CN106835933B - A kind of CFST Arch Bridge column and arch rib nodes construct - Google Patents

A kind of CFST Arch Bridge column and arch rib nodes construct Download PDF

Info

Publication number
CN106835933B
CN106835933B CN201611193002.2A CN201611193002A CN106835933B CN 106835933 B CN106835933 B CN 106835933B CN 201611193002 A CN201611193002 A CN 201611193002A CN 106835933 B CN106835933 B CN 106835933B
Authority
CN
China
Prior art keywords
column
arch
arch rib
plate
curved surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611193002.2A
Other languages
Chinese (zh)
Other versions
CN106835933A (en
Inventor
刘坚
孙学水
邹勇辉
朱玉
陈原
袁华
毛捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou University
Original Assignee
Guangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou University filed Critical Guangzhou University
Priority to CN201611193002.2A priority Critical patent/CN106835933B/en
Publication of CN106835933A publication Critical patent/CN106835933A/en
Application granted granted Critical
Publication of CN106835933B publication Critical patent/CN106835933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to construction engineering technical fields, more particularly to a kind of joint structure for joint steel pipe concrete arch-type bridge column and arch rib, for connecting the column and arch rib of concrete arch-type bridge, the joint structure includes the plane steel plate connecting for the column with concrete arch-type bridge, plate with curved surface for being connect with arch rib, if the plane steel plate is connect with plate with curved surface by dry joint ribbed stiffener, the present invention can be avoided concrete and form wedge block to the huge extruding force of its weld seam generation in the junction of arch rib and column, and structure is enable to be in good stress;Joint structure can formed by integrally casting molding, steel plant's pouring molding greatly reduces the harm of residual stress than welding fabrication, and can be mass, and strong operability, location accuracy are high;And have structure simple, light-weight, and convenient transportation, practical advantage.

Description

A kind of CFST Arch Bridge column and arch rib nodes construct
Technical field
The present invention relates to construction engineering technical field more particularly to a kind of CFST Arch Bridge columns and arch rib nodes structure It makes.
Background technique
Size rivers, deep valley danger gully across China currently, CFST Arch Bridge is such as emerged rapidly in large numbersBamboo shoots after a spring rain, concrete-filled steel tube arch Bridge construction is positive to be a dark horse, from nineteen ninety First CFST Arch Bridge -- and it is short since Sichuan Wangcang Donghe Bridge is built up More than 400 seat of size steel concrete arch bridge is built up between 26 years, technology is in world lead level, but still there are many be not fully solved or go back The problem of not handled well.The present invention connect with arch rib for CFST Arch Bridge spandrel column at this stage and sets Meter is constructed and is generated.
Currently, CFST Arch Bridge spandrel column is free steel pipe column (more) or steel core concrete column (less), steel pipe The common practice that concrete arch-type bridge spandrel column is connect with arch rib: first by cable hoisting steel tube arch rib, then in arch rib mesh Mark direct welded still pipe on control point.This way is easy to cause arch rib steel penstock stress to concentrate, and influences the bearing capacity of arch rib;Especially For the concrete filled steel tube column of concrete perfusion, concrete forms wedge block in the junction of arch rib and column, due to mixed The vertical pressure of solidifying soil transmitting generates huge extruding force to the connection of arch rib and column, has seriously affected the stress of weld seam Energy.More scientific, more practical, more economical novel structure and installation method are proposed in this context.
Summary of the invention
The present invention provides a kind of reasonable stress, construction to overcome deficiency existing for the above existing design, construction technology The joint structure of convenient novel steel tube concrete arch-type bridge column and arch rib.
The technical solution adopted by the present invention is that:
A kind of CFST Arch Bridge column and arch rib nodes construct, for connecting the column and arch rib of concrete arch-type bridge, The joint structure includes the plane steel plate connecting for the column with concrete arch-type bridge, the curved surface steel for connecting with arch rib Plate, if the plane steel plate is connect with plate with curved surface by dry joint ribbed stiffener.
Wherein, the inner wall curvature of the plate with curved surface and the outer wall curvature of arch rib are consistent.
Further, the surface of the plate with curved surface is provided with slot weld, and the slot weld is perpendicular to arch rib axial direction Setting.
Further, several connector pilot pins abutted with the inner wall of column are provided on the plane steel plate.
Preferably, the connector pilot pin is a five side column bodies with chamfering, there is a side of chamfering and stand The inner wall of column abuts.
Further, several suspension column ribbed stiffeners are provided on the outer wall of the column.
Wherein, the connector ribbed stiffener is the domes that top has a plane, and top planes and plane steel plate weld Fixation is connect, the inner wall curvature of domes and the outer wall curvature of plate with curved surface are consistent.
Preferably, the plane steel plate, plate with curved surface and connector ribbed stiffener formed by integrally casting form.
It is that the present invention reaches the utility model has the advantages that
1) compared to existing technology, the present invention can be avoided concrete and form wedge block in the junction of arch rib and column Huge extruding force is generated to its weld seam, structure is enable to be in good stress;
2) joint structure of the invention can formed by integrally casting molding, steel plant's pouring molding greatly reduces than welding fabrication The harm of residual stress, and can be mass, strong operability, location accuracy are high;
3) novel arch rib of the invention and column connecting node structural texture are simple, light-weight, convenient transportation, practicability By force.
Detailed description of the invention
Described herein the drawings are intended to provide a further understanding of the invention, constitutes part of this application, but And it does not constitute a limitation of the invention.
Fig. 1 is the structural schematic diagram of CFST Arch Bridge column and arch rib nodes construction of the invention.
Fig. 2 is the fractionation structural representation of CFST Arch Bridge column and arch rib nodes construction of the invention.
Fig. 3 is the main view of CFST Arch Bridge column and arch rib nodes construction of the invention.
Wherein, 1- column, 2- arch rib, 3- concrete, 4- plane steel plate, 5- plate with curved surface, 6- connector ribbed stiffener, 7- slot welding Seam, 8- connector pilot pin, 9- suspension column ribbed stiffener.
Specific embodiment
For the present invention is described in further detail, below in conjunction with drawings and the specific embodiments, the present invention will be described in detail.
Embodiment 1.
According to Fig. 1-3, the present embodiment provides a kind of 3 arch bridge column 1 of concrete filled steel tube and 2 node structures of arch rib It makes, for connecting the column 1 and arch rib 2 of 3 arch bridge of concrete, the joint structure includes for the column 1 with 3 arch bridge of concrete The plane steel plate 4 of connection, the plate with curved surface 5 for being connect with arch rib 2, if the plane steel plate 4 and plate with curved surface 5 pass through stem grafting Head ribbed stiffener 6 connects, and the present invention can be avoided concrete 3 and form wedge block to its weld seam in the junction of arch rib 2 and column 1 Huge extruding force is generated, structure is enable to be in good stress;Joint structure can formed by integrally casting molding, steel plant, which pour, to be built up Type greatly reduces the harm of residual stress than welding fabrication, and can be mass, and strong operability, location accuracy are high; And have structure simple, light-weight, and convenient transportation, practical advantage.
Wherein, the inner wall curvature of the plate with curved surface 5 and the outer wall curvature of arch rib 2 are consistent, guarantee what the two was cooperatively connected Matching and the fastness of welding.
Further, the surface of the plate with curved surface 5 is provided with slot weld 7, and the slot weld 7 is axial perpendicular to arch rib 2 Direction setting.
Further, it is provided with the connector pilot pin 8 that several inner walls with column 1 abut on the plane steel plate 4, is convenient for Column 1 only need to be directed at institute on the plane steel plate 4 after accurate positioning in hoisting upright column 1 by the lifting location and installation of column 1 It states connector pilot pin 8 to fall, is conducive to improve lifting efficiency and setting accuracy.
Preferably, the connector pilot pin 8 is a five side column bodies with chamfering, there is a side of chamfering and stand The inner wall of column 1 abuts, and guarantees the setting accuracy of column 1, while the column 1 after lifting can be fixed, and prevents from welding It shifts in the process.
Further, it is provided with several suspension column ribbed stiffeners 9 on the outer wall of the column 1, improves structural strength, avoids welding Deformation occurs in termination process.
Wherein, the connector ribbed stiffener 6 is the domes that top has a plane, top planes and plane steel plate 4 It is welded and fixed, the inner wall curvature of domes and the outer wall curvature of plate with curved surface 5 are consistent.
Preferably, the plane steel plate 4, plate with curved surface 5 and 6 formed by integrally casting of connector ribbed stiffener form, compared to welding Molding greatly reduces the harm of residual stress, and can be mass, and strong operability, location accuracy are high.
Some embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (6)

1. a kind of CFST Arch Bridge column and arch rib nodes construct, for connecting the column and arch rib of concrete arch-type bridge, It is characterized in that, the joint structure includes the plane steel plate connecting for the column with concrete arch-type bridge, for connecting with arch rib Plate with curved surface, if the plane steel plate is connect with plate with curved surface by dry joint ribbed stiffener;The inner wall of the plate with curved surface is bent Rate is consistent with the outer wall curvature of arch rib;The connector ribbed stiffener be top have a plane domes, top planes with Plane steel plate is welded and fixed, and the inner wall curvature of domes and the outer wall curvature of plate with curved surface are consistent.
2. CFST Arch Bridge column according to claim 1 and arch rib nodes construct, which is characterized in that the curved surface The surface of steel plate is provided with slot weld, and the slot weld is arranged perpendicular to arch rib axial direction.
3. CFST Arch Bridge column according to claim 1 and arch rib nodes construct, which is characterized in that the plane Several connector pilot pins abutted with the inner wall of column are provided on steel plate.
4. CFST Arch Bridge column according to claim 3 and arch rib nodes construct, which is characterized in that the connector Pilot pin is a five side column bodies with chamfering, and a side with chamfering is abutted with the inner wall of column.
5. CFST Arch Bridge column according to claim 3 and arch rib nodes construct, which is characterized in that the column Outer wall on be provided with several suspension column ribbed stiffeners.
6. CFST Arch Bridge column according to claim 1 and arch rib nodes construct, which is characterized in that the plane Steel plate, plate with curved surface and connector ribbed stiffener formed by integrally casting form.
CN201611193002.2A 2016-12-21 2016-12-21 A kind of CFST Arch Bridge column and arch rib nodes construct Active CN106835933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611193002.2A CN106835933B (en) 2016-12-21 2016-12-21 A kind of CFST Arch Bridge column and arch rib nodes construct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611193002.2A CN106835933B (en) 2016-12-21 2016-12-21 A kind of CFST Arch Bridge column and arch rib nodes construct

Publications (2)

Publication Number Publication Date
CN106835933A CN106835933A (en) 2017-06-13
CN106835933B true CN106835933B (en) 2019-05-03

Family

ID=59136630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611193002.2A Active CN106835933B (en) 2016-12-21 2016-12-21 A kind of CFST Arch Bridge column and arch rib nodes construct

Country Status (1)

Country Link
CN (1) CN106835933B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806018B (en) * 2017-10-31 2019-01-22 信阳师范学院 For repairing the rapidly-assembled small span arch bridge and construction technology of rush construction
CN109281400A (en) * 2018-09-27 2019-01-29 中北大学 A kind of the large span space node and construction method of additional concrete filled steel tube

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201301431Y (en) * 2008-11-12 2009-09-02 四川省交通厅公路规划勘察设计研究院 Joint construction for spandrel steel-tube upright post
CN102094386A (en) * 2011-03-30 2011-06-15 长安大学 PBL (perfobond leiste) shear connector stiffened steel pipe concrete arch
CN103485275A (en) * 2013-10-11 2014-01-01 中铁第一勘察设计院集团有限公司 Continuous beam-joist combined bridge node structure
KR20150004136A (en) * 2013-07-02 2015-01-12 (유)하남종합건설 A web member for improving the connection structure of the node connecting of composite truss girder
CN107806018A (en) * 2017-10-31 2018-03-16 信阳师范学院 For rushing to repair the rapidly-assembled small span arch bridge and construction technology of rush construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201301431Y (en) * 2008-11-12 2009-09-02 四川省交通厅公路规划勘察设计研究院 Joint construction for spandrel steel-tube upright post
CN102094386A (en) * 2011-03-30 2011-06-15 长安大学 PBL (perfobond leiste) shear connector stiffened steel pipe concrete arch
KR20150004136A (en) * 2013-07-02 2015-01-12 (유)하남종합건설 A web member for improving the connection structure of the node connecting of composite truss girder
CN103485275A (en) * 2013-10-11 2014-01-01 中铁第一勘察设计院集团有限公司 Continuous beam-joist combined bridge node structure
CN107806018A (en) * 2017-10-31 2018-03-16 信阳师范学院 For rushing to repair the rapidly-assembled small span arch bridge and construction technology of rush construction

Also Published As

Publication number Publication date
CN106835933A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN105544865B (en) A kind of prestressing force assembled combined special-shaped column
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN205329526U (en) Pier is assembled to precast concrete
CN106835933B (en) A kind of CFST Arch Bridge column and arch rib nodes construct
CN107386434A (en) A kind of novel fabricated attachment structure of concrete column and concrete column
CN104372967A (en) Raking prop structure used for natural draft cooling tower and construction method thereof
CN105507426A (en) Half-through bracket haunching type compound steel pipe concrete column-steel beam joint
CN204357167U (en) A kind of cooling stack inclined strut structure
CN205399824U (en) Special -shaped post of prestressing force assembled combination
CN104196023A (en) Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip
CN108867863A (en) A kind of novel fabricated connection structure of steel column and steel column
CN102041849A (en) Double-angle spliced buckling-restrained brace
CN209195137U (en) A kind of concrete-filled double skin steel tube mixing splicing node
CN206917353U (en) A kind of cooling stack concrete filled steel tube inclined strut structure
CN204040214U (en) Compound concrete filled steel tube outer ring plate beam-column connection
CN105178445A (en) Connection joint between endplate type concrete-filled steel tube column and steel beam with internal reinforcement ring
CN105239668A (en) Inner separation plate type steel pipe concrete conversion node structure and construction method thereof
CN205776748U (en) Box column and the most contour girder steel attachment structure
CN208666868U (en) Heavy stay column sets turbine draft tube fast fixing tool
CN212129467U (en) Inner tube strenghthened type square sleeve side cavity intermediate layer steel core concrete column and girder steel node
CN204589785U (en) A kind of rectangular steel pipe negative and positive interfix joint
CN108571120B (en) Concrete filled steel tubular column and construction method thereof
CN210713250U (en) Assembly type concrete filled steel tube combined column joint area connecting structure
CN208415525U (en) A kind of connecting structure of steel-concrete combined structure node
CN205153119U (en) Interior iris type steel pipe concrete conversion node structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant