Workpiece, the experiment condition of step S1-S7 and test for the first time it is identical, after step S8 is performed, by Al alloy parts from defeated
Taken down in line sending 2, it is to be coated dry after, its adhesive force is tested.Test of polishing is carried out to first Al alloy parts, is adopted
With rubber with 1s be one circulation, wipe 15 times, the passivating film of Al alloy parts does not expose;Second Al alloy parts is glued
Oil test, after gummed paper is pressed against into Al alloy parts surface 150s, tears rapidly, is come off without oil reservoir;Two Al alloy parts
Hardenability value is all higher than 0.2, and plastic strain ratio is all higher than 0.7.
To sum up, by the step S1-S7 in above-mentioned experimental technique, alkali cleaning, pickling, the chemical conversion of aluminium alloy plate are capable of achieving
Treatment, alkali cleaning, pickling, passivation, the processing sequence of drying can not be converted, and the main above-mentioned reality being made up of the processing sequence
Proved recipe method has the following advantages that:The effect of pickling is after first alkali cleaning, first by the greasy dirt on Al alloy parts surface and is consolidated by alkali cleaning
Body particle is removed, alloying element and residual oxide layer insoluble on mordant removal Al alloy parts when facilitating pickling, to fill
Point ground exposes aluminium alloy and it be passivated in subsequent step and forms passivating film, and alkali cleaning is unable to reach this effect after elder generation's pickling;
One layer of passivating film is formed on Al alloy parts surface, workpiece surface not oxidized corrosion in transport and storing process is protected;Energy
Aluminium alloy plate sheet resistance is significantly reduced, beneficial to downstream welding assembly;Increase conversion film and aluminium alloy plate surface matrix caking property,
Increase the adhesive force to lube layer, be conducive to bonding and japanning of the workpiece during subsequent production;Improve punching performance, carry
Punching press rate high, reduces mould consumption.
Also, alkali cleaning spray pressure, alkali wash water composition and content, alkali wash water pH value, alkali cleaning liquid temperature in the experimental technique
Rinsing time, pickling spray pressure, pickle composition and content, pickle pH value, pickling liquid temperature after degree, alkali cleaning time, alkali cleaning
Rinsing time, passivation spray pressure, passivating solution composition and content, passivating solution pH value, passivation liquid temperature after degree, pickling time, pickling
The technological parameter such as rinsing time, drying temperature, drying time, parameter of drying blower fan can root after degree, passivation time, passivation
Do corresponding adjustment according to experiment purpose, for example, for a kind of specific Al alloy parts by adjust above-mentioned each technological parameter come
A set of suitable, preferable processing parameter is obtained, and then has very strong directive significance to actual production.Preferably in above-mentioned reality
Apply selection technological parameter in each number range listed in example.
Additionally, the experimental technique may be directly applied to production line, for example, it is applied to actual aluminium alloy automobile plate surface treatment
Production line, thus, conversely, the experimental technique can fit, actual production line is simulated experiment.
Above content is only presently preferred embodiments of the present invention, for one of ordinary skill in the art, according to of the invention
Thought, will change in specific embodiments and applications, and this specification content should not be construed as to the present invention
Limitation.
Claims (10)
1. a kind of Al alloy parts are surface-treated experimental technique, it is characterised in that the experimental provision that the experimental technique is used includes
Alkali cleaning equipment (4), the first rinsing equipment (5), pickler (6), the second rinsing equipment (7), paralysis facility (8), the 3rd rinsing
Equipment (9), drying plant (10), pipeline (2) and actuator (3), wherein, the pipeline (2) sequentially passes through the alkali
Wash equipment (4), first rinsing equipment (5), the pickler (6), second rinsing equipment (7), it is described passivation set
Standby (8), the 3rd rinsing equipment (9) and the drying plant (10);
The actuator (3) drives the pipeline (2) to drive Al alloy parts to travel forward, and to the Al alloy parts according to
It is secondary to be handled as follows step:
S1, the alkali cleaning equipment (4) carry out alkali cleaning to Al alloy parts;
S2, first rinsing equipment (5) are rinsed to the Al alloy parts after alkali cleaning;
Al alloy parts after S3, the pickler (6) are rinsed to alkali cleaning carry out pickling;
S4, second rinsing equipment (7) are rinsed to the Al alloy parts after pickling;
S5, the paralysis facility (8) are passivated to the Al alloy parts after pickling-rinsing;
S6, the 3rd rinsing equipment (9) rinse to the Al alloy parts after passivation;
S7, the drying plant (10) are dried to the Al alloy parts after passivation rinsing.
2. Al alloy parts according to claim 1 are surface-treated experimental technique, it is characterised in that
The experimental provision also includes central controller;
The alkali cleaning equipment (4) includes alkali cleaning spray groove, alkali cleaning shower, alkali cleaning nozzle, alkali cleaning circulating tank, alkali cleaning water pump, alkali
Head tank and alkali cleaning deionization water pot are washed, the alkali cleaning shower is fixed on the alkali cleaning spray groove, the alkali cleaning nozzle is consolidated
It is scheduled on the alkali cleaning shower and is connected with the alkali cleaning shower, bottom and the alkali cleaning of the alkali cleaning spray groove is circulated
The entrance connection of tank, the outlet that the entrance of the alkali cleaning shower passes through the alkali cleaning water pump and the alkali cleaning circulating tank,
The alkali cleaning circulating tank is with the alkali cleaning head tank and the alkali cleaning deionization water pot respectively by the first alkali cleaning switch and second
Alkali cleaning switchs selectable connection, and alkali cleaning conductivity meter, the alkali cleaning electrical conductivity are provided with the bottom of the alkali cleaning spray groove
Instrument is connected with central controller communication, and the central controller is switched with first alkali cleaning and second alkali cleaning switch communication connects
Connect;
In step sl, alkali cleaning is carried out by the way of alkali wash water is sprayed, in alkaline cleaning procedure, the alkali cleaning conductivity meter is examined in real time
The electrical conductivity of the alkali wash water surveyed after spray, and the electrical conductivity is delivered to the central controller, it is higher than setting range in the electrical conductivity
When, the central controller controls the second alkali cleaning switch open to control the first alkali cleaning switch to close simultaneously, in the electrical conductivity less than setting
During scope, the central controller controls the first alkali cleaning switch open to control the second alkali cleaning switch to close simultaneously, is located in the electrical conductivity
When in setting range, the central controller controls the first alkali cleaning switch and the second alkali cleaning switch to be turned off.
3. Al alloy parts according to claim 2 are surface-treated experimental technique, it is characterised in that
The pickler (6) includes pickling spray groove, pickling shower, pickling nozzle, pickling circulating tank, pickling water pump, acid
Head tank and pickling deionization water pot are washed, the pickling shower is fixed on the pickling spray groove, the pickling nozzle is consolidated
It is scheduled on the pickling shower and is connected with the pickling shower, bottom and the pickling of the pickling spray groove is circulated
The entrance connection of tank, the outlet that the entrance of the pickling shower passes through the pickling water pump and the pickling circulating tank,
The pickling circulating tank is with the pickling head tank and the pickling deionization water pot respectively by the first pickling switch and second
Pickling switchs selectable connection, and online fluorine ion instrument, the online fluorine ion are provided with the bottom of the pickling spray groove
Instrument is connected with central controller communication, and the central controller is switched with first pickling and second pickling switch communication connects
Connect;
In step s3, pickling is carried out by the way of spray acid washing lotion, in acid cleaning process, the online fluorine ion instrument is real-time
The fluorinion concentration of the pickle after detection spray, and the fluorinion concentration is delivered to the central controller, it is dense in the fluorine ion
When degree is higher than setting range, the central controller controls the first pickling switch open to control the second pickling switch to close simultaneously, in fluorine
When ion concentration is less than setting range, the central controller controls the second pickling switch open to control the first pickling switch to close simultaneously
Close, when fluorinion concentration is located in setting range, the central controller controls the first pickling switch and the second pickling switch to close
Close.
4. Al alloy parts according to claim 3 are surface-treated experimental technique, it is characterised in that
The paralysis facility (8) includes passivation spray groove, passivation shower, passivation nozzle, passivation cycle tank, passivation water pump, blunt
Change head tank and passivation deionization water pot, the passivation shower is fixed on the passivation spray groove, and the passivation nozzle is consolidated
Be scheduled on it is described passivation shower on and with it is described passivation shower connect, it is described be passivated spray groove bottom and the passivation cycle
The entrance connection of tank, the entrance of the passivation shower by the outlet for being passivated water pump and the passivation cycle tank,
The passivation cycle tank is with the passivation head tank and the passivation deionization water pot respectively by the first passivation switch and second
The selectable connection of passivation switch, passivation conductivity meter, the passivation electrical conductivity are provided with the bottom of the passivation spray groove
Instrument is connected with central controller communication, and the central controller connects with the described first passivation switch and the second passivation switch communication
Connect;
In step s 5, it is passivated by the way of passivating solution is sprayed, in passivating process, the passivation conductivity meter is examined in real time
The electrical conductivity of the passivating solution surveyed after spray, and the electrical conductivity is delivered to the central controller, it is higher than setting range in the electrical conductivity
When, the central controller control second is passivated switch open and controls the first passivation switch to close simultaneously, in the electrical conductivity less than setting
During scope, the central controller control first is passivated switch open and controls the second passivation switch to close simultaneously, is located in the electrical conductivity
When in setting range, central controller control the first passivation switch and the second passivation switch are turned off.
5. Al alloy parts according to claim 4 are surface-treated experimental technique, it is characterised in that
Raw material of the alkali wash water comprising following weight parts:20 parts of potassium hydroxide, 25 parts of sodium tripolyphosphates, 10 parts of silicic acid anhydrides
Sodium, 5 parts of natrium carbonicum calcinatums, 5 parts of triethanolamines, 2 parts of neopelexes;
Raw material of the pickle comprising following weight parts:30 parts of sulfuric acid, 45 parts of nitric acid, 10 parts of ammonium acid fluorides, 1 part of alkyl phenol gather
Oxygen vinethene, 1 portion of carboxycellulose salt.
6. Al alloy parts according to claim 4 are surface-treated experimental technique, it is characterised in that
In the alkali cleaning equipment (4), equidistant 6-8 roots alkali cleaning spray is respectively set above and below the pipeline (2)
Pipe, the alkali cleaning nozzle of top alkali cleaning shower is fixed downward, and the alkali cleaning nozzle of lower section alkali cleaning shower is fixed upward,
The distance of adjacent two alkali cleaning showers is 2-3cm, the alkali cleaning nozzle spaced set on every alkali cleaning shower, alkali cleaning nozzle
Outlet a diameter of 0.5-0.6cm, the distance between two neighboring alkali cleaning nozzle is 2-3cm, and alkali cleaning nozzle is exported to institute
The distance for stating pipeline (2) is located at 30-45cm;
In the pickler (6), equidistant 4-6 roots pickling spray is respectively set above and below the pipeline (2)
Pipe, the pickling nozzle of top pickling shower is fixed downward, and the pickling nozzle of lower section pickling shower is fixed upward,
The distance of adjacent two pickling showers is 3-4cm, the pickling nozzle spaced set on every pickling shower, pickling nozzle
Outlet a diameter of 0.6-0.7cm, the distance between two neighboring pickling nozzle is 3-4cm, and pickling nozzle is exported to institute
The distance for stating pipeline (2) is located at 30-45cm.
7. Al alloy parts according to claim 4 are surface-treated experimental technique, it is characterised in that
The alkali cleaning equipment (4), the pickler (6) and the paralysis facility (8) also include temperature sensor, heating dress
(14) and controllable silicon thermoregulating system are put, the temperature sensor and the heater (14) are arranged on the bottom of corresponding spray groove
Portion, the temperature sensor and the heater (14) are connected with the controllable silicon thermoregulating system.
8. Al alloy parts according to claim 4 are surface-treated experimental technique, it is characterised in that
The alkali cleaning equipment (4), the pickler (6) and the paralysis facility (8) also include pressure sensor, pressure regulation
Valve, PLC control system, the pressure sensor and the pressure regulator valve are arranged on what corresponding water pump and corresponding shower were connected
On pipeline, the PLC control system is connected with the pressure sensor and the pressure regulator valve;
The alkali cleaning equipment (4), the pickler (6) and the paralysis facility (8) also include flowmeter and frequency converter, institute
State alkali cleaning water pump, the pickling water pump, the passivation water pump and be variable frequency pump, the flowmeter is connected with the frequency converter,
The frequency converter is connected with corresponding water pump, and the flowmeter is arranged on the pipe that corresponding circulating tank is connected with corresponding shower
Lu Shang.
9. Al alloy parts according to claim 4 are surface-treated experimental technique, it is characterised in that
The experimental provision also includes roll coating apparatus (11), and the roll coating apparatus (11) are under the drying plant (10)
Trip, the pipeline (2) through the roll coating apparatus (11), wherein, the roll coating apparatus (11) including feeding roller (17), be located at
The coating roller (18) in feeding roller (17) downstream, determine deflector roll (20) and positioned at institute positioned at the coating roller (18) downstream
State the support roller (19) below coating roller (18);
Following steps are performed after step S7:
S8, the surface of the roll coating apparatus (11) Al alloy parts after the drying form lube layer.
10. experimental provision according to claim 4, it is characterised in that
The pH value of the alkali wash water in the range of 8-12, temperature in the range of 30-80 DEG C, model of the alkali cleaning time in 2-10s
In enclosing, spray pressure is in the range of 2-6bar;
The pH value of the pickle in the range of 1-5, temperature in the range of 30-80 DEG C, scope of the pickling time in 1-7s
Interior, spray pressure is in the range of 2-6bar;
The pH value of the passivating solution in the range of 2-6, temperature in the range of 10-70 DEG C, scope of the passivation time in 2-15s
It is interior.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710176737.2A CN106868525B (en) | 2017-03-23 | 2017-03-23 | Al alloy parts are surface-treated experimental method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710176737.2A CN106868525B (en) | 2017-03-23 | 2017-03-23 | Al alloy parts are surface-treated experimental method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106868525A true CN106868525A (en) | 2017-06-20 |
CN106868525B CN106868525B (en) | 2019-04-30 |
Family
ID=59173413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710176737.2A Active CN106868525B (en) | 2017-03-23 | 2017-03-23 | Al alloy parts are surface-treated experimental method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106868525B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004530A (en) * | 2017-08-03 | 2018-05-08 | 合肥市华林模具有限公司 | A kind of chemical-treating facility of inner flow passage alloy product |
CN108941109A (en) * | 2018-07-03 | 2018-12-07 | 佛山市瑞丰恒业机械有限公司 | Pop can tank washing equipment |
CN109338379A (en) * | 2018-10-23 | 2019-02-15 | 聪恳环保科技(上海)有限公司 | A kind of metal product deoils derusting process |
CN109576721A (en) * | 2018-12-24 | 2019-04-05 | 陆其华 | The surface treatment method of die casting aluminium degreaser and preparation method thereof, die casting aluminium |
CN110560809A (en) * | 2019-08-28 | 2019-12-13 | 扬州领先发电设备有限公司 | Preparation method of rotor winding tool |
CN112481630A (en) * | 2020-11-12 | 2021-03-12 | 航天科工哈尔滨风华有限公司 | Automatic alkaline washing cleaning device and method |
WO2021103509A1 (en) * | 2020-06-18 | 2021-06-03 | 江苏徐工工程机械研究院有限公司 | Workpiece cleaning apparatus and cleaning method |
CN113201741A (en) * | 2021-05-06 | 2021-08-03 | 东风汽车车轮随州有限公司 | Bright aluminum alloy wheel acid pickling mixed flow production process |
CN114481111A (en) * | 2022-01-18 | 2022-05-13 | 深圳市飞航精工科技有限公司 | Rainbow color conductive oxidation method and oxidation liquid |
CN114737195A (en) * | 2022-04-19 | 2022-07-12 | 青岛云路先进材料技术股份有限公司 | Amorphous alloy strip surface cleaning method and amorphous alloy strip |
CN115476027A (en) * | 2022-09-15 | 2022-12-16 | 西安建筑科技大学 | Method for welding bar material and intermediate rod for rotating electrode through resistance butt welding |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201586619U (en) * | 2009-12-01 | 2010-09-22 | 广州擎天实业有限公司 | Treatment steam/waste liquid recovery device before coating |
CN102658690A (en) * | 2012-05-04 | 2012-09-12 | 东莞市华轩幕墙材料有限公司 | Self-cleaning aluminum veneer and preparation process |
CN103447220A (en) * | 2013-08-13 | 2013-12-18 | 河南辉龙铝业股份有限公司 | Aluminum profile spraying process |
US20150211129A1 (en) * | 2012-08-08 | 2015-07-30 | Premium Aerotech Gmbh | Surface Treatment Process for Components Composed of Aluminium Having Detection of Impermissible Overheating |
CN105803442A (en) * | 2016-05-25 | 2016-07-27 | 博罗县东明化工有限公司 | Zr-Ti passive film treating agent for aluminum or aluminum alloy and treating method thereof |
-
2017
- 2017-03-23 CN CN201710176737.2A patent/CN106868525B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201586619U (en) * | 2009-12-01 | 2010-09-22 | 广州擎天实业有限公司 | Treatment steam/waste liquid recovery device before coating |
CN102658690A (en) * | 2012-05-04 | 2012-09-12 | 东莞市华轩幕墙材料有限公司 | Self-cleaning aluminum veneer and preparation process |
US20150211129A1 (en) * | 2012-08-08 | 2015-07-30 | Premium Aerotech Gmbh | Surface Treatment Process for Components Composed of Aluminium Having Detection of Impermissible Overheating |
CN103447220A (en) * | 2013-08-13 | 2013-12-18 | 河南辉龙铝业股份有限公司 | Aluminum profile spraying process |
CN105803442A (en) * | 2016-05-25 | 2016-07-27 | 博罗县东明化工有限公司 | Zr-Ti passive film treating agent for aluminum or aluminum alloy and treating method thereof |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004530A (en) * | 2017-08-03 | 2018-05-08 | 合肥市华林模具有限公司 | A kind of chemical-treating facility of inner flow passage alloy product |
CN108941109A (en) * | 2018-07-03 | 2018-12-07 | 佛山市瑞丰恒业机械有限公司 | Pop can tank washing equipment |
CN109338379A (en) * | 2018-10-23 | 2019-02-15 | 聪恳环保科技(上海)有限公司 | A kind of metal product deoils derusting process |
CN109576721A (en) * | 2018-12-24 | 2019-04-05 | 陆其华 | The surface treatment method of die casting aluminium degreaser and preparation method thereof, die casting aluminium |
CN110560809A (en) * | 2019-08-28 | 2019-12-13 | 扬州领先发电设备有限公司 | Preparation method of rotor winding tool |
WO2021103509A1 (en) * | 2020-06-18 | 2021-06-03 | 江苏徐工工程机械研究院有限公司 | Workpiece cleaning apparatus and cleaning method |
CN112481630A (en) * | 2020-11-12 | 2021-03-12 | 航天科工哈尔滨风华有限公司 | Automatic alkaline washing cleaning device and method |
CN112481630B (en) * | 2020-11-12 | 2023-05-23 | 航天科工哈尔滨风华有限公司 | Automatic alkaline washing and cleaning device and method |
CN113201741A (en) * | 2021-05-06 | 2021-08-03 | 东风汽车车轮随州有限公司 | Bright aluminum alloy wheel acid pickling mixed flow production process |
CN113201741B (en) * | 2021-05-06 | 2022-11-15 | 东风汽车车轮随州有限公司 | Bright aluminum alloy wheel acid pickling mixed flow production process |
CN114481111A (en) * | 2022-01-18 | 2022-05-13 | 深圳市飞航精工科技有限公司 | Rainbow color conductive oxidation method and oxidation liquid |
CN114481111B (en) * | 2022-01-18 | 2023-09-29 | 深圳市飞航精工科技有限公司 | Iridescent conductive oxidation method and oxidation liquid |
CN114737195A (en) * | 2022-04-19 | 2022-07-12 | 青岛云路先进材料技术股份有限公司 | Amorphous alloy strip surface cleaning method and amorphous alloy strip |
CN115476027A (en) * | 2022-09-15 | 2022-12-16 | 西安建筑科技大学 | Method for welding bar material and intermediate rod for rotating electrode through resistance butt welding |
CN115476027B (en) * | 2022-09-15 | 2024-06-04 | 西安建筑科技大学 | Method for welding bar stock and intermediate rod for rotary electrode through resistance butt welding |
Also Published As
Publication number | Publication date |
---|---|
CN106868525B (en) | 2019-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106868525B (en) | Al alloy parts are surface-treated experimental method | |
CN103952732B (en) | Metal super-hydrophobic surface and preparation method thereof | |
CN101665934B (en) | Film treating agent for treatment before electro-coating of die-cast aluminum alloy workpiece and preparation method thereof | |
CN102114460A (en) | Pretreatment process for coating | |
CN103088393A (en) | Surface treatment method of automobile covering parts | |
CN107825264A (en) | A kind of handling process and equipment of the wire rod after drawing soft annealing | |
CN100335682C (en) | Method and apparatus for rapid preparation of anodic oxidation film on aluminium alloy products | |
CN109778166A (en) | The phosphorization treatment process of phosphating solution, the preparation method of phosphating solution and metal wire rod | |
CN107475704B (en) | Metal surface silane treatment agent and preparation method thereof | |
CN109706464A (en) | A kind of neutrality rust remover and preparation method thereof | |
CN101671827A (en) | Normal temperature leather diaphragm passivating agent before spraying and coating steel workpiece and preparation method thereof | |
CN103102724B (en) | A kind of containing acrylic acid Metal surface silane treatment agent and preparation method thereof | |
CN103397320B (en) | Cathodic electrophoresis pre-treatment liquor used on surface of hot-galvanized plate of automobile | |
CN200996050Y (en) | Aluminum-material surface treatment continuous processor with chemical polishing sequence | |
CN106435535A (en) | Online repairing platform for high temperature plating solution coating type chemical plating | |
CN107779932B (en) | A kind of automobile processing mold electrophoresis process for protecting | |
CN102993870A (en) | Modified silanized metal surface pre-treating agent containing polyoxyethylene oleate and preparation method thereof | |
CN101665935B (en) | Normal-temperature film passivating agent for processing before electro-coating of iron and steel workpiece and preparation method thereof | |
CN109628970A (en) | A kind of zinc-plated processing technique of fastener | |
CN209238352U (en) | A kind of electrostatic spraying pick pretreating device | |
CN102978597A (en) | Spraying type comprehensive phosphate treating agent for cold-rolled sheet workpiece spraying coating and preparation method of spraying type comprehensive phosphate treating agent | |
CN208104542U (en) | A kind of phosphating pond phosphoric acid automatic adding device | |
CN103014687B (en) | Glycerol trilaurate-containing modified silanization metal surface pretreatment agent and preparation method thereof | |
CN106833370A (en) | A kind of zinc-aluminum paint and its preparation method and application | |
CN104070690A (en) | Treating process and device of hydrofluoric acid corrosion resistant aluminum-plastic composite film |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |