CN106829026A CN201710125722.3A CN201710125722A CN106829026A CN 106829026 A CN106829026 A CN 106829026A CN 201710125722 A CN201710125722 A CN 201710125722A CN 106829026 A CN106829026 A CN 106829026A
Authority
CN
China
Prior art keywords
hydraulic cylinder
expansion link
steel pipe
base
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710125722.3A
Other languages
Chinese (zh)
Other versions
CN106829026B (en
Inventor
曾文涛
赵子宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Fulu Metal Products Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710125722.3A priority Critical patent/CN106829026B/en
Publication of CN106829026A publication Critical patent/CN106829026A/en
Application granted granted Critical
Publication of CN106829026B publication Critical patent/CN106829026B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B27/00Bundling particular articles presenting special problems using string, wire, or narrow tape or band; Baling fibrous material, e.g. peat, not otherwise provided for
    • B65B27/10Bundling rods, sticks, or like elongated objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B13/00Bundling articles
    • B65B13/18Details of, or auxiliary devices used in, bundling machines or bundling tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Basic Packing Technique (AREA)

Abstract

A kind of hexagon binding apparatus of steel pipe, belongs to field of electromechanical equipment, by base assembly, bundling component, ties up component and constitutes, it is characterised in that:Described bundling component is arranged on base assembly, is tied up component and is arranged on the steel pipe tied up, and bundling is tied up for last;Described base assembly is made up of steel pipe alignment plate, guide rail, base, first hydraulic cylinder, second hydraulic cylinder, and steel pipe alignment plate is arranged on base one end, and on base, first hydraulic cylinder and second hydraulic cylinder are arranged on base guide rails assembling.The usefulness of the invention is:Steel pipe alignment plate can realize aligning for sheet material;Bundling component can realize tying up for different size size steel pipe.

Description

A kind of hexagon binding apparatus of steel pipe
Technical field
The present invention relates to a kind of hexagon binding apparatus of steel pipe, specifically using base assembly, bundling component, bundle Component composition is pricked, belongs to field of electromechanical equipment.
Background technology
Steel pipe is a kind of material commonly used in engineering, and because purposes is different, model is different, it is necessary to by steel after steel pipe's production Pipe transport is very inconvenient when carrying because it is circular, crank to each place.The big requirement of present demand pipe amount, The carrying of steel pipe should be convenient, flexible, and should safety, in the urgent need to it is a kind of Steel tube packaging into stable gravity center hexagonal device, but In the market without such device.In view of the above problems, the hexagon binding apparatus of this steel pipe is devised.
The content of the invention
For above-mentioned deficiency, the invention provides a kind of hexagon binding apparatus of steel pipe.
The present invention is achieved by the following technical solutions:A kind of hexagon binding apparatus of steel pipe, be by base assembly, Bundling component, tie up component composition, it is characterised in that:Described bundling component is arranged on base assembly, ties up component peace On the steel pipe tied up, bundling is tied up for last.
Described base assembly is made up of steel pipe alignment plate, guide rail, base, first hydraulic cylinder, second hydraulic cylinder, steel pipe pair Positive plate is arranged on base one end, and on base, first hydraulic cylinder and second hydraulic cylinder are arranged on base guide rails assembling.
Described bundling component is stretched by first hydraulic cylinder seat, the 3rd hydraulic cylinder, the first track base, the 4th hydraulic cylinder, first Contracting bar, the 5th hydraulic cylinder, the second track base, the 6th hydraulic cylinder, second hydraulic cylinder seat, the 3rd hydraulic cylinder seat, the second expansion link, Three expansion links, the 4th expansion link, the 7th hydraulic cylinder, the 8th hydraulic cylinder, the 5th expansion link, the 6th expansion link, the 4th hydraulic cylinder seat Composition, the 3rd hydraulic cylinder is arranged on first hydraulic cylinder seat, and the first track base is fixedly connected with the 3rd hydraulic cylinder, the 6th hydraulic cylinder On second hydraulic cylinder seat, the second track base is fixedly connected with the 6th hydraulic cylinder, and the 3rd hydraulic cylinder seat is led installed in second On rail chair, the 4th hydraulic cylinder seat is arranged on the first track base, and the 4th hydraulic cylinder is arranged on the 4th hydraulic cylinder seat, the 5th hydraulic pressure Cylinder is arranged on the 3rd hydraulic cylinder seat, and the 4th hydraulic cylinder and the 5th hydraulic cylinder are linked together by the first expansion link, and second stretches Contracting bar is connected with the 3rd hydraulic cylinder seat, and the 4th expansion link is connected with the second expansion link, and the 3rd expansion link and the 4th expansion link pass through 7th hydraulic cylinder is linked together, and the 3rd expansion link and the 5th expansion link are connected by the 8th hydraulic cylinder, the 5th expansion link and the Six expansion links are linked together, and the 6th expansion link is arranged on the 4th hydraulic cylinder seat.
Described component of tying up is made up of the 7th expansion link, screw, screw hole, the 8th expansion link, and screw is arranged on screw Kong Shang, on the 7th expansion link and the 8th expansion link, the 7th expansion link and the 8th expansion link are connected by screw screw hole.
The usefulness of the invention is:Steel pipe alignment plate can realize aligning for sheet material;Bundling component can realize different size Size steel pipe is tied up.Adjustment first hydraulic cylinder and second hydraulic cylinder incline base first, then by adjusting the 3rd hydraulic pressure Cylinder, the 6th hydraulic cylinder, the 7th hydraulic cylinder and the 8th hydraulic cylinder make bundling assembly volume become big, and steel pipe then is put into bundling component In, align steel pipe using steel pipe alignment plate, then the 3rd hydraulic cylinder, the 6th hydraulic cylinder, the 7th hydraulic cylinder and the 8th hydraulic cylinder Start action by Steel tube packaging into hexagon, carry out tying up sizing finally by component is tied up.
Brief description of the drawings
Accompanying drawing 1 is schematic structural view of the invention;
Accompanying drawing 2 is to tie up modular construction schematic diagram;
Accompanying drawing 3 is base assembly structural representation;
Accompanying drawing 4 is bundling modular construction schematic diagram.
In figure, 1, base assembly, 2, bundling component, the 3, the 7th expansion link, 4, screw, 5, screw hole, the 6, the 8th expansion link, 101st, steel pipe alignment plate, 102, guide rail, 103, base, 104, first hydraulic cylinder, 105, second hydraulic cylinder, 201, first hydraulic cylinder Seat, the 202, the 3rd hydraulic cylinder, the 203, first track base, the 204, the 4th hydraulic cylinder, the 205, first expansion link, the 206, the 5th hydraulic pressure Cylinder, the 207, second track base, the 208, the 6th hydraulic cylinder, 209, second hydraulic cylinder seat, the 210, the 3rd hydraulic cylinder seat, 211, second stretches Contracting bar, the 212, the 3rd expansion link, the 213, the 4th expansion link, the 214, the 7th hydraulic cylinder, the 215, the 8th hydraulic cylinder, the 216, the 5th stretches Bar, the 217, the 6th expansion link, the 218, the 4th hydraulic cylinder seat.
Specific embodiment
A kind of hexagon binding apparatus of steel pipe, by base assembly 1, bundling component 2, ties up component and constitutes, and it is special Levy and be:Described bundling component 2 is arranged on base assembly 1, is tied up component and is arranged on the steel pipe tied up, for last Tie up bundling.
Described base assembly 1 is by steel pipe alignment plate 101, guide rail 102, base 103, first hydraulic cylinder 104, the second hydraulic pressure Cylinder 105 is constituted, and steel pipe alignment plate 101 is arranged on the one end of base 103, and guide rail 102 is arranged on base 103, first hydraulic cylinder 104 It is arranged on base 103 with second hydraulic cylinder 105.
Described bundling component 2 is by the 201, the 3rd hydraulic cylinder 202 of first hydraulic cylinder seat, the first track base 203, the 4th hydraulic pressure Cylinder 204, the first expansion link 205, the 5th hydraulic cylinder 206, the second track base 207, the 6th hydraulic cylinder 208, second hydraulic cylinder seat 209th, the 3rd hydraulic cylinder seat the 210, second expansion link 211, the 3rd expansion link 212, the 4th expansion link 213, the 7th hydraulic cylinder 214, 8th hydraulic cylinder 215, the 5th expansion link 216, the 6th expansion link 217, the 4th hydraulic cylinder seat 218 are constituted, and the 3rd hydraulic cylinder 202 is pacified On first hydraulic cylinder seat 201, the first track base 203 is fixedly connected with the 3rd hydraulic cylinder 202, and the 6th hydraulic cylinder 208 is installed On second hydraulic cylinder seat 209, the second track base 207 is fixedly connected with the 6th hydraulic cylinder 208, and the 3rd hydraulic cylinder seat 210 is installed On the second track base 207, the 4th hydraulic cylinder seat 218 is arranged on the first track base 203, and the 4th hydraulic cylinder 204 is arranged on the On four hydraulic cylinders seat 218, the 5th hydraulic cylinder 206 is arranged on the 3rd hydraulic cylinder seat 210, the 4th hydraulic cylinder 204 and the 5th hydraulic pressure Cylinder 206 is linked together by the first expansion link 205, and the second expansion link 211 is connected with the 3rd hydraulic cylinder seat 210, and the 4th stretches Bar 213 is connected with the second expansion link 211, and the 3rd expansion link 212 and the 4th expansion link 213 are connected to by the 7th hydraulic cylinder 214 Together, the 3rd expansion link 212 and the 5th expansion link 216 are connected by the 8th hydraulic cylinder 215, and the 5th expansion link 216 and the 6th is stretched Contracting bar 217 is linked together, and the 6th expansion link 217 is arranged on the 4th hydraulic cylinder seat 218.
Described component of tying up is made up of the 7th expansion link 3, screw 4, screw hole 5, the 8th expansion link 6, and screw 4 is arranged on On screw hole 5, on the 7th expansion link 3 and the 8th expansion link 6, the 7th expansion link 3 and the 8th expansion link 6 pass through spiral shell to screw hole 5 Nail 4 is connected.
When the device works, first hydraulic cylinder 104 and second hydraulic cylinder 105 are adjusted first inclines base, Ran Houtong Crossing the 3rd hydraulic cylinder 202 of adjustment, the 6th hydraulic cylinder 208, the 7th hydraulic cylinder 214 and the 8th hydraulic cylinder 215 makes the volume of bundling component 2 Become big, then steel pipe be put into bundling component 2, steel pipe is aligned using steel pipe alignment plate 101, then the 3rd hydraulic cylinder 202, 6th hydraulic cylinder 208, the 7th hydraulic cylinder 214 and the 8th hydraulic cylinder 215 start to act by Steel tube packaging into hexagon, finally by Tying up component carries out tying up sizing.
For the ordinary skill in the art, teaching of the invention, do not depart from principle of the invention with In the case of spirit, the changes, modifications that are carried out to implementation method, replace and modification still fall within protection scope of the present invention it It is interior.

Claims (4)

1. the hexagon binding apparatus of a kind of steel pipe, by base assembly, bundling component, ties up component and constitutes, and its feature exists In:Described bundling component is arranged on base assembly, is tied up component and is arranged on the steel pipe tied up, and is tied up for last Bundling.
2. the hexagon binding apparatus of a kind of steel pipe according to claim 1, it is characterised in that:Described base assembly by Steel pipe alignment plate, guide rail, base, first hydraulic cylinder, second hydraulic cylinder composition, steel pipe alignment plate are arranged on base one end, guide rail On base, first hydraulic cylinder and second hydraulic cylinder are arranged on base.
3. the hexagon binding apparatus of a kind of steel pipe according to claim 1, it is characterised in that:Described bundling component by First hydraulic cylinder seat, the 3rd hydraulic cylinder, the first track base, the 4th hydraulic cylinder, the first expansion link, the 5th hydraulic cylinder, the second guide rail Seat, the 6th hydraulic cylinder, second hydraulic cylinder seat, the 3rd hydraulic cylinder seat, the second expansion link, the 3rd expansion link, the 4th expansion link, the 7th Hydraulic cylinder, the 8th hydraulic cylinder, the 5th expansion link, the 6th expansion link, the 4th hydraulic cylinder seat composition, the 3rd hydraulic cylinder are arranged on first On hydraulic cylinder seat, the first track base is fixedly connected with the 3rd hydraulic cylinder, and the 6th hydraulic cylinder is arranged on second hydraulic cylinder seat, and second Track base is fixedly connected with the 6th hydraulic cylinder, and the 3rd hydraulic cylinder seat is arranged on the second track base, and the 4th hydraulic cylinder seat is arranged on On first track base, the 4th hydraulic cylinder is arranged on the 4th hydraulic cylinder seat, and the 5th hydraulic cylinder is arranged on the 3rd hydraulic cylinder seat, the Four hydraulic cylinders and the 5th hydraulic cylinder are linked together by the first expansion link, and the second expansion link is connected with the 3rd hydraulic cylinder seat, the Four expansion links are connected with the second expansion link, and the 3rd expansion link and the 4th expansion link are linked together by the 7th hydraulic cylinder, and the 3rd Expansion link and the 5th expansion link are connected by the 8th hydraulic cylinder, and the 5th expansion link and the 6th expansion link link together, and the 6th stretches Contracting bar is arranged on the 4th hydraulic cylinder seat.
4. the hexagon binding apparatus of a kind of steel pipe according to claim 1, it is characterised in that:It is described tie up component by 7th expansion link, screw, screw hole, the 8th expansion link composition, screw are arranged on screw hole, screw hole in the 7th expansion link and On 8th expansion link, the 7th expansion link and the 8th expansion link are connected by screw.
CN201710125722.3A 2017-03-05 2017-03-05 A kind of hexagon binding apparatus of steel pipe Active CN106829026B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710125722.3A CN106829026B (en) 2017-03-05 2017-03-05 A kind of hexagon binding apparatus of steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710125722.3A CN106829026B (en) 2017-03-05 2017-03-05 A kind of hexagon binding apparatus of steel pipe

Publications (2)

Publication Number Publication Date
CN106829026A true CN106829026A (en) 2017-06-13
CN106829026B CN106829026B (en) 2018-10-26

Family

ID=59138550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710125722.3A Active CN106829026B (en) 2017-03-05 2017-03-05 A kind of hexagon binding apparatus of steel pipe

Country Status (1)

Country Link
CN (1) CN106829026B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706123A (en) * 2018-05-28 2018-10-26 中冶华天南京工程技术有限公司 Energy-saving shaped steel binding apparatus
CN109229518A (en) * 2018-11-20 2019-01-18 袁福英 A kind of working method of steel tube hexagon shape automatic bonding unit
CN116331630A (en) * 2023-05-26 2023-06-27 安徽盛衡智能装备有限公司 Goods transportation stacking device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0752916A (en) * 1991-04-18 1995-02-28 Gefima Srl Automatic binding device
CN202213739U (en) * 2011-07-18 2012-05-09 天津市飞龙制管有限公司 Hydraulic packager
CN202368811U (en) * 2011-12-16 2012-08-08 金长秋 Multifunctional hydraulic packaging machine
CN103407606A (en) * 2013-08-20 2013-11-27 天津市鑫智强钢管有限公司 Steel tube bundling device
CN104071384A (en) * 2014-06-30 2014-10-01 国海芝 Hexagonal strapping device for steel tubes
CN205440955U (en) * 2015-12-18 2016-08-10 邢立杰 Automatic packing apparatus of steel pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0752916A (en) * 1991-04-18 1995-02-28 Gefima Srl Automatic binding device
CN202213739U (en) * 2011-07-18 2012-05-09 天津市飞龙制管有限公司 Hydraulic packager
CN202368811U (en) * 2011-12-16 2012-08-08 金长秋 Multifunctional hydraulic packaging machine
CN103407606A (en) * 2013-08-20 2013-11-27 天津市鑫智强钢管有限公司 Steel tube bundling device
CN104071384A (en) * 2014-06-30 2014-10-01 国海芝 Hexagonal strapping device for steel tubes
CN205440955U (en) * 2015-12-18 2016-08-10 邢立杰 Automatic packing apparatus of steel pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706123A (en) * 2018-05-28 2018-10-26 中冶华天南京工程技术有限公司 Energy-saving shaped steel binding apparatus
CN109229518A (en) * 2018-11-20 2019-01-18 袁福英 A kind of working method of steel tube hexagon shape automatic bonding unit
CN116331630A (en) * 2023-05-26 2023-06-27 安徽盛衡智能装备有限公司 Goods transportation stacking device

Also Published As

Publication number Publication date
CN106829026B (en) 2018-10-26

Similar Documents

Publication Publication Date Title
CN106829026A (en) A kind of hexagon binding apparatus of steel pipe
CN206052563U (en) Arch bridge suspender tensioning equipment
CN107887857A (en) One kind is used for the locking support meanss of cable testing bridge
CN203047772U (en) Packaging frame for steel tube
CN106904306A (en) A kind of hexagon binding apparatus of steel pipe
CN202213739U (en) Hydraulic packager
CN204280024U (en) A kind of trustship device of tubing wrapping machine
CN201777781U (en) Flange suspension apparatus
CN206839474U (en) A kind of pipe flange weld positioning device
CN202944998U (en) Attached installation and maintenance platform of calibrated tower crane
CN206667707U (en) A kind of construction scaffold of installation easy to disassemble
CN207258107U (en) A kind of bagging device of tubing packing machine
CN107611831A (en) Application method for assisting respirator dismounting pallet
CN206385431U (en) Road roller mechanical elevating safety device
CN201416420Y (en) Safety belt fastening device for oil pumping unit
CN207112330U (en) Tramcar oiling machine
CN205877413U (en) Vertical pipe bearing structure
CN206418414U (en) Derrick type arch bridge suspender replacing device
CN204753642U (en) Municipal administration is with combination formula inspection shaft
CN201106289Y (en) Casual railing
CN206886520U (en) A kind of composite steel wire rope rigging
CN205714239U (en) A kind of pliers anchor cable folder
CN206474870U (en) The vertical entirely floating device of automobile press
CN211663837U (en) Oil field well workover multilayer bank of tubes ties up ware
CN205478141U (en) Hydraulic manual pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180911

Address after: 751400 room 33, building 1, long Chen Yuan, Lingwu City Garden, Yinchuan, the Ningxia Hui Autonomous Region

Applicant after: The big smooth mechanical Science and Technology Ltd. in Lingwu City

Address before: 252515 No. 2 Zhao Li Zhuang village, fan Zhai Township, Guanxian, Liaocheng, Shandong

Applicant before: Zhao Zining

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191108

Address after: No. 99, Changli Road, Wuzhong District, Suzhou, Jiangsu 215100

Patentee after: SUZHOU CITY WUZHONG TECHNOLOGY INNOVATION PARK MANAGEMENT CO.,LTD.

Address before: 751400 room 33, building 1, long Chen Yuan, Lingwu City Garden, Yinchuan, the Ningxia Hui Autonomous Region

Patentee before: The big smooth mechanical Science and Technology Ltd. in Lingwu City

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220420

Address after: 214072 floor 5, No. 583, Jianzhu West Road, Binhu District, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Jingwei Intellectual Property Operation Co.,Ltd.

Address before: 215100 99 Changli Road, Wuzhong District, Suzhou City, Jiangsu Province

Patentee before: SUZHOU CITY WUZHONG TECHNOLOGY INNOVATION PARK MANAGEMENT CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220829

Address after: A404, Carmore Automobile Plaza, Dongting Street, Xishan District, Wuxi City, Jiangsu Province, 214101

Patentee after: Wuxi Fulu Metal Products Co.,Ltd.

Address before: 214072 floor 5, No. 583, Jianzhu West Road, Binhu District, Wuxi City, Jiangsu Province

Patentee before: Jiangsu Jingwei Intellectual Property Operation Co.,Ltd.