CN106836001A - Integrate the bridge construction ladder access structure of concrete conveying pipe - Google Patents

Integrate the bridge construction ladder access structure of concrete conveying pipe Download PDF

Info

Publication number
CN106836001A
CN106836001A CN201710224703.6A CN201710224703A CN106836001A CN 106836001 A CN106836001 A CN 106836001A CN 201710224703 A CN201710224703 A CN 201710224703A CN 106836001 A CN106836001 A CN 106836001A
Authority
CN
China
Prior art keywords
ladder access
column
conveying pipe
concrete conveying
angle platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710224703.6A
Other languages
Chinese (zh)
Inventor
李超
戴俊男
陆斌
曾华彬
耿立明
蔡郗
简训
周鑫
吴限
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical First Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority to CN201710224703.6A priority Critical patent/CN106836001A/en
Publication of CN106836001A publication Critical patent/CN106836001A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of bridge construction ladder access structure for integrating concrete conveying pipe, including bridge pier, beam body, it is characterized in that:Also including the construction ladder access body for being located at the gusset of beam body and bridge pier vertically and being connected with beam body and bridge pier, the concrete conveying pipe being fixedly connected on construction ladder access body;Construction ladder access body left column and right column, the multiple left-hand rotation angles platform being located on the left of left column, the multiple right turn angle platforms being located on the right side of right column, left-hand rotation angle platform interlocks with right turn angle platform and is equidistantly positioned, and construction ladder access body also includes the ladder access of connection two neighboring left-hand rotation angle platform and right turn angle platform;Concrete conveying pipe is fixed on the right side of left column or the left side of right column.It can reduce bridge construction and take up room, it is possible to increase efficiency of construction;The structure of construction ladder access can be simplified, that saves construction ladder access builds the time;Ensure that fastness, stability and the security of structure;Can be easy for installation and removal, reduces cost.

Description

Integrate the bridge construction ladder access structure of concrete conveying pipe
Technical field
The present invention relates to bridge construction, and in particular to a kind of bridge construction ladder access knot for integrating concrete conveying pipe Structure.
Background technology
With developing rapidly that China's economy is obtained, based on the transport development one of built also quickly grow, bridge is built If being an important component in transport development, Bridge Design more and more tends to large span, high pier.Although existing Bridge Design level can reach these requirements, but large span, the structure design of high pier bring to bridge construction Huge difficulty and danger.In bridge construction process, to ensure the quality of bridge, management and administrative staff can be often to bridges Beam condition of construction exercises supervision and checks, therefore setting up for passage of constructing is particularly important;Meanwhile, needed in work progress a large amount of Concrete, the conveying of concrete also turns into a problem.General bridge construction passage is all to separate with appts. for transferring ready-mixed concrete Design, construction passage generally uses ladder access structure or construction elevator, concrete to be conveyed using special loop wheel machine.Due to construction Passage is provided separately with appts. for transferring ready-mixed concrete so that constructing, it is larger to take up room, and transported using loop wheel machine using concrete Relatively costly, each time of delivery is long, conveying capacity is limited so that efficiency of construction reduction.
Disclosed in CN201620422409.7《Bridge maintenance inclined ladder》, including Cantilever Beams, side bar, support post, side bar with Cantilever Beams are connected, and are inclined by Cantilever Beams and earthward extended, and support post is located at the middle part of side bar, and ground is fixed in one end of column On face or bridge, multiple step plates are provided with equal intervals along side bar, can facilitate bridge maintaining;The patent document is only to bridge Construction passage is improved, and the bridge maintenance inclined ladder take up room it is larger, using easily limited. Disclosed in CN201420827856.1《A kind of railroad bridge high pier construction safety climbing ladder》, including vertical rod, cross bar and brace, should Safety climbing ladder also includes a Z-shaped stair, and vertical rod is fixedly connected with cross bar by latch, by the V-arrangement pin storehouse in vertical rod, on cross bar Crossbar joint and brace on diagonal draw bar vertical rod, cross bar and brace are fixedly connected to form a net for cuboid Pipe support, Z-shaped stair are arranged in webmaster frame;The patent document is same only to be improved bridge construction passage, and four are stood Bar as cat ladder main support, using frame structure so that cat ladder is safe and reliable.Disclosed in CN201320387443.1《Bridge Beam construction appts. for transferring ready-mixed concrete》, including support, the guide rail being arranged on support and the fixed pulley that is arranged on guide rail top, And the drawstring being connected with fixed pulley, drawstring one end connection hoist engine, the other end connection conveyer bucket, be provided with the top of support Crossbeam, is provided with the aggregate bin mounting bracket for installing aggregate bin on crossbeam, can replace the engineering machinery such as crane or tower crane The conveying of concrete is carried out in engineering machinery cannot reach the bridge construction in region, relative to engineering machinery such as crane or tower cranes For, cost is small, and Local Adaptation is strong;The patent document is only designed appts. for transferring ready-mixed concrete.
The content of the invention
It is an object of the invention to provide a kind of bridge construction ladder access structure for integrating concrete conveying pipe, it can Reduce bridge construction to take up room, it is possible to increase efficiency of construction;The structure of construction ladder access can be simplified, taking for construction ladder access is saved Build the time;Fastness, stability and the security of structure can be ensure that;Can be easy for installation and removal, reduces cost.
The bridge construction ladder access structure for integrating concrete conveying pipe of the present invention, including bridge pier and described The connected beam body in bridge pier upper end, it is characterized in that:Also include being located at vertically the gusset of the beam body and bridge pier and with the beam body and The construction ladder access body of bridge pier connection, the concrete conveying pipe being fixedly connected on the construction ladder access body;The construction Ladder access body includes being located at the beam body and bridge pier gusset and the left column that is connected with the beam body and bridge pier and right column, is located at Multiple left-hand rotation angles platform on the left of the left column, the multiple right turn angle platforms being located on the right side of the right column, the left-hand rotation angle Platform interlocks with the right turn angle platform and is equidistantly positioned, and the construction ladder access body also includes the two neighboring left-hand rotation of connection The ladder access of angle platform and right turn angle platform;The concrete conveying pipe is fixed on the right side of the left column or a left side for right column Side.
Further, the ladder access include the two neighboring left-hand rotation angle platform of connection and right turn angle platform ladder access side bar, The polylith ladder access pedal for being located between the ladder access side bar and being connected with the ladder access side bar.
Further, the lower end of the left column and right column is fixed on cushion cap foundation, middle part is supported and institute by adhering to State that bridge pier is fixedly connected, upper end is fixedly connected with the end of the beam body.
Further, it is connected with web beam between the left column and right column.
Further, left-hand rotation angle platform fixes support by being welded on the bracket on the left of the left column;The right-hand rotation Angle platform fixes support by being welded on the bracket on the right side of right column.
Further, the bracket of fixed support left-hand rotation angle platform is four, respectively fixed support left-hand rotation angle platform Front left, anterior right side, rear left and rear right;The bracket of the fixed support right turn angle platform is four, point Front left, anterior right side, rear left and the rear right of the right turn angle platform Gu Ding not supported.
Further, the cushion cap foundation is provided with pre-embedded steel slab, and the lower end of the left column and right column is pre-buried with described Steel plate is welded and fixed, and the left column and right column are provided with deep floor with the connecting portion of the pre-embedded steel slab.
Further, the ladder access side bar is provided with guard rail.
Further, the concrete conveying pipe is fixed on the right side of the left column or a left side for right column by anchor ear Side.
Further, the left column and right column are spiral steel pipe.
The beneficial technique effect of the present invention:Due to concrete conveying pipe is fixed on construction ladder access body, reduce Bridge construction takes up room, and improves efficiency of construction;Meanwhile, using left column and right column as the main of whole ladder access structure Support, is supported fixation, relatively by welding bracket on left column and right column to left-hand rotation angle platform and right turn angle platform In the existing frame structure ladder access using four root posts, simplify the structure of construction ladder access so that construction ladder access is built more Plus easily, save construction ladder access builds the time;Attachment support, web beam, bracket, deep floor, guard rail etc. Design so that total is firm, stability is high, safe;Easy installation and removal, reduces cost.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the top view of Fig. 1.
In figure:1- beam bodies, 2- bridge piers, 3- construction ladder access bodies, 4- concrete conveying pipes, 5- cushion cap foundations, 6- is pre-buried Steel plate, 7- deep floors, 8- attachment supports, 9- web beams;
31- left columns, 32- right columns, 33- left-hand rotations angle platform, 34- right turn angle platforms, 35- brackets, 36- ladder access side bars, 37- ladder access pedals, 38- guard rails.
Specific embodiment
The present invention is elaborated below in conjunction with drawings and Examples.
Referring to the bridge construction ladder access structure for integrating concrete conveying pipe shown in Fig. 1, Fig. 2 and Fig. 3, including bridge The beam body 1 that pier 2 is connected with the upper end of the bridge pier 2, it is characterized in that:Also include being located at vertically the gusset of the beam body 1 and bridge pier 2 And the construction ladder access body 3 being connected with the beam body 1 and bridge pier 2, the concrete that is fixedly connected on the construction ladder access body 3 Conveyance conduit 4;The construction ladder access body 3 includes being located at the beam body 1 and the gusset of bridge pier 2 and connecting with the beam body 1 and bridge pier 2 The left column 31 and right column 32 that connect, the multiple left-hand rotation angles platform 33 for being located at the left side of the left column 31, it is located at the right column Multiple right turn angle platforms 34 on 32 right sides, left-hand rotation angle platform 33 is staggeredly equidistantly positioned with the right turn angle platform 34, institute Stating construction ladder access body 3 also includes the ladder access of the two neighboring left-hand rotation angle platform 33 of connection and right turn angle platform 34;It is described mixed Solidifying soil conveyance conduit 4 is fixed on the right side of the left column 31 or the left side of right column 32.Concrete conveying pipe 4 is fixed on a left side The right side of column 31 or the left side of right column 32, an entirety is designed to by concrete conveying pipe 4 with construction ladder access body 3, Left column 31 and right column 32 both as the main supporting of construction ladder access body 3, can play fixing concrete conveyance conduit 4 again Effect, can reduce bridge construction and take up room.Concrete is pressed into concrete conveying pipe 4 by pump machine, can be constantly defeated Concrete is sent, efficiency of construction is improved.
The ladder access is including connecting the ladder access side bar 36 of two neighboring left-hand rotation angle platform 33 and right turn angle platform 34, setting The polylith ladder access pedal 37 being connected between the ladder access side bar 36 and with the ladder access side bar 36.
The lower end of the left column 31 and right column 32 is fixed on cushion cap foundation 5, middle part by adhere to support 8 with it is described Bridge pier 2 is fixedly connected, upper end is fixedly connected with the end of the beam body 1.Cushion cap foundation 5 typically uses concreting, attachment Support 8 can play booster action.The lower end of left column 31 and right column 32, middle part, upper end are fixed, construction can be strengthened The intensity of ladder access body 3.
Web beam 9 is connected between the left column 31 and right column 32.One end of web beam 9 is welded on left column On 31, the other end is welded on right column 32, can increase booster action so that left column 31 is more consolidated with right column 32.
Left-hand rotation angle platform 33 fixes support, four oxen by being welded on four brackets 35 in the left side of the left column 31 Leg 35 fixes front left, anterior right side, rear left and the rear right of support left-hand rotation angle platform 33 respectively;The right side Corner platform 34 fixes support by being welded on four brackets 35 on the right side of right column 32, and four brackets 35 fix support institute respectively State front left, anterior right side, rear left and the rear right of right turn angle platform 34.The number of bracket 35 can be according to specific Situation be configured, can be two, three, five.Using left column and right column as the main of whole ladder access structure Support, is supported fixation, relatively by welding bracket on left column and right column to left-hand rotation angle platform and right turn angle platform In the existing frame structure ladder access using four root posts, the structure of construction ladder access can be simplified so that construction ladder access is built It is more prone to, can save construction ladder access builds the time.
The cushion cap foundation 5 is provided with pre-embedded steel slab 6, the lower end and the pre-buried steel of the left column 31 and right column 32 Plate 6 is welded and fixed, and the left column 31 and right column 32 are provided with deep floor 7 with the connecting portion of the pre-embedded steel slab 6.
The ladder access side bar 36 is provided with guard rail 38.
The concrete conveying pipe 4 is fixed on the right side of the left column 31 or the left side of right column 32 by anchor ear.
The left column 31 and right column 32 are spiral steel pipe.
The bridge construction ladder access structure for integrating concrete conveying pipe of the present invention, builds step as follows:
The first step:When with concreting cushion cap foundation 5, two pieces of pre-embedded steel slabs 6 are put into, by left column 31 and right column 32 lower end is welded with two pieces of pre-embedded steel slabs 6 respectively, and is welded between the outer wall and pre-embedded steel slab 6 of left column 31 and right column 32 Connect deep floor 7;The middle part attachment support of left column 31 and right column 32 8 is connected with the beam body 1 or bridge pier 2, top with The pre-embedded steel slab welding of the end of beam body 1.
Second step:Right turn angle platform is welded on the right side of the left side welding left-hand rotation angle platform 33, right column 32 of left column 31 34, and left-hand rotation angle platform 33 and right turn angle platform 34 staggeredly disposed at equal distance are caused, near each left-hand rotation angle on left column 31 The lower position welding bracket 35 of platform 33, near the lower position welding bracket of each right turn angle platform 34 on right column 32 35。
3rd step:Pipe clamp or anchor ear are welded on left column 31 or right column 32, concrete conveying pipe 4 is fixed on On left column 31 or right column 32.
4th step:Ladder access side bar 36, Ran Hou is welded between two neighboring left-hand rotation angle platform 33 and right turn angle platform 34 Ladder access pedal 37 is welded between ladder access side bar 36, guard rail 38 is finally welded.
Left-hand rotation angle platform 33, right turn angle platform 34, ladder access pedal 37 can make of waste and old bridge pier punching block, can save Cost.Using being welded to connect more than whole construction ladder access structure, sound construction, globality are strong, and load ability to bear is big, stability Height, safe, easy installation and removal, low cost.

Claims (10)

1. the bridge construction ladder access structure of concrete conveying pipe, including bridge pier (2) and the bridge pier (2) upper end are integrated Connected beam body (1), it is characterized in that:Also include being located at vertically the gusset of the beam body (1) and bridge pier (2) and with the beam body (1) and bridge pier (2) connection construction ladder access body (3), the concrete conveyance that is fixedly connected on construction ladder access body (3) Pipeline (4);It is described construction ladder access body (3) including be located at the beam body (1) and bridge pier (2) gusset and with the beam body (1) and The left column (31) and right column (32) of bridge pier (2) connection, the multiple left-hand rotation angles platform being located on the left of the left column (31) (33) the multiple right turn angle platforms (34) on the right side of the right column (32), left-hand rotation angle platform (33) and the right-hand rotation, are located at Angle platform (34) interlocks and is equidistantly positioned, and construction ladder access body (3) also includes the two neighboring left-hand rotation angle platform of connection (33) and right turn angle platform (34) ladder access;The concrete conveying pipe (4) be fixed on the left column (31) right side or The left side of right column (32).
2. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 1, it is characterized in that:Institute State ladder access side bar (36) of the ladder access including the two neighboring left-hand rotation angle platform (33) of connection and right turn angle platform (34), be located at institute Polylith ladder access pedal (37) stated between ladder access side bar (36) and be connected with the ladder access side bar (36).
3. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 1 and 2, its feature It is:The lower end of the left column (31) and right column (32) is fixed on cushion cap foundation (5), middle part by adhere to support (8) with The bridge pier (2) is fixedly connected, upper end is fixedly connected with the end of the beam body (1).
4. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 3, it is characterized in that:Institute State and web beam (9) is connected between left column (31) and right column (32).
5. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 1 and 2, its feature It is:Support is fixed in left-hand rotation angle platform (33) by being welded on the bracket (35) on the left of the left column (31);The right-hand rotation Angle platform (34) fixes support by being welded on the bracket (35) on the right side of right column (32).
6. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 5, it is characterized in that:Gu Surely the bracket (35) for supporting left-hand rotation angle platform (33) is four, respectively the front portion of fixed support left-hand rotation angle platform (33) Left side, anterior right side, rear left and rear right;The bracket (35) of the fixed support right turn angle platform (34) is four, Front left, anterior right side, rear left and the rear right of the support right turn angle platform (34) are fixed respectively.
7. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 3, it is characterized in that:Institute State cushion cap foundation (5) and be provided with pre-embedded steel slab (6), the lower end and the pre-embedded steel slab of the left column (31) and right column (32) (6) it is welded and fixed, and the left column (31) and right column (32) are provided with ribs with the connecting portion of the pre-embedded steel slab (6) Plate (7).
8. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 2, it is characterized in that:Institute State ladder access side bar (36) and be provided with guard rail (38).
9. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 1, it is characterized in that:Institute State concrete conveying pipe (4) and the right side of the left column (31) or the left side of right column (32) are fixed on by anchor ear.
10. the bridge construction ladder access structure for integrating concrete conveying pipe according to claim 1, it is characterized in that: The left column (31) and right column (32) are spiral steel pipe.
CN201710224703.6A 2017-04-07 2017-04-07 Integrate the bridge construction ladder access structure of concrete conveying pipe Pending CN106836001A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710224703.6A CN106836001A (en) 2017-04-07 2017-04-07 Integrate the bridge construction ladder access structure of concrete conveying pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710224703.6A CN106836001A (en) 2017-04-07 2017-04-07 Integrate the bridge construction ladder access structure of concrete conveying pipe

Publications (1)

Publication Number Publication Date
CN106836001A true CN106836001A (en) 2017-06-13

Family

ID=59146836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710224703.6A Pending CN106836001A (en) 2017-04-07 2017-04-07 Integrate the bridge construction ladder access structure of concrete conveying pipe

Country Status (1)

Country Link
CN (1) CN106836001A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005248628A (en) * 2004-03-05 2005-09-15 Tonichi Koji Kk Vent equipment and its construction method
CN202175917U (en) * 2011-07-25 2012-03-28 中建七局第三建筑有限公司 Safety ladder
CN202324433U (en) * 2011-11-08 2012-07-11 中煤西安设计工程有限责任公司 Spiral-type ladder compartment with pulling/pressing structure for mine
CN203626217U (en) * 2013-12-02 2014-06-04 国家电网公司 External stepwise power maintenance platform established in pond
CN104895329A (en) * 2015-05-11 2015-09-09 中国十七冶集团有限公司 Lifting-following conveying and pouring device of silo sliding formwork library wall concrete
CN205577377U (en) * 2016-03-31 2016-09-14 中国建筑第八工程局有限公司 Superelevation industry factory building operation platform is removed in detachable remote control

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005248628A (en) * 2004-03-05 2005-09-15 Tonichi Koji Kk Vent equipment and its construction method
CN202175917U (en) * 2011-07-25 2012-03-28 中建七局第三建筑有限公司 Safety ladder
CN202324433U (en) * 2011-11-08 2012-07-11 中煤西安设计工程有限责任公司 Spiral-type ladder compartment with pulling/pressing structure for mine
CN203626217U (en) * 2013-12-02 2014-06-04 国家电网公司 External stepwise power maintenance platform established in pond
CN104895329A (en) * 2015-05-11 2015-09-09 中国十七冶集团有限公司 Lifting-following conveying and pouring device of silo sliding formwork library wall concrete
CN205577377U (en) * 2016-03-31 2016-09-14 中国建筑第八工程局有限公司 Superelevation industry factory building operation platform is removed in detachable remote control

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HTTP://PRODUCT.QIHUIWANG.COM/186322558.HTML: "三明永安市水泥烟囱安装转梯公司不搭脚手架", 《三明永安市水泥烟囱安装转梯公司不搭脚手架 *

Similar Documents

Publication Publication Date Title
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN104878693A (en) Lateral girder erection and construction method for truss double-girder type bridge girder erection machine
CN107090975A (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN210216163U (en) Self-supporting cantilever formwork support system
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN113550578A (en) High-altitude overhanging structure formwork support and upper protection system construction method
CN202370233U (en) Pull rod type external wall cantilever discharging platform setting-up structure
CN105544409B (en) Double guide beam bridge erecting machine sets up combination beam and now spells a section girder steel construction technology
CN211472143U (en) Pier steel form
CN107905111A (en) A kind of rigid frame-continuous girder end bay construction technology
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN103938871B (en) A kind of construction method adopting the steel core concrete column bonded prestress frame beam structure of reinforced concrete ring beam joint
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN205314539U (en) Large -scale cantilever type combination steel form
CN209603163U (en) A kind of tower crane bearing platform ruggedized construction
CN103950811B (en) The people's Cargo Lift mounting structure and its installation method of complicated appearance building structure
CN107882065B (en) Operating platform for concrete beam construction above rail-mounted area and building method thereof
CN106836001A (en) Integrate the bridge construction ladder access structure of concrete conveying pipe
CN214363595U (en) Construction elevator foundation
CN205296206U (en) Tower cane foundation
CN212897667U (en) Temporary supporting device for swing column
CN213572927U (en) Movable steel platform with adjustable size and capable of being circulated
CN210134343U (en) Trolley for mounting drain pipe on outer side edge of bridge
CN207073145U (en) Super high-rise construction elevator wall external-hanging section steel-concrete combined foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170613