CN106832971A - A kind of modified asphalt cement concrete pavement construction method - Google Patents

A kind of modified asphalt cement concrete pavement construction method Download PDF

Info

Publication number
CN106832971A
CN106832971A CN201710074821.3A CN201710074821A CN106832971A CN 106832971 A CN106832971 A CN 106832971A CN 201710074821 A CN201710074821 A CN 201710074821A CN 106832971 A CN106832971 A CN 106832971A
Authority
CN
China
Prior art keywords
parts
modified asphalt
cement concrete
asphalt cement
interfacial agents
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710074821.3A
Other languages
Chinese (zh)
Other versions
CN106832971B (en
Inventor
何梦玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hua Guan Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910157881.0A priority Critical patent/CN109881554B/en
Priority to CN201710074821.3A priority patent/CN106832971B/en
Publication of CN106832971A publication Critical patent/CN106832971A/en
Application granted granted Critical
Publication of CN106832971B publication Critical patent/CN106832971B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L95/00Compositions of bituminous materials, e.g. asphalt, tar, pitch
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/14Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements
    • C04B28/142Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements containing synthetic or waste calcium sulfate cements
    • C04B28/143Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements containing synthetic or waste calcium sulfate cements the synthetic calcium sulfate being phosphogypsum
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D4/00Coating compositions, e.g. paints, varnishes or lacquers, based on organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond ; Coating compositions, based on monomers of macromolecular compounds of groups C09D183/00 - C09D183/16
    • C09D4/06Organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond in combination with a macromolecular compound other than an unsaturated polymer of groups C09D159/00 - C09D187/00
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D7/00Features of coating compositions, not provided for in group C09D5/00; Processes for incorporating ingredients in coating compositions
    • C09D7/40Additives
    • C09D7/60Additives non-macromolecular
    • C09D7/63Additives non-macromolecular organic
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
    • E01C7/265Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L2205/00Polymer mixtures characterised by other features
    • C08L2205/03Polymer mixtures characterised by other features containing three or more polymers in a blend
    • C08L2205/035Polymer mixtures characterised by other features containing three or more polymers in a blend containing four or more polymers in a blend

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Inorganic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Medicinal Chemistry (AREA)
  • Polymers & Plastics (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

A kind of modified asphalt cement concrete pavement construction method:Its step includes:The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, after sprinkling is uniform, stand 10 minutes, then spray second time;Interfacial agents of the present invention with very strong caking property, and formation chemical interactions increase road bottom and modified asphalt cement concrete road surface adhesion in easily infiltrating into surface void, 1 hour 1.4MPa of shear bonding strength 1.2 of interfacial agents of the present invention, 3 hours 1.8MPa of shear bonding strength 1.6,1 hour tensile bond strength 0.15 0.17MPa, 3 hours 0.21MPa of tensile bond strength 0.19.

Description

A kind of modified asphalt cement concrete pavement construction method
Technical field
The present invention relates to a kind of modified asphalt cement concrete pavement construction method, belongs to pavement construction art field.
Background technology
With the increasingly increase of the magnitude of traffic flow, traffic density is big, and vehicle maximization, heavy duty overload is serious, and speed is high, bears Lotus action time is short, and density increases fast, the requirement more and more higher of these road pavements.The confrontation fissility requirement of highway surface layer is very high, This requires that there is surface layer good adhesiveness to increase the service life.Road surface does not often reach requirement because of adhesiveness, road surface into Surface layer is set to depart from basic unit through load-bearing repeatedly after type, still effectively can not improve basalis at present firmly glues with supercrust The method that conjunction reaches extension pavement life.
The content of the invention
In order to overcome the defect on more than existing, the present invention to provide a kind of modified asphalt cement concrete pavement construction side Method.A kind of modified asphalt cement concrete pavement construction method, its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:Acrylamide 10-15 parts, acrylate resins 10-12 Part, 5-10 parts of styrene-butadiene emulsion, polyethylene glycol 3-6 parts, resorcinol 1-3 parts, acetone 100-150 parts, water 120- 180 parts,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.15-0.2 parts of terpene resin, Polyacrylonitrile 0.05-0.1 parts, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, After 900rpm down cuts 30 minutes, 165 DEG C are cooled to, add 0.1-0.15 parts of ethylene nonyl phenylate, cut under 1200rpm Cut 20 minutes, add 0.05-0.1 parts and dolomite dust 0.05-0.1 parts of graphite high speed shear 15min, temperature at 1600 rpm Being down to 40-50 DEG C, to obtain modified pitch stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Cement, stone, sand, ardealite, diatomite and water are added To in agitator, after stirring 10 minutes, stirring material is preheated, 40-50 DEG C of preheating temperature, it is modified that addition step 2 is obtained Pitch, after stirring 3-5 minutes, obtains modified asphalt cement concrete mixture;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 3-6 days.
Preferably, described a kind of modified asphalt cement concrete pavement construction method, total fountain height is interfacial agents twice About 0.3-0.6kg/m2, first time fountain height about 0.2-0.3kg/m2, second fountain height about 0.1-0.3kg/m2.
Preferably, a kind of described modified asphalt cement concrete pavement construction method, interfacial agents include mass parts:Propylene 11 parts of acid amides, 11 parts of acrylate resins, 6 parts of styrene-butadiene emulsion, 5 parts of polyethylene glycol, 1 part of resorcinol, acetone 50 Part, 55 parts of water.
Preferably, a kind of described modified asphalt cement concrete pavement construction method, interfacial agents include mass parts:Propylene 10 parts of acid amides, 12 parts of acrylate resins, 6 parts of styrene-butadiene emulsion, 3 parts of polyethylene glycol, 1 part of resorcinol, acetone 45 Part, 60 parts of water.
Preferably, a kind of described modified asphalt cement concrete pavement construction method, cement:Stone:Sand:Ardealite:Silicon Diatomaceous earth:Water:The weight ratio of modified pitch is 50-60:100-150:100-120:10-15:10-20:20-30:50-80.
Preferably, a kind of described modified asphalt cement concrete pavement construction method, cement:Stone:Sand:Ardealite:Silicon Diatomaceous earth:Water:The weight ratio of modified pitch is 52:140:100:10:12:25:70.
Preferably, described a kind of modified asphalt cement concrete pavement construction method, conserves 5 days in step 4.
Preferably, described a kind of modified asphalt cement concrete pavement construction method, interfacial agents treatment after bottom with Interval is no more than 30 minutes between modified asphalt cement concrete mixture is laid in step 4
Preferably, described a kind of modified asphalt cement concrete pavement construction method, by 1 part of heating of matrix pitch in step 2 To 170 DEG C, 0.15 part of terpene resin, 0.08 part of polyacrylonitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring are added.
Preferably, between being laid between modified asphalt cement concrete mixture in the bottom and step 4 after interfacial agents treatment Every no more than 30 minutes
Preferably, road bottom is cement stabilized macadam floor or water stabilized gravel base
Preferably, total fountain height is 0.3-0.6kg/m2 to interfacial agents twice, and first time fountain height is 0.2-0.3kg/m2, second Fountain height is 0.1-0.3kg/m2,
Preferably, addition step 2 is obtained in step 3 modified pitch 50-80 parts, whipping temp is maintained at 40-50 DEG C, stirs After mixing 3-5 minutes, modified asphalt cement concrete mixture is obtained,
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:Acrylamide 10-15 parts, acrylate resins 10-12 Part, 5-10 parts of styrene-butadiene emulsion, polyethylene glycol 3-6 parts, resorcinol 1-3 parts, acetone 100-150 parts, water 120- 180 parts,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.15-0.2 parts of terpene resin, Polyacrylonitrile 0.05-0.1 parts, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, After 900rpm down cuts 30 minutes, 165 DEG C are cooled to, add 0.1-0.15 parts of ethylene nonyl phenylate, cut under 1200rpm Cut 20 minutes, add 0.05-0.1 parts and dolomite dust 0.05-0.1 parts of graphite high speed shear 15min, temperature at 1600 rpm Being down to 40-50 DEG C, to obtain modified pitch stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)Cement 50-60 parts, stone 100-150 parts, Sand 100-120 parts, ardealite 10-15 parts, diatomite 10-20 parts and water 20-30 parts is added in agitator, stirs 10 minutes Afterwards, stirring material is preheated, 40-50 DEG C of preheating temperature, adds obtain modified pitch 50-80 part of step 2, stirring 3-5 to divide Zhong Hou, obtains modified asphalt cement concrete mixture;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 3-6 days.
Interfacial agents of the present invention with very strong caking property, and to easily infiltrate into and form chemical interactions in surface void Increase road bottom and modified asphalt cement concrete road surface adhesion, 1 hour shear bonding strength 1.2- of interfacial agents of the present invention 1.4MPa, 3 hours shear bonding strength 1.6-1.8MPa, 1 hour tensile bond strength 0.15-0.17MPa, stretching in 3 hours is viscous Knotting strength 0.19-0.21MPa, of the invention to use modified pitch to cause that modified asphalt cement concrete has preferably dynamic steady Fixed degree and residual stability, porosity are improved, and frost resistance is improved.In addition the addition of modified pitch can improve coagulation The bond performance of soil and interfacial agents.Improve the easily peelable phenomenon in concrete road surface.
Specific embodiment
Embodiment 1
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:10 parts of acrylamide, 11 parts of acrylate resins, benzene 6 parts of ethylene-butylene emulsion, 4 parts of polyethylene glycol, 3 parts of resorcinol, 120 parts of acetone, 160 parts of water,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.16 part of terpene resin, poly- third 0.05 part of alkene nitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, under 900rpm After shearing 30 minutes, 165 DEG C are cooled to, add 0.15 part of ethylene nonyl phenylate, in 1200rpm down cuts 20 minutes, plus Enter 0.06 part of 0.07 part of graphite and dolomite dust high speed shear 15min at 1600 rpm, temperature is down to 40-50 DEG C and is modified Pitch is stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)52 parts of cement, 140 parts of stone, sand 120 Part, 10 parts of ardealite, 28 parts of 18 parts of diatomite and water are added in agitator, after stirring 10 minutes, stirring material are preheated, 40-50 DEG C of preheating temperature, 60 parts of modified pitch for adding step 2 to obtain after stirring 3-5 minutes, obtains modified asphalt cement and mixes Solidifying soil compound;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 5 days.
Embodiment 2
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:14 parts of acrylamide, 12 parts of acrylate resins, benzene 9 parts of ethylene-butylene emulsion, 5 parts of polyethylene glycol, 1 part of resorcinol, 100 parts of acetone, 180 parts of water,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.2 part of terpene resin, poly- third 0.05 part of alkene nitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, under 900rpm After shearing 30 minutes, 165 DEG C are cooled to, add 0.12 part of ethylene nonyl phenylate, in 1200rpm down cuts 20 minutes, plus Enter 0.08 part of 0.09 part of graphite and dolomite dust high speed shear 15min at 1600 rpm, temperature is down to 45 DEG C and obtains modified pitch It is stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)54 parts of cement, 120 parts of stone, sand 100 Part, 13 parts of ardealite, 28 parts of 11 parts of diatomite and water are added in agitator, after stirring 10 minutes, stirring material are preheated, 45 DEG C of preheating temperature, 70 parts of modified pitch for adding step 2 to obtain after stirring 3-5 minutes, obtains modified asphalt cement coagulation Native compound;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 4 days.
Embodiment 3
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:14 parts of acrylamide, 10 parts of acrylate resins, benzene 10 parts of ethylene-butylene emulsion, 5 parts of polyethylene glycol, 3 parts of resorcinol, 150 parts of acetone, 170 parts of water,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.15 part of terpene resin, poly- third 0.08 part of alkene nitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, under 900rpm After shearing 30 minutes, 165 DEG C are cooled to, add 0.11 part of ethylene nonyl phenylate, in 1200rpm down cuts 20 minutes, plus Enter 0.07 part of 0.06 part of graphite and dolomite dust high speed shear 15min at 1600 rpm, temperature is down to 40-50 DEG C and is modified Pitch is stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)51 parts of cement, 110 parts of stone, sand 110 Part, 14 parts of ardealite, 26 parts of 17 parts of diatomite and water are added in agitator, after stirring 10 minutes, stirring material are preheated, 40-50 DEG C of preheating temperature, 65 parts of modified pitch for adding step 2 to obtain after stirring 3-5 minutes, obtains modified asphalt cement and mixes Solidifying soil compound;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 6 days.
Embodiment 4
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:10 parts of acrylamide, 10 parts of acrylate resins, benzene 10 parts of ethylene-butylene emulsion, 5 parts of polyethylene glycol, 1 part of resorcinol, 140 parts of acetone, 150 parts of water,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.15 part of terpene resin, poly- third 0.1 part of alkene nitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, under 900rpm After shearing 30 minutes, 165 DEG C are cooled to, add 0.14 part of ethylene nonyl phenylate, in 1200rpm down cuts 20 minutes, plus Enter 0.09 part of 0.08 part of graphite and dolomite dust high speed shear 15min at 1600 rpm, temperature is down to 40-50 DEG C and is modified Pitch is stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)54 parts of cement, 135 parts of stone, sand 115 Part, 11 parts of ardealite, 28 parts of 17 parts of diatomite and water are added in agitator, after stirring 10 minutes, stirring material are preheated, 40-50 DEG C of preheating temperature, 70 parts of modified pitch for adding step 2 to obtain after stirring 3-5 minutes, obtains modified asphalt cement and mixes Solidifying soil compound;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 3 days.
Embodiment 5
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:13 parts of acrylamide, 11 parts of acrylate resins, benzene 5 parts of ethylene-butylene emulsion, 4 parts of polyethylene glycol, 1 part of resorcinol, 150 parts of acetone, 170 parts of water,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.15-0.2 parts of terpene resin, 0.07 part of polyacrylonitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, After 900rpm down cuts 30 minutes, 165 DEG C are cooled to, 0.13 part of ethylene nonyl phenylate are added, in 1200rpm down cuts 20 Minute, 0.06 part of 0.08 part of graphite and dolomite dust high speed shear 15min at 1600 rpm are added, temperature is down to 40-50 DEG C and is obtained It is stand-by to modified pitch.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)51 parts of cement, 145 parts of stone, sand 105 Part, 14 parts of ardealite, 22 parts of 13 parts of diatomite and water are added in agitator, after stirring 10 minutes, stirring material are preheated, 40-50 DEG C of preheating temperature, 64 parts of modified pitch for adding step 2 to obtain after stirring 3-5 minutes, obtains modified asphalt cement and mixes Solidifying soil compound;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 5 days.
Embodiment 6
A kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:15 parts of acrylamide, 11 parts of acrylate resins, benzene 6 parts of ethylene-butylene emulsion, 3 parts of polyethylene glycol, 3 parts of resorcinol, 110 parts of acetone, 180 parts of water,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.2 part of terpene resin, poly- third 0.1 part of alkene nitrile, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, under 900rpm After shearing 30 minutes, 165 DEG C are cooled to, add 0.15 part of ethylene nonyl phenylate, in 1200rpm down cuts 20 minutes, plus Enter 0.08 part and dolomite dust 0.05-0.1 parts of graphite high speed shear 15min at 1600 rpm, temperature is down to 40-50 DEG C and is obtained Modified pitch is stand-by.
The prewired modified asphalt cement concrete mixture of step 3:Will(Weight portion)56 parts of cement, 140 parts of stone, sand 100 Part, 11 parts of ardealite, 28 parts of 14 parts of diatomite and water are added in agitator, after stirring 10 minutes, stirring material are preheated, 40-50 DEG C of preheating temperature, 55 parts of modified pitch for adding step 2 to obtain after stirring 3-5 minutes, obtains modified asphalt cement and mixes Solidifying soil compound;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 6 days.
Table 1 implements sharp 1-6 interfacial agents and comparative example test result
Table 2 implements sharp 1-6 modified asphalt cements concrete test result
Test event Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4 Embodiment 5 Embodiment 6
Dynamic stability/mm 4582 4350 4682 4456 4604 4421
Marshall stability kN 11.8 10.8 11.4 11.0 10.3 11.2
Maximum deformation quantity mm 4.03 4.23 4.20 3.85 3.98 4.10
Flow valuve 0.1mm 32 33 32 34 35 33
Porosity % 4.2 4.1 4.1 4.2 4.3 4.2
Residual stability % 87.7 88.3 87.4 87.8 88.2 88.9
Freeze-thaw split strength ratio % 83.6 82.3 82.8 82.6 83.5 83.1

Claims (9)

1. a kind of modified asphalt cement concrete pavement construction method:Its step includes:
The treatment of step one bottom surface interfacial agents:After road bottom surface is cleaned up, interfacial agents are sprayed to its surface, sprinkling is equal After even, 10 minutes are stood, then spray second time;Interfacial agents include mass parts:Acrylamide 10-15 parts, acrylate resins 10-12 Part, 5-10 parts of styrene-butadiene emulsion, polyethylene glycol 3-6 parts, resorcinol 1-3 parts, acetone 100-150 parts, water 120- 180 parts,
Step 2 prepares modified pitch:By weight portion matrix pitch, 1 part is heated to 170 DEG C, adds 0.15-0.2 parts of terpene resin, Polyacrylonitrile 0.05-0.1 parts, 0.05 part of dimethyl methyl phosphonate, mixing and stirring;Mixture temperature is increased to 185 DEG C, After 900rpm down cuts 30 minutes, 165 DEG C are cooled to, add 0.1-0.15 parts of ethylene nonyl phenylate, cut under 1200rpm Cut 20 minutes, add 0.05-0.1 parts and dolomite dust 0.05-0.1 parts of graphite high speed shear 15min, temperature at 1600 rpm Being down to 40-50 DEG C, to obtain modified pitch stand-by,
The prewired modified asphalt cement concrete mixture of step 3:Cement, stone, sand, ardealite, diatomite and water are added to and stirred Mix in device, after stirring 10 minutes, stirring material is preheated, 40-50 DEG C of preheating temperature, the modified drip for adding step 2 to obtain Green grass or young crops, after stirring 3-5 minutes, obtains modified asphalt cement concrete mixture;
Step 4 lays road surface:Modified asphalt cement concrete mixture is laid on road bottom after being processed to interfacial agents, treats hard Modified asphalt cement concrete road surface is formed after change, modified asphalt cement concrete roadway surface covers wet straw mattress and conserved, Maintenance 3-6 days.
2. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, interfacial agents total fountain height twice It is of about 0.3-0.6kg/m2, first time fountain height about 0.2-0.3kg/m2, second fountain height about 0.1-0.3kg/m2.
3. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, interfacial agents include mass parts:Third 11 parts of acrylamide, 11 parts of acrylate resins, 6 parts of styrene-butadiene emulsion, 5 parts of polyethylene glycol, 1 part of resorcinol, acetone 50 Part, 55 parts of water.
4. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, interfacial agents include mass parts:Third 10 parts of acrylamide, 12 parts of acrylate resins, 6 parts of styrene-butadiene emulsion, 3 parts of polyethylene glycol, 1 part of resorcinol, acetone 45 Part, 60 parts of water.
5. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, cement:Stone:Sand:Ardealite: Diatomite:Water:The weight ratio of modified pitch is 50-60:100-150:100-120:10-15:10-20:20-30:50-80.
6. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, cement:Stone:Sand:Ardealite: Diatomite:Water:The weight ratio of modified pitch is 52:140:100:10:12:25:70.
7. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, conserves 5 days in step 4.
8. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, the bottom after interfacial agents treatment Interval is no more than 30 minutes between laying modified asphalt cement concrete mixture in step 4.
9. a kind of modified asphalt cement concrete pavement construction method as claimed in claim 1, by matrix pitch 1 in step 2 Part is heated to 170 DEG C, adds 0.15 part of terpene resin, 0.08 part of polyacrylonitrile, 0.05 part of dimethyl methyl phosphonate to mix Uniformly.
CN201710074821.3A 2017-02-12 2017-02-12 A kind of modified asphalt cement concrete pavement construction method Active CN106832971B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910157881.0A CN109881554B (en) 2017-02-12 2017-02-12 Construction method of modified asphalt cement concrete pavement
CN201710074821.3A CN106832971B (en) 2017-02-12 2017-02-12 A kind of modified asphalt cement concrete pavement construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710074821.3A CN106832971B (en) 2017-02-12 2017-02-12 A kind of modified asphalt cement concrete pavement construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201910157881.0A Division CN109881554B (en) 2017-02-12 2017-02-12 Construction method of modified asphalt cement concrete pavement

Publications (2)

Publication Number Publication Date
CN106832971A true CN106832971A (en) 2017-06-13
CN106832971B CN106832971B (en) 2019-04-16

Family

ID=59128025

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201910157881.0A Active CN109881554B (en) 2017-02-12 2017-02-12 Construction method of modified asphalt cement concrete pavement
CN201710074821.3A Active CN106832971B (en) 2017-02-12 2017-02-12 A kind of modified asphalt cement concrete pavement construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201910157881.0A Active CN109881554B (en) 2017-02-12 2017-02-12 Construction method of modified asphalt cement concrete pavement

Country Status (1)

Country Link
CN (2) CN109881554B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108147727A (en) * 2018-02-02 2018-06-12 司彦胜 A kind of high strength asphalt concrete pavement construction method
CN111648190A (en) * 2020-04-25 2020-09-11 河南省金德园林绿化工程有限公司 Asphalt concrete pavement and paving construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111635180B (en) * 2020-06-24 2022-02-11 南宁市嘉大混凝土有限公司 Environment-friendly pavement concrete and preparation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148856A (en) * 2007-11-12 2008-03-26 徐培华 Asphalt macadam stress absorption layer and construction method thereof
CN102390939A (en) * 2011-08-02 2012-03-28 张家港市一达水泥混凝土外加剂有限公司 Concrete interface composite binder
CN104725883A (en) * 2015-04-20 2015-06-24 武汉理工大学 High-viscosity high-elasticity asphalt based on surface modification of rubber particles, and high-viscosity high-elasticity SMA (stone mastic asphalt) mixture based on surface modification of rubber particles and preparing method thereof
CN105175011A (en) * 2015-09-21 2015-12-23 陈卓杰 Repairing method for concrete pavement
CN106336140A (en) * 2016-08-25 2017-01-18 苏州金螳螂建筑装饰股份有限公司 Interface agent and construction method thereof, and cement slurry and construction method thereof.

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5888289A (en) * 1996-05-20 1999-03-30 Shell Oil Company Bitumen compositions and a process for their preparation
EP1491684A1 (en) * 2003-06-23 2004-12-29 Morant AG Method for repairing a road surface
CN101381520A (en) * 2008-10-17 2009-03-11 广东省石油化工研究院 Modified asphalt and preparation method thereof
CN102964854B (en) * 2012-11-23 2015-02-11 山东泰德新能源有限公司 Road asphalt modifier
CN103864374B (en) * 2012-12-10 2016-03-09 中国石油天然气股份有限公司 Semi-flexible pavement base material and preparation method thereof
CN103483834B (en) * 2013-08-21 2015-06-17 黄卫 Epoxide modified asphalt material as well as preparation method and use method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148856A (en) * 2007-11-12 2008-03-26 徐培华 Asphalt macadam stress absorption layer and construction method thereof
CN102390939A (en) * 2011-08-02 2012-03-28 张家港市一达水泥混凝土外加剂有限公司 Concrete interface composite binder
CN104725883A (en) * 2015-04-20 2015-06-24 武汉理工大学 High-viscosity high-elasticity asphalt based on surface modification of rubber particles, and high-viscosity high-elasticity SMA (stone mastic asphalt) mixture based on surface modification of rubber particles and preparing method thereof
CN105175011A (en) * 2015-09-21 2015-12-23 陈卓杰 Repairing method for concrete pavement
CN106336140A (en) * 2016-08-25 2017-01-18 苏州金螳螂建筑装饰股份有限公司 Interface agent and construction method thereof, and cement slurry and construction method thereof.

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐方 等: "新型聚合物水泥胶浆界面剂粘结性能及作用机理研究", 《材料导报B:研究篇》 *
袁宗征 等: "公路罩面层聚合物改性界面剂粘结性能研究", 《科学技术与工程》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108147727A (en) * 2018-02-02 2018-06-12 司彦胜 A kind of high strength asphalt concrete pavement construction method
CN111648190A (en) * 2020-04-25 2020-09-11 河南省金德园林绿化工程有限公司 Asphalt concrete pavement and paving construction method thereof

Also Published As

Publication number Publication date
CN109881554B (en) 2021-12-21
CN106832971B (en) 2019-04-16
CN109881554A (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN106832971A (en) A kind of modified asphalt cement concrete pavement construction method
CN105801002B (en) A kind of processing method of polyurethane rubber concrete material and the material
CA2734875A1 (en) Composition and process of using an asphalt emulsion to convert an unpaved surface into a paved surface
CN107586459A (en) A kind of durability porous asphalt pavement anti-disperse material and its construction method
CN106700577A (en) Water-based epoxy modified emulsified asphalt and preparation method thereof
CN106479201A (en) Ultra-thin micro- sealing material of a kind of novel pavement antiskid type and preparation method thereof
CN108147727B (en) High-strength asphalt concrete pavement construction method
JP4759029B2 (en) Surface layer construction method and surface layer body
JP3438065B2 (en) Airport pavement pavement structure and its construction method
CN103951344B (en) A kind of compound cold asphalt mixture for asphalt pavement pit repairing
CN106082742A (en) A kind of cement original washing powder and in the application of cement concrete and application in highway construction thereof
CN112962380B (en) Construction method of asphalt pavement
JPH10147766A (en) Paving mixture
CN212670171U (en) Grouting pavement
US1690020A (en) Pavement and process oe laying same
JP2003040977A (en) Binder for paving material and paving material using the same
JP2006124236A (en) Hybrid aggregate, its producing method, paving material using the hybrid aggregate, and method for applying the same
JPH06329918A (en) Pavement composition
CN105884263A (en) Epoxy emulsified asphalt mortar grouting material
CN110295525A (en) A kind of asphalt plus concrete road structure using high glutinous modified pitch
JP2000302516A (en) Mixing type semiflexible paving material and semiflexible paving structure
CN109233635A (en) A kind of sponge urban water-through dedicated highly resistance of mating formation is dispersed material and its application
JP2657972B2 (en) Cement-based permeable pavement material
JPH10147767A (en) Paving mixture and cured product thereof
JP5812770B2 (en) Porous asphalt mixture and construction method using the same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190320

Address after: 519000 No. 229 Yinhua Road, Xiangzhou, Zhuhai City, Guangdong Province

Applicant after: Hua Guan Engineering Co., Ltd.

Address before: 250014 Xincheng Construction Engineering Co., Ltd. No. 126 Jiefang East Road, Lixia District, Jinan City, Shandong Province

Applicant before: He Mengling

GR01 Patent grant
GR01 Patent grant