CN106826686A - A kind of new type crank belt pulley bolt fixture and method - Google Patents
A kind of new type crank belt pulley bolt fixture and method Download PDFInfo
- Publication number
- CN106826686A CN106826686A CN201710209691.XA CN201710209691A CN106826686A CN 106826686 A CN106826686 A CN 106826686A CN 201710209691 A CN201710209691 A CN 201710209691A CN 106826686 A CN106826686 A CN 106826686A
- Authority
- CN
- China
- Prior art keywords
- belt pulley
- new type
- fixed
- type crank
- pulley bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B27/00—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
- B25B27/14—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B11/00—Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
- B25B11/02—Assembly jigs
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Devices For Conveying Motion By Means Of Endless Flexible Members (AREA)
- Shafts, Cranks, Connecting Bars, And Related Bearings (AREA)
Abstract
The invention belongs to engine art, and in particular to a kind of new type crank belt pulley bolt fixture and method.The fixing device includes supporting mechanism, drive module, locating module, the locating module includes the guide rod being sequentially connected, supports block, match block and alignment pin, and the bindiny mechanism, guide rod, support block, match block and alignment pin and bent axle are on the same axis;Methods described includes:A. be screwed into service bolt in the crankshaft flange end flywheel screwed hole of engine by operator;B. when station where engine reaches new type crank belt pulley bolt fixture, new type crank belt pulley bolt fixture is started;C. new type crank belt pulley bolt fixture is fixed to bent axle automatically;D. operator's fixed crankshaft belt pulley bolt;E. operator back-outs the service bolt in the flywheel screwed hole of crankshaft flange end.Fixing hole in the present invention in match block is engaged with alignment pin fixes bent axle, facilitates operating personnel's fixed crankshaft belt pulley bolt.
Description
Technical field
The invention belongs to engine art, more particularly to a kind of new type crank belt pulley bolt fixture.Present invention tool
Body is related to a kind of new type crank belt pulley bolt fixed mode.
Background technology
The crank pulley bolt tightening torque of automobile engine is about 150Nm ~ 250Nm, tightens bent during crank pulley
Axle can rotate, it is necessary to prevent crank rotation with auxiliary mould, and country's main flow car enterprise obtains mode using fast pulley at present
Prevent crank rotation.But belt pulley fixing tool is cast iron, weight is larger, it has not been convenient to operate;And different type of machines, different manufacturers
And change of product etc., cause belt pulley outward appearance different, different belt pulley fixing tools need to be designed;Reuse can cause belt
Wheel fixing tool is damaged, abrasion, need to constantly be changed, be safeguarded;Belt pulley fixing tool is easily beated, comes off again when tightening, and is made
Used time needs hand steered, the risk for have hand clamping, dropping;Bounce easily makes belt pulley because of unbalance stress when belt pulley fixing tool is tightened
And break, cause part quality defect;Because of the market demand, crank pulley need to be cancelled and remove repeated hole so that belt pulley fixing tool
It is invalid.
The content of the invention
For defect present in prior art or deficiency, the technical problems to be solved by the invention are:Solve in fixation
During crank pulley bolt, crank rotation is easily beated, come off the technical problem hurted sb.'s feelings using belt pulley fixing tool, there is provided one
Plant new type crank belt pulley bolt fixture and method.
To achieve these goals, the technical scheme that the present invention takes is fixed to provide a kind of new type crank belt pulley bolt
Device, including the locating module that supporting mechanism, the drive module that is fixed on supporting mechanism are connected with drive module, it is described fixed
Position module include be sequentially connected guide rod, support block, match block and for position alignment pin, the match block be provided with for
The fixing hole of fixed crankshaft, the fixing hole at least two, the bindiny mechanism, guide rod, support block, match block and alignment pin
With bent axle on the same axis.Fixing hole in match block is engaged with alignment pin, and bent axle is fixed, and facilitates operating personnel to fix
Crank pulley bolt.
As a further improvement on the present invention, the supporting mechanism is included for supporting the drive module and locating module
Support column, the base being fixed on support column, the parallel slide rail being fixed on base, the cunning that is fixed on below locating module
Platform, the slide unit mutually agree with the parallel slide rail;The bindiny mechanism includes fixed plate and shaft coupling, and the shaft coupling will lead
Bar and drive module are fixed in fixed plate, and the fixed plate is fixed on the base by fixture.
As a further improvement on the present invention, the match block is bolted on the support block by M8 counter sinks.
The bolt during using the new type crank belt pulley bolt fixture can be avoided to be contacted with the external world using M8 dormant bolts
Cause to release.
As a further improvement on the present invention, the fixing hole is long arc-shaped holes.Because of the internal diameter of the long arc-shaped holes song
The diameter of service bolt is big on axle, and fixing hole and service bolt can be accomplished completely docks success rate, increased bent axle and fixes
Efficiency.
As a further improvement on the present invention, the drive module is cylinder.
Present invention simultaneously provides a kind of crank pulley bolt fixed mode, including step:
A. be screwed into service bolt in the crankshaft flange end flywheel screwed hole of engine by operator;
B. when station where engine reaches new type crank belt pulley bolt fixture, new type crank belt pulley spiral shell is started
Bolt fixing device;
C. new type crank belt pulley bolt fixture is fixed to bent axle automatically;
D. operator's fixed crankshaft belt pulley bolt;
E. new type crank belt pulley bolt fixture reinstatement state, operator back-outs in the flywheel screwed hole of crankshaft flange end
On service bolt.
As a further improvement on the present invention, the step C is comprised the following steps:
C1. drive module promotes slide unit to be moved to engine direction along slide rail;
C2. alignment pin is stretched into the pilot hole of crankshaft flange end, and fixing hole is docked with service bolt;
C3. drive module stops promoting slide unit;
As a further improvement on the present invention, the service bolt is for 45# steel is processed and carries out the M8 bolts of Darkening process.
The beneficial effects of the invention are as follows:The present invention solves manual fixed crankshaft in the prior art, is fixed using belt pulley
Frock, belt pulley fixing tool is easily beated, come off the technical problem hurted sb.'s feelings.The present invention is fixed to bent axle automatically, it is to avoid
Belt pulley fixing tool is easily beated, come off the hidden danger hurted sb.'s feelings, and improves the fixed efficiency of crank pulley bolt.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is structural decomposition diagram of the present invention;
Fig. 3 is top view of the invention;
Fig. 4 is the top view of match block of the invention;
Fig. 5 is the sectional view in dormant bolt hole in match block of the invention;
Fig. 6 is that slightly mounting hole schematic diagram is positioned in match block of the invention;
Fig. 7 is locating pin structure schematic diagram of the invention;
Fig. 8 is service bolt schematic diagram of the invention;
Fig. 9 is the plan view at crankshaft flange end;
Wherein numeral is represented:00- alignment pins;01- match blocks;010- dormant bolts hole;011- fixing holes;012- alignment pins are pacified
Dress hole;02- supports block;03- guide rods;04- shaft couplings;05- fixed plates;10- cylinders;21- slide units;The parallel slide rails of 22-;23- bottoms
Seat;24- support columns;30- bent axles;300- flywheel screwed holes;301- crankshaft flanges end pilot hole.
Specific embodiment
The present invention is further described for explanation and specific embodiment below in conjunction with the accompanying drawings.
As shown in Figures 1 to 9, the new type crank belt pulley bolt fixture, including supporting mechanism, drive module
And locating module, the supporting mechanism include support column 24, base 23, parallel slide rail 22 and slide unit 21, the driving mould
Block includes cylinder 10, and the locating module includes alignment pin 00, match block 01, supports block 02, guide rod 03 and fixed plate 05, institute
State alignment pin 00 to be secured by bolts in match block 01, the match block 01 is fixed on the support by dormant bolt 010
On block 02, the support block 02 is secured by bolts on slide unit 21;One end of the guide rod 03 is fixed on support block 02, and
The other end is connected by shaft coupling 04 through the hole in fixed plate 05 with cylinder 10, and the fixed plate 05 is secured by bolts in
On the base 23, the alignment pin 00, match block 02, support block 03, guide rod 03, fixed plate 05 and cylinder 10 and bent axle method
Blue end pilot hole 301 is on the same axis.The support block 02 is individually fixed on slide unit 21 and base 23 with fixed plate 05, is risen
The effect of whole new type crank belt pulley bolt fixture is fixed to support.The slide unit 21 towards the one side of base 23 have with
Sliding wheel or coasting mechanism that the parallel slide rail 22 mutually agrees with so that cylinder 10 promotes slide unit 21 to move.The parallel cunning
Rail 22 is fixed on base 23, and base 23 is fixed on the support column 24 by fixed mechanism, four legs of support column 24
Or three legs, smoothly it is placed on ground, have for by the support column 24 on the part on the laminating of the support column 24 ground
It is fixed on ground or fixed part elsewhere.
As described in Fig. 4 to 6, there is some for match block 01 to be fixed on the support block 02 in the match block 01
, with the support block 02 be fixed together match block 01 using dormant bolt so that dormant bolt is complete by dormant bolt hole 010
It is contained in the dormant bolt hole 010, it is to avoid dormant bolt frequently contact dormant bolt abrasion, the slip for causing with the external world
The problems such as, and cause match block 01 and support to be loosened between block 02, influence new type crank belt pulley bolt fixture fixes bent
The effect of axle.Also include two or more fixing hole 011 in the match block 01, the fixing hole 011 is circular arc elongated hole or half
Month shape arcuate socket so that the fixing hole 011 can easily accommodate the technique spiral shell on flange end in flywheel screwed hole 300 very much
Bolt.
As shown in Figure 6 and Figure 7, the center of the match block 01 is provided with determining for the fixation alignment pin 00
Position pin mounting hole 012, the alignment pin 00 include the screwed location division that matches with the alignment pin mounting hole 012 and
Inside there is the location division of cavity.The alignment pin 00 is inserted in crankshaft flange end pilot hole 301, flywheel screwed hole on bent axle
Service bolt in 300 is inserted in the fixing hole 011 in the match block 01, the two mutual cooperation, and bent axle is firmly fixed
Firmly.The head of the service bolt is regular hexagon, facilitates operative employee that service bolt is screwed into flywheel spiral shell using air gun jacketed cylinder
In pit 300.It is strengthening process bolt strength, reduces the abrasion of service bolt, the service bolt is gone forward side by side using the processing of 45# steel
Row Darkening process.
The new type crank belt pulley bolt fixing means includes:
A. be screwed into service bolt in the crankshaft flange end flywheel screwed hole 300 of engine by operator;
B. when station where engine reaches new type crank belt pulley bolt fixture, new type crank belt pulley spiral shell is started
Bolt fixing device;
C. new type crank belt pulley bolt fixture is fixed to bent axle automatically;
D. operator's fixed crankshaft belt pulley bolt;
E. new type crank belt pulley bolt fixture reinstatement state, operator back-outs crankshaft flange end flywheel screwed hole 300
In on service bolt.
Be screwed into service bolt in the crankshaft flange end flywheel screwed hole 300 by upper operative employee, and engine enters described
Station where new type crank belt pulley bolt fixture, starts the new type crank belt pulley bolt fixture, cylinder 10
Drive leader 03 extends, while guide rod 03 promotes slide unit 21 to move forward, it is right that alignment pin 00 is carried out with alignment pin mounting hole 012
Connect, fixing hole 011 is docked with crankshaft flange end pilot hole, because in advance by crankshaft flange end flywheel screwed hole 300
Service bolt position adjustment be it is identical with the position of fixing hole 011 in match block 01, and fixing hole 011 be more than the work
Skill bolt head external diameter, so docking is easy to successfully, and crankshaft flange end pilot hole 301 also functions to a guiding alignment pin 00
Direction effect.Treat that bent axle is fixed successfully, the stop motion of cylinder 10, operative employee is fixed behaviour to crank pulley bolt
Make, after the completion of the operation of fixed crankshaft belt pulley bolt, the drive leader 03 of cylinder 10 is moved rearwards by, cancel the fixed behaviour to bent axle
Make, set back and put, engine shifts to next station, and the next operative employee backs out the service bolt on bent axle.
Above content is to combine specific preferred embodiment further description made for the present invention, it is impossible to assert
Specific implementation of the invention is confined to these explanations.For general technical staff of the technical field of the invention,
On the premise of not departing from present inventive concept, some simple deduction or replace can also be made, should be all considered as belonging to of the invention
Protection domain.
Claims (10)
1. a kind of new type crank belt pulley bolt fixture, it is characterised in that including supporting mechanism, be fixed on supporting mechanism
The locating module that is connected with drive module of drive module, the locating module include the guide rod being sequentially connected, support block,
Alignment pin with block and for positioning, the match block is provided with the fixing hole for fixed crankshaft, the bindiny mechanism, leads
Bar, support block, match block and alignment pin and bent axle are on the same axis.
2. new type crank belt pulley bolt fixture according to claim 1, it is characterised in that the fixing hole is at least
Two.
3. new type crank belt pulley bolt fixture according to claim 1, it is characterised in that the supporting mechanism includes
For support the drive module and locating module support column, be fixed on support column base, be fixed on base and
Row slide rail, the slide unit being fixed on below locating module, the slide unit mutually agree with the parallel slide rail.
4. new type crank belt pulley bolt fixture according to claim 3, it is characterised in that the drive module and fixed
Position module is connected by bindiny mechanism, and the bindiny mechanism includes fixed plate and shaft coupling, and the shaft coupling is by guide rod and driving
Module is fixed in fixed plate, and the fixed plate is fixed on the base.
5. new type crank belt pulley bolt fixture according to claim 1, it is characterised in that the match block is by heavy
Head bore is bolted on the support block.
6. new type crank belt pulley bolt fixture according to claim 1, it is characterised in that the fixing hole is arc
Elongated hole.
7. the new type crank belt pulley bolt fixture according to claim any one of 1-6, it is characterised in that the driving
Module is cylinder.
8. a kind of method based on new type crank belt pulley bolted fastening system described in claim any one of 1-7, its feature exists
In comprising the following steps:
Be screwed into service bolt in the crankshaft flange end flywheel screwed hole of engine by operator;
When station where engine reaches new type crank belt pulley bolt fixture, start new type crank belt pulley bolt and consolidate
Determine device;
New type crank belt pulley bolt fixture is fixed to bent axle automatically;
Operator's fixed crankshaft belt pulley bolt;
New type crank belt pulley bolt fixture reinstatement state, operator back-outs in the flywheel screwed hole of crankshaft flange end
Service bolt.
9. method according to claim 8, it is characterised in that the step C includes:
C1. drive module promotes slide unit to be moved to engine direction along slide rail;
C2. alignment pin is stretched into the pilot hole of crankshaft flange end, and fixing hole is docked with service bolt;
C3. drive module stops promoting slide unit.
10. method according to claim 9, it is characterised in that the service bolt is for 45# steel is processed and is carried out black
Change the M8 bolts for the treatment of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710209691.XA CN106826686B (en) | 2017-03-31 | 2017-03-31 | Novel crankshaft pulley bolt fixing device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710209691.XA CN106826686B (en) | 2017-03-31 | 2017-03-31 | Novel crankshaft pulley bolt fixing device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106826686A true CN106826686A (en) | 2017-06-13 |
CN106826686B CN106826686B (en) | 2023-03-31 |
Family
ID=59141776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710209691.XA Active CN106826686B (en) | 2017-03-31 | 2017-03-31 | Novel crankshaft pulley bolt fixing device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106826686B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201257604Y (en) * | 2008-09-12 | 2009-06-17 | 天润曲轴股份有限公司 | Gripper for drilling crank shaft flange hole |
CN102773711A (en) * | 2012-07-31 | 2012-11-14 | 重庆歇马机械曲轴有限公司 | Processing device and processing method for center hole of crankshaft rod portion and end face |
CN103240700A (en) * | 2013-05-10 | 2013-08-14 | 上汽通用五菱汽车股份有限公司 | Tightening and positioning tooling of crankshaft pulley of engine |
CN203471301U (en) * | 2013-09-12 | 2014-03-12 | 天津朗德数控技术有限公司 | Crankshaft pulley locking mechanism |
CN205237611U (en) * | 2015-12-22 | 2016-05-18 | 浙江金兰汽车零部件有限公司 | Bent axle drilling frock clamp |
CN206748345U (en) * | 2017-03-31 | 2017-12-15 | 上汽通用五菱汽车股份有限公司 | A kind of new type crank belt pulley bolt fixture |
-
2017
- 2017-03-31 CN CN201710209691.XA patent/CN106826686B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201257604Y (en) * | 2008-09-12 | 2009-06-17 | 天润曲轴股份有限公司 | Gripper for drilling crank shaft flange hole |
CN102773711A (en) * | 2012-07-31 | 2012-11-14 | 重庆歇马机械曲轴有限公司 | Processing device and processing method for center hole of crankshaft rod portion and end face |
CN103240700A (en) * | 2013-05-10 | 2013-08-14 | 上汽通用五菱汽车股份有限公司 | Tightening and positioning tooling of crankshaft pulley of engine |
CN203471301U (en) * | 2013-09-12 | 2014-03-12 | 天津朗德数控技术有限公司 | Crankshaft pulley locking mechanism |
CN205237611U (en) * | 2015-12-22 | 2016-05-18 | 浙江金兰汽车零部件有限公司 | Bent axle drilling frock clamp |
CN206748345U (en) * | 2017-03-31 | 2017-12-15 | 上汽通用五菱汽车股份有限公司 | A kind of new type crank belt pulley bolt fixture |
Also Published As
Publication number | Publication date |
---|---|
CN106826686B (en) | 2023-03-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208322607U (en) | A kind of turnable complete pneumatic assembling jig of heavy truck frame cross assembly | |
CN207788047U (en) | Movable roller press roll shaft REPAIR WELDING device | |
CN206348147U (en) | A kind of test-bed device of engine and power assembly | |
CN203764692U (en) | Improved vehicle wheel roundness correction device | |
CN110296830A (en) | A kind of running-in test device of track train stem gear case | |
CN208628822U (en) | A kind of multiple degrees of freedom device for screwing up | |
CN208528977U (en) | Tire taper point automatic matching device | |
CN206748345U (en) | A kind of new type crank belt pulley bolt fixture | |
CN106826686A (en) | A kind of new type crank belt pulley bolt fixture and method | |
US9272372B2 (en) | Welding spinners, and related methods and devices | |
CN201012442Y (en) | Digging machine left and right crawler frame universal soldering fixture | |
CN108214137A (en) | Can automatic loading/unloading the Special Automatic grinding machine of Crankshaft Machining and its processing method | |
CN209190111U (en) | A kind of elevator sprocket wheel welding pre-determined bit tooling | |
CN109702424B (en) | Rapid pipeline assembling tool and assembling method | |
CN208528426U (en) | A kind of vehicle bridge automatic soldering device | |
CN212311691U (en) | Novel casting gate grinding device | |
CN205342253U (en) | Automatic turnover welding machine that compresses tightly of saddle | |
CN113927236A (en) | Welding tool and welding method for main channel steel frame of suspension cage of construction elevator | |
CN210678108U (en) | Device for polishing burrs in steel pipe | |
CN209850253U (en) | Diaxon rotation and turnover welding position device | |
CN209230589U (en) | A kind of automotive hub flatness checking device | |
CN111716219B (en) | Casting gate grinding device | |
CN206393583U (en) | A kind of movable rotary platform for being exclusively used in automobile engine numerical control packer | |
CN207402428U (en) | A kind of continuous reaming chasing bar | |
CN215328255U (en) | Main engine mounting structure of left and right wheel body induction quenching equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |