The automatic recording device and method of commissioning stage debugging information to be measured Download PDFInfo
- Publication number
- CN106844125B CN106844125B CN201510883092.7A CN201510883092A CN106844125B CN 106844125 B CN106844125 B CN 106844125B CN 201510883092 A CN201510883092 A CN 201510883092A CN 106844125 B CN106844125 B CN 106844125B
- Authority
- CN
- China
- Prior art keywords
- control unit
- measured
- time
- signal
- debugging information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
- G06F11/25—Testing of logic operation, e.g. by logic analysers
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The present invention provides a kind of automatic recording device of commissioning stage debugging information to be measured, the debugging information generated when executing and be switched on suitable for the commissioning stage to be measured of automatic recording one, the device includes logic analyser and control terminal computer, the control terminal computer includes first control unit and the second control unit, and wherein first control unit controls the opening and closing of the logic analyser;The output signal of second control unit reception universal input and output port, and judge whether persistently receive holding time for the output signal consistent with preset time, if inconsistent, then the second control unit sends open signal to first control unit and timing, control logic analyser unlatching recording motherboard removes wrong data, second control unit calls recording time, when the opening time of the second control unit transmission open signal and timing arrival logic analyser is identical as recording time, second control unit sends closure signal to the first control unit, control logic analyser closure.
Description
Technical field
The invention relates to a kind of automatic recording device and method of debugging information more particularly to a kind of commissioning stages to be measured
The automatic recording device and method of debugging information.
Background technique
Mainboard is called motherboard (Main Board, abbreviation MB), it is mounted in cabinet, is that computer is most basic and most heavy
One of component wanted, it is however generally that, in order to ensure the running stability for restarting process of motherboard, motherboard is gone in factory
Toward the switching on and shutting down test needed by thousands of times, common test method is using manually switching on and shutting down and records dependence test
The mode of data carries out: setting up logic analyser (Interface Tracer), logic analyser and motherboard are passed through USB
The wrong data of removing of motherboard, manual operation control computer control logic analyzer are recorded in the connection such as interface by logic analyser
Working condition, it is however generally that, when there is debugging information, manual operation control terminal computer open record debugging information, directly
After the completion of recording to debugging information, manually operation control computer stops recording debugging information again, also or, when removing
When wrong information and operator can not operate control computer in time situations such as (such as operator away from keyboard control computer), then
Be likely to occur not in time open logic analyser or not in time close logic analyser the case where generation, specifically, ought not and
When Shi Kaiqi logic analyser, in fact it could happen that the situation that debugging information can not be arrived by record, and when closing logic analyser not in time,
It then may cause debugging information and other information be recorded together, so that operator needs to be found in numerous data except wrong letter
Breath, what is more, if operator's time departure is too long, and the capacity of logic analyser memory itself is inadequate, then may cause it
Preceding debugging information is capped, to generate the loss of debugging information.Therefore, when such method will lead to time-consuming detection
Journey, or even operator's graveyard shift is needed to be monitored.
For these reasons, it is really necessary to overcome disadvantages mentioned above, device and the side of a kind of debugging information automatic recording are provided
Method, by monitoring the state of commissioning stage to be measured in real time, the debugging information of automatic recording board to be measured is saved without human intervention
Human cost and time cost.
[summary of the invention]
Therefore, for above situation, the purpose of the present invention is be to provide a kind of commissioning stage debugging information to be measured automatic
Record device and method, the debugging information of automatic recording board to be measured, without human intervention.
In order to achieve the above object, the present invention provides a kind of automatic recording device of commissioning stage debugging information to be measured, is applicable in
The debugging information generated when the commissioning stage to be measured of automatic recording one is executed and is switched on, the device include logic analyser and control terminal electricity
Brain, wherein when the logic analyser is opened, which reads the debugging information and record;On the control terminal computer
The commissioning stage to be measured is set to preset when except wrong operation through a universal input and output port persistently receives an output signal one
Time and persistently record board to be measured debugging information a recording time, the control terminal computer and the commissioning stage to be measured pass through logical
It is connected with input/output port, which includes:
First control unit controls the opening and closing of the logic analyser;
Second control unit, receives the output signal of the universal input and output port, and judges persistently to receive this general defeated
Whether consistent with the preset time enter holding time for the output signal of delivery outlet, if second control unit does not receive persistently
The output signal is changed to the preset time, then second control unit sends open signal to the first control unit
And timing, after which receives the open signal, which controls logic analyser unlatching, by patrolling
That collects analyzer recording motherboard removes wrong data, which calls recording time simultaneously, to second control unit
Send open signal and timing reach the logic analyser opening time it is identical as the recording time when, second control unit
Closure signal is sent to the first control unit, after which receives the closure signal, the first control unit control
Make logic analyser closure.
Particularly, the output current potential of the universal input and output port includes high potential and low potential, when the output current potential is
When high potential, which is defined as an output signal.
Particularly, which executes different when restarting test, the corresponding different preset time and the recording
Time.
The present invention also provides a kind of automatic recording methods of commissioning stage debugging information to be measured, are suitable for above-mentioned commissioning stage to be measured
The automatic recording device of debugging information, the device include control terminal computer and logic analyser, wherein the control terminal computer includes
First control unit and the second control unit, this method comprises:
It is lasting through the universal input and output port when except wrong operation in setting commissioning stage to be measured on the control terminal computer
It receives a preset time of an output signal and persistently records a recording time of the debugging information of board to be measured;
Second control unit receives the output signal of universal input and output port and timing;
Second control unit persistently receives the universal input and output port according to the timing for receiving the output signal, judgement
The one of the output signal holds time with whether the preset time is consistent;
If inconsistent, i.e., the output signal does not continue to the preset time to change, then it is single to trigger second control
Member sends open signal and starts timing;
After the first control unit receives the open signal, triggers the first control unit and control logic analyser unlatching
And start to be recorded;
Second control unit calls the recording time;
When the second control to the unit sends open signal and starts timing and reach the recording time, second control unit
Send closure signal;
After the first control unit receives the closure signal, triggers the first control unit and control logic analyser closure
And stop recording.
Particularly, the output current potential of the universal input and output port includes high potential and low potential, when the output current potential is
When high potential, which is defined as an output signal.
Particularly, which executes different when restarting test, the corresponding different preset time and the recording
Time.
Compared to the prior art, the automatic recording device and method of commissioning stage debugging information to be measured of the invention, passes through prison
The output signal for surveying the universal input and output port of commissioning stage to be measured judges the state of the commissioning stage to be measured, automatically controls logic
Debugging information is opened and recorded to analyzer, without human intervention, saves human cost and time cost.
[Detailed description of the invention]
Fig. 1 is the block diagram of the automatic recording device of present invention commissioning stage debugging information to be measured;
Fig. 2 is the flow chart of the automatic recording method of present invention commissioning stage debugging information to be measured.
[specific embodiment]
The automatic recording device and method of commissioning stage debugging information to be measured of the invention, by monitoring the logical of commissioning stage to be measured
With the output signal of input/output port, the state of the commissioning stage to be measured is judged, automatically control logic analyser and open and record
Debugging information saves human cost and time cost without human intervention.
Referring to Fig. 1, the block diagram of the automatic recording device for present invention commissioning stage debugging information to be measured, as shown,
The device includes control terminal computer 1 and logic analyser 3, when being suitable for executing booting suitable for automatic recording commissioning stage 2 to be measured
The debugging information of generation, wherein when the logic analyser 3 is opened, read the debugging information and record;On control terminal computer 1
The commissioning stage 2 to be measured is set to preset when except wrong operation through a universal input and output port persistently receives an output signal one
Time and persistently record board to be measured debugging information ㄧ recording time, which passes through with the commissioning stage 3 to be measured
Universal input and output port connection, the control terminal computer 1 include first control unit 11 and the second control unit 12, in which:
The opening and closing of the control of first control unit 11 logic analyser 3;
The output of the second control unit 12 reception universal input and output port (GPIO, General Purpose I/O)
Signal, and judge persistently receive the general input/output port the output signal hold time whether with the preset time one
It causes, if second control unit does not receive the output signal persistently and do not continue to the preset time to change, this second
Control unit 12 sends open signal to the first control unit 11 and timing, which receives the open signal
Afterwards, which controls the logic analyser 3 and opens, should by logic analyser recording motherboard except wrong data
Second control unit 12 calls the recording time simultaneously, sends open signal to second control unit and timing reaches the recording
When the time, which sends closure signal to the first control unit 11, which receives should
After closure signal, which controls the logic analyser 3 closure.
Referring to Fig. 2, the flow chart of the automatic recording method for present invention commissioning stage debugging information to be measured, as shown,
This method comprises:
Step 21: the universal input output end is penetrated when removing wrong operation in setting commissioning stage to be measured on the control terminal computer
Mouth persistently receives a preset time of an output signal and persistently records the ㄧ recording time of the debugging information of board to be measured;
Step 22: the second control unit receives the output signal of universal input and output port and timing;
Step 23: for the second control unit according to the timing for receiving the output signal, it is defeated that judgement persistently receives the universal input
The one of the output signal of exit port holds time with whether the preset time is consistent, if so, step 24 is gone to, if it is not, then
Go to step 22;
Step 24: second control unit sends open signal and starts timing;
Step 25: after the first control unit receives the open signal, which controls the logic analyser
It opens and starts to be recorded;
Step 26: second control unit calls the recording time;
Step 27: the second control unit, which judges to send, open signal and starts whether timing reaches the recording time, if so,
Step 28 is then gone to, if it is not, then repeating this step;
Step 28: second control unit sends closure signal;
Step 29: the first control unit receives the closure signal, triggers the first control unit and controls the logic analysis
Instrument is closed and stops recording.
In this present embodiment, the output current potential of the universal input and output port includes high potential and low potential, when the output
When current potential is high potential, it includes high potential and low potential which, which is defined as an output signal, for example, second control is single
Member 12 judges when holding time inconsistent with preset time of high potential, that is to say, that the input/output terminal in commissioning stage 3 to be measured
Mouthful high potential duration shorter (do not arrive preset time and be just changed to low potential) or longer (arrived preset time also
It is not changed to low potential) when, which sends open signal, which controls the logic analysis
Instrument 3 is opened and records the debugging information.
In this present embodiment, which executes different when restarting test, corresponding different preset time and
The recording time.
A specific embodiment of the invention and embodiment are elaborated above in conjunction with attached drawing, but the present invention is not
It is limited to the above-described embodiment and examples, within the knowledge of those skilled in the art, this can also be not being departed from
It is made a variety of changes under the premise of inventive concept.
Claims (6)
1. a kind of automatic recording device of commissioning stage debugging information to be measured is suitable for the commissioning stage to be measured of automatic recording one and executes booting
When the debugging information that generates, which is characterized in that the device includes:
Logic analyser reads the debugging information and records when the logic analyser is opened;
Control terminal computer, setting the commissioning stage to be measured, persistently to receive one by a universal input and output port when except wrong operation defeated
A preset time of signal and persistently record a recording time of the commissioning stage debugging information to be measured out, the control terminal computer with should
Commissioning stage to be measured is connected by universal input and output port, which includes:
First control unit controls the opening and closing of the logic analyser;
Second control unit, receives the output signal of the universal input and output port, and judges persistently to receive the universal input defeated
Whether holding time for the output signal of outlet be consistent with the preset time, if second control unit persistently receives the output
Signal does not continue to the preset time to change, then second control unit sends open signal to the first control unit
And the timing opening time, after which receives the open signal, which controls the logic analyser
Open, by logic analyser record the motherboard of the commissioning stage to be measured except wrong data, which calls record simultaneously
Time processed, when the opening time of the second control unit timing is identical as the recording time, second control unit transmission is closed
Signal is closed to the first control unit, after which receives the closure signal, which controls this and patrol
Collect analyzer closure.
2. the automatic recording device of commissioning stage debugging information to be measured according to claim 1, which is characterized in that this is general defeated
The output current potential for entering output port includes high potential and low potential, when the output current potential is high potential, output current potential definition
For an output signal.
3. the automatic recording device of commissioning stage debugging information to be measured according to claim 1, which is characterized in that this is to be tested
Board executes different when restarting test, the corresponding different preset time and the recording time.
4. a kind of automatic recording method of commissioning stage debugging information to be measured, is removed suitable for commissioning stage to be measured described in claim 1
The automatic recording device of wrong information, the device include control terminal computer and logic analyser, wherein the control terminal computer includes the
One control unit and the second control unit, which is characterized in that this method comprises:
One is persistently received by universal input and output port in setting commissioning stage to be measured on the control terminal computer when except wrong operation
One preset time of output signal and the recording time for persistently recording the commissioning stage debugging information to be measured;
Second control unit receives the output signal of universal input and output port and timing;
Second control unit according to the timing for receiving the output signal, judgement persistently receive the universal input and output port this is defeated
The one of signal holds time with whether the preset time is consistent out;
If inconsistent, i.e., the output signal does not continue to the preset time to change, then triggers second control unit hair
It send open signal and starts the timing opening time;
After the first control unit receives the open signal, triggers the first control unit and control the logic analyser and open and open
Beginning is recorded;
Second control unit calls the recording time;
When the opening time of timing reaching the recording time, which sends closure signal;
After the first control unit receives the closure signal, the first control unit is triggered and controls the logic analyser being closed and stopping
Only record.
5. the automatic recording method of commissioning stage debugging information to be measured according to claim 4, which is characterized in that this is general defeated
The output current potential for entering output port includes high potential and low potential, when the output current potential is high potential, output current potential definition
For an output signal.
6. the automatic recording method of commissioning stage debugging information to be measured according to claim 4, which is characterized in that this is to be tested
Board executes different when restarting test, the corresponding different preset time and the recording time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510883092.7A CN106844125B (en) | 2015-12-03 | 2015-12-03 | The automatic recording device and method of commissioning stage debugging information to be measured |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510883092.7A CN106844125B (en) | 2015-12-03 | 2015-12-03 | The automatic recording device and method of commissioning stage debugging information to be measured |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106844125A CN106844125A (en) | 2017-06-13 |
CN106844125B true CN106844125B (en) | 2019-05-31 |
Family
ID=59149662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510883092.7A Expired - Fee Related CN106844125B (en) | 2015-12-03 | 2015-12-03 | The automatic recording device and method of commissioning stage debugging information to be measured |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106844125B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111722880B (en) * | 2020-05-11 | 2024-02-09 | 深圳市共进电子股份有限公司 | Equipment production method and device, terminal equipment and medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101854258A (en) * | 2010-06-01 | 2010-10-06 | 杭州和利时自动化有限公司 | Implementation method and device for eliminating communication chip failures |
CN102541702A (en) * | 2010-12-30 | 2012-07-04 | 精英电脑股份有限公司 | Test method for automatically restarting mainboard and recording debugging datum as well as restarting device of mainboard |
CN102790869A (en) * | 2012-07-31 | 2012-11-21 | 福建捷联电子有限公司 | Realization method for recording programs in TV |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9645870B2 (en) * | 2013-06-27 | 2017-05-09 | Atmel Corporation | System for debugging DMA system data transfer |
-
2015
- 2015-12-03 CN CN201510883092.7A patent/CN106844125B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101854258A (en) * | 2010-06-01 | 2010-10-06 | 杭州和利时自动化有限公司 | Implementation method and device for eliminating communication chip failures |
CN102541702A (en) * | 2010-12-30 | 2012-07-04 | 精英电脑股份有限公司 | Test method for automatically restarting mainboard and recording debugging datum as well as restarting device of mainboard |
CN102790869A (en) * | 2012-07-31 | 2012-11-21 | 福建捷联电子有限公司 | Realization method for recording programs in TV |
Also Published As
Publication number | Publication date |
---|---|
CN106844125A (en) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110347085A (en) | Automatization test system, method, vehicle and computer-readable medium | |
US20070021848A1 (en) | Testing system and related method for testing an electronic device by determining a power on/off signal | |
CN104994459B (en) | Terminal digital power amplifier configuration method and device | |
CN112148515A (en) | Fault positioning method, system, device, medium and equipment | |
CN108009065A (en) | The method and apparatus for monitoring AXI buses | |
US20110057643A1 (en) | Oscillograph and signal integrity test method using the oscillograph | |
WO2023001169A1 (en) | Automobile instrument test method, apparatus and system, and storage medium | |
CN113407393B (en) | Chip verification method, terminal device, verification platform and storage medium | |
US20190278645A1 (en) | Log post-processor for identifying root causes of device failure during automated testing | |
CN110750790B (en) | CAN bus vulnerability detection method and device, terminal equipment and medium | |
CN102789405A (en) | Automated testing method and system for mainboard | |
US20210111967A1 (en) | Graphical user interface for traffic capture and debugging tool | |
CN103760394A (en) | Automatic processing method and device for measured data of oscilloscope | |
CN106771453B (en) | Testing method and device for oscilloscope | |
CN112822440A (en) | Biological sample preparation monitoring method, application server, system and storage medium | |
CN106844125B (en) | The automatic recording device and method of commissioning stage debugging information to be measured | |
CN104468279A (en) | Routing protocol interaction testing method and tool | |
CN109597389B (en) | Test system of embedded control system | |
CN107576864A (en) | Self-learning type relay protection automatic test approach and system | |
CN116860535A (en) | Automatic testing device, system and method | |
CN116306429A (en) | Method, device, computer storage medium and terminal for realizing state data capture | |
CN113590498B (en) | Method and system for testing application starting time of desktop operating system | |
CN109522212A (en) | A kind of acquisition terminal software reliability safety half detection system in kind | |
CN114879647A (en) | ECU fault code test system, electronic controller and car | |
CN113140217B (en) | Voice instruction testing method, testing device and readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190531 Termination date: 20211203 |