CN107622153A - A kind of large scale equipment lifting construction analogy method based on BIM technology - Google Patents

A kind of large scale equipment lifting construction analogy method based on BIM technology Download PDF

Info

Publication number
CN107622153A
CN107622153A CN201710783852.6A CN201710783852A CN107622153A CN 107622153 A CN107622153 A CN 107622153A CN 201710783852 A CN201710783852 A CN 201710783852A CN 107622153 A CN107622153 A CN 107622153A
Authority
CN
China
Prior art keywords
working truck
model
arm
large scale
navisworks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710783852.6A
Other languages
Chinese (zh)
Inventor
蒋经纬
覃瑞
王彩明
宫红亮
刘海球
李承珂
黄彬
辛炯业
江春强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710783852.6A priority Critical patent/CN107622153A/en
Publication of CN107622153A publication Critical patent/CN107622153A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of large scale equipment lifting construction analogy method based on BIM technology, including step:Three-dimensional body structural model is established using Autodesk Revit softwares, primarily determines that traffic route and crane website;Established using Rhino softwares and treat hanging device model;The model of foundation is directed into Navisworks platforms, carries out location matches;Working truck is imported, working truck is subjected to Traveling simulator along traffic route;By observing the Traveling simulator situation of working truck and interference situation with peripheral structure, traffic route adjustment is carried out;Working truck is placed in crane website, carries out lifting simulation;By observing the lifting analog case of working truck and interference situation with peripheral structure, crane website adjustment is carried out.The present invention, by animation simulation, can more intuitively be predicted the possible potential variety of problems of construction, breach the limitation in two-dimentional epoch, make engineering progress more smooth by BIM utilization.

Description

A kind of large scale equipment lifting construction analogy method based on BIM technology
Technical field
The present invention relates to lifting construction simulation application field, more particularly to a kind of large scale equipment lifting based on BIM technology Method for analog construction.
Background technology
As economic technology develops, large-scale literary trip's intermediate item is more and more, it is complicated and containing a large amount of special equipments pacify Dress construction.Conventional plane simulation mode is difficult to full forecast potential problems, obtains optimal case.By taking large-scale recreation ground as an example, There is substantial amounts of ad hoc recreation facility in paradise, and its scale of construction is big, the duration is tight, installation difficulty is high, wherein height exists and travelled more than 23m Equipment installation conflicts with agent structure and phenomenon of doing over again occurs.
The content of the invention
To solve above-mentioned the problems of the prior art, the invention provides a kind of large scale equipment lifting based on BIM technology Method for analog construction, by BIM utilization, by animation simulation, can more intuitively predict construction may be potential a variety of Problem, the limitation in two-dimentional epoch is breached, make engineering progress more smooth.
To achieve the above object, the technical solution adopted by the present invention is:A kind of large scale equipment lifting based on BIM technology is applied Work analogy method, it is characterised in that including step:
Three-dimensional body structural model is established using Autodesk Revit softwares, roadway is primarily determined that according to arrangement and method for construction Line and crane website;
Established using Rhino softwares and treat hanging device model;
By the three-dimensional body structural model of foundation and described treat that hanging device model is directed into BIM construction simulation softwares In Navisworks platforms, location matches are carried out according to arrangement and method for construction;
Working truck is imported in the Navisworks platforms, working truck is subjected to Traveling simulator along traffic route;
By observing the Traveling simulator situation of working truck and interference situation with peripheral structure, to traffic route, three-dimensional Agent structure model and the deployment progress reasonability adjustment for treating hanging device model;
In the Navisworks platforms, working truck is placed in crane website, carries out lifting simulation;And
By observing the lifting analog case of working truck and interference situation with peripheral structure, the work to working truck The deployment of scope and crane website carries out reasonability adjustment.
The large scale equipment lifting construction analogy method based on BIM technology of the present invention, which is further improved, to be, described The three-dimensional body structural model that Autodesk Revit softwares are established is exported with nwc file formats, and is directed into described In Navisworks platforms.
The large scale equipment lifting construction analogy method based on BIM technology of the present invention, which is further improved, to be, described The described of Rhino softwares foundation treats that hanging device model is exported with fbx file formats, and is directed into the Navisworks platforms In.
The present invention the large scale equipment lifting construction analogy method based on BIM technology further improve is, by with Lower method to import Navisworks platforms described in three-dimensional body structural model and it is described treat hanging device model carry out position Matching, methods described include:
By the three-dimensional body structural model of different-format and it is described treat hanging device model import Navisworks put down In platform, corresponding model is selected in the selection tree function of Navisworks platforms;
The measurement that basic point carries out point-to-point to each modal position is chosen, the size that three axles of x, y, z occurs in measurement result is inclined Data are moved, by selecting tree function to choose the options for the model to be moved, according to each model relative position, in the list of options Three modification of dimension x, y, z, three sized datas below position and conversion attribute Central Plains point option, match the three-dimensional body knot Structure model and the relative position for treating hanging device model.
The large scale equipment lifting construction analogy method based on BIM technology of the present invention, which is further improved, to be, the row Bus or train route line is continuously laid by the track of one fixed width and obtained;
And wherein, the Traveling simulator situation of the observation working truck, including:Observe the width in track and whether turn round Meet the walking of working truck.
The large scale equipment lifting construction analogy method based on BIM technology of the present invention, which is further improved, to be, the week Side structure includes three-dimensional body structural model and treats hanging device model;
And wherein, the interference situation of the observation working truck and peripheral structure, including:Observation working truck is being walked With three-dimensional body structural model and the collision situation of hanging device model is treated in simulation process.
The large scale equipment lifting construction analogy method based on BIM technology of the present invention, which is further improved, to be, the work Industry vehicle is provided with arm, and parameterizes and be provided with arm shape facility and arm swing feature;
And wherein, the lifting analog case of the observation working truck and the interference situation with peripheral structure, including:See Examine whether swing of the arm of working truck in simulation process is lifted collides peripheral structure, whether meets that working range will Ask, and whether the arm swing of working truck interferes between different crane websites.
The large scale equipment lifting construction analogy method based on BIM technology of the present invention, which is further improved, to be, described right The step of working range of working truck and the deployment of crane website carry out reasonability adjustment, including:
For working truck arm pendulum impact to peripheral structure in the case of, adjust arm shape facility and arm pendulum Dynamic feature;
In the case of swing for the arm of working truck is unsatisfactory for working range requirement, before peripheral structure is not collided Put, adjust arm shape facility and arm swings feature;
Arm for working truck between different crane websites swings the in the case of of interfering, and is not colliding peripheral structure And on the premise of meeting working range requirement, adjust arm shape facility and arm swings feature.
Due to using above technical scheme, what is made it have has the beneficial effect that the present invention:
Based on BIM technology lifting construction program simulation application process, by the utilization of model, the simulation of animation, more Working truck and building body, reserved contacting between route and website are intuitively expressed, timely prioritization scheme, makes scheme completeer Kind, scheme implement it is finer, meanwhile, simulation animation can also further during guiding construction existing for should be noted it is a variety of Problem, effectively work is set more to coordinate, it is more scientific reasonable.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, make required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is a kind of stream of large scale equipment lifting construction analogy method based on BIM technology in embodiments of the invention Cheng Tu.
Fig. 2 is application scheme figure of the present invention in the simulation of recreation facility lifting construction.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the present invention, rather than limitation of the invention.It also should be noted that in order to just Part related to the present invention rather than full content are illustrate only in description, accompanying drawing.
As economic technology develops, large-scale literary trip's intermediate item is more and more, it is complicated and containing a large amount of special equipments pacify Dress construction.Extraordinary large scale equipment scale of construction is big, the duration is tight, installation difficulty is high for these, to avoid large scale equipment installation and agent structure Conflict and the phenomenon that occurs doing over again, the present invention carries out arrangement and method for construction simulation, first, can be clear in advance using BIM technology visualization feature Chu Faxian recreation facilities and structural hazard, the place of collision, give warning in advance elimination conflict;Second, recreation facility lifting is simulated in advance Process, the inconsiderate situation for causing lifting machine activity space deficiency, causing difficulty of construction increasing is avoided, so as to be hung for construction Dress provides more scientific rational Hoisting Program.
First, as shown in fig.1, being illustrated as a kind of large scale equipment lifting based on BIM technology in the embodiment of the present invention Method for analog construction, it is mainly included the following steps that:
Step 101:Three-dimensional body structural model is established using Autodesk Revit softwares, it is tentatively true according to arrangement and method for construction Determine traffic route and crane website;
Wherein, Autodesk Revit softwares towards BIM (Building Information Model, letter Claim BIM) and build, support Sustainable Design, collision detection, Construction Specifications and construction, at the same help with engineer, contractor and Owner preferably links up cooperation.Having altered in design process can all be realized more in relevant design with being automatically updated in document Add harmonious flow, obtain relatively reliable design documentation.
Step 102:Established using Rhino softwares and treat hanging device model;
Wherein, Rhino, Chinese rhinoceros, it is a superpower D modeling tool, size ability tens, hardware will Ask also very low.But it contains all NURBS modeling functions, it can glibly be modeled very much, then exported high-precision with it Model is spent to use to other three-dimensional softwares.
Step 103:By the three-dimensional body structural model of foundation and treat that hanging device model is directed into BIM construction simulation softwares In Navisworks platforms, location matches are carried out according to arrangement and method for construction;
Wherein, BIM construction simulations software Navisworks platforms visualize and emulated, analyze the three of multiple format Dimension designs a model.Navisworks solutions support all items related side reliably to integrate, share and check detailed three Dimension is designed a model, and core status is in BIM (BIM) workflow.
In the present embodiment, the three-dimensional body structural model that Autodesk Revit softwares are established is led with nwc file formats Go out, and be directed into Navisworks platforms;
What Rhino softwares were established treats that hanging device model is exported with fbx file formats, and is directed into Navisworks platforms In.
Navisworks platforms are waited to hang in the three-dimensional body structural model and fbx file formats for importing nwc file formats After filling device model, the matching of a position is carried out to the model of two different-formats, i.e., first by the model of required different-format Import in Navisworks, then can select corresponding model in " selection tree " function of Navisworks platforms;Then base is chosen Point carries out the measurement of point-to-point to each modal position, and the result of measurement occurs the size offset data of three axles of x, y, z, passed through " selection tree " function chooses the options for the model to be moved, according to each model relative position, unit and conversion in options Three modification of dimension x, y, z, three sized datas below the point option of attribute Central Plains, the relative position of two models can be matched, Both are made to be combined into a complete model.
Step 104:Working truck is imported in Navisworks platforms, working truck is subjected to walking mould along traffic route Intend;
By the analogue simulation function of Navisworks platforms, animation simulation is carried out, simulation job vehicle is in traffic route Upper walking.
Step 105:By observing the Traveling simulator situation of working truck and interference situation with peripheral structure, to roadway Line, three-dimensional body structural model and the deployment progress reasonability adjustment for treating hanging device model;
Wherein, traffic route is continuously laid by the track of one fixed width and obtained;
And wherein, observing the Traveling simulator situation of working truck can further comprise:Observe width and the turn in track Whether the walking of working truck is met.The width in the track that the walking for being unsatisfactory for working truck requires and turn are adjusted It is whole, required with meeting walking.
In addition, peripheral structure therein includes three-dimensional body structural model and treats hanging device model;
And wherein, observing working truck and the interference situation of peripheral structure can further comprise:Observation working truck exists With three-dimensional body structural model and the collision situation of hanging device model is treated during Traveling simulator.Walked for working truck , can be by adjusting three-dimensional body with three-dimensional body structural model and treating the situation that hanging device model collides in simulation process Structural model and the location matches for treating hanging device model, are suitably adjusted, with ensure compliance with safety requirements, zero collide, into This minimum scheme.
Step 106:In Navisworks platforms, working truck is placed in crane website, carries out lifting simulation;
Based on meeting working truck and three-dimensional body structure after adjustment, treat to contact feelings between hanging device and traffic route Under condition, working truck is placed in crane website, and hanging for the working truck at crane website is carried out using Navisworks platforms Die-filling plan.
Step 107:By observing the lifting analog case of working truck and interference situation with peripheral structure, to Operation Van Working range and crane website deployment carry out reasonability adjustment.
Wherein, working truck is provided with arm, and parameterizes and be provided with arm shape facility and arm swing feature;
And wherein, observe the lifting analog case of working truck and can further be wrapped with the interference situation of peripheral structure Include:Observe whether swing of the arm of working truck in simulation process is lifted collides peripheral structure, whether meets work model Whether the arm swing for enclosing working truck between requirement, and different crane websites interferes.
Moreover, the deployment of the working range and crane website to working truck can be further the step of carrying out reasonability adjustment Including:
For working truck arm pendulum impact to peripheral structure in the case of, adjust arm shape facility and arm pendulum Dynamic feature;
In the case of swing for the arm of working truck is unsatisfactory for working range requirement, before peripheral structure is not collided Put, adjust arm shape facility and arm swings feature;And
Arm for working truck between different crane websites swings the in the case of of interfering, and is not colliding peripheral structure And on the premise of meeting working range requirement, adjust arm shape facility and arm swings feature.
So as to by the utilization of model, the simulation of animation, more intuitively express working truck and building body, roadway Contact between line and website, timely prioritization scheme, make scheme is more perfect, scheme implement it is finer, meanwhile, simulation animation also may be used With the existing variety of problems that should be noted during further guiding construction, effectively work is set more to coordinate, it is more scientific reasonable.
With reference to shown in Fig. 2, it is illustrated that for application scheme figure of the present invention in the simulation of recreation facility lifting construction.
Step a. three-dimensional modelings:Three-dimensional body structural model is established by BIM software Autodesk Revit, according to scheme Traffic route (track) and crane website are established, primarily determines that traffic route and the reasonability of crane website, exports nwc trays Formula;Large scale equipment model to be lifted is established by Rhino, exports fbx formatted files.Not apposition derived from above-mentioned two software The model of formula type, all it is introduced into the premise of Navisworks platforms.Autodesk Revit softwares and Rhino softwares adopt root Build the mode of threedimensional model according to two-dimentional drawing to establish threedimensional model, including Revit building structure threedimensional model and Rhino it is big Type device model.
Step b. models import:Based on step a, the model derived from imports BIM construction simulation softwares Navisworks and put down Platform, first have to carry out the model of two different-formats the matching of one position, be allowed to be combined into a complete model.Lead again Enter the model of special working truck, be ready for the animation simulation of next step.
Step c. analogue simulations:After the completion of preparation based on step b, animation simulation is carried out, is existed by working truck The Traveling simulator in track, it can be seen that the width in track and turn round whether meet the easy access of vehicle, meanwhile, also can be intuitively Find out whether height of car collides with the main body beam column of three-dimensional body structural model, structure construction deployment and track are arranged Reasonability has an intuitive judgment.
Step d. optimum scheme comparisons:Track reasonability based on step c, working truck is hung on crane website Whether die-filling plan, the working range for the arm that lifting simulation is mainly reflected in industry vehicle reach requirement, for example, the extension pendulum of arm It is dynamic whether to encounter whether agent structure or large scale equipment hoisting process arm can reach required position apart from angle, such as More working trucks, between crane website and crane website working truck activity whether rationally, with the presence or absence of collision etc..In this way, By a series of simulation, to determine the feasibility of scheme, select and meet the minimum side of quality safety requirement, zero collision, cost Case.By visual Simulation mechanical hoisting, vehicle running orbit, verification scheme reasonability, optimize optimum scheme comparison.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only coordinating Content disclosed in bright book, so that those skilled in the art understands and reads, it is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Influence under the effect of present invention can be generated and the purpose that can reach, all should still fall and be obtained in disclosed technology contents In the range of covering.It is meanwhile cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, understanding for narration is merely convenient to, and is not used to limit the enforceable scope of the present invention, the change of its relativeness or tune It is whole, in the case where changing technology contents without essence, when being also considered as the enforceable category of the present invention.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent change and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention It is interior.

Claims (8)

1. a kind of large scale equipment lifting construction analogy method based on BIM technology, it is characterised in that including step:
Establish three-dimensional body structural model using Autodesk Revit softwares, according to arrangement and method for construction primarily determine that traffic route and Crane website;
Established using Rhino softwares and treat hanging device model;
By the three-dimensional body structural model of foundation and described treat that hanging device model is directed into BIM construction simulation softwares In Navisworks platforms, location matches are carried out according to arrangement and method for construction;
Working truck is imported in the Navisworks platforms, working truck is subjected to Traveling simulator along traffic route;
By observing the Traveling simulator situation of working truck and interference situation with peripheral structure, to traffic route, three-dimensional body Structural model and the deployment progress reasonability adjustment for treating hanging device model;
In the Navisworks platforms, working truck is placed in crane website, carries out lifting simulation;And
By observing the lifting analog case of working truck and interference situation with peripheral structure, to the working range of working truck And the deployment of crane website carries out reasonability adjustment.
2. the large scale equipment lifting construction analogy method based on BIM technology as claimed in claim 1, it is characterised in that:It is described The three-dimensional body structural model that Autodesk Revit softwares are established is exported with nwc file formats, and is directed into described In Navisworks platforms.
3. the large scale equipment lifting construction analogy method based on BIM technology as claimed in claim 1, it is characterised in that:It is described The described of Rhino softwares foundation treats that hanging device model is exported with fbx file formats, and is directed into the Navisworks platforms In.
4. such as the large scale equipment lifting construction analogy method according to any one of claims 1 to 3 based on BIM technology, it is special Sign is, by the following method to importing three-dimensional body structural model described in Navisworks platforms and described treating hanging device Model carries out location matches, and methods described includes:
By the three-dimensional body structural model of different-format and it is described treat hanging device model import Navisworks platforms in, Corresponding model is selected in the selection tree function of Navisworks platforms;
The measurement that basic point carries out point-to-point to each modal position is chosen, the size offset number of three axles of x, y, z occurs in measurement result According to, by selecting tree function to choose the options for the model to be moved, according to each model relative position, options unit and Three modification of dimension x, y, z, three sized datas below the point option of attribute Central Plains are converted, match the three-dimensional body structure mould Type and the relative position for treating hanging device model.
5. the large scale equipment lifting construction analogy method based on BIM technology as claimed in claim 1, it is characterised in that described Traffic route is continuously laid by the track of one fixed width and obtained;
And wherein, the Traveling simulator situation of the observation working truck, including:Observe the width in track and turn round and whether meet The walking of working truck.
6. the large scale equipment lifting construction analogy method based on BIM technology as described in claim 1 or 5, it is characterised in that institute Stating peripheral structure includes three-dimensional body structural model and treats hanging device model;
And wherein, the interference situation of the observation working truck and peripheral structure, including:Working truck is observed in Traveling simulator During with three-dimensional body structural model and treat the collision situation of hanging device model.
7. the large scale equipment lifting construction analogy method based on BIM technology as claimed in claim 1, it is characterised in that described Working truck is provided with arm, and parameterizes and be provided with arm shape facility and arm swing feature;
And wherein, the lifting analog case of the observation working truck and the interference situation with peripheral structure, including:Observation is made Swing of the arm of industry vehicle in simulation process is lifted whether collide peripheral structure, whether meet working range requirement, with And whether the arm swing of working truck interferes between different crane websites.
8. the large scale equipment lifting construction analogy method based on BIM technology as claimed in claim 7, it is characterised in that described The deployment of working range and crane website to working truck is carried out the step of reasonability adjustment, including:
For working truck arm pendulum impact to peripheral structure in the case of, adjust arm shape facility and arm swing it is special Sign;
In the case of swing for the arm of working truck is unsatisfactory for working range requirement, the premise of peripheral structure is not being collided Under, adjust arm shape facility and arm swings feature;
Arm for working truck between different crane websites swings the in the case of of interfering, and is not colliding peripheral structure and is expiring On the premise of sufficient working range requirement, adjust arm shape facility and arm swings feature.
CN201710783852.6A 2017-09-04 2017-09-04 A kind of large scale equipment lifting construction analogy method based on BIM technology Pending CN107622153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710783852.6A CN107622153A (en) 2017-09-04 2017-09-04 A kind of large scale equipment lifting construction analogy method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710783852.6A CN107622153A (en) 2017-09-04 2017-09-04 A kind of large scale equipment lifting construction analogy method based on BIM technology

Publications (1)

Publication Number Publication Date
CN107622153A true CN107622153A (en) 2018-01-23

Family

ID=61088504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710783852.6A Pending CN107622153A (en) 2017-09-04 2017-09-04 A kind of large scale equipment lifting construction analogy method based on BIM technology

Country Status (1)

Country Link
CN (1) CN107622153A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107944096A (en) * 2017-11-07 2018-04-20 山东住工装配建筑有限公司 A kind of assembled architecture prefabricated components simulation hanging method and system based on BIM
CN109272451A (en) * 2018-08-24 2019-01-25 中国电力工程顾问集团西南电力设计院有限公司 A method of the displaying of converter station panorama is carried out based on threedimensional model
CN109325312A (en) * 2018-10-31 2019-02-12 上海二十冶建设有限公司 Using the method for BIM technology Build Security area's experience high altitude operation scaffold
CN109534184A (en) * 2018-11-03 2019-03-29 上海二十冶建设有限公司 Cold rolling acid tandem rolling mill memorial archway hanging method based on BIM technology
CN109543342A (en) * 2018-12-11 2019-03-29 北京市政路桥股份有限公司 Small space steel box-girder lifts dynamic crash detection method
CN110135757A (en) * 2019-05-23 2019-08-16 中铁二局集团有限公司 A kind of method of weight in determining limited space, big lifting component scheme
CN112380603A (en) * 2020-11-13 2021-02-19 中建四局第六建设有限公司 BIM-based large prefabricated part hoisting simulation method
CN112464329A (en) * 2020-10-13 2021-03-09 福建金启点实业有限公司 BIM steel structure-based integral hoisting method
CN114969901A (en) * 2022-05-10 2022-08-30 深圳采骏绿碳供应链有限公司 Building equipment and building information model matching method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150310135A1 (en) * 2014-04-24 2015-10-29 The Board Of Trustees Of The University Of Illinois 4d vizualization of building design and construction modeling with photographs
CN105868440A (en) * 2016-03-21 2016-08-17 扬州大学 Construction engineering data modeling method based on BIM (Building Information Modeling) technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150310135A1 (en) * 2014-04-24 2015-10-29 The Board Of Trustees Of The University Of Illinois 4d vizualization of building design and construction modeling with photographs
CN105868440A (en) * 2016-03-21 2016-08-17 扬州大学 Construction engineering data modeling method based on BIM (Building Information Modeling) technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董骁等: "建筑信息模型(BIM)技术在AP1000 核岛大件吊装仿真中的应用", 《工业建筑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107944096A (en) * 2017-11-07 2018-04-20 山东住工装配建筑有限公司 A kind of assembled architecture prefabricated components simulation hanging method and system based on BIM
CN109272451A (en) * 2018-08-24 2019-01-25 中国电力工程顾问集团西南电力设计院有限公司 A method of the displaying of converter station panorama is carried out based on threedimensional model
CN109325312A (en) * 2018-10-31 2019-02-12 上海二十冶建设有限公司 Using the method for BIM technology Build Security area's experience high altitude operation scaffold
CN109534184A (en) * 2018-11-03 2019-03-29 上海二十冶建设有限公司 Cold rolling acid tandem rolling mill memorial archway hanging method based on BIM technology
CN109543342A (en) * 2018-12-11 2019-03-29 北京市政路桥股份有限公司 Small space steel box-girder lifts dynamic crash detection method
CN110135757A (en) * 2019-05-23 2019-08-16 中铁二局集团有限公司 A kind of method of weight in determining limited space, big lifting component scheme
CN112464329A (en) * 2020-10-13 2021-03-09 福建金启点实业有限公司 BIM steel structure-based integral hoisting method
CN112380603A (en) * 2020-11-13 2021-02-19 中建四局第六建设有限公司 BIM-based large prefabricated part hoisting simulation method
CN114969901A (en) * 2022-05-10 2022-08-30 深圳采骏绿碳供应链有限公司 Building equipment and building information model matching method and device

Similar Documents

Publication Publication Date Title
CN107622153A (en) A kind of large scale equipment lifting construction analogy method based on BIM technology
Tak et al. BIM-based 4D mobile crane simulation and onsite operation management
Li et al. Integrating design and construction through virtual prototyping
CN106250638B (en) A kind of backform comprehensive design and application process based on BIM
CN112069698B (en) BIM-based hoisting simulation construction method and system
Lai et al. Collision detection strategies for virtual construction simulation
Hasan et al. Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects
CN107944096A (en) A kind of assembled architecture prefabricated components simulation hanging method and system based on BIM
CN110210097A (en) A kind of metal Roof optimized construction method based on BIM technology
Beirão et al. Parametric urban design An interactive sketching system for shaping neighborhoods
CN104699822A (en) Automatic collocation method for annotations of map point elements
CN112446642A (en) Multi-crown-block scheduling optimization method and system
Li et al. A 4D automatic simulation tool for construction resource planning: a case study
CN115048699A (en) Construction management method based on BIM
CN107194035A (en) A kind of automatized script generation method towards SCADE
CN110135757A (en) A kind of method of weight in determining limited space, big lifting component scheme
Tantisevi et al. Transformation of a 4D product and process model to generate motion of mobile cranes
Hung et al. Configurable model for real-time crane erection visualization
Marx et al. Simulation of construction processes considering spatial constraints of crane operations
Han et al. Simulation of mobile crane operations in 3D space
CN110688805A (en) Analysis method for flow numerical value of automobile external flow field
CN103020355B (en) Method for realizing spatial arrangement scheduling of curved section of ship
CN116226977A (en) Supervision method and device of construction tower crane, electronic equipment and storage medium
Helenowska-Peschke Applying generative modelling tools to explore architectural forms
Hemalattha et al. Developing an integrated framework for optimization of spatial requirements of construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication