CN106836831A - A kind of shear wall overlay film maintenance process - Google Patents

A kind of shear wall overlay film maintenance process Download PDF

Info

Publication number
CN106836831A
CN106836831A CN201710158006.5A CN201710158006A CN106836831A CN 106836831 A CN106836831 A CN 106836831A CN 201710158006 A CN201710158006 A CN 201710158006A CN 106836831 A CN106836831 A CN 106836831A
Authority
CN
China
Prior art keywords
wall
film
brushing
maintenance
overlay film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710158006.5A
Other languages
Chinese (zh)
Inventor
魏佳鑫
高尚
吕志伟
马文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201710158006.5A priority Critical patent/CN106836831A/en
Publication of CN106836831A publication Critical patent/CN106836831A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Abstract

A kind of shear wall overlay film maintenance process, belongs to wall overlay film maintenance technology field.Construction technology process:Wall base treatment → curing fluid brushing → covered rearing with plastic film → examination.By making wall quickly effectively kept with air insulated the construction method of moist environment in walls concrete using plastic sheeting after wall form removal, on the premise of additionally construction cost is not increased, promotion concrete strength lifting is reached, it is ensured that intensity purpose.Advantage is to construct relatively simple, and compared to more traditional watering maintenance process and curing fluid maintenance process, maintenance effect is good, and construction cost is low.

Description

A kind of shear wall overlay film maintenance process
Technical field
The invention belongs to wall overlay film maintenance technology field, a kind of shear wall overlay film maintenance process is in particular, provided, sheared The overlay film maintenance of the components such as wall, post is a kind of emerging construction technology, is constructed relatively simple, compared to more traditional watering maintenance process And curing fluid maintenance process, maintenance effect is good, and construction cost is low, the humidity needed for maintenance can be reached substantially, mixes wall Effectively being conserved for solidifying soil, reaches the intensity of design;Suitable for all types of civil buildings.
Background technology
Concrete can reach design strength in care environments relative humidity needs 28 talentes more than 95% that mark supports room Value, but conditions of similarity can not possibly be reached under construction site condition, and and construction rhythm is very fast, concrete especially walls concrete Design strength is unable to reach in the checking spring range in later stage.To sprinkle water and smearing curing fluid, water exists the conventional maintenance means of wall Cannot be retained for a long time above wall, maintenance liquid is relatively costly and easy appearance cannot natural dropping situations, later stage finishing is deposited In certain hidden danger.
Wall maintenance difficulty has become a problem of puzzlement constituent parts.
The content of the invention
It is an object of the invention to provide a kind of shear wall overlay film maintenance process, wall maintenance difficult problem is overcome, led to Cross makes wall quickly effectively kept with air insulated being moistened in walls concrete after wall form removal using plastic sheeting The construction method of environment, on the premise of additionally construction cost is not increased, reaches promotion concrete strength lifting, it is ensured that intensity mesh 's.
The technical solution adopted for the present invention to solve the technical problems is:Construction technology process:Wall base treatment → support Shield liquid brushing → covered rearing with plastic film → examination.Specific steps and the technical parameter of control are as follows:
1st, after the completion of shear wall, column template are removed, after first component surface is cleaned out, flour, caustic soda, water are according to 1: 2.5:100 ratio matches somebody with somebody stirring-head uniform stirring using electric drill, notices that observation has agranular type powder bag not stir out after stirring.
When the 2nd, brushing maintenance liquid material, at least 3 people operate simultaneously, from wall one end to other end brushing, each brushing width Should wider than plastic sheeting 100 ㎜ -150 millimeters, it is to avoid batch position is connect when brushing again and brushes not in place, from up to down applied during brushing Brush, it is complete after plastic covering film immediately, it is to avoid water loss, film lap-joint is 50mm-60 ㎜, and oral area is secured, and makes film Space is hedged off from the outer world.Finally, special messenger's nurse is arranged, it is ensured that plastic sheeting is not destroyed.Overlay film curing time is no less than 14 days. During one face wall of overlay film maintenance construction, without special circumstances, centre should not have interval.
3rd, when shear wall body is painted with door-window opening, maintenance liquid material, and plastic covering should be brushed in door-window opening side There are line box, electronic box cavity on film, such as wall, plastic sheeting should not disconnect, and should cover cavity.Covered rearing with plastic film is completed Afterwards, check film whether there is breakage, if any should repair immediately.
Wall is completely cut off air and is pinned the method for moisture using plastic sheeting and ensure the growth of strength of wall body.
The beneficial effects of the invention are as follows:
1st, technical benefits:Operation is simply convenient to carry out, it is adaptable to all types of civil buildings.
2nd, economic benefit:Following expense can be saved:
(1) fixed watering personal expenditures and the water rate after wall form removal.
(2) because of the common big polishing labour cost for carrying out of maintenance surface carbonation depth.
(3) the core boring sampling expense that intensity level is carried out is not up to after wall resilience.
(4) ftracture the labour cost repaired caused by maintenance is not in place.
3rd, social benefit
(1) flow of wall maintenance with the maintenance of specification wall, can be specified, the standardization of finished product maintenance is reached.
(2) can be that the intensity of structure make strong guarantee, reach that intensity level 100% is qualified, obtain good society Can influence.
(3) maintenance water can be saved, the purpose for economizing on resources is reached.
Advantage is to construct relatively simple, compared to more traditional watering maintenance process and curing fluid maintenance process, maintenance effect It is really good, and construction cost is low, it is understood that the care environments relative humidity of concrete is needed more than 60%, it is artificial to sprinkle water and support Shield liquid maintenance is extremely difficult to this effect.
Brief description of the drawings
Fig. 1 is the wall overlay film maintenance schematic diagram of the specific embodiment of the invention;Wherein, structure wall 1, interfacial agents 2, modeling Material film 3.
Specific embodiment
The implementation of shear wall overlay film maintenance
1 chooses (floor of Tangshan Everest Town Design by Vanke project 14# buildings three) shear wall at three is supported using overlay film maintenance construction technique Shield
2 construction equipments prepare:Hand electric drill is with stirring-head, handcart, round brush, metal bucket, big shovel, portable distribution box, electricity Sub- scale
Material prepares:Caustic soda, flour, water, plastic sheeting
Personnel prepare:The people of supervisory engineering staff two, the people of operator 3
After 3 shear wall body form removables, by the ㎏ of caustic soda 2.5, the ㎏ of flour 6.25, the ㎏ of water 250 (according to 1:2.5:100) press The order of caustic soda-flour-water is successively poured into ready metal bucket, electric stirring head uniform stirring, 3 minutes time, after stirring Notice that observation has agranular type powder bag not stir out, stirred if any continuation.
There are free from dust and open defect in shear wall surface after the completion of 4 inspection form removables, will be stirred after the completion of cleaning Liquid since shear wall end from top to bottom brush, brushing width be 1.1M, it is thin that the wall after the completion of brushing carries out plastics Film is covered, and first checks film whether there is hole destruction during covering.After the completion of the covering of first film brush successively remaining position, according to Secondary covering, ㎜ -150 millimeters of each brushing width wider than plastic sheeting 100, it is to avoid connect when brushing again batch position brush less than Position, film lap-joint is not less than 50mm, and we will secure oral area adhesive tape after the completion of shear wall body is all brushed.
Special messenger's nurse is arranged after the completion of 5 overlay film maintenance constructions, is repaired in time if any destruction, curing time is no less than 14 days.
6 we overlay film maintenance construction technique walls concrete intensity employed at three to this carry out regular checking spring range, do Record (referring to table 1) easy to remember, after age shear wall concrete phase is full 30 days, is analyzed to testing result, and analysis result draws use The shear wall concrete strength of overlay film maintenance construction technique than traditional water seasoning mode walls concrete intensity 3-4MPa high, And the small 1-2 ㎜ of carbonation depth.
Table 1
3. key Quality Control
3.1 shearing wall column formworks remove 4 hours planted agents and complete overlay film maintenance, it is to avoid inside concrete moisture evaporation.
3.2 plastic sheetings overlap joint is no less than 50 ㎜.
The stirring of 3.3 curing fluids must be uniform, it is to avoid particle situation occurs because stirring is uneven.
The maintenance of 3.4 normal silicate concrete overlay films is no less than 14 days, should not mixed with impervious, micro-expanding agent concrete Less than 30 days.
4. construction operation condition
4.1 construction environment temperature reach 5 DEG C
4.2 shear wall bodies, column template complete overlay film in 4 hours and conserve after removing with planted agent, it is ensured that moisture does not steam in coagulation Hair.
The treatment of 4.3 basic units, wall cleaning must totally, in place.
4.4 caustic soda, flour are proportionally added water after stirring, and completion should be used in 5 hours.
4.5 shear walls, column template should first check that concrete has winding without outlet fault after the completion of removing, if any mass defect In brushing curing fluid after should repairing
5th, construction safety safeguard measure
5.1 is a kind of highly basic with severe corrosive because of caustic soda, and safety goggles should be worn during construction, wears rubber gloves, behaviour Carefully used when making, carefully splashed in clothing, mouth and nose, anti-poison respirator is worn if necessary.
5.2 caustic soda packaging bags are not used should being stored in the canister of lid for completion after opening.

Claims (1)

1. a kind of shear wall overlay film maintenance process, construction technology process:Wall base treatment → curing fluid brushing → plastic sheeting Covering → check and accept;Characterized in that, specific steps and the technical parameter of control are as follows:
(1) after the completion of shear wall, column template are removed, after first component surface is cleaned out, flour, caustic soda, water are according to 1:2.5: 100 ratio matches somebody with somebody stirring-head uniform stirring using electric drill;
(2) when brushing maintenance liquid material, at least 3 people operate simultaneously, and from wall one end to other end brushing, each brushing width should compare ㎜ -150 millimeters of plastic sheeting wide 100, it is to avoid batch position is connect when brushing again and brushes not in place, from up to down brushed during brushing, Plastic covering film immediately after complete, it is to avoid water loss, film overlap joint 50-60mm, oral area is secured, make the space of film with it is extraneous Isolation;Ensure that plastic sheeting is not destroyed, overlay film curing time is no less than 14 days;
(3) when shear wall body is painted with door-window opening, maintenance liquid material should be brushed in door-window opening side, and plastic covering is thin Film, when there is the cavities such as line box, electronic box on wall, plastic sheeting should not disconnect, and should cover cavity;After the completion of covered rearing with plastic film, Check film whether there is breakage, there is breakage to repair.
CN201710158006.5A 2017-03-16 2017-03-16 A kind of shear wall overlay film maintenance process Pending CN106836831A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710158006.5A CN106836831A (en) 2017-03-16 2017-03-16 A kind of shear wall overlay film maintenance process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710158006.5A CN106836831A (en) 2017-03-16 2017-03-16 A kind of shear wall overlay film maintenance process

Publications (1)

Publication Number Publication Date
CN106836831A true CN106836831A (en) 2017-06-13

Family

ID=59144929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710158006.5A Pending CN106836831A (en) 2017-03-16 2017-03-16 A kind of shear wall overlay film maintenance process

Country Status (1)

Country Link
CN (1) CN106836831A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362721A (en) * 2018-12-25 2020-07-03 中国建筑第八工程局有限公司 Construction method for reducing shrinkage deformation of concrete surface

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089322A (en) * 1993-01-03 1994-07-13 洪爵禄 Demoulding and curing agent for concrete and manufacture method thereof
US6238476B1 (en) * 1998-06-24 2001-05-29 Mark A. Sprinkle Method of curing drywall compound
CN1453244A (en) * 2002-04-26 2003-11-05 上海三瑞化学有限公司 Water-base liquid film-type concrete curing agent
CN102358773A (en) * 2011-07-11 2012-02-22 桂林理工大学 Preparation method for water-preserving and salt-tolerant alkaline concrete internal curing agent
CN102964086A (en) * 2012-12-18 2013-03-13 白玉清 Concrete curing agent
CN105347724A (en) * 2015-11-26 2016-02-24 桂林理工大学 Preparation method for concrete inner-maintenance material in interpenetrated network structure
CN106285006A (en) * 2016-08-31 2017-01-04 绍兴职业技术学院 A kind of cold district concreting in cold-weather method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089322A (en) * 1993-01-03 1994-07-13 洪爵禄 Demoulding and curing agent for concrete and manufacture method thereof
US6238476B1 (en) * 1998-06-24 2001-05-29 Mark A. Sprinkle Method of curing drywall compound
CN1453244A (en) * 2002-04-26 2003-11-05 上海三瑞化学有限公司 Water-base liquid film-type concrete curing agent
CN102358773A (en) * 2011-07-11 2012-02-22 桂林理工大学 Preparation method for water-preserving and salt-tolerant alkaline concrete internal curing agent
CN102964086A (en) * 2012-12-18 2013-03-13 白玉清 Concrete curing agent
CN105347724A (en) * 2015-11-26 2016-02-24 桂林理工大学 Preparation method for concrete inner-maintenance material in interpenetrated network structure
CN106285006A (en) * 2016-08-31 2017-01-04 绍兴职业技术学院 A kind of cold district concreting in cold-weather method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曲昭嘉等: "《实用建筑工程施工工艺及通病防治手册》", 31 January 2010, 机械工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111362721A (en) * 2018-12-25 2020-07-03 中国建筑第八工程局有限公司 Construction method for reducing shrinkage deformation of concrete surface
CN111362721B (en) * 2018-12-25 2022-04-29 中国建筑第八工程局有限公司 Construction method for reducing shrinkage deformation of concrete surface

Similar Documents

Publication Publication Date Title
CN103553538B (en) Architecture indoor percdation solidifies not damaged waterproofing agent
CN110486023A (en) Tunnel defect administering method
JPH01239262A (en) Removing and disposing method for fine fibrous substance layer such as asbestos affixed to wall surface
CN106836831A (en) A kind of shear wall overlay film maintenance process
CN107310023A (en) Brick making system
CN206616594U (en) A kind of service shaft well
CN206810747U (en) Concrete washing equipment
CN104452813B (en) A kind of underground power house gate shaft protected against the effects of immersion method
CN214632408U (en) A implant accuracy testing arrangement for tooth is planted
US20020043273A1 (en) Method of removing hazardous insulation material
CN206763459U (en) A kind of root system flushing operation platform
CN107190984A (en) A kind of concreting casing construction method
CN209538742U (en) A kind of swimming pool brick layer infiltration repairing construction device
CN109707176A (en) A kind of swimming pool brick layer infiltration method for repairing and constructing and device
CN206667760U (en) A kind of device for reducing dust of civil construction
CN214748920U (en) Sampling device for chemical assay analysis
CN207170320U (en) A kind of medical oral mixes knife cleaning device with tune
CN206256417U (en) A kind of watering device for excavator
CN206309024U (en) A kind of steel door window hole large form
CN211734980U (en) Line drawing and marking device for railway civil engineering foundation construction
CN213648116U (en) Manual mixing arrangement for concrete
CN205621811U (en) Novel crowded cream system of lead acid battery positive plate
Vješnica et al. Restoration of an ancient imperial sculpture from Vis
CN205444062U (en) Slag removal machine for civil engineering
CN208373772U (en) A kind of construction site equipment cleaning plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170613

WD01 Invention patent application deemed withdrawn after publication