CN106846638A - The surplus management method and device of intelligence instrument - Google Patents

The surplus management method and device of intelligence instrument Download PDF

Info

Publication number
CN106846638A
CN106846638A CN201710007729.5A CN201710007729A CN106846638A CN 106846638 A CN106846638 A CN 106846638A CN 201710007729 A CN201710007729 A CN 201710007729A CN 106846638 A CN106846638 A CN 106846638A
Authority
CN
China
Prior art keywords
instrument
surplus
payment
current
intelligence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710007729.5A
Other languages
Chinese (zh)
Inventor
宋明星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xiaomi Mobile Software Co Ltd
Original Assignee
Beijing Xiaomi Mobile Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xiaomi Mobile Software Co Ltd filed Critical Beijing Xiaomi Mobile Software Co Ltd
Priority to CN201710007729.5A priority Critical patent/CN106846638A/en
Publication of CN106846638A publication Critical patent/CN106846638A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/10Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity with alarm or warning devices, e.g. indicating the interrupting of the supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • G06Q20/145Payments according to the detected use or quantity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/22Payment schemes or models
    • G06Q20/28Pre-payment schemes, e.g. "pay before"
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/06Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity with means for prepaying basic charges, e.g. rent for meters
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/001Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for gas
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/003Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity for electricity

Abstract

The disclosure is directed to the surplus management method and device of a kind of intelligence instrument, wherein, method includes:Obtain the current instrument surplus of the intelligence instrument;The current instrument surplus is compared with default Margin threshold, comparative result is obtained;Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user's paying.By the technical scheme, the current instrument surplus of intelligence instrument can automatically be obtained, so as to current instrument surplus and default Margin threshold are compared, output payment reminder message is determined whether according to comparative result, remind the user that payment, this way it is possible to avoid the instrument surplus deficiency of intelligence instrument causes the user can not to be continuing with, so as to lift the experience of user.

Description

The surplus management method and device of intelligence instrument
Technical field
This disclosure relates to intelligence instrument technical field, more particularly to a kind of intelligence instrument surplus management method and device.
Background technology
The mode of the current more convenient inquiry available balance of home intelligent ammeter actively passes through the side such as app or wechat for user Formula is inquired about, and this mode extremely relies on user, if payment is powered off when electricity remaining sum can be caused to be 0 not in time, so as to influence household electrical appliances Use.
The content of the invention
The embodiment of the present disclosure provides the surplus management method and device of a kind of intelligence instrument, including following technical scheme:
According to the first aspect of the embodiment of the present disclosure, there is provided a kind of surplus management method of intelligence instrument, including:
Obtain the current instrument surplus of the intelligence instrument;
The current instrument surplus is compared with default Margin threshold, comparative result is obtained;
Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user to pay Expense.
In one embodiment, it is described that output payment prompting message is determined whether according to comparative result, including:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, institute is exported State payment prompting message.
In one embodiment, methods described also includes:
When the comparative result is that the current instrument surplus is more than the default Margin threshold, obtained according to current time Take the history same period consumption record of the intelligence instrument;
Target instrument surplus is determined according to the current instrument surplus and the default Margin threshold, wherein, the target The difference of the balance of current instrument surplus of instrument and the default Margin threshold;
The available duration of the target instrument surplus is determined according to history same period consumption record;
According to the current time and the available duration, it is determined that obtaining the object time of instrument surplus next time;
When the object time is reached, the step of the current instrument surplus for obtaining the intelligence instrument is performed again.
In one embodiment, the payment prompting message includes recommendation payment amount of money, and methods described also includes:
The intelligence instrument corresponding history payment cycle and history same period consumption record are obtained according to current time;
Paid the fees cycle and the history same period consumption record determination recommendation payment amount of money according to the history.
In one embodiment, methods described also includes:
After the payment prompting message is exported, it is determined whether the default means of payment of binding;
When it is determined that binding the default means of payment, automatic fee is carried out according to the recommendation payment amount of money.
In one embodiment, it is described according to the current time and the available duration, it is determined that obtaining instrument next time The object time of surplus, including:
It is described according to the current time and the available duration, determine to obtain instrument next time according to the mode of dichotomy The object time of surplus.
According to the second aspect of the embodiment of the present disclosure, there is provided a kind of surplus managing device of intelligence instrument, including:
First acquisition module, the current instrument surplus for obtaining the intelligence instrument;
Comparison module, for the current instrument surplus to be compared with default Margin threshold, obtains comparative result;
First determining module, for determining whether output payment prompting message according to comparative result, letter is reminded in the payment Cease for reminding user's paying.
In one embodiment, first determining module is used for:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, institute is exported State payment prompting message.
In one embodiment, described device also includes:
Second acquisition module, for being that the current instrument surplus is more than the default Margin threshold when the comparative result When, the history same period consumption record of the intelligence instrument is obtained according to current time;
Second determining module, for being determined more than target instrument according to the current instrument surplus and the default Margin threshold Amount, wherein, the difference of the balance of current instrument surplus of target instrument and the default Margin threshold;
3rd determining module, for determining the available of the target instrument surplus according to history same period consumption record Duration;
4th determining module, for according to the current time and the available duration, it is determined that obtain more than instrument next time The object time of amount;
Trigger module, the intelligence is obtained for when the object time is reached, triggering first acquisition module again The current instrument surplus of energy instrument.
In one embodiment, the payment prompting message includes recommendation payment amount of money, and described device also includes:
3rd acquisition module, for obtaining the intelligence instrument corresponding history payment cycle and history according to current time Same period consumption is recorded;
5th determining module, for being paid the fees described in cycle and history same period consumption record determination according to the history Recommend payment amount of money.
In one embodiment, described device also includes:
6th determining module, for after the payment prompting message is exported, it is determined whether the default means of payment of binding;
Payment module, for when it is determined that binding the default means of payment, being carried out certainly according to the recommendation payment amount of money Dynamic payment.
In one embodiment, the 4th determining module is used for:
It is described according to the current time and the available duration, determine to obtain instrument next time according to the mode of dichotomy The object time of surplus.
According to the third aspect of the embodiment of the present disclosure, there is provided a kind of surplus managing device of intelligence instrument, including:
Processor;
Memory for storing processor-executable instruction;
Wherein, the processor is configured as:
Obtain the current instrument surplus of the intelligence instrument;
The current instrument surplus is compared with default Margin threshold, comparative result is obtained;
Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user to pay Expense.
The technical scheme provided by this disclosed embodiment can include the following benefits:
Above-mentioned technical proposal, can automatically obtain the current instrument surplus of intelligence instrument, thus by current instrument surplus with Default Margin threshold is compared, and output payment reminder message is determined whether according to comparative result, reminds the user that payment, this Sample, can avoid the instrument surplus deficiency of intelligence instrument from causing the user can not to be continuing with, so as to lift the experience of user.
It should be appreciated that the general description of the above and detailed description hereinafter are only exemplary and explanatory, not The disclosure can be limited.
Brief description of the drawings
Accompanying drawing herein is merged in specification and constitutes the part of this specification, shows the implementation for meeting the disclosure Example, and it is used to explain the principle of the disclosure together with specification.
Fig. 1 is a kind of flow chart of the surplus management method of the intelligence instrument according to an exemplary embodiment.
Fig. 2 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
Fig. 3 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
Fig. 4 be a kind of intelligence instrument according to an exemplary embodiment surplus management method in step S304 stream Cheng Tu.
Fig. 5 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
Fig. 6 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
Fig. 7 is a kind of block diagram of the surplus managing device of the intelligence instrument according to an exemplary embodiment.
Fig. 8 is the block diagram of the surplus managing device of another intelligence instrument according to an exemplary embodiment.
Fig. 9 is the block diagram of the surplus managing device of another intelligence instrument according to an exemplary embodiment.
Figure 10 is the block diagram of the surplus managing device of another intelligence instrument according to an exemplary embodiment.
Figure 11 is a kind of block diagram of the surplus managing device for intelligence instrument according to an exemplary embodiment.
Specific embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment Described in implementation method do not represent all implementation methods consistent with the disclosure.Conversely, they be only with it is such as appended The example of the consistent apparatus and method of some aspects described in detail in claims, the disclosure.
The embodiment of the present disclosure provides a kind of surplus management method of intelligence instrument, the method can be used in intelligence instrument or In the terminal device that person is connected with intelligence instrument, wherein, intelligence instrument includes but is not limited to various for measuring available resources (such as Water, electricity, combustion gas etc.) specifying information instrument.Preferably, intelligence instrument can be domestic intelligent instrument, such as ammeter, combustion gas Table, water meter etc..
Fig. 1 is a kind of flow chart of the surplus management method of the intelligence instrument according to an exemplary embodiment.
As shown in figure 1, the method comprising the steps of S101-S103:
In step S101, the current instrument surplus of intelligence instrument is obtained;
Intelligence instrument includes but is not limited to various for measuring the specifying information of available resources (such as water, electricity, combustion gas) Instrument.Preferably, intelligence instrument can be domestic intelligent instrument, such as ammeter, gas meter, flow meter, water meter.Current instrument surplus can be with It is that amount of money surplus can also be instrument number surplus.
In step s 102, current instrument surplus and default Margin threshold are compared, obtain comparative result;
In this embodiment, user can set the default Margin threshold of intelligence instrument, such as set ammeter, gas meter, flow meter, water The default Margin threshold of table etc., so that when current instrument surplus is less than the default Margin threshold, output payment prompting message, Remind subscriber payment.
In step s 103, output payment prompting message is determined whether according to comparative result, payment prompting message is used to carry Awake user's paying.
In this embodiment it is possible to automatically obtain intelligence instrument current instrument surplus so that by current instrument surplus with Default Margin threshold is compared, and output payment reminder message is determined whether according to comparative result, reminds the user that payment, this Sample, it is not necessary to the surplus of user's manual queries intelligence instrument, but actively carry out instrument surplus inquiry and true according to Query Result Whether fixed to need to remind subscriber payment, the instrument surplus deficiency such that it is able to avoid intelligence instrument causes the user can not to continue to make With improving the experience of user.
Fig. 2 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
As shown in Fig. 2 in one embodiment, above-mentioned steps S103 includes step S201:
In step s 201, when comparative result is that current instrument surplus is less than or equal to default Margin threshold, output Payment prompting message.
In this embodiment, when current instrument surplus is less than or equal to default Margin threshold, letter is reminded in output payment Breath, this way it is not necessary to the surplus of user's manual queries intelligence instrument, but actively carry out the inquiry of instrument surplus and tied according to inquiry Fruit determines the need for reminding subscriber payment, and the instrument surplus deficiency such that it is able to avoid intelligence instrument causes the user can not to continue Use, improve the experience of user.
Fig. 3 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
As shown in figure 3, in one embodiment, the above method also includes step S301-S305:
In step S301, when comparative result is that current instrument surplus is more than default Margin threshold, according to current time Obtain the history same period consumption record of intelligence instrument;
If current instrument surplus is more than default Margin threshold, illustrate now need not also remind user, now, The history same period consumption record of intelligence instrument can be obtained according to current time.For example, intelligence instrument is intelligent electric meter, then exist Former electric quantity consumption amount data can be recorded in ammeter, wherein, the history same period consumption record can in units of the moon, for example, Current time is the A days December in 2016, then history same period consumption record can be the electric quantity consumption amount number in December, 2015 Can also be in units of season, half a year, 1 year according to, certain history same period consumption record, history same period consumption record can be with It it is 1 year, or for many years, if there is many annual datas, electricity consumption monthly is the average value of the same period amount of money for many years.
In step s 302, target instrument surplus is determined according to current instrument surplus and default Margin threshold, wherein, target The difference of the balance of current instrument surplus of instrument and default Margin threshold;
Default Margin threshold is subtracted with current instrument surplus obtain target instrument surplus.
In step S303, the available duration of target instrument surplus is determined according to history same period consumption record;
In step s 304, according to current time and available duration, it is determined that obtaining the object time of instrument surplus next time;
In step S305, when the object time is reached, the step of the current instrument surplus for obtaining intelligence instrument is performed again Suddenly.
In this embodiment, when current instrument surplus is more than default Margin threshold, calculate current instrument surplus and preset Difference between Margin threshold, obtains target instrument surplus, and determine target instrument surplus according to history same period consumption record Available duration, so as to be determined to obtain the object time of instrument surplus next time according to available duration and current time, so, no It is to obtain instrument surplus in real time, but determines when that acquisition is worked as according to the available duration of current time and target instrument surplus Preceding instrument surplus, this way it is possible to avoid obtaining the waste of the resource that instrument surplus is caused in real time.
Fig. 4 be a kind of intelligence instrument according to an exemplary embodiment surplus management method in step S304 stream Cheng Tu.
As shown in figure 4, in one embodiment, above-mentioned steps S304 includes step S401:
In step S401, according to current time and available duration, determine to obtain instrument next time according to the mode of dichotomy The object time of table surplus.
Specifically, can determine to obtain the object time of instrument surplus next time according to the mode of dichotomy.Below with one Individual specific embodiment describes the technical scheme in detail.For example, with intelligence instrument as ammeter, the electric quantity data of 1 year history same period is Example (if there is many annual datas, electricity consumption monthly is the average value of the same period amount of money for many years), every month in previous year January to December Electricity consumption is M1, and M2 ... Mn ... M12, current month is n, the current balance of Y of instrument, and the amount of money is reminded in user's setting payment, I.e. instrument Margin threshold is Z, if then Y≤Z, can remind subscriber payment, if Y > Z, is recorded according to history same period consumption It is determined that obtaining the object time of instrument surplus next time, specifically, user can be accustomed to according to payment, (week in setting payment cycle Phase can be the moon, season, half a year or 1 year).Assuming that the same day is the A days of the n months, distance of that month last day also remains B days, goes The daily electricity consumption amount of the year monthly average of same time n-th is D=Mn/ (A+B), if Y-Z≤D*B, illustrates that Sorry, your ticket has not enough value for current ammeter To use the end of month, ammeter remaining sum can use remaining number of days P=(Y-Z)/D, according to the mode of dichotomy, in of that month (A+P/2) day When, can be in backstage active inquiry intelligent electric meter remaining sum, remaining sum is Y ', if Y '≤Z, subscriber payment is reminded, otherwise, according to it Preceding computational methods calculate P ', similarly, can do and inquire about next time in (A+P/2+P '/2) day, by that analogy, dynamically look into Ammeter remaining sum is ask, until when remaining sum is less than the payment value boundary that user sets, reminding subscriber payment;If Y-Z>D*B, then First day n+1 month, ammeter remaining sum is inquired about, then according to such scheme, carry out dynamic queries, user is reminded when Sorry, your ticket has not enough value.
Fig. 5 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
As shown in figure 5, in one embodiment, payment prompting message includes recommending payment amount of money, and the above method is also wrapped Include step S501-S502:
In step S501, intelligence instrument corresponding history payment cycle and the consumption of the history same period are obtained according to current time Amount record;
In step S502, paid the fees cycle and history same period consumption record determination recommendation payment amount of money according to history.
In this embodiment, can also be according to intelligence instrument corresponding history payment cycle and history same period consumption record Recommendation payment amount of money is calculated, so as to payment amount of money is recommended in output in output payment prompting message, so, user can be according to The payment amount of money of recommendation is paid the fees, and payment amount of money is calculated without artificial again, further improves the experience of user.
Fig. 6 is the flow chart of the surplus management method of another intelligence instrument according to an exemplary embodiment.
As shown in fig. 6, in one embodiment, the above method also includes step S601-S602:
In step s 601, after output payment prompting message, it is determined whether the default means of payment of binding;
In step S602, when it is determined that the means of payment is preset in binding, automatic fee is carried out according to payment amount of money is recommended.
In this embodiment, if user has bound the default means of payment, can be according to recommendation payment amount of money according to pre- If the means of payment is paid the fees automatically, so as to further lift the experience of user.
Following is disclosure device embodiment, can be used for performing method of disclosure embodiment.
Fig. 7 is a kind of block diagram of the surplus managing device of the intelligence instrument according to an exemplary embodiment, the device Can by software, hardware or both be implemented in combination with turn into some or all of of intelligence instrument or terminal device.Such as Shown in Fig. 7, the surplus managing device of the intelligence instrument includes:
First acquisition module 71, is configured as obtaining the current instrument surplus of the intelligence instrument;
Intelligence instrument includes but is not limited to various for measuring the specifying information of available resources (such as water, electricity, combustion gas) Instrument.Preferably, intelligence instrument can be domestic intelligent instrument, such as ammeter, gas meter, flow meter, water meter.Current instrument surplus can be with It is that amount of money surplus can also be instrument number surplus.
Comparison module 72, is configured as being compared the current instrument surplus with default Margin threshold, is compared As a result;
In this embodiment, user can set the default Margin threshold of intelligence instrument, such as set ammeter, gas meter, flow meter, water The default Margin threshold of table etc., so that when current instrument surplus is less than the default Margin threshold, output payment prompting message, Remind subscriber payment.
First determining module 73, is configured as determining whether output payment prompting message, the payment according to comparative result Prompting message is used to remind user's paying.
In this embodiment it is possible to automatically obtain intelligence instrument current instrument surplus so that by current instrument surplus with Default Margin threshold is compared, and output payment reminder message is determined whether according to comparative result, reminds the user that payment, this Sample, it is not necessary to the surplus of user's manual queries intelligence instrument, but actively carry out instrument surplus inquiry and true according to Query Result Whether fixed to need to remind subscriber payment, the instrument surplus deficiency such that it is able to avoid intelligence instrument causes the user can not to continue to make With improving the experience of user.
In one embodiment, first determining module 73 is used for:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, institute is exported State payment prompting message.
In this embodiment, when current instrument surplus is less than or equal to default Margin threshold, letter is reminded in output payment Breath, this way it is not necessary to the surplus of user's manual queries intelligence instrument, but actively carry out the inquiry of instrument surplus and tied according to inquiry Fruit determines the need for reminding subscriber payment, and the instrument surplus deficiency such that it is able to avoid intelligence instrument causes the user can not to continue Use, improve the experience of user.
Fig. 8 is the block diagram of the surplus managing device of another intelligence instrument according to an exemplary embodiment.
As shown in figure 8, in one embodiment, said apparatus also include:
Second acquisition module 81, is configured as the comparative result for the current instrument surplus is default remaining more than described During amount threshold value, the history same period consumption record of the intelligence instrument is obtained according to current time;
If current instrument surplus is more than default Margin threshold, illustrate now need not also remind user, now, The history same period consumption record of intelligence instrument can be obtained according to current time.For example, intelligence instrument is intelligent electric meter, then exist Former electric quantity consumption amount data can be recorded in ammeter, wherein, the history same period consumption record can in units of the moon, for example, Current time is the A days December in 2016, then history same period consumption record can be the electric quantity consumption amount number in December, 2015 Can also be in units of season, half a year, 1 year according to, certain history same period consumption record, history same period consumption record can be with It it is 1 year, or for many years, if there is many annual datas, electricity consumption monthly is the average value of the same period amount of money for many years.
Second determining module 82, is configured as determining target according to the current instrument surplus and the default Margin threshold Instrument surplus, wherein, the difference of the balance of current instrument surplus of target instrument and the default Margin threshold;With current Instrument surplus subtracts default Margin threshold and obtains target instrument surplus.
3rd determining module 83, is configured as determining the target instrument surplus according to history same period consumption record Available duration;
4th determining module 84, is configured as according to the current time and the available duration, it is determined that obtain next time The object time of instrument surplus;
Trigger module 85, when being configured as reaching the object time, triggers first acquisition module and obtains again The current instrument surplus of the intelligence instrument.
In this embodiment, when current instrument surplus is more than default Margin threshold, calculate current instrument surplus with it is described Difference between default Margin threshold, obtains target instrument surplus, and determine target instrument according to history same period consumption record The available duration of surplus, so as to be determined to obtain the object time of instrument surplus next time according to available duration and current time, this Sample, is not to obtain instrument surplus in real time, but determined when according to the available duration of current time and target instrument surplus Current instrument surplus is obtained, this way it is possible to avoid obtaining the waste of the resource that instrument surplus is caused in real time.
In one embodiment, the 4th determining module 84 is used for:
It is described according to the current time and the available duration, determine to obtain instrument next time according to the mode of dichotomy The object time of surplus.
Specifically, can determine to obtain the object time of instrument surplus next time according to the mode of dichotomy.Below with one Individual specific embodiment describes the technical scheme in detail.For example, with intelligence instrument as ammeter, the electric quantity data of 1 year history same period is Example (if there is many annual datas, electricity consumption monthly is the average value of the same period amount of money for many years), every month in previous year January to December Electricity consumption is M1, and M2 ... Mn ... M12, current month is n, the current balance of Y of instrument, and the amount of money is reminded in user's setting payment, I.e. instrument Margin threshold is Z, if then Y≤Z, can remind subscriber payment, if Y > Z, is recorded according to history same period consumption It is determined that obtaining the object time of instrument surplus next time, specifically, user can be accustomed to according to payment, (week in setting payment cycle Phase can be the moon, season, half a year or 1 year).Assuming that the same day is the A days of the n months, distance of that month last day also remains B days, goes The daily electricity consumption amount of the year monthly average of same time n-th is D=Mn/ (A+B), if Y-Z≤D*B, illustrates that Sorry, your ticket has not enough value for current ammeter To use the end of month, ammeter remaining sum can use remaining number of days P=(Y-Z)/D, according to the mode of dichotomy, in of that month (A+P/2) day When, can be in backstage active inquiry intelligent electric meter remaining sum, remaining sum is Y ', if Y '≤Z, subscriber payment is reminded, otherwise, according to it Preceding computational methods calculate P ', similarly, can do and inquire about next time in (A+P/2+P '/2) day, by that analogy, dynamically look into Ammeter remaining sum is ask, until when remaining sum is less than the payment value boundary that user sets, reminding subscriber payment;If Y-Z>D*B, then First day n+1 month, ammeter remaining sum is inquired about, then according to such scheme, carry out dynamic queries, user is reminded when Sorry, your ticket has not enough value.
Fig. 9 is the block diagram of the surplus managing device of another intelligence instrument according to an exemplary embodiment.
As shown in figure 9, in one embodiment, the payment prompting message includes recommending payment amount of money, said apparatus Also include:
3rd acquisition module 91, is configured as obtaining the intelligence instrument corresponding history payment cycle according to current time Recorded with history same period consumption;
5th determining module 92, is configured as true according to history payment cycle and history same period consumption record The fixed recommendation payment amount of money.
In this embodiment, can also be according to intelligence instrument corresponding history payment cycle and history same period consumption record Recommendation payment amount of money is calculated, so as to payment amount of money is recommended in output in output payment prompting message, so, user can be according to The payment amount of money of recommendation is paid the fees, and payment amount of money is calculated without artificial again, further improves the experience of user.
Figure 10 is the block diagram of the surplus managing device of another intelligence instrument according to an exemplary embodiment.
As shown in Figure 10, in one embodiment, said apparatus also include:
6th determining module 1001, is configured as after the payment prompting message is exported, it is determined whether the default branch of binding The mode of paying;
Payment module 1002, is configured as when it is determined that binding the default means of payment, payment gold being recommended according to described Volume carries out automatic fee.
In this embodiment, if user has bound the default means of payment, can be according to recommendation payment amount of money according to pre- If the means of payment is paid the fees automatically, so as to further lift the experience of user.
According to the third aspect of the embodiment of the present disclosure, there is provided a kind of surplus managing device of intelligence instrument, including:
Processor;
Memory for storing processor-executable instruction;
Wherein, processor is configured as:
Obtain the current instrument surplus of the intelligence instrument;
The current instrument surplus is compared with default Margin threshold, comparative result is obtained;
Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user to pay Expense.
Above-mentioned processor is also configured to:
It is described that output payment prompting message is determined whether according to comparative result, including:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, institute is exported State payment prompting message.
Above-mentioned processor is also configured to:
When the comparative result is that the current instrument surplus is more than the default Margin threshold, obtained according to current time Take the history same period consumption record of the intelligence instrument;
Target instrument surplus is determined according to the current instrument surplus and the default Margin threshold, wherein, the target The difference of the balance of current instrument surplus of instrument and the default Margin threshold;
The available duration of the target instrument surplus is determined according to history same period consumption record;
According to the current time and the available duration, it is determined that obtaining the object time of instrument surplus next time;
When the object time is reached, the step of the current instrument surplus for obtaining the intelligence instrument is performed again.
Above-mentioned processor is also configured to:
The payment prompting message includes recommendation payment amount of money, and methods described also includes:
The intelligence instrument corresponding history payment cycle and history same period consumption record are obtained according to current time;
Paid the fees cycle and the history same period consumption record determination recommendation payment amount of money according to the history.
Above-mentioned processor is also configured to:
After the payment prompting message is exported, it is determined whether the default means of payment of binding;
When it is determined that binding the default means of payment, automatic fee is carried out according to the recommendation payment amount of money.
Above-mentioned processor is also configured to:
It is described according to the current time and the available duration, it is determined that obtain the object time of instrument surplus next time, Including:
It is described according to the current time and the available duration, determine to obtain instrument next time according to the mode of dichotomy The object time of surplus.
Figure 11 is a kind of block diagram of the surplus managing device for intelligence instrument according to an exemplary embodiment, should Device is applied to terminal device.For example, device 1100 can be mobile phone, computer, digital broadcast terminal, information receiving and transmitting sets It is standby, game console, tablet device, Medical Devices, body-building equipment, personal digital assistant etc..
Device 1100 can include following one or more assemblies:Processing assembly 1102, memory 1104, power supply module 1106, multimedia groupware 1108, audio-frequency assembly 1110, the interface 1112 of input/output (I/O), sensor cluster 1114, and Communication component 1116.
The integrated operation of the usual control device 1100 of processing assembly 1102, such as with display, call, data communication, Camera operation and the associated operation of record operation.Processing assembly 1102 can include one or more processors 1120 to perform Instruction, to complete all or part of step of above-mentioned method.Additionally, processing assembly 1102 can include one or more moulds Block, is easy to the interaction between processing assembly 1102 and other assemblies.For example, processing assembly 1102 can include multi-media module, To facilitate the interaction between multimedia groupware 1108 and processing assembly 1102.
Memory 1104 is configured as storing various types of data supporting the operation in device 1100.These data Instruction of the example including any application program or method for being operated on device 1100, contact data, telephone book data, Message, picture, video etc..Memory 1104 can by any kind of volatibility or non-volatile memory device or they Combination realizes, such as static RAM (SRAM), Electrically Erasable Read Only Memory (EEPROM), it is erasable can Program read-only memory (EPROM), programmable read only memory (PROM), read-only storage (ROM), magnetic memory, flash memory Reservoir, disk or CD.
Power supply module 1106 provides electric power for the various assemblies of device 1100.Power supply module 1106 can include power management System, one or more power supplys, and other generate, manage and distribute the component that electric power is associated with for device 1100.
Multimedia groupware 1108 is included in one screen of output interface of offer between described device 1100 and user. In some embodiments, screen can include liquid crystal display (LCD) and touch panel (TP).If screen includes touch panel, Screen may be implemented as touch-screen, to receive the input signal from user.Touch panel includes that one or more touches are passed Sensor is with the gesture on sensing touch, slip and touch panel.The touch sensor can not only sensing touch or slip be dynamic The border of work, but also the detection duration related to the touch or slide and pressure.In certain embodiments, it is many Media component 1108 includes a front camera and/or rear camera.When device 1100 is in operator scheme, mould is such as shot When formula or video mode, front camera and/or rear camera can receive outside multi-medium data.Each preposition shooting Head and rear camera can be a fixed optical lens systems or with focusing and optical zoom capabilities.
Audio-frequency assembly 1110 is configured as output and/or input audio signal.For example, audio-frequency assembly 1110 includes a wheat Gram wind (MIC), when device 1100 is in operator scheme, such as call model, logging mode and speech recognition mode, microphone quilt It is configured to receive external audio signal.The audio signal for being received can be further stored in memory 1104 or via communication Component 1116 sends.In certain embodiments, audio-frequency assembly 1110 also includes a loudspeaker, for exports audio signal.
I/O interfaces 1112 are that interface, above-mentioned peripheral interface module are provided between processing assembly 1102 and peripheral interface module Can be keyboard, click wheel, button etc..These buttons may include but be not limited to:Home button, volume button, start button and Locking press button.
Sensor cluster 1114 includes one or more sensors, and the state for providing various aspects for device 1100 is commented Estimate.For example, sensor cluster 1114 can detect the opening/closed mode of device 1100, the relative positioning of component, such as institute Display and keypad that component is device 1100 are stated, sensor cluster 1114 can be with detection means 1100 or device 1,100 1 The position of individual component changes, and user is presence or absence of with what device 1100 was contacted, the orientation of device 1100 or acceleration/deceleration and dress Put 1100 temperature change.Sensor cluster 1114 can include proximity transducer, be configured to without any physics The presence of object nearby is detected during contact.Sensor cluster 1114 can also include optical sensor, and such as CMOS or ccd image are sensed Device, for being used in imaging applications.In certain embodiments, the sensor cluster 1114 can also include acceleration sensing Device, gyro sensor, Magnetic Sensor, pressure sensor or temperature sensor.
Communication component 1116 is configured to facilitate the communication of wired or wireless way between device 1100 and other equipment.Dress Putting 1100 can access the wireless network based on communication standard, such as WiFi, 2G or 3G, or combinations thereof.It is exemplary at one In embodiment, communication component 1116 receives broadcast singal or broadcast correlation from external broadcasting management system via broadcast channel Information.In one exemplary embodiment, the communication component 1116 also includes near-field communication (NFC) module, to promote short distance Communication.For example, radio frequency identification (RFID) technology, Infrared Data Association (IrDA) technology, ultra wide band can be based in NFC module (UWB) technology, bluetooth (BT) technology and other technologies are realized.
In the exemplary embodiment, device 1100 can be by one or more application specific integrated circuits (ASIC), numeral Signal processor (DSP), digital signal processing appts (DSPD), PLD (PLD), field programmable gate array (FPGA), controller, microcontroller, microprocessor or other electronic building bricks realization, for performing the above method.
In the exemplary embodiment, a kind of non-transitorycomputer readable storage medium including instructing, example are additionally provided Such as include the memory 1104 of instruction, above-mentioned instruction can be performed to complete the above method by the processor 1120 of device 1100.Example Such as, the non-transitorycomputer readable storage medium can be ROM, random access memory (RAM), CD-ROM, tape, soft Disk and optical data storage devices etc..
A kind of non-transitorycomputer readable storage medium, when the instruction in the storage medium is by the treatment of device 1100 When device is performed so that device 1100 is able to carry out the surplus management method of above-mentioned intelligence instrument, and methods described includes:
Obtain the current instrument surplus of the intelligence instrument;
The current instrument surplus is compared with default Margin threshold, comparative result is obtained;
Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user to pay Expense.
In one embodiment, it is described that output payment prompting message is determined whether according to comparative result, including:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, institute is exported State payment prompting message.
In one embodiment, methods described also includes:
When the comparative result is that the current instrument surplus is more than the default Margin threshold, obtained according to current time Take the history same period consumption record of the intelligence instrument;
Target instrument surplus is determined according to the current instrument surplus and the default Margin threshold, wherein, the target The difference of the balance of current instrument surplus of instrument and the default Margin threshold;
The available duration of the target instrument surplus is determined according to history same period consumption record;
According to the current time and the available duration, it is determined that obtaining the object time of instrument surplus next time;
When the object time is reached, the step of the current instrument surplus for obtaining the intelligence instrument is performed again.
In one embodiment, the payment prompting message includes recommendation payment amount of money, and methods described also includes:
The intelligence instrument corresponding history payment cycle and history same period consumption record are obtained according to current time;
Paid the fees cycle and the history same period consumption record determination recommendation payment amount of money according to the history.
In one embodiment, methods described also includes:
After the payment prompting message is exported, it is determined whether the default means of payment of binding;
When it is determined that binding the default means of payment, automatic fee is carried out according to the recommendation payment amount of money.
In one embodiment, it is described according to the current time and the available duration, it is determined that obtaining instrument next time The object time of surplus, including:
It is described according to the current time and the available duration, determine to obtain instrument next time according to the mode of dichotomy The object time of surplus.
Those skilled in the art will readily occur to its of the disclosure after considering specification and putting into practice disclosure disclosed herein Its embodiment.The application is intended to any modification, purposes or the adaptations of the disclosure, these modifications, purposes or Person's adaptations follow the general principle of the disclosure and including the undocumented common knowledge in the art of the disclosure Or conventional techniques.Description and embodiments are considered only as exemplary, and the true scope of the disclosure and spirit are by following Claim is pointed out.
It should be appreciated that the disclosure is not limited to the precision architecture for being described above and being shown in the drawings, and And can without departing from the scope carry out various modifications and changes.The scope of the present disclosure is only limited by appended claim.

Claims (13)

1. the surplus management method of a kind of intelligence instrument, it is characterised in that including:
Obtain the current instrument surplus of the intelligence instrument;
The current instrument surplus is compared with default Margin threshold, comparative result is obtained;
Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user to pay expense With.
2. method according to claim 1, it is characterised in that described to determine whether that output payment is reminded according to comparative result Information, including:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, paid described in output Take prompting message.
3. method according to claim 2, it is characterised in that methods described also includes:
When the comparative result is that the current instrument surplus is more than the default Margin threshold, institute is obtained according to current time State the history same period consumption record of intelligence instrument;
Target instrument surplus is determined according to the current instrument surplus and the default Margin threshold, wherein, the target instrument The difference of the balance of current instrument surplus and the default Margin threshold;
The available duration of the target instrument surplus is determined according to history same period consumption record;
According to the current time and the available duration, it is determined that obtaining the object time of instrument surplus next time;
When the object time is reached, the step of the current instrument surplus for obtaining the intelligence instrument is performed again.
4. method according to claim 2, it is characterised in that the payment prompting message includes recommending payment amount of money, Methods described also includes:
The intelligence instrument corresponding history payment cycle and history same period consumption record are obtained according to current time;
Paid the fees cycle and the history same period consumption record determination recommendation payment amount of money according to the history.
5. method according to claim 4, it is characterised in that methods described also includes:
After the payment prompting message is exported, it is determined whether the default means of payment of binding;
When it is determined that binding the default means of payment, automatic fee is carried out according to the recommendation payment amount of money.
6. method according to claim 3, it is characterised in that described according to the current time and the available duration, It is determined that the object time of instrument surplus is obtained next time, including:
It is described according to the current time and the available duration, determine to obtain instrument surplus next time according to the mode of dichotomy Object time.
7. the surplus managing device of a kind of intelligence instrument, it is characterised in that including:
First acquisition module, the current instrument surplus for obtaining the intelligence instrument;
Comparison module, for the current instrument surplus to be compared with default Margin threshold, obtains comparative result;
First determining module, for determining whether output payment prompting message according to comparative result, the payment prompting message is used In prompting user's paying.
8. device according to claim 7, it is characterised in that first determining module is used for:
When the comparative result is that the current instrument surplus is less than or equal to the default Margin threshold, paid described in output Take prompting message.
9. device according to claim 8, it is characterised in that described device also includes:
Second acquisition module, for when the comparative result be the current instrument surplus be more than the default Margin threshold when, The history same period consumption record of the intelligence instrument is obtained according to current time;
Second determining module, for determining target instrument surplus according to the current instrument surplus and the default Margin threshold, Wherein, the difference of the balance of current instrument surplus of the target instrument and the default Margin threshold;
3rd determining module, for according to history same period consumption record determine the target instrument surplus it is available when It is long;
4th determining module, for according to the current time and the available duration, it is determined that obtaining instrument surplus next time Object time;
Trigger module, the Intelligent Instrument is obtained for when the object time is reached, triggering first acquisition module again The current instrument surplus of table.
10. device according to claim 8, it is characterised in that the payment prompting message includes recommending payment amount of money, Described device also includes:
3rd acquisition module, for obtaining the intelligence instrument corresponding history payment cycle and the history same period according to current time Consumption is recorded;
5th determining module, for being paid the fees cycle and the history same period consumption record determination recommendation according to the history Payment amount of money.
11. devices according to claim 10, it is characterised in that described device also includes:
6th determining module, for after the payment prompting message is exported, it is determined whether the default means of payment of binding;
Payment module, for when it is determined that binding the default means of payment, being paid automatically according to the recommendation payment amount of money Take.
12. devices according to claim 9, it is characterised in that the 4th determining module is used for:
It is described according to the current time and the available duration, determine to obtain instrument surplus next time according to the mode of dichotomy Object time.
A kind of surplus managing device of 13. intelligence instruments, it is characterised in that including:
Processor;
Memory for storing processor-executable instruction;
Wherein, the processor is configured as:
Obtain the current instrument surplus of the intelligence instrument;
The current instrument surplus is compared with default Margin threshold, comparative result is obtained;
Output payment prompting message is determined whether according to comparative result, the payment prompting message is used to remind user to pay expense With.
CN201710007729.5A 2017-01-05 2017-01-05 The surplus management method and device of intelligence instrument Pending CN106846638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710007729.5A CN106846638A (en) 2017-01-05 2017-01-05 The surplus management method and device of intelligence instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710007729.5A CN106846638A (en) 2017-01-05 2017-01-05 The surplus management method and device of intelligence instrument

Publications (1)

Publication Number Publication Date
CN106846638A true CN106846638A (en) 2017-06-13

Family

ID=59117845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710007729.5A Pending CN106846638A (en) 2017-01-05 2017-01-05 The surplus management method and device of intelligence instrument

Country Status (1)

Country Link
CN (1) CN106846638A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107464359A (en) * 2017-08-03 2017-12-12 苏州燃气集团有限责任公司 The processing method and system of a kind of prepayment information
CN111028429A (en) * 2019-12-27 2020-04-17 深圳华越诚电子科技有限公司 Water, electricity and gas remote prepayment method and system
CN111263319A (en) * 2018-11-30 2020-06-09 中国移动通信集团山东有限公司 Method and device for reminding balance of mobile phone charge
CN111341026A (en) * 2020-03-04 2020-06-26 成都易信达科技股份有限公司 Water fee payment system and payment method
CN111612977A (en) * 2020-05-06 2020-09-01 国网河北省电力有限公司灵寿县供电分公司 Electric power payment system and method
CN113763636A (en) * 2021-09-07 2021-12-07 安徽华汇电力设备有限公司 Electric power prepayment system
CN114664021A (en) * 2020-12-23 2022-06-24 金卡智能集团股份有限公司 Gas consumption management method for metering instrument and metering instrument

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955821A (en) * 2014-04-01 2014-07-30 华为技术有限公司 Recharging method, recharging terminal and recharging server
CN104156852A (en) * 2014-07-15 2014-11-19 杭州海兴电力科技股份有限公司 Prepaid interaction platform and prepaid interaction method based on AMI system
CN204833484U (en) * 2015-08-03 2015-12-02 河南师范大学 Intelligent kilowatt -hour meter attachment device of collecting fee is reminded to SMS
CN105467181A (en) * 2015-12-24 2016-04-06 刘永祥 Device and method used for short-message payment notification of resident charge urging meter
CN105547331A (en) * 2016-01-14 2016-05-04 重庆蓝岸通讯技术有限公司 Intelligent electric meter electric quantity reminding method based on wireless communication
CN105590189A (en) * 2015-12-14 2016-05-18 苏州天平先进数字科技有限公司 Charging system and charging method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955821A (en) * 2014-04-01 2014-07-30 华为技术有限公司 Recharging method, recharging terminal and recharging server
CN104156852A (en) * 2014-07-15 2014-11-19 杭州海兴电力科技股份有限公司 Prepaid interaction platform and prepaid interaction method based on AMI system
CN204833484U (en) * 2015-08-03 2015-12-02 河南师范大学 Intelligent kilowatt -hour meter attachment device of collecting fee is reminded to SMS
CN105590189A (en) * 2015-12-14 2016-05-18 苏州天平先进数字科技有限公司 Charging system and charging method thereof
CN105467181A (en) * 2015-12-24 2016-04-06 刘永祥 Device and method used for short-message payment notification of resident charge urging meter
CN105547331A (en) * 2016-01-14 2016-05-04 重庆蓝岸通讯技术有限公司 Intelligent electric meter electric quantity reminding method based on wireless communication

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107464359A (en) * 2017-08-03 2017-12-12 苏州燃气集团有限责任公司 The processing method and system of a kind of prepayment information
CN111263319A (en) * 2018-11-30 2020-06-09 中国移动通信集团山东有限公司 Method and device for reminding balance of mobile phone charge
CN111263319B (en) * 2018-11-30 2021-10-29 中国移动通信集团山东有限公司 Method and device for reminding balance of mobile phone charge
CN111028429A (en) * 2019-12-27 2020-04-17 深圳华越诚电子科技有限公司 Water, electricity and gas remote prepayment method and system
CN111341026A (en) * 2020-03-04 2020-06-26 成都易信达科技股份有限公司 Water fee payment system and payment method
CN111612977A (en) * 2020-05-06 2020-09-01 国网河北省电力有限公司灵寿县供电分公司 Electric power payment system and method
CN114664021A (en) * 2020-12-23 2022-06-24 金卡智能集团股份有限公司 Gas consumption management method for metering instrument and metering instrument
CN113763636A (en) * 2021-09-07 2021-12-07 安徽华汇电力设备有限公司 Electric power prepayment system

Similar Documents

Publication Publication Date Title
CN106846638A (en) The surplus management method and device of intelligence instrument
CN105095345B (en) The reminding method and device of PUSH message
CN104539009B (en) charging management method and device
CN106774774A (en) The electric quantity display method and device of end cell
CN107134823A (en) Charge prompting method and device
US20150346250A1 (en) Method, apparatus, and system for counting electricity consumption
CN104394137B (en) A kind of method and device of prompting voice call
CN104281432A (en) Method and device for regulating sound effect
CN105898032A (en) Adjusting method and apparatus for warning tone
CN104297542B (en) A kind of reminding method and device based on power consumption
CN106776068A (en) Display methods, device and equipment that candidate applies
CN105472097A (en) Automatic reminding method based on mobile communication device, and mobile communication device thereof
CN107656694A (en) The display control method and device of user interface
CN106921797A (en) Information prompting method and device
CN104536753B (en) Backlog labeling method and device
CN107341657A (en) Payment process method, apparatus and terminal based on application program
CN107566750A (en) Control method, device and the storage medium of flash lamp
CN104968034A (en) Data transmission method and apparatus
CN106774802A (en) The reminding method of terminal power, device and terminal
CN104219648B (en) Prompt the method and device of charging information
CN109769145A (en) Access control method, device, terminal and the storage medium of short-sighted frequency
CN107704294A (en) The method and apparatus for handling reservation event
CN107168634A (en) The method and device that securities information is shown
CN106775646A (en) Alarm clock control method and device
CN106936986A (en) Application processing method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613