CN106813893A - The short cycle high pressure fluctuations pilot system of metal Roof - Google Patents

The short cycle high pressure fluctuations pilot system of metal Roof Download PDF

Info

Publication number
CN106813893A
CN106813893A CN201710150983.0A CN201710150983A CN106813893A CN 106813893 A CN106813893 A CN 106813893A CN 201710150983 A CN201710150983 A CN 201710150983A CN 106813893 A CN106813893 A CN 106813893A
Authority
CN
China
Prior art keywords
pressure
high pressure
metal roof
blast
short cycle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710150983.0A
Other languages
Chinese (zh)
Other versions
CN106813893B (en
Inventor
彭耀光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Huiyong Construction Technology Co., Ltd
Original Assignee
Baianli Steel Structure Application Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baianli Steel Structure Application Science & Technology Co Ltd filed Critical Baianli Steel Structure Application Science & Technology Co Ltd
Priority to CN201710150983.0A priority Critical patent/CN106813893B/en
Publication of CN106813893A publication Critical patent/CN106813893A/en
Application granted granted Critical
Publication of CN106813893B publication Critical patent/CN106813893B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/06Measuring arrangements specially adapted for aerodynamic testing

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses a kind of short cycle high pressure fluctuations pilot system of metal Roof.The present invention includes lower box (1),Upper box (2),Style high-pressure storage chamber (3),High pressure positive blower (4),Blast controls assembly (40),Master control end (9),Metal Roof detection test specimen is positioned in lower box (1),Upper box (2) is adapted with lower box (1) and is connected,So that metal Roof detection test specimen surrounds closed specimen test chamber (20) with upper box (2),High pressure positive blower (4) is connected with the air inlet of blast control assembly (40),The air outlet of blast control assembly (40) is divided into two-way,The first blast pipeline (5) is connected all the way and is passed through specimen test chamber (20),Produce the operating pressure of test requirements document,Another road connects the second blast pipeline (6) and is passed through style high-pressure storage chamber (3),Form the high pressure of stabilization,Style high-pressure storage chamber (3) can as needed under the control of master control end (9),To rapid high pressure of releasing in specimen test chamber (20),Meet the short cycle high pressure fluctuations requirement of experiment.The composite can be widely applied to metal Roof detection field.

Description

The short cycle high pressure fluctuations pilot system of metal Roof
Technical field
The present invention relates to a kind of short cycle high pressure fluctuations pilot system of metal Roof.
Background technology
With the development of science and technology, various modern buildings are presented in face of people.There is many again at present Novel building uses the Roof system of metal structure, especially the building of steel construction, and its Roof system naturally also uses metal The Roof system of structure.Composite metal Roof system is in all kinds of buildings using more and more extensive.
The wind loading rating of the building of metal structure especially metal Roof, directly influence building safety in itself and Life-span, concerning life and production.At present, the means for being detected to metal Roof system are limited, are especially difficult to simulate the short cycle By the situation of high pressure fluctuations.
The content of the invention
The technical problems to be solved by the invention are to overcome the deficiencies in the prior art, there is provided a kind of metal Roof short cycle is high Pressure fluctuation check system.
The technical solution adopted in the present invention is:The present invention include lower box, upper box, style high-pressure storage chamber, high pressure positive blower, Blast control assembly, master control end, metal Roof detection test specimen are positioned in the lower box, the upper box and the nowel Body phase adaptation connection, so that metal Roof detection test specimen surrounds closed specimen test chamber with the upper box, it is described High pressure positive blower is connected with the air inlet of blast control assembly, and the air outlet of the blast control assembly is divided into two-way, one Road connects the first blast pipeline and is simultaneously passed through the specimen test chamber, produces the operating pressure of test requirements document, another road connection the Two blast pipelines are simultaneously passed through the style high-pressure storage chamber, form the high pressure of stabilization, and the style high-pressure storage chamber can as needed described Under the control at master control end, to rapid high pressure of releasing in the specimen test chamber, the short cycle high pressure fluctuations for meeting experiment will Ask.
The first blast pipeline is provided with several branch pipes in parallel, be equipped with each branch pipe reducing oviduct and Switch valve.
Under the control at the master control end, when the switch valve is opened, air-flow flows when the reducing oviduct is flowed through Amount reduces, and pressure increases, so as to finely tune operating pressure in the specimen test chamber;By on several described branch pipes in parallel The switch valve open and-shut mode combination, realize to the precise control of operating pressure.
The blast controls assembly under the control at the master control end, and the examination is passed through by the first blast pipeline The operating pressure of part test chamber is periodic wave dynamic pressure.
The style high-pressure storage chamber is provided with several Drainage valves and is passed through in the upper box, when carrying out detection experiment, pressure Cycle, under the control at the master control end, the Drainage valve was opened, and makes what is stored in the storage of higher pressures room in high pressure Pressure releasing is in the specimen test chamber.
At the end of high pressure cycle, the Drainage valve is closed, by the second blast pipeline to the style high-pressure storage chamber Interior supplement high pressure, waits next high pressure cycle;Meanwhile, the specimen test chamber is discharged rapidly by exhaust-valve goalkeeper's pressure To the external world.
The four-stage in the pressure oscillation cycle in the specimen test chamber includes boosting, pressurize, pressure release and wait, four The time in individual stage is identical, is 0.5~2 second.
The blast control assembly controls the pressure of the second blast pipeline and the style high-pressure storage chamber simultaneously.
The blast control assembly includes quick valve and flow divider.
The style high-pressure storage chamber is arranged in the upper box.
The beneficial effects of the invention are as follows:Because the present invention includes lower box, upper box, style high-pressure storage chamber, high pressure positive blower, wind Voltage-controlled assembly processed, master control end, metal Roof detection test specimen are positioned in the lower box, the upper box and the lower box Connection is adapted, so that metal Roof detection test specimen surrounds closed specimen test chamber, the height with the upper box Pressure fan is connected with the air inlet of blast control assembly, and the air outlet of the blast control assembly is divided into two-way, all the way Connect the first blast pipeline and be passed through the specimen test chamber, produce the operating pressure of test requirements document, another road connection second Blast pipeline is simultaneously passed through the style high-pressure storage chamber, forms the high pressure of stabilization, and the style high-pressure storage chamber can as needed described total Under the control of control end, to rapid high pressure of releasing in the specimen test chamber, the short cycle high pressure fluctuations requirement of experiment is met; Instant invention overcomes the deficiencies in the prior art, by traditional blower fan to increasing the storage of higher pressures between testing inspection casing Room, realizes the quick response of high pressure fluctuations, the high-voltage energy storage part fast reaction in loading, and then resynchronisation supplement differential pressure, full The test request of the short cycle inner high voltage rapid fluctuations of foot, to check the anti-burst fluctuation blast ability of metal Roof system;Therefore this Invention is a kind of short cycle high pressure fluctuations pilot system of brand-new metal Roof.
Brief description of the drawings
Fig. 1 is the attachment structure schematic diagram of the embodiment of the present invention;
Fig. 2 is the system control schematic diagram of the embodiment of the present invention;
Fig. 3 be the embodiment of the present invention upper box be connected with lower box after structural representation;
Fig. 4 is the perspective structure schematic diagram of the upper box with lower box of the embodiment of the present invention;
Fig. 5 is test pressure curve map period of waves of the embodiment of the present invention.
Specific embodiment
As shown in Fig. 1~Fig. 5, the short cycle high pressure fluctuations pilot system of metal Roof of the present embodiment include lower box 1, on Casing 2, style high-pressure storage chamber 3, high pressure positive blower 4, blast control assembly 40, master control end 9, metal Roof detection test specimen are positioned over institute State in lower box 1, the intracavity space 10 of specially described lower box 1 is mainly used in placing purlin of metal Roof backplanes support etc. Metal roofing board is placed by structure, the top the superiors, and the upper box 2 is adapted with the lower box 1 and is connected, so that the metal Roofing detection test specimen surrounds closed specimen test chamber 20 with the upper box 2, and rear box entirety chi is connected in the present embodiment Very little is 7.5 meters × 3.5 meters of large scale experimental box body, and the high pressure positive blower 4 controls the air inlet phase of assembly 40 with the blast Connection, the air outlet of the blast control assembly 40 is divided into two-way, and the first blast pipeline 5 is connected all the way and the test specimen examination is passed through Chamber 20 is tested, the operating pressure of test requirements document is produced, the blast controls assembly 40 under the control at the master control end 9, leads to Cross the first blast pipeline 5 and be passed through the operating pressure of the specimen test chamber 20 for periodic wave dynamic pressure, i.e., described the One blast pipeline 5 meets the cycle request of experiment as blast dynamic load, and another road connects the second blast pipeline 6 and is passed through described Style high-pressure storage chamber 3, forms the high pressure of stabilization, and blast control assembly 40 controls the second blast pipeline 6 and described simultaneously The pressure of style high-pressure storage chamber 3, the blast control assembly 40 includes quick valve and flow divider, and the style high-pressure storage chamber 3 can basis Need under the control at the master control end 9, to rapid high pressure of releasing in the specimen test chamber 20, meet the short week of experiment The requirement of phase high pressure fluctuations;The first blast pipeline 5 is provided with several branch pipes 50 in parallel, is equipped with each branch pipe 50 Reducing oviduct 7 and switch valve 8, the reducing oviduct 7 are that one end is big, the small approximate tubaeform throat structure in one end, in institute State under the control at master control end 9, when the switch valve 8 is opened, when the reducing oviduct 7 is flowed through, flow reduces air-flow, stream Speed increases, and pressure increases, so that the rapidly pressure in Control experiment casing, finely tunes work pressure in the specimen test chamber 20 Power, i.e., finely tune the air pressure of the adjustment main pipeline of the first blast pipeline 5 by the branch pipe 50, changes the flow face of compressed air pipe line Product, it is possible to continuously adjust pressure value in a small range, making pressure to rise can drop;The pressure limit of each described branch pipe 50 regulation It is fixed, is combined by the open and-shut mode of the switch valve 8 on several described branch pipes 50 in parallel, control participates in work The branch pipe 50 quantity, so as to reach the experiment pressure controlled purpose of casing, realize to the precise control of operating pressure;Institute State style high-pressure storage chamber 3 to be arranged in the upper box 2, the style high-pressure storage chamber 3 is provided with several Drainage valves and is passed through on described In casing 2, carry out detection experiment when, the high pressure positive blower 4 produces high constant high-pressure, pressure cycle in high pressure, Under the control at the master control end 9, the Drainage valve is opened, and makes the interior pressure releasing for storing of the style high-pressure storage chamber 3 to institute State in specimen test chamber 20, meet the high pressure requirement of experiment;At the end of high pressure cycle, the Drainage valve is closed, by institute The second blast pipeline 6 is stated to high pressure is supplemented in the style high-pressure storage chamber 3, next high pressure cycle is waited;Meanwhile, the test specimen examination Test chamber 20 and the external world is promptly released into by exhaust-valve goalkeeper's pressure;Pressure oscillation cycle in the specimen test chamber 20 Four-stage includes boosting, pressurize, pressure release and wait, and the time of four-stage is identical, is 0.5~2 second, and the present embodiment is 1 Second.
The present invention, to the style high-pressure storage chamber 3 is increased between testing inspection casing, realizes high pressure wave by traditional blower fan Dynamic quick response, the high-voltage energy storage part fast reaction in loading, then resynchronisation supplements differential pressure, and connects trumpet type tune Section valve pipe, is more precisely controlled reaction accuracy, and the test request and test pressure for meeting short cycle inner high voltage rapid fluctuations are accurate The requirement of fine setting, to check the anti-burst fluctuation blast ability of metal Roof system;Therefore the present invention is a kind of brand-new metal The short cycle high pressure fluctuations pilot system of roofing.
The composite can be widely applied to metal Roof detection field.

Claims (10)

1. the short cycle high pressure fluctuations pilot system of a kind of metal Roof, it is characterised in that:Including lower box (1), upper box (2), Style high-pressure storage chamber (3), high pressure positive blower (4), blast control assembly (40), master control end (9), and metal Roof detection test specimen is positioned over In the lower box (1), the upper box (2) is adapted with the lower box (1) and is connected, so that metal Roof detection examination Part surrounds closed specimen test chamber (20) with the upper box (2), and the high pressure positive blower (4) controls assembly with the blast (40) air inlet is connected, and the air outlet of blast control assembly (40) is divided into two-way, and the first blast pipeline is connected all the way (5) and it is passed through the specimen test chamber (20), produces the operating pressure of test requirements document, another road connects the second blast pipeline (6) and it is passed through the style high-pressure storage chamber (3), forms the high pressure of stabilization, the style high-pressure storage chamber (3) can as needed described total Under the control of control end (9), to rapid high pressure of releasing in the specimen test chamber (20), the short cycle high pressure wave of experiment is met It is dynamic to require.
2. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 1, it is characterised in that:First wind Pressure pipeline (5) is provided with several branch pipes in parallel (50), and reducing oviduct (7) and switch are equipped with each branch pipe (50) Valve (8).
3. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 2, it is characterised in that:In the master control Under the control of end (9) processed, when the switch valve (8) is opened, when reducing oviduct (7) are flowed through, flow reduces air-flow, pressure Power increases, so as to finely tune the interior operating pressure of the specimen test chamber (20);By on several described branch pipes (50) in parallel The switch valve (8) open and-shut mode combination, realize to the precise control of operating pressure.
4. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 1, it is characterised in that:The blast control Assembly (40) processed is passed through the specimen test chamber under the control of the master control end (9) by the first blast pipeline (5) The operating pressure of room (20) is periodic wave dynamic pressure.
5. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 1 or 4, it is characterised in that:The height Pressure storage room (3) is provided with several Drainage valves and is passed through in the upper box (2), and when carrying out detection experiment, pressure cycle is in height During pressure, under the control of the master control end (9), the Drainage valve is opened, and makes the pressure of storage in the style high-pressure storage chamber (3) Power is released in the specimen test chamber (20).
6. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 5, it is characterised in that:High pressure cycle knot Shu Shi, the Drainage valve is closed, and high pressure is supplemented to the style high-pressure storage chamber (3) is interior by the second blast pipeline (6), etc. Treat next high pressure cycle;Meanwhile, the specimen test chamber (20) is promptly released into the external world by exhaust-valve goalkeeper's pressure.
7. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 6, it is characterised in that:The test specimen examination The four-stage in the pressure oscillation cycle tested in chamber (20) includes boosting, pressurize, pressure release and wait, the time phase of four-stage Together, it is 0.5~2 second.
8. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 1, it is characterised in that:The blast control Assembly (40) processed is while control the pressure of the second blast pipeline (6) and the style high-pressure storage chamber (3).
9. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 1 or 8, it is characterised in that:The wind Voltage-controlled assembly processed (40) includes quick valve and flow divider.
10. the short cycle high pressure fluctuations pilot system of metal Roof according to claim 1, it is characterised in that:The high pressure Storage room (3) is arranged in the upper box (2).
CN201710150983.0A 2017-03-14 2017-03-14 Metal Roof short cycle high pressure fluctuations pilot system Expired - Fee Related CN106813893B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710150983.0A CN106813893B (en) 2017-03-14 2017-03-14 Metal Roof short cycle high pressure fluctuations pilot system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710150983.0A CN106813893B (en) 2017-03-14 2017-03-14 Metal Roof short cycle high pressure fluctuations pilot system

Publications (2)

Publication Number Publication Date
CN106813893A true CN106813893A (en) 2017-06-09
CN106813893B CN106813893B (en) 2018-12-28

Family

ID=59114931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710150983.0A Expired - Fee Related CN106813893B (en) 2017-03-14 2017-03-14 Metal Roof short cycle high pressure fluctuations pilot system

Country Status (1)

Country Link
CN (1) CN106813893B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109932159A (en) * 2019-04-09 2019-06-25 上海北分科技股份有限公司 A kind of dust wind tunnel system and its control method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0470534A (en) * 1990-07-12 1992-03-05 Mitsubishi Heavy Ind Ltd Aircraft-testing wind tunnel
JPH063218A (en) * 1992-06-22 1994-01-11 Mitsubishi Heavy Ind Ltd Suction type impact wind tunnel
CN2890882Y (en) * 2005-11-25 2007-04-18 上海市建筑科学研究院有限公司 Industrial personal computer detection network system for building curtain wall detector
CN102183380A (en) * 2011-03-16 2011-09-14 百安力钢结构应用科技有限公司 System for testing comprehensive performance of metal roof
CN104142253A (en) * 2014-07-07 2014-11-12 百安力钢结构应用科技有限公司 Movable metal roof detection equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0470534A (en) * 1990-07-12 1992-03-05 Mitsubishi Heavy Ind Ltd Aircraft-testing wind tunnel
JPH063218A (en) * 1992-06-22 1994-01-11 Mitsubishi Heavy Ind Ltd Suction type impact wind tunnel
CN2890882Y (en) * 2005-11-25 2007-04-18 上海市建筑科学研究院有限公司 Industrial personal computer detection network system for building curtain wall detector
CN102183380A (en) * 2011-03-16 2011-09-14 百安力钢结构应用科技有限公司 System for testing comprehensive performance of metal roof
CN104142253A (en) * 2014-07-07 2014-11-12 百安力钢结构应用科技有限公司 Movable metal roof detection equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109932159A (en) * 2019-04-09 2019-06-25 上海北分科技股份有限公司 A kind of dust wind tunnel system and its control method

Also Published As

Publication number Publication date
CN106813893B (en) 2018-12-28

Similar Documents

Publication Publication Date Title
CN108388281A (en) The closed loop reflux of injection driving temporarily rushes formula supersonic wind tunnel flow field control method
CN108693897A (en) The closed loop reflux of injection driving temporarily rushes formula Asia transonic wind tunnel flow field control method
EP2009369A1 (en) A heat pump air condition system, and the steam jet system and the control method thereof
CN102384834B (en) Detonation-driving shock tunnel explosive discharge device
WO2023045023A1 (en) Low-temperature, low-pressure performance test device and method for hydrogen fuel cell system of unmanned aerial vehicle
CN110057533A (en) Jet pressures volume control device and control method in a kind of wind tunnel test
EP1659294A3 (en) Compressor control unit and gas turbine power plant including this unit
CN208653742U (en) It is a kind of sealing and the testing integrated machine of pulse
CN103487269A (en) Capacity-variable water cooling unit test system
US8776528B2 (en) Method for operating a gas turbine plant with a compressor station for gaseous fuel
CN102954051A (en) Accumulator system capable of automatically regulating inflation pressure
CN107328659A (en) It is a kind of metal, rod-shaped to use gas type stretching-machine
CN106813893A (en) The short cycle high pressure fluctuations pilot system of metal Roof
WO2012048524A1 (en) Liquid nitrogen pump equipment load testing and experimenting apparatus and testing and experimenting method thereof
HK1116852A1 (en) A system and a method for capacity control in a screw compressor
CN104049212A (en) Low-pressure work performance test system for hydrogen-air fuel cell
CN102287362B (en) System for testing performance and energy efficiency of air compressor by simulating all-weather working conditions
CN207761921U (en) A kind of load simulating device for testing air conditioner compressor
CN201532300U (en) Airplane passenger oxygen regulator testing device
CN105739556A (en) Fluctuation pressurized control system and method for building curtain wall detection
CN206863597U (en) A kind of laboratory can quantify the dissolved gas supersaturation water body generating means of control
CN110409565A (en) Water storage pressurized tank automatic air entraining system and its implementation
CN214916177U (en) Humidifying device of low-pressure damp-heat test box
CN209707060U (en) Jet pressures volume control device in a kind of wind tunnel test
CN210668551U (en) Fuel cell temperature control test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200907

Address after: No.7 Zhuoyue Road, Sanzao Town, Jinwan District, Zhuhai City, Guangdong Province

Patentee after: Zhuhai Huiyong Construction Technology Co., Ltd

Address before: Room 1516, 15 / F, Tuen Mun Central Plaza, 22 Hoi Wing Road, Tuen Mun, New Territories

Patentee before: Baianli Steel Structure Application Science & Technology Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228

Termination date: 20210314

CF01 Termination of patent right due to non-payment of annual fee