CN106786896A - A kind of electric supply installation for intellectual water closet - Google Patents

A kind of electric supply installation for intellectual water closet Download PDF

Info

Publication number
CN106786896A
CN106786896A CN201611216324.4A CN201611216324A CN106786896A CN 106786896 A CN106786896 A CN 106786896A CN 201611216324 A CN201611216324 A CN 201611216324A CN 106786896 A CN106786896 A CN 106786896A
Authority
CN
China
Prior art keywords
water closet
intellectual water
unit
electricity
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611216324.4A
Other languages
Chinese (zh)
Other versions
CN106786896B (en
Inventor
林孝发
林孝山
林存辉
张晓立
于海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jomoo Group Co Ltd
Original Assignee
Jomoo Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jomoo Group Co Ltd filed Critical Jomoo Group Co Ltd
Priority to CN201611216324.4A priority Critical patent/CN106786896B/en
Publication of CN106786896A publication Critical patent/CN106786896A/en
Application granted granted Critical
Publication of CN106786896B publication Critical patent/CN106786896B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0042Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by the mechanical construction
    • H02J7/0045Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by the mechanical construction concerning the insertion or the connection of the batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits

Abstract

The present invention discloses a kind of electric supply installation for intellectual water closet, and the charging device includes cradle, wireless electricity accumulating unit, power supply pedestal and control system;Cradle, it is arranged on intellectual water closet, and is connected with intellectual water closet and control system;Wireless electricity accumulating unit, it docks cooperation with cradle, and supplies intellectual water closet electricity;This is wireless, and electricity accumulating unit includes sending and receiving electricity port, charge storage unit and displacement carriage assemblies;The displacement carriage assemblies drive charge storage unit is displaced to power supply pedestal and is charged, and is docked with cradle to supply intellectual water closet electricity by sending and receiving electricity port;Power supply pedestal, its docking AC outlet, docks for wireless electricity accumulating unit and charges;The present invention provides a kind of electric supply installation for intellectual water closet, simple structure, reasonable in design and easy realization, supply defect of the existing bathroom without pre-buried socket, realize a kind of more safe and reliable powering mode, it is supporting with intellectual water closet, lift overall intelligence effect.

Description

A kind of electric supply installation for intellectual water closet
Technical field
It is especially relevant with a kind of electric supply installation for intellectual water closet the present invention relates to sanitary ware industry.
Background technology
With intelligent scientific and technological progress, to be rooted in the hearts of the people, intelligence science and technology has been widely used in product in all kinds of products to intelligent concept, such as Intellectual water closet, its unique Consumer's Experience is favored by more users;But the electric power system that intellectual water closet is needed is supported, And in existing or bathroom fitment process before, all do not reserve power supply base in toilet seat position mostly so that Yong Huxuan Select conventional toilet seat or socket is introduced by rewiring and power, greatly obstruction is caused to intellectual water closet market;Additionally, The AC-powered that intellectual water closet is connected by socket, though safety utilization of electric power design is provided with, because bathroom keeps for a long time Humidity, still there is the possibility for producing the phenomenons such as electric leakage, and security performance has much room for improvement;Such as powered according to battery, though safety can be solved Problem, but delivery is not enough, and user cannot judge not enough power supply, cause to be failed during Based Intelligent Control, systemic breakdown;To sum up, it is existing The electric power system of intellectual water closet still have the space of improvement.
The content of the invention
It is an object of the invention to solve the problems, such as it is existing in, there is provided a kind of electric supply installation for intellectual water closet, its Simple structure, reasonable in design and easy realization, supply defect of the existing bathroom without pre-buried socket, realize a kind of more safe and reliable Powering mode, it is supporting with intellectual water closet, lifted overall intelligence effect.
To reach above-mentioned purpose, the present invention is adopted the following technical scheme that:
A kind of electric supply installation for intellectual water closet, it is characterised in that:The charging device includes cradle, wireless electric power storage Unit, power supply pedestal and control system;
Cradle, it is arranged on intellectual water closet, and is connected with intellectual water closet and control system;
Wireless electricity accumulating unit, it docks cooperation with cradle, and supplies intellectual water closet electricity;This is wireless electricity accumulating unit bag Include sending and receiving electricity port, charge storage unit and displacement carriage assemblies;The displacement carriage assemblies drive charge storage unit to be displaced to power supply base Seat is charged, and is docked with cradle to supply intellectual water closet electricity by sending and receiving electricity port;
Power supply pedestal, its docking AC outlet, docks for wireless electricity accumulating unit and charges;
Control system, it is built on intellectual water closet, and is electrically connected with displacement carriage assemblies, controls the displacement delivery group Part works;The control system includes PLC technology unit, information receiving module and instruction sending module;The PLC technology Unit is connected by information receiving module with each functional part in intellectual water closet inside, charge storage unit and displacement carriage assemblies, and The instruction for receiving PLC technology unit is sent to displacement carriage assemblies by instruction sending module, orders about displacement carriage assemblies The power supply pedestal cradle that charged or be returned to is moved to power.
Further, the control system also includes electric quantity monitoring module, and it is electrically connected with PLC technology unit, and is used for Monitor the electricity of the charge storage unit;The electric quantity monitoring module is set as electricity less than in the case of percentage five to percentage 20 Feedback PLC technology unit, and send instruction to displacement carriage assemblies be moved to power supply pedestal charged.
Further, the displacement carriage assemblies include a housing, pulley mechanism and Position Fixing Navigation System;The housing Inserted for charge storage unit, and run through for sending and receiving electricity port;The pulley mechanism is arranged at housing bottom, and is powered with power supply unit Pulley mechanism is moved;Position Fixing Navigation System is connected with PLC technology unit, and sets cradle on intellectual water closet, supplies The coordinate and slide assemblies of electric pedestal drive the track of the housing displacement;Wherein, the PLC technology unit receives electricity Amount monitoring module low battery signal, and instruction is sent to Position Fixing Navigation System and pulley mechanism, order about pulley mechanism drive described Charge storage unit in housing reaches the coordinate of the power supply pedestal specified along its default track, and makes charge storage unit with power supply pedestal Docking is charged.
Further, also including an obstacle detouring system, it is adapted to pulley mechanism;The obstacle detouring system is detected including real time line Head, avoid analysis module and cross over analysis module;The real time line detecting head is analyzed with avoidance analysis module and leap respectively Module is connected;Analysis module is avoided to be electrically connected respectively PLC technology unit with across analysis module;Wherein, the real time line is visited Gauge head detection projected route on barrier, and by avoid analysis module with across analysis module analyze judge avoid or across Obstacle-overpass thing, and by feedback of the information to PLC technology unit, by PLC technology unit pulley mechanism across or around Cross barrier.
Further, the real time line detecting head includes image imaging detecting head, and it is divided into housing forward end with left and right Both sides;Wherein, image imaging detecting head scanning barrier, and imaging projection obstacle height, compares with across analysis module, The leap of PLC technology Unit selection is fed back to according to comparison result or avoidance detours.
Further, the pulley mechanism includes driving wheel, Stump-jump wheel and deflecting roller;The driving wheel is divided into housing bottom Portion;The Stump-jump wheel is arranged on housing bottom front end;The deflecting roller is installed in the centre position of housing bottom.
Further, also including an environment monitoring module, it is arranged on the housing, for detecting running orbit periphery Temperature and humidity, and feed back to PLC technology unit, corrected according to testing result or compensation desired trajectory route.
Further, the power supply pedestal includes a framework, torsion spring, contact plate and the charge contact being arranged on contact plate Terminal;The contact plate be hinged with edge in framework, and interior be provided with the torsion spring;Wherein, the displacement carriage assemblies insert framework, And push up apical grafting touch panel and torsion spring is rotated up, order about charge contact terminal on the contact plate and be connected charge storage unit Sending and receiving electricity port offsets to coordinate and charges.
Further, the rated operational voltage of the charge storage unit is≤36V direct current safe operating voltages.
Technical solutions according to the invention are relative to prior art, the beneficial effect of acquirement:
(1) a kind of electric supply installation for intellectual water closet provided by the present invention, its simple structure, reasonable in design and easy reality It is existing, defect of the existing bathroom without pre-buried socket is supplied, intelligent power supply is carried out using wireless electricity accumulating unit, while passing through control system Homing vector charging is realized, a kind of more safe and reliable powering mode is realized, it is to avoid the electric leakage produced during using alternating current is endangered Danger, it is supporting with intellectual water closet, lift overall intelligence effect;
(2) electric quantity monitoring module is provided with control system of the invention, its real-time monitoring power consumption, and feed back to control system The PLC technology unit of system, instruction is sent when being set in not enough power supply automatically, is ordered about wireless electricity accumulating unit and is charged;If The low situation of electricity is currently in use, and programmable control system is judged, postpones to charge, and whether prompting needs manually to be moved It is dynamic;
(3) present invention carries the dynamic charge storage unit and is charged by displacement carriage assemblies, and utilizes Position Fixing Navigation System Homing vector recharging base is carried out, the effect of smart motion displacement is played, whole process is all realized by PLC technology unit, Without manually operating, displacement carriage assemblies are charged or are returned according to presetting circuit;
(4) present invention additionally comprises an obstacle detouring system, by real time line detecting head, avoid analysis module and cross over and analyze mould Block;When being prevented effectively from the generation barrier on scheduled circuit or track, can be intelligently target-seeking to recharging base;When running into barrier When, the detection of real time line detecting head, and feed back to avoidance analysis module and cross over analysis module, it is by the judgement of two analysis modules No leap is detoured, then by PLC technology unit drive displacement carriage assemblies obstacle detouring in what manner, reaches height intelligence Target-seeking effect;
(5) real time line detecting head of the present invention uses image imaging detecting head, the image imaging detecting head to scan barrier, And imaging projection obstacle height, and compared with across analysis module, the choosing of PLC technology unit is fed back to according to comparison result Select leap or avoidance detours, while constantly detected during detouring, to select optimal obstacle detouring route;
(6) pulley mechanism of the present invention includes driving wheel, Stump-jump wheel and deflecting roller;Can be effective by the setting of three kinds of wheel groups And obstacle detouring is rapidly carried out, strengthen the obstacle climbing ability of pulley mechanism;
(7) present invention also sets environment monitoring module, because the environment in bathroom keeps that humidity is larger, ground is wet for a long time Sliding situations such as, go to and ensure accuracy on the route of charging, detected by environment monitoring module, while feeding back to programmable Control unit, carries out real-Time Compensation, it is to avoid because excess surface water or other environmental factors lead to not accurate recharging base;
(8) present invention power supply pedestal utilizes torsion spring structure, it is ensured that when charge storage unit is connected with cradle on intellectual water closet It is more accurate, it is difficult for drop-off, the stability of testimony electricity of trying hard to keep is compressed by clamping;
(9) set direct-current working volts of the rated operational voltage less than or equal to 36V of the present invention, the voltage in the range of this It is safe voltage, it is to avoid produce Danger Electric shock risk, security performance is good.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes a part of the invention, this hair Bright schematic description and description does not constitute inappropriate limitation of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the dimensional decomposition structure diagram of the intellectual water closet for being equiped with charging device of the present invention;
Fig. 2 is the dimensional structure diagram of the intellectual water closet for being equiped with charging device of the present invention;
Fig. 3 is the dimensional structure diagram of wireless electricity accumulating unit of the present invention;
Fig. 4 is the dimensional structure diagram of power supply pedestal of the present invention;
Fig. 5 is the structural representation of control system of the present invention;
Specific embodiment
In order that the technical problems to be solved by the invention, technical scheme and beneficial effect are clearer, clear, below tie Drawings and Examples are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used To explain the present invention, it is not intended to limit the present invention.
As shown in Figures 1 to 5, a kind of electric supply installation for intellectual water closet of the present invention, the charging device includes Cradle 1, wireless electricity accumulating unit 2, power supply pedestal 3 and control system 4;
Cradle 1, it is arranged on intellectual water closet 5, and is connected with intellectual water closet 5 and control system 4;The charging Seat 1 includes a framework 31, torsion spring 32, contact plate 33 and the charge contact terminal 34 being arranged on contact plate 33;The contact plate 33 be hinged with edge in framework 31, and interior be provided with the torsion spring 32;Wherein, the displacement carriage assemblies insert framework 31, and upwards Ejection contact plate 33 and torsion spring 32 are rotated up, and order about charge contact terminal 34 on the contact plate 33 and are connected charge storage unit Sending and receiving electricity port offset cooperation charge;
Wireless electricity accumulating unit 2, it docks cooperation with cradle 1, and supplies the electricity of intellectual water closet 5;This is wireless electric power storage list Unit 2 includes sending and receiving electricity port 21, charge storage unit 22 and displacement carriage assemblies 23;The displacement carriage assemblies 23 drive storing up electricity list Unit 22 is displaced to power supply pedestal 3 and is charged, and is docked with cradle 1 to supply intellectual water closet 5 by sending and receiving electricity port 21 Electricity;The rated operational voltage of the charge storage unit 22 is≤36V direct current safe voltages;
The displacement carriage assemblies 23 include a housing 231, pulley mechanism 232 and Position Fixing Navigation System 233;The shell Body 231 is inserted for charge storage unit 22, and is run through for sending and receiving electricity port 21;The pulley mechanism 232 is arranged at the bottom of housing 231, And moved with power supply unit pulley mechanism 232 of powering;Position Fixing Navigation System 233 is connected with PLC technology unit 41, and Cradle 1, the coordinate of power supply pedestal 3 and slide assemblies drive the rail of the housing 231 displacement on setting intellectual water closet 5 Mark;Wherein, the PLC technology unit 41 receives the low battery signal of electric quantity monitoring module 44, and sends instruction to location navigation System 233 and pulley mechanism 232, order about pulley mechanism 232 and drive the charge storage unit 22 in the housing 231 along its default rail Mark reaches the coordinate of the power supply pedestal 3 specified, and charge storage unit 22 is docked charging with power supply pedestal 3.
Power supply pedestal 3, its docking AC outlet, docks for wireless electricity accumulating unit 2 and charges;The power supply pedestal 3 is wrapped Include a framework 31, torsion spring 32, contact plate 33 and the charge contact terminal 34 being arranged on contact plate 33;The contact plate 33 is hinged With edge in framework 31, and interior the torsion spring 32 is provided with;Wherein, the displacement carriage assemblies insert framework 31, and push up apical grafting Touch panel 33 and torsion spring 32 are rotated up, and order about the charge contact terminal 34 on the contact plate 33 and the sending and receiving for being connected charge storage unit Electric port offsets to coordinate and charges;
Control system 4, it is built on intellectual water closet 5, and is electrically connected with displacement carriage assemblies 23, controls the displacement fortune Component 23 is carried to work;The control system 4 includes PLC technology unit 41, information receiving module 411 and instruction sending module 412;The PLC technology unit 41 is by information receiving module 411 and each functional part in the inside of intellectual water closet 5, storing up electricity list Unit 22 and displacement carriage assemblies 23 are connected, and are sent out by the instruction that instruction sending module 412 will receive PLC technology unit 41 Displacement carriage assemblies 23 are delivered to, displacement carriage assemblies 23 is ordered about and move to the power supply cradle 1 that charged or be returned to of pedestal 3 supplying Electricity.
More specifically, the control system 4 also includes electric quantity monitoring module 44, it is electrically connected with PLC technology unit 41, And for monitoring the electricity of the charge storage unit 22;The electric quantity monitoring module 44 is set as electricity less than percentage five to percentage two PLC technology unit 41 is fed back in the case of ten, and is sent instruction to displacement carriage assemblies 23 and is moved to power supply pedestal 3 and carry out Charge.
More specifically, also including an obstacle detouring system 6, it is adapted to pulley mechanism 232;The obstacle detouring system 6 includes actual time line Road detecting head 61, avoidance analysis module 62 and leap analysis module 63;The real time line detecting head 61 is analyzed with avoidance respectively Module 62 and leap analysis module 63 are connected;Analysis module 62 is avoided to be electrically connected respectively PLC technology list with across analysis module 63 Unit 41;Wherein, the barrier in the real time line detecting head 61 detection projected route, and by avoid analysis module 62 with across The more analysis of analysis module 63 judges to avoid or across obstacle, and by feedback of the information to PLC technology unit 41, by that can compile The pulley mechanism 232 of process control unit 41 is crossed over or cut-through thing;The real time line detecting head 61 is in including image As detecting head, it is divided into the front end of housing 231 and the left and right sides;Wherein, image imaging detecting head scanning barrier, and imaging Projection obstacle height, and compared with across analysis module 63, feeding back to PLC technology unit 41 according to comparison result selects Across or avoidance detour.
More specifically, the pulley mechanism 232 includes driving wheel 232A, Stump-jump wheel 232B and deflecting roller 232C;The drive Driving wheel 232A is divided into the bottom of housing 231;The Stump-jump wheel 232B is arranged on the bottom front of housing 231;The deflecting roller 232C It is installed in the centre position of the bottom of housing 231.
More specifically, also including an environment monitoring module 7, it is arranged on the housing 231, for detecting running orbit The temperature and humidity on periphery, and PLC technology unit 41 is fed back to, corrected according to testing result or compensation desired trajectory route.
Specific embodiment, a kind of (as shown in Figures 1 to 5) charging device for intellectual water closet of the present invention, Including following part:
Intellectual water closet part, it includes intellectual water closet 5 and cradle 1, and cradle 1 is arranged on the bottom of intellectual water closet 5 Plate;Additionally, PLC technology unit 41 is also built in intellectual water closet 5, it passes through WIFE, LAN protocol or bluetooth etc. and leads to News mode is connected cooperation with displacement carriage assemblies 23 and power supply pedestal 3;
Wireless electricity accumulating unit 2, including sending and receiving electricity port 21, charge storage unit 22 and displacement carriage assemblies 23;
Displacement carriage assemblies 23 then include a housing 231, driving wheel 232A, Stump-jump wheel 232B, deflecting roller 232C, obstacle detouring system System 6, Position Fixing Navigation System 233 and environment monitoring module 7;The driving wheel 232A is divided into the bottom of housing 231, it is described to get over Barrier wheel 232B is arranged on the bottom front of housing 231, and the deflecting roller 232C is installed in the centre position of the bottom of housing 231;And store up Electric unit 22 is then installed in housing 231, and sending and receiving electricity port 21 is arranged on the upper end of housing 231, the contact chip of its correspondence cradle 1 And the power supply correspondence of pedestal 3;Real time line detecting head 61 is additionally provided with inside the housing 231, its be installed in the front end of housing 231 with The left and right sides;
Position Fixing Navigation System 233 is connected with PLC technology unit 41, and sets cradle 1 on intellectual water closet 5, power supply The coordinate and pulley mechanism 232 of pedestal 3 drive the track of the displacement of the housing 231;
Obstacle detouring system 6, including real time line detecting head 61, avoidance analysis module 62 and leap analysis module 63;The reality When line sniffing first 61 respectively with avoid analysis module 62 and be connected across analysis module 63;Avoid analysis module 62 and cross over and divide Analysis module 63 is electrically connected PLC technology unit 41 respectively;Wherein, the barrier in the detection of real time line detecting head 61 projected route Hinder thing, and by avoiding analysis module 62 and being analyzed across analysis module 63 and judge to avoid or across obstacle, and will letter Breath feeds back to PLC technology unit 41, is crossed over or cut-through by the pulley mechanism 232 of PLC technology unit 41 Thing;
Environment monitoring module 7, it is arranged on the housing 231, temperature and humidity for detecting running orbit periphery, And PLC technology unit 41 is fed back to, desired trajectory route is corrected according to testing result;
Power supply pedestal 3, its docking AC outlet, docks for wireless electricity accumulating unit 2 and charges;And by framework 31, torsion Spring 32, contact plate 33 and the composition cradle 1 of charge contact terminal 34 being arranged on contact plate 33, contact plate 33 are hinged and framework Edge on 31, and it is interior be provided with the torsion spring 32, by torsion spring 32 cause contact plate 33 on charge contact terminal 34 be connected storing up electricity The sending and receiving electricity port 21 of unit 22 offsets to coordinate and charges;
When actually used, as shown in Figures 1 to 5, the PLC technology unit 41 in intellectual water closet 5 is received by information Each functional part in the inside of module 411 and intellectual water closet 5, charge storage unit 22 and displacement carriage assemblies 23 are connected, when receiving electricity Whether during amount 44 low battery signal of monitoring modular, judge has user to be currently in use first, if so, then judging whether to use enough Family uses, if nothing, directly sends instructions to displacement carriage assemblies 23, displacement carriage assemblies by instruction sending module 412 23 drive charge storage unit 22 to depart from cradle 1 first according to instruction, then move to enter at power supply pedestal 3 by the route of setting Row wireless charging, when electricity meets use demand, PLC technology unit 41 is fed back to by signal, and send instruction recall to The cradle 1 of intellectual water closet 5;
Charged or during recalling to cradle 1 going on the displacement carriage assemblies 23, thereon environmental monitoring mould Block 7 can at any time monitor ground and environmental aspect, and whether Real-time Feedback continues to fill to PLC technology unit 41 to be given Electricity or return;And the when line sniffing head on displacement carriage assemblies 23 uses image imaging detecting head 61, it sets up front end separately with a left side Right both sides;Whether there is barrier on the real time scan scheduled circuit of image imaging detecting head 61, if nothing, by original circuit displacement To intended destination, if so, then projecting obstacle height by imaging, and first pass through and compared across analysis module 63, judgement is It is no to cross over, if can cross over, PLC technology unit 41 is fed back to according to comparison result, institute is driven by PLC technology State Stump-jump wheel 232B and driving wheel 232A to coordinate, to cross over corresponding barrier;
If comparing structure cannot cross over, selection avoidance detours, and now makes analysis by avoidance analysis module 62, coordinates left The data of right both sides image imaging detecting head feedback, judge whether to be detoured from that direction with angle, anti-after choice direction PLC technology unit 41 is fed to, and is compared and matched with advance route by PLC technology unit 41, while driving deflecting roller 232C and driving wheel 232A coordinates, and selection optimal path detours;In addition analysis module 62 is avoided to be additionally operable to judge and compare housing 231 is safe distance at a distance of 10-20 centimeters of distance with barrier;
Preferential selected recurrence projected route, bypass route is recorded by PLC technology unit 41 after cut-through thing, with Preferentially selected during for next avoidance;
A kind of electric supply installation for intellectual water closet provided by the present invention, its simple structure, reasonable in design and easy realization, Defect of the existing bathroom without pre-buried socket is supplied, intelligent power supply is carried out using wireless electricity accumulating unit, while passing through control system reality Existing homing vector charging, realizes a kind of more safe and reliable powering mode, it is to avoid the electric leakage produced during using alternating current is endangered Danger, it is supporting with intellectual water closet, lift overall intelligence effect;Electric quantity monitoring module is provided with control system of the invention, in fact When monitor power consumption, and feed back to the PLC technology unit of control system, send instruction automatically when being set in not enough power supply, drive Wireless electricity accumulating unit is set to be charged;If being currently in use in the low situation of electricity, programmable control system is judged, postpones to fill Electricity, and point out whether to need manually to move;The present invention carries the dynamic charge storage unit and is charged by displacement carriage assemblies, And homing vector recharging base is carried out using Position Fixing Navigation System, and the effect of smart motion displacement is played, whole process all passes through PLC technology unit realizes that, without artificial operation, displacement carriage assemblies are charged or returned according to presetting circuit;This hair It is bright also to include an obstacle detouring system, by real time line detecting head, avoid analysis module and cross over analysis module;It is prevented effectively from pre- When producing barrier on alignment road or track, can be intelligently target-seeking to recharging base;When barrier is run into, real time line detection Head detection, and feed back to avoidance analysis module and cross over analysis module, determine whether to cross over or detour by two analysis modules, Again by PLC technology unit drive displacement carriage assemblies obstacle detouring in what manner, the target-seeking effect of height intelligence is reached;This hair Bright real time line detecting head uses image imaging detecting head, image imaging detecting head scanning barrier, and imaging projection obstacle Thing highly, and is compared with across analysis module, and feeding back to PLC technology Unit selection according to comparison result crosses over or avoidance Detour, while constantly detected during detouring, to select optimal obstacle detouring route;Pulley mechanism of the present invention includes driving Driving wheel, Stump-jump wheel and deflecting roller;Obstacle detouring can efficiently and quickly be carried out by the setting of three kinds of wheel groups, strengthen the obstacle detouring of pulley mechanism Ability;The present invention also sets environment monitoring module, because the environment in bathroom keeps the feelings such as humidity is larger, ground is wet and slippery for a long time Condition, goes to and ensures accuracy on the route of charging, is detected by environment monitoring module, while feeding back to PLC technology list Unit, carries out real-Time Compensation, it is to avoid because excess surface water or other environmental factors lead to not accurate recharging base;Cradle of the present invention Using torsion spring structure, it is ensured that charge storage unit is more accurate when being connected with cradle on intellectual water closet, difficult for drop-off, by clamping Compress the stability of testimony electricity of trying hard to keep;Set direct-current working volts of the rated operational voltage less than or equal to 36V of the invention, this In the range of voltage be safe voltage, it is to avoid produce Danger Electric shock risk, security performance is good.
Described above has shown and described the preferred embodiments of the present invention, as previously described, it should be understood that not office of the invention Be limited to form disclosed herein, be not to be taken as the exclusion to other embodiment, and can be used for various other combinations, modification and Environment, and can be changed by the technology or knowledge of above-mentioned teaching or association area in invention contemplated scope described herein It is dynamic.And the change and change that those skilled in the art are carried out do not depart from the spirit and scope of the present invention, then all should be appended by the present invention In scope of the claims.

Claims (9)

1. a kind of electric supply installation for intellectual water closet, it is characterised in that:The charging device includes cradle, wireless electric power storage list Unit, power supply pedestal and control system;
Cradle, it is arranged on intellectual water closet, and is connected with intellectual water closet and control system;
Wireless electricity accumulating unit, it docks cooperation with cradle, and supplies intellectual water closet electricity;This is wireless, and electricity accumulating unit includes connecing Generating port, charge storage unit and displacement carriage assemblies;The displacement carriage assemblies drive charge storage unit is displaced to power supply pedestal and enters Row charges, and is docked with cradle to supply intellectual water closet electricity by sending and receiving electricity port;
Power supply pedestal, its docking AC outlet, docks for wireless electricity accumulating unit and charges;
Control system, it is built on intellectual water closet, and is electrically connected with displacement carriage assemblies, controls the displacement carriage assemblies work Make;
The control system includes PLC technology unit, information receiving module and instruction sending module;The PLC technology list Unit is connected by information receiving module with each functional part in intellectual water closet inside, charge storage unit and displacement carriage assemblies, and is led to Cross instruction sending module to send to displacement carriage assemblies the instruction for receiving PLC technology unit, order about displacement carriage assemblies fortune Move to the power supply pedestal cradle that charged or be returned to and power.
2. a kind of electric supply installation for intellectual water closet as claimed in claim 1, it is characterised in that:The control system is also Including electric quantity monitoring module, it is electrically connected with PLC technology unit, and for monitoring the electricity of the charge storage unit;The electricity Monitoring modular is set as electricity less than feedback PLC technology unit in the case of percentage five to percentage 20, and sends instruction extremely Displacement carriage assemblies are moved to power supply pedestal and are charged.
3. a kind of electric supply installation for intellectual water closet as claimed in claim 2, it is characterised in that:The displacement delivery group Part includes a housing, pulley mechanism and Position Fixing Navigation System;The housing is inserted for charge storage unit, and is passed through for sending and receiving electricity port Wear;The pulley mechanism is arranged at housing bottom, and is moved with power supply unit pulley mechanism of powering;Position Fixing Navigation System with PLC technology unit is connected, and sets cradle on intellectual water closet, the coordinate of power supply pedestal and slide assemblies drive institute State the track of housing displacement;Wherein, the PLC technology unit receives electricity monitoring module low battery signal, and sends instruction To Position Fixing Navigation System and pulley mechanism, order about pulley mechanism and drive the charge storage unit in the housing to be arrived along its default track Up to the coordinate of the power supply pedestal specified, and charge storage unit is set to dock charging with power supply pedestal.
4. a kind of electric supply installation for intellectual water closet as claimed in claim 3, it is characterised in that:Also include an obstacle detouring system System, it is adapted to pulley mechanism;The obstacle detouring system includes real time line detecting head, avoids analysis module and cross over analysis module; The real time line detecting head is connected with avoidance analysis module and across analysis module respectively;Avoid analysis module and cross over analysis Module is electrically connected PLC technology unit respectively;Wherein, the barrier in the real time line detecting head detection projected route, and lead to Avoidance analysis module is crossed to judge to avoid or across obstacle with across analysis module analysis, and by feedback of the information to programmable control Unit processed, is crossed over or cut-through thing by PLC technology unit pulley mechanism.
5. a kind of electric supply installation for intellectual water closet as claimed in claim 4, it is characterised in that:The real time line is visited Gauge head includes image imaging detecting head, and it is divided into housing forward end and the left and right sides;Wherein, image imaging detecting head scanning barrier Hinder thing, and imaging projection obstacle height, compared with across analysis module, PLC technology unit is fed back to according to comparison result Selection is crossed over or avoidance detours.
6. a kind of electric supply installation for intellectual water closet as described in claim 3,4 or 5, it is characterised in that:The pulley Mechanism includes driving wheel, Stump-jump wheel and deflecting roller;The driving wheel is divided into housing bottom;The Stump-jump wheel is arranged on housing bottom Portion front end;The deflecting roller is installed in the centre position of housing bottom.
7. a kind of electric supply installation for intellectual water closet as claimed in claim 6, it is characterised in that:Also supervised including an environment Module is surveyed, it is arranged on the housing, for detecting the temperature and humidity on running orbit periphery, and feeds back to PLC technology Unit, corrects or compensation desired trajectory route according to testing result.
8. a kind of electric supply installation for intellectual water closet as claimed in claim 1, it is characterised in that:The power supply pedestal bag Include a framework, torsion spring, contact plate and the charge contact terminal being arranged on contact plate;The contact plate be hinged with edge in framework, And interior it is provided with the torsion spring;Wherein, the displacement carriage assemblies insert framework, and push up apical grafting touch panel and torsion spring turns upwards It is dynamic, order about the charge contact terminal on the contact plate and offset to coordinate with the sending and receiving electricity port for being connected charge storage unit and charge.
9. a kind of electric supply installation for intellectual water closet as claimed in claim 1, it is characterised in that:The charge storage unit Rated operational voltage is≤36V direct current safe operating voltages.
CN201611216324.4A 2016-12-26 2016-12-26 Power supply device for intelligent toilet Active CN106786896B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611216324.4A CN106786896B (en) 2016-12-26 2016-12-26 Power supply device for intelligent toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611216324.4A CN106786896B (en) 2016-12-26 2016-12-26 Power supply device for intelligent toilet

Publications (2)

Publication Number Publication Date
CN106786896A true CN106786896A (en) 2017-05-31
CN106786896B CN106786896B (en) 2023-05-02

Family

ID=58925766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611216324.4A Active CN106786896B (en) 2016-12-26 2016-12-26 Power supply device for intelligent toilet

Country Status (1)

Country Link
CN (1) CN106786896B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110460122A (en) * 2018-05-07 2019-11-15 曹可瀚 Toilet and charging method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010200591A (en) * 2009-02-27 2010-09-09 Inax Corp Battery-powered remote control device
US20100237096A1 (en) * 2009-03-17 2010-09-23 Gojo Industries, Inc. Wirelessly-powered dispenser system
CN104790492A (en) * 2015-04-28 2015-07-22 苏州路之遥科技股份有限公司 3D intelligent pedestal pan
CN105569145A (en) * 2014-10-13 2016-05-11 洪东 Pedestal pan and installation method thereof
CN105827001A (en) * 2016-04-22 2016-08-03 厦门科牧智能技术有限公司 Pedestal pan with wireless charging function, device matched with pedestal pan to realize charging and charging mechanism
CN206575176U (en) * 2016-12-26 2017-10-20 九牧厨卫股份有限公司 A kind of electric supply installation for intellectual water closet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010200591A (en) * 2009-02-27 2010-09-09 Inax Corp Battery-powered remote control device
US20100237096A1 (en) * 2009-03-17 2010-09-23 Gojo Industries, Inc. Wirelessly-powered dispenser system
CN105569145A (en) * 2014-10-13 2016-05-11 洪东 Pedestal pan and installation method thereof
CN104790492A (en) * 2015-04-28 2015-07-22 苏州路之遥科技股份有限公司 3D intelligent pedestal pan
CN105827001A (en) * 2016-04-22 2016-08-03 厦门科牧智能技术有限公司 Pedestal pan with wireless charging function, device matched with pedestal pan to realize charging and charging mechanism
CN206575176U (en) * 2016-12-26 2017-10-20 九牧厨卫股份有限公司 A kind of electric supply installation for intellectual water closet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110460122A (en) * 2018-05-07 2019-11-15 曹可瀚 Toilet and charging method

Also Published As

Publication number Publication date
CN106786896B (en) 2023-05-02

Similar Documents

Publication Publication Date Title
CN104578255B (en) Two-way charger
CN111660859A (en) Electric vehicle charging system of indoor parking lot and control method thereof
CN107627879A (en) A kind of mobile charging system and method to be charged in order for more static electric automobiles
CN106042959A (en) Self-recognition electric automobile charging method and device
CN105634060B (en) The charge-discharge system and its method of mobile power
CN204391771U (en) For the charging device of inductive charging
US20120249054A1 (en) Universal charging board assembly and method for providing power to devices connected thereof
EP3683083A1 (en) Full-feature container and container switching station
CN107334424B (en) A kind of novel flight formula sweeping robot
DK2779349T3 (en) POWER CONTROL DEVICES
CN110994732A (en) Automatic battery replacement system and method for mobile equipment
CN206575176U (en) A kind of electric supply installation for intellectual water closet
CN106786896A (en) A kind of electric supply installation for intellectual water closet
CN102570519B (en) Automotive traveling equipment
US9711997B2 (en) System and method for storing and distributing DC power
CN108340808A (en) Movable-type intelligent charging equipment
JP2011097685A (en) Parking device group
CN106093789A (en) A kind of household service robot realizing electric power detection distant early warning
CN103576823A (en) Voltage Regulating Device
WO2012066407A1 (en) Multiple battery charger for portable electronic devices
KR102165955B1 (en) Electronic vehicle charging apparatus having control function by sensing user
CN107985088A (en) A kind of removable energy storage charging station
CN109427001A (en) The lend-lease administration device and method of mobile power source
CN107733060A (en) The outdoor shared charging leasing system of canopy formula
CN205608115U (en) Portable electric pile detection device that fills

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant