CN106845837A - Project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology - Google Patents

Project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology Download PDF

Info

Publication number
CN106845837A
CN106845837A CN201710049870.1A CN201710049870A CN106845837A CN 106845837 A CN106845837 A CN 106845837A CN 201710049870 A CN201710049870 A CN 201710049870A CN 106845837 A CN106845837 A CN 106845837A
Authority
CN
China
Prior art keywords
data
project
transmitting
converting electricity
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710049870.1A
Other languages
Chinese (zh)
Other versions
CN106845837B (en
Inventor
谢连科
赵岩
臧玉魏
张永
白晓春
张国英
马新刚
刘辉
陈素红
王飞
李勇
尹建光
徐桂彬
李华峰
李虎林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710049870.1A priority Critical patent/CN106845837B/en
Publication of CN106845837A publication Critical patent/CN106845837A/en
Application granted granted Critical
Publication of CN106845837B publication Critical patent/CN106845837B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology, system is configured as being managed all sensitizing ranges in project of transmitting and converting electricity, record and update project of transmitting and converting electricity data, figure layer data, environmental monitoring data and environmentally friendly dispute data, carry out the synchronous of data and interact with power grid environment conservative management subsystem by interface, update power grid environment protection data, it is connected with state net GIS platform by interface, the data of state's net GIS platform are carried out into three dimensions rectangular coordinate system conversion, its project of transmitting and converting electricity figure layer of real-time calling and geographical location information;Project of transmitting and converting electricity data, figure layer data, environmental monitoring data, environmentally friendly dispute data and geographic information data to obtaining are merged, and its correspondence is displayed in same figure layer.The present invention can carry out all multi informations in current project of transmitting and converting electricity unifying display, and different information are merged in map, really realize the integrated of data.

Description

Project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology
Technical field
The present invention relates to a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology.
Background technology
As the development of China's power industry, the capacity of power network are increasing, the distance of conveying is more and more remote, transmission line of electricity Voltage class also improving constantly, the construction scale of high voltage substation and overhead transmission line constantly expands.Along with economy The influence of the social factor such as development and population growth, newly-built project of transmitting and converting electricity is gradually approached to densely populated area and had become greatly Gesture is become.Many cities are powered the reorganization and expansion of power network in recent years, and transformer station is gradually built to urban district, high pressure by city suburbs Overhead transmission line spreads all over the place in Urban Public playground and residential block, transformer station and the issuable environment of transmission line of electricity Influence is increasingly subject to the concern of people, and the environmental protection work to project of transmitting and converting electricity proposes requirement higher.
Due to transformer station and transmission line of electricity substantial amounts, simple dependence is manually carried out to project of transmitting and converting electricity environmental protection work Management not only expends great effort but also mistake easily occurs, therefore carries out intelligent management ten to project of transmitting and converting electricity efforts at environmental protection Divide necessity.At present, State Grid Corporation of China's power grid environment protection work intellectuality has been achieved for very big progress, but in reality Still suffered from work portion link intelligence degree it is not high the problems such as, constrain the efficiency of project of transmitting and converting electricity environmental protection work.
First, it is relevant due to lacking environmentally sensitive areas distribution in project of transmitting and converting electricity environmental impact assessment and design phase Data, in project of transmitting and converting electricity addressing route selection and process of construction, what part engineering was taken in terms of environmentally sensitive areas avoidance arranges Apply and manage supporting method not enough;Project of transmitting and converting electricity environmental impact prediction technology is not high in terms of automation, the level of informatization, Addressing route selection stage and path cannot quickly, timely and accurately assess the influence of project of transmitting and converting electricity environmentally sensitive point when adjusting. Need to set up renewable, expansion the database for covering environmentally sensitive areas distribution, research is defeated based on existing power network GIS platform The automatic identification of power transformation engineering environment sensitive spot, sorting technique and project of transmitting and converting electricity electromagnetism, influence of noise automatic Prediction analysis skill Art, improves informationization, lean, the intelligent level of State Grid Corporation of China's power network environmental protection management.
Secondly, in the electricity transmitting and converting construction construction stage, environmental protective measure implementation of conditions and monitoring method it is cumbersome with letter Breath missing, information management mode falls behind;The record of environmental protective measure in construction process cannot be realized.Need to study defeated change Environmental protective measure in electrical engineering process of construction is implemented and monitoring method, solves each link environmental protection data of process of construction Intellectuality is collected, processed, information integration, realizes the overall process pipe to electricity transmitting and converting construction process environment carrying out measures situation Reason.
Again, in terms of electromagnetic environment monitoring, weather limitation, the measuring instrument of electromagnetic environment parameter monitoring Device species is various, measurement task complexity and data message are scattered, report generation is difficult, data inputting cannot realize batch behaviour Make, Monitoring Data cannot be shown to the public in real time.Need to develop round-the-clock real-time electromagnetic environment on-line monitoring system, build The vertical full state electromagnetic environment intelligent monitor system of wide area, the function such as realizes the batch capture of field data, storage, remotely has access to, to Public's real-time exhibition electromagnetic environment data.
The content of the invention
The present invention is in order to solve the above problems, it is proposed that a kind of project of transmitting and converting electricity environmental sensitive area based on big data technology Domain monitoring system and method, data of the present invention based on relevant database and GIS-Geographic Information System, by integrated data same Monitor plane to be shown, realize the Centralized Monitoring of project of transmitting and converting electricity environmentally sensitive areas.
To achieve these goals, the present invention is adopted the following technical scheme that:
A kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology, is configured as to power transmission and transformation work All sensitizing ranges in journey are managed, and record and update project of transmitting and converting electricity data, figure layer data, environmental monitoring data and environmental protection Dispute data, the monitoring system is carried out the synchronous of data and interacted by interface with power grid environment conservative management subsystem, more New power grid environment protection data;The monitoring system is connected by interface with state net GIS platform, by the data of state's net GIS platform Carry out three dimensions rectangular coordinate system conversion, its project of transmitting and converting electricity figure layer of real-time calling and geographical location information;
To the project of transmitting and converting electricity data, figure layer data, environmental monitoring data, environmentally friendly dispute data and the geography information number that obtain According to being merged, its correspondence is set to be displayed in same figure layer.
The project of transmitting and converting electricity environmentally sensitive areas monitoring system, specifically include data Layer, logical layer, service interaction layer and Represent layer, wherein:
The data Layer includes relational database and data update interface, and the relation data library storage is updated by data The project of transmitting and converting electricity environmental sensitive area numeric field data of interactive interfacing and other subsystem informations;
The logical layer is web server, is configured as the identification of storage environment sensitizing range with forecast model with environment-identification Sensitizing range, and the interactive geography information of fused data layer and environmental monitoring data, environmentally friendly dispute data, form each environment sensitive Section model;
Service interaction layer, is configured as reading each environment sensitive section model, using representing control by environment sensitive The multiple data possessed in section model is overlapped displaying, and every layer of information configuration is shown into label;
The represent layer, the figure layer for being configured to represent all environment sensitive section models of page presentation is marked with displaying Sign.
The data Layer, logical layer are respectively by database server and web server realization, the database server Capacity planning with web server determines according to the number of users of power consumer general headquarters, provincial company, three aspects of prefecture-level company.
The logical layer, is configured with authority management module, and according to the user gradation for logging in, given threshold divides different Environment sensitive section model map data mining platform or the authority for browsing or changing data of different compasses of competency.
The presentation layer, project of transmitting and converting electricity digital map, the region in show map are shown based on current page size Or transformer station, project of transmitting and converting electricity, environment in the sensitizing range of display historical relic sight spot, wire historic site, nature reserve area or water head site Sensitizing range type and corresponding environmental monitoring and environmentally friendly dispute information.
The logical layer, be configured as support by directly draw, node pull in real time or input coordinate edit mode Increase, modification environmental sensitive area information, the management function such as be provided additionally with deleting and imports, to the setting of different type environmental sensitive area Analytical parameters, on map in different colors or mark make a distinction.
The logical layer, the environment for being configured to the monitoring of interface dispatch environment and image data and project of transmitting and converting electricity entangles Confused disposal information, with assistant analysis transformer station electromagnetic environment, including project of transmitting and converting electricity enquiry module, addressing assistant analysis module and Feedback opinion statistical module, the project of transmitting and converting electricity enquiry module relies on state's net GIS platform to look into project of transmitting and converting electricity comprehensively Ask, the line planned or the sensitizing range for standing periphery on the addressing assistant analysis module analysis and identification map can be automatic Calculate distance, the opinion that feedback opinion statistical module record homepage is submitted on map.
A kind of project of transmitting and converting electricity environmentally sensitive areas monitoring method based on big data technology, to the institute in project of transmitting and converting electricity There is sensitizing range to be managed, record and update project of transmitting and converting electricity data, figure layer data, environmental monitoring data and environmentally friendly dispute number According to, carry out the synchronous of data and interact with power grid environment conservative management subsystem, update power grid environment protection data;By state's net The data of GIS platform carry out three dimensions rectangular coordinate system conversion, and its project of transmitting and converting electricity figure layer of real-time calling is believed with geographical position Breath;Project of transmitting and converting electricity data, figure layer data, environmental monitoring data, environmentally friendly dispute data and geographic information data to obtaining enter Row fusion, makes its correspondence be displayed in same figure layer.
The method of three dimensions rectangular coordinate system conversion is using seven parameter models, using seven unknown parameters:Three seats Mark translational movement, the anglec of rotation and scale factor of three reference axis, by rotating three reference axis specified angles in order, make two The XYZ overlapping of axles of individual rectangular coordinate system in space together, during Coordinate Conversion, reads at least three public known points, at two not Six pairs of XYZ coordinate values in isospace rectangular coordinate system, extrapolate above-mentioned seven unknown parameters, build seven Parameter Relations, will The XYZ coordinate value of one next point of rectangular coordinate system in space is converted to the XYZ coordinate value under another rectangular coordinate system in space.
Beneficial effects of the present invention are:
(1) present invention can be with the environmentally friendly management information system of Guo Wang companies, GIS platform, electromagnetic environment intellectual monitoring system System, read in project of transmitting and converting electricity environmental forecasting subsystem and call the document datas such as related monitoring, image, and data structure and Relevant system is consistent, so as to avoid repetition typing of the user to basic data, while ensureing the uniqueness of data;
(2) present invention is with patterned mode display systems significant data, including two parts:One can be displaying power transmission and transformation Engineering Digital map, full frame can amplify and select the region in map or transformer station, to historical relic sight spot, wire historic site, nature Protection zone, water head site etc. possess project of transmitting and converting electricity in programming count region, environmental sensitive area type and relevant information;Two can be Environmental monitoring and environmentally friendly dispute information in query region, possess the functions such as classification display, inquiry, scaling, different rights and level Other user is into the data message for being only capable of browsing region within the jurisdiction after system;
(3) present invention can carry out all multi informations in current project of transmitting and converting electricity unifying display, merge different in map Information, realize the batch capture of field data, storage, it is long-range the function such as have access to, to public's real-time exhibition electromagnetic environment data, very Just realizing the integrated of data.
Brief description of the drawings
Fig. 1 is that project of transmitting and converting electricity environmental sensitive area of the invention GIS-Geographic Information System is illustrated with the integrated situation of other systems Figure;
Fig. 2 is project of transmitting and converting electricity environmental sensitive area of the invention GIS-Geographic Information System and other systems data production procedure Figure;
Fig. 3 is database data structure schematic diagram in environmental sensitive area of the invention;
Fig. 4 is the expansion schematic diagram based on relevant database of the invention;
Fig. 5 is project of transmitting and converting electricity environmentally sensitive areas monitoring system Organization Chart of the invention.
Specific embodiment:
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As shown in figure 5, a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology, is configured as All sensitizing ranges in project of transmitting and converting electricity are managed, project of transmitting and converting electricity data, figure layer data, environmental monitoring is recorded and update Data and environmentally friendly dispute data, the monitoring system carry out the synchronous of data by interface with power grid environment conservative management subsystem With interact, update power grid environment protection data;The monitoring system is connected by interface with state net GIS platform, state is netted into GIS and is put down The data of platform carry out three dimensions rectangular coordinate system conversion, its project of transmitting and converting electricity figure layer of real-time calling and geographical location information;
To the project of transmitting and converting electricity data, figure layer data, environmental monitoring data, environmentally friendly dispute data and the geography information number that obtain According to being merged, its correspondence is set to be displayed in same figure layer.
The project of transmitting and converting electricity environmentally sensitive areas monitoring system, specifically include data Layer, logical layer, service interaction layer and Represent layer, wherein:
The data Layer includes relational database and data update interface, and the relation data library storage is updated by data The project of transmitting and converting electricity environmental sensitive area numeric field data of interactive interfacing and other subsystem informations;
The logical layer is web server, is configured as the identification of storage environment sensitizing range with forecast model with environment-identification Sensitizing range, and the interactive geography information of fused data layer and environmental monitoring data, environmentally friendly dispute data, form each environment sensitive Section model;
Service interaction layer, is configured as reading each environment sensitive section model, using representing control by environment sensitive The multiple data possessed in section model is overlapped displaying, and every layer of information configuration is shown into label;
The represent layer, the figure layer for being configured to represent all environment sensitive section models of page presentation is marked with displaying Sign.
The data Layer, logical layer are respectively by database server and web server realization, the database server Capacity planning with web server determines according to the number of users of power consumer general headquarters, provincial company, three aspects of prefecture-level company.
The logical layer, is configured with authority management module, and according to the user gradation for logging in, given threshold divides different Environment sensitive section model map data mining platform or the authority for browsing or changing data of different compasses of competency.
The presentation layer, project of transmitting and converting electricity digital map, the region in show map are shown based on current page size Or transformer station, project of transmitting and converting electricity, environment in the sensitizing range of display historical relic sight spot, wire historic site, nature reserve area or water head site Sensitizing range type and corresponding environmental monitoring and environmentally friendly dispute information.
The logical layer, be configured as support by directly draw, node pull in real time or input coordinate edit mode Increase, modification environmental sensitive area information, the management function such as be provided additionally with deleting and imports, to the setting of different type environmental sensitive area Analytical parameters, on map in different colors or mark make a distinction.
The logical layer, the environment for being configured to the monitoring of interface dispatch environment and image data and project of transmitting and converting electricity entangles Confused disposal information, with assistant analysis transformer station electromagnetic environment, including project of transmitting and converting electricity enquiry module, addressing assistant analysis module and Feedback opinion statistical module, the project of transmitting and converting electricity enquiry module relies on state's net GIS platform to look into project of transmitting and converting electricity comprehensively Ask, the line planned or the sensitizing range for standing periphery on the addressing assistant analysis module analysis and identification map can be automatic Calculate distance, the opinion that feedback opinion statistical module record homepage is submitted on map.
As shown in figure 3, data framework includes service application data field, application service layer, data access layer and data resource Area and the part of system inside and outside interface five.What service application data field was embodied is the page data that presentation layer represents to user, right Answer basic data, statistics, calculate data and non-structural data, realize service application data service logic is application service Layer and data access layer, progressive, the data resource memory block of the bottom, i.e. oracle database file, including object are closed Be type spatial data, sensitizing range attribute data and equipment information database, in line file, multi-format document, papery scanning file With Network data etc..
As shown in figure 4, the expansion and renewal of environmental sensitive area database, after the completion of database development, with netting public with state The environmentally friendly management information system of department's power network, electromagnetic environment intelligent monitor system, the interface of the unified GIS platform of state's net, facilitate from now on Systemic-function is expanded or interacted with other platform datas when safeguarding, meanwhile, by the consistency operation of system, can be to all geography Information, environmental sensitive area data enter the operation such as edlin, increase and decrease, by setting up multistage auditing mechanism, can obtain database data To upgrading in time, reflection Around actual conditions, are preferably engineering feasibility study, plan evaluation service in time.
With reference to the technological development direction of current GIS-Geographic Information System, to the interacting of systemic-function and other systems, figure exhibition Show, studied and discussed the problems such as data output, the feasibility of intranet and extranet data interaction, three-dimensional data and panel data are selected Card.
Main functional requirement is:
(1) using Fundamental Geographic Information System (1 in state's net GIS platform:50000 numerical maps, satellite image map), it is detailed defeated Power transformation engineering path site information, transformer station transmission line of electricity environmental monitoring data, relevant environment sensitizing range Historical Monitoring data Image data, in that context it may be convenient to inquired about lot of essential factors such as all kinds of environmental sensitive area, projects of transmitting and converting electricity, counted, it is automatic right One circuit, site, a designated environment sensitizing range for a panel region are screened and environmental impact prediction, with reference to satellite image Figure, in that context it may be convenient to intuitively shown.
(2) function with database, can solve that data reusability in engineering previous work is not high, repeat to receive money, existing Drawing information is outmoded, live money of searching easily is omitted, searches and provide problem long of costly cycle;User of service is allowed easily to add new Sensitive target, after system manager's investigation confirms accuracy, can enter base map.So that system data has can expand Malleability, constantly accumulation, progressively tends to perfect in use.
As needed, can be linked in map for environmental impact assessment, complete stage report etc. by user, facilitate administrative staff to adjust With.
(3) system has power frequency electric field, power frequency magnetic field, noise calculation function, and the personnel for possessing authority can be soft using this Part, analysis is predicted to power frequency electric field, power frequency magnetic field, radio interference, noise etc. around circuit.Possesses transformer station's typical case's class Than monitor database (Monitoring Data typing, other systems digital independent), can be called when transformer station's Analysis of Electromagnetic Environment is carried out Similar substation data assistant analysis.
(4) conventional func:The functions such as the newly-built of project of transmitting and converting electricity, modification, deletion, importing, management;Sensitizing range it is newly-built, Modification, delete, import, management etc. function, different type sensitizing range parameter setting analysis, project of transmitting and converting electricity analysis, statistics, sieve Choosing, the automatic identification of environmental sensitive area, statistics, output, the automatic Prediction of environmental sensitive area electromagnetic environmental impact and display.
User's interpolation data type includes:Video, audio, picture (form such as various photos and pdf), document (notepad, The documents such as word, excel) etc.;System energy automatic marking provides the source of data above;For the other specification for needing typing, Can be with other data forms directly batch importing such as .xls;For live feedback information, user planned, design and carry out environment Data source can be clearly differentiated during the analytic statistics of sensitizing range.
For transmission line of electricity, transformer station, each increase of environmental sensitive area, deletion, editor, modification all should be in database Modification record.To selected areas (can in setting-out mode determine region and its node can be edited arbitrarily), possesses programming count point Project of transmitting and converting electricity, environmental sensitive area type and relevant information in analysis region.
(5) possess directly drafting, node reality for the newly-increased of the objects such as project of transmitting and converting electricity, environmental sensitive area, edit request When various editing and processing modes such as towing, input coordinate.
Additionally, the ageing and specific aim to ensure system data, it is desirable to which system possesses the work(for allowing user to upload resource Can, it is allowed to which user of service easily adds new sensitive target, after backstage confirms, base map can be entered.So by product After tired and constantly improve, can effectively solve in engineering previous work that data reusability is not high, repeat to receive money, existing drawing information Outmoded, live money of searching easily is omitted, searches and provide costly cycle problem long.
Main application scenarios are:
(1) in power network construction project planning, feasibility study, preliminary design stage, can application item achievement carry out the environmental protection of addressing, route selection Corresponding environmental practice is evaded or taken to optimization, the environment sensitive target near recognitive engineering ahead of time, and reducing project may The environmental risk of presence.
(2) planning, feasibility study, the green audit in design review stage, the angle evaded or protect from environment sensitive target are carried Go out examination reports.
(3) environmental impact assessment, complete stage stage, environmental impact assessment, Check & Acceptance unit can carry out project analysis with application achievements, be Formulate programme of work and support is provided.
(4) design, environmentally friendly administrative staff can be using the Analysis of Electromagnetic Environment forecasting software and analogy number of system support The ambient influnence characteristic of circuit, transformer station is estimated and is shown according to storehouse and intuitively.
(5) retrieval and application of the data such as project of transmitting and converting electricity, environmental sensitive area.
Main application model is:
System uses one-level deployment management mould using two grades of deployment management modes during pilot during later stage whole nation popularization Formula.The business module of deployment has:Homepage, environmental sensitive area management, environmental monitoring data management, environment difficulties disposal management, electricity The management of magnetic environment factor standard, statistical analysis, the big module of system administration 7.Meanwhile, realize being protected with state net GIS platform, power grid environment Pillar reason subsystem, electromagnetic environment intelligent monitor system, the database interface of project of transmitting and converting electricity environmental forecasting software with it is integrated.This Phase is in Guo Wang Shaanxi Prov. Power Co., State Grid Shandong Electric Power Company's completion system research and development and pilot application.
System uses SoTower+Web GIS modes, in customer-side, using IE login systems, you can carry out system Browse, inquire about or data upload etc. operation.Server aspect, it is contemplated that this project belongs to scientific research project, to unified one-level portion Administration is not, it is necessary in strict accordance with the flow development related work of information work, satisfy the requirements also temporarily.Therefore developed for the current period For, achievement carries out two grades of deployment, and the requirement in Shaanxi, Shandong two places pilot carries out small range application, and deployment form is in letter The form of computer room is rented by logical company, provides the user service.
Computer room is rented by Xintong Co:By the regular maintenance of Xintong Co's reception server, the dimension of data is responsible for by project team Shield, renewal and background audit.The standardization that the form is safeguarded beneficial to server, also allows for improving Shaanxi, Shandong pilot provincial company Data access speed.
Main system actor is:
The convenience of applicable object and system operatio in view of system, system is configured by two-stage user right.
Analyze as desired, the exploitation of the project of transmitting and converting electricity environmental sensitive area GIS-Geographic Information System of research and development will possess following work( Energy:
(1) in order to meet planning, feasibility study, preliminary design, design phase site path avoid environmental sensitive area demand, system will Possesses the function of environmental sensitive area Intelligent Recognition and analysis.
For the sensitive region of strict No striding, to avoid the occurrence of in early days, failing identification causes environmentally friendly subversiveness opinion Or the later stage it is passive relocate, it is necessary to include the engineering design all stage in Planning preparation, feasibility study design, to Around coverage Interior environmental sensitive area fully recognize, analyze and count, and the demand of sensitizing range avoidance is met, for planning, feasibility study, design are carried For foundation.
(2) after the completion of system development, to be applied in planning, feasibility study, preliminary design, the examination & verification of design.In view of existing The numerical map that design platform is all based on five a ten thousandths is designed, and for ease of being integrated with design, system is needed using same The Vectorgraph (gamut covering city, rural area, mountain area etc.) of engineer's scale, a good basis is provided to design and evaluating Platform.
(3) for caused by avoiding line corridor crowded environmental protection dispute, it is necessary to assess designed lines, existing line and environment quick The relation of sensillary area.System will possess calls state to net existing site, the polar plot in path in GIS, possesses assessment designed lines, existing The function of the relation of circuit and environmental sensitive area.
Using Fundamental Geographic Information System (1 in state's net GIS platform:50000 numerical maps, satellite image map), detailed defeated change Electrical engineering path site information, transformer station transmission line of electricity environmental monitoring data, relevant environment sensitizing range Historical Monitoring data shadow As data, in that context it may be convenient to the lot of essential factors such as all kinds of environmental sensitive area, project of transmitting and converting electricity are inquired about, is counted, automatically to one Bar circuit, site, a designated environment sensitizing range for a panel region are screened and environmental impact prediction, with reference to satellite image Figure, in that context it may be convenient to intuitively shown.
(4) for the demand for meeting the environmentally friendly dispute of reply, write work report, provide the environmental protection management such as statistics, carry Going out system will build the file such as including Environmental Monitoring Report, environment impact assessment statement, complete stage report, environmentally friendly dispute disposal data In the functional requirement of interior database.
Build including the database including above-mentioned data, as needed, user can be by environmental impact assessment, complete stage report etc. It is linked in map, facilitates administrative staff to call, system will be with good expansibility, in use constantly accumulation, Data tend to perfect.
(5) it is the forecast demand that meets project of transmitting and converting electricity to neighbouring sensitizing range electromagnetic environmental impact level, it is desirable to which system is carried For transmission line of electricity EME forecast and transformer station's analogy forecast function.
System embedment power frequency electric field, power frequency magnetic field, radio interference, noise calculation software, the personnel for possessing authority can be with Using the software, analysis is predicted to power frequency electric field, power frequency magnetic field, radio interference, noise etc. around circuit.Possesses power transformation Stand typical analogy monitor database (Monitoring Data typing, other systems digital independent), carrying out transformer station's Analysis of Electromagnetic Environment When can call similar substation data assistant analysis.
(6) open system is built up, it is desirable to which system possesses the function of allowing user to upload resource.
Allow user of service easily to add new sensitive target, after backstage confirms, base map can be entered.By product Tired, constantly improve can effectively solve in engineering previous work that data reusability is not high, repeat to receive money, existing drawing information old Old, live money of searching easily is omitted, searches and provide costly cycle problem long.
(7) conventional func:The functions such as the newly-built of project of transmitting and converting electricity, modification, deletion, importing, management;Sensitizing range it is newly-built, Modification, delete, import, management etc. function, different type sensitizing range parameter setting analysis, project of transmitting and converting electricity analysis, statistics, sieve Choosing, the automatic identification of environmental sensitive area, statistics, output, the automatic Prediction of environmental sensitive area electromagnetic environmental impact and display.
Functional Design, the functional framework of system are as shown in Figure 1, 2.
The data that the system is collected are mainly based upon 54 coordinate systems or Xi'an1980 coordinate system, and state's net GIS platform is used Be 2000 coordinate systems of national the earth, therefore, need to change coordinate system in system research and development.Handling implement is selected ArcGIS, for .shp source files, coordinate system is set by ArcGIS, and coordinate system is arranged into the standard of Xi'an 80, is then passed through By Coordinate Conversion into WGS84 (being equal to 2000 standards of national the earth), conversion is main to be turned ArcGIS using " seven parameters " method Change.
, it is necessary to apply to seven parameters in transfer process.Changed between two different three dimensions rectangular coordinate systems When, usually using seven parameter models (math equation group), there are seven unknown parameters in the model, i.e.,:
1. three coordinate translation amounts (Δ X, Δ Y, Δ Z), i.e., mark difference between the origin of coordinates of two spaces coordinate system;
2. three anglecs of rotation of reference axis (Δ α, Δ β, Δ γ)), specify angle by rotating three reference axis in order Degree, can make the XYZ overlapping of axles of two spaces rectangular coordinate system together.
3. the same section of lenth ratio of straight line in scale factor K, i.e. two spaces coordinate system, realizes that the ratio of yardstick turns Change.Usual K values are no better than 1.Seven parameters of the above are commonly referred to seven parameters.The Coordinate Conversion carried out with seven parameters is referred to as seven Parameter Coordinate Conversion.
During Coordinate Conversion, three public known points, in two different spaces rectangular coordinate systems six are typically at least needed To XYZ coordinate value, this seven unknown parameters can be just extrapolated, calculate this seven parameters, it is possible to by seven parametric equations Group, the XYZ XYZ coordinate value of a next point of rectangular coordinate system in space is converted under another rectangular coordinate system in space sits Scale value.
According to systematic difference environmental analysis, at the beginning of system design is developed, to the user group of system, entered using frequency range Research is gone, number of users has been determined from general headquarters, provincial company, three aspects of prefecture-level company, it is determined that the capacity rule of system application Draw.
After logging in system by user, name, unit, department and the Role Information of active user, homepage are shown at the top of homepage Body part is with patterned mode display systems significant data, including two parts:One is to adapt to current page half size Region displaying project of transmitting and converting electricity digital map, can it is full frame amplification and selection map in region or transformer station, to historical relic scape Point, wire historic site, nature reserve area, water head site etc. possess project of transmitting and converting electricity in programming count region, environmental sensitive area type and Relevant information;Two can be environmental monitoring and environmentally friendly dispute information in query region, possess classification display, inquiry, scaling etc. The user of function, different rights and rank is into the data message for being only capable of browsing region within the jurisdiction after system.
For the management of environmental sensitive area, can by directly drawing, node be pulled in real time, various editing sides such as input coordinate Formula increases, modification environmental sensitive area information, the management function such as is provided additionally with deleting and import.Can be to different type environmental sensitive area Set analytical parameters, on map in different colors or mark make a distinction.In actually used, do not possess the user of modification authority, The data (the mainly change of the change of sensitizing range, resident) not being inconsistent system and actual conditions, can be supplemented on map Draw and submit to, it is automatically updated to actual data storehouse after being audited by keeper.
For the treatment of environmental monitoring data, transformer station's typical analogy is mainly safeguarded by environmental monitoring data management module Monitor database, for homepage displaying project of transmitting and converting electricity digital map data supporting is provided, by with Guo Wang companies power network ring Protect management information system and do interface (also having interface with electromagnetic environment intelligent monitor system), carry out transformer station's Analysis of Electromagnetic Environment When, can automatically call relevant environment to monitor and image data assistant analysis.Can also manually increase newly, change, delete, import Data are safeguarded etc. mode.
Additionally, also there are system environment difficulties to dispose data management function, the module safeguards project of transmitting and converting electricity environment difficulties The relevant information of disposal, for the project of transmitting and converting electricity digital map of homepage displaying provides data supporting, by electric with Guo Wang companies The environmentally friendly management information system of net does interface, obtains the environment difficulties disposal information of project of transmitting and converting electricity, is carrying out transformer station's electromagnetism ring When border is analyzed, relevant environment dispute can be automatically called to dispose information assistant analysis.Can also manually increase newly, change, deleting, The modes such as importing safeguard the environment difficulties disposal information of project of transmitting and converting electricity.
In statistical analysis module, it is divided into project of transmitting and converting electricity inquiry, prediction assistant analysis, addressing assistant analysis, feedback opinion Four parts of statistics, introduce individually below:
Project of transmitting and converting electricity enquiry module support state net GIS platform carries out thorough search to project of transmitting and converting electricity.
The line planned on addressing assistant analysis module analysis and identification map or the sensitizing range on station periphery, can be automatic Calculate distance.
The opinion that feedback opinion statistical module record homepage is submitted on map.
System administration includes that institutional framework, system user, role's maintenance, user role, user right, system module are safeguarded Deng submodule, to user units one belongs at different levels institutional framework, user base information, role-security carry out maintenance and management.The mould Block early stage and system other module synchronizations exploitation, it is unified to use state's net after later stage insertion power grid environment conservative management subsystem Unitized overall development platform configured.
The specific methods such as the identification of environmental sensitive area that the present invention is mentioned and prediction, can be using existing identification and prediction side Method, other undocumented specific methods, is the common knowledge of those skilled in the art, is clearly.
Although above-mentioned be described with reference to accompanying drawing to specific embodiment of the invention, not to present invention protection model The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need the various modifications made by paying creative work or deformation still within protection scope of the present invention.

Claims (9)

1. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology, it is characterized in that:It is right to be configured as All sensitizing ranges in project of transmitting and converting electricity are managed, and record and update project of transmitting and converting electricity data, figure layer data, environmental monitoring number According to environmentally friendly dispute data, the monitoring system by interface and power grid environment conservative management subsystem carry out the synchronous of data with Interaction, updates power grid environment protection data;The monitoring system is connected by interface with state net GIS platform, by state's net GIS platform Data carry out three dimensions rectangular coordinate system conversion, its project of transmitting and converting electricity figure layer of real-time calling and geographical location information;
Project of transmitting and converting electricity data, figure layer data, environmental monitoring data, environmentally friendly dispute data and geographic information data to obtaining enter Row fusion, makes its correspondence be displayed in same figure layer.
2. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology as claimed in claim 1, its It is characterized in:The project of transmitting and converting electricity environmentally sensitive areas monitoring system, specifically include data Layer, logical layer, service interaction layer and Represent layer, wherein:
The data Layer includes relational database and data update interface, and the relation data library storage passes through data more new interface Interactive project of transmitting and converting electricity environmental sensitive area numeric field data and other subsystem informations;
The logical layer is web server, is configured as the identification of storage environment sensitizing range sensitive with environment-identification with forecast model Area, and the interactive geography information of fused data layer and environmental monitoring data, environmentally friendly dispute data, form each environmental sensitive area mould Type;
Service interaction layer, is configured as reading each environment sensitive section model, using representing control by environmental sensitive area mould The multiple data possessed in type is overlapped displaying, and every layer of information configuration is shown into label;
The represent layer, is configured to represent the figure layer and displaying label of all environment sensitive section models of page presentation.
3. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology as claimed in claim 2, its It is characterized in:The data Layer, logical layer are respectively by database server and web server realization, the database server Capacity planning with web server determines according to the number of users of power consumer general headquarters, provincial company, three aspects of prefecture-level company.
4. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology as claimed in claim 2, its It is characterized in:The logical layer, is configured with authority management module, and according to the user gradation for logging in, given threshold is divided different The map data mining platform of environment sensitive section model or the authority for browsing or changing data of different compasses of competency.
5. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology as claimed in claim 2, its It is characterized in:The presentation layer, project of transmitting and converting electricity digital map is shown based on current page size, region in show map or Transformer station, project of transmitting and converting electricity, environment are quick in the sensitizing range of display historical relic sight spot, wire historic site, nature reserve area or water head site Sensillary area type and corresponding environmental monitoring and environmentally friendly dispute information.
6. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology as claimed in claim 2, its It is characterized in:The logical layer, is configured as supporting to be pulled in real time by directly drafting, node or the edit mode of input coordinate increases Plus, modification environmental sensitive area information, the management function such as be provided additionally with deleting and imports, different type environmental sensitive area is set and is divided Analysis parameter, on map in different colors or mark make a distinction.
7. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring system based on big data technology as claimed in claim 2, its It is characterized in:The logical layer, the environment for being configured to the monitoring of interface dispatch environment and image data and project of transmitting and converting electricity entangles Confused disposal information, with assistant analysis transformer station electromagnetic environment, including project of transmitting and converting electricity enquiry module, addressing assistant analysis module and Feedback opinion statistical module, the project of transmitting and converting electricity enquiry module relies on state's net GIS platform to look into project of transmitting and converting electricity comprehensively Ask, the line planned or the sensitizing range for standing periphery on the addressing assistant analysis module analysis and identification map can be automatic Calculate distance, the opinion that feedback opinion statistical module record homepage is submitted on map.
8. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring method based on big data technology, it is characterized in that:To power transmission and transformation work All sensitizing ranges in journey are managed, and record and update project of transmitting and converting electricity data, figure layer data, environmental monitoring data and environmental protection Dispute data, carry out the synchronous of data and interact with power grid environment conservative management subsystem, update power grid environment protection data;Will The data of state's net GIS platform carry out three dimensions rectangular coordinate system conversion, its project of transmitting and converting electricity figure layer of real-time calling and geographical position Confidence ceases;To the project of transmitting and converting electricity data, figure layer data, environmental monitoring data, environmentally friendly dispute data and the geography information number that obtain According to being merged, its correspondence is set to be displayed in same figure layer.
9. a kind of project of transmitting and converting electricity environmentally sensitive areas monitoring method based on big data technology as claimed in claim 8, its It is characterized in:The method of three dimensions rectangular coordinate system conversion is using seven parameter models, using seven unknown parameters:Three coordinates The anglec of rotation and scale factor of translational movement, three reference axis, by rotating three reference axis specified angles in order, make two The XYZ overlapping of axles of rectangular coordinate system in space together, during Coordinate Conversion, reads at least three public known points, in two differences Six pairs of XYZ coordinate values in rectangular coordinate system in space, extrapolate above-mentioned seven unknown parameters, seven Parameter Relations are built, by one The XYZ coordinate value of the individual next point of rectangular coordinate system in space is converted to the XYZ coordinate value under another rectangular coordinate system in space.
CN201710049870.1A 2017-01-23 2017-01-23 Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology Active CN106845837B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710049870.1A CN106845837B (en) 2017-01-23 2017-01-23 Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710049870.1A CN106845837B (en) 2017-01-23 2017-01-23 Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology

Publications (2)

Publication Number Publication Date
CN106845837A true CN106845837A (en) 2017-06-13
CN106845837B CN106845837B (en) 2020-05-22

Family

ID=59120180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710049870.1A Active CN106845837B (en) 2017-01-23 2017-01-23 Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology

Country Status (1)

Country Link
CN (1) CN106845837B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109413036A (en) * 2018-09-12 2019-03-01 全球能源互联网研究院有限公司 Sensitive information outflow monitoring method, device and server extremely
CN111898986A (en) * 2020-07-30 2020-11-06 华中科技大学 Digital secretary for power transmission and transformation engineering design
CN113806423A (en) * 2021-09-18 2021-12-17 武汉朗迈科技有限公司 GIS-based power transmission and transformation project environment-friendly detection system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002305814A (en) * 2001-03-30 2002-10-18 Toshiba Corp Electric power substation
CN102708518A (en) * 2012-05-03 2012-10-03 山东电力研究院 Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology
US20140365264A1 (en) * 2013-06-10 2014-12-11 Abb Research Ltd. Criticality profile for industrial asset
CN106202000A (en) * 2016-07-22 2016-12-07 武汉大学 Seven-parameter transformation method between country's three-dimensional system of coordinate and anywhere plane coordinate system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002305814A (en) * 2001-03-30 2002-10-18 Toshiba Corp Electric power substation
CN102708518A (en) * 2012-05-03 2012-10-03 山东电力研究院 Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology
US20140365264A1 (en) * 2013-06-10 2014-12-11 Abb Research Ltd. Criticality profile for industrial asset
CN106202000A (en) * 2016-07-22 2016-12-07 武汉大学 Seven-parameter transformation method between country's three-dimensional system of coordinate and anywhere plane coordinate system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何林: "常见平面坐标系之间相互转换的方法研究", 《测绘通报》 *
冯智慧: "基于分布式多层体系的输变电工程电磁环境智能", 《中国电力》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109413036A (en) * 2018-09-12 2019-03-01 全球能源互联网研究院有限公司 Sensitive information outflow monitoring method, device and server extremely
CN111898986A (en) * 2020-07-30 2020-11-06 华中科技大学 Digital secretary for power transmission and transformation engineering design
CN113806423A (en) * 2021-09-18 2021-12-17 武汉朗迈科技有限公司 GIS-based power transmission and transformation project environment-friendly detection system and method

Also Published As

Publication number Publication date
CN106845837B (en) 2020-05-22

Similar Documents

Publication Publication Date Title
Marzouk et al. Planning utility infrastructure requirements for smart cities using the integration between BIM and GIS
Wang et al. Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
Chen et al. Development of city buildings dataset for urban building energy modeling
Ashkezari et al. Development of an enterprise Geographic Information System (GIS) integrated with smart grid
CN103093008A (en) System and method for power transmission and transformation project three-dimensional-aided preliminary design
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN106446033A (en) Potential safety hazard information management system and method for underground pipelines
CN104077667A (en) Digital campus integrated application system based on two-dimensional and three-dimensional integration
CN106919987B (en) Method for manufacturing and managing operation and maintenance information model of high-speed railway passenger dedicated line equipment in virtual reality environment
CN112035983A (en) Urban medium-voltage power grid planning and designing platform based on three-dimensional real scene
CN103646091A (en) Generation method and device of grid graph data
CN112036766A (en) Gridding distribution network service management method and device, computer equipment and storage medium
CN106845837A (en) Project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology
CN106875091A (en) A kind of Management System of Urban Dangers based on address cloud service
Huang et al. The city management based on smart information system using digital technologies in China
CN116362909A (en) Mineral resource dynamic law enforcement monitoring system
CN112380246A (en) Planning service-oriented multi-terminal visual application system and line planning method
Li et al. Research and design of mineral resource management system based on big data and GIS technology
Chen et al. Data visualization in smart grid and low‐carbon energy systems: A review
Li et al. Construction of smart city street landscape big data-driven intelligent system based on industry 4.0
Mohanlal et al. Applications of 4D GIS Model in Construction Management
CN112308382B (en) Open TOD city big data monitoring analysis platform
CN113268839B (en) Urban network decentralized planning method based on cable pipe network system
CN107680002A (en) A kind of electric power facility information system based on GIS and BIM
CN102324060A (en) Method for acquiring multidimensional space-time power-engineering geological information and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant