CN106836033B - 一种三管法涵洞顶推施工装置及施工方法 - Google Patents
一种三管法涵洞顶推施工装置及施工方法 Download PDFInfo
- Publication number
- CN106836033B CN106836033B CN201611155892.8A CN201611155892A CN106836033B CN 106836033 B CN106836033 B CN 106836033B CN 201611155892 A CN201611155892 A CN 201611155892A CN 106836033 B CN106836033 B CN 106836033B
- Authority
- CN
- China
- Prior art keywords
- lining cutting
- rubber ring
- cutting rubber
- push plate
- exhaust
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 29
- 230000033001 locomotion Effects 0.000 claims abstract description 7
- 238000006073 displacement reaction Methods 0.000 claims description 38
- 238000006243 chemical reaction Methods 0.000 claims description 18
- 238000009434 installation Methods 0.000 claims description 4
- 239000007788 liquid Substances 0.000 claims 2
- 230000000694 effects Effects 0.000 abstract description 4
- 239000000411 inducer Substances 0.000 abstract 1
- 230000000740 bleeding effect Effects 0.000 description 23
- 230000001737 promoting effect Effects 0.000 description 18
- 230000014509 gene expression Effects 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000008961 swelling Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Pipe Accessories (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611155892.8A CN106836033B (zh) | 2016-12-14 | 2016-12-14 | 一种三管法涵洞顶推施工装置及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611155892.8A CN106836033B (zh) | 2016-12-14 | 2016-12-14 | 一种三管法涵洞顶推施工装置及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106836033A CN106836033A (zh) | 2017-06-13 |
CN106836033B true CN106836033B (zh) | 2018-11-13 |
Family
ID=59139500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611155892.8A Expired - Fee Related CN106836033B (zh) | 2016-12-14 | 2016-12-14 | 一种三管法涵洞顶推施工装置及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836033B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107701192B (zh) * | 2017-10-19 | 2019-07-19 | 中国建筑工程(香港)有限公司 | 具有顶推架组件的箱涵中继顶推系统 |
CN107762526B (zh) * | 2017-10-19 | 2019-07-19 | 中国建筑工程(香港)有限公司 | 具有顶推装置与箱涵推块连接结构的箱涵中继顶推系统 |
CN107740694B (zh) * | 2017-10-19 | 2019-07-19 | 中国建筑工程(香港)有限公司 | 箱涵中继顶推系统及其使用方法 |
CN107747494B (zh) * | 2017-10-19 | 2019-07-19 | 中国建筑工程(香港)有限公司 | 具有移动机构的箱涵中继顶推系统 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4603994B2 (ja) * | 2006-03-29 | 2010-12-22 | 株式会社奥村組 | パイプルーフ形成用パイプ |
CN201187306Y (zh) * | 2008-01-08 | 2009-01-28 | 倪既民 | 圈框护撑式组合剪叉伸缩顶推机构 |
JP5064261B2 (ja) * | 2008-02-19 | 2012-10-31 | 東日本旅客鉄道株式会社 | 鋼製エレメント施工方法 |
CN103670434B (zh) * | 2013-12-06 | 2016-06-01 | 南宁市西真电子科技开发有限公司 | 一种地下管道挖掘装置 |
CN205013005U (zh) * | 2015-09-29 | 2016-02-03 | 四川省玉斧无杆自动钻井机有限公司 | 筒管式间歇推进掘进装置 |
-
2016
- 2016-12-14 CN CN201611155892.8A patent/CN106836033B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106836033A (zh) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836033B (zh) | 一种三管法涵洞顶推施工装置及施工方法 | |
CN104389631B (zh) | 一种低透气性煤层割缝与压裂协同网络化增透方法 | |
CN106948833A (zh) | 拼装式联络通道结构及其施工方法 | |
CN104747207B (zh) | 中隔墙矩形隧道管片衬砌及管片拼装方法 | |
CN105297807B (zh) | 一种具有自动回填功能的综合管沟明挖掘进机 | |
CN109595392A (zh) | F型钢筋混凝土中继间顶管 | |
CN106287104A (zh) | 一种径向撑开式凹管维修器 | |
CN103334899B (zh) | 可变耐压级联式液体活塞装置 | |
CN104314572B (zh) | 一种由外侧倒角两半矩形管节构筑的隧道的施工方法 | |
CN102287207B (zh) | 一种有关小断面隧洞严重塌方的拼装顶进法 | |
CN103471930B (zh) | 一种山丘区输水管道试压方法及试压装置 | |
CN104929586A (zh) | 自控式油井套管气回收装置 | |
CN205206836U (zh) | 一种用于管片二次衬砌设备的内涨式反力支撑装置 | |
CN205101006U (zh) | 隧道高强度管棚超前支护结构 | |
CN204754884U (zh) | 自控式油井套管气回收装置 | |
CN218953333U (zh) | 用于隧道群t型联络通道掘进施工的顶推系统的传力机构 | |
CN210860271U (zh) | 一种分体楔合式管道堵水设备 | |
CN206987816U (zh) | 一种集成式泥水顶管机顶推系统 | |
CN109707919A (zh) | 一种模块化预制循环水玻璃钢管道及其制备方法 | |
CN113217037B (zh) | 一种单护盾tbm或盾构管片壁后的回填系统及回填方法 | |
KR101050756B1 (ko) | 복합중압관을 이용한 세미쉴드 굴착장치 및 터널 굴착방법 | |
CN207761645U (zh) | 盾构管廊系统 | |
CN211081878U (zh) | 一种水利工程施工用挖掘防塌陷装置 | |
CN109248766B (zh) | 一种液压冲击胀管器及地下管道非开挖更换系统 | |
CN202834386U (zh) | 三维双曲线钢顶管轴线形成过渡装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Qiu Junling Inventor after: Qin Haiyang Inventor after: Yu Deqiang Inventor after: Lai Jinxing Inventor after: Han Zhilin Inventor after: Wang Xiuling Inventor after: He Siyue Inventor after: Gan Lu Inventor after: Wang Yadong Inventor before: Lai Jinxing Inventor before: Qin Haiyang Inventor before: Yu Deqiang Inventor before: Qiu Junling Inventor before: Han Zhilin Inventor before: Wang Xiuling Inventor before: He Siyue Inventor before: Gan Lu Inventor before: Wang Yadong |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181113 Termination date: 20201214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |