CN1068616A - The anti-leakage method of pressure diversion tunnel man-made fracture control - Google Patents

The anti-leakage method of pressure diversion tunnel man-made fracture control Download PDF

Info

Publication number
CN1068616A
CN1068616A CN91104829A CN91104829A CN1068616A CN 1068616 A CN1068616 A CN 1068616A CN 91104829 A CN91104829 A CN 91104829A CN 91104829 A CN91104829 A CN 91104829A CN 1068616 A CN1068616 A CN 1068616A
Authority
CN
China
Prior art keywords
leakage
concrete
reinforced concrete
lining
pressure diversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN91104829A
Other languages
Chinese (zh)
Other versions
CN1027600C (en
Inventor
朱暾
邢贵碧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN WATER CONSERVANCY AND ELECTRIC POWER COLLEGE
Original Assignee
WUHAN WATER CONSERVANCY AND ELECTRIC POWER COLLEGE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN WATER CONSERVANCY AND ELECTRIC POWER COLLEGE filed Critical WUHAN WATER CONSERVANCY AND ELECTRIC POWER COLLEGE
Priority to CN91104829A priority Critical patent/CN1027600C/en
Publication of CN1068616A publication Critical patent/CN1068616A/en
Application granted granted Critical
Publication of CN1027600C publication Critical patent/CN1027600C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

This method utilization steel concrete redistribution of internal force theory, employing is provided with several man-made fractures and hoop steel bar stress and is configured in two measures such as the lining cutting outside in the reinforced concrete lining layer precalculated position, the people is for causing the lining cutting redistribution of internal force, make that lining cutting becomes the large eccentric tension state by the small eccentricity tension state on the reinforced concrete, and in the inboard three dimension stress district that can not ftracture that forms of reinforced concrete lining layer, this three dimension stress district circularizes water-stopping system with embedding waterstop mutual group in advance, thereby satisfies the requirement of pressure diversion tunnel anti-leakage.This method combines application with prestressed reinforced concrete anti-leakage method, and effect is better.

Description

The anti-leakage method of pressure diversion tunnel man-made fracture control
The invention belongs to technical field of civil engineering, the anti-leakage method of particularly a kind of garden shape steel concrete pressure diversion tunnel.
The water-power plant pressure diversion tunnel has strict anti-leakage requirement, and traditional anti-leakage measure has following four types:
A) steel concrete is by the cracking computation anti-leakage;
B) adopt the prestressed reinforced concrete anti-leakage;
C) steel concrete lining steel plate anti-leakage;
D) the steel concrete inner surface is brushed with machine coating anti-leakage.
Above anti-leakage method can reduce two classes: a class (as A and B) is to manage to guarantee that reinforced concrete lining layer does not ftracture, thereby reaches the purpose of anti-leakage; Another kind of (as C and D) allows the steel concrete cracking and through crack occurs, controlling under the crack width prerequisite with steel plate or organic coating anti-leakage.Above method is anti-leakage effectively, but they or invest higher (as A and D), or construction complicated (as B), or maintenance difficulty (as C and D) exist some defective and deficiency.
The objective of the invention is to overcome the deficiency of conventional method, use simple manual presetting method for controlling crack and a kind of effectively anti-leakage of developing, can save construction investment again, shorten the pressure diversion tunnel anti-leakage method of construction period.
Concrete measure of the present invention is:
1) in steel concrete pressure tunnel precalculated position some man-made fractures is set, the position of man-made fracture preferentially is chosen in the less position of positive bending moment, but disposed at equal distance, also disposed at equal distance not, its penetration of fracture can be paid the utmost attention to and be 1/2 to 2/3 of reinforced concrete lining layer thickness, establish copper sheet or Rubber water stop band in the crack with effective sealing, man-made fracture should be able to effectively be born pressure and shearing, can pay the utmost attention to for this reason toothing is done in the crack, be provided with thick 3~5 millimeters between the crack, the steel plate of two oilings or pitch, steel plate is imbedded as dividing plate when concreting.
2) the hoop steel bar stress in the reinforced concrete lining layer is arranged in the lining cutting outside, its layout thickness can be considered in 1/2~1/3 lining thickness scope, divide one or more layers to arrange, its number of steel bars can be determined with the strength calculation formula that the water conservancy project Design Code of Reinforced Concrete provides according to the internal force size at man-made fracture place.
More than two measures to make the pressure tunnel reinforced concrete lining layer be that main load action issues the redistribution of internal force that the stranger is in internal water pressure, reinforced concrete lining layer section between any two man-made fractures is in large eccentric tension stress state, outside concrete in tension, form the normal crack district, its number of steel bars, crack width can be determined with water conservancy project Design Code of Reinforced Concrete given draw greatly partially component strength design formulas and the calculating of crack width calculation formula, and can make control of crack width in allowed band.
Analyze on the steel concrete large eccentric tension member section stress distribution also as can be known, the inboard concrete of reinforced concrete lining layer bears compressive stress, is in the three dimension stress state and can not ftractures.Reliable impervious drop ply and the antipriming between man-made fracture that this position concrete forms constitute an effective annular water-stopping system, thereby satisfy instructions for use.In order to prevent thermal cracking and shrinkage crack, the place is provided with the distributing bar net at pressure tunnel steel concrete inwall, guarantees the service behaviour of impervious drop ply, bears other loads simultaneously and forms the tensile stress that may produce at this position down.
Pressure diversion tunnel tradition anti-leakage method is it not to be ftractureed or the concrete that ftractures is crammed the purpose that the crack reaches anti-leakage by control reinforced concrete soil stress, shows as the anti-leakage of passive protection formula.The present invention reaches the anti-leakage purpose by the people for engineering measure changes stress state, shows as the initiatively anti-leakage of attack formula, thereby has opened up a kind of new anti-leakage approach.
The present invention also can combine application with the impervious method of prestressed reinforced concrete, be that the prestressed reinforced concrete anti-leakage is adopted in second garden, method anti-leakage of the present invention is adopted in first garden, build second garden concrete during concrete enforcement earlier, and second garden concrete applied prestressing force with post stretching, the location arrangements of prestressed reinforcement promptly is positioned at three branch places, cross section from the thick place of lining cutting inwall 1/3 lining cutting.Making lining cutting outside concrete answer pressure in advance is zero, thereby avoided country rock and concrete co-operation to applying prestressed influence, lining cutting is stressed clear and definite, it is obvious to apply prestressed effect, half garden stretching construction difficulty is little simultaneously, loss of prestress is less, has solved Quan Yuanzhou and has applied a prestressed technology difficult problem.After second garden construction finishes, build first garden concrete again, at this moment can the part of impervious drop ply is prefabricated, use as internal mold lifting splicing back, then can also further increase wage.
Adopt anti-leakage of the present invention, construction investment is suitable with the prestressed reinforced concrete anti-leakage, and job practices and programming are suitable with steel plate anti-leakage and coating anti-leakage again, and its economic benefit is conspicuous.Be not only applicable to hydropower station pressure tunnel anti-leakage, be applicable to the anti-leakage of other garden shape structure simultaneously yet.
Accompanying drawing one is a structure principle chart of the present invention.Wherein 1 is man-made fracture, and 2 is the hoop steel bar stress, and 3 is copper sheet or Rubber water stop band, and 4 is the normal crack district, and 5 is impervious drop ply, and 6 is prestressed concrete, and 7 is prestressed reinforcement, and 8 is the distributing bar net, and 9 is the steel concrete internal mold.

Claims (3)

1, a kind of anti-leakage method of pressure diversion tunnel is characterized in that being provided with in steel concrete pressure tunnel precalculated position some the man-made fractures with copper sheet or Rubber water stop band; And with the hoop steel bar stress layered arrangement in the reinforced concrete lining layer in the lining cutting outside.
2, the anti-leakage method of pressure diversion tunnel as claimed in claim 1, it is characterized in that, the position of described man-made fracture can preferentially be chosen in the less position of positive bending moment, its penetration of fracture is 1/2 to 2/3 of a reinforced concrete lining layer thickness, the crack is a zigzag, and the thickness of imbedding as dividing plate when being provided with at concreting between the crack is the steel plate of 3~5 millimeters, two oilings or pitch.
3, as the anti-leakage method of claim 1,2 described pressure diversion tunnels, it is characterized in that: second garden prestressed concrete of building described pressure diversion tunnel earlier, and second garden concrete applied prestressing force with post stretching, the position of prestressed reinforcement can preferentially be arranged in from lining cutting inwall 1/3 lining thickness place.
CN91104829A 1991-07-16 1991-07-16 Anti percolation method for water guiding tunnel by fracture control Expired - Fee Related CN1027600C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN91104829A CN1027600C (en) 1991-07-16 1991-07-16 Anti percolation method for water guiding tunnel by fracture control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN91104829A CN1027600C (en) 1991-07-16 1991-07-16 Anti percolation method for water guiding tunnel by fracture control

Publications (2)

Publication Number Publication Date
CN1068616A true CN1068616A (en) 1993-02-03
CN1027600C CN1027600C (en) 1995-02-08

Family

ID=4906844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN91104829A Expired - Fee Related CN1027600C (en) 1991-07-16 1991-07-16 Anti percolation method for water guiding tunnel by fracture control

Country Status (1)

Country Link
CN (1) CN1027600C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322149A (en) * 2011-06-27 2012-01-18 中国建筑第二工程局有限公司 Full-section overall casting construction method for circulating water pipe ditch of nuclear power plant
CN102535404A (en) * 2012-01-11 2012-07-04 中国建筑第二工程局有限公司 Construction device and construction method for steep segment of circulating pipe ditch
CN102619201A (en) * 2012-04-24 2012-08-01 四川大学 Method for distributing bars in water diversion tunnel
CN102622493A (en) * 2012-03-31 2012-08-01 广东省电力设计研究院 Method and device for determining maximum crack widths of ring-shaped members of round coal bunker
WO2012155727A1 (en) * 2011-05-16 2012-11-22 长江勘测规划设计研究有限责任公司 Water conveyance tunnel with prestressed composite lining for shield tunnel
CN103046935A (en) * 2012-12-31 2013-04-17 西南交通大学 Construction method of annually-perforated long-span mass concrete tunnel lining structure
CN103590378A (en) * 2013-11-05 2014-02-19 中国水电顾问集团西北勘测设计研究院 Steel lining reinforced concrete pipe with guide cracks
CN104695980A (en) * 2015-03-11 2015-06-10 中水北方勘测设计研究有限责任公司 Hydropower diversion tunnel lining structure applied to rock burst regions with high burial depth, high ground temperature and high ground stress
CN109238844A (en) * 2016-07-08 2019-01-18 长安大学 Tunnel lining structure crack treatment experimental method
CN111140264A (en) * 2020-04-02 2020-05-12 中铁工程设计咨询集团有限公司 Method for treating water leakage of cracks of tunnel concrete lining structure

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012155727A1 (en) * 2011-05-16 2012-11-22 长江勘测规划设计研究有限责任公司 Water conveyance tunnel with prestressed composite lining for shield tunnel
CN102322149B (en) * 2011-06-27 2013-03-27 中国建筑第二工程局有限公司 Full-section overall casting construction method for circulating water pipe ditch of nuclear power plant
CN102322149A (en) * 2011-06-27 2012-01-18 中国建筑第二工程局有限公司 Full-section overall casting construction method for circulating water pipe ditch of nuclear power plant
CN102535404B (en) * 2012-01-11 2014-04-09 中国建筑第二工程局有限公司 Construction device and construction method for steep segment of circulating pipe ditch
CN102535404A (en) * 2012-01-11 2012-07-04 中国建筑第二工程局有限公司 Construction device and construction method for steep segment of circulating pipe ditch
CN102622493A (en) * 2012-03-31 2012-08-01 广东省电力设计研究院 Method and device for determining maximum crack widths of ring-shaped members of round coal bunker
CN102622493B (en) * 2012-03-31 2014-01-29 广东省电力设计研究院 Method and device for determining maximum crack widths of ring-shaped members of round coal bunker
CN102619201A (en) * 2012-04-24 2012-08-01 四川大学 Method for distributing bars in water diversion tunnel
CN103046935A (en) * 2012-12-31 2013-04-17 西南交通大学 Construction method of annually-perforated long-span mass concrete tunnel lining structure
CN103590378A (en) * 2013-11-05 2014-02-19 中国水电顾问集团西北勘测设计研究院 Steel lining reinforced concrete pipe with guide cracks
CN103590378B (en) * 2013-11-05 2015-11-25 中国电建集团西北勘测设计研究院有限公司 With the steel lined reinforced concrete penstock of guide slit
CN104695980A (en) * 2015-03-11 2015-06-10 中水北方勘测设计研究有限责任公司 Hydropower diversion tunnel lining structure applied to rock burst regions with high burial depth, high ground temperature and high ground stress
CN104695980B (en) * 2015-03-11 2017-03-15 中水北方勘测设计研究有限责任公司 For the regional Lining of Power Tunnel structure of high buried depth, High-geotemperature, high stress rock burst
CN109238844A (en) * 2016-07-08 2019-01-18 长安大学 Tunnel lining structure crack treatment experimental method
CN109238844B (en) * 2016-07-08 2020-12-01 长安大学 Tunnel lining structure crack treatment experimental method
CN111140264A (en) * 2020-04-02 2020-05-12 中铁工程设计咨询集团有限公司 Method for treating water leakage of cracks of tunnel concrete lining structure

Also Published As

Publication number Publication date
CN1027600C (en) 1995-02-08

Similar Documents

Publication Publication Date Title
WO2018126954A1 (en) Fiber composite material multifunctional disassembly-free formwork and method for fabrication thereof
CN1027600C (en) Anti percolation method for water guiding tunnel by fracture control
CN106869015A (en) A kind of FRP pipes cast-in-place with half half prefabricated regeneration concrete prestressing force overlapping bridge pier and preparation method
CN208917657U (en) Prefabricated assembled ultra-high performance concrete prestressing force i-shaped beams
CN102943678A (en) Arched subway station old and new building connection structure and construction method
CN106759434B (en) A kind of groined type precast concrete king-post basis and its construction method
CN208844773U (en) A kind of ultra-high performance concrete steel bar girder laminated floor slab
CN109057148A (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN108951399A (en) A kind of Single-box multi-chamber box beam bridge and its construction method
Li et al. Applications of engineered cementitious composites (ecc)
CN106836600A (en) A kind of reinforcing bar composite floor for power transformation engineering
CN212715656U (en) Assembled prestressing force structure of curve cloth muscle
CN115029983B (en) Longitudinal and transverse staggered bidirectional prestress assembly road based on post grouting process and construction method
CN103590538A (en) Non-circular rib for concrete
CN216477359U (en) Superposed prefabricated double-layer duct piece structure
CN115026944A (en) Method for pre-stressed construction of highway municipal prestressed concrete precast box girder
CN205474788U (en) Broad width box girder bridge girder roof reinforced structure
CN103790385A (en) Construction method for tensioning prestressed structure
CN104032741A (en) Rapid construction method for large-size temperature control in water conservancy project
CN210194868U (en) Prefabricated primary and secondary roof beam connected node
CN210104592U (en) Prestressed composite reinforcing structure of pier bent cap
CN209244093U (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam
CN211114317U (en) Steel bar truss composite floor slab
CN217869975U (en) Pretensioned prestressing UHPC-superposed bridge deck composite beam
CN2749966Y (en) Overlong concrete building structure equipped with connector and prestressed tendon

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee