CN106815136A - Unit test method and device - Google Patents

Unit test method and device Download PDF

Info

Publication number
CN106815136A
CN106815136A CN201510862173.9A CN201510862173A CN106815136A CN 106815136 A CN106815136 A CN 106815136A CN 201510862173 A CN201510862173 A CN 201510862173A CN 106815136 A CN106815136 A CN 106815136A
Authority
CN
China
Prior art keywords
sql server
mongodb
unit
data
presetting database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510862173.9A
Other languages
Chinese (zh)
Other versions
CN106815136B (en
Inventor
储雨知
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Gridsum Technology Co Ltd
Original Assignee
Beijing Gridsum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Gridsum Technology Co Ltd filed Critical Beijing Gridsum Technology Co Ltd
Priority to CN201510862173.9A priority Critical patent/CN106815136B/en
Publication of CN106815136A publication Critical patent/CN106815136A/en
Application granted granted Critical
Publication of CN106815136B publication Critical patent/CN106815136B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3684Test management for test design, e.g. generating new test cases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites

Abstract

This application discloses a kind of unit test method and device.The method includes:By starting mongodb program creation sql server SQL server examples;Start SQL server examples and load mongodb servers;Presetting database, and the execution unit test on mongodb servers are created in mongodb servers, wherein, presetting database is used to store the data in execution unit test process;And after execution unit test terminates, close SQL server examples.By the application, solve the problems, such as portable poor in unit test method in correlation technique.

Description

Unit test method and device
Technical field
The application is related to system testing field, in particular to a kind of unit test method and device.
Background technology
At present, mongodb is a set of popular non-relational database, after many systems can all be used it as End.After system development terminates, for the performance of checking system, then need to carry out unit testing to system.To being System is when carrying out unit testing, it is necessary to be not stored with the database in the presence of related database and ensureing in systems any Data, also there must be an a certain specific example for mongodb program creations to outside.Due in correlation technique When unit testing is carried out, a certain specific example is depended on, so as to cause the portable poor of unit testing.
For portable poor problem in unit test method in correlation technique, effective solution is not yet proposed at present Scheme.
The content of the invention
The main purpose of the application is to provide a kind of unit test method and device, is surveyed with unit in solving correlation technique Portable poor problem in method for testing.
To achieve these goals, according to the one side of the application, there is provided a kind of unit test method.The method Including:By starting mongodb program creation sql server SQL server examples;Start SQL Server examples load mongodb servers;Presetting database is created in mongodb servers, and in mongodb Execution unit test on server, wherein, presetting database is used to store the data in execution unit test process;With And after execution unit test terminates, close SQL server examples.
Further, by starting mongodb program creation sql server SQL server examples Afterwards, before SQL server examples loading mongodb servers are started, the method also includes:Acquisition preset into Cheng Hao, wherein, it is the process number that mongodb servers are loaded when SQL server examples run to preset process number, is opened Dynamic SQL server examples load mongodb servers to be included:When SQL server examples are run to default process number Load mongodb servers;Database path is obtained, wherein, database path is the path for storing presetting database, Presetting database is created in mongodb servers to be included:Presetting database is created in mongodb servers, and Presetting database is stored on database path.
Further, after establishment presetting database in mongodb servers, performed on mongodb servers Before unit testing, the method also includes:By call the first pre-set code delete presetting database in all data.
Further, execution unit test includes on mongodb servers:Obtain data to be tested;Will be to be tested Data are added to presetting database;The data to be tested stored in presetting database are read, target data is obtained;And Data to be tested and target data are compared, target data is verified.
Further, after execution unit test terminates, closing SQL server examples includes:By calling second Pre-set code closes SQL server examples.
To achieve these goals, according to the another aspect of the application, there is provided a kind of unit testing device.The device Including:First creating unit, for by starting mongodb program creation sql servers SQL Server examples;Load units, mongodb servers are loaded for starting SQL server examples;Second creates single Unit, for creating presetting database, and the execution unit test on mongodb servers in mongodb servers, Wherein, presetting database is used to store the data in execution unit test process;And closing unit, for performing After unit testing terminates, SQL server examples are closed.
Further, the device also includes:Acquiring unit, for obtaining default process number, wherein, preset process number The process number of mongodb servers is loaded when being run for SQL server examples, load units are additionally operable in SQL server Example is run to loading mongodb servers during default process number;Database path is obtained, wherein, database path To store the path of presetting database, the second creating unit is additionally operable to create presetting database in mongodb servers, And presetting database is stored on database path.
Further, the device also includes:Call unit, for call the first pre-set code delete presetting database in All data.
Further, the second creating unit includes:Acquisition module, for obtaining data to be tested;Add module, uses In by data to be tested be added to presetting database;Read module, for reading store in presetting database to be tested Data, obtain target data;And authentication module, for data to be tested and target data to be compared, checking Target data.
Further, closing unit is additionally operable to close SQL server examples by calling the second pre-set code.
By the application, using following steps:Start mongodb program creation SQL server examples;Start SQL Server examples load mongodb servers;Presetting database is created in mongodb servers, and in mongodb Execution unit test on server, wherein, presetting database is used to store the data in execution unit test process;With And after execution unit test terminates, SQL server examples are closed, solve unit test method in correlation technique The poor problem of middle portability, by calling mongod program creation SQL server examples, in unit testing knot SQL server examples are closed during beam so that there is an interim SQL server in the life cycle of unit testing Example, it is to avoid depend on a certain specific example, so as to reach the portable effect of lift unit test.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing further understanding of the present application, the schematic reality of the application Apply example and its illustrate for explaining the application, do not constitute the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the flow chart of the unit test method according to the embodiment of the present application;And
Fig. 2 is the schematic diagram of the unit testing device according to the embodiment of the present application.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the application in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order that those skilled in the art more fully understand application scheme, below in conjunction with the embodiment of the present application Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present application, it is clear that described embodiment The only embodiment of the application part, rather than whole embodiments.Based on the embodiment in the application, ability The every other embodiment that domain those of ordinary skill is obtained under the premise of creative work is not made, should all belong to The scope of the application protection.
It should be noted that term " first ", " in the description and claims of this application and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that this The data that sample is used can be exchanged in the appropriate case, so as to embodiments herein described herein.Additionally, term " comprising " and " having " and their any deformation, it is intended that covering is non-exclusive to be included, for example, comprising The process of series of steps or unit, method, system, product or equipment are not necessarily limited to those steps clearly listed Rapid or unit, but may include not listing clearly or intrinsic for these processes, method, product or equipment Other steps or unit.
For the ease of description, below to the invention relates to part term illustrate:
Mongo DB are at present in a kind of popular non-relational database (NoSql) of IT industries, its flexible number The favor of current IT practitioner is enjoyed according to storage mode.Mongo DB realize the thought of object-oriented well, Each record is all a Document object in Mongo DB.Mongo DB maximum advantage is own Lasting data operation all write SQL statement manually without developer, directly invoking method just can easily realize CRUD is operated.
So-called " SQL Server examples ", may be also referred to simply as " Server examples ", actually sql server Engine, it is not the shared system of other examples and user data that each SQL Server database engines example respectively has a set of Storehouse.On one computer, multiple SQL Server can be installed, each SQL Server is it can be understood that it is one to be Individual example.Example is divided into " default instance " and " name example " again, if installing first on one computer SQL Server, name is set if keeping giving tacit consent to, and this example is exactly default instance.On one computer at most Only one of which default instance, it is also possible to which, without default instance, default instance name is identical with computer name.
Unit testing (unit testing), refer to software in minimum Testable unit checked and verified.Perform Unit testing, exactly in order to prove this section of behavior of code and expect the consistent of performance.
According to embodiments herein, there is provided a kind of unit test method.
Fig. 1 is the flow chart of the unit test method according to the embodiment of the present application.As shown in figure 1, the method include with Lower step:
Step S101, by starting mongodb program creation sql server SQL server examples.
In unit testing initial phase, application programming interface in caller (i.e. some pre-defined letters Number), start mongodb programs to create a SQL server example.
Step S102, starts SQL server examples and loads mongodb servers.
Start methods in caller start SQL server examples and load mongodb servers.Alternatively, exist In the unit test method that the embodiment of the present application is provided, by starting mongodb program creation SQLs After Servers-SQL server examples, before SQL server examples loading mongodb servers are started, the party Method also includes:Default process number is obtained, wherein, default process number is that SQL server examples load mongodb when running The process number of server, starting SQL server examples loading mongodb servers includes:In SQL server examples Run to loading mongodb servers during default process number;Database path is obtained, wherein, database path is to deposit Store up the path of presetting database.
For example, above-mentioned default process number is 10000, that is, represents and run to the 10000th in SQL server examples Mongodb servers are loaded during journey.Above-mentioned database path is the path that user preassigns storage presetting database, The ready work of presetting database is created for follow-up.
Step S103, creates presetting database, and performed on mongodb servers in mongodb servers Unit testing, wherein, presetting database is used to store the data in execution unit test process.
Presetting database is created in mongodb servers, and the database that preset data library storage is specified in user In path.Data in preset data library storage execution unit test process.
Alternatively, in the unit test method that the embodiment of the present application is provided, create default in mongodb servers After database, before execution unit test on mongodb servers, the method also includes:By calling first Pre-set code deletes all data in presetting database.
By by the data dump in presetting database, when execution unit is tested, for unit testing provides a sky Database, it is ensured that the correctness of data interaction during unit testing.
Alternatively, in the unit test method that the embodiment of the present application is provided, the execution unit on mongodb servers Test includes:Obtain data to be tested;Data to be tested are added to presetting database;Deposited in reading presetting database The data to be tested of storage, obtain target data;And be compared data to be tested and target data, verify target Data.
By inserting data in presetting database, the data in presetting database are read, entered in the data to reading The modes such as row checking carry out unit testing.It should be noted that additions and deletions can also be performed on mongodb servers changing The multi-mode operation such as looking into carries out unit testing with the performance of test system.
Step S104, after execution unit test terminates, closes SQL server examples.
Alternatively, in the unit test method that the embodiment of the present application is provided, after execution unit test terminates, close Closing SQL server examples includes:SQL server examples are closed by calling the second pre-set code.
SQL server examples are closed by calling the second pre-set code so that exist in the life cycle of unit testing One interim SQL server example, it is to avoid depend on a certain specific example, so as to reach lift unit survey The portable effect of examination.
The unit test method that the embodiment of the present application is provided, by starting mongodb program creation SQLs Servers-SQL server examples;Start SQL server examples and load mongodb servers;In mongodb clothes Presetting database, and the execution unit test on mongodb servers are created in business device, wherein, presetting database is used Data in execution unit test process is stored;And after execution unit test terminates, close SQL server Example, solve the problems, such as it is portable poor in unit test method in correlation technique, by calling mongod journeys Sequence creates SQL server examples, SQL server examples is closed at the end of unit testing so that in unit testing There is interim SQL server example in life cycle, it is to avoid depend on a certain specific example, so as to reach The portable effect of lift unit test is arrived.
It should be noted that can be in such as one group computer executable instructions the step of the flow of accompanying drawing is illustrated Performed in computer system, and, although logical order is shown in flow charts, but in some cases, can Shown or described step is performed with different from order herein.
The embodiment of the present application additionally provides a kind of unit testing device, it is necessary to explanation, the unit of the embodiment of the present application Test device can be used for perform the embodiment of the present application provided for unit test method.The application is implemented below The unit testing device that example is provided is introduced.
Fig. 2 is the schematic diagram of the unit testing device according to the embodiment of the present application.As shown in Fig. 2 the device includes: First creating unit 10, load units 20, the second creating unit 30 and closing unit 40.
First creating unit 10, for by starting mongodb program creation sql servers SQL Server examples.
Load units 20, mongodb servers are loaded for starting SQL server examples.
Second creating unit 30, for creating presetting database in mongodb servers, and in mongodb clothes Execution unit test on business device, wherein, presetting database is used to store the data in execution unit test process.
Closing unit 40, after terminating in execution unit test, closes SQL server examples.
The unit testing device that the embodiment of the present application is provided, starts mongodb programs and creates by the first creating unit 10 Build SQL server examples;Load units 20 start SQL server examples and load mongodb servers;Second wound Build unit 30 and presetting database is created in mongodb servers, and execution unit is surveyed on mongodb servers Examination, wherein, presetting database is used to store the data in execution unit test process;And closing unit 40 is being performed After unit testing terminates, SQL server examples are closed, solve in correlation technique portable in unit test method Property poor problem, mongod program creation SQL server examples are called by the first creating unit 10, close single Unit 40 closes SQL server examples at the end of unit testing so that have one in the life cycle of unit testing Interim SQL server examples, it is to avoid depend on a certain specific example, so as to reach lift unit test Portable effect.
Alternatively, in the unit testing device that the embodiment of the present application is provided, the device also includes:Acquiring unit, uses Process number is preset in obtaining, wherein, it is that SQL server examples load mongodb servers when running to preset process number Process number, load units be additionally operable to when SQL server examples are run to default process number load mongodb service Device;Database path is obtained, wherein, database path is the path for storing presetting database, and the second creating unit is also For creating presetting database in mongodb servers, and presetting database is stored on database path.
Alternatively, in the unit testing device that the embodiment of the present application is provided, the device also includes:Call unit, uses All data in calling the first pre-set code to delete presetting database.
Alternatively, in the unit testing device that the embodiment of the present application is provided, the second creating unit 30 includes:Obtain mould Block, for obtaining data to be tested;Add module, for data to be tested to be added into presetting database;Read mould Block, for reading the data to be tested stored in presetting database, obtains target data;And authentication module, it is used for Data to be tested and target data are compared, target data is verified.
Alternatively, in the unit testing device that the embodiment of the present application is provided, closing unit 40 is additionally operable to by calling the Two pre-set codes close SQL server examples.
The unit testing device includes processor and memory, above-mentioned first creating unit, load units, the second wound Build unit and closing unit etc. to be stored in memory as program unit, by computing device storage in memory Said procedure unit realize corresponding function.Above-mentioned default process number, presetting database, the first pre-set code, second Pre-set code may be stored in memory.
Kernel is included in processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can set one Or more, carry out unit testing by adjusting kernel parameter.
Memory potentially includes the volatile memory in computer-readable medium, random access memory (RAM) and/ Or the form, such as read-only storage (ROM) or flash memory (flash RAM) such as Nonvolatile memory, memory includes at least one Individual storage chip.
Present invention also provides a kind of embodiment of computer program product, when being performed on data processing equipment, fit In the program code for performing initialization there are as below methods step:By starting mongodb program creation structuralized query languages Speech Servers-SQL server examples;Start SQL server examples and load mongodb servers;In mongodb Presetting database, and the execution unit test on mongodb servers are created in server, wherein, presetting database For storing the data in execution unit test process;And after execution unit test terminates, close SQL server Example.
It should be noted that for foregoing each method embodiment, in order to be briefly described, therefore it is all expressed as one it is The combination of actions of row, but those skilled in the art should know, and the application is not limited by described sequence of movement System, because according to the application, some steps can sequentially or simultaneously be carried out using other.Secondly, art technology Personnel should also know that embodiment described in this description belongs to preferred embodiment, involved action and module Not necessarily necessary to the application.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, and does not have the portion described in detail in certain embodiment Point, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed device, can be by other sides Formula is realized.For example, device embodiment described above is only schematical, such as the division of described unit, only Only a kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can To combine or be desirably integrated into another system, or some features can be ignored, or not perform.
The unit that is illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part for showing can be or may not be physical location, you can with positioned at a place, or can also be distributed to On multiple NEs.Some or all of unit therein can be according to the actual needs selected to realize the present embodiment The purpose of scheme.
In addition, during each functional unit in the application each embodiment can be integrated in a processing unit, it is also possible to It is that unit is individually physically present, it is also possible to which two or more units are integrated in a unit.It is above-mentioned integrated Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
Obviously, those skilled in the art should be understood that each module or each step of above-mentioned the application can be with general Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing device institutes On the network of composition, alternatively, they can be realized with the executable program code of computing device, it is thus possible to It is stored in being performed by computing device in storage device, or they is fabricated to each integrated circuit die respectively Block, or the multiple modules or step in them are fabricated to single integrated circuit module to realize.So, the application Any specific hardware and software is not restricted to combine.
The preferred embodiment of the application is the foregoing is only, the application is not limited to, for those skilled in the art For member, the application can have various modifications and variations.It is all within spirit herein and principle, made it is any Modification, equivalent, improvement etc., should be included within the protection domain of the application.

Claims (10)

1. a kind of unit test method, it is characterised in that including:
By starting mongodb program creation sql server SQL server examples;
Start the SQL server examples and load mongodb servers;
Presetting database is created in the mongodb servers, and is performed on the mongodb servers Unit testing, wherein, the presetting database is used to store the data in execution unit test process;And
After performing the unit testing and terminating, the SQL server examples are closed.
2. method according to claim 1, it is characterised in that
After by starting mongodb program creation sql server SQL server examples, Before the SQL server examples loading mongodb servers are started, methods described also includes:Obtain pre- If process number, wherein, the default process number is that the SQL server examples load the mongodb when running The process number of server,
Starting the SQL server examples loading mongodb servers includes:In the SQL server examples The mongodb servers are loaded when operation is to the default process number;Database path is obtained, wherein, institute It is the path for storing the presetting database to state database path,
Presetting database is created in the mongodb servers to be included:Created in the mongodb servers The presetting database is built, and the presetting database is stored on the database path.
3. method according to claim 1 and 2, it is characterised in that
After establishment presetting database in the mongodb servers, held on the mongodb servers Before row unit testing, methods described also includes:The presetting database is deleted by calling the first pre-set code In all data.
4. method according to claim 1, it is characterised in that execution unit is surveyed on the mongodb servers Examination includes:
Obtain data to be tested;
The data to be tested are added to the presetting database;
The data to be tested stored in the presetting database are read, target data is obtained;And
The data to be tested and the target data are compared, the target data is verified.
5. method according to claim 1, it is characterised in that after performing the unit testing and terminating, close The SQL server examples include:The SQL server examples are closed by calling the second pre-set code.
6. a kind of unit testing device, it is characterised in that including:
First creating unit, for being serviced by starting mongodb program creations sql server Device SQL server examples;
Load units, mongodb servers are loaded for starting the SQL server examples;
Second creating unit, for creating presetting database in the mongodb servers, and described Execution unit test on mongodb servers, wherein, the presetting database is used to store execution unit test During data;And
Closing unit, for after performing the unit testing and terminating, closing the SQL server examples.
7. device according to claim 6, it is characterised in that
Described device also includes:Acquiring unit, for obtaining default process number, wherein, the default process number The process number of the mongodb servers is loaded when being run for the SQL server examples,
The load units are additionally operable to load institute when the SQL server examples are run to the default process number State mongodb servers;Database path is obtained, wherein, the database path is the storage present count According to the path in storehouse,
Second creating unit is additionally operable to create the presetting database in the mongodb servers, and in institute State and stored on database path the presetting database.
8. the device according to claim 6 or 7, it is characterised in that described device also includes:Call unit, uses All data in calling the first pre-set code to delete the presetting database.
9. device according to claim 6, it is characterised in that second creating unit includes:
Acquisition module, for obtaining data to be tested;
Add module, for the data to be tested to be added into the presetting database;
Read module, for reading the data to be tested stored in the presetting database, obtains target data; And
Authentication module, for the data to be tested and the target data to be compared, verifies the target Data.
10. device according to claim 6, it is characterised in that closing unit is additionally operable to by calling for the second default generation Code closes the SQL server examples.
CN201510862173.9A 2015-11-30 2015-11-30 Unit testing method and device Active CN106815136B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510862173.9A CN106815136B (en) 2015-11-30 2015-11-30 Unit testing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510862173.9A CN106815136B (en) 2015-11-30 2015-11-30 Unit testing method and device

Publications (2)

Publication Number Publication Date
CN106815136A true CN106815136A (en) 2017-06-09
CN106815136B CN106815136B (en) 2020-03-03

Family

ID=59108079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510862173.9A Active CN106815136B (en) 2015-11-30 2015-11-30 Unit testing method and device

Country Status (1)

Country Link
CN (1) CN106815136B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108845921A (en) * 2018-05-30 2018-11-20 郑州云海信息技术有限公司 A kind of method, apparatus, readable storage medium storing program for executing and the computer equipment of test database performance

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102426589A (en) * 2011-10-31 2012-04-25 合一网络技术(北京)有限公司 Interlayer system used for searching database information and information searching method
US20140222522A1 (en) * 2013-02-07 2014-08-07 Ibms, Llc Intelligent management and compliance verification in distributed work flow environments
CN104156369A (en) * 2013-05-14 2014-11-19 上海盛大网络发展有限公司 Database mirror making method and database
CN104407973A (en) * 2014-11-25 2015-03-11 珠海格力电器股份有限公司 Automatic unit test realizing method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102426589A (en) * 2011-10-31 2012-04-25 合一网络技术(北京)有限公司 Interlayer system used for searching database information and information searching method
US20140222522A1 (en) * 2013-02-07 2014-08-07 Ibms, Llc Intelligent management and compliance verification in distributed work flow environments
CN104156369A (en) * 2013-05-14 2014-11-19 上海盛大网络发展有限公司 Database mirror making method and database
CN104407973A (en) * 2014-11-25 2015-03-11 珠海格力电器股份有限公司 Automatic unit test realizing method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡小春 等: ""基于NoSQL的大数据应用设计与性能保障方案研究"", 《广西大学学报:自然科学版》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108845921A (en) * 2018-05-30 2018-11-20 郑州云海信息技术有限公司 A kind of method, apparatus, readable storage medium storing program for executing and the computer equipment of test database performance

Also Published As

Publication number Publication date
CN106815136B (en) 2020-03-03

Similar Documents

Publication Publication Date Title
CN109670951B (en) Block chain intelligent contract debugging and publishing method and system
AU2018310287A1 (en) Smart contract processing method and apparatus
CN106326120B (en) Regression testing method and device for application software and electronic equipment
CN103649907A (en) Registration and execution of highly concurrent processing tasks
CN110888797A (en) Test data generation method and device, computer equipment and storage medium
CN104573497B (en) A kind for the treatment of method and apparatus of startup item
CN114531477B (en) Method and device for configuring functional components, computer equipment and storage medium
CN111124872A (en) Branch detection method and device based on difference code analysis and storage medium
CN107766230A (en) A kind of method and apparatus tested based on configuration file
CN111338955B (en) Software graphical interface testing method and device, software development system and server
CN105095072B (en) Application testing method and device and terminal
CN107203373B (en) Interface control acquiring method, interface control testing method, interface control acquiring device and interface control testing device
CN112561690A (en) Method, system, equipment and storage medium for testing credit card staging service interface
CN106815136A (en) Unit test method and device
CN115757172A (en) Test execution method and device, storage medium and computer equipment
CN114610516B (en) Application program repairing method and device, computer equipment and storage medium
CN110059002A (en) Generation method, test equipment, storage medium and the device of test data
CN110471828A (en) A kind of operating system testing method, apparatus and its equipment
CN108874556A (en) A kind of data interactive method, device, storage medium and mobile terminal
CN107229650B (en) Test method and device
CN114691496A (en) Unit testing method, unit testing device, computing equipment and medium
CN108845953B (en) Interface testing method and device
CN110457205A (en) Interface test method, device, computer equipment and storage medium
CN110297625B (en) Application processing method and device
CN109308256A (en) A kind of java dynamically analyzing of program method, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100083 No. 401, 4th Floor, Haitai Building, 229 North Fourth Ring Road, Haidian District, Beijing

Applicant after: Beijing Guoshuang Technology Co.,Ltd.

Address before: 100086 Cuigong Hotel, 76 Zhichun Road, Shuangyushu District, Haidian District, Beijing

Applicant before: Beijing Guoshuang Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant