CN106829746A - The repair method of the metallurgical bridge crane based on BIM - Google Patents
The repair method of the metallurgical bridge crane based on BIM Download PDFInfo
- Publication number
- CN106829746A CN106829746A CN201510887827.3A CN201510887827A CN106829746A CN 106829746 A CN106829746 A CN 106829746A CN 201510887827 A CN201510887827 A CN 201510887827A CN 106829746 A CN106829746 A CN 106829746A
- Authority
- CN
- China
- Prior art keywords
- module
- bim
- construction
- bridge crane
- major
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C15/00—Safety gear
Abstract
The present invention provides a kind of repair method of the metallurgical bridge crane based on BIM, comprises the following steps:S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM;S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme;S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to the preliminary arrangement and method for construction ordered arrangement formulated;S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, proof scheme.Enable to metallurgical bridge crane upkeep operation more compact by this method, so as to shorten duration, reduction personnel input.Further, since can further reduce the security risk of construction operation by all potential safety hazards being likely to occur in Virtual Construction discovery operation process before the construction.
Description
Technical field
Gone along with sb. to guard him the present invention relates to metallurgical equipment;
More particularly to a kind of repair method of the metallurgical bridge crane based on BIM.
Background technology
Metallurgical bridge crane maintenance belongs to more complicated online complete maintenance engineering, is related to machinery, electric, instrument etc. multiple specially
Industry, the cooperation of its multiple project and the arrangement of personnel are in the project a big difficult points, and maintainer needs to know whole maintenance side
The details of each project under construction in case, it is impossible to a bit mistake occur, each maintainer's water during project practice of construction
It is flat uneven, and the technical not enough maintenance process to equipment causes huge loss, while also bringing great safety hidden
Suffer from, so metallurgical bridge crane repair method is extremely important.
Lack a kind of safely and efficiently metallurgical bridge crane repair method at present.
The content of the invention
A variety of deficiencies of prior art in view of the above, the technical problem to be solved in the present invention is to provide a kind of based on BIM's
The repair method of metallurgical bridge crane, to overcome the drawbacks described above of prior art.
In order to achieve the above objects and other related objects, the present invention provides a kind of maintenance side of the metallurgical bridge crane based on BIM
Method, comprises the following steps:
S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM, by metallurgy in the BIM models
Bridge crane is divided into major-minor coil cord, suspension hook, portal frame and changes module;Major-minor volume reel, accident brake, oil
Cooling is changed;Major-minor rolls up 1-2 reduction box and changes module;Major-minor volume brake, universal drive shaft, motor change module;It is fixed
Pulley changes module;Major-minor car wheel changes module;Cart wheel changes module;Cart walking speed reducer, universal drive shaft
Change module;Driver's cabin changes module;
S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme;
S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to first
Walk the arrangement and method for construction ordered arrangement formulated;
S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, proof scheme.
Further, in the step S2, major-minor coil cord, suspension hook, portal frame change module and are listed in the first dismounting, and in
Dress is returned in last position.
Further, in the step S2, major-minor roll up 1-2 reduction box change module and major-minor roll up brake, universal drive shaft,
Motor is changed module and is carried out after major-minor volume reel, accident brake, oil cooling but change module.
Further, in the step S2, the resource parameters at least include personnel, live goods and materials and plant.
Further, in the step S4, proof scheme at least includes:With the presence or absence of interference between each module construction project;Inspection
Repair resource utilization whether execute-in-place;With the presence or absence of can synchronous construction project.
Further, also including being verified to the maintenance solution after modification and perfection, until forming final scheme.
By above technical scheme, the present invention has following technique effect compared to prior art:Smelting is enabled to by this method
Golden bridge crane upkeep operation is more compact, so as to shorten duration, reduction personnel input.Further, since can be logical before construction
Cross Virtual Construction and find all potential safety hazards being likely to occur in operation process, can further reduce the security risk of construction operation.
Brief description of the drawings
The schematic flow sheet of the repair method of Fig. 1 display metallurgical bridge cranes of the present invention based on BIM.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be taken off by this specification
The content of dew understands other advantages of the invention and effect easily.
Refer to Fig. 1.It should be clear that structure, ratio, size depicted in this specification institute accompanying drawings etc., is only used to coordinate
Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to enforceable restriction of the invention
Condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, in not shadow
Ring under present invention effect that can be generated and the purpose to be reached, all should still fall obtain and can contain in disclosed technology contents
In the range of lid.Meanwhile, in this specification it is cited as " on ", D score, "left", "right", " centre " and
The term of " one " etc., is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, its relativeness
Be altered or modified, under without essence change technology contents, when being also considered as enforceable category of the invention.
Refering to shown in Fig. 1, the present invention provides a kind of repair method of the metallurgical bridge crane based on BIM, comprises the following steps:
S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM, by metallurgical bridge-type in the BIM models
Crane is divided into major-minor coil cord, suspension hook, portal frame and changes module;Major-minor volume reel, accident brake, oil cooling are but changed;
Major-minor rolls up 1-2 reduction box and changes module;Major-minor volume brake, universal drive shaft, motor change module;Fixed pulley changes module;
Major-minor car wheel changes module;Cart wheel changes module;Cart walking speed reducer, universal drive shaft change module;Driver's cabin is more
Mold changing block.
S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme,
Resource parameters include personnel, live goods and materials and information etc. plant.Preliminary maintenance solution is to determine the necessity between each module
Sequentially, there is following logical relation between each module of general crane:
(1) major-minor coil cord, suspension hook, portal frame must just be removed in the first step, and carry out back dress in final step;
(2) major-minor roll up 1-2 reduction box change and major-minor roll up brake, universal drive shaft, motor change the two projects must be
Major-minor volume reel, accident brake, oil cooling are carried out after but removing;
(3) project of the project of cart walking system and major-minor volume system can not synchronously carry out.
Due to the difference in crane for steelworks use function and design, partial metallurgical crane there may be more modules, each module it
Between activity's precedence relationships also should be used as one of main principle.
S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to first
Walk the arrangement and method for construction ordered arrangement formulated.
S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, the feasibility of proof scheme.
The main following part of checking:
(1) with the presence or absence of interference between each module construction project;
(2) the whether live practical operation of the utilization of the resource such as consumptive material, machinery in maintenance process;
(3) whether the personnel placement of each project under construction and allotment are reasonable;
(4) the whole construction period whether compact and reasonable, if exist can the project of synchronous construction be adjusted;
(5) in maintenance, if exist in the middle of certain project under construction operation process, new dangerous matter sources are produced to other projects under construction
And cause safety out of control.
(6) considering operation scheme according to the maintenance resource (including personnel, live goods and materials and plant) that can be allocated is
It is no rationally and to meet itself operating feature, according to actual conditions, surplus is set.
S5, according to the result obtained by above-mentioned steps, adjusts and changes to the maintenance solution of whole metallurgical bridge crane.Utilize
BIM model demonstrations continue to verify the maintenance solution after modification and perfection, until forming final scheme.
The above-described embodiments merely illustrate the principles and effects of the present invention, not for the limitation present invention.It is any to be familiar with this skill
The personage of art all can carry out modifications and changes under without prejudice to spirit and scope of the invention to above-described embodiment.Therefore, such as
Those of ordinary skill in the art completed under without departing from disclosed spirit and technological thought all etc.
Effect modifications and changes, should be covered by claim of the invention.
Claims (6)
1. a kind of repair method of the metallurgical bridge crane based on BIM, it is characterised in that comprise the following steps:
S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM, by metallurgy in the BIM models
Bridge crane is divided into major-minor coil cord, suspension hook, portal frame and changes module;Major-minor volume reel, accident brake, oil
Cooling is changed;Major-minor rolls up 1-2 reduction box and changes module;Major-minor volume brake, universal drive shaft, motor change module;It is fixed
Pulley changes module;Major-minor car wheel changes module;Cart wheel changes module;Cart walking speed reducer, universal drive shaft
Change module;Driver's cabin changes module;
S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme;
S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to first
Walk the arrangement and method for construction ordered arrangement formulated;
S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, proof scheme.
2. the repair method of the metallurgical bridge crane based on BIM according to claim 1, it is characterised in that the step
In S2, major-minor coil cord, suspension hook, portal frame change module and are listed in the first dismounting, and return dress in last position.
3. the repair method of the metallurgical bridge crane based on BIM according to claim 1, it is characterised in that the step
In S2, major-minor rolls up 1-2 reduction box and changes module and major-minor volume brake, universal drive shaft, motor replacing module in master
Pair volume reel, accident brake, oil cooling are carried out after but changing module.
4. the repair method of the metallurgical bridge crane based on BIM according to claim 1, it is characterised in that the step
In S2, the resource parameters at least include personnel, live goods and materials and plant.
5. the repair method of the metallurgical bridge crane based on BIM according to claim any one of 1-4, it is characterised in that
In the step S4, proof scheme at least includes:With the presence or absence of interference between each module construction project;Overhaul the profit of resource
With whether execute-in-place;With the presence or absence of can synchronous construction project.
6. the repair method of the metallurgical bridge crane based on BIM according to claim 5, it is characterised in that also including right
Maintenance solution after modification and perfection is verified, until forming final scheme.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510887827.3A CN106829746B (en) | 2015-12-04 | 2015-12-04 | The repair method of metallurgical bridge crane based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510887827.3A CN106829746B (en) | 2015-12-04 | 2015-12-04 | The repair method of metallurgical bridge crane based on BIM |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106829746A true CN106829746A (en) | 2017-06-13 |
CN106829746B CN106829746B (en) | 2018-11-20 |
Family
ID=59151224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510887827.3A Active CN106829746B (en) | 2015-12-04 | 2015-12-04 | The repair method of metallurgical bridge crane based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106829746B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007055807A (en) * | 2005-08-26 | 2007-03-08 | Ishikawajima Transport Machinery Co Ltd | Base isolation supporting method and device for crane |
CN102001588A (en) * | 2010-11-15 | 2011-04-06 | 中冶焦耐(大连)工程技术有限公司 | Coke quenching vehicle displacement detection device and use method thereof |
CN203269454U (en) * | 2013-04-22 | 2013-11-06 | 新乡市恒创机械设备有限公司 | Crane coiling block maintenance lifting device |
-
2015
- 2015-12-04 CN CN201510887827.3A patent/CN106829746B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007055807A (en) * | 2005-08-26 | 2007-03-08 | Ishikawajima Transport Machinery Co Ltd | Base isolation supporting method and device for crane |
CN102001588A (en) * | 2010-11-15 | 2011-04-06 | 中冶焦耐(大连)工程技术有限公司 | Coke quenching vehicle displacement detection device and use method thereof |
CN203269454U (en) * | 2013-04-22 | 2013-11-06 | 新乡市恒创机械设备有限公司 | Crane coiling block maintenance lifting device |
Non-Patent Citations (1)
Title |
---|
周凯旋: "创新设计中的起重机可互换性虚拟装配及干涉检查", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106829746B (en) | 2018-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Auer et al. | Combined Life Cycle Assessment and Life Cycle Costing in the Eco-Care-Matrix: A case study on the performance of a modernized manufacturing system for glass containers | |
CN107423458A (en) | Steel manufacture process analogue system | |
CN107331235A (en) | Gantry container crane simulated operation full-view simulation system and method | |
CN107622153A (en) | A kind of large scale equipment lifting construction analogy method based on BIM technology | |
CN102849425A (en) | Pin shaft conveying device for chain joint assembling machine | |
CN106649986A (en) | Method for achieving optimization matching of copper pipe horizontal continuous casting parameters based on PROCAST simulation platform | |
CN112446642A (en) | Multi-crown-block scheduling optimization method and system | |
CN105303320A (en) | Intelligent scheduling algorithm for steelmaking | |
CN104238506B (en) | Working condition information acquiring and processing system and method | |
CN101941648A (en) | Method for processing conflict among multiple cranes in logistics simulation system in steelmaking continuous casting workshop | |
CN112241579A (en) | Virtual simulation system and method for steel production process | |
CN106829746A (en) | The repair method of the metallurgical bridge crane based on BIM | |
Zheng et al. | Production scheduling problems of steelmaking-continuous casting process in dynamic production environment | |
CN107487716A (en) | Radio crane control system | |
CN208020735U (en) | A kind of continuous 3D printer of high-precision high-speed | |
CN106347420B (en) | A kind of offline adjustment drives curve method and system | |
CN205469172U (en) | Portable screen cabinet transport vechicle | |
CN115049228A (en) | Construction method of steelmaking-continuous casting section logistics simulation intelligent system | |
CN106292532A (en) | The speed compensation method that a kind of continuous annealing line carbon set roller mill is damaged | |
CN114433834A (en) | Integrative intelligence control system of mulling molding pouring | |
CN105735686B (en) | Ultra-large type complex factories and its horizontal layout method | |
CN206984076U (en) | A kind of adjustable space transport vehicle for logistics transportation system | |
CN106774216A (en) | Crystallite copper ball Full Automatic Liquid it is molded and circulation production line and intellectualized management system | |
Chao et al. | Research on optimization and simulation of sand casting production line based on VSM | |
CN207629126U (en) | Automation plus sand station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |