CN106812042A - A kind of assembling steel plate road structure and construction method - Google Patents
A kind of assembling steel plate road structure and construction method Download PDFInfo
- Publication number
- CN106812042A CN106812042A CN201710138398.9A CN201710138398A CN106812042A CN 106812042 A CN106812042 A CN 106812042A CN 201710138398 A CN201710138398 A CN 201710138398A CN 106812042 A CN106812042 A CN 106812042A
- Authority
- CN
- China
- Prior art keywords
- road
- steel plate
- otic placode
- guiding gutter
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/083—Temporary pavings made of metal, e.g. plates, network
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of assembling steel plate road structure and construction method, the structure includes multiple road steel plates, two neighboring road steel plate contact gap bottom is provided with guiding gutter, guiding gutter bottom is provided with concrete prefabricated pier, the reinforcing bar of fixed road steel plate is embedded with concrete prefabricated pier, often arrange and rhone is provided with concrete prefabricated pier, otic placode connecting plate is bolted two adjacent otic placodes of homonymy on two adjacent road steel plates;The construction method includes step:First, Prefabricated road steel plate and otic placode is welded;2nd, road foundation construction;3rd, steel plate road drainage construction;4th, paving coarse sand is levelling;5th, embedding concrete prefabricated pier;6th, laying road steel plate and fixed otic placode and real-time quality are checked and accepted.Complete function of the present invention, by Prefabricated road steel plate, builds and coordinates and the road foundation with drain function with Prefabricated road steel plate, and laying road steel plate, while meeting road hardening requirement, the materials'use number of turnover is increased again.
Description
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of assembling steel plate road structure and construction method.
Background technology
Job site temporary road carries transport of materials, and the effect that personnel pass through is the important set of live temporary construction
Into part.Traditional way is first basic unit's ash rammed earth, after-pouring concrete road surface, and concrete road surface intensity to be poured reaches holds
Carry after requiring, can use, and be disposable input, need to remove after the completion of engineering, not only time-consuming, waste of resource, increase money
Gold input, and a large amount of building wastes can be produced.To realize environmental protection, economize on resources, nowadays lack a kind of repeatable profit
With, assembling steel plate road structure simple to operate, reasonable in design and construction method, can be assembled by the assembling of steel plate road,
Accelerating road construction speed simultaneously, both meeting road hardening requirement, the material number of turnover and service life are being increased again,
The discharge of building waste is reduced, cost has been saved.
The content of the invention
The technical problems to be solved by the invention are for above-mentioned deficiency of the prior art, there is provided a kind of assembled steel
Board road structure, it is novel in design rationally, by the laying road steel plate on the road foundation for be embedded with guiding gutter, using coagulation
The prefabricated pier of soil fixes road steel plate prevents steel plate road from moving, and while meeting road hardening requirement, material turnover is increased again
Number of times and service life, the discharge of building waste is reduced, it is cost-effective.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of assembling steel plate road structure, it is special
Levy and be:It is laid on the road steel plate of the rectangle on the road foundation, phase successively along road foundation length direction including multiple
Adjacent two road steel plates contact gap bottom and stretch to and guiding gutter is provided with the road foundation, the road foundation
Both sides and the concrete prefabricated pier for extending into underground is provided with positioned at each guiding gutter bottom, is embedded with concrete prefabricated pier
Two reinforcing bars, often arrange and are provided with concrete prefabricated pier positioned at the water side lower section of guiding gutter and surface gathered water is emitted into precipitation
The rhone in pond, is provided with the otic placode for preventing road steel plate from moving, on otic placode at four square positions of each road steel plate
Otic placode fixed via and otic placode connection through hole are provided with, otic placode is pre- by concrete at the corresponding position of otic placode fixed via
Reinforcing bar pre-buried on pier processed coordinates, and otic placode connecting plate is bolted homonymy is adjacent on two adjacent road steel plates two
Otic placode, bolt coordinates through otic placode connection through hole and otic placode connecting plate.
A kind of above-mentioned assembling steel plate road structure, it is characterised in that:The width of the guiding gutter is more than two neighboring
Road steel plate contacts gap width, the width of the length more than the road foundation of guiding gutter.
A kind of above-mentioned assembling steel plate road structure, it is characterised in that:Four otic placodes on the road steel plate with
Road steel plate is welded as a whole.
A kind of above-mentioned assembling steel plate road structure, it is characterised in that:Connecting plate is provided with the otic placode connecting plate to lead to
Hole, the quantity of the connecting plate through hole is the twice of the otic placode connection number of openings on otic placode, the position of the connecting plate through hole
The connection through hole of the otic placode on two otic placodes adjacent with homonymy on two adjacent road steel plates is put to correspond up and down.
Meanwhile, the invention also discloses a kind of method and step is simple, reasonable in design, complete function, by Prefabricated road steel
Plate, builds and coordinates and the road foundation with drain function with Prefabricated road steel plate, realizes assembling steel plate road on road foundation
The construction method on road, it is characterised in that the construction method is comprised the following steps:
Step one, Prefabricated road steel plate simultaneously weld otic placode:First, according to design requirement cutting steel plate, multiple structures are obtained
The road steel plate of the rectangle of size all same;Then, the equal welding structure size at four square positions of each road steel plate
The otic placode of all same, otic placode fixed via and otic placode connection through hole are beaten otic placode each described using bench drill;
Step 2, road foundation construction:First, position, the shape according to design drawing requirement to job site road construction
Shape and elevation are demarcated, and realize in-site measurement unwrapping wire;Then, road basis carries out grey earth foundation rammer after being positioned to surveying setting-out
It is real;
Step 3, steel plate road drainage construction, process are as follows:
Step 301, put guiding gutter:Equidistantly put and the road foundation length along the road foundation length direction
Direction is vertical and the guiding gutter that is embedded in the grey earth foundation of compacting, and the clear distance between two neighboring guiding gutter is that L and L meet:
H-C<L<H, wherein, H is the width of road steel plate, and C is the width of guiding gutter;
Step 302, fixed rhone:Distinguish along road foundation both sides length direction and less than the water side of guiding gutter
Rhone is set;
Step 4, paving coarse sand are levelling:After the completion of steel plate road drainage construction, paving coarse sand is put on the basis of the dirt of compacting and is looked for
It is flat, keep the road foundation surface after paving coarse sand to be located at sustained height with guiding gutter top;
Step 5, embedding concrete prefabricated pier:Positioned at each guiding gutter bottom, embedding underground and the rest of extending into is arranged
The concrete prefabricated pier of tank, is embedded with the reinforcing bar for fixing otic placode in concrete prefabricated pier;
Step 6, laying road steel plate and fixed otic placode and real-time quality examination:First, between two neighboring guiding gutter
Clear distance center line is the width centreline laying road steel plate of road steel plate, and four otic placodes on each road steel plate are fixed
On the reinforcing bar coordinated with its otic placode fixed via, complete steel plate road laying, using with install with check by the way of carry out
Inspection of quality, keeps the discrepancy in elevation of two neighboring road steel plate to cannot be greater than 2mm, while any two road steel plate in steel plate road
The discrepancy in elevation cannot be greater than 5mm;Then, using otic placode connecting plate by two adjacent otic placodes of homonymy on two adjacent road steel plates
It is fixedly connected, completes the construction of steel plate road.
Above-mentioned construction method, it is characterised in that:Guiding gutter is channel-section steel in step 301, and the width of guiding gutter is the groove
Steel is highly.
Above-mentioned construction method, it is characterised in that:Welded at four square positions of each road steel plate in step one
Otic placode corner angle are polished after otic placode.
The present invention has advantages below compared with prior art:
1st, the assembling steel plate road structure that the present invention is used, is embedded in by the road foundation installed for road steel plate
The equidistant installation multiple guiding gutter of formula, while be located at below multiple guiding gutters in road foundation both sides installing and multiple guiding gutters
The rhone that water side coordinates, forms discharge conduit, prevents the ponding of steel plate road surface from penetrating into bottom and soaking road foundation,
Produce sinking influence to use, sedimentation basin, draining are entered after the ponding of steel plate road surface is flow to rhone through multiple guiding gutters
Groove and the hidden assembling of multiple guiding gutters, the laying road steel plate on road foundation, make transport of materials and personnel pass through and row
Water is independent of each other, and is easy to promote the use of.
2nd, the assembling steel plate road structure that the present invention is used, sets pre-buried by two adjacent road steel plate bottoms
There is the concrete prefabricated pier of reinforcing bar, the concrete prefabricated pier unit of two rows is formed, by four right-angle positions to each road steel plate
The otic placode that place's welding coordinates with reinforcing bar is put, each concrete prefabricated pier can play the work of fixed otic placode and then fixed road steel plate
With, prevent road steel plate from moving, while being easy to supporting rhone, reliable and stable, using effect is good.
3rd, the construction method step that the present invention is used is simple, the road steel plate of precast construction size all same, by determining
Clear distance center line between two neighboring guiding gutter, fast and accurately laying road steel plate, easy installation and removal, meet road hard
While change is required, the material number of turnover and service life are increased again, reduce the discharge of building waste, it is cost-effective.
In sum, the present invention is novel in design rationally, by Prefabricated road steel plate, build coordinate with Prefabricated road steel plate and
Road foundation with drain function, is realized assembling steel plate road on road foundation, and road is fixed using concrete prefabricated pier
Steel plate prevents steel plate road from moving, and while meeting road hardening requirement, the material number of turnover and service life is increased again, subtracts
Lack the discharge of building waste, it is cost-effective.
Below by drawings and Examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the assembling design sketch of assembling steel plate road structure of the present invention.
Fig. 2 is the assembling structure schematic diagram of two neighboring road steel plate of the invention.
Fig. 3 is the FB(flow block) of construction method of the present invention.
Description of reference numerals:
1-road steel plate;2-otic placode;3-otic placode connecting plate;
4-guiding gutter;5-concrete prefabricated pier;6-reinforcing bar;
7-rhone;8-bolt.
Specific embodiment
As depicted in figs. 1 and 2, a kind of assembling steel plate road structure of the present invention, including multiple is along road foundation
Length direction is laid on the road steel plate 1 of the rectangle on the road foundation successively, and two neighboring road steel plate 1 contacts gap bottom
Portion and stretch to guiding gutter 4 is provided with the road foundation, both sides of the road foundation and under each guiding gutter 4
Portion is provided with the concrete prefabricated pier 5 for extending into underground, and two reinforcing bars 6 are embedded with concrete prefabricated pier 5, often arranges concrete
The rhone 7 that sedimentation basin is emitted into positioned at the water side lower section of guiding gutter 4 and by surface gathered water is provided with prefabricated pier 5, each
The otic placode 2 for preventing road steel plate 1 from moving is provided with four square positions of road steel plate 1, otic placode is provided with otic placode 2 and is fixed
Through hole and otic placode connection through hole, otic placode 2 is by pre-buried on concrete prefabricated pier 5 at the corresponding position of otic placode fixed via
Reinforcing bar 6 coordinate, otic placode connecting plate 3 connects two adjacent otic placodes 2 of homonymy on two adjacent road steel plates 1 by bolt 8,
Bolt 8 coordinates through otic placode connection through hole with otic placode connecting plate 3.
Two neighboring road steel plate 1 contacts gap bottom and stretches to and guiding gutter 4 is provided with the road foundation, leads
The ponding for being disposed to prevent the steel plate road laid by multiple road steel plates 1 from being formed of tank 4 is along two neighboring road
The contact of road steel plate 1 gap penetrates into bottom immersion road foundation and produces sinking, influences the use of steel plate road, and guiding gutter 4 is stretched to
For the ease for the treatment of road foundation in the road foundation, be laid on road steel plate 1 flat on road foundation, assemble it is hidden and
The stability of steel plate road can be increased, road steel plate 1 is easy to the splicing of steel plate road to align using rectangular configuration, each road steel
The otic placode 2 for preventing road steel plate 1 from moving is provided with four square positions of plate 1, otic placode 2 is welded on the straight of road steel plate 1
At the corner position of angle, because multiple road steel plates 1 are laid successively along road foundation length direction, therefore, two adjacent roads
Four otic placodes 2 are provided with the contact gap position of steel plate 1, four otic placodes 2 are divided into two groups of both sides for being separately positioned on steel plate road,
The both sides of the road foundation and the concrete prefabricated pier 5 for extending into underground is provided with positioned at each bottom of guiding gutter 4, is formed
The concrete prefabricated pier 5 of two rows, it is to fix and the guiding gutter 4 simultaneously that concrete prefabricated pier 5 is arranged on each bottom of guiding gutter 4
Two road steel plates 1 of contact, reduce the usage quantity of concrete prefabricated pier 5, in addition, concrete prefabricated pier 5 sets as far as possible
It is, for supporting rhone 7, two reinforcing bars 6 to be embedded with concrete prefabricated pier 5 to put under rhone 7, wherein, two reinforcing bars 6
In a reinforcing bar 6 be used to connect an otic placode 2 in one group of otic placode 2, another reinforcing bar 6 in two reinforcing bars 6 is used to connect
Another otic placode 2 in one group of otic placode 2, is provided with otic placode fixed via and otic placode connection through hole on each otic placode 2, otic placode is fixed
Being disposed to of through hole coordinates with reinforcing bar 6, defines the installation site of otic placode 2, and otic placode connecting plate 3 connects phase using bolt 8
On two adjacent road steel plates 1 one group of adjacent otic placode 2 of homonymy be in order to further two adjacent road steel plates 1 are fixed,
Prevent road steel plate 1 from moving.
In the present embodiment, the width of the guiding gutter 4 contacts gap width, guiding gutter 4 more than two neighboring road steel plate 1
Length more than the road foundation width.
In the present embodiment, the width of guiding gutter 4 contacts gap width more than two neighboring road steel plate 1, is to ensure
The opening of guiding gutter 4 all can contact gap comprising two neighboring road steel plate 1, so that steel plate road ponding all flows into water guide
Groove 4, prevents steel plate road ponding from flowing into road foundation;The length of guiding gutter 4 is to protect more than the width of the road foundation
Card guiding gutter 4 is located on road foundation along road foundation width whole covering path roadbed, guiding gutter 4, and both sides keep
Have to stretch out and coordinate draining with the rhone 7 of both sides.
In the present embodiment, four otic placodes 2 on the road steel plate 1 are welded as a whole with road steel plate 1.
Four otic placodes 2 on road steel plate 1 are welded as a whole with road steel plate 1 and ensure four otic placodes 2 and road steel plate 1
Form a pavement of road for entirety, good integrity.
In the present embodiment, connecting plate through hole is provided with the otic placode connecting plate 3, the quantity of the connecting plate through hole is otic placode
The otic placode connects the twice of number of openings, the position of the connecting plate through hole and homonymy on two adjacent road steel plates 1 on 2
Otic placode connection through hole on two adjacent otic placodes 2 is corresponded up and down.
Every group of otic placode 2 is fixed by bolt 8 with otic placode connecting plate 3, because otic placode connecting plate 3 connects two otic placodes 2, ear
A connecting plate through hole on otic placode connection through hole correspondence otic placode connecting plate 3 on plate 2, in the present embodiment, on each otic placode 2
It is provided with an otic placode fixed via and two otic placodes connection through holes, otic placode fixed via is pre-buried one with concrete prefabricated pier 5
The correspondence of individual reinforcing bar 6, comprising four otic placode connection through holes on every group of otic placode 2, therefore, four connecting plates are provided with otic placode connecting plate 3
Through hole, the four connecting plate through holes opened on otic placode connecting plate 3, two otic placodes adjacent with homonymy on two adjacent road steel plates 1
Otic placode connection through hole on 2 corresponds be easily installed alignment up and down.
A kind of construction method of steel plate road assembling as shown in Figure 3, comprises the following steps:
Step one, Prefabricated road steel plate simultaneously weld otic placode:First, according to design requirement cutting steel plate, multiple structures are obtained
The road steel plate 1 of the rectangle of size all same;Then, the equal welding structure chi at four square positions of each road steel plate 1
The otic placode 2 of very little all same, using bench drill to 2 dozens of otic placode fixed vias of otic placode each described and otic placode connection through hole;
The road steel plate 1 of the rectangle of prefabricated multiple physical dimension all sames is to realize not differentiated between during steel plate road pavement
Road steel plate 1 is directly assembled, and road assembling is simple, is easy to alignment, is welded at four square positions of each road steel plate 1
The otic placode 2 of physical dimension all same is in order to form overall road surface, using bench drill to the otic placode fixed via and ear of designed in advance
Plate connection lead to the hole site carries out perforate;
Step 2, road foundation construction:First, position, the shape according to design drawing requirement to job site road construction
Shape and elevation are demarcated, and realize in-site measurement unwrapping wire;Then, road basis carries out grey earth foundation rammer after being positioned to surveying setting-out
It is real;
Step 3, steel plate road drainage construction, process are as follows:
Step 301, put guiding gutter:Equidistantly put and the road foundation length along the road foundation length direction
Direction is vertical and the guiding gutter 4 that is embedded in the grey earth foundation of compacting, between two neighboring guiding gutter 4 clear distance is for L and L is full
Foot:H-C<L<H, wherein, H is the width of road steel plate 1, and C is the width of guiding gutter 4;
Grey soil matrix that is vertical with the road foundation length direction and being embedded in compacting is put on the basis of the dirt of compacting
Guiding gutter 4 in plinth is to realize that the low level of guiding gutter 4 is designed, being easy to carry out pavement of road ponding reception ejectment, adjacent two
Clear distance L between individual guiding gutter 4 meets:H-C<L<H;L>H-C is the water guide that one or both sides are covered in order to avoid road steel plate 1
Groove 4, while being overlapped with adjacent road steel plate 1, causes road steel plate 1 to assemble and mismatches, L<H is to ensure road steel plate 1
Road foundation between two neighboring guiding gutter 4 can be completely covered, it is to avoid road foundation leakage cruelly exists between two neighboring guiding gutter 4
Outward, penetrated into road foundation so as to meet water;
Step 302, fixed rhone:Along road foundation both sides length direction and less than the water side point of guiding gutter 4
She Zhi not rhone 7;
Along road foundation both sides length direction and less than the water side of guiding gutter 4 be respectively provided with rhone 7 be in order to
Coordinate multiple guiding gutters 4 and the ponding that multiple guiding gutters 4 flow out timely is emitted into sedimentation basin;
Step 4, paving coarse sand are levelling:After the completion of steel plate road drainage construction, paving coarse sand is put on the basis of the dirt of compacting and is looked for
It is flat, keep the road foundation surface after paving coarse sand to be located at sustained height with the top of guiding gutter 4;
Guiding gutter 4 is embedded in the grey earth foundation of compacting causes grey earth foundation Uneven road unavoidably, and steel plate road drainage is applied
Levelling for grading roads road bed by spreading coarse sand after the completion of work, basis is smooth when making later stage laying road steel plate 1, stabilization
It is reliable, while keeping the road foundation surface after paving coarse sand to be located at sustained height, the road after the coarse sand of pawnshop with the top of guiding gutter 4
When road bed is higher than 4 overhead height of guiding gutter, because friction is by unnecessary coarse sand when occurring laying road steel plate 1 unavoidably
In propulsion guiding gutter 4, guiding gutter 4 is blocked;When road foundation surface after the coarse sand of pawnshop is less than 4 overhead height of guiding gutter, water guide
Groove 4 plays support road steel plate 1, and road foundation caves in and do not contacted with road steel plate 1, it is impossible to realize to road steel plate 1
Supporting role, causes steel plate road stability poor;
Step 5, embedding concrete prefabricated pier:Positioned at each bottom of guiding gutter 4, embedding underground and the rest of extending into is arranged
The reinforcing bar 6 for fixing otic placode 2 is embedded with the concrete prefabricated pier 5 of tank 7, concrete prefabricated pier 5;
Each concrete prefabricated pier 5 can play a part of fixed otic placode and then fixed road steel plate, prevent road steel plate
It is mobile, while being easy to supporting rhone 7;
Step 6, laying road steel plate and fixed otic placode and real-time quality examination:First, with two neighboring guiding gutter 4 it
Between clear distance center line be the width centreline laying road steel plate 1 of road steel plate 1, and by four ears on each road steel plate 1
Plate 2 be fixed on its otic placode fixed via coordinate reinforcing bar 6 on, complete steel plate road laying, using with install with check
Mode carries out inspection of quality, keeps the discrepancy in elevation of two neighboring road steel plate 1 to cannot be greater than 2mm, while any two in steel plate road
The discrepancy in elevation of individual road steel plate 1 cannot be greater than 5mm;Then, using otic placode connecting plate 3 by homonymy on two adjacent road steel plates 1
Two adjacent otic placodes 2 are fixedly connected, and complete the construction of steel plate road.
In practical operation, the center line of clear distance between two neighboring guiding gutter 4 is marked, while marking each road steel plate 1
Width centreline, the width centreline of road steel plate 1 is directed at net between two neighboring guiding gutter 4 during laying road steel plate 1
Away from center line, road steel plate 1 can be accurately positioned, laying is quick, it is to avoid adjust road steel plate 1 repeatedly and closed with the cooperation of guiding gutter 4
System, using being in order to avoid unnecessary repeated workload, to improve work effect with installing with inspection of quality is carried out by the way of checking
Rate;The discrepancy in elevation of two neighboring road steel plate 1 is not more than 2mm, while the discrepancy in elevation of any two road steel plate 1 is little in steel plate road
In 5mm, it is ensured that steel plate road is flat, using effect is good;
In the present embodiment, guiding gutter 4 is channel-section steel in step 301, the width of guiding gutter 4 for the channel-section steel highly.
Preferred guiding gutter 4 is channel-section steel, and for the channel-section steel highly, the height of guiding gutter 4 is the groove to the width of guiding gutter 4
The leg of steel is wide, and when actually used, using the female end of channel-section steel upward as water guide channel, materials are easy, and it is convenient to assemble.
In the present embodiment, to otic placode 2 after welding otic placode 2 at four square positions of each road steel plate 1 in step one
Corner angle are polished.
It is to prevent to carry out polishing to the corner angle of otic placode 2 after welding otic placode 2 at four square positions of each road steel plate 1
The unwelded corner angle in road steel plate 1 stab workman when being collided with people, it is to avoid injury of the fortuitous event to workman;
The present invention assembling when, it is reusable while meeting road hardening requirement, to environment regulation require it is low, zero
Part is used in turn flexibly, and service life is long, it is to avoid the discharge of the building waste that casting concrete brings, cost-effective;Meanwhile,
The present invention is simple to operate, it is easy to transport in dismounting, convenient material drawing when damage of components maintenance or replacing, then makes or store
Easily, road construction speed is effectively accelerated.
The above, is only presently preferred embodiments of the present invention, and not the present invention is imposed any restrictions, every according to the present invention
Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention
In the protection domain of art scheme.
Claims (7)
1. a kind of assembling steel plate road structure, it is characterised in that:It is laid on successively along road foundation length direction including multiple
The road steel plate (1) of the rectangle on the road foundation, two neighboring road steel plate (1) contacts gap bottom and stretches to described
It is provided with guiding gutter (4) in road foundation, the both sides of the road foundation and is provided with positioned at each guiding gutter (4) bottom
The concrete prefabricated pier (5) of underground is extend into, two reinforcing bars (6) are embedded with concrete prefabricated pier (5), often arranged concrete prefabricated
The rhone (7) that sedimentation basin is emitted into positioned at the water side lower section of guiding gutter (4) and by surface gathered water is provided with pier (5), often
The otic placode (2) for preventing road steel plate (1) mobile is provided with four square positions of individual road steel plate (1), otic placode is opened on (2)
There are otic placode fixed via and otic placode connection through hole, otic placode (2) is by concrete at the corresponding position of otic placode fixed via
Reinforcing bar (6) pre-buried on prefabricated pier (5) coordinates, and otic placode connecting plate (3) connects two adjacent road steel plates by bolt (8)
(1) two adjacent otic placodes (2) of homonymy on, bolt (8) coordinates through otic placode connection through hole and otic placode connecting plate (3).
2. according to a kind of assembling steel plate road structure described in claim 1, it is characterised in that:The width of the guiding gutter (4)
Degree contacts gap width, the width of the length more than the road foundation of guiding gutter (4) more than two neighboring road steel plate (1).
3. according to a kind of assembling steel plate road structure described in claim 1, it is characterised in that:On the road steel plate (1)
Four otic placodes (2) be welded as a whole with road steel plate (1).
4. according to a kind of assembling steel plate road structure described in claim 1, it is characterised in that:The otic placode connecting plate (3)
On be provided with connecting plate through hole, the quantity of the connecting plate through hole on otic placode (2) otic placode connect the twice of number of openings, institute
State the otic placode on position two otic placodes (2) adjacent with homonymy on two adjacent road steel plates (1) of connecting plate through hole
Connection through hole is corresponded up and down.
5. a kind of construction method that steel plate road assembling is carried out using structure as claimed in claim 2, it is characterised in that the construction
Method is comprised the following steps:
Step one, Prefabricated road steel plate simultaneously weld otic placode:First, according to design requirement cutting steel plate, multiple physical dimensions are obtained
The road steel plate (1) of the rectangle of all same;Then, the equal welding structure chi at four square positions of each road steel plate (1)
The otic placode (2) of very little all same, otic placode fixed via and otic placode connection through hole are beaten otic placode each described (2) using bench drill;
Step 2, road foundation construction:First, according to design drawing requirement to the position of job site road construction, shape and
Elevation is demarcated, and realizes in-site measurement unwrapping wire;Then, road basis carries out grey earth foundation compacting after being positioned to surveying setting-out;
Step 3, steel plate road drainage construction, process are as follows:
Step 301, put guiding gutter:Equidistantly put and the road foundation length direction along the road foundation length direction
Guiding gutter (4) that is vertical and being embedded in the grey earth foundation of compacting, the clear distance between two neighboring guiding gutter (4) is that L and L expire
Foot:H-C<L<H, wherein, H is the width of road steel plate (1), and C is the width of guiding gutter (4);
Step 302, fixed rhone:Distinguish along road foundation both sides length direction and less than the water side of guiding gutter (4)
Rhone (7) is set;
Step 4, paving coarse sand are levelling:Steel plate road drainage construction after the completion of, compacting dirt on the basis of put paving coarse sand it is levelling,
The road foundation surface after paving coarse sand is kept to be located at sustained height with guiding gutter (4) top;
Step 5, embedding concrete prefabricated pier:Underground and rest draining are extend into positioned at each guiding gutter (4) bottom is embedding
The reinforcing bar (6) for fixing otic placode (2) is embedded with the concrete prefabricated pier (5) of groove (7), concrete prefabricated pier (5);
Step 6, laying road steel plate and fixed otic placode and real-time quality examination:First, between two neighboring guiding gutter (4)
Clear distance center line is width centreline laying road steel plate (1) of road steel plate (1), and by four on each road steel plate (1)
Individual otic placode (2) is fixed on the reinforcing bar (6) coordinated with its otic placode fixed via, the laying of steel plate road is completed, using with installation
Inspection of quality is carried out with the mode for checking, keeps the discrepancy in elevation of two neighboring road steel plate (1) to cannot be greater than 2mm, while steel plate road
The discrepancy in elevation of any two road steel plate (1) cannot be greater than 5mm in road;Then, using otic placode connecting plate (3) by two adjacent roads
Two adjacent otic placodes (2) of homonymy are fixedly connected on road steel plate (1), complete the construction of steel plate road.
6. according to the construction method described in claim 5, it is characterised in that:Guiding gutter (4) is channel-section steel, guiding gutter in step 301
(4) width be the channel-section steel highly.
7. according to the construction method described in claim 5, it is characterised in that:At four of each road steel plate (1) in step one
Otic placode (2) corner angle are polished after welding otic placode (2) at square position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710138398.9A CN106812042A (en) | 2017-03-09 | 2017-03-09 | A kind of assembling steel plate road structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710138398.9A CN106812042A (en) | 2017-03-09 | 2017-03-09 | A kind of assembling steel plate road structure and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106812042A true CN106812042A (en) | 2017-06-09 |
Family
ID=59114829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710138398.9A Pending CN106812042A (en) | 2017-03-09 | 2017-03-09 | A kind of assembling steel plate road structure and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106812042A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457148A (en) * | 2018-03-21 | 2018-08-28 | 中国冶集团有限公司 | A kind of multi-functional temporary road structure of assembled and its construction method |
CN110820461A (en) * | 2019-11-04 | 2020-02-21 | 深圳市能源环保有限公司 | Method for manufacturing stainless steel ground of unloading room of garbage transfer station |
CN112962386A (en) * | 2021-02-10 | 2021-06-15 | 索新科技(北京)有限公司 | ADG steel floor unit and laying method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070093819A (en) * | 2007-03-08 | 2007-09-19 | 조남준 | Sound barriers for road |
CN103711056A (en) * | 2013-12-19 | 2014-04-09 | 江苏邗建集团有限公司 | Steel tool type temporary construction road and construction method thereof |
CN105220595A (en) * | 2015-10-23 | 2016-01-06 | 中建四局第一建筑工程有限公司 | A kind of construction work temporary road structure and construction method thereof |
CN106193081A (en) * | 2016-08-31 | 2016-12-07 | 陕西建工第五建设集团有限公司 | A kind of from draining assembled basic structure for moving house |
CN206736660U (en) * | 2017-03-09 | 2017-12-12 | 陕西建工第五建设集团有限公司 | Assembling steel plate road structure |
-
2017
- 2017-03-09 CN CN201710138398.9A patent/CN106812042A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070093819A (en) * | 2007-03-08 | 2007-09-19 | 조남준 | Sound barriers for road |
CN103711056A (en) * | 2013-12-19 | 2014-04-09 | 江苏邗建集团有限公司 | Steel tool type temporary construction road and construction method thereof |
CN105220595A (en) * | 2015-10-23 | 2016-01-06 | 中建四局第一建筑工程有限公司 | A kind of construction work temporary road structure and construction method thereof |
CN106193081A (en) * | 2016-08-31 | 2016-12-07 | 陕西建工第五建设集团有限公司 | A kind of from draining assembled basic structure for moving house |
CN206736660U (en) * | 2017-03-09 | 2017-12-12 | 陕西建工第五建设集团有限公司 | Assembling steel plate road structure |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457148A (en) * | 2018-03-21 | 2018-08-28 | 中国冶集团有限公司 | A kind of multi-functional temporary road structure of assembled and its construction method |
CN108457148B (en) * | 2018-03-21 | 2020-10-23 | 中国一冶集团有限公司 | Assembled multifunctional temporary road structure and construction method thereof |
CN110820461A (en) * | 2019-11-04 | 2020-02-21 | 深圳市能源环保有限公司 | Method for manufacturing stainless steel ground of unloading room of garbage transfer station |
CN110820461B (en) * | 2019-11-04 | 2021-07-20 | 深圳市能源环保有限公司 | Method for manufacturing stainless steel ground of unloading room of garbage transfer station |
CN112962386A (en) * | 2021-02-10 | 2021-06-15 | 索新科技(北京)有限公司 | ADG steel floor unit and laying method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101701439B (en) | Steel reinforcement cage track skeleton method construction process of steel spring floating plate track | |
CN106812042A (en) | A kind of assembling steel plate road structure and construction method | |
CN104727302B (en) | Board wall cast-in-place construction technique between a kind of friction pile stake | |
CN102966037A (en) | Installation and construction process of bridge expansion joints | |
CN109454746B (en) | Concrete pouring device for building construction and construction method thereof | |
CN110593307A (en) | Construction method for pre-protection structure of underground comprehensive pipe gallery with top-span proposed tunnel | |
CN112663516A (en) | Construction method of bridge thin-wall hollow pier column | |
CN101424063A (en) | Interim and permanent roads single time construction method | |
CN206736660U (en) | Assembling steel plate road structure | |
CN106592438B (en) | Twin shaft pier and middle binder truss move integrally construction method | |
CN210561541U (en) | Prefabricated assembled municipal concrete pavement | |
CN205476655U (en) | Satisfy installation of extra -high voltage GIS device context with totally closed removal factory building track | |
CN208121776U (en) | A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled | |
CN110700116A (en) | Overpass reverse construction method suitable for loess area | |
CN113898006B (en) | Stable and rapid jacking construction method for box culvert under large excavation surface | |
CN111648373B (en) | Excavation supporting construction process for water-rich deep foundation pit fender pile gap | |
CN213539038U (en) | Non-embedded type rear tower crane foundation device suitable for building construction | |
CN107700301A (en) | A kind of ruggedized construction on express highway roadbed | |
CN113005903A (en) | Grouting sleeve connection type bent cap assembling construction process | |
KR101224380B1 (en) | Prefab water-storage tank | |
CN217177671U (en) | Protection device for horizontal pipe of ground source heat pump | |
CN213038426U (en) | Extension slide plate for stable and rapid jacking construction of box culvert under large excavation surface | |
CN219012545U (en) | Be suitable for highway bridge drilling bored concrete pile construction with mud cyclic utilization device | |
CN219793954U (en) | Old urban drainage pipeline slot concrete dado supporting construction | |
CN113622254B (en) | Construction method of heavy-load temporary precast reinforced concrete road slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170609 |
|
RJ01 | Rejection of invention patent application after publication |