CN106801533A CN201710157402.6A CN201710157402A CN106801533A CN 106801533 A CN106801533 A CN 106801533A CN 201710157402 A CN201710157402 A CN 201710157402A CN 106801533 A CN106801533 A CN 106801533A
Authority
CN
China
Prior art keywords
shaft tower
reinforced
connection
tube
combination formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710157402.6A
Other languages
Chinese (zh)
Inventor
钱方良
张斌杰
翟宏伟
禇禹秋
蒋建强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUZHOU FEIJIAN TOWER MANUFACTURING CO LTD
Original Assignee
HUZHOU FEIJIAN TOWER MANUFACTURING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUZHOU FEIJIAN TOWER MANUFACTURING CO LTD filed Critical HUZHOU FEIJIAN TOWER MANUFACTURING CO LTD
Priority to CN201710157402.6A priority Critical patent/CN106801533A/en
Publication of CN106801533A publication Critical patent/CN106801533A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Wind Motors (AREA)

Abstract

A kind of high-strength combination formula shaft tower, including at least two segmented shaft tower unit, each shaft tower unit includes that four are used for assembled principal post, connection member is set between adjacent two principal posts, the connection member includes at least more than two the first reinforced pipes for being used to reinforce connection, telophragma and support tube for carrying telophragma for fixing the first reinforced pipe, positioned at first reinforced pipe of telophragma the same side, its one end is all connected with telophragma, the other end is connected with the two ends of principal post respectively, the structure carries out splicing installation after can facilitating shaft tower installation in advance in mountain area, and possess high intensity.

Description

A kind of high-strength combination formula shaft tower
Technical field
The present invention relates to power Transmission equipment, the high-strength combination formula shaft tower of extra-high voltage electric power is more particularly to conveyed.
Background technology
Originally the shaft tower installation difficulty of transport extra-high voltage electric power is big, and the time is long.Because shaft tower requirement is installed in no road , it is necessary to each component for constituting shaft tower is first transported into specified location on the mountain ridge, splicing installation is then carried out by workman again. There is transportation rod tower assembly difficulty greatly in this mode, the splicing of each component installs cumbersome, and because single component needs workman to exist Height carries out splicing assembling in the air, for the problem that the intensity of whole shaft tower can affect.
A kind of iron tower for ultra-high voltage transmission that such as patent announcement CN201433592Y is announced, the iron tower for ultra-high voltage transmission can expire The electric clearance requirement of sufficient UHV transmission;Negative shielding angle is formed to wire, suitable mountain area uses;Using comprehensive length tower Leg, protects landform and the vegetation in mountain area, beneficial to environmental protection.But the iron tower component transport difficulty is big, component is cumbersome when installing, while Because component is workman aerial separately installed in height, the intensity after shaft tower installation is caused easily to be affected.
The content of the invention
The technical problem to be solved
The purpose of the present invention is directed to the above mentioned problem existing for prior art, and spy provides a kind of high-strength combination formula shaft tower.
Technical scheme
In order to solve the above technical problems, the present invention provides a kind of high-strength combination formula shaft tower, including at least two segmentation Formula shaft tower unit, each shaft tower unit includes that four are used for assembled principal post, and connecting portion is set between adjacent two principal posts Part, the connection member includes at least more than two for reinforcing the first reinforced pipes for connecting, for fixing the first reinforced pipe Telophragma and the support tube for carrying telophragma, positioned at first reinforced pipe of telophragma the same side, its one end all with centre Disk is connected, and the other end is connected with the two ends of principal post respectively.
Further, the two ends of the support tube are connected on two adjacent principal posts, and the support tube includes length Pipe, is arranged at the ring flange of tube end long, the short tube being connected with long tube by ring flange.
Further, the long tube stretched out in and be connected with short tube by ring flange again outside telophragma, enables telophragma complete Can be by adjusting the accuracy of short tube guarantee connection and improving the strong of whole support tube when being carried on long tube entirely, and installing Degree.
Further, the second reinforced pipe is set between adjacent connection member, by what is surrounded between multiple second reinforced pipes Plane and it is parallel to each other by the plane surrounded between multiple support tubes.
Further, the first reinforced tube is set between second reinforced pipe and its principal post closest to side;The phase The second reinforced tube is set between adjacent two second reinforced pipes, both of which plays a part of enhancing structure stability and intensity.
Further, the first benefit being connected with the first reinforced tube is all respectively arranged on second reinforced pipe and principal post Strong plate, also sets up the second stiffening plate for be connected with the second reinforced tube on second reinforced pipe, first stiffening plate and Second stiffening plate is in the same plane.
Further, the telophragma includes being welded in supporting plate on long tube, and the supporting plate is towards the second reinforced pipe One side on be provided for the fixed plate that is connected with the second reinforced pipe, opposite side sets the limited block being connected with support tube.
Further, the limited block is the two boards in length and breadth of right-angled intersection, increases vertical when supporting plate is connected with support tube To and transverse direction on intensity.
Further, the first reinforced pipe two ends open up welding U-board in bayonet socket, the bayonet socket, right on the principal post Reinforcing plate is set in the position of U-board connection, plane is parallel with plane where supporting plate where the reinforcing plate.
Further preferably the bayonet socket is arranged at the centre position of the first reinforced pipe two ends, and its depth is less than U-board Length, for improving stability during connection.
Beneficial effects of the present invention:
This shaft tower solves the installation question of extra-high voltage electric power shaft tower, and bar is made by way of being assembled after installing in advance Tower installs become succinct in mountain area, quickly, without workman the separately installed shaft tower in mountain area high-altitude each component, and this shaft tower Structural strength is high, beneficial to the influence that the various natural causes of reply are caused to shaft tower.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the left view of telophragma;
Fig. 3 is the structural representation of support tube;
Fig. 4 is the structural representation of the first reinforced pipe.
In figure, 1- principal posts, 11- reinforcing plates, 2- connection members, the reinforced pipes of 21- first, 211- bayonet sockets, 22- telophragmas, 221- supporting plates, 222- fixed plates, 223- limited blocks, 23- support tubes, 231- long tubes, 232- ring flanges, 233- short tubes, 24- Two reinforced pipes, the reinforced tubes of 25- first, the reinforced tubes of 26- second, the stiffening plates of 27- first, the stiffening plates of 28- second, 29-U shape plates, 3- Bolt.
Specific embodiment
Invention is described further below in conjunction with the accompanying drawings:
As shown in Figure 1 and Figure 4, a kind of high-strength combination formula shaft tower, including at least two segmented shaft tower unit, it is described Segmented shaft tower unit includes that four are used for assembled principal post 1, and the principal post 1 is round steel pipe, is led between adjacent two principal posts 1 Connection member 2 is crossed to be attached.The connection member 2 includes four the first reinforced pipes 21 for being used to reinforce connection, described first Reinforced pipe 21 is round steel pipe of the diameter less than the diameter of principal post 1, and its two ends opens up bayonet socket 211, and the bayonet socket 211 is strip Shape, its position is located on the center line of the first reinforced pipe 21, then in the interior welds U-board 29 of bayonet socket 211, it is ensured that U-board 29 It is to be overlapped with the center line of the first reinforced pipe 21.After so by U-board 29 and miscellaneous part welding, the first reinforced pipe is just can determine that 21 place plane.The U-board 29 is formed by rectangle steel plate bending, compared to common rectangle steel plate, its structure tool There is intensity higher.Throat thickness is more than the steel reinforcing plate 11 of U-board 29 on the principal post 1, for improving and U-board 29 Bonding strength.The U-board 29 of described one end of first reinforced pipe 21 is connected with reinforcing plate 11 by bolt 3, and the connected mode is not only Facilitating workman carries out installation fixation, moreover it is possible to ensure to be fixed by face between the first reinforced pipe 21 and principal post 1, and increase connects between the two Contacting surface is accumulated, so that total has more preferable stabilized soil pavement.
As shown in figures 1 and 3, the other end of the first reinforced pipe 21 passes through U-board 29 and is carried on support tube 23 Telophragma 22 is connected by bolt 3, and the two ends of the support tube 23 are respectively welded on two adjacent principal posts 1.The support Pipe 23 includes long tube 231, is arranged at the ring flange 232 of the end of long tube 231, the short tube being connected with long tube 231 by ring flange 232 233.The long tube 231 is round steel pipe, its one end is welded and fixed with principal post 1, other end welding flange 232 and extends Outside disk 22, whole telophragma 22 is carried on completely on long tube 231, be used to ensure the stability of telophragma 22.The short tube 233 is the round steel pipe with the same diameter of long tube 231, and its one end is welded with principal post 1, and the other end passes through ring flange 232 and long tube 231 connections, this connected mode can be by adjusting the connection of short tube 233 to correct the position of telophragma 22, so as to improve whole The stability of individual structure and the difficulty for reducing installation.
As shown in Fig. 2 the telophragma 22 includes the supporting plate 221 being welded on long tube 231, the face of the supporting plate 221 To for being provided for what is be connected with the second reinforced pipe 24 in the one side for connecting the second reinforced pipe 24 between abutting connection part 2 Fixed plate 222, opposite side sets the limited block 223 being made up of the plate of two pieces of cruciform shapes being connected with support tube 23.It is described The place plane of fixed plate 222 is mutually perpendicular to the place plane of supporting plate 221, makes the uniform force of telophragma 22.The limited block 223 Increased longitudinal direction when supporting plate 221 is connected with support tube 23 and the intensity in transverse direction.
As shown in figure 1, the plane by being surrounded between four the second reinforced pipes 24 and being enclosed by between four support tubes 23 Into plane be parallel to each other, and due to the plane be horizontal plane, can reduce the structure wind-engaging power effect influence.It is simultaneously described First reinforced tube 25, adjacent two second reinforced pipes are set between the second reinforced pipe 24 and its principal post 1 closest to side Second reinforced tube 26 is set between 24, is all respectively arranged on second reinforced pipe 24 and principal post 1 and the first reinforced tube 25 First stiffening plate 27 of connection, also sets up the second stiffening plate for being connected with the second reinforced tube 26 on second reinforced pipe 24 28, first stiffening plate 27 stability that is used to improve when being connected structure in the same plane with the second stiffening plate 28.Institute State material all with the first reinforced pipe 21 of the second reinforced pipe 24, the first reinforced tube 25 and the second reinforced tube 26, structure identical, but Length dimension is different, and all carries out bolt connection by U-board 29 and other plate bodys.By the second reinforced pipe 24, first The setting of the reinforced tube 26 of reinforced tube 25 and second, connection possesses intensity higher between making connection member 2, whole so as to improve The strength and stability of individual segmented shaft tower unit.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, on the premise of the technology of the present invention principle is not departed from, some improvements and modifications can also be made, these improvements and modifications Also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of high-strength combination formula shaft tower, including at least two segmented shaft tower unit, it is characterised in that:Described point Segmentation shaft tower unit includes that four are used for assembled principal post(1), adjacent two principal posts(1)Between connection member is set(2), The connection member(2)Including at least more than two the first reinforced pipes for being used to reinforce connection(21), for fixing the first reinforcement Pipe(21)Telophragma(22)And for carrying telophragma(22)Support tube(23), positioned at telophragma(22)The of the same side One reinforced pipe(21), its one end all with telophragma(22)Connection, the other end respectively with principal post(1)Two ends connection.
2. a kind of high-strength combination formula shaft tower according to claim 1, it is characterised in that:The support tube(23)Two ends It is connected to two adjacent principal posts(1)On, the support tube(23)Including long tube(231), it is arranged at long tube(231)End Ring flange(232), by ring flange(232)With long tube(231)The short tube of connection(233).
3. a kind of high-strength combination formula shaft tower according to claim 2, it is characterised in that:The long tube(231)Stretch out in Telophragma(22)It is outer to pass through ring flange again(232)With short tube(233)Connection.
4. a kind of high-strength combination formula shaft tower according to claim 1, it is characterised in that:Adjacent connection member(2)It Between the second reinforced pipe is set(24), by multiple second reinforced pipes(24)Between the plane that surrounds with by multiple support tubes(23)Between The plane for surrounding is parallel to each other.
5. a kind of high-strength combination formula shaft tower according to claim 4, it is characterised in that:Second reinforced pipe(24)With Its principal post closest to side(1)Between the first reinforced tube is set(25);Adjacent two second reinforced pipes(24)Between set Two reinforced tubes(26).
6. a kind of high-strength combination formula shaft tower according to claim 5, it is characterised in that:Second reinforced pipe(24)With Principal post(1)On be all respectively arranged to and the first reinforced tube(25)First stiffening plate of connection(27), second reinforced pipe (24)On also set up for the second reinforced tube(26)Second stiffening plate of connection(28), first stiffening plate(27)With second Stiffening plate(28)It is in the same plane.
7. a kind of high-strength combination formula shaft tower according to claim 2, it is characterised in that:The telophragma(22)Including weldering It is connected to long tube(231)On supporting plate(221), the supporting plate(221)Towards the second reinforced pipe(24)One side on set use In with the second reinforced pipe(24)The fixed plate of connection(222), opposite side set and support tube(23)The limited block of connection(223).
8. a kind of high-strength combination formula shaft tower according to claim 7, it is characterised in that:The limited block(223)By ten Word X-shape two boards are combined.
9. a kind of high-strength combination formula shaft tower according to claim 1, it is characterised in that:First reinforced pipe(21) Two ends open up bayonet socket(211), the bayonet socket(211)Interior welding U-board(29), the principal post(1)On for U-board(29)Connection Position set reinforcing plate(11), the reinforcing plate(11)Place plane and supporting plate(221)Place plane is parallel.
10. a kind of high-strength combination formula shaft tower according to claim 9, it is characterised in that:The bayonet socket(211)It is arranged at First reinforced pipe(21)The centre position of two ends, its depth is less than U-board(29)Length.
CN201710157402.6A 2017-03-16 2017-03-16 A kind of high-strength combination formula shaft tower Pending CN106801533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710157402.6A CN106801533A (en) 2017-03-16 2017-03-16 A kind of high-strength combination formula shaft tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710157402.6A CN106801533A (en) 2017-03-16 2017-03-16 A kind of high-strength combination formula shaft tower

Publications (1)

Publication Number Publication Date
CN106801533A true CN106801533A (en) 2017-06-06

Family

ID=58988023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710157402.6A Pending CN106801533A (en) 2017-03-16 2017-03-16 A kind of high-strength combination formula shaft tower

Country Status (1)

Country Link
CN (1) CN106801533A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004084438A (en) * 2002-08-26 2004-03-18 Fukumoto Kogyo Kk Dehumidifying method available at the time of hermetically sealing steel pipe main pole member for steel tower structure
CN201649771U (en) * 2010-08-18 2010-11-24 青岛汇金通电力设备有限公司 Node structure for electric power tower
CN202090658U (en) * 2010-12-30 2011-12-28 国家电网公司 Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
CN203569956U (en) * 2013-10-15 2014-04-30 广州电力设计院 Truss of transmission tower
CN204112828U (en) * 2014-08-29 2015-01-21 国家电网公司 A kind of connector of steel tube
CN206903334U (en) * 2017-03-16 2018-01-19 湖州飞剑杆塔制造有限公司 A kind of high-strength combination formula shaft tower

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004084438A (en) * 2002-08-26 2004-03-18 Fukumoto Kogyo Kk Dehumidifying method available at the time of hermetically sealing steel pipe main pole member for steel tower structure
CN201649771U (en) * 2010-08-18 2010-11-24 青岛汇金通电力设备有限公司 Node structure for electric power tower
CN202090658U (en) * 2010-12-30 2011-12-28 国家电网公司 Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
CN203569956U (en) * 2013-10-15 2014-04-30 广州电力设计院 Truss of transmission tower
CN204112828U (en) * 2014-08-29 2015-01-21 国家电网公司 A kind of connector of steel tube
CN206903334U (en) * 2017-03-16 2018-01-19 湖州飞剑杆塔制造有限公司 A kind of high-strength combination formula shaft tower

Similar Documents

Publication Publication Date Title
WO2022213492A1 (en) Frp steel concrete column and steel beam combined joint, and installation method therefor
US20180291570A1 (en) Method for launching/constructing bridge using assembly of precast bottom plate and concrete-filled steel tube truss girder
KR101440434B1 (en) Construction Method for Composite Type Rahmen Bridge
KR101913069B1 (en) Prestressed Steel-Concrete Composite Girder and Method for Fabricating thereof
CN108149577B (en) A kind of steel bracket system and its installation method
CN206903334U (en) A kind of high-strength combination formula shaft tower
CN105568860A (en) Temporary pier construction method adopting assembled heavy steel pipe supporting device
KR20140145746A (en) Prestressed concrete segment girder with reinforced rigidity
WO2017118362A1 (en) Telecommunication tower
CN106801533A (en) A kind of high-strength combination formula shaft tower
JP2000045231A (en) Erection method for arch bridge
CN113550616A (en) Reinforcing rod based on hoop connection and reinforcing method thereof
CN108130852A (en) A kind of steel reinforced concrete combined board structure of Short/Medium Span Bridge
KR20160068107A (en) Steel beam and prestressed composite girder using the same thing and construction method there of
CN108755960A (en) A kind of high intensity square tube beam-to-column joint structure and its installation method
CN203924115U (en) A kind of subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar
CN215947934U (en) Big super high small radius circle curve steel box girder top pushes away nose girder
CN209368701U (en) Girder steel and beams of concrete floorings rigid splicing binding structure
CN206859038U (en) A kind of large span track beam structure
CN107558733B (en) The construction method of post-concreted expansion strip lower die frame system dismounting synchronous with periphery support for shuttering
CN105442456A (en) Assembling type heavy steel tube supporting device
JP2004116124A (en) Foundation structure of steel tower
CN208884712U (en) A kind of high intensity square tube beam-to-column joint structure
CN219099788U (en) Pre-buried arch foot system of arched bridge
KR101801371B1 (en) Beam With Stress Distributing Member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170606

WD01 Invention patent application deemed withdrawn after publication