CN106812225A - 一种自复位耗能支撑 - Google Patents
一种自复位耗能支撑 Download PDFInfo
- Publication number
- CN106812225A CN106812225A CN201710026499.7A CN201710026499A CN106812225A CN 106812225 A CN106812225 A CN 106812225A CN 201710026499 A CN201710026499 A CN 201710026499A CN 106812225 A CN106812225 A CN 106812225A
- Authority
- CN
- China
- Prior art keywords
- confinement tube
- self
- interior
- shearing resistance
- otic placode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Abstract
一种自复位耗能支撑,包括内约束管、外约束管、宽耳板、抗剪铆钉、铅沙、外约束管耳板、隔板、固定端板、索、夹具和锚板。在工厂先将所述宽耳板、抗剪铆钉与内约束管焊接拼装,将所述外约束管耳板、隔板与外约束管焊接拼装,再将内约束管设置在外约束管内,将外约束管再焊接连接,然后将所述自复位体系的索插入内约束管中,再穿过固定端板的开孔,通过施加预应力将固定端板紧紧压在外约束管两端,张紧索并用夹具锚固在锚板上,最后将铅沙通过灌注孔注入形成铅心,即完成拼装。本发明的焊接拼装过程均在工厂完成,抗剪铆钉与铅沙摩擦作用耗能效果显著、自复位能力强和工业化生产效率高等优点。
Description
技术领域
本发明涉及一种自复位耗能支撑,属于钢结构应用技术领域。
背景技术
目前多高层钢结构中,框架—支撑结构体系是应用最广泛的结构体系之一。作为一种较为新型的建筑类型,框架—支撑结构具有优良的抗震性能,对我国做好抗震防震工作意义重大。当地震作用发生时,钢支撑可承担大部分水平剪力,减少整体结构的水平位移。
传统的普通中心支撑在水平地震作用下容易发生侧向屈曲,特别是在往复的水平地震作用下,当结构的受力进入弹塑性范围内,楼层的抗剪能力和侧向刚度急剧下降,易导致结构发生整体失稳破坏;在传统的偏心支撑结构体系中,由于耗能梁段塑性变形较大,在震后极难修复。传统的防屈曲支撑构件是应用于多高层结构中的抗侧力耗能减震装置,在中震或大震作用下,防屈曲支撑构件在拉压时均能实现全截面充分屈服,又不出现支撑构件的整体或局部屈曲破坏,使原来通过主体结构梁端塑性铰的耗能方式转变为只在防屈曲支撑部件上集中耗能,从而较好地保护了主体结构;然而在大震作用下,防屈曲支撑的残余变形较大,相应的整体结构残余变形也较大,震后修复难度大且成本高。
这些传统的支撑构件且不具备自我复位能力,因此震后修复难度大、成本高且修复正常使用的时间长。
发明内容
本发明提出了一种以铆钉和铅沙摩擦作用耗能且具有自复位、工业化生产效率高等优点的自复位耗能支撑。其目的是至少在一定程度上解决背景技术中的技术问题,体现出钢结构的优势。
本发明的技术方案如下:
一种自复位耗能支撑,包括铅沙、内约束管(1)、宽耳板(2)、抗剪铆钉(3)、外约束管耳板(4)、外约束管(5)、隔板(6)、固定端板(7)、索(8)、夹具(9)和锚板(10)。
所述宽耳板(2)焊接于内约束管(1)一端,所述抗剪铆钉(3)焊接于内约束管(1)中部位置,所述内约束管(1)设置在外约束管(5)内;所述外约束管(5)一端开有长槽孔,一端焊接有外约束管耳板(4),所述隔板(6)焊接于外约束管(5)内侧中部位置,所述固定端板(7)由施加预应力的自复位体系紧紧压在外约束管(5)两端;所述索(8)施加预应力张拉后由夹具(9)锚固在锚板(10)上。
所述宽耳板(2)一端与建筑物相连,在宽耳板(2)上施加拉力和压力时,内约束管可在外约束管滑动,内约束管与铅沙发生相对运动,铅沙阻止抗剪铆钉(3)和内约束管滑动,耗散能量;可通过改变抗剪铆钉(3)的数量和布置位置,调整与铅沙之间的摩擦作用力,抗剪铆钉(3)沿内约束管(1)长度方向可布置成单排或多排,抗剪铆钉(3)在同一截面的布置数量、抗剪铆钉(3)的具体尺寸取决于支撑耗能大小和内约束管(1)尺寸。
所述外约束管(5)由两相同外槽钢通过焊接拼装而成,外槽钢由三块钢板通过半熔透焊焊接而成,所开长槽孔宽度要比宽耳板(2)的厚度大1-2mm,以便宽耳板(2)在水平力作用下可滑动;外约束管耳板(4)一端与建筑物连接;隔板(6)所开孔洞直径应比外约束管(1)直径大1-2mm,以方便拼装;由于钢管(1)中部焊接有抗剪铆钉(3),此处尺寸应比外约束管(5)的内部高度小,具体差值应利于所述内约束管(1)滑移;外约束管(5)中部应预设灌注孔,灌注孔的尺寸大小和具体位置,取决于铅沙灌注量和抗剪铆钉位置;当所述内约束管(1)与外约束管(5)拼装完成之后,内约束管(1)、外约束管(5)和隔板(6)组成密闭的空间,通过在外约束管(5)预设的灌注孔,灌注铅沙,完成之后封闭开孔,形成铅心。
所述索(8)、夹具(9)和锚板(10)组成自复位体系,所述自复位体系用于对外界拉力或压力作用下移位的内约束管进行复位。所述索(8)可采用钢绞线索、钢丝索和钢丝绳索;所述夹具(9)应与所述索(8)对应,将索(8)锚固在锚板(10)的外部;所述锚板(10)开有索孔,索孔的大小宜比所述索(8)大1-2mm,位置应与所述索(8)相对应。
所述的钢索(8)通过施加预应力使外约束管(5)两侧的固定端板(7),紧紧压在外约束管(5)两侧,当地震等水平作用发生时,建筑物会对宽耳板(2)和外约束管耳板(4)施加压力或者拉力,内约束管(1)顶开外约束管(5)两侧固定端板(7)而发生滑移,同时固定端板(7)的滑移将一部分水平力传递给自复位体系的预应力索(8),此时预应力索(8)的张拉力大于内约束管(1)的抗剪铆钉(3)与铅沙之间的摩擦阻力;当地震等水平作用发生后,索力克服内约束管(1)的抗剪铆钉(3)与铅沙的摩擦阻力,内约束管(1)被压回到外约束管(5)内,实现再复位。
以上所述的该自复位耗能支撑的新形式应属于本发明保护的范围。
有益效果
本发明提出的一种自复位耗能支撑,可以根据建筑结构体系设计的需要,灵活调整本发明耗能参数和自复位参数,以满足不同建筑结构耗能需求。本发明目的在于克服现有技术下的缺陷,在地震等水平作用下,自复位耗能支撑承担大部分水平剪力,抗剪铆钉与铅沙之间的产生相对运动,铅沙阻止抗剪铆钉的运动,耗散能量,减少整体结构的水平位移;并在地震等水平作用发生后,索力克服抗剪铆钉与铅沙的摩擦阻力,内约束管管被压回到外约束管内,实现支撑再复位,进而减少整个结构的残余变形。本发明所有部件均在工厂加工拼装完成,制作简单,易于拼装,可显著减少施工工期。
附图说明
图1是本发明实例1的整体示意图
图2是本发明实例1的整体分解图
图3是本发明实例1的内约束部件示意图
图4是本发明实例1的外约束部件示意图
图5是本发明实例1的外约束部件分解图
图6是本发明实例1的自复位体系示意图
图7是本发明实例2的整体示意图
图8是本发明实例2的整体分解图
图9是本发明实例3的整体分解图
图中,1-内约束管;2-宽耳板;3-铆钉;4-外约束管耳板;5-外约束管;6-隔板;7-固定端板;8-索;9-夹具;10-锚板。
具体实施方式
下面结合附图对本发明进行详细说明,下面通过参考附图描述的实施例是实例型的,旨在用于解释本发明,而不能理解为对本发明的限制。
如附图1-附图6所示,本发明的焊接拼装过程均在工厂完成,在工厂先将所述宽耳板⑵、抗剪铆钉(3)与内约束管(1)焊接拼装,将所述外约束管耳板(4)、隔板(6)和外约束管(5)焊接拼装,再将内约束管(1)设置在外约束管(5)内,然后将所述自复位体系的索(8)插入内约束管中,再穿过固定端板(7)的开孔,通过施加预应力将固定端板(7)紧紧压在外约束管(5)两端,张紧索(8)并用夹具(9)锚固在锚板(10)上,最后将铅沙通过灌注孔注入形成铅心,即完成拼装。
结合附图1-附图6对所述装配式自复位耗能支撑的工作过程进行描述:在地震等水平作用发生时,建筑物通过宽耳板(2)和外约束管耳板(4)向支撑施加拉力或压力,内约束管(1)在外约束管(5)内部发生滑移,抗剪铆钉(3)与铅沙发生相对运动,铅沙发生剪切变形,阻止抗剪铆钉(3)运动,铅沙与抗剪铆钉(3)发生摩擦作用而耗散能量;同时内约束管(1)运动会顶开外约束管(5)两侧的固定端板(7),而固定端板(7)的运动会将一部分水平力传递给自复位体系的预应力索(8),使预应力索(8)继续张拉,此时预应力索(8)的张拉力大于内约束管(1)与铅沙、抗剪铆钉(3)与铅沙的摩擦阻力之和;当地震等水平作用发生后,预应力索(8)的索力会克服内约束管(1)与铅沙、抗剪铆钉(3)与铅沙的摩擦阻力,带动固定端板(7)回移,固定端板(7)又将内约束管(1)压回到外约束管(5)内,实现支撑再复位。
如附图7和附图8所示,本实例与实例1的不同之处在于:所述外约束管(5)是圆形钢,隔板(6)是圆钢板,固定端板(7)是圆形钢板。
如附图9所示,本实例与实例1的不同之处在于:所述抗剪铆钉(3)为弧形抗剪钢板。
Claims (3)
1.一种自复位耗能支撑,其特征在于:包括铅沙、内约束管(1)、宽耳板(2)、抗剪铆钉(3)、外约束管耳板(4)、外约束管(5)、隔板(6)、固定端板(7)、索(8)、夹具(9)和锚板(10)。
所述宽耳板(2)焊接于内约束管⑴一端,所述抗剪铆钉(3)焊接于内约束管(1)中部位置,所述内约束管(1)设置在外约束管(5)内;所述外约束管(5)一端开有长槽孔,另一端焊接有外约束管耳板(4),所述隔板(6)焊接于外约束管(5)内侧中部位置,所述固定端板(7)由施加预应力的自复位体系紧紧压在外约束管(5)两端;所述索(8)施加预应力张拉后由夹具(9)锚固在锚板(10)上。
2.根据权利要求1所述的一种自复位耗能支撑,其特征在于:支撑通过抗剪铆钉(3)与铅沙之间的摩擦作用耗能,在自复位机构作用下恢复到初始状态;抗剪铆钉(3)焊接于内约束管(1)的中部,通过改变抗剪铆钉(3)的数量和布置位置,能调整与铅沙的摩擦力,抗剪铆钉(3)沿内约束管(1)长度方向布置成单排或多排。
3.根据权利要求1所述的一种自复位耗能支撑,其特征在于:焊接拼装过程均在工厂完成,在工厂先将所述宽耳板(2)、抗剪铆钉(3)与内约束管(1)焊接拼装,将所述外约束管耳板(4)、隔板(6)与外约束管(5)焊接拼装,再将内约束管(1)设置在外约束管(5)内,然后将所述自复位体系的索(8)插入内约束管(1)中,再穿过固定端板(7)的开孔,通过施加预应力将固定端板(7)紧紧压在外约束管(5)两端,张紧索(8)并用夹具(9)锚固在锚板(10)上,最后将铅沙通过灌注孔注入形成铅心,即完成拼装。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710026499.7A CN106812225A (zh) | 2017-01-14 | 2017-01-14 | 一种自复位耗能支撑 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710026499.7A CN106812225A (zh) | 2017-01-14 | 2017-01-14 | 一种自复位耗能支撑 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106812225A true CN106812225A (zh) | 2017-06-09 |
Family
ID=59110837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710026499.7A Pending CN106812225A (zh) | 2017-01-14 | 2017-01-14 | 一种自复位耗能支撑 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106812225A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893563A (zh) * | 2017-11-16 | 2018-04-10 | 山东大学 | 装配式自复位耗能支撑装置 |
CN109138204A (zh) * | 2018-09-06 | 2019-01-04 | 中国矿业大学 | 一种冷弯型钢组合约束十字形耗能内芯防屈曲支撑构件 |
CN109629751A (zh) * | 2019-01-25 | 2019-04-16 | 北京工业大学 | 一种附加brb的震后可恢复功能十字型柱脚节点 |
CN109898743A (zh) * | 2019-03-01 | 2019-06-18 | 北京工业大学 | 一种附加可更换斜向抗侧brb的自复位l型件连接柱脚节点 |
CN110284743A (zh) * | 2019-06-13 | 2019-09-27 | 北京工业大学 | 一种具有限位功能的自复位金属波纹管阻尼器 |
CN112095832A (zh) * | 2020-09-29 | 2020-12-18 | 扬州大学 | 一种基于预压碟簧的自复位耗能拉索支撑装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001323684A (ja) * | 2000-05-17 | 2001-11-22 | Shimizu Corp | ブレースダンパーおよびその製作方法 |
CN101463634A (zh) * | 2008-12-05 | 2009-06-24 | 北京工业大学 | 端部带耗能铅盒的约束屈曲支撑及其制作方法 |
CN202248249U (zh) * | 2011-08-23 | 2012-05-30 | 建研科技股份有限公司 | 一种屈曲约束支撑 |
CN103104049A (zh) * | 2013-02-05 | 2013-05-15 | 北京工业大学 | 钢铅组合防屈曲支撑 |
CN105155710A (zh) * | 2015-08-06 | 2015-12-16 | 北京建筑大学 | 一种自复位软钢耗能支撑 |
CN106013494A (zh) * | 2016-07-01 | 2016-10-12 | 福建工程学院 | 点状可调阻尼装配式铅挤压阻尼器 |
-
2017
- 2017-01-14 CN CN201710026499.7A patent/CN106812225A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001323684A (ja) * | 2000-05-17 | 2001-11-22 | Shimizu Corp | ブレースダンパーおよびその製作方法 |
CN101463634A (zh) * | 2008-12-05 | 2009-06-24 | 北京工业大学 | 端部带耗能铅盒的约束屈曲支撑及其制作方法 |
CN202248249U (zh) * | 2011-08-23 | 2012-05-30 | 建研科技股份有限公司 | 一种屈曲约束支撑 |
CN103104049A (zh) * | 2013-02-05 | 2013-05-15 | 北京工业大学 | 钢铅组合防屈曲支撑 |
CN105155710A (zh) * | 2015-08-06 | 2015-12-16 | 北京建筑大学 | 一种自复位软钢耗能支撑 |
CN106013494A (zh) * | 2016-07-01 | 2016-10-12 | 福建工程学院 | 点状可调阻尼装配式铅挤压阻尼器 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107893563A (zh) * | 2017-11-16 | 2018-04-10 | 山东大学 | 装配式自复位耗能支撑装置 |
CN109138204A (zh) * | 2018-09-06 | 2019-01-04 | 中国矿业大学 | 一种冷弯型钢组合约束十字形耗能内芯防屈曲支撑构件 |
CN109629751A (zh) * | 2019-01-25 | 2019-04-16 | 北京工业大学 | 一种附加brb的震后可恢复功能十字型柱脚节点 |
CN109898743A (zh) * | 2019-03-01 | 2019-06-18 | 北京工业大学 | 一种附加可更换斜向抗侧brb的自复位l型件连接柱脚节点 |
CN110284743A (zh) * | 2019-06-13 | 2019-09-27 | 北京工业大学 | 一种具有限位功能的自复位金属波纹管阻尼器 |
CN110284743B (zh) * | 2019-06-13 | 2020-07-31 | 北京工业大学 | 一种具有限位功能的自复位金属波纹管阻尼器 |
CN112095832A (zh) * | 2020-09-29 | 2020-12-18 | 扬州大学 | 一种基于预压碟簧的自复位耗能拉索支撑装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106812225A (zh) | 一种自复位耗能支撑 | |
WO2018006558A1 (zh) | 一种适用于地下隧洞的高强约束混凝土支护体系 | |
CN106351348B (zh) | 一种装配式自复位耗能支撑 | |
CN106401254B (zh) | 一种屈曲约束核心板耗能的自复位钢框架结构 | |
CN108643602B (zh) | 一种适用于混凝土梁柱节点的外包锚钢加固结构 | |
CN106382040A (zh) | 一种摩擦耗能的自复位钢框架结构 | |
CN108842911A (zh) | 装配式自复位预应力混凝土框架sma耗能节点 | |
CN106812366A (zh) | 一种装配式自复位耗能支撑结构 | |
CN106320191A (zh) | 预张拉钢丝‑聚合物砂浆外加层加固装置 | |
US10988952B2 (en) | Buckling-restrained brace containing L-shaped energy dissipation element, building and assembly method | |
CN104929265B (zh) | 弹簧式自复位防屈曲支撑装置 | |
CN106703247A (zh) | 一种装配式自复位耗能支撑 | |
CN104358328B (zh) | 一种全钢四钢管多段可装配超长防屈曲支撑 | |
US20190085884A1 (en) | Method for creating a high Tensile Strength Joint for Connecting Rods and Fittings | |
CN104947826B (zh) | 自复位防屈曲支撑装置 | |
CN105155680A (zh) | 一种自开式盲眼螺栓锚固装置 | |
CN110685484A (zh) | 黏弹性自复位支撑 | |
US20190048669A1 (en) | Method for Creating a High Tensile Strength Joint for Connecting Rods and Fittings | |
CN207525618U (zh) | 一种带压簧的预应力锚固体系 | |
DE102011115772A1 (de) | Gerüstanker mit Gerüstabstützung für Wärmedämmverbundsysteme | |
CN106088766B (zh) | 一种钢管填充混凝土外包式剪切型屈曲约束支撑 | |
CN204940273U (zh) | 一种压力分散型预应力锚索施工装置 | |
CN212358645U (zh) | 一种装配式端部梁柱预应力节点构造 | |
CN110159306B (zh) | 用于隧道穿越活断层的二次衬砌柔性接头装置及施工方法 | |
KR101861551B1 (ko) | Frp를 이용한 조적 벽체 건축물의 내진 보강의 시공방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |