CN106848925B - High-voltage operation folding ladder - Google Patents

High-voltage operation folding ladder Download PDF

Info

Publication number
CN106848925B
CN106848925B CN201710156770.9A CN201710156770A CN106848925B CN 106848925 B CN106848925 B CN 106848925B CN 201710156770 A CN201710156770 A CN 201710156770A CN 106848925 B CN106848925 B CN 106848925B
Authority
CN
China
Prior art keywords
bracket
handrail
pressure equalizing
armrest
ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710156770.9A
Other languages
Chinese (zh)
Other versions
CN106848925A (en
Inventor
刘元庆
高晨光
陆家榆
张喜润
白锋
郭剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201710156770.9A priority Critical patent/CN106848925B/en
Publication of CN106848925A publication Critical patent/CN106848925A/en
Application granted granted Critical
Publication of CN106848925B publication Critical patent/CN106848925B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Ladders (AREA)

Abstract

本发明提供了一种高电压作业折叠梯。该折叠梯包括折叠扶手、两个固定扶手和两个均压球,折叠扶手位于固定扶手的上端;其中,高电压作业折叠梯的端部分别与地面和检测维修装置相连接;折叠扶手包括横梁和两个扶手支架;两个扶手支架的第一端通过横梁相连接,第二端分别与两个均压球可拆卸地相连接;横梁的长度大于两个固定扶手的距离;两个扶手支架分别置于两个固定扶手的两侧且与两个固定扶手可转动地相连接;当线路运行时,横梁与固定扶手相接触;当线路维修时,横梁与检测维修装置相接触。本发明折叠梯在线路运行时,横梁阻挡了儿童或自杀者的攀爬,均压球增大了折叠梯顶端的曲率半径,解决了高压环境下高电压作业梯子顶端发生电晕放电的问题。

Figure 201710156770

The invention provides a high-voltage working folding ladder. The folding ladder includes folding handrails, two fixed handrails and two pressure equalizing balls. The folding handrails are located at the upper end of the fixed handrails; wherein, the ends of the high-voltage operation folding ladder are respectively connected with the ground and the detection and maintenance device; the folding handrails include a beam and two armrest brackets; the first ends of the two armrest brackets are connected by a beam, and the second ends are detachably connected with two pressure equalizing balls; the length of the beam is greater than the distance between the two fixed armrests; the two armrest brackets They are placed on both sides of the two fixed handrails and are rotatably connected to the two fixed handrails; when the line is running, the beam is in contact with the fixed handrails; when the line is maintained, the beam is in contact with the detection and maintenance device. When the folding ladder of the invention is running on the line, the beam blocks children or suicides from climbing, the pressure equalizing ball increases the curvature radius of the top of the folding ladder, and solves the problem of corona discharge at the top of the high-voltage working ladder in a high-voltage environment.

Figure 201710156770

Description

高电压作业折叠梯High voltage work folding ladder

技术领域technical field

本发明涉及电力维修技术领域,具体而言,涉及一种高电压作业折叠梯。The invention relates to the technical field of electric power maintenance, in particular to a high-voltage operation folding ladder.

背景技术Background technique

在高压线路附近或高压环境下高空作业时,经常需要用梯子。在高电压下,电场周围曲率半径较小的电极附近,由于空气游离就会发生放电,形成电晕。因为在电晕的外围电场很弱,不发生碰撞游离,电晕外围带电粒子基本都是电离子,这些离子便形成了电晕放电电流。由于梯子上方作业区域电压高,梯子顶端曲率半径小的部位往往出现电晕放电的现象。电晕放电发生时,不仅会有晕光产生,还有放电的声音,因此电晕放电会引起电能的损耗而且会对电视广播产生干扰。Ladders are often required when working at heights near high-voltage lines or in high-voltage environments. At high voltage, near the electrode with a small radius of curvature around the electric field, discharge will occur due to free air, forming a corona. Because the electric field around the corona is very weak and no collision and dissociation occurs, the charged particles around the corona are basically ions, and these ions form the corona discharge current. Due to the high voltage in the working area above the ladder, corona discharge often occurs at the top of the ladder with a small radius of curvature. When the corona discharge occurs, not only the halo light is produced, but also the sound of the discharge, so the corona discharge will cause the loss of electric energy and interfere with the TV broadcast.

另外,为了便于梯子的攀爬和人员保护,现有梯子两侧均设置有固定扶手。但是固定扶手同时便于了其他人员的攀爬,在高压环境下,人员靠近会发生触电危险,如此便造成了儿童或自杀者的人身伤害。In addition, in order to facilitate the climbing of the ladder and the protection of personnel, fixed handrails are provided on both sides of the existing ladder. However, the fixed handrail also facilitates the climbing of other people. In a high-voltage environment, there is a danger of electric shock when people approach, thus causing personal injury to children or suicide.

发明内容SUMMARY OF THE INVENTION

鉴于此,本发明提出了一种高电压作业折叠梯,旨在解决现有梯子顶端发生电晕放电和不安全的问题。In view of this, the present invention proposes a high-voltage working folding ladder, which aims to solve the problems of corona discharge and insecurity at the top of the existing ladder.

一个方面,本发明提出了一种高电压作业折叠梯,该装置包括:折叠扶手、两个固定扶手和两个均压球,所述折叠扶手位于所述固定扶手的上端;其中,所述高电压作业折叠梯的端部分别与地面和检测维修装置相连接;所述折叠扶手包括横梁和两个扶手支架;其中,所述两个扶手支架的第一端通过所述横梁相连接,并且,第二端分别与所述两个均压球可拆卸地相连接;所述横梁的长度大于所述两个固定扶手之间的距离;所述两个扶手支架分别置于所述两个固定扶手的两侧且与所述两个固定扶手可转动地相连接;当线路运行时,所述横梁与所述两个固定扶手相接触,用于阻挡人员攀爬;当线路维修时,所述横梁与所述检测维修装置相接触,用于支撑所述扶手支架。In one aspect, the present invention provides a high-voltage operation folding ladder, the device comprising: a folding handrail, two fixed handrails and two pressure equalizing balls, the folding handrails are located at the upper end of the fixed handrails; wherein, the high The ends of the voltage operation folding ladder are respectively connected with the ground and the detection and maintenance device; the folding handrail includes a beam and two handrail brackets; wherein, the first ends of the two handrail brackets are connected through the beam, and, The second ends are detachably connected to the two pressure equalizing balls respectively; the length of the beam is greater than the distance between the two fixed armrests; the two armrest brackets are respectively placed on the two fixed armrests The two sides of the rail are rotatably connected with the two fixed handrails; when the line is running, the beam is in contact with the two fixed handrails to prevent people from climbing; when the line is repaired, the beam is in contact with the two fixed handrails. It is in contact with the detection and maintenance device and is used for supporting the armrest bracket.

进一步地,上述扶手支架包括:一个扶手架和一个支撑架;其中,所述扶手架的一端与所述固定扶手可转动地相连接,并且,所述扶手架的另一端与所述均压球可拆卸地相连接;所述支撑架的一端与所述扶手架和所述固定扶手的连接处可转动地相连接,并且,所述支撑架的另一端与所述横梁固定连接。Further, the above-mentioned armrest bracket includes: an armrest frame and a support frame; wherein, one end of the armrest frame is rotatably connected to the fixed armrest, and the other end of the armrest frame is connected to the pressure equalizing ball Removably connected; one end of the support frame is rotatably connected to the joint between the armrest frame and the fixed armrest, and the other end of the support frame is fixedly connected to the beam.

进一步地,上述扶手支架包括:第一支架、第二支架和扶手架;其中,所述第一支架的第一端和所述第二支架的第一端相连接,并且,所述第一支架的第二端与所述扶手架相连接;所述第二支架的第二端与所述扶手架的第一端相连接,并且,所述第一支架、所述第二支架和所述扶手架围设成一三角形;所述扶手架的第二端置于所述三角形外且与所述均压球可拆卸地相连接;所述横梁固定连接于所述第一支架和所述第二支架的连接处。Further, the armrest bracket includes: a first bracket, a second bracket and an armrest bracket; wherein, the first end of the first bracket and the first end of the second bracket are connected, and the first bracket The second end of the armrest is connected with the armrest; the second end of the second support is connected with the first end of the armrest, and the first support, the second support and the armrest The frame is surrounded by a triangle; the second end of the armrest frame is placed outside the triangle and is detachably connected with the pressure equalizing ball; the beam is fixedly connected to the first bracket and the second bracket bracket connection.

进一步地,上述均压球开设有与所述扶手架的第二端相匹配的凹槽;所述扶手架的第二端卡接于所述凹槽内。Further, the pressure equalizing ball is provided with a groove matching the second end of the armrest frame; the second end of the armrest frame is clamped in the groove.

进一步地,上述均压球为空心球体,并且所述均压球开设有与所述扶手架的第二端相匹配的开口;所述扶手架的第二端穿设于开口且套接于所述均压球内。Further, the pressure equalizing ball is a hollow sphere, and the pressure equalizing ball is provided with an opening that matches the second end of the armrest frame; the second end of the armrest frame passes through the opening and is sleeved on the armrest frame. inside the pressure equalizing sphere.

进一步地,上述开口为直径大于所述扶手架的第二端的直径的圆孔。Further, the above-mentioned opening is a circular hole with a diameter larger than that of the second end of the armrest frame.

进一步地,上述均压球通过连接件与所述固定扶手相连接,所述连接件用于固定所述均压球。Further, the pressure equalizing ball is connected to the fixed handrail through a connecting piece, and the connecting piece is used for fixing the pressure equalizing ball.

进一步地,上述连接件为引线绳。Further, the above-mentioned connector is a lead wire.

进一步地,上述引线绳为钢丝绳、钢绞线绳、钢芯铝绞线绳或铜线绳。Further, the above-mentioned lead rope is a steel wire rope, a steel stranded wire rope, a steel core aluminum stranded wire rope or a copper wire rope.

进一步地,上述横梁通过插销与所述检测维修装置可拆卸地相连接。Further, the above-mentioned cross beam is detachably connected with the detection and maintenance device through a bolt.

本发明提供的高电压作业折叠梯,在线路运行时,折叠扶手转动至横梁与固定扶手相接触,横梁可以阻挡儿童或自杀者的攀爬,减少了高压线路周围的触电危险的可能性,解决了高电压作业梯子带来的不安全性问题。同时,均压球与高电压作业折叠梯中顶部尖端部位相连接,增大了高电压作业折叠梯顶端部件的曲率半径,解决了高压环境下高电压作业梯子顶端发生电晕放电的问题。In the high-voltage operation folding ladder provided by the present invention, when the line is running, the folding handrail is rotated until the cross beam is in contact with the fixed handrail. It solves the insecurity problem caused by high-voltage working ladders. At the same time, the pressure equalizing ball is connected to the top tip of the high-voltage operation folding ladder, which increases the curvature radius of the top part of the high-voltage operation folding ladder, and solves the problem of corona discharge at the top of the high-voltage operation ladder in a high-voltage environment.

附图说明Description of drawings

通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本发明的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are for the purpose of illustrating preferred embodiments only and are not to be considered limiting of the invention. Also, the same components are denoted by the same reference numerals throughout the drawings. In the attached image:

图1为本发明实施例提供的高电压作业折叠梯在高压运行时的侧面结构示意图;Fig. 1 is the side structure schematic diagram of the high-voltage operation folding ladder provided by the embodiment of the present invention during high-voltage operation;

图2为本发明实施例提供的高电压作业折叠梯在高压运行时的正面结构示意图;FIG. 2 is a schematic diagram of the front structure of the high-voltage operation folding ladder provided by the embodiment of the present invention during high-voltage operation;

图3为本发明实施例提供的高电压作业折叠梯在线路维修时的侧面结构示意图;Fig. 3 is the side structure schematic diagram of the high-voltage operation folding ladder provided by the embodiment of the present invention during line maintenance;

图4为本发明实施例提供的高电压作业折叠梯在线路维修时的正面结构示意图;4 is a schematic diagram of the front structure of the high-voltage operation folding ladder during line maintenance provided by an embodiment of the present invention;

图5为本发明实施例提供的的高电压作业折叠梯中均压球的结构示意图。5 is a schematic structural diagram of a pressure equalizing ball in a high-voltage operation folding ladder according to an embodiment of the present invention.

具体实施方式Detailed ways

下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited by the embodiments set forth herein. Rather, these embodiments are provided so that the present disclosure will be more thoroughly understood, and will fully convey the scope of the present disclosure to those skilled in the art. It should be noted that the embodiments of the present invention and the features of the embodiments may be combined with each other under the condition of no conflict. The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

参见图1,图1为本发明实施例提供的高电压作业折叠梯在高压运行时的侧面结构示意图。如图所示,该高电压作业折叠梯包括:折叠扶手1、两个固定扶手2和两个均压球3,折叠扶手1位于固定扶手2的上端(相对于图1所示的位置而言)。本技术人员所公知的是高电压作业折叠梯还包括梯子本体,梯子本体可以竖直放置(相对于图1所示的位置而言),也可以为倾斜放置(相对于图1所示的位置而言),本实施例对其不做任何限定。梯子本体两侧下端(相对于图1所示的位置而言)焊接有两个固定扶手2。折叠扶手1位于两个固定扶手2的上端(相对于图1所示的位置而言)且与两个固定扶手2可转动地相连接。优选地,均压球3可以为金属球。进一步优选地,均压球3可以为铝球、不锈钢球或铁球,当然,均压球3也可以为其他材质的球体,本实施例对其不做任何限定。其中,Referring to FIG. 1 , FIG. 1 is a schematic side structure diagram of the high-voltage operation folding ladder provided by the embodiment of the present invention when the high-voltage operation is performed. As shown in the figure, the high-voltage operation folding ladder includes: a folding handrail 1 , two fixed handrails 2 and two pressure equalizing balls 3 , and the folding handrail 1 is located at the upper end of the fixed handrail 2 (relative to the position shown in FIG. 1 ) ). It is well known to those skilled in the art that the high-voltage operation folding ladder also includes a ladder body, and the ladder body can be placed vertically (relative to the position shown in FIG. 1 ), or can be placed obliquely (relative to the position shown in FIG. 1 ) ), which is not limited in this embodiment. Two fixed handrails 2 are welded on the lower ends of both sides of the ladder body (relative to the position shown in FIG. 1 ). The folding armrest 1 is located at the upper end of the two fixed armrests 2 (relative to the position shown in FIG. 1 ) and is rotatably connected to the two fixed armrests 2 . Preferably, the pressure equalizing ball 3 may be a metal ball. Further preferably, the pressure equalizing ball 3 may be an aluminum ball, a stainless steel ball or an iron ball. Of course, the pressure equalizing ball 3 may also be a sphere of other materials, which is not limited in this embodiment. in,

如图1至图4所示,高电压作业折叠梯的端部分别与地面和检测维修装置相连接。具体地,高电压作业折叠梯的底端(相对于图1所示的位置而言)即梯子本体的底端(相对于图1所示的位置而言)与地面相连接,高电压作业折叠梯的顶端(相对于图1所示的位置而言)即梯子本体的顶端(相对于图1所示的位置而言)与检测维修装置相连接。为进一步加强该折叠梯的安全稳固性,优选地,该折叠梯与地面和检测维修装置底面的连接方式可以为焊接。本领域技术人员所熟知的是检测维修装置可以是电晕笼,也可以是高压环境下作业人员作业时的其他装置。As shown in Figures 1 to 4, the ends of the high-voltage operation folding ladder are respectively connected to the ground and the detection and maintenance device. Specifically, the bottom end (relative to the position shown in FIG. 1 ) of the high-voltage operation folding ladder, that is, the bottom end of the ladder body (relative to the position shown in FIG. 1 ) is connected to the ground, and the high-voltage operation folds The top end of the ladder (relative to the position shown in FIG. 1 ), that is, the top end of the ladder body (relative to the position shown in FIG. 1 ) is connected to the inspection and maintenance device. In order to further enhance the safety and stability of the folding ladder, preferably, the connection between the folding ladder and the ground and the bottom surface of the inspection and maintenance device may be welding. It is well known to those skilled in the art that the detection and maintenance device may be a corona cage, or may be other devices when an operator is working in a high-voltage environment.

折叠扶手1包括:横梁11和两个扶手支架12。其中,两个扶手支架12的第一端(如图1所示的右下端)通过横梁11相连接,并且,两个扶手支架12的第二端(如图1所示的右上端)分别与两个均压球3可拆卸地相连接。具体地,横梁11可以水平放置(相对于图2所示的位置而言),两个扶手支架12可以竖直放置(相对于图2所示的位置而言),两个扶手支架12可以通过横梁11相连接。扶手支架12与横梁11可以一体成型,当然,扶手支架12与横梁11的连接方式也可以为本领域技术人员所熟知的其他连接方式例如焊接等,本实施例对其不做任何限定。两个扶手支架12的第二端(如图1所示的右上端)分别与两个均压球3可拆卸地相连接,当线路维修时,两个均压球3拆下放置,当线路运行时,两个均压球3与两个扶手支架12的第二端(如图1所示的右上端)相连接。The folding armrest 1 includes: a cross beam 11 and two armrest brackets 12 . Wherein, the first ends of the two armrest brackets 12 (the lower right end as shown in FIG. 1 ) are connected by the beam 11 , and the second ends of the two armrest brackets 12 (the upper right end as shown in FIG. 1 ) are respectively connected with The two pressure equalizing balls 3 are detachably connected. Specifically, the beam 11 can be placed horizontally (relative to the position shown in FIG. 2 ), the two armrest brackets 12 can be placed vertically (relative to the position shown in FIG. 2 ), and the two armrest brackets 12 can pass through The beams 11 are connected. The handrail bracket 12 and the beam 11 can be integrally formed. Of course, the connection method of the handrail bracket 12 and the beam 11 can also be other connection methods known to those skilled in the art, such as welding, which is not limited in this embodiment. The second ends of the two armrest brackets 12 (the upper right end as shown in FIG. 1 ) are detachably connected to the two pressure equalizing balls 3 respectively. When the line is repaired, the two pressure equalizing balls 3 are removed and placed. During operation, the two pressure equalizing balls 3 are connected with the second ends of the two handrail brackets 12 (the upper right end shown in FIG. 1 ).

横梁11的长度大于两个固定扶手2之间的距离。两个扶手支架12分别置于两个固定扶手2的两侧且与两个固定扶手2可转动地相连接。具体地,横梁11的水平长度(相对于图2所示的位置而言)可以大于两个固定扶手2之间的水平距离(相对于图2所示的位置而言),两个扶手支架12分别置于两个固定扶手2的左右两侧(相对于图2所示的位置而言),并且,两个扶手支架12可以均通过紧固件螺栓与两个固定扶手2可转动地相连接,当然,两个扶手支架12与两个固定扶手2之间的连接方式也可以通过本领域技术人员所熟知的其他方式例如连杆等连接,本实施例对其不做任何限定。The length of the beam 11 is greater than the distance between the two fixed handrails 2 . The two armrest brackets 12 are respectively placed on both sides of the two fixed armrests 2 and are rotatably connected to the two fixed armrests 2 . Specifically, the horizontal length of the beam 11 (relative to the position shown in FIG. 2 ) may be greater than the horizontal distance between the two fixed handrails 2 (relative to the position shown in FIG. 2 ), and the two handrail brackets 12 are respectively placed on the left and right sides of the two fixed handrails 2 (relative to the position shown in FIG. 2 ), and the two handrail brackets 12 can be rotatably connected to the two fixed handrails 2 through fastener bolts Of course, the connection between the two armrest brackets 12 and the two fixed armrests 2 may also be connected by other means known to those skilled in the art, such as connecting rods, which are not limited in this embodiment.

如图1至2所示,当线路运行时,横梁11与两个固定扶手2相接触,用于阻挡人员攀爬。具体地,线路运行时,横梁11与两个固定扶手2相接触,固定扶手2可以支撑折叠扶手1防止其转动,并且,横梁11可以阻挡人员沿该折叠梯攀爬至检测维修装置的危险区域。同时,此时两个均压球3与两个扶手支架12的第二端相连接。As shown in Figures 1 to 2, when the line is running, the beam 11 is in contact with the two fixed handrails 2 for preventing people from climbing. Specifically, when the line is running, the cross beam 11 is in contact with the two fixed handrails 2, the fixed handrails 2 can support the folding handrail 1 to prevent it from rotating, and the cross beam 11 can prevent personnel from climbing along the folding ladder to the dangerous area of the inspection and maintenance device . At the same time, at this time, the two pressure equalizing balls 3 are connected with the second ends of the two armrest brackets 12 .

如图3至4所示,当线路维修时,横梁11与检测维修装置相接触,用于支撑扶手支架12。具体地,线路停止运行后且线路维修前,将两个均压球3拆下放置其他位置后,折叠扶手1绕两个固定扶手2和两个扶手支架12的连接处转动,转动至横梁11与检测维修装置相接触。当线路维修时,横梁11与检测维修装置相接触,检测维修装置可以支撑折叠扶手1防止其转动。As shown in FIGS. 3 to 4 , when the line is maintained, the beam 11 is in contact with the detection and maintenance device, and is used to support the handrail bracket 12 . Specifically, after the line stops running and before line maintenance, after removing the two pressure equalizing balls 3 and placing them in other positions, the folding armrest 1 rotates around the connection between the two fixed armrests 2 and the two armrest brackets 12 , and rotates to the beam 11 . Contact with inspection and maintenance device. When the line is repaired, the beam 11 is in contact with the detection and maintenance device, and the detection and maintenance device can support the folding handrail 1 to prevent it from rotating.

本实施例的工作过程为:首先转动折叠扶手1至横梁11与固定扶手2相接触,然后将两个均压球3分别与两个扶手支架12的第二端(如图1所示的右上端)相连接,此种状态下,线路运行;线路需要维修时,线路停止运行,首先将两个均压球3与两个扶手支架12的第二端(如图1所示的右上端)分离放置在其他位置,然后绕两个扶手支架12的第一端(如图1所示的右下端)逆时针(相对于图1所示的方向而言)转动折叠扶手1,转动至横梁11与检测维修装置相接触(如图4所示的状态)后,维修人员便可以攀爬进而维修线路。The working process of this embodiment is as follows: firstly, rotate the folding armrest 1 until the beam 11 contacts the fixed armrest 2, and then connect the two pressure equalizing balls 3 to the second ends of the two armrest brackets 12 (as shown in the upper right of FIG. 1). In this state, the line runs; when the line needs to be repaired, the line stops running. First, connect the two pressure equalizing balls 3 to the second ends of the two handrail brackets 12 (the upper right end as shown in Figure 1) Separate and place them in other positions, and then turn the folding armrest 1 counterclockwise (relative to the direction shown in FIG. 1 ) around the first end of the two armrest brackets 12 (the lower right end as shown in FIG. 1 ), and turn to the beam 11 After being in contact with the detection and maintenance device (the state shown in Figure 4), the maintenance personnel can climb and then repair the line.

与现有技术相比,本实施例提供的高电压作业折叠梯,在线路运行时,折叠扶手1转动至横梁11与固定扶手2相接触,横梁11可以阻挡儿童或自杀者的攀爬,减少了高压线路周围的触电危险的可能性,解决了高电压作业梯子带来的不安全性问题。同时,均压球3与高电压作业折叠梯中顶部尖端部位相连接,增大了高电压作业折叠梯顶端部件的曲率半径,解决了高压环境下高电压作业梯子顶端发生电晕放电的问题。Compared with the prior art, in the high-voltage operation folding ladder provided in this embodiment, when the line is running, the folding handrail 1 is rotated until the cross beam 11 is in contact with the fixed handrail 2, and the cross beam 11 can prevent children or suicides from climbing, reducing The possibility of electric shock around the high-voltage line is eliminated, and the insecurity problem caused by the high-voltage working ladder is solved. At the same time, the pressure equalizing ball 3 is connected to the top tip of the high-voltage operation folding ladder, which increases the curvature radius of the top part of the high-voltage operation folding ladder, and solves the problem of corona discharge at the top of the high-voltage operation ladder in a high-voltage environment.

本实施例的一种实施方式,扶手支架12可以包括:一个扶手架和一个支撑架;其中,扶手架的一端可以与固定扶手2可转动地相连接,并且,扶手架的另一端可以与均压球3可拆卸地相连接。支撑架的一端可以与扶手架和固定扶手2的连接处可转动地相连接,并且,支撑架的另一端可以与横梁11固定连接。In one implementation of this embodiment, the armrest bracket 12 may include: an armrest frame and a support frame; wherein, one end of the armrest frame may be rotatably connected to the fixed armrest 2, and the other end of the armrest frame may be connected to the The pressure balls 3 are detachably connected. One end of the support frame can be rotatably connected with the joint between the handrail frame and the fixed handrail 2 , and the other end of the support frame can be fixedly connected with the beam 11 .

具体实施时,每个扶手支架包括一个扶手架和一个支撑架,该折叠梯包括两个扶手支架,即该折叠梯共包括两个扶手架和两个支撑架。两个扶手架的一端均可以分别与两个固定扶手2可转动地相连接,另一端均可以分别与两个均压球3可拆卸地相连接。两个支撑架的一端可以分别与扶手架和固定扶手2的连接处和另一个扶手架和固定扶手2的连接处可转动地相连接。优选地,为便于更换和拆卸,支撑架的一端与扶手架和固定扶手2的连接处可以通过螺栓相连接。两个支撑架的另一端均可以与横梁11固定连接,支撑架与横梁11可以一体成型,当然也可以为本领域技术人员所熟知的其他连接方式例如焊接,本实施例对其不做任何限定。In a specific implementation, each handrail bracket includes a handrail bracket and a support bracket, and the folding ladder includes two handrail brackets, that is, the folding ladder includes a total of two handrail brackets and two support brackets. One end of the two armrests can be rotatably connected to the two fixed armrests 2 respectively, and the other end can be detachably connected to the two pressure equalizing balls 3 respectively. One end of the two support frames can be respectively rotatably connected with the connection between the armrest frame and the fixed armrest 2 and the connection between the other armrest frame and the fixed armrest 2 . Preferably, in order to facilitate replacement and disassembly, the connection between one end of the support frame and the handrail frame and the fixed handrail 2 can be connected by bolts. The other ends of the two support frames can be fixedly connected with the beam 11, the support frame and the beam 11 can be integrally formed, and of course other connection methods known to those skilled in the art, such as welding, are not limited in this embodiment. .

可以看出,本实施例中,扶手支架12的扶手架可以增长扶手的长度,维修人员攀爬至该折叠梯顶部时增加了可攀爬的扶手,增加了维修人员的安全性,而且,横梁11与固定扶手12接触时即该折叠梯折叠后顶端无扶手可以进一步阻挡儿童或自杀者的攀爬至检测维修装置内的危险区域。同时,扶手架和支撑架之间可转动连接便于安装和运输。It can be seen that in this embodiment, the handrail frame of the handrail bracket 12 can increase the length of the handrail, and when the maintenance personnel climbs to the top of the folding ladder, a climbable handrail is added, which increases the safety of the maintenance personnel, and the beam When 11 is in contact with the fixed handrail 12, that is, after the folding ladder is folded, there is no handrail at the top, which can further prevent children or suicides from climbing to the dangerous area in the detection and maintenance device. At the same time, the rotatable connection between the handrail frame and the support frame is convenient for installation and transportation.

仅需参见图1至图4,本实施例的另一种实施方式,扶手支架12可以包括:第一支架121、第二支架122和扶手架123。具体地,左右两侧的两个扶手支架12(相对于图2所示的位置而言)均可以包括第一支架121、第二支架122和扶手架123。其中,Only referring to FIGS. 1 to 4 , in another implementation of this embodiment, the armrest bracket 12 may include: a first bracket 121 , a second bracket 122 and an armrest bracket 123 . Specifically, the two armrest brackets 12 on the left and right sides (relative to the position shown in FIG. 2 ) may each include a first bracket 121 , a second bracket 122 and an armrest bracket 123 . in,

第一支架121的第一端(如图1所示的下端)可以和第二支架122的第一端(如图1所示的右上端)相连接,并且,第一支架121的第二端(如图1所示的上端)可以与扶手架123相连接。第二支架122的第二端(如图1所示的左下端)可以与扶手架123的第一端(如图1所示的左下端)相连接,并且,第一支架121、第二支架122和扶手架123可以围设成一三角形。具体地,第一支架121、第二支架122和扶手架123两两相连接围设成一个三角形。为进一步增大强度,优选地,第一支架121的第一端(如图1所示的下端)和第二支架122的第一端(如图1所示的右上端)围设成一个直角。The first end of the first bracket 121 (the lower end shown in FIG. 1 ) can be connected to the first end of the second bracket 122 (the upper right end shown in FIG. 1 ), and the second end of the first bracket 121 (the upper end shown in FIG. 1 ) can be connected with the armrest frame 123 . The second end of the second bracket 122 (the lower left end shown in FIG. 1 ) can be connected with the first end of the armrest frame 123 (the lower left end shown in FIG. 1 ), and the first bracket 121 , the second bracket 122 and the armrest frame 123 can enclose a triangle. Specifically, the first bracket 121 , the second bracket 122 and the armrest frame 123 are connected in two phases to form a triangle. In order to further increase the strength, preferably, the first end of the first bracket 121 (the lower end as shown in FIG. 1 ) and the first end of the second bracket 122 (the upper right end as shown in FIG. 1 ) are set to form a right angle .

扶手架123的第二端(如图1所示的右上端)可以置于三角形外且与均压球3可拆卸地相连接,横梁11可以固定连接于第一支架121和第二支架122的连接处。The second end of the armrest frame 123 (the upper right end shown in FIG. 1 ) can be placed outside the triangle and can be detachably connected with the pressure equalizing ball 3 , and the beam 11 can be fixedly connected to the first bracket 121 and the second bracket 122 . Junction.

优选地,横梁11的左端(相对于图2所示的位置而言)可以固定连接于左侧扶手支架12(相对于图2所示的位置而言)的第一支架121和第二支架122的连接处,横梁11的右端(相对于图2所示的位置而言)可以固定连接于右侧扶手支架12(相对于图2所示的位置而言)的第一支架121和第二支架122的连接处。具体实施时,第一支架121、第二支架122和扶手架123可以一体成型,当然也可以为本领域技术人员所熟知的其他连接方式如焊接,本实施例对其不做任何限定。Preferably, the left end of the beam 11 (relative to the position shown in FIG. 2 ) can be fixedly connected to the first bracket 121 and the second bracket 122 of the left armrest bracket 12 (relative to the position shown in FIG. 2 ) At the connection point, the right end of the beam 11 (relative to the position shown in FIG. 2 ) can be fixedly connected to the first bracket 121 and the second bracket of the right handrail bracket 12 (relative to the position shown in FIG. 2 ) 122 connection. During specific implementation, the first bracket 121 , the second bracket 122 and the armrest bracket 123 may be integrally formed, and of course other connection methods known to those skilled in the art such as welding, which are not limited in this embodiment.

本实施例中,当线路维修时,不仅横梁11与检测维修装置相接触支撑扶手支架12,而且第二支架122可以支撑扶手架123,减小攀爬者对横梁11的作用力。同时,扶手支架12的第一支架121、第二支架122和扶手架123围设成一个三角形,增大了扶手支架11的强度,进而增大了该折叠梯的使用寿命。In this embodiment, when the line is repaired, not only the beam 11 is in contact with the detection and maintenance device to support the handrail bracket 12 , but also the second bracket 122 can support the handrail frame 123 to reduce the climbing force on the beam 11 . At the same time, the first bracket 121 , the second bracket 122 and the handrail bracket 123 of the handrail bracket 12 are encircled into a triangle, which increases the strength of the handrail bracket 11 and thus increases the service life of the folding ladder.

在上述实施例中的一种实施方式中,均压球3可以开设有与扶手架123的第二端(图2所示的右上端)相匹配的凹槽,扶手架123的第二端(图2所示的右上端)可以卡接于凹槽内。为进一步增加均压球2稳定性,均压球2开设的凹槽与扶手架123的第二端(图2所示的右上端)相匹配,例如,如果扶手架123的第二端(图2所示的右上端)为圆柱体,均压球2开设的凹槽可以为与上述圆柱体的外径相匹配的圆形凹槽,圆形凹槽的内径可以与上述圆柱体的外径相同或者是比上述圆柱体的外径略大。In one implementation of the above embodiments, the pressure equalizing ball 3 may be provided with a groove matching the second end of the armrest frame 123 (the upper right end shown in FIG. 2 ), and the second end of the armrest frame 123 ( The upper right end shown in Figure 2) can be snapped into the groove. In order to further increase the stability of the pressure equalizing ball 2, the groove opened by the pressure equalizing ball 2 is matched with the second end of the armrest frame 123 (the upper right end shown in FIG. 2 ). The upper right end shown in 2) is a cylinder, and the groove opened by the pressure equalizing ball 2 can be a circular groove that matches the outer diameter of the above-mentioned cylinder, and the inner diameter of the circular groove can be the same as the outer diameter of the above-mentioned cylinder. The same or slightly larger than the outer diameter of the above cylinder.

可以看出,本实施例中,均压球3与扶手架123第二端的结构和连接方式结构简单,易于实现,而且,该均压球3便于拆卸和安装。It can be seen that in this embodiment, the structure and connection method of the pressure equalizing ball 3 and the second end of the armrest frame 123 are simple in structure and easy to implement, and the pressure equalizing ball 3 is easy to disassemble and install.

参见图5,图5为为本发明实施例提供的的高电压作业折叠梯中均压球的结构示意图。在上述实施例中的另一种实施方式中,如图所示,均压球3为空心球体,并且均压球3开设有与扶手架123的第二端相匹配的开口31,扶手架123的第二端穿设于开口31且套接于均压球3内。为了制作简单,优选地,均压球3可以为壁厚均匀的中空球体。Referring to FIG. 5 , FIG. 5 is a schematic structural diagram of a pressure equalizing ball in a high-voltage operation folding ladder according to an embodiment of the present invention. In another implementation of the above embodiment, as shown in the figure, the pressure equalizing ball 3 is a hollow sphere, and the pressure equalizing ball 3 is provided with an opening 31 that matches the second end of the armrest frame 123 , and the armrest frame 123 The second end of the ball is inserted through the opening 31 and sleeved in the pressure equalizing ball 3 . For simplicity of manufacture, preferably, the pressure equalizing ball 3 may be a hollow sphere with a uniform wall thickness.

本实施例中,均压球3为空心球体不仅可以使均压球3稳定连接于扶手架123的第二端,而且可以节省材料和制造成本。In this embodiment, if the pressure equalizing ball 3 is a hollow sphere, not only can the pressure equalizing ball 3 be stably connected to the second end of the armrest frame 123 , but also material and manufacturing costs can be saved.

进一步地,在上述实施例中,开口31可以为直径大于扶手架123的第二端的直径的圆孔。具体地,开口31可以为圆形孔,该圆形孔的直径可以大于扶手架123的第二端的外径。然而本发明不限于此,在其他实施例中,开口31可以为其他适当的形状,例如方形孔等。Further, in the above embodiment, the opening 31 may be a circular hole with a diameter larger than that of the second end of the armrest frame 123 . Specifically, the opening 31 may be a circular hole, and the diameter of the circular hole may be larger than the outer diameter of the second end of the armrest frame 123 . However, the present invention is not limited thereto, and in other embodiments, the opening 31 may have other suitable shapes, such as a square hole and the like.

在上述各实施例中,均压球3通过连接件4与固定扶手2相连接,连接件4用于固定均压球3。具体实施时,该折叠梯可以包括两个连接件,每个连接件的一端可以分别与一个固定扶手2相连接,连接件4的另一端可以分别与一个均压球4相连接。其中,连接件4可以为可伸缩的杆件或可弯折的塑料件,本实施例对其不做任何限定。当线路维修时,两个均压球3可以与扶手支架123的第二端(图1所示的右上端)分离,通过连接件4挂置于两个固定扶手2的两侧。In the above embodiments, the pressure equalizing ball 3 is connected to the fixed handrail 2 through the connecting member 4 , and the connecting member 4 is used for fixing the pressure equalizing ball 3 . In specific implementation, the folding ladder may include two connecting pieces, one end of each connecting piece may be connected with a fixed handrail 2 respectively, and the other end of the connecting piece 4 may be connected with a pressure equalizing ball 4 respectively. Wherein, the connecting member 4 may be a telescopic rod member or a bendable plastic member, which is not limited in this embodiment. During line maintenance, the two pressure equalizing balls 3 can be separated from the second end of the armrest bracket 123 (the upper right end shown in FIG. 1 ), and hung on both sides of the two fixed armrests 2 through the connecting piece 4 .

可以看出,本实施例中,均压球3与折叠扶手1拆卸后可直接挂置在固定扶手2上,因此该折叠梯可以防止均压球3丢失,同时,可以防止出现均压球3滚动引起的不安全事故。It can be seen that in this embodiment, the pressure-equalizing ball 3 and the folding handrail 1 can be directly hung on the fixed handrail 2 after being disassembled, so the folding ladder can prevent the pressure-equalizing ball 3 from being lost, and at the same time, can prevent the pressure-equalizing ball 3 from appearing. Unsafe accidents caused by rolling.

进一步地,连接件4可以为引线绳。具体地,引线绳的一端可以捆绑在固定扶手2上,另一端可以穿设至均压球3内。为了防止均压球3掉落,优选地,引线绳可以为金属绳。进一步优选地,引线绳可以为钢丝绳、钢绞线绳、钢芯铝绞线绳或铜线绳。当然,引线绳也可以为其他材质的绳子,本实施例对其不做任何限定。本实施例中,该连接件4可以随意弯折,而且其长度也可以随意更改,所以该连接件4安装简单,当线路维修时,均压球4的位置可以调整。Further, the connecting member 4 may be a lead wire. Specifically, one end of the lead rope can be tied to the fixed handrail 2 , and the other end can be inserted into the pressure equalizing ball 3 . In order to prevent the pressure equalizing ball 3 from falling, preferably, the lead wire can be a metal wire. Further preferably, the lead wire rope can be a steel wire rope, a steel strand rope, a steel core aluminum stranded wire rope or a copper wire rope. Of course, the lead rope can also be a rope made of other materials, which is not limited in this embodiment. In this embodiment, the connecting piece 4 can be bent at will, and its length can also be changed at will, so the connecting piece 4 is easy to install, and the position of the pressure equalizing ball 4 can be adjusted when the line is repaired.

在上述各实施例中,横梁11可以通过插销与检测维修装置可拆卸地相连接。具体地,当线路维修时,插销插入,横梁11与检测维修装置相连接;当线路维修后,插销拔出后,横梁11与检测维修装置可分离。本实施例中,线路维修时,插销的设置可以进一步稳定横梁11与检测维修装置固定连接,可以防止横梁11带动折叠扶手1晃动。In the above-mentioned embodiments, the beam 11 can be detachably connected to the inspection and maintenance device through a latch. Specifically, when the line is repaired, the plug is inserted, and the beam 11 is connected to the detection and maintenance device; when the line is repaired, after the plug is pulled out, the beam 11 can be separated from the detection and maintenance device. In this embodiment, during line maintenance, the arrangement of the latch can further stabilize the fixed connection between the beam 11 and the detection and maintenance device, and can prevent the beam 11 from driving the folding handrail 1 to shake.

下面对本发明实施例提供的高电压作业折叠梯进行更为详细的说明。The following is a more detailed description of the high-voltage operation folding ladder provided by the embodiment of the present invention.

如图1至图5所示,该折叠梯包括梯子本体、折叠扶手1、两个固定扶手2、两个均压球3和两个连接件4。其中,均压球3为壁厚均匀的中空球体,其外径可以为200~500mm,壁厚可以为1~10mm,优选地,其外径和壁厚分贝为400mm和5mm,并且底部(相对于图5所示的方向)开设有圆孔。梯子本体可以为直梯或斜梯,两个固定扶手2设置于梯子本体的下端,折叠扶手1设置于固定扶手的上端。折叠扶手1包括两个扶手支架12和横梁11,而且扶手支架12包括第一支架121、第二支架122和扶手架123。为综合考虑折叠扶手的成本和折叠性,扶手架123长度为0.5~1.7m,优选地,扶手架123长度为1m。第一支架121、第二支架122和扶手架123两两依次相连接且围设成一个直角三角形,并且,扶手架123的第二端(如图1所示的右上端)置于三角形外。横梁11的端部均与第一支架121与第二支架的连接处固定连接,第一支架121和扶手架123的连接处均与固定扶手2可转动地相连接。均压球3开设的圆孔直径比第三支架的外径大1~50mm,优选地,均压球3开设的圆孔直径比第三支架的外径大30mm,且扶手架123的第二端(如图1所示的右上端)穿设于该圆孔置于均压球3内。均压球3可以通过连接件4与固定扶手2相连接,线路维修时,均压球4通过连接件4悬挂在梯子本体的两侧,线路运行时,均压球3与扶手架123的第二端(如图1所示的右上端)相连接。为足够承受均压球的重量,连接件4可以为直径1~10mm的钢丝绳、钢绞线绳、钢芯铝绞线绳或铜线绳,优选地,其直径为5mm的钢丝绳。电晕笼长70m,由截面为10m×10m的两个笼体组成且两个笼体中间有2层中间网隔开,电晕笼呈悬链线结构布置,两端笼体处距地面约3m时,为安全稳固,电晕笼设置有4个与底面呈60°设置的该高压作业折叠梯,梯子本体为铁材质制造,且该折叠梯两端分别与底面和电晕笼焊接,可以通过插销将横梁11与电晕笼固定和分离。As shown in FIGS. 1 to 5 , the folding ladder includes a ladder body, a folding handrail 1 , two fixed handrails 2 , two pressure equalizing balls 3 and two connecting pieces 4 . Wherein, the pressure equalizing ball 3 is a hollow sphere with uniform wall thickness, its outer diameter can be 200-500mm, and its wall thickness can be 1-10mm, preferably, its outer diameter and wall thickness decibels are 400mm and 5mm, and the bottom (relative to In the direction shown in Figure 5), a circular hole is opened. The ladder body can be a straight ladder or an inclined ladder, two fixed handrails 2 are arranged on the lower end of the ladder body, and a folding handrail 1 is arranged on the upper end of the fixed handrails. The folding armrest 1 includes two armrest brackets 12 and a cross beam 11 , and the armrest bracket 12 includes a first bracket 121 , a second bracket 122 and an armrest bracket 123 . In order to comprehensively consider the cost and foldability of the folding handrail, the length of the handrail frame 123 is 0.5-1.7 m, preferably, the length of the handrail frame 123 is 1 m. The first bracket 121 , the second bracket 122 and the armrest frame 123 are connected in sequence to form a right triangle, and the second end of the armrest frame 123 (the upper right end as shown in FIG. 1 ) is placed outside the triangle. The ends of the beam 11 are fixedly connected to the connection between the first bracket 121 and the second bracket, and the connection between the first bracket 121 and the armrest frame 123 is rotatably connected to the fixed armrest 2 . The diameter of the circular hole opened by the pressure equalizing ball 3 is 1-50 mm larger than the outer diameter of the third bracket. Preferably, the diameter of the circular hole opened by the pressure equalizing ball 3 is 30 mm larger than the outer diameter of the third bracket, and the second The end (the upper right end as shown in FIG. 1 ) passes through the circular hole and is placed in the pressure equalizing ball 3 . The pressure-equalizing ball 3 can be connected to the fixed handrail 2 through the connecting piece 4. When the line is maintained, the pressure-equalizing ball 4 is suspended on both sides of the ladder body through the connecting piece 4. The two ends (the upper right end shown in Figure 1) are connected. In order to sufficiently bear the weight of the pressure equalizing ball, the connecting member 4 can be a steel wire rope with a diameter of 1-10 mm, a steel strand rope, a steel core aluminum stranded wire rope or a copper wire rope, preferably, a steel wire rope with a diameter of 5 mm. The corona cage is 70m long and consists of two cages with a cross-section of 10m×10m. There are 2 layers of intermediate nets between the two cages. The corona cage is arranged in a catenary structure, and the distance between the cages at both ends is about 100 m from the ground. When the height is 3m, for safety and stability, the corona cage is provided with 4 high-voltage operation folding ladders arranged at 60° to the bottom surface. The beam 11 is fixed and separated from the corona cage by means of latches.

综上所述,本实施例提供的高电压作业折叠梯,在线路运行时,横梁11与固定扶手2相接触可以阻挡儿童或自杀者的攀爬,减少了高压线路周围的触电危险的可能性,解决了高电压作业梯子带来的不安全性问题。同时,均压球3与高电压作业折叠梯中顶部尖端部位相连接,增大了高电压作业折叠梯顶端部件的曲率半径,解决了高压环境下高电压作业梯子顶端发生电晕放电的问题。To sum up, in the high-voltage operation folding ladder provided in this embodiment, when the line is running, the contact between the beam 11 and the fixed handrail 2 can prevent children or suicides from climbing, and reduce the possibility of electric shock around the high-voltage line , to solve the problem of insecurity caused by high-voltage working ladders. At the same time, the pressure equalizing ball 3 is connected to the top tip of the high-voltage operation folding ladder, which increases the curvature radius of the top part of the high-voltage operation folding ladder, and solves the problem of corona discharge at the top of the high-voltage operation ladder in a high-voltage environment.

显然,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit and scope of the invention. Thus, provided that these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims (9)

1. A high voltage operation folding ladder, comprising: the foldable handrail (1) is positioned at the upper end of the fixed handrail (2); wherein,
the end part of the high-voltage operation folding ladder is respectively connected with the ground and the detection and maintenance device;
the folding handrail (1) comprises a cross beam (11) and two handrail supports (12); wherein the first ends of the two armrest supports (12) are connected through the cross beam (11), and the second ends are respectively detachably connected with the two pressure equalizing balls (3);
the length of the cross beam (11) is greater than the distance between the two fixed armrests (2);
the two handrail supports (12) are respectively arranged on two sides of the two fixed handrails (2) and are rotatably connected with the two fixed handrails (2);
when the line runs, the cross beam (11) is in contact with the two fixed handrails (2) and is used for blocking people from climbing;
when the line is maintained, the cross beam (11) is in contact with the detection and maintenance device and is used for supporting the handrail support (12).
2. High voltage service stepladder according to claim 1, characterized in that the handrail support (12) comprises: a first bracket (121), a second bracket (122) and an armrest frame (123); wherein,
a first end of the first bracket (121) is connected with a first end of the second bracket (122), and a second end of the first bracket (121) is connected with the armrest frame (123);
the second end of the second bracket (122) is connected with the first end of the handrail frame (123), and the first bracket (121), the second bracket (122) and the handrail frame (123) enclose a triangle;
the second end of the armrest frame (123) is arranged outside the triangle and is detachably connected with the pressure equalizing ball (3);
the cross beam (11) is fixedly connected to the joint of the first bracket (121) and the second bracket (122).
3. The high voltage service attic ladder of claim 2,
the pressure equalizing ball (3) is provided with a groove matched with the second end of the armrest frame (123);
the second end of the armrest frame (123) is clamped in the groove.
4. The high voltage service attic ladder of claim 2,
the pressure equalizing ball (3) is a hollow ball body, and the pressure equalizing ball (3) is provided with an opening (31) matched with the second end of the armrest frame (123);
the second end of the armrest frame (123) penetrates through the opening (31) and is sleeved in the pressure equalizing ball (3).
5. A high voltage operating ladder according to claim 4, wherein the opening (31) is a circular hole with a diameter larger than the diameter of the second end of the handrail frame (123).
6. A high voltage service attic ladder as claimed in any one of claims 1 to 5,
the pressure equalizing ball (3) is connected with the fixed handrail (2) through a connecting piece (4), and the connecting piece (4) is used for fixing the pressure equalizing ball (3).
7. A high voltage operating stepladder according to claim 6, wherein the connection (4) is a lead wire.
8. The high voltage operating attic ladder of claim 7, wherein the lead wire rope is a wire rope, a steel strand wire rope, a steel-reinforced aluminum strand wire rope, or a copper wire rope.
9. A high voltage service attic ladder as claimed in any one of claims 1 to 5, wherein said cross member (11) is detachably connected to said service detection device by means of a latch.
CN201710156770.9A 2017-03-16 2017-03-16 High-voltage operation folding ladder Active CN106848925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710156770.9A CN106848925B (en) 2017-03-16 2017-03-16 High-voltage operation folding ladder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710156770.9A CN106848925B (en) 2017-03-16 2017-03-16 High-voltage operation folding ladder

Publications (2)

Publication Number Publication Date
CN106848925A CN106848925A (en) 2017-06-13
CN106848925B true CN106848925B (en) 2020-01-03

Family

ID=59143867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710156770.9A Active CN106848925B (en) 2017-03-16 2017-03-16 High-voltage operation folding ladder

Country Status (1)

Country Link
CN (1) CN106848925B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0951614A (en) * 1995-08-04 1997-02-18 Central Res Inst Of Electric Power Ind Steel tower for power transmission with safety facility
JP2002201885A (en) * 2000-12-28 2002-07-19 Minoru Furuhata Warning display device of transferable ladder
CN202673134U (en) * 2012-07-10 2013-01-16 浙江国星实业有限公司 Crawling ladder of wind power generation tower
CN105203021A (en) * 2015-10-21 2015-12-30 华北电力大学 Measuring device and method of roughness coefficient of high-voltage conducting wire

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0951614A (en) * 1995-08-04 1997-02-18 Central Res Inst Of Electric Power Ind Steel tower for power transmission with safety facility
JP2002201885A (en) * 2000-12-28 2002-07-19 Minoru Furuhata Warning display device of transferable ladder
CN202673134U (en) * 2012-07-10 2013-01-16 浙江国星实业有限公司 Crawling ladder of wind power generation tower
CN105203021A (en) * 2015-10-21 2015-12-30 华北电力大学 Measuring device and method of roughness coefficient of high-voltage conducting wire

Also Published As

Publication number Publication date
CN106848925A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
KR200483185Y1 (en) Built Type Scaffold having Fall and Drop Prevention Net
US20030192742A1 (en) Helicopter lineman's ladder and method for energized powerline repair
CN109372240B (en) All-steel attached lifting scaffolding
CN204299289U (en) A kind of safe fence for electric power overhaul, test
CN104577876B (en) Plug-in hanging basket for live working of helicopter
CN103840392A (en) Concrete pole operation platform
CN106848925B (en) High-voltage operation folding ladder
CN204767097U (en) High altitude construction safety belt linkage
CN206545481U (en) High voltage operations folding ladder
CN104600611A (en) Portable maintenance platform of disconnecting switch
CN204497406U (en) High-tension overhead line protective earthing line
CN105083350A (en) Special vehicle for power maintenance
CN104819817A (en) Detection device for power construction safety belt hanger
CN104746863B (en) A kind of concrete chimney Demolition Construction platform
CN207699068U (en) One kind is ridden posture gondola-hanging mechanism
CN205976442U (en) Outer wall steel pipe scaffold puts up isolating device
KR200403972Y1 (en) Transmission Tower
CN212562399U (en) Foldable maintenance platform
CN209316872U (en) A single-rod anti-drop device for steel pipe poles
CN204782697U (en) Cat ladder is mended to safe and reliable's cluster
CN219034108U (en) Fire-catching device and operation platform
CN107508179A (en) A kind of pylon inspection platform
CN203850734U (en) On-site easy-dismounting 110kV wall bushing unkeeping support
CN205840294U (en) Hanging flower basket protection canopy
KR101546295B1 (en) Safty guardrail having refuge ability for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant