CN106786533A - The acquisition methods and device of electric dispatching plan data - Google Patents

The acquisition methods and device of electric dispatching plan data Download PDF

Info

Publication number
CN106786533A
CN106786533A CN201611230438.4A CN201611230438A CN106786533A CN 106786533 A CN106786533 A CN 106786533A CN 201611230438 A CN201611230438 A CN 201611230438A CN 106786533 A CN106786533 A CN 106786533A
Authority
CN
China
Prior art keywords
power network
data
electric
power
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611230438.4A
Other languages
Chinese (zh)
Other versions
CN106786533B (en
Inventor
王宝松
张桂芹
崔志国
高立志
郑悦
徐晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611230438.4A priority Critical patent/CN106786533B/en
Publication of CN106786533A publication Critical patent/CN106786533A/en
Application granted granted Critical
Publication of CN106786533B publication Critical patent/CN106786533B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Abstract

The invention provides a kind of acquisition methods and device of electric dispatching plan data, it is related to technical field of electric power, the method to include obtaining the basic data of the power network in electric dispatching plan;Judge type of the power network in the electric dispatching plan, obtain the corresponding relation factor of type of the power network;Wherein, the type of the power network includes receiving end power network and sending end power network;Obtain additional data corresponding with the type of the relation factor and the power network;Topological structure of electric based on the power network is matched and concatenation the basic data with the additional data, obtains the electric dispatching plan data of the power network.The present invention can improve the acquisition efficiency and accuracy of electric dispatching plan data.

Description

The acquisition methods and device of electric dispatching plan data
Technical field
The present invention relates to technical field of electric power, more particularly, to a kind of acquisition methods and dress of electric dispatching plan data Put.
Background technology
With continuing to develop for global economy, power network interconnects the inexorable trend as power system development, electric power on a large scale Network has turned into one of most complicated in the world network.Under current dispatching of power netwoks enterprise schema, interconnection between region and province Transmission of electricity plan is to realize one of necessary links of energy most optimum distribution of resources in nationwide, is the composition portion of rational dispatching by power grids Point, therefore, electric dispatching plan has critical role in rational dispatching by power grids.
However, existing electric dispatching plan establishment is only related to the supporting power supply of sending end and electricity transaction, it has therefore been proposed to institute The data for needing are relatively limited, but if considering sending outside and receiving end operation of power networks demand etc. for sending end power network scene clean energy resource Various accompanying informations, the then requirement to the overall data needed for electric dispatching plan will be significantly increased so that the base of original power network Plinth data are more difficult with the processing procedure for considering the excessive data after accompanying information.
After power network accompanying information is considered in the prior art, it is difficult to obtain the problem of electric dispatching plan data, at present Not yet propose effective solution.
The content of the invention
In view of this, it is an object of the invention to provide a kind of acquisition methods and device of electric dispatching plan data, energy Enough alleviate after considering power network accompanying information present in prior art, be difficult to obtain the problem of electric dispatching plan data.
To achieve these goals, the technical scheme that the embodiment of the present invention is used is as follows:
In a first aspect, a kind of acquisition methods of electric dispatching plan data are the embodiment of the invention provides, including:Obtain electricity The basic data of the power network in power operation plan;The voltage amplitude of each node in topological structure of electric of the basic data including power network Value, voltage phase angle, active power and reactive power;Judge type of the power network in electric dispatching plan, obtain the type of power network Corresponding relation factor;Wherein, the type of power network includes receiving end power network and sending end power network;Obtain the class with relation factor and power network The corresponding additional data of type;Basic data is matched and is spliced behaviour by the topological structure of electric based on power network with additional data Make, obtain the electric dispatching plan data of power network.
With reference in a first aspect, the embodiment of the invention provides the first possible implementation method of first aspect, wherein, obtain The corresponding relation factor of type of power taking net includes:When the type of power network is sending end power network, the relation factor of acquisition is conventional The energy and/or clean energy resource;When the type of power network is receiving end power network, the relation factor of acquisition constrain for active balance and/or Emphasis section tidal current is constrained.
With reference to the first possible implementation method of first aspect, second of first aspect is the embodiment of the invention provides Possible implementation method, wherein, obtaining additional data corresponding with the type of relation factor and power network includes:When the type of power network It is sending end power network, and relation factor is when including clean energy resource, obtains following additional data:The clean energy resource prediction that needs are sent outside Value, transactional reference value, supporting normal power supplies information and send adjustment information outside;Wherein, transactional reference value is advised including electricity transaction Power value, bound adjustment interval range and suggestion electricity;Supporting normal power supplies information includes the start-stop meter of supporting normal power supplies Draw, the regulation performance of supporting normal power supplies and suggestion electricity;Send adjustment interval and peak valley that adjustment information is sent outside including direct current outside Electric power constraint information;When the type of power network is receiving end power network, and relation factor is when including active Constraints of Equilibrium, obtains following additional Data:The active bound of clean energy resource and conventional energy resource is adjustable interval range, the prediction of receiving end network load, operation plan, mutually Contact broken string cross-section limitation and original plan value between connection power network;When the type of power network is receiving end power network, and relation factor bag When including the constraint of emphasis section tidal current, following additional data is obtained:The initial power flow solutions of emphasis section, direct current drop point are disconnected to concern The active po wer sensitivity in face.
With reference in a first aspect, the embodiment of the invention provides the third possible implementation method of first aspect, wherein, base Basic data is matched and concatenation with additional data in the topological structure of electric of power network, is obtained the power scheduling of power network Planning data includes:According to the topological structure of electric of power network, power network is divided into multiple regions;Wherein, each region carries Identity;According to corresponding each node of basic data and the position relationship of regional, the basis for setting up basic data is consolidated Calibration is known;Wherein, basic constant mark has the first corresponding relation with identity;According to power network additional data and regional Incidence relation, set up the additional constant mark of additional data, wherein, additional constant mark and identity have second corresponding Relation;According to the first corresponding relation and the second corresponding relation, the 3rd corresponding relation of basic data and additional data is determined;According to 3rd corresponding relation, is matched and concatenation to basic data with additional data, obtains the electric dispatching plan number of power network According to.
With reference in a first aspect, the embodiment of the invention provides the 4th kind of possible implementation method of first aspect, wherein, side Method also includes:Electric dispatching plan model is set up according to electric dispatching plan data.
Second aspect, the embodiment of the present invention also provides a kind of acquisition device of electric dispatching plan data, including:Basic number According to acquisition module, the basic data for obtaining the power network in electric dispatching plan;Basic data includes the power network topology of power network The voltage magnitude of each node, voltage phase angle, active power and reactive power in structure;Relevancy factor acquisition module, for sentencing Type of the power-off net in electric dispatching plan, obtains the corresponding relation factor of type of power network;Wherein, the type of power network includes Receiving end power network and sending end power network;Additional data acquisition module, it is corresponding with the type of relation factor and power network additional for obtaining Data;Planning data obtains module, and basic data is matched with additional data for the topological structure of electric based on power network With concatenation, the electric dispatching plan data of power network are obtained.
With reference to second aspect, the first possible implementation method of second aspect is the embodiment of the invention provides, wherein, close Connection factor acquisition module includes:Sending end acquiring unit, for when the type of power network is sending end power network, the relation factor of acquisition to be Conventional energy resource and/or clean energy resource;Receiving end acquiring unit, for when the type of power network is receiving end power network, the association of acquisition because Element is active balance constraint and/or the constraint of emphasis section tidal current.
With reference to the first possible implementation method of second aspect, second of second aspect is the embodiment of the invention provides Possible implementation method, wherein, additional data acquisition module includes:First acquisition unit, for being sending end when the type of power network Power network, and relation factor is when including clean energy resource, obtains following additional data:Clean energy resource predicted value, transaction that needs are sent outside Reference value, supporting normal power supplies information and send adjustment information outside;Wherein, transactional reference value include electricity transaction suggestion power value, Bound adjusts interval range and suggestion electricity;It is the start-stop plan of supporting normal power supplies information including supporting normal power supplies, supporting The regulation performance and suggestion electricity of normal power supplies;Send adjustment interval and peak-trough electricity force constraint that adjustment information is sent outside including direct current outside Information;Second acquisition unit, for when power network type be receiving end power network, and relation factor include active Constraints of Equilibrium when, obtain Take following additional data:The active bound of clean energy resource and conventional energy resource is adjustable interval range, the prediction of receiving end network load, adjust Contact broken string cross-section limitation and original plan value between degree plan, interconnected network;3rd acquiring unit, for when the class of power network Type is receiving end power network, and relation factor is when including that emphasis section tidal current is constrained, and obtains following additional data:Emphasis section it is initial The active po wer sensitivity of power flow solutions, direct current drop point to concern section.
With reference to second aspect, the third possible implementation method of second aspect is the embodiment of the invention provides, wherein, meter Data are drawn to obtain module and include:Division unit, for the topological structure of electric according to power network, multiple regions is divided into by power network; Wherein, each region carries identity;Basis mark set up unit, for according to corresponding each node of basic data with The position relationship of regional, sets up the basic constant mark of basic data;Wherein, basic constant mark has with identity First corresponding relation;Additional identification sets up unit, for the incidence relation according to power network additional data and regional, sets up attached The additional constant mark of addend evidence, wherein, additional constant mark has the second corresponding relation with identity;Relation determines single Unit, for according to the first corresponding relation and the second corresponding relation, determining the 3rd corresponding relation of basic data and additional data;Meter Draw data and obtain unit, for according to the 3rd corresponding relation, being matched with additional data to basic data and concatenation, obtain To the electric dispatching plan data of power network.
With reference to second aspect, the 4th kind of possible implementation method of first aspect is the embodiment of the invention provides, wherein, dress Putting also includes:Model building module, for setting up electric dispatching plan model according to electric dispatching plan data.
A kind of acquisition methods and device of electric dispatching plan data are the embodiment of the invention provides, electric power tune can be obtained The basic data of the inside the plan power network of degree, and relation factor according to corresponding to type of the power network in electric dispatching plan obtains Take corresponding additional data;The topological structure of electric for being finally based on power network is matched and spelled to basic data with additional data Connect, finally give the electric dispatching plan data of the power network.This mode can targetedly obtain power network and add accordingly Data, determine more crucial data in the numerous data being related to from complex electric network, greatly reduce unrelated redundant digit According to, Data Collection and analysis difficulty are reduced, help to simplify follow-up data splicing matching operation;According to power network topology knot Structure carries out matching splicing to basic data and additional data, and the electric dispatching plan data for finally obtaining can be made more accurate, because And the acquisition methods and device of electric dispatching plan data provided in an embodiment of the present invention can improve electric dispatching plan data Acquisition efficiency and accuracy.
Other features and advantages of the present invention will be illustrated in the following description, also, the partly change from specification Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims And specifically noted structure is realized and obtained in accompanying drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
In order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art, below will be to specific The accompanying drawing to be used needed for implementation method or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 shows a kind of acquisition methods flow chart of electric dispatching plan data that the embodiment of the present invention is provided;
Fig. 2 shows the concrete methods of realizing flow of step S108 in method shown in Fig. 1 that the embodiment of the present invention is provided Figure;
Fig. 3 shows a kind of structural frames of the acquisition device of electric dispatching plan data that the embodiment of the present invention is provided Figure;
Fig. 4 shows a kind of concrete structure of the acquisition device of electric dispatching plan data that the embodiment of the present invention is provided Block diagram.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Generally need to consider in current electric dispatching plan such as honourable clean energy resource send outside and receiving end operation of power networks is needed Various accompanying informations such as seek, this additional Consideration can cause the more complicated redundancy of data being related to, be not easy to subsequent treatment, So as to be difficult to effectively obtain the data for electric dispatching plan.Based on this, a kind of electric power provided in an embodiment of the present invention is adjusted The acquisition methods and device of planning data are spent, can be alleviated after considering power network accompanying information present in prior art, be difficult to obtain Obtain the problem of electric dispatching plan data.The embodiment of the present invention is described in detail below.
Embodiment one:
A kind of acquisition methods flow chart of electric dispatching plan data shown in Figure 1, comprises the following steps:
Step S102, obtains the basic data of the power network in electric dispatching plan;Basic data includes that the power network of power network is opened up Flutter the voltage magnitude of each node, voltage phase angle, active power and reactive power in structure;
Step S104, judges type of the power network in electric dispatching plan, obtains the corresponding relation factor of type of power network; Wherein, the type of power network includes receiving end power network and sending end power network;
Step S106, obtains additional data corresponding with the type of relation factor and power network;
Basic data is matched and is spliced behaviour by step S108, the topological structure of electric based on power network with additional data Make, obtain the electric dispatching plan data of power network.
In the above method of the present embodiment, by obtaining the basic data of the power network in electric dispatching plan, and according to this Relation factor corresponding to type of the power network in electric dispatching plan obtains corresponding additional data;It is finally based on the electricity of power network Net topology structure is matched and spliced with additional data to basic data, finally gives the electric dispatching plan number of the power network According to.This mode can targetedly obtain the corresponding additional data of power network, in the numerous data being related to from complex electric network More crucial data are determined, unrelated redundant data is greatly reduced, Data Collection and analysis difficulty is reduced, helped Splice matching operation in the follow-up data of simplification;Matching spelling is carried out to basic data and additional data according to topological structure of electric Connect, the electric dispatching plan data for finally obtaining can be made more accurate, thus electric dispatching plan provided in an embodiment of the present invention The acquisition methods of data can improve the acquisition efficiency and accuracy of electric dispatching plan data.
Type of the power network in electric dispatching plan is different, there is the receiving end power network for receiving the energy, also has and sends sending for the energy outside End power network;In electric dispatching plan, the relation factor considered needed for different types of power network is also differed, therefore it is determined that electricity After net type, the corresponding relation factor of type that power network is obtained in above-mentioned steps S104 is specifically referred to following execution:
(1) when the type of power network is sending end power network, the relation factor of acquisition is conventional energy resource and/or clean energy resource;
(2) when the type of power network is receiving end power network, the relation factor of acquisition is that active balance constraint and/or emphasis are disconnected Face trend constraint.
The above-mentioned relation factor related to power network type is preferred relation factor, that is, need preferential in electric dispatching plan The power network accompanying information of consideration, contributes to electric dispatching plan more to fit reality, make power network based in the case of various more Safe and reliable operation.For example, it is desired to consider the situation that the clean energy resourcies such as sending end power network wind energy luminous energy are sent outside, or consider Situations such as receiving end power network such as active balance, emphasis section tidal current.
It is determined that after the related relation factor of power network type, in addition it is also necessary to further targetedly obtain with relation factor and The corresponding additional data of type of power network, so that Data Collection amount and analysis difficulty are reduced, in order to follow-up actually active place Reason.Therefore, above-mentioned steps S106 specifically can be obtained targetedly in numerous data of complex electric network as follows Corresponding additional data:
1) when the type of power network is sending end power network, and relation factor is when including clean energy resource, obtains following additional data:Need The clean energy resource predicted value to be sent outside, transactional reference value, supporting normal power supplies information and send adjustment information outside;Wherein, transaction ginseng Examining value includes electricity transaction suggestion power value, bound adjustment interval range and suggestion electricity;Supporting normal power supplies information includes The start-stop plan of supporting normal power supplies, the regulation performance of supporting normal power supplies and suggestion electricity;Sending adjustment information outside includes direct current The adjustment interval sent outside and peak-trough electricity force constraint information;
2) when the type of power network is receiving end power network, and relation factor is when including active Constraints of Equilibrium, obtains following additional number According to:The active bound of clean energy resource and conventional energy resource is adjustable interval range, the prediction of receiving end network load, operation plan, interconnection Contact broken string cross-section limitation and original plan value between power network;
3) when the type of power network is receiving end power network, and relation factor is when including that emphasis section tidal current is constrained, and obtains following attached Addend evidence:The initial power flow solutions of emphasis section, direct current drop point are to paying close attention to the active po wer sensitivity of section.
It should be noted that data above can be obtained all, it is also possible to which part obtains, and is answered according to actual conditions With.Such as when the direct current conveying power in electric dispatching plan is dissolved in drop point province Dan Sheng completely, in above-mentioned additional data Contact broken string cross-section limitation and the original plan value between interconnected network, the only direct current in electric dispatching plan can not be included Conveying power also has other interconnection provinces to dissolve jointly in addition in drop point identity, then need the contact between interconnected network Broken string cross-section limitation and original plan value also serve as additional data.
Fig. 2 shows the concrete methods of realizing flow of step S108 in method shown in Fig. 1 that the embodiment of the present invention is provided Figure, specifically includes following steps:
Step S202, according to the topological structure of electric of power network, multiple regions is divided into by power network;Wherein, each region is taken With identity;
Step S204, according to corresponding each node of basic data and the position relationship of regional, sets up basic data Basic constant mark;Wherein, basic constant mark has the first corresponding relation with identity;
Step S206, according to power network additional data and the incidence relation of regional, sets up the additional fixation of additional data Mark, wherein, additional constant mark has the second corresponding relation with identity;
Step S208, according to the first corresponding relation and the second corresponding relation, determines the 3rd of basic data and additional data Corresponding relation;
Step S210, according to the 3rd corresponding relation, is matched and concatenation to basic data with additional data, is obtained The electric dispatching plan data of power network.
For example, the basic constant mark of basic data A is A1, the identity of region X is X1, according to power network topology knot Structure, A1 and X1 have and associates, and incidence relation is the first corresponding relation;A1 represents the basic data A of region X.Power network is added The additional constant mark of data B is B1, and according to topological structure of electric, B1 and X1 have and associate, and incidence relation is the second correspondence Relation;According to the first corresponding relation and the second corresponding relation, you can determine associating for A1 and B1, i.e. the 3rd corresponding relation, so that Basic data A and additional data B are matched and spliced according to the 3rd corresponding relation.
Through the above way, can fast and effectively based on data and additional data set up and associate, consequently facilitating will have The basic data and additional data of association are matched and spliced.
Specifically, above-mentioned corresponding relation can be to correspond, or one-to-many correspondence, and mark can To be identical, the identity for for example making the basic constant mark of the basic data in one be carried with region It is identical.
Specifically, the present embodiment provides a kind of specific matching process:According to additional data and basic data, it is determined that additional The corresponding relation of data and basic data;Wherein, corresponding relation includes corresponding and one-to-many correspondence;When corresponding relation is It is seasonable in pairs, additional data and basic data are carried out by additional data and basic data respective constant mark Match somebody with somebody;When corresponding relation be it is one-to-many to correspondence when the logical expression that is relied on by additional data and basic data to additional data Matched with basic data.Further, it is also possible to actual measuring value and additional data and basic data pair according to historical data The actual physics element title of the power network answered, matches to additional data and basic data.
Additionally, the above method also includes:Electric dispatching plan model is set up according to electric dispatching plan data.By electric power Operation plan model, can in advance simulate power scheduling, so as to improve accuracy of the power scheduling in practical operation running And reliability.
Embodiment two:
A kind of a kind of acquisition methods of the electric dispatching plan data provided for previous embodiment are be provided Concrete application example, reference can be made to as described below:
The first step:The basic data of the power network in electric dispatching plan is obtained by power system monitoring system;The basis The voltage magnitude of each node, voltage phase angle, active power and reactive power in topological structure of electric of the data including power network;Base Plinth data can turn into flow data again, can be by the power equipment collecting part data on the node of each on power network, and by tide Stream calculation obtains whole related datas.
Second step:Type according to power network in electric dispatching plan, it is determined that relation factor corresponding with the power network type, And additional data is determined according to relation factor.Can specifically determine according in relation factor table set in advance.Hereinafter carry out one Plant the labor during practical operation:
(1) when power network is sending end power network, it is considered to which the clean energy resource such as wind energy of sending end power network is sent outside.Transregional direct current An important function in electric dispatching plan is that the clean energy resource such as wind energy for realizing sending end power network is sent outside.Presently mainly lead to Cross the mode of raising low ebb electricity sent outside as far as possible ensures wind electricity digestion come the mode to sending end power network offer wind electricity digestion space. But which will cannot need to carry out the actual conditions of the clean energy resourcies such as direct current plan and wind-powered electricity generation in electric dispatching plan It is unified to consider, cannot also give full play to the regulation performance of normal power supplies, it is therefore necessary to using conventional energy resource and clean energy resource as The relation factor of sending end power network is accounted for, and in abundant external data, preferably increases data below newly as additional data:
1.1) the default side of scene sent outside the need for being given according to 96 periods;
1.2) electricity transaction be given according to 96 periods advises that power value, the bound of 96 forms adjust interval, suggestion Electricity etc.;
1.3) information such as the start-stop plan of supporting normal power supplies, regulation performance and suggestion electricity;
1.4) direct current is sent outside adjustment is interval and the information such as peak-trough electricity force constraint.
Wherein, the 96 above-mentioned periods by 24 hours one day it is to be understood that be divided into 96 periods, each period is 15 points Clock, above-mentioned data value can correspond respectively to each period, and the additional data of a day is 96 values so that the data of acquisition have Representativeness, can accurately reflect system situation.
Consider sending end power network merely sends the security constraint that demand is difficult to meet receiving end power network sometimes outside, it is therefore necessary to examine Consider the accompanying information of receiving end power network, it is the active balance and emphasis section of receiving end power network to influence larger.
(2) when power network is receiving end power network, it is considered to the active balance constraint of the receiving end power network, active balance is constrained and is made It is the relation factor of receiving end power network.In abundant external data, data below is preferably increased newly as additional data:
2.1) the active bound for providing such as water power, thermoelectricity, clean energy resource and other power supply types according to 96 periods can Adjust interval;If cannot adjust, the upper limit is made to be equal to lower limit;
2.2) the receiving end network load predicted value be given according to 96 periods;
2.3) the receiving end dispatching of power netwoks plan be given according to 96 periods (also known as total openning plan)
2.4) interconnection cross-section limitation and original plan value between all interconnection provinces for being given according to 96 periods.
It should be noted that when the direct current conveying power in electric dispatching plan is dissolved in drop point province Dan Sheng completely, Interconnection cross-section limitation between all interconnection provinces be given according to 96 periods and just can not be included in above-mentioned additional data Direct current in beginning planned value, only electric dispatching plan conveys power and also has other interconnection provinces to be total in addition in drop point identity With dissolving, then the interconnection cross-section limitation and original plan value between all interconnection provinces that will be given according to 96 periods are needed As additional data.
(3) when power network is receiving end power network, it is considered to the emphasis section tidal current constraint of the receiving end power network, by emphasis section tide Stream is constrained as the relation factor of receiving end power network.In abundant external data, data below is preferably increased newly as additional data:
3.1) the initial power flow solutions of emphasis section;
3.2) active po wer sensitivity of the direct current drop point to concern section.Wherein it is possible to the adjustment of direct current is multiplied by into sensitivity recognize To be the change of power flow (have ignored influence of other power supplys to the section) of the section.
3rd step:Because above-mentioned data are all from different scheduling institution or system monitorings, therefore also need to above-mentioned base Plinth data and additional data are matched and spliced.Matching ensures to splice successful committed step.This gives following Several specific matching ways:
Matching way one:Constant mark is relied on to be matched.Logic matching can be carried out by constant mark.For example, Each province is considered as being the regional for dividing power network that there is respective identity in each province.Each direct current Mark is needed to send receiving end province (i.e. identity), the contact section between each province is also required for mark to send receiving end province (i.e. body Part mark).At this point it is possible to the interconnection that the graphics logic of the Points And lines in electric power topological structure is obtained between all provinces is closed System, the data in each province area can then be corresponded.Additionally, the supporting power supply of direct current is also required for the mark of fixation Know, can be matched with direct current.
Matching way two:Logical expression is relied on to be matched.Under normal circumstances, relying on the matching of constant mark has a spy There is one-to-one relationship in the thing of point, i.e. splicing, but one-to-many relation is there is likely to be between data, therefore can be with head Corresponding logical expression is first obtained according to electric power topological structure, it is also possible to represented with linear arithmetic.For example, electric power is adjusted Degree transregional direct current conveying power P in the works is both dissolved in drop point province A, and is dissolved in B the and C provinces of interconnection, and ratio of dissolving Example is 1:2:1, then matching relationship now be:P=A+2B+C.All adjustment to P are all needed in electric dispatching plan afterwards The matching relationship is met, so as to realize Data Matching.
Matching way three:Physical component is relied on to be matched.In topological structure of electric, can be by structure power network The title of actual physics element is matched.For example, power supply, direct current in power network etc. only need to taken in electric network model it is corresponding Description title, both can realize being matched with electric network model, and such as alternating current interconnection section then needs to obtain and constitutes the section Physical component title, and the data in electric dispatching plan are matched according to physical component.Specifically, can be according to electricity The actual measuring value of the historical data of net realizes power distribution and Data Matching as ratio.
4th step:The additional data and basic data of matching are spliced, or combination, so as to obtain the electric power of power network Dispatch plan data.
Embodiment three:
For a kind of acquisition methods of the electric dispatching plan data provided in embodiment one, the embodiment of the present invention is provided A kind of acquisition device of electric dispatching plan data, shown in Figure 3, the device is included with lower module:
Basic data acquisition module 302, the basic data for obtaining the power network in electric dispatching plan;Basic data bag Include voltage magnitude, voltage phase angle, active power and the reactive power of each node in the topological structure of electric of power network;
Relevancy factor acquisition module 304, for judging type of the power network in electric dispatching plan, obtains the type of power network Corresponding relation factor;Wherein, the type of power network includes receiving end power network and sending end power network;
Additional data acquisition module 306, for obtaining additional data corresponding with the type of relation factor and power network;
Planning data obtains module 308, enters basic data with additional data for the topological structure of electric based on power network Row matching and concatenation, obtain the electric dispatching plan data of power network.
In the said apparatus of the present embodiment, the power network in electric dispatching plan is obtained by basic data acquisition module 302 Basic data, and according to corresponding to relevancy factor acquisition module 304 obtains type of the power network in electric dispatching plan Relation factor, and then corresponding additional data is obtained by additional data acquisition module 306;Module is obtained finally by planning data The 308 electric dispatching plan data for finally giving the power network.Device provided in an embodiment of the present invention can be obtained targetedly The corresponding additional data of power network, determines more crucial data in the numerous data being related to from complex electric network, greatly reduce Unrelated redundant data, reduces Data Collection and analysis difficulty, helps to simplify follow-up data splicing matching operation; Matching splicing is carried out to basic data and additional data according to topological structure of electric, the electric dispatching plan for finally obtaining can be made Data are more accurate, thus the acquisition device of electric dispatching plan data provided in an embodiment of the present invention can improve power scheduling meter Draw the acquisition efficiency and accuracy of data.
Type of the power network in electric dispatching plan is different, there is the receiving end power network for receiving the energy, also has and sends sending for the energy outside End power network;In electric dispatching plan, the relation factor considered needed for different types of power network is also differed, therefore can be found in figure A kind of concrete structure block diagram of the acquisition device of the electric dispatching plan data shown in 4.
Relevancy factor acquisition module 304 includes:Sending end acquiring unit 3041, for being sending end power network when the type of power network When, the relation factor of acquisition is conventional energy resource and/or clean energy resource;Receiving end acquiring unit 3042, be for the type when power network During receiving end power network, the relation factor of acquisition is active balance constraint and/or the constraint of emphasis section tidal current.
Additional data acquisition module 306 includes:First acquisition unit 3061, for being sending end power network when the type of power network, And relation factor is when including clean energy resource, following additional data is obtained:Clean energy resource predicted value, transactional reference that needs are sent outside Value, supporting normal power supplies information and send adjustment information outside;Wherein, transactional reference value include electricity transaction suggestion power value, up and down Limit adjustment interval range and suggestion electricity;Supporting normal power supplies information includes start-stop plan, the supporting routine of supporting normal power supplies The regulation performance and suggestion electricity of power supply;Send adjustment interval and peak-trough electricity force constraint letter that adjustment information is sent outside including direct current outside Breath;Second acquisition unit 3062, for when power network type be receiving end power network, and relation factor include active Constraints of Equilibrium when, Obtain following additional data:The active bound of clean energy resource and conventional energy resource is adjustable interval range, the prediction of receiving end network load, Contact broken string cross-section limitation and original plan value between operation plan, interconnected network;3rd acquiring unit 3063, for when electricity The type of net is receiving end power network, and relation factor is when including that emphasis section tidal current is constrained, and obtains following additional data:Emphasis section Initial power flow solutions, direct current drop point to pay close attention to section active po wer sensitivity.
Planning data obtains module 308 to be included:Division unit 3081, for the topological structure of electric according to power network, by electricity Net is divided into multiple regions;Wherein, each region carries identity;Basis mark sets up unit 3082, for according to base Corresponding each node of plinth data and the position relationship of regional, set up the basic constant mark of basic data;Wherein, basis Constant mark has the first corresponding relation with identity;Additional identification sets up unit 3083, for according to power network additional data With the incidence relation of regional, the additional constant mark of additional data is set up, wherein, additional constant mark has with identity There is the second corresponding relation;Relation determination unit 3084, for according to the first corresponding relation and the second corresponding relation, it is determined that basic number According to the 3rd corresponding relation with additional data;Planning data obtains unit 3085, for according to the 3rd corresponding relation, to basic number Matched and concatenation according to additional data, obtained the electric dispatching plan data of power network.
Further, in order to improve accuracy and reliability of the power scheduling in practical operation running.Said apparatus are also Including:Model building module, for setting up electric dispatching plan model according to electric dispatching plan data.
The technique effect of the device that the present embodiment is provided, its realization principle and generation is identical with previous embodiment, is letter Describe, device embodiment part does not refer to part, refers to corresponding contents in preceding method embodiment.
In sum, the acquisition methods and device of a kind of electric dispatching plan data provided in an embodiment of the present invention, can The basic data of the power network in electric dispatching plan is obtained, and according to corresponding to type of the power network in electric dispatching plan Relation factor obtains corresponding additional data;The topological structure of electric for being finally based on power network is carried out to basic data with additional data Matching and splicing, finally give the electric dispatching plan data of the power network.This mode can targetedly obtain power network phase The additional data answered, determines more crucial data in the numerous data being related to from complex electric network, greatly reduce unrelated Redundant data, reduce Data Collection and analysis difficulty, help to simplify follow-up data splicing matching operation;According to electricity Net topology structure carries out matching splicing to basic data and additional data, can make the electric dispatching plan data for finally obtaining more Accurately, thus acquisition methods and device of electric dispatching plan data provided in an embodiment of the present invention can improve power scheduling meter Draw the acquisition efficiency and accuracy of data.
The acquisition methods and the computer program of device of a kind of electric dispatching plan data that the embodiment of the present invention is provided Product, including the computer-readable recording medium of program code is stored, the instruction that described program code includes can be used to perform Method described in previous methods embodiment, implements and can be found in embodiment of the method, will not be repeated here.
In addition, in the description of the embodiment of the present invention, unless otherwise clearly defined and limited, term " installation ", " phase Company ", " connection " should be interpreted broadly, for example, it may be being fixedly connected, or being detachably connected, or be integrally connected;Can Being to mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi Two connections of element internal.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
If the function is to realize in the form of SFU software functional unit and as independent production marketing or when using, can be with Storage is in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter Calculation machine software product is stored in a storage medium, including some instructions are used to so that a computer equipment (can be individual People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the invention. And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", D score, "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outward " be based on orientation shown in the drawings or position relationship, merely to Be easy to the description present invention and simplify describe, rather than indicate imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicating or implying relative importance.
Finally it should be noted that:Embodiment described above, specific embodiment only of the invention, is used to illustrate the present invention Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light Change is readily conceivable that, or equivalent is carried out to which part technical characteristic;And these modifications, change or replacement, do not make The essence of appropriate technical solution departs from the spirit and scope of embodiment of the present invention technical scheme, should all cover in protection of the invention Within the scope of.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

1. a kind of acquisition methods of electric dispatching plan data, it is characterised in that including:
Obtain the basic data of the power network in electric dispatching plan;The basic data includes the topological structure of electric of the power network In the voltage magnitude of each node, voltage phase angle, active power and reactive power;
Judge type of the power network in the electric dispatching plan, obtain the corresponding relation factor of type of the power network; Wherein, the type of the power network includes receiving end power network and sending end power network;
Obtain additional data corresponding with the type of the relation factor and the power network;
Topological structure of electric based on the power network is matched and concatenation the basic data with the additional data, Obtain the electric dispatching plan data of the power network.
2. method according to claim 1, it is characterised in that obtain the corresponding relation factor bag of type of the power network Include:
When the type of the power network is sending end power network, the relation factor of acquisition is conventional energy resource and/or clean energy resource;
When the type of the power network is receiving end power network, the relation factor of acquisition is active balance constraint and/or emphasis section tide Stream constraint.
3. method according to claim 2, it is characterised in that obtain and the relation factor and the type pair of the power network The additional data answered includes:
When the type of the power network is sending end power network, and the relation factor is when including clean energy resource, obtains following additional data: Need the clean energy resource predicted value sent outside, transactional reference value, supporting normal power supplies information and send adjustment information outside;Wherein, it is described Transactional reference value includes electricity transaction suggestion power value, bound adjustment interval range and suggestion electricity;The supporting conventional electricity Source information includes start-stop plan, the regulation performance of supporting normal power supplies and the suggestion electricity of supporting normal power supplies;It is described to send tune outside Adjustment interval and peak-trough electricity force constraint information that whole information is sent outside including direct current;
When the type of the power network is receiving end power network, and the relation factor is when including active Constraints of Equilibrium, obtains following additional Data:The active bound of clean energy resource and conventional energy resource is adjustable interval range, the prediction of receiving end network load, operation plan, mutually Contact broken string cross-section limitation and original plan value between connection power network;
When the power network type be receiving end power network, and the relation factor include emphasis section tidal current constrain when, obtain it is as follows Additional data:The initial power flow solutions of emphasis section, direct current drop point are to paying close attention to the active po wer sensitivity of section.
4. method according to claim 1, it is characterised in that the topological structure of electric based on the power network is by the basis Data are matched and concatenation with the additional data, and the electric dispatching plan data for obtaining the power network include:
According to the topological structure of electric of the power network, the power network is divided into multiple regions;Wherein, each region carries body Part mark;
According to corresponding each node of the basic data and the position relationship in each region, the basic data is set up Basic constant mark;Wherein, the basic constant mark has the first corresponding relation with the identity;
According to the power network additional data and the incidence relation in each region, the additional fixed mark of the additional data is set up Know, wherein, the additional constant mark has the second corresponding relation with the identity;
According to first corresponding relation and second corresponding relation, the of the basic data and the additional data is determined Three corresponding relations;
According to the 3rd corresponding relation, the basic data is matched with the additional data and concatenation, obtained The electric dispatching plan data of the power network.
5. method according to claim 1, it is characterised in that methods described also includes:
Electric dispatching plan model is set up according to the electric dispatching plan data.
6. a kind of acquisition device of electric dispatching plan data, it is characterised in that including:
Basic data acquisition module, the basic data for obtaining the power network in electric dispatching plan;The basic data includes The voltage magnitude of each node, voltage phase angle, active power and reactive power in the topological structure of electric of the power network;
Relevancy factor acquisition module, for judging type of the power network in the electric dispatching plan, obtains the power network The corresponding relation factor of type;Wherein, the type of the power network includes receiving end power network and sending end power network;
Additional data acquisition module, for obtaining additional data corresponding with the type of the relation factor and the power network;
Planning data obtains module, for the topological structure of electric based on the power network by the basic data and the additional number According to being matched and concatenation, the electric dispatching plan data of the power network are obtained.
7. device according to claim 6, it is characterised in that the relevancy factor acquisition module includes:
Sending end acquiring unit, for when the type of the power network is sending end power network, the relation factor of acquisition for conventional energy resource and/ Or clean energy resource;
Receiving end acquiring unit, for when the type of the power network is receiving end power network, the relation factor of acquisition for active balance about Beam and/or emphasis section tidal current are constrained.
8. device according to claim 7, it is characterised in that the additional data acquisition module includes:
First acquisition unit, for when the power network type be sending end power network, and the relation factor include clean energy resource when, Obtain following additional data:Need the clean energy resource predicted value sent outside, transactional reference value, supporting normal power supplies information and send tune outside Whole information;Wherein, the transactional reference value includes electricity transaction suggestion power value, bound adjustment interval range and suggestion electricity Amount;The start-stop plan of the supporting normal power supplies information including supporting normal power supplies, the regulation performance of supporting normal power supplies and build View electricity;It is described to send adjustment interval and the peak-trough electricity force constraint information that adjustment information is sent outside including direct current outside;
Second acquisition unit, for being receiving end power network when the type of the power network, and the relation factor includes active balance about Shu Shi, obtains following additional data:The active bound of clean energy resource and conventional energy resource is adjustable interval range, receiving end network load Prediction, contact broken string cross-section limitation and original plan value between operation plan, interconnected network;
3rd acquiring unit, for being receiving end power network when the type of the power network, and the relation factor includes emphasis section tide During stream constraint, following additional data is obtained:The initial power flow solutions of emphasis section, direct current drop point are active sensitive to concern section Degree.
9. device according to claim 6, it is characterised in that the planning data obtains module to be included:
Division unit, for the topological structure of electric according to the power network, multiple regions is divided into by the power network;Wherein, often Individual region carries identity;
Basis mark sets up unit, is closed for the position according to corresponding each node of the basic data and each region System, sets up the basic constant mark of the basic data;Wherein, the basic constant mark has first with the identity Corresponding relation;
Additional identification sets up unit, for the incidence relation according to the power network additional data and each region, sets up institute The additional constant mark of additional data is stated, wherein, the additional constant mark has the second corresponding relation with the identity;
Relation determination unit, for according to first corresponding relation and second corresponding relation, determining the basic data With the 3rd corresponding relation of the additional data;
Planning data obtains unit, for according to the 3rd corresponding relation, entering with the additional data to the basic data Row matching and concatenation, obtain the electric dispatching plan data of the power network.
10. device according to claim 6, it is characterised in that described device also includes:
Model building module, for setting up electric dispatching plan model according to the electric dispatching plan data.
CN201611230438.4A 2016-12-26 2016-12-26 The acquisition methods and device of electric dispatching plan data Active CN106786533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611230438.4A CN106786533B (en) 2016-12-26 2016-12-26 The acquisition methods and device of electric dispatching plan data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611230438.4A CN106786533B (en) 2016-12-26 2016-12-26 The acquisition methods and device of electric dispatching plan data

Publications (2)

Publication Number Publication Date
CN106786533A true CN106786533A (en) 2017-05-31
CN106786533B CN106786533B (en) 2019-09-06

Family

ID=58921130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611230438.4A Active CN106786533B (en) 2016-12-26 2016-12-26 The acquisition methods and device of electric dispatching plan data

Country Status (1)

Country Link
CN (1) CN106786533B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109871983A (en) * 2019-01-17 2019-06-11 国家电网有限公司 A kind of power energy management system
CN110084448A (en) * 2018-01-24 2019-08-02 阿里巴巴集团控股有限公司 A kind of analysis method of electric system, device and its equipment
CN111523827A (en) * 2020-05-13 2020-08-11 中国电力科学研究院有限公司 Method and system for selecting nodes in inter-provincial transaction proxy mode

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942613A (en) * 2014-04-09 2014-07-23 国电南瑞科技股份有限公司 Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode
US20140277797A1 (en) * 2013-03-15 2014-09-18 Open Access Technology International, Inc. Systems and Methods of Determining Optimal Scheduling and Dispatch of Power Resources
CN104318391A (en) * 2014-10-24 2015-01-28 中国南方电网有限责任公司 Method for implementing plan security check on basis of power grid operation service bus
CN105260813A (en) * 2015-09-15 2016-01-20 中国电力科学研究院 Evaluation method and evaluation model for planned completed progress of power generation dispatching unit
CN105321047A (en) * 2015-11-10 2016-02-10 中国电力科学研究院 Multi-dimensional verification method for schedule plan data
CN105930971A (en) * 2016-04-22 2016-09-07 国网江西省电力科学研究院 City smart power grid panoramic information visual multidimensional display technology framework

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140277797A1 (en) * 2013-03-15 2014-09-18 Open Access Technology International, Inc. Systems and Methods of Determining Optimal Scheduling and Dispatch of Power Resources
CN103942613A (en) * 2014-04-09 2014-07-23 国电南瑞科技股份有限公司 Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode
CN104318391A (en) * 2014-10-24 2015-01-28 中国南方电网有限责任公司 Method for implementing plan security check on basis of power grid operation service bus
CN105260813A (en) * 2015-09-15 2016-01-20 中国电力科学研究院 Evaluation method and evaluation model for planned completed progress of power generation dispatching unit
CN105321047A (en) * 2015-11-10 2016-02-10 中国电力科学研究院 Multi-dimensional verification method for schedule plan data
CN105930971A (en) * 2016-04-22 2016-09-07 国网江西省电力科学研究院 City smart power grid panoramic information visual multidimensional display technology framework

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110084448A (en) * 2018-01-24 2019-08-02 阿里巴巴集团控股有限公司 A kind of analysis method of electric system, device and its equipment
CN109871983A (en) * 2019-01-17 2019-06-11 国家电网有限公司 A kind of power energy management system
CN109871983B (en) * 2019-01-17 2024-02-06 国家电网有限公司 Electric power energy management system
CN111523827A (en) * 2020-05-13 2020-08-11 中国电力科学研究院有限公司 Method and system for selecting nodes in inter-provincial transaction proxy mode
CN111523827B (en) * 2020-05-13 2022-02-11 中国电力科学研究院有限公司 Method and system for selecting nodes in inter-provincial transaction proxy mode

Also Published As

Publication number Publication date
CN106786533B (en) 2019-09-06

Similar Documents

Publication Publication Date Title
CN103955777B (en) Photovoltaic generation accesses power distribution network conceptual design and analysis and evaluation accessory system
CN108400590A (en) A kind of micro- energy net ecosystem based on block chain and cloud power supply
CN103942613B (en) Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode
CN101692575B (en) Method for processing data for real-time load flow calculation in large electric systems
CN108736465A (en) A kind of future-state electric network model construction method and device
CA3030490A1 (en) Intelligent energy management system for distributed energy resources and energy storage systems using machine learning
CN103500423A (en) Case adaptation and decision method for power emergency events
CN106786533A (en) The acquisition methods and device of electric dispatching plan data
CN110119888A (en) A kind of active gridding planing method based on distributed generation resource access
CN106505624B (en) Determine the regulator control system and method for the optimal ability to arrange jobs of power distribution network distributed generation resource
CN107181284A (en) The method of adjustment and device of a kind of out-of-limit electricity of circuit
CN106600145A (en) Power distribution network reliability analysis method and device
CN108400589A (en) Cloud power natural gas ecosystem based on graphene
CN109861295B (en) Multi-target new energy planning method and device
US11387652B2 (en) Systems and methods for enhanced reactive power management in a hybrid environment
CN108053140A (en) A kind of Method of Wind Resource Assessment, system and a kind of computer readable storage medium
Hjelmeland et al. Combined SDDP and simulator model for hydropower scheduling with sales of capacity
CN107967543A (en) A kind of wind-resources assessment equipment
CN115577903A (en) Method, device, equipment and medium for evaluating influence of new energy on power grid peak regulation
CN108510164A (en) The online generation method of external network equivalent model of designated area in a kind of electric system
CN109190212A (en) The intelligent automatic cloth machine method of the land wind power plant of complicated landform and its realization system
ES2537586A1 (en) Procedure of repowering a wind farm (Machine-translation by Google Translate, not legally binding)
CN112434446A (en) Distributed energy storage economy evaluation method based on full life cycle
CN206490612U (en) A kind of microcomputer excitation controllers of GDF 4
CN105404958A (en) Market competitiveness analysis and evaluation method for power transmission system and realization device thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant