CN106829746A - The repair method of the metallurgical bridge crane based on BIM - Google Patents

The repair method of the metallurgical bridge crane based on BIM Download PDF

Info

Publication number
CN106829746A
CN106829746A CN201510887827.3A CN201510887827A CN106829746A CN 106829746 A CN106829746 A CN 106829746A CN 201510887827 A CN201510887827 A CN 201510887827A CN 106829746 A CN106829746 A CN 106829746A
Authority
CN
China
Prior art keywords
module
bim
construction
bridge crane
major
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510887827.3A
Other languages
Chinese (zh)
Other versions
CN106829746B (en
Inventor
周晓峰
张秋杰
张希贤
叶晓酬
杨晨筠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Baosteel Technology Services Co Ltd
Original Assignee
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Baosteel Technology Services Co Ltd filed Critical MCC Baosteel Technology Services Co Ltd
Priority to CN201510887827.3A priority Critical patent/CN106829746B/en
Publication of CN106829746A publication Critical patent/CN106829746A/en
Application granted granted Critical
Publication of CN106829746B publication Critical patent/CN106829746B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear

Abstract

The present invention provides a kind of repair method of the metallurgical bridge crane based on BIM, comprises the following steps:S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM;S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme;S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to the preliminary arrangement and method for construction ordered arrangement formulated;S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, proof scheme.Enable to metallurgical bridge crane upkeep operation more compact by this method, so as to shorten duration, reduction personnel input.Further, since can further reduce the security risk of construction operation by all potential safety hazards being likely to occur in Virtual Construction discovery operation process before the construction.

Description

The repair method of the metallurgical bridge crane based on BIM
Technical field
Gone along with sb. to guard him the present invention relates to metallurgical equipment;
More particularly to a kind of repair method of the metallurgical bridge crane based on BIM.
Background technology
Metallurgical bridge crane maintenance belongs to more complicated online complete maintenance engineering, is related to machinery, electric, instrument etc. multiple specially Industry, the cooperation of its multiple project and the arrangement of personnel are in the project a big difficult points, and maintainer needs to know whole maintenance side The details of each project under construction in case, it is impossible to a bit mistake occur, each maintainer's water during project practice of construction It is flat uneven, and the technical not enough maintenance process to equipment causes huge loss, while also bringing great safety hidden Suffer from, so metallurgical bridge crane repair method is extremely important.
Lack a kind of safely and efficiently metallurgical bridge crane repair method at present.
The content of the invention
A variety of deficiencies of prior art in view of the above, the technical problem to be solved in the present invention is to provide a kind of based on BIM's The repair method of metallurgical bridge crane, to overcome the drawbacks described above of prior art.
In order to achieve the above objects and other related objects, the present invention provides a kind of maintenance side of the metallurgical bridge crane based on BIM Method, comprises the following steps:
S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM, by metallurgy in the BIM models Bridge crane is divided into major-minor coil cord, suspension hook, portal frame and changes module;Major-minor volume reel, accident brake, oil Cooling is changed;Major-minor rolls up 1-2 reduction box and changes module;Major-minor volume brake, universal drive shaft, motor change module;It is fixed Pulley changes module;Major-minor car wheel changes module;Cart wheel changes module;Cart walking speed reducer, universal drive shaft Change module;Driver's cabin changes module;
S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme;
S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to first Walk the arrangement and method for construction ordered arrangement formulated;
S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, proof scheme.
Further, in the step S2, major-minor coil cord, suspension hook, portal frame change module and are listed in the first dismounting, and in Dress is returned in last position.
Further, in the step S2, major-minor roll up 1-2 reduction box change module and major-minor roll up brake, universal drive shaft, Motor is changed module and is carried out after major-minor volume reel, accident brake, oil cooling but change module.
Further, in the step S2, the resource parameters at least include personnel, live goods and materials and plant.
Further, in the step S4, proof scheme at least includes:With the presence or absence of interference between each module construction project;Inspection Repair resource utilization whether execute-in-place;With the presence or absence of can synchronous construction project.
Further, also including being verified to the maintenance solution after modification and perfection, until forming final scheme.
By above technical scheme, the present invention has following technique effect compared to prior art:Smelting is enabled to by this method Golden bridge crane upkeep operation is more compact, so as to shorten duration, reduction personnel input.Further, since can be logical before construction Cross Virtual Construction and find all potential safety hazards being likely to occur in operation process, can further reduce the security risk of construction operation.
Brief description of the drawings
The schematic flow sheet of the repair method of Fig. 1 display metallurgical bridge cranes of the present invention based on BIM.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be taken off by this specification The content of dew understands other advantages of the invention and effect easily.
Refer to Fig. 1.It should be clear that structure, ratio, size depicted in this specification institute accompanying drawings etc., is only used to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to enforceable restriction of the invention Condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, in not shadow Ring under present invention effect that can be generated and the purpose to be reached, all should still fall obtain and can contain in disclosed technology contents In the range of lid.Meanwhile, in this specification it is cited as " on ", D score, "left", "right", " centre " and The term of " one " etc., is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, its relativeness Be altered or modified, under without essence change technology contents, when being also considered as enforceable category of the invention.
Refering to shown in Fig. 1, the present invention provides a kind of repair method of the metallurgical bridge crane based on BIM, comprises the following steps: S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM, by metallurgical bridge-type in the BIM models Crane is divided into major-minor coil cord, suspension hook, portal frame and changes module;Major-minor volume reel, accident brake, oil cooling are but changed; Major-minor rolls up 1-2 reduction box and changes module;Major-minor volume brake, universal drive shaft, motor change module;Fixed pulley changes module; Major-minor car wheel changes module;Cart wheel changes module;Cart walking speed reducer, universal drive shaft change module;Driver's cabin is more Mold changing block.
S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme, Resource parameters include personnel, live goods and materials and information etc. plant.Preliminary maintenance solution is to determine the necessity between each module Sequentially, there is following logical relation between each module of general crane:
(1) major-minor coil cord, suspension hook, portal frame must just be removed in the first step, and carry out back dress in final step;
(2) major-minor roll up 1-2 reduction box change and major-minor roll up brake, universal drive shaft, motor change the two projects must be Major-minor volume reel, accident brake, oil cooling are carried out after but removing;
(3) project of the project of cart walking system and major-minor volume system can not synchronously carry out.
Due to the difference in crane for steelworks use function and design, partial metallurgical crane there may be more modules, each module it Between activity's precedence relationships also should be used as one of main principle.
S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to first Walk the arrangement and method for construction ordered arrangement formulated.
S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, the feasibility of proof scheme.
The main following part of checking:
(1) with the presence or absence of interference between each module construction project;
(2) the whether live practical operation of the utilization of the resource such as consumptive material, machinery in maintenance process;
(3) whether the personnel placement of each project under construction and allotment are reasonable;
(4) the whole construction period whether compact and reasonable, if exist can the project of synchronous construction be adjusted;
(5) in maintenance, if exist in the middle of certain project under construction operation process, new dangerous matter sources are produced to other projects under construction And cause safety out of control.
(6) considering operation scheme according to the maintenance resource (including personnel, live goods and materials and plant) that can be allocated is It is no rationally and to meet itself operating feature, according to actual conditions, surplus is set.
S5, according to the result obtained by above-mentioned steps, adjusts and changes to the maintenance solution of whole metallurgical bridge crane.Utilize BIM model demonstrations continue to verify the maintenance solution after modification and perfection, until forming final scheme.
The above-described embodiments merely illustrate the principles and effects of the present invention, not for the limitation present invention.It is any to be familiar with this skill The personage of art all can carry out modifications and changes under without prejudice to spirit and scope of the invention to above-described embodiment.Therefore, such as Those of ordinary skill in the art completed under without departing from disclosed spirit and technological thought all etc. Effect modifications and changes, should be covered by claim of the invention.

Claims (6)

1. a kind of repair method of the metallurgical bridge crane based on BIM, it is characterised in that comprise the following steps:
S1, the form according to metallurgical bridge crane sets up crane BIM models based on BIM, by metallurgy in the BIM models Bridge crane is divided into major-minor coil cord, suspension hook, portal frame and changes module;Major-minor volume reel, accident brake, oil Cooling is changed;Major-minor rolls up 1-2 reduction box and changes module;Major-minor volume brake, universal drive shaft, motor change module;It is fixed Pulley changes module;Major-minor car wheel changes module;Cart wheel changes module;Cart walking speed reducer, universal drive shaft Change module;Driver's cabin changes module;
S2, sets preliminary maintenance solution, based on the arrangement and method for construction of each module of BIM layouts, is input into resource parameters needed for each scheme;
S3, based on BIM Virtual Constructions, the arrangement and method for construction expressing in series of module that metallurgical bridge crane is respectively constructed, and according to first Walk the arrangement and method for construction ordered arrangement formulated;
S4, based on Virtual Construction demonstration, observes each module Virtual Construction process, proof scheme.
2. the repair method of the metallurgical bridge crane based on BIM according to claim 1, it is characterised in that the step In S2, major-minor coil cord, suspension hook, portal frame change module and are listed in the first dismounting, and return dress in last position.
3. the repair method of the metallurgical bridge crane based on BIM according to claim 1, it is characterised in that the step In S2, major-minor rolls up 1-2 reduction box and changes module and major-minor volume brake, universal drive shaft, motor replacing module in master Pair volume reel, accident brake, oil cooling are carried out after but changing module.
4. the repair method of the metallurgical bridge crane based on BIM according to claim 1, it is characterised in that the step In S2, the resource parameters at least include personnel, live goods and materials and plant.
5. the repair method of the metallurgical bridge crane based on BIM according to claim any one of 1-4, it is characterised in that In the step S4, proof scheme at least includes:With the presence or absence of interference between each module construction project;Overhaul the profit of resource With whether execute-in-place;With the presence or absence of can synchronous construction project.
6. the repair method of the metallurgical bridge crane based on BIM according to claim 5, it is characterised in that also including right Maintenance solution after modification and perfection is verified, until forming final scheme.
CN201510887827.3A 2015-12-04 2015-12-04 The repair method of metallurgical bridge crane based on BIM Active CN106829746B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510887827.3A CN106829746B (en) 2015-12-04 2015-12-04 The repair method of metallurgical bridge crane based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510887827.3A CN106829746B (en) 2015-12-04 2015-12-04 The repair method of metallurgical bridge crane based on BIM

Publications (2)

Publication Number Publication Date
CN106829746A true CN106829746A (en) 2017-06-13
CN106829746B CN106829746B (en) 2018-11-20

Family

ID=59151224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510887827.3A Active CN106829746B (en) 2015-12-04 2015-12-04 The repair method of metallurgical bridge crane based on BIM

Country Status (1)

Country Link
CN (1) CN106829746B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007055807A (en) * 2005-08-26 2007-03-08 Ishikawajima Transport Machinery Co Ltd Base isolation supporting method and device for crane
CN102001588A (en) * 2010-11-15 2011-04-06 中冶焦耐(大连)工程技术有限公司 Coke quenching vehicle displacement detection device and use method thereof
CN203269454U (en) * 2013-04-22 2013-11-06 新乡市恒创机械设备有限公司 Crane coiling block maintenance lifting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007055807A (en) * 2005-08-26 2007-03-08 Ishikawajima Transport Machinery Co Ltd Base isolation supporting method and device for crane
CN102001588A (en) * 2010-11-15 2011-04-06 中冶焦耐(大连)工程技术有限公司 Coke quenching vehicle displacement detection device and use method thereof
CN203269454U (en) * 2013-04-22 2013-11-06 新乡市恒创机械设备有限公司 Crane coiling block maintenance lifting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周凯旋: "创新设计中的起重机可互换性虚拟装配及干涉检查", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Also Published As

Publication number Publication date
CN106829746B (en) 2018-11-20

Similar Documents

Publication Publication Date Title
Auer et al. Combined Life Cycle Assessment and Life Cycle Costing in the Eco-Care-Matrix: A case study on the performance of a modernized manufacturing system for glass containers
CN107423458A (en) Steel manufacture process analogue system
CN107331235A (en) Gantry container crane simulated operation full-view simulation system and method
CN107622153A (en) A kind of large scale equipment lifting construction analogy method based on BIM technology
CN102849425A (en) Pin shaft conveying device for chain joint assembling machine
CN106649986A (en) Method for achieving optimization matching of copper pipe horizontal continuous casting parameters based on PROCAST simulation platform
CN112446642A (en) Multi-crown-block scheduling optimization method and system
CN105303320A (en) Intelligent scheduling algorithm for steelmaking
CN104238506B (en) Working condition information acquiring and processing system and method
CN101941648A (en) Method for processing conflict among multiple cranes in logistics simulation system in steelmaking continuous casting workshop
CN112241579A (en) Virtual simulation system and method for steel production process
CN106829746A (en) The repair method of the metallurgical bridge crane based on BIM
Zheng et al. Production scheduling problems of steelmaking-continuous casting process in dynamic production environment
CN107487716A (en) Radio crane control system
CN208020735U (en) A kind of continuous 3D printer of high-precision high-speed
CN106347420B (en) A kind of offline adjustment drives curve method and system
CN205469172U (en) Portable screen cabinet transport vechicle
CN115049228A (en) Construction method of steelmaking-continuous casting section logistics simulation intelligent system
CN106292532A (en) The speed compensation method that a kind of continuous annealing line carbon set roller mill is damaged
CN114433834A (en) Integrative intelligence control system of mulling molding pouring
CN105735686B (en) Ultra-large type complex factories and its horizontal layout method
CN206984076U (en) A kind of adjustable space transport vehicle for logistics transportation system
CN106774216A (en) Crystallite copper ball Full Automatic Liquid it is molded and circulation production line and intellectualized management system
Chao et al. Research on optimization and simulation of sand casting production line based on VSM
CN207629126U (en) Automation plus sand station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant