CN106840544B CN201710056549.6A CN201710056549A CN106840544B CN 106840544 B CN106840544 B CN 106840544B CN 201710056549 A CN201710056549 A CN 201710056549A CN 106840544 B CN106840544 B CN 106840544B
Authority
CN
China
Prior art keywords
rock
gas
rock sample
coring
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710056549.6A
Other languages
Chinese (zh)
Other versions
CN106840544A (en
Inventor
王宏语
杨润泽
侯云超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences Beijing
Original Assignee
China University of Geosciences Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences Beijing filed Critical China University of Geosciences Beijing
Priority to CN201710056549.6A priority Critical patent/CN106840544B/en
Publication of CN106840544A publication Critical patent/CN106840544A/en
Application granted granted Critical
Publication of CN106840544B publication Critical patent/CN106840544B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/22Devices for withdrawing samples in the gaseous state

Abstract

A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method, comprising the following steps: prepare rock column, rock is sealed processing to rock column, is transported in laboratory;Rock column is placed into rock sample internal fissure detection device and carries out Crack Detection;Rock column after Crack Detection is qualified, which is placed into rock coring gas collecting apparatus, carries out coring gas collection.The present invention takes non-contact detecting to rock sample sealing propertytest, can keep the integrality of rock sample, can the efficiency of significant subsequent coring gas collection experiment and the accuracy of experimental result.The present invention is in the case where assert that the position gas in fine and close shale gas-bearing formation bosom does not escape, processing is sealed to such rock core, again under the physical condition for simulating underground in laboratory, rock core is crept into again, measure the tolerance lost in drilling process due to catalase, it more accurately solves the problems, such as shale gas-bearing formation gas-bearing property, is more conducive to the evaluation of shale gas-bearing formation.

Description

A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method
Technical field
The invention belongs to shale gas-bearing properties to survey gas technical field more particularly to a kind of shale rock sample sealing propertytest and coring Gas collection simulation experiment method.
Background technique
In production process of natural gas, especially in the production process of shale gas, mud shale gas-bearing property is for evaluating shale Gas resource potential and Favorable Areas are preferentially vital direct parameters, but the sampling and testing technology of shale air content is not at present It is enough complete.The method of existing evaluation shale air content is using sorption and desorption isotherm experimental provision, and the method is by drilling well The coal core returned up in journey carries out sorption and desorption isotherm, assesses the gassiness of shale gas reservoir by desorbing resulting methane content Amount.If if the tolerance that subsurface rock loses in shattering process is more, the tolerance that shale gas site desorption obtains will be de- From reality.The method is effective, but right to a certain extent in for example middle high-rank coals coal seam in the low coal seam of free gas comparision contents For shale, although its whole air content is lower than middle high-order coal, since its free gas air content is generally higher, bored in drill bit It is relatively high into the tolerance for being crushed institute's loss by shale in the process, it, should for gas-bearing property natively poor mud shale The Accurate Determining of part loss tolerance is particularly important.In view of the situation, if the tolerance lost in drilling process is measured, In conjunction with sorption and desorption isotherm method, the gas-bearing property of shale reservoir more will be accurately evaluated.It can currently, there has been no similar Measure the device of gas windage caused by being crushed in drilling process due to shale.Due to the agensis of mud shale crack but greatly Hole development, the tightness of shale itself is preferable, and in drilling process, the gas of part that only rock mass is destroyed scatters and disappears, and Its internal gas is substantially intact, drills through process losses tolerance simulation experiment method for core and provides the foundation condition.
Summary of the invention
The present invention provides a kind of shale rock sample sealing propertytest and coring collection to solve shortcoming in the prior art Gas simulation experiment method is that shale rock sample is sealed processing in drilling process, first carries out Crack Detection and assert fine and close page In the case that the position gas in rock gas-bearing formation bosom does not escape, then in laboratory simulate underground physical condition under, to rock The heart is crept into again, measures the tolerance lost in drilling process due to catalase.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of shale rock sample sealing propertytest and taking Core gas collection simulation experiment method, comprising the following steps:
One, rock column first is prepared in actual well drilled place, rock column uses the position in fine and close shale gas-bearing formation bosom, in gas In the case that body does not escape, processing is sealed to rock column, is transported in laboratory;
Two, rock column is placed into rock sample internal fissure detection device and carries out Crack Detection;
Three, the rock column after Crack Detection is qualified, which is placed into rock coring gas collecting apparatus, carries out coring gas collection.
Rock sample internal fissure detection device in step 2 includes cabinet body, and rock sample accommodation chamber, gas inspection are provided in cabinet body Cabin, electric four-way valve, vacuum pump and air blower are surveyed, rock sample accommodation chamber is columnar structured in front end opening, before rock sample accommodation chamber End is fixedly connected on the front inner wall of cabinet body by screw, and the setting of gas detection cabin is accommodated in the intracorporal bottom of cabinet and with rock sample Cabin is connected by sealed fitting, methane detection instrument and air pressure detector is equipped in gas detection cabin, gas detection cabin passes through Intake and exhaust pipeline is connected with first interface of electric four-way valve, and second interface of electric four-way valve is by gas exhaust piping and very Sky pump is connected, and the third interface of electric four-way valve is connected by air inlet pipeline with air blower, the 4th interface of electric four-way valve Connect sky;
Outer surface is equipped with operation panel on front side of cabinet body, and operation panel is equipped with start button and scram button, in cabinet body Bottom is equipped with control cabinet, and operation panel is connected by data/address bus with control cabinet, methane detection instrument pass through No.1 data line and Control cabinet is connected, and air pressure detector is connected by two number lines with control cabinet, and electric four-way valve passes through three number lines and control Cabinet processed is connected, and outer on control cabinet to extend equipment control line, equipment control line is connected with vacuum pump and air blower respectively;
Cabinet body installed in front has hatch door corresponding with rock sample accommodation chamber, the rotation equipped with the cooperation of cabinet body leading flank on hatch door Lock;When rotation lock is locked, hatch door seals rock sample accommodation chamber, when rotation lock is opened, opens hatch door, rock sample is put into or is taken out rock Sample accommodation chamber;Attaching plug and total power button is arranged in cabinet body right hand external, and bottom of cabinet bulk is equipped with four universal wheels, and cabinet body is left Upper lateral part and right upper portion are mounted on a handle, and regulated power supply is equipped in cabinet body, and regulated power supply passes through output power line It is connect with control cabinet, regulated power supply is connect by input power cord with attaching plug;Grid air hole is provided on the left of cabinet body.
Rock coring gas collecting apparatus in step 3 includes column, and being horizontally disposed on column has testing stand, solid on testing stand Surely it is equipped with the test cylinder of cylindrical structure, the center line of test cylinder is arranged in vertical, is fixed on test cylinder inner wall Rock column location structure and the rock column axial positioning structure above rock column circumferential positioning structure, test cylinder upper end outside Edge is horizontally disposed mounting disc, and mounting disc upper surface is removably connected with the sealing for sealing test cylinder by fastening bolt Lid, the first sealing ring between sealing cover lower surface and mounting disc upper surface, sealing cover be equipped with lower end with connect inside test cylinder Logical water injection pipe, blow-down pipe and gauge line;Testing stand lower surface be connected with the drainpipe that is connected to inside test cylinder, on drainpipe Equipped with drain valve;
Mounting disc lower surface is fixed with two about the symmetrical lifting motor in test cylinder center, each lifting motor Main shaft vertically upward pass through mounting disc and it is coaxial be sequentially connected with a lead screw, be threaded with one on every lead screw Sleeve, by one piece of mounting plate connection between two sleeves, the middle part upper surface of mounting plate is fixed with a coring motor, takes The main shaft of core motor pass through vertically downward mounting plate and it is coaxial be sequentially connected with drilling pipe, the setting of drilling pipe lower circumferential edge is with teeth The diamond drilling sword of shape, drilling pipe pass through sealing cover from top to bottom and extend into test cylinder, be provided on sealing cover with outside drilling pipe Second sealing ring of wall sealing cooperation;Mounting disc upper surface be vertically fixed with two it is symmetrical about test cylinder center line Guide rod, be connected with the guide plate for respectively corresponding and being slidably located on a guide rod on mounting plate;
Mounting disc upper surface is vertically equipped at least four struts along test cylinder center line circular array arrangement, all struts Upper end is connected with the water tank that an entirety is in circular ring shape, and lead screw and guide rod are respectively positioned on the inside of water tank, and the water inlet of water injection pipe connects It connects and is provided with water injection valve on the bottom of water tank, water injection pipe;
Vacuum pump is provided on water tank, mounting disc is equipped with expansion box, be connected with pressure gauge on expansion box, gauge line it is upper End is connect with expansion box, and metering ball valve is provided on gauge line, emptying ball valve is provided on blow-down pipe;
It is provided on testing stand for controlling lifting motor, coring motor and vacuum pump opening and closing and the control of revolving speed dress It sets.
Rock column location structure is provided with two layers, and every layer of rock column location structure includes four and radially sets along test cylinder The locating rod set, four locating rods arrange that the outer end of every locating rod is fixed along the centerline direction circumference array of test cylinder It is located on test cylinder inner wall, every locating rod inner end is fixed with one piece of arc panel, the center line of four pieces of arc panels and test The center line of cylinder is overlapped;
Rock column axial positioning structure includes that positioning ring flat-plate and three pieces of fixed plates, the outer circumferential walls for positioning ring flat-plate are fixed with Three pieces of connecting plates, three pieces of fixed plates along test cylinder center line circular array arrangement, fixed plate fixation are located on test cylinder inner wall, It respectively corresponds on three pieces of connecting plates and is connect with one piece of fixed plate by positioning bolt.
Step 2 specifically includes following procedure:
1) starting of rock sample internal fissure detection device;
2) calibration of rock sample accommodation chamber and gas detection cabin;
3) rock sample internal fissure test experience;
4) instrument after rock sample internal fissure test experience arranges.
Step 1) specifically includes following procedure:
A, automatic rock sample internal fissure detection device is pushed away and is placed on smooth ground;
B, by the attaching plug of civilian 220V plant-grid connection rock sample internal fissure detection device;
C, the total power button by attaching plug is pressed, each component is powered in rock sample internal fissure detection device.
Step 2 specifically includes following procedure:
A, the start button on pushing operation panel, the booting of rock sample internal fissure detection device;
B, hatch door is opened, " gas cleaning " order is assigned on operation panel, electric four-way valve is automatically regulated to be company at this time Logical air blower and gas detection cabin, then start air blower one minute, are that rock sample accommodation chamber and gas detection cabin are divulged information, eliminate it In interference gas that may be present;
C, after " gas cleaning " EP (end of program), " gas calibration " order is assigned on operation panel, at this time electric four-way valve It is automatically regulated to be the 4th interface and the gas detection cabin of connection electric four-way valve, methane detection instrument and air pressure detector reading are returned Zero.
Step 3) specifically includes following procedure:
I, after " gas calibration " EP (end of program), hatch door is opened, the rock sample prepared is placed in rock sample accommodation chamber, closes hatch door And lock rotation lock;
II, " rock sample detection " order is assigned on operation panel, electric four-way valve is automatically regulated to be connection vacuum pump at this time With gas detection cabin, subsequent vacuum pump startup starts to depressurize for rock sample accommodation chamber and gas detection cabin, and methane is visited in decompression process Instrument and air pressure detector real time readouts are surveyed, marked gas detects the methane content and atmospheric pressure value in cabin, sets when methane concentration reaches When fixed threshold value, information is fed back on operation panel, shows that current rock sample internal interstices development is intact, when atmospheric pressure value reaches setting Threshold value when, vacuum pump stops working, and prevents in cabin that air pressure is too low to cause equipment damage;
III, " pressing again in cabin " order after " rock sample detection " EP (end of program), is assigned on operation panel, at this time electric four-way valve The 4th interface being slowly connected to and gas detection cabin are that gas detection cabin and rock sample accommodation chamber restore air pressure.
Step 4) specifically includes following procedure:
1., after " in cabin again press " order, open hatch door, rock sample taken out;
2., assign on operation panel " gas cleaning " order, electric four-way valve is automatically regulated to be connection air blower at this time With gas detection cabin, start air blower one minute later, is that rock sample accommodation chamber and gas detection cabin are divulged information, eliminates present in it Methane gas;
3., press total power button by attaching plug, power off, will be split inside rock sample for rock sample internal fissure detection device Seam detection device, which is shifted onto, puts in order position.
Step 3 specifically includes following procedure:
(1) the rock column of Crack Detection qualification is put into test cylinder, the outer diameter of the rock column of acquisition is equal to or slightly less than The internal diameter of arc panel, the intrados of totally 8 pieces of arc panels is bonded with rock column extrados to rock column progress radial limit upper layer and lower layer Position, is then placed into rock column upper end for positioning ring flat-plate, is connected and fixed plate and connecting plate using positioning bolt, positions ring flat-plate and rock Stone column press fit plays axial limiting to rock column;
(2) emptying ball valve and water injection valve are opened, drain valve and metering ball valve are closed, the water in water tank is under difference in height effect Through water injection pipe be flowed into test cylinder in, with the raising of the water surface in test cylinder, air is discharged by blow-down pipe, the first sealing ring and Second sealing ring plays the role of avoiding gas leakage and leak, after drained air is full of water in test cylinder, closes emptying ball valve And water injection valve;
(3) it keeps metering ball valve to be in off state, opens vacuum pump, vacuumize process is carried out to expansion box, passes through gas storage The pressure gauge of box top connection carries out expansion box internal pressure and shows, metering ball valve is opened after the completion of expansion box vacuumizes;
(4) start coring motor and two lifting motors, the revolving speed of two lifting motors is identical, and lifting motor drives lead screw Rotation limits sleeve and rotates with lead screw since guide plate is set on guide rod, and with the rotation of lead screw, sleeve is transported downwards along lead screw Dynamic, the mounting plate between two sleeves drives coring motor to realize feed motion axially downwards, and coring motor drives drilling pipe rotation, The diamond drilling sword cutting rock column of drilling pipe lower end carries out coring;
(5) for drilling pipe during circumgyration incision rock column, the water in test cylinder plays lubrication cooling to hard rock drilling sword Effect, while rock column internal fracture rock can discharge gas, discharged gas is since differential pressure action enters in expansion box and leads to Excess pressure table shows gas pressure change in expansion box, to realize that the gas discharged in location of the coring procedure to rock column carries out It collects and shows;
(6) volume of acquisition gas is obtained by the conversion pressure that the intrinsic volume of expansion box and pressure gauge are shown;
(7) drain valve is opened, the water in test cylinder is discharged by drainpipe, then will be cut isolated core and is taken out.
By adopting the above technical scheme, the rock sample internal fissure detection device in the present invention can detect rock sample and take non-connect Touching detection, can keep the integrality of rock sample, eliminate the cutting housekeeping in conventional method to rock sample, and complete machine structure Compact, mobility is good, and high degree of automation, experiment flow is simple, and the detection that can be completed in a short time rock sample leakproofness is real It tests, it can the efficiency of significant subsequent coring gas collection experiment and the accuracy of experimental result.
The present invention can simulate and acquire the tolerance that core is discharged in shale gas production process, and the present invention is real by simulation Existing location of the coring procedure, while acquiring the tolerance for measuring that core is discharged when being crushed core in location of the coring procedure.The present invention is to assert In the case that the position gas in fine and close shale gas-bearing formation bosom does not escape, processing is sealed to such rock core, then with experiment Under the physical condition for simulating underground in room, rock core is crept into again, measures in drilling process and is lost due to catalase Tolerance.The combination of the present invention and traditional air content appraisal procedure more will accurately solve asking for shale gas-bearing formation gas-bearing property Topic, is more conducive to the evaluation of shale gas-bearing formation.
Detailed description of the invention
Fig. 1 is schematic perspective view of the rock sample internal fissure detection device external form under a visual angle in the present invention;
Fig. 2 is schematic perspective view of the rock sample internal fissure detection device external form under another visual angle in the present invention;
Fig. 3 is the schematic diagram of internal structure of rock sample internal fissure detection device in the present invention;
Fig. 4 is the structural schematic diagram that rock sample internal fissure detection device removes after cabinet body and rock sample accommodation chamber in the present invention;
Fig. 5 is the schematic perspective view of rock coring gas collecting apparatus external form in the present invention;
Fig. 6 is the schematic diagram of internal structure of rock coring gas collecting apparatus in the present invention;
Fig. 7 is the schematic perspective view of drilling pipe in Fig. 6.
Specific embodiment
As shown in Fig. 1-Fig. 7, of the invention a kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method, packet Include following steps:
One, rock column 38 first being prepared in actual well drilled place, rock column 38 uses the position in fine and close shale gas-bearing formation bosom, In the case where gas does not escape, processing is sealed to rock column 38, is transported in laboratory;
Two, rock column 38 is placed into rock sample internal fissure detection device and carries out Crack Detection;
Three, the rock column 38 after Crack Detection is qualified, which is placed into rock coring gas collecting apparatus, carries out coring gas collection.
Rock sample internal fissure detection device in step 2 includes cabinet body 40, be provided in cabinet body 40 rock sample accommodation chamber 41, Gas detection cabin 42, electric four-way valve 45, vacuum pump 46 and air blower 47, the cylinder-shaped knot open in front end of rock sample accommodation chamber 41 Structure, 41 front end of rock sample accommodation chamber are fixedly connected on the front inner wall of cabinet body 40 by screw, and gas detection cabin 42 is arranged in cabinet Bottom in body 40 is simultaneously connected with rock sample accommodation chamber 41 by sealed fitting 48, is equipped with methane detection in gas detection cabin 42 Instrument 43 and air pressure detector 44, gas detection cabin 42 pass through first interface phase of intake and exhaust pipeline 49 and electric four-way valve 45 Even, second interface of electric four-way valve 45 is connected by gas exhaust piping 50 with vacuum pump 46, the third of electric four-way valve 45 Interface is connected by air inlet pipeline 51 with air blower 47, and the 4th interface of electric four-way valve 45 connects sky;
40 front side outer surface of cabinet body is equipped with operation panel 54, and operation panel 54 is equipped with start button 62 and scram button 63, bottom is equipped with control cabinet 56 in cabinet body 40, and operation panel 54 is connected by data/address bus 55 with control cabinet 56, methane detection Instrument 43 is connected by No.1 data line 57 with control cabinet 56, and air pressure detector 44 passes through two number lines 58 and 56 phase of control cabinet Even, electric four-way valve 45 is connected by three number lines 61 with control cabinet 56, outer on control cabinet 56 to extend equipment control line 59, if Standby control line 59 is connected with vacuum pump 7 and air blower 47 respectively.
40 installed in front of cabinet body has hatch door 52 corresponding with rock sample accommodation chamber 41, matches on hatch door 52 equipped with 40 leading flank of cabinet body The rotation lock 53 of conjunction;When rotation lock 53 is locked, hatch door 52 seals rock sample accommodation chamber 41, when rotation lock 53 is opened, opens hatch door 52, rock sample is put into or is taken out rock sample accommodation chamber 41;Attaching plug 64 and total power button 65, cabinet is arranged in 40 right hand external of cabinet body 40 bottom of body is equipped with four universal wheels 66, and 40 left upper portion of cabinet body and right upper portion are mounted on a handle 67, cabinet body 40 Regulated power supply 69 is inside installed, regulated power supply 69 is connect by output power line 68 with control cabinet 56, and regulated power supply 69 passes through defeated Enter power supply line 70 to connect with attaching plug 64.Grid air hole 60 is provided on the left of cabinet body 40.
Rock coring gas collecting apparatus in step 3 includes column 1, and being horizontally disposed on column 1 has testing stand 2, testing stand 2 On be fixed with the test cylinder 3 of cylindrical structure, the center line of test cylinder 3 is arranged in vertical, solid on 3 inner wall of test cylinder Surely rock column location structure and the rock column axial positioning structure above rock column circumferential positioning structure, test cylinder 3 are equipped with Upper end outer side edges have mounting disc 4 along horizontally disposed, and 4 upper surface of mounting disc is removably connected with by fastening bolt 5 by test cylinder 3 The sealing cover 6 of sealing, sealing cover 6 in intermediate curved-surface structure protruding upward, 6 lower surface of sealing cover and 4 upper surface of mounting disc it Between the first sealing ring 7, sealing cover 6 be equipped with lower end with the water injection pipe 8, blow-down pipe 9 and gauge line that are connected to inside test cylinder 3 10;2 lower surface of testing stand is connected with the drainpipe 11 being connected to inside test cylinder 3, and drainpipe 11 is equipped with drain valve 12.
4 lower surface of mounting disc is fixed with two about the symmetrical lifting motor 13 in 3 center of test cylinder, each lifting electricity The main shaft of machine 13 passes through mounting disc 4 vertically upward and coaxial is sequentially connected with a lead screw 14, equal spiral shell on every lead screw 14 Line is connected with a sleeve 15, is connected between two sleeves 15 by one piece of mounting plate 16, and the middle part upper surface of mounting plate 16 is solid Surely it is equipped with a coring motor 17, the main shaft of coring motor 17 passes through mounting plate 16 vertically downward and coaxial is sequentially connected with brill Cylinder 18,18 lower circumferential edge of drilling pipe are provided with the diamond drilling sword 19 of dentation, and drilling pipe 18 passes through sealing cover 6 from top to bottom and stretches Enter into test cylinder 3, the second sealing ring 20 with the sealing cooperation of 18 outer wall of drilling pipe is provided on sealing cover 6;4 upper surface of mounting disc Two are vertically fixed with about the symmetrical guide rod 21 in 3 center of test cylinder, is connected with and respectively corresponds on mounting plate 16 The guide plate 22 being slidably located on a guide rod 21.
4 upper surface of mounting disc is vertically equipped at least four struts 23 along 3 center line circular array of test cylinder arrangement, owns 23 upper end of strut is connected with the water tank 24 that an entirety is in circular ring shape, and lead screw 14 and guide rod 21 are respectively positioned on the inside of water tank 24, note The water inlet of water pipe 8 is connected to the bottom of water tank 24, and water injection valve 25 is provided on water injection pipe 8.
Vacuum pump 26 is provided on water tank 24, mounting disc 4 is equipped with expansion box 27, be connected with pressure gauge on expansion box 27 28, the upper end of gauge line 10 is connect with expansion box 27, and metering ball valve 29 is provided on gauge line 10, is provided with and puts on blow-down pipe 9 Empty ball valve 31.
It is provided on testing stand 2 for controlling lifting motor 13, coring motor 17 and the opening and closing of vacuum pump 26 and revolving speed Control device 39.
Rock column location structure is provided with two layers, and every layer of rock column location structure includes four radial along test cylinder 3 The locating rod 32 of setting, four locating rods 32 arrange along the centerline direction circumference array of test cylinder 3, every locating rod 32 it is outer End fixation is located on 3 inner wall of test cylinder, and every 32 inner end of locating rod is fixed with one piece of arc panel 33, four pieces of arc panels 33 Center line be overlapped with the center line of test cylinder 3.
Rock column axial positioning structure includes positioning ring flat-plate 34 and three pieces of fixed plates 35, and the outer circumferential walls of positioning ring flat-plate 34 are solid Surely three pieces of connecting plates 36, three pieces of fixed plates 35 along 3 center line circular array of test cylinder arrangement are equipped with, the fixation of fixed plate 35 is located at On 3 inner wall of test cylinder, respectively corresponds on three pieces of connecting plates 36 and connect with one piece of fixed plate 35 by positioning bolt 37.
Step 2 specifically includes following procedure:
1) starting of rock sample (i.e. rock column 38) internal fissure detection device;
2) calibration of rock sample accommodation chamber 41 and gas detection cabin 42;
3) rock sample internal fissure test experience;
4) instrument after rock sample internal fissure test experience arranges.
Step 1) specifically includes following procedure:
A, rock sample internal fissure detection device is pushed away and is placed on smooth ground;
B, by the attaching plug 64 of civilian 220V plant-grid connection rock sample internal fissure detection device;
C, the total power button 65 on 64 side of attaching plug is pressed, each component is powered in rock sample internal fissure detection device.
Step 2 specifically includes following procedure:
A, rock sample internal fissure detection device is pushed away and is placed on smooth ground;
B, by the attaching plug 64 of civilian 220V plant-grid connection rock sample internal fissure detection device;
C, the total power button 65 on 64 side of attaching plug is pressed, each component is powered in rock sample internal fissure detection device.
Step 3) specifically includes following procedure:
I, after " gas calibration " EP (end of program), hatch door 52 is opened, the rock sample prepared is placed in rock sample accommodation chamber, closes cabin Door 52 simultaneously locks rotation lock 53;
II, " rock sample detection " order is assigned on operation panel 54, it is true to be automatically regulated to be connection for electric four-way valve 45 at this time Sky pump 46 and gas detection cabin 42, the subsequent starting of vacuum pump 46 start to depressurize for rock sample accommodation chamber 41 and gas detection cabin 42, subtract 44 real time readouts of methane detection instrument 43 and air pressure detector during pressure, marked gas detect methane content and air pressure in cabin 42 Value, when methane concentration reaches the threshold value of setting, information is fed back on operation panel 54, shows current rock sample internal interstices development Intact, when atmospheric pressure value reaches the threshold value of setting, vacuum pump 46 stops working, and prevents in cabin that air pressure is too low to cause equipment damage;
III, " pressing again in cabin " order after " rock sample detection " EP (end of program), is assigned on operation panel 54, at this time electric four passes The 4th interface and gas detection cabin 42 that valve 45 is slowly connected to are that gas detection cabin 42 and rock sample accommodation chamber 41 restore gas Pressure.
Step 4) specifically includes following procedure:
1., after " in cabin again press " order, open hatch door 52, rock sample taken out;
2., assign on operation panel 54 " gas cleaning " order, electric four-way valve 45 is automatically regulated to be connection drum at this time Blower 47 and gas detection cabin 42 start air blower 47 1 minutes later, are that rock sample accommodation chamber 41 and gas detection cabin 42 are divulged information, Eliminate methane gas present in it;
3., press the total power button 65 on the side of attaching plug 64, powered off for rock sample internal fissure detection device, will be in rock sample Portion's crack detecting device, which is shifted onto, puts in order position.
Step 3 specifically includes following procedure:
(1) the rock column 38 of Crack Detection qualification is put into test cylinder 3, the outer diameter of the rock column 38 of acquisition is equal to or slightly Less than the internal diameter of arc panel 33, the intrados of totally 8 pieces of arc panels 33 is bonded with 38 extrados of rock column to rock column upper layer and lower layer 38 carry out radial limit, and positioning ring flat-plate 34 is then placed into 38 upper end of rock column, is connected and fixed plate 35 using positioning bolt 37 With connecting plate 36, ring flat-plate 34 and 38 press fit of rock column are positioned, axial limiting is risen to rock column 38;
(2) emptying ball valve 31 and water injection valve 25 are opened, closes drain valve 12 and metering ball valve 29, the water in water tank 24 is in height It is flowed into 3 body of test cylinder under degree difference effect through water injection pipe 8, with the raising of the water surface in test cylinder 3, air is by 9 row of blow-down pipe Out, the first sealing ring 7 and the second sealing ring 20 play the role of avoiding gas leakage and leak, when drained air fills in 3 body of test cylinder After full water, emptying ball valve 31 and water injection valve 25 are closed;
(3) it keeps metering ball valve 29 to be in off state, opens vacuum pump 26, vacuumize process is carried out to expansion box 27, is led to It crosses the progress of pressure gauge 28 27 internal pressure of expansion box connected at the top of expansion box 27 to show, be beaten after the completion of expansion box 27 vacuumizes Open metering ball valve 29;
(4) start coring motor 17 and two lifting motors 13, the revolving speed of two lifting motors 13 is identical, lifting motor 13 It drives lead screw 14 to rotate, limits sleeve 15 with the rotation of lead screw 14, with lead screw 14 since guide plate 22 is set on guide rod 21 Rotation, sleeve 15 are moved downward along lead screw 14, and the mounting plate 16 between two sleeves 15 drives coring motor 17 to realize to lower axle To feed motion, coring motor 17 drives drilling pipe 18 to rotate, the diamond drilling sword 19 of 18 lower end of drilling pipe cut rock column 38 into Row coring;
(5) for drilling pipe 18 during circumgyration incision rock column 38, the water in test cylinder 3 plays lubrication to hard rock drilling sword Cooling effect, while 38 internal fracture rock of rock column can discharge gas, discharged gas enters expansion box due to differential pressure action Gas pressure change in expansion box 27 is shown in 27 and by pressure gauge 28, to realize in location of the coring procedure to 38 institute of rock column The gas of release is collected and shows;
(6) volume of acquisition gas is obtained by the conversion pressure that the intrinsic volume of expansion box 27 and pressure gauge 28 are shown;
(7) drain valve 12 is opened, the water in test cylinder 3 is discharged by drainpipe 11, then will be cut isolated core and is taken Out.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (9)

1. a kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method, it is characterised in that: the following steps are included:
One, rock column first is prepared in actual well drilled place, rock column is not had using the position in fine and close shale gas-bearing formation bosom in gas In the case where having evolution, processing is sealed to rock column, is transported in laboratory;
Two, rock column is placed into rock sample internal fissure detection device and carries out Crack Detection;
Three, the rock column after Crack Detection is qualified, which is placed into rock coring gas collecting apparatus, carries out coring gas collection;
Rock sample internal fissure detection device in step 2 includes cabinet body, be provided in cabinet body rock sample accommodation chamber, gas detection cabin, Electric four-way valve, vacuum pump and air blower, rock sample accommodation chamber is columnar structured in front end opening, and rock sample accommodation chamber front end passes through Screw is fixedly connected on the front inner wall of cabinet body, and gas detection cabin is arranged in the intracorporal bottom of cabinet and passes through with rock sample accommodation chamber Sealed fitting is connected, and methane detection instrument and air pressure detector is equipped in gas detection cabin, gas detection cabin passes through intake and exhaust Pipeline is connected with first interface of electric four-way valve, and second interface of electric four-way valve passes through gas exhaust piping and vacuum pump phase Even, the third interface of electric four-way valve is connected by air inlet pipeline with air blower, and the 4th interface of electric four-way valve connects sky;
Outer surface is equipped with operation panel on front side of cabinet body, and operation panel is equipped with start button and scram button, bottom in cabinet body Control cabinet is installed, operation panel is connected by data/address bus with control cabinet, and methane detection instrument passes through No.1 data line and control Cabinet is connected, and air pressure detector is connected by two number lines with control cabinet, and electric four-way valve passes through three number lines and control cabinet It is connected, outer on control cabinet to extend equipment control line, equipment control line is connected with vacuum pump and air blower respectively;
Cabinet body installed in front has hatch door corresponding with rock sample accommodation chamber, the rotation lock equipped with the cooperation of cabinet body leading flank on hatch door;Rotation When twist lock is locked, hatch door seals rock sample accommodation chamber, when rotation lock is opened, opens hatch door, rock sample is put into or is taken out rock sample appearance Receive cabin;Cabinet body right hand external is arranged attaching plug and total power button, and bottom of cabinet bulk is equipped with four universal wheels, on the left of cabinet body on Portion and right upper portion are mounted on a handle, and regulated power supply is equipped in cabinet body, and regulated power supply passes through output power line and control Cabinet connection processed, regulated power supply are connect by input power cord with attaching plug;Grid air hole is provided on the left of cabinet body.
2. a kind of shale rock sample sealing propertytest according to claim 1 and coring gas collection simulation experiment method, feature Be: the rock coring gas collecting apparatus in step 3 includes column, and being horizontally disposed on column has testing stand, and fixation is set on testing stand There is the test cylinder of cylindrical structure, the center line of test cylinder is arranged in vertical, and is fixed with rock on test cylinder inner wall Column location structure and the rock column axial positioning structure above rock column circumferential positioning structure, test cylinder upper end outer side edges edge Horizontally disposed to have mounting disc, mounting disc upper surface is removably connected with the sealing cover for sealing test cylinder by fastening bolt, close The first sealing ring between lower surface and mounting disc upper surface is covered, sealing cover is equipped with the note that lower end is connected to test cylinder inside Water pipe, blow-down pipe and gauge line;Testing stand lower surface is connected with the drainpipe being connected to test cylinder inside, and drainpipe is equipped with row Water valve;
Mounting disc lower surface is fixed with two about the symmetrical lifting motor in test cylinder center, the main shaft of each lifting motor Vertically upward pass through mounting disc and it is coaxial be sequentially connected with a lead screw, a set is threaded on every lead screw Tin, by one piece of mounting plate connection between two sleeves, the middle part upper surface of mounting plate is fixed with a coring motor, coring The main shaft of motor pass through vertically downward mounting plate and it is coaxial be sequentially connected with drilling pipe, drilling pipe lower circumferential edge is provided with dentation Diamond drilling sword, drilling pipe passes through sealing cover from top to bottom and extend into test cylinder, be provided on sealing cover and drilling pipe outer wall Seal the second sealing ring of cooperation;Mounting disc upper surface be vertically fixed with two it is symmetrical about test cylinder center Guide rod is connected with the guide plate for respectively corresponding and being slidably located on a guide rod on mounting plate;
Mounting disc upper surface is vertically equipped at least four struts along test cylinder center line circular array arrangement, all strut upper ends It is connected with the water tank that an entirety is in circular ring shape, lead screw and guide rod are respectively positioned on the inside of water tank, and the water inlet of water injection pipe is connected to The bottom of water tank is provided with water injection valve on water injection pipe;
Vacuum pump is provided on water tank, mounting disc is equipped with expansion box, be connected with pressure gauge on expansion box, the upper end of gauge line with Expansion box connects, and is provided with metering ball valve on gauge line, emptying ball valve is provided on blow-down pipe;
The control device for controlling lifting motor, coring motor and vacuum pump opening and closing and revolving speed is provided on testing stand.
3. a kind of shale rock sample sealing propertytest according to claim 2 and coring gas collection simulation experiment method, feature Be: rock column location structure is provided with two layers, and every layer of rock column location structure includes four and is arranged radially along test cylinder Locating rod, four locating rods along test cylinder centerline direction circumference array arrange, the outer end of every locating rod fixation sets On test cylinder inner wall, every locating rod inner end is fixed with one piece of arc panel, the center line and test cylinder of four pieces of arc panels Center line be overlapped;
Rock column axial positioning structure includes that positioning ring flat-plate and three pieces of fixed plates, the outer circumferential walls for positioning ring flat-plate are fixed with three pieces Connecting plate, three pieces of fixed plates along test cylinder center line circular array arrangement, fixed plate fixation are located on test cylinder inner wall, and three pieces It respectively corresponds on connecting plate and is connect with one piece of fixed plate by positioning bolt.
4. a kind of shale rock sample sealing propertytest according to claim 3 and coring gas collection simulation experiment method, feature Be: step 2 specifically includes following procedure:
1) starting of rock sample internal fissure detection device;
2) calibration of rock sample accommodation chamber and gas detection cabin;
3) rock sample internal fissure test experience;
4) instrument after rock sample internal fissure test experience arranges.
5. a kind of shale rock sample sealing propertytest according to claim 4 and coring gas collection simulation experiment method, feature Be: step 1) specifically includes following procedure:
A, automatic rock sample internal fissure detection device is pushed away and is placed on smooth ground;
B, by the attaching plug of civilian 220V plant-grid connection rock sample internal fissure detection device;
C, the total power button by attaching plug is pressed, each component is powered in rock sample internal fissure detection device.
6. a kind of shale rock sample sealing propertytest according to claim 4 and coring gas collection simulation experiment method, feature Be: step 2 specifically includes following procedure:
A, the start button on pushing operation panel, the booting of rock sample internal fissure detection device;
B, hatch door is opened, " gas cleaning " order is assigned on operation panel, electric four-way valve is automatically regulated to be connection drum at this time Then blower and gas detection cabin start air blower one minute, be that rock sample accommodation chamber and gas detection cabin are divulged information, elimination wherein may be used Interference gas existing for energy;
C, after " gas cleaning " EP (end of program), " gas calibration " order is assigned on operation panel, electric four-way valve is automatic at this time It is adjusted to the 4th interface and the gas detection cabin of connection electric four-way valve, methane detection instrument and air pressure detector reading zero.
7. a kind of shale rock sample sealing propertytest according to claim 6 and coring gas collection simulation experiment method, feature Be: step 3) specifically includes following procedure:
I, after " gas calibration " EP (end of program), hatch door is opened, the rock sample prepared is placed in rock sample accommodation chamber, hatch door is closed and locks Tight rotation lock;
II, " rock sample detection " order is assigned on operation panel, it is gentle to be automatically regulated to be connection vacuum pump for electric four-way valve at this time Cabin is surveyed in physical examination, and subsequent vacuum pump startup starts to depressurize for rock sample accommodation chamber and gas detection cabin, methane detection instrument in decompression process With air pressure detector real time readouts, marked gas detects the methane content and atmospheric pressure value in cabin, when methane concentration reaches setting When threshold value, information is fed back on operation panel, shows that current rock sample internal interstices development is intact, when atmospheric pressure value reaches the threshold of setting When value, vacuum pump stops working, and prevents in cabin that air pressure is too low to cause equipment damage;
III, " pressing again in cabin " order after " rock sample detection " EP (end of program), is assigned on operation panel, electric four-way valve is slow at this time 4th interface of ground connection and gas detection cabin are that gas detection cabin and rock sample accommodation chamber restore air pressure.
8. a kind of shale rock sample sealing propertytest according to claim 7 and coring gas collection simulation experiment method, feature Be: step 4) specifically includes following procedure:
1., after " in cabin again press " order, open hatch door, rock sample taken out;
2., assign on operation panel " gas cleaning " order, it is gentle to be automatically regulated to be connection air blower for electric four-way valve at this time Cabin is surveyed in physical examination, is started air blower one minute later, is that rock sample accommodation chamber and gas detection cabin are divulged information, is eliminated methane present in it Gas;
3., press total power button by attaching plug, powered off for rock sample internal fissure detection device, rock sample internal fissure examined Survey device, which is shifted onto, puts in order position.
9. a kind of shale rock sample sealing propertytest according to claim 3 and coring gas collection simulation experiment method, feature Be: step 3 specifically includes following procedure:
(1) the rock column of Crack Detection qualification is put into test cylinder, the outer diameter of the rock column of acquisition is equal to or slightly less than arc The internal diameter of plate, the intrados of totally 8 pieces of arc panels is bonded to the radial limit of rock column progress, so upper layer and lower layer with rock column extrados Positioning ring flat-plate is placed into rock column upper end afterwards, is connected and fixed plate and connecting plate, positioning ring flat-plate and rock column using positioning bolt Press fit plays axial limiting to rock column;
(2) emptying ball valve and water injection valve are opened, drain valve and metering ball valve are closed, the water in water tank is under difference in height effect through infusing Water pipe is flowed into test cylinder, and with the raising of the water surface in test cylinder, air is discharged by blow-down pipe, the first sealing ring and second Sealing ring plays the role of avoiding gas leakage and leak, after drained air is full of water in test cylinder, closes emptying ball valve and note Water valve;
(3) it keeps metering ball valve to be in off state, opens vacuum pump, vacuumize process is carried out to expansion box, passes through expansion box top The pressure gauge of portion's connection carries out expansion box internal pressure and shows, metering ball valve is opened after the completion of expansion box vacuumizes;
(4) start coring motor and two lifting motors, the revolving speed of two lifting motors is identical, and lifting motor drives lead screw to turn It is dynamic, it limits sleeve since guide plate is set on guide rod and is rotated with lead screw, with the rotation of lead screw, sleeve is transported downwards along lead screw Dynamic, the mounting plate between two sleeves drives coring motor to realize feed motion axially downwards, and coring motor drives drilling pipe rotation, The diamond drilling sword cutting rock column of drilling pipe lower end carries out coring;
(5) for drilling pipe during circumgyration incision rock column, the water in test cylinder plays the role of lubrication cooling to hard rock drilling sword, Rock column internal fracture rock can discharge gas simultaneously, and discharged gas is since differential pressure action enters in expansion box and passes through pressure Table shows gas pressure change in expansion box, thus realize rock column is discharged in location of the coring procedure gas be collected and Display;
(6) volume of acquisition gas is obtained by the conversion pressure that the intrinsic volume of expansion box and pressure gauge are shown;
(7) drain valve is opened, the water in test cylinder is discharged by drainpipe, then will be cut isolated core and is taken out.
CN201710056549.6A 2017-01-25 2017-01-25 A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method Expired - Fee Related CN106840544B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710056549.6A CN106840544B (en) 2017-01-25 2017-01-25 A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710056549.6A CN106840544B (en) 2017-01-25 2017-01-25 A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method

Publications (2)

Publication Number Publication Date
CN106840544A CN106840544A (en) 2017-06-13
CN106840544B true CN106840544B (en) 2018-12-21

Family

ID=59121225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710056549.6A Expired - Fee Related CN106840544B (en) 2017-01-25 2017-01-25 A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method

Country Status (1)

Country Link
CN (1) CN106840544B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110631951B (en) * 2018-06-22 2021-11-09 中国石油化工股份有限公司 On-site detection device and method for shale desorption gas
CN112033770A (en) * 2018-07-26 2020-12-04 杜瑞青 Sampling collector for pretreatment of underground mine gas containing large amount of dust and use method
CN108896357A (en) * 2018-08-20 2018-11-27 贵州大学 A kind of shale gas sealed sampling device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201909732U (en) * 2010-12-24 2011-07-27 中国石油天然气股份有限公司 Portable tester of shale gas and coal bed gas
CN202453266U (en) * 2012-03-07 2012-09-26 中国石油天然气股份有限公司 Gas content testing device
CN103063545B (en) * 2012-12-28 2015-01-07 恒泰尚合能源技术(北京)有限公司 Shale gas content detecting method
CN104131803A (en) * 2013-05-10 2014-11-05 中国石油大学(北京) Experiment method for evaluating shale fracturing crack mesh forming capability
CN103808592A (en) * 2014-03-04 2014-05-21 江苏珂地石油仪器有限公司 Gas content tester for shale gas
CN104713802B (en) * 2015-04-01 2018-12-04 中国石油化工股份有限公司江汉油田分公司勘探开发研究院 A kind of shale gas reservoir gassiness weight testing method

Also Published As

Publication number Publication date
CN106840544A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106706363B (en) A kind of shale rock sample coring simulation test device and its simulation experiment method
CN105547907B (en) The servo measurement pilot system and method for coal sample gas adsorption desorption
CN106840544B (en) A kind of shale rock sample sealing propertytest and coring gas collection simulation experiment method
CN102735548B (en) Multifunctional true triaxial flow solid coupling test system
CN102735547B (en) Coal-rock hydraulic fracturing testing method under true triaxial state
CN107576774B (en) Coal seam containing gas mechanical characteristic analogue experiment method under uniaxial compression
CN102735600B (en) Method for testing coal sample seepage under true triaxial state
CN102735549B (en) Multifunctional true triaxial flow solid coupling pressure chamber
CN105756674B (en) Fracture-matrix coupling flow damage evaluation device and method for simulating formation conditions
CN105424905B (en) Gas abnormity desorption characteristic test device and method in coal body destruction process
CN201241707Y (en) Tunnel upward floating model trial apparatus
CN109507077A (en) Simulate supercritical carbon dioxide coal petrography pressure break CT imaging and evaluating apparatus and its application method under in-situ condition
CN205844014U (en) A kind of drilling fluid online quantitative collection transmitting device
CN110306964B (en) Hydraulic fracturing coal seam crack visualization and permeability increasing effect evaluation method
CN205477605U (en) Crack - matrix coupling of simulated formation condition is flowed and is harmd evaluation device
CN106680451A (en) Underground rapid measurement method for coal and gas outburst parameter as well as apparatus thereof
CN107807084A (en) A kind of rock sample seepage flow test device and method
CN111271051A (en) Three-way loading mine drilling and hole sealing effect simulation test device and method
CN106814002B (en) It is a kind of to simulate the apparatus and method that tolerance is lost in low coal rank coal sample location of the coring procedure
CN103698166A (en) Rock analysis gas high-vacuum degassing and gas-collecting device
CN205246645U (en) Experimental test system of unusual desorption of gas in coal sample destructive process
CN207194943U (en) A kind of Drillhole gas pumping laboratory analog system
CN202793863U (en) Rock analysis gas high vacuum degassing and gas collecting device
CN209231046U (en) A kind of oil log detection sample gas dust filtration device
CN206990545U (en) Drilling fluid field assay chemically examines operating desk

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181221