CN106786300A - A kind of power equipment ice-snow clearing device - Google Patents
A kind of power equipment ice-snow clearing device Download PDFInfo
- Publication number
- CN106786300A CN106786300A CN201611131899.6A CN201611131899A CN106786300A CN 106786300 A CN106786300 A CN 106786300A CN 201611131899 A CN201611131899 A CN 201611131899A CN 106786300 A CN106786300 A CN 106786300A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- spring
- support
- bar
- montant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/16—Devices for removing snow or ice from lines or cables
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
A kind of power equipment ice-snow clearing device,Including base plate,Positioner,Lowering or hoisting gear,Electric cylinders device,Holder device,Frame device,Whirligig and air extractor,Base plate is provided with the first support block and the first roller,Positioner includes first support bar,First spring,Second support bar and second spring,Lowering or hoisting gear includes crane,Second roller,3rd spring,Starting stave,First elastic rod,Electric cylinders device includes electric cylinders,Catch bar and pushing block,Holder device includes the first montant,4th spring,5th spring,First cross bar,6th spring,Second cross bar and the first fix bar,Frame device includes framework,Sealing block,Sealing ring,Second montant,Radiating frame,Heating rod,Whirligig includes rotating frame,Pipeline,Support ring,Connecting rod,Rotating shaft,Motor,First support,Lean frame and the second fix bar,The present invention can carry out effective heating to the accumulated snow on power equipment,Homogeneous heating and quick.
Description
Technical field
Filled with ice and snow removing the present invention relates to power equipment assistive device technical field, more particularly to a kind of power equipment
Put.
Background technology
In recent years, in the northern area of China, due to icing and accumulated snow on power equipment, the damage of power equipment is often caused
It is bad, bring huge potential safety hazard and economic loss.The existing power equipment typically property without snow defence, power equipment exists
After snow cover, frozen after temperature is raised and be wrapped on power equipment outer surface, it is necessary to be purged in time, and existing electricity
Power equipment ice-snow clearing device is more deficient, and cleaning effect is not good, especially lack it is quick effectively, safe ready specifically designed for electricity
The ice-snow clearing device of power equipment.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
The content of the invention
It is an object of the invention to provide a kind of power equipment ice-snow clearing device that can effectively solve above-mentioned technical problem.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:
A kind of power equipment ice-snow clearing device, power equipment ice-snow clearing device is including base plate, positioned at institute
State the positioner above base plate, the lowering or hoisting gear above the positioner, the electricity on the left of the positioner
Cylinder assembly, the holder device on the left of the lowering or hoisting gear, the frame device for being arranged at the holder device upper end, it is arranged at
Whirligig on the frame device and the air extractor on the right side of the frame device, the base plate are provided with positioned at it
First support block of the lower section left and right sides and the first roller below first support block, the positioner include the
One support bar, the first spring being contained in the first support bar, the second support bar above first spring and
Second spring above the first support bar, the lowering or hoisting gear includes crane, is arranged at the crane lower end
The second roller, be arranged on the crane the 3rd spring, the starting stave above the crane, positioned at described
The first elastic rod below crane, the electric cylinders device includes electric cylinders, the catch bar on the left of the electric cylinders and positioned at institute
State the pushing block on the left of catch bar, the holder device include the first montant, the 4th spring on the right side of first montant,
It is the 5th spring below the 4th spring, the first cross bar below the 5th spring, perpendicular positioned at described first
The 6th spring below bar, the second cross bar on the left of first montant and below second cross bar first consolidate
Fixed pole, the frame device include framework, be arranged in the framework sealing block, be contained in the framework sealing ring,
The second montant on the right side of the sealing ring, the radiating frame above second montant, it is contained in the radiating inframe
Heating rod, the whirligig include rotating frame, the pipeline above the rotating frame, be arranged at the pipeline upper end
Support ring, the connecting rod above the pipeline, the rotating shaft above the connecting rod, the electricity above the rotating shaft
Machine, the first support positioned at the motor left and right sides, leaning frame and be arranged at the pipeline above the rotating frame
On the second fix bar, the air extractor include exhaust tube, be arranged on the exhaust tube blower fan, on the blower fan
The second support and the screen pack on the right side of the exhaust tube of side.
First support block is provided with two, and the upper surface of first support block is fixed with the lower surface of the base plate and connected
Connect, the lower surface of first support block is provided with the first groove, and first roller is provided with two, and first roller is in cylinder
Body, first roller is contained in first groove and pivotally connected with first support block.
The first support bar is in cuboid and places vertically, and the lower end of the first support bar is fixed with the base plate and connected
Connect, the upper surface of the first support bar is provided with the second groove, and first spring is contained in second groove, described
The lower end of one spring is fixedly connected with the inner surface of the first support bar, and the upper end of first spring and described second supports
The lower end of bar is fixedly connected, and the second support bar is in cuboid and places vertically, and the lower end of the second support bar is contained in
It is slidably connected in second groove and with the inner surface of the first support bar, the second spring is provided with two, described the
In placement vertically, the lower end of the second spring is fixedly connected two springs with the upper end of the first support bar.
The crane is in concave shape, and the lower end of the crane is provided with the 3rd groove, the upper end of the second support bar
Lower surface with the crane is fixedly connected, and the upper end of the second spring is fixedly connected with the lower surface of the crane,
Second roller is in cylinder, and second roller is contained in the 3rd groove and pivotally connected with the crane,
3rd spring is horizontal, and the right-hand member of the 3rd spring is fixedly connected with the crane, and the starting stave is in length
Cube and vertically placement, the lower end of the starting stave are fixedly connected with the upper surface of the crane, first elastic rod
In bending, the upper end of first elastic rod is fixedly connected with the lower surface of the crane, under first elastic rod
End is acted against on the upper surface of the base plate.
The lower surface of the electric cylinders is fixedly connected with the base plate, right surface and the first support bar of the electric cylinders
Left surface is fixedly connected, and the catch bar is in cuboid and horizontal positioned, and the right-hand member of the catch bar is connected with the electric cylinders, institute
State the left end of catch bar to be fixedly connected with the right surface of the pushing block, the rectangular triangle in cross section of the pushing block, institute
The lower surface for stating pushing block is connected with the upper surface slide of the base plate, and first elastic rod acts against a left side for the pushing block
It is slidably connected on surface and with it.
First montant is in cuboid and places vertically, and the 4th spring is provided with two, and the 4th spring is in water
Flat-shaped, the right-hand member of the 4th spring is fixedly connected with the starting stave, and the left end of the 4th spring is perpendicular with described first
Bar is fixedly connected, and the 5th spring is horizontal, and the right-hand member of the 5th spring is fixedly connected with the upper end of the crane,
The left end of the 5th spring is fixedly connected with the right surface of first montant, and first cross bar is put in cuboid and level
Put, the left end of first cross bar is fixedly connected with the right surface of first montant, the upper surface of first cross bar and institute
The inner surface for stating crane is slidably connected, and second roller is acted against on the lower surface of first cross bar, the 3rd bullet
The left end of spring is fixedly connected with the right-hand member of first cross bar, the 6th spring in vertically placement, the 6th spring it is upper
End is fixedly connected with the lower end of first montant, and the lower end of the 6th spring is fixed with the lower end of first elastic rod and connected
Connect, second cross bar is in cuboid and horizontal positioned, the right-hand member of second cross bar is consolidated with the left surface of first montant
Fixed connection, first fix bar is oblique, and the lower end of first fix bar is fixedly connected with first montant, described
The upper end of the first fix bar is fixedly connected with the lower surface of second cross bar.
The framework is in hollow cuboid and horizontal positioned, and the framework is provided with the first through hole on surface disposed thereon
And positioned at second through hole on its right surface, the left end of second cross bar is fixedly connected with the right surface of the framework, described close
Envelope block is in cylinder, and the sealing block is contained in the first through hole and is fixedly connected with the framework, and the sealing ring is in
Cross section is the cylinder of annulus, and the sealing ring is placed vertically, and the lower surface of the sealing ring is consolidated with the inner surface of the framework
Fixed connection, second montant is in cuboid and places vertically, and the lower end of second montant is solid with the inner surface of the framework
Fixed connection, the upper end of second montant is fixedly connected with the lower surface of the radiating frame, and the radiating frame is in hollow rectangular
Body.
The rotating frame is in hollow cylinder and horizontal positioned, and the rotating frame is provided with positioned at some of its lower surface
Third through-hole and the fourth hole on surface disposed thereon, fourth hole described in the lower end aligned of the pipeline and with the rotating frame
Upper surface be fixedly connected, the pipeline through the framework surfaces externally and internally and be slidably connected with it, the support ring in circle
Ring-type, the medial surface of the support ring is fixedly connected with the outer surface of the pipeline, and the lateral surface of the support ring is close with described
The inner surface of seal ring is slidably connected, and the lower surface of the support ring is slidably connected with the inner surface of the framework, the connecting rod
Obliquely, the lower end of the connecting rod is fixedly connected with the pipeline, the lower end of the upper end of the connecting rod and the rotating shaft
It is fixedly connected, the rotating shaft is in cylinder and places vertically, and the rotating shaft runs through the upper and lower surface of the sealing block and slided with it
Dynamic connection, the upper end of the rotating shaft and the motor connection, the first support are provided with two, and the first support is L-shaped, institute
The one end for stating first support is fixedly connected with the upper surface of the framework, the side of the other end of the first support and the motor
Face is fixedly connected, and the frame that leans in the cylinder that cross section is annulus, place vertically, the upper table for leaning frame by the frame that leans
Face is fixedly connected with the lower surface of the framework, the lower surface for leaning frame act against the upper surface of the rotating frame and and its
Be slidably connected, second fix bar is provided with two, second fix bar is oblique, the upper end of second fix bar with
The pipeline is fixedly connected, and the lower end of second fix bar is fixedly connected with the upper surface of the rotating frame.
The left end of the exhaust tube is directed at second through hole and is fixedly connected with the right surface of the framework, described second
Support is L-shaped, and one end of the second support is fixedly connected with the right surface of the framework, the other end of the second support with
The blower fan is fixedly connected, and the screen pack is in cuboid and places vertically, and the lower surface of the screen pack is horizontal with described second
The upper surface of bar is fixedly connected, and the right-hand member of the exhaust tube is fixedly connected with the left surface of the screen pack.
After adopting the above technical scheme, the invention has the advantages that:
Power equipment of the present invention ice-snow clearing device simple structure, it is easy to use, can be to the accumulated snow on power equipment
Effectively heated, then homogeneous heating and quick can cause that ice and snow quickly melts, to reach the mesh of ice and snow removing
, and it can be adjusted highly according to the height of power equipment, to adapt to different height power equipment the need for, expand it
Use scope..
Brief description of the drawings
The specific embodiment to power equipment ice-snow clearing device of the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of power equipment ice-snow clearing device of the present invention;
Specific embodiment
As shown in figure 1, power equipment ice-snow clearing device of the present invention includes base plate 1, determining positioned at the top of the base plate 1
Position device 2, the lowering or hoisting gear 3 positioned at the top of the positioner 2, the electric cylinders device 4, position positioned at the left side of the positioner 2
Holder device 5 in the left side of the lowering or hoisting gear 3, the frame device 6 for being arranged at the upper end of the holder device 5, be arranged at it is described
Whirligig 7 on frame device 6 and the air extractor 8 positioned at the right side of the frame device 6.
As shown in figure 1, the base plate 1 is in cuboid and horizontal positioned, the base plate 1 is provided with and is disposed below left and right two
First support block 11 of side and the first roller 12 positioned at the lower section of first support block 11.First support block 11 is provided with two
Individual, the upper surface of first support block 11 is fixedly connected with the lower surface of the base plate 1, the following table of first support block 11
Face is provided with the first groove.First roller 12 is provided with two, and first roller 12 is in cylinder, and first roller 12 is received
It is dissolved in first groove and pivotally connected with first support block 11 so that first roller 12 can be described the
Rotation in one groove.
As shown in figure 1, the positioner 2 includes first support bar 21, be contained in the first support bar 21 the
One spring 22, the second support bar 23 positioned at the top of first spring 22 and positioned at the top of the first support bar 21 second
Spring 24.The first support bar 21 is in cuboid and places vertically, and the lower end of the first support bar 21 is solid with the base plate 1
Fixed connection, the upper surface of the first support bar 21 is provided with the second groove 211, and second groove 211 is in rectangular-shape.It is described
First spring 22 is contained in second groove 211, in the lower end of first spring 22 and the first support bar 21
Surface is fixedly connected, and the upper end of first spring 22 is fixedly connected with the lower end of the second support bar 23.Described second
Strut 23 is in cuboid and places vertically, the lower end of the second support bar 23 be contained in second groove 211 and with institute
The inner surface for stating first support bar 21 is slidably connected so that the second support bar 23 can be moved in second groove 211
It is dynamic.The second spring 24 is provided with two, the second spring 24 in placement vertically, the lower end of the second spring 24 with it is described
The upper end of first support bar 21 is fixedly connected.
As shown in figure 1, the lowering or hoisting gear 3 includes crane 31, is arranged at the second roller of the lower end of the crane 31
32nd, the 3rd spring 33 on the crane 31, the starting stave 34 positioned at the top of the crane 31 are arranged at, positioned at described
First elastic rod 35 of the lower section of crane 31.The crane 31 is in concave shape, and it is recessed that the lower end of the crane 31 is provided with the 3rd
Groove 311, the 3rd groove 311 is in rectangular-shape, the lower surface of the upper end of the second support bar 23 and the crane 31
It is fixedly connected, the upper end of the second spring 24 is fixedly connected with the lower surface of the crane 31.Second roller 32 is in
Cylinder, second roller 34 is contained in the 3rd groove 311 and pivotally connected with the crane 31 so that described
Second roller 34 can be such that it actively revolves in the interior rotation of the 3rd groove 311, second roller 34 and motor connection
Turn.3rd spring 33 is horizontal, and the right-hand member of the 3rd spring 33 is fixedly connected with the crane 31.Described first
Riser 34 is in cuboid and places vertically, and the lower end of the starting stave 34 is fixedly connected with the upper surface of the crane 31.
First elastic rod 35 is in bending, and the upper end of first elastic rod 35 is fixed with the lower surface of the crane 31 and connected
Connect, the lower end of first elastic rod 35 is acted against on the upper surface of the base plate 1, first elastic rod 35 has elasticity,
Allow that first elastic rod 35 occurs bending and deformation, first elastic rod 35 can play branch to the crane 31
Support is acted on.
As shown in figure 1, the electric cylinders device 4 includes electric cylinders 41, the catch bar 43 positioned at the left side of the electric cylinders 41 and is located at
The pushing block 42 in the left side of the catch bar 43.The electric cylinders 41 are connected with power supply, it is normally run, the electric cylinders 41
Lower surface is fixedly connected with the base plate 1, and the right surface of the electric cylinders 41 is fixed with the left surface of the first support bar 21 and connected
Connect.The catch bar 43 is in cuboid and horizontal positioned, and the right-hand member of the catch bar 43 is connected with the electric cylinders 41 so that described
Electric cylinders 41 can drive the catch bar 43 to move left and right, and the left end of the catch bar 43 is consolidated with the right surface of the pushing block 42
Fixed connection.The rectangular triangle in cross section of the pushing block 42, the upper table of the lower surface of the pushing block 42 and the base plate 1
Face is slidably connected, and first elastic rod 35 is acted against on the left surface of the pushing block 42 and is slidably connected with it, and then right
First elastic rod 35 is played a supporting role.
As shown in figure 1, the holder device 5 includes the first montant 51, the 4th bullet positioned at the right side of first montant 51
Spring 52, the 5th spring 53 positioned at the lower section of the 4th spring 52, the first cross bar 54, position positioned at the lower section of the 5th spring 53
The 6th spring 55 in the lower section of first montant 51, the second cross bar 57 positioned at the left side of first montant 51 and positioned at described
First fix bar 56 of the lower section of the second cross bar 57.First montant 51 is in cuboid and places vertically.4th spring 52
Two are provided with, the 4th spring 52 is horizontal, the right-hand member of the 4th spring 52 is fixedly connected with the starting stave 34,
The left end of the 4th spring 52 is fixedly connected with first montant 51.5th spring 53 is horizontal, and the described 5th
The right-hand member of spring 53 is fixedly connected with the upper end of the crane 31, left end and first montant 51 of the 5th spring 53
Right surface be fixedly connected.First cross bar 54 be in cuboid and horizontal positioned, the left end of first cross bar 54 with it is described
The right surface of the first montant 51 is fixedly connected, and the upper surface of first cross bar 54 is slided with the inner surface of the crane 31 and connected
Connect, second roller 32 is acted against on the lower surface of first cross bar 54, first cross bar 54 played a supporting role,
The left end of the 3rd spring 33 is fixedly connected with the right-hand member of first cross bar 54.6th spring 55 is placed in vertical,
The upper end of the 6th spring 55 is fixedly connected with the lower end of first montant 51, the lower end of the 6th spring 55 with it is described
The lower end of the first elastic rod 35 is fixedly connected.Second cross bar 57 be in cuboid and horizontal positioned, second cross bar 57
Right-hand member is fixedly connected with the left surface of first montant 51.First fix bar 56 is oblique, first fix bar
56 lower end is fixedly connected with first montant 51, the following table of the upper end of first fix bar 56 and second cross bar 57
Face is fixedly connected.
As shown in figure 1, the frame device 6 includes framework 61, the sealing block 62 being arranged in the framework 61, is contained in
Sealing ring 63 in the framework 61, the second montant 64 positioned at the right side of the sealing ring 63, on second montant 64
The radiating frame 65 of side, the heating rod 66 being contained in the radiating frame 65.The framework 61 is put in hollow cuboid and level
Put, the framework 61 is provided with the first through hole 611 and the second through hole 612 positioned at its right surface on surface disposed thereon, described
The through hole 612 of first through hole 611 and second is rounded and is communicated with the inside of the framework 61, the left end of second cross bar 57 with
The right surface of the framework 61 is fixedly connected.The sealing block 62 is in cylinder, and the sealing block 62 is contained in described first and leads to
It is fixedly connected in hole 611 and with the framework 61.The sealing ring 63 is the cylinder of annulus in cross section, and the sealing ring 63 is erected
Straight to place, the lower surface of the sealing ring 63 is fixedly connected with the inner surface of the framework 61.Second montant 64 is in rectangular
Body and vertically placement, the lower end of second montant 64 are fixedly connected with the inner surface of the framework 61, second montant 64
Upper end with it is described radiating frame 65 lower surface be fixedly connected.The radiating frame 65 is in hollow cuboid, the radiating frame 65
It is made of Heat Conduction Material.The heating rod 66 is connected with power supply so that the heating rod 66 can produce heat.
As shown in figure 1, the whirligig 7 includes rotating frame 71, the pipeline 72 positioned at the top of the rotating frame 71, sets
Support ring 73 in the upper end of the pipeline 72, the connecting rod 74 positioned at the top of the pipeline 72, positioned at the top of the connecting rod 74
Rotating shaft 75, the motor 77 positioned at the top of the rotating shaft 75, the first support 76 positioned at the left and right sides of the motor 77, positioned at institute
That states the top of rotating frame 71 leans frame 78 and the second fix bar 79 being arranged on the pipeline 72.The rotating frame 71 is in hollow
Cylinder and horizontal positioned, the rotating frame 71 is provided with positioned at some third through-holes 711 of its lower surface and disposed thereon
The fourth hole 712 on surface, the third through-hole 711 is provided with several, and the fourth hole 712 is provided with one, the described 3rd
Through hole 711 and fourth hole 712 are rounded and communicated with the inside of the rotating frame 71.Described in the lower end aligned of the pipeline 72
Fourth hole 712 and it is fixedly connected with the upper surface of the rotating frame 71 so that the inside of the pipeline 72 and the rotating frame
71 inside communicates, and the pipeline 72 runs through the surfaces externally and internally of the framework 61 and is slidably connected with it so that the pipeline 72
The rotation that can stablize.The support ring 73 is in annular shape, the outer surface of the medial surface of the support ring 73 and the pipeline 72
It is fixedly connected, the lateral surface of the support ring 73 is slidably connected with the inner surface of the sealing ring 63, under the support ring 73
Surface is slidably connected with the inner surface of the framework 61, and then the pipeline 72 can be played a supporting role.The connecting rod
74 is oblique, and the lower end of the connecting rod 74 is fixedly connected with the pipeline 72, the upper end of the connecting rod 74 with described turn
The lower end of axle 75 is fixedly connected.The rotating shaft 75 is in cylinder and places vertically, and the rotating shaft 75 is through the sealing block 62
Upper and lower surface and it is slidably connected with it, the upper end of the rotating shaft 75 is connected with the motor 77 so that the motor 77 drives institute
Rotating shaft 75 is stated to rotate.The power supply of the motor more than 77 is connected, and it is normally run.The first support 76 is provided with two, institute
State that first support 76 is L-shaped, one end of the first support 76 is fixedly connected with the upper surface of the framework 61, described first
The other end of frame 76 is fixedly connected with the side of the motor 77.The frame 78 that leans is described in the cylinder that cross section is annulus
Lean frame 78 to place vertically, the upper surface for leaning frame 78 is fixedly connected with the lower surface of the framework 61, described to lean frame
78 lower surface acts against the upper surface of the rotating frame 71 and is slidably connected with it so that what the rotating frame 71 can be stablized
Rotation.Second fix bar 79 is provided with two, and second fix bar 79 is oblique, the upper end of second fix bar 79
It is fixedly connected with the pipeline 72, the lower end of second fix bar 79 is fixedly connected with the upper surface of the rotating frame 71.
As shown in figure 1, the air extractor 8 includes exhaust tube 81, the blower fan 82 being arranged on the exhaust tube 81, is located at
The second support 83 and the screen pack 84 positioned at the right side of the exhaust tube 81 of the top of the blower fan 82.The left end of the exhaust tube 81
It is directed at second through hole 612 and is fixedly connected with the right surface of the framework 61 so that the inside of the exhaust tube 81 and institute
The inside for stating framework 61 communicates.The blower fan 82 is connected with power supply, it is normally run.The second support 83 is L-shaped,
One end of the second support 83 is fixedly connected with the right surface of the framework 61, the other end of the second support 83 with it is described
Blower fan 82 is fixedly connected.The screen pack 84 is in cuboid and places vertically, the lower surface of the screen pack 84 and described second
The upper surface of cross bar 57 is fixedly connected, and the right-hand member of the exhaust tube 81 is fixedly connected with the left surface of the screen pack 84, and then
So that the air entered into the exhaust tube 81 needs the filtering by screen pack 84.
As shown in figure 1, when the power equipment ice-snow clearing device of the present invention is used, move to the present invention needs first
Remove by the power equipment of ice and snow.When power equipment is higher, the switch of electric cylinders 41 can be opened so that the catch bar 43
It is moved to the left, and then causes that the pushing block 42 is moved to the left, then pushing block 42 promotes the first elastic rod 35 upward so that
The crane 31 is moved up, and then can cause that the holder device 5, frame device 6 and whirligig 7 are moved up,
Until its height for moving to is higher than the height of power equipment.Then the motor being connected with the second roller 32 is opened so that second
The rotate counterclockwise of roller 32, and then cause that first cross bar 54 is moved to the left by frictional force, then cause described first to erect
Bar 51 is moved to the left, and then causes that the framework 61, rotating frame 71 are moved to the left, until the rotating frame 71 moves to electric power setting
Standby surface.Then the switch of heating rod 66 is opened, makes it start to produce heat, and then cause the temperature in the framework 61
Rise.Then the switch of blower fan 82 is opened so that extraneous air is by entering into the exhaust tube after the filtering of screen pack 84
In 81, then entered into the framework 61 by the second through hole 612, then with framework 61 in hot air so that can
Heated with to air, the air after heating is entered into the pipeline 72, then into the rotating frame 71, then
Sprayed by the third through-hole 711, it is directly injected on the ice and snow on power equipment, so that power equipment
Upper ice and snow melts as soon as possible, and is conveniently disposed.In order to realize homogeneous heating, motor 77 can be opened so that described
Rotating shaft 75 rotates, and then causes that the pipeline 72 rotates by connecting rod 74, and then causes that the rotating frame 71 rotates, and then makes
The hot-air that is sprayed from the third through-hole 711 be rotated with, make on the ice and snow that it is uniformly ejected on power equipment, from
And conveniently dispose the ice and snow on power equipment as soon as possible.So far, power equipment ice-snow clearing device of the present invention was used
Journey is described.
The above, specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, and it is any
Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all cover
Within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.
Claims (9)
1. a kind of power equipment ice-snow clearing device, it is characterised in that:The power equipment includes bottom with ice-snow clearing device
Plate, the positioner above the base plate, the lowering or hoisting gear above the positioner, positioned at the positioner
The electric cylinders device in left side, the holder device on the left of the lowering or hoisting gear, the framework dress for being arranged at the holder device upper end
The whirligig put, being arranged on the frame device and the air extractor on the right side of the frame device, on the base plate
It is provided with and is disposed below the first support block of the left and right sides and the first roller below first support block, the positioning
Device includes first support bar, the first spring being contained in the first support bar, above first spring the
Two support bars and the second spring above the first support bar, the lowering or hoisting gear include crane, be arranged at it is described
Second roller of crane lower end, the 3rd spring being arranged on the crane, above the crane first are erected
Plate, the first elastic rod below the crane, the electric cylinders device include electric cylinders, the promotion on the left of the electric cylinders
Bar and the pushing block on the left of the catch bar, the holder device is including the first montant, positioned at first montant right side
The 4th spring, the 5th spring below the 4th spring, the first cross bar below the 5th spring, be located at
The 6th spring below first montant, the second cross bar on the left of first montant and under second cross bar
First fix bar of side, the frame device includes framework, the sealing block being arranged in the framework, is contained in the framework
Sealing ring, the second montant on the right side of the sealing ring, the radiating frame above second montant, be contained in it is described
The heating rod of the inframe that radiates, the whirligig includes rotating frame, the pipeline above the rotating frame, is arranged at the pipe
The support ring of road upper end, the connecting rod above the pipeline, the rotating shaft above the connecting rod, positioned at the rotating shaft
The motor of top, the first support positioned at the motor left and right sides, leaning frame and be arranged above the rotating frame
The second fix bar on the pipeline, the air extractor is including exhaust tube, the blower fan being arranged on the exhaust tube, positioned at institute
State the second support above blower fan and the screen pack on the right side of the exhaust tube.
2. power equipment ice-snow clearing device according to claim 1, it is characterised in that:First support block is provided with
Two, the upper surface of first support block is fixedly connected with the lower surface of the base plate, the lower surface of first support block
The first groove is provided with, first roller is provided with two, and first roller is in cylinder, and first roller is contained in described
It is in first groove and pivotally connected with first support block.
3. power equipment ice-snow clearing device according to claim 2, it is characterised in that:The first support bar is in length
Cube and vertically placement, the lower end of the first support bar are fixedly connected with the base plate, the upper surface of the first support bar
Be provided with the second groove, first spring is contained in second groove, the lower end of first spring with described first
The inner surface of strut is fixedly connected, and the upper end of first spring is fixedly connected with the lower end of the second support bar, and described
Two support bars are in cuboid and place vertically, and the lower end of the second support bar is contained in second groove and with described the
The inner surface of one support bar is slidably connected, and the second spring is provided with two, and the second spring is in placement, described second vertically
The lower end of spring is fixedly connected with the upper end of the first support bar.
4. power equipment ice-snow clearing device according to claim 3, it is characterised in that:The crane is in character cut in bas-relief
Shape, the lower end of the crane is provided with the 3rd groove, and the upper end of the second support bar is fixed with the lower surface of the crane
Connection, the upper end of the second spring is fixedly connected with the lower surface of the crane, and second roller is in cylinder, described
Second roller is contained in the 3rd groove and pivotally connected with the crane, and the 3rd spring is horizontal, described
The right-hand member of the 3rd spring is fixedly connected with the crane, and the starting stave is in cuboid and places vertically, and described first erects
The lower end of plate is fixedly connected with the upper surface of the crane, and first elastic rod is in bending, first elastic rod
Upper end is fixedly connected with the lower surface of the crane, and the lower end of first elastic rod acts against the upper surface of the base plate
On.
5. power equipment ice-snow clearing device according to claim 4, it is characterised in that:The lower surface of the electric cylinders with
The base plate is fixedly connected, and the right surface of the electric cylinders is fixedly connected with the left surface of the first support bar, the catch bar
In cuboid and horizontal positioned, the right-hand member of the catch bar is connected with the electric cylinders, the left end of the catch bar and the promotion
The right surface of block is fixedly connected, the rectangular triangle in cross section of the pushing block, the lower surface of the pushing block and the bottom
The upper surface slide connection of plate, first elastic rod is acted against on the left surface of the pushing block and is slidably connected with it.
6. power equipment ice-snow clearing device according to claim 5, it is characterised in that:First montant is in rectangular
Body and place vertically, the 4th spring is provided with two, and the 4th spring is horizontal, the right-hand member of the 4th spring and institute
State starting stave to be fixedly connected, the left end of the 4th spring is fixedly connected with first montant, the 5th spring is in water
Flat-shaped, the right-hand member of the 5th spring is fixedly connected with the upper end of the crane, the left end of the 5th spring and described
The right surface of one montant is fixedly connected, and first cross bar is in cuboid and horizontal positioned, the left end of first cross bar and institute
The right surface for stating the first montant is fixedly connected, and upper surface and the inner surface of the crane of first cross bar are slidably connected,
Second roller is acted against on the lower surface of first cross bar, the left end of the 3rd spring and the right side of first cross bar
End is fixedly connected, and the 6th spring in placement vertically, fix by upper end and the lower end of first montant of the 6th spring
Connection, the lower end of the 6th spring is fixedly connected with the lower end of first elastic rod, second cross bar in cuboid and
Horizontal positioned, the right-hand member of second cross bar is fixedly connected with the left surface of first montant, and first fix bar is in incline
Ramp-like, the lower end of first fix bar is fixedly connected with first montant, the upper end of first fix bar and described
The lower surface of two cross bars is fixedly connected.
7. power equipment ice-snow clearing device according to claim 6, it is characterised in that:The framework is in hollow length
Cube and horizontal positioned, the framework are provided with the first through hole and the second through hole positioned at its right surface on surface disposed thereon,
The left end of second cross bar is fixedly connected with the right surface of the framework, and the sealing block is in cylinder, and the sealing block is received
It is dissolved in the first through hole and is fixedly connected with the framework, the sealing ring is the cylinder of annulus in cross section, described close
Seal ring is placed vertically, and the lower surface of the sealing ring is fixedly connected with the inner surface of the framework, and second montant is in rectangular
Body and vertically placement, the lower end of second montant are fixedly connected with the inner surface of the framework, the upper end of second montant
Lower surface with the radiating frame is fixedly connected, and the radiating frame is in hollow cuboid.
8. power equipment ice-snow clearing device according to claim 7, it is characterised in that:The rotating frame is in hollow
Cylinder and horizontal positioned, the rotating frame be provided with positioned at its lower surface some third through-holes and surface disposed thereon
Four through holes, fourth hole described in the lower end aligned of the pipeline and are fixedly connected, the pipeline with the upper surface of the rotating frame
Through the framework surfaces externally and internally and be slidably connected with it, the support ring in annular shape, the medial surface of the support ring with
The outer surface of the pipeline is fixedly connected, and the lateral surface of the support ring is slidably connected with the inner surface of the sealing ring, described
The lower surface of support ring is slidably connected with the inner surface of the framework, and the connecting rod is oblique, the lower end of the connecting rod
It is fixedly connected with the pipeline, the upper end of the connecting rod is fixedly connected with the lower end of the rotating shaft, the rotating shaft is in cylinder
And place vertically, the rotating shaft through the sealing block upper and lower surface and be slidably connected with it, the upper end of the rotating shaft and institute
Motor connection is stated, the first support is provided with two, and the first support is L-shaped, one end of the first support and the frame
The upper surface of body is fixedly connected, and the other end of the first support is fixedly connected with the side of the motor, and the frame that leans is in
Cross section is the cylinder of annulus, and the frame that leans is placed vertically, and the upper surface for leaning frame is consolidated with the lower surface of the framework
Fixed connection, the lower surface for leaning frame acts against the upper surface of the rotating frame and is slidably connected with it, and described second fixes
Bar is provided with two, and second fix bar is oblique, and the upper end of second fix bar is fixedly connected with the pipeline, described
The lower end of the second fix bar is fixedly connected with the upper surface of the rotating frame.
9. power equipment ice-snow clearing device according to claim 8, it is characterised in that:The left end pair of the exhaust tube
Accurate second through hole and it is fixedly connected with the right surface of the framework, the second support is L-shaped, the one of the second support
End is fixedly connected with the right surface of the framework, and the other end of the second support is fixedly connected with the blower fan, the filtering
Net is in cuboid and places vertically, and the lower surface of the screen pack is fixedly connected with the upper surface of second cross bar, described to take out
The right-hand member of tracheae is fixedly connected with the left surface of the screen pack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611131899.6A CN106786300B (en) | 2016-12-09 | 2016-12-09 | A kind of power equipment ice-snow clearing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611131899.6A CN106786300B (en) | 2016-12-09 | 2016-12-09 | A kind of power equipment ice-snow clearing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106786300A true CN106786300A (en) | 2017-05-31 |
CN106786300B CN106786300B (en) | 2018-04-03 |
Family
ID=58879693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611131899.6A Expired - Fee Related CN106786300B (en) | 2016-12-09 | 2016-12-09 | A kind of power equipment ice-snow clearing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106786300B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107181229A (en) * | 2017-06-14 | 2017-09-19 | 深圳市安思科电子科技有限公司 | A kind of efficient power cable deicing equipment |
CN107910841A (en) * | 2017-11-02 | 2018-04-13 | 国家电网公司 | Remove the snow deicing equipment |
CN108296225A (en) * | 2017-12-14 | 2018-07-20 | 国网江苏省电力公司泰州市姜堰区供电公司 | A kind of snow-removing device for power equipment |
CN108325892A (en) * | 2018-01-29 | 2018-07-27 | 宋森 | A kind of power equipment device for expelling ice and snow |
CN112072526A (en) * | 2020-09-07 | 2020-12-11 | 李逢香 | Outdoor switch board surface snow remove device |
CN112260201A (en) * | 2020-11-01 | 2021-01-22 | 杨友明 | Machinery field is with novel transmission line deicing equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2001063715A1 (en) * | 2000-02-22 | 2001-08-30 | HYDRO-QUéBEC | Remote-operated trolley for inspection and intervention for a live electrical power grid in operation and ice removing equipment |
DE102007037558A1 (en) * | 2007-08-09 | 2009-06-10 | Borys Tashlyk | High voltage electric current line cleaning device, has rollers for progressively moving device along line, and cutting tool for removing ice and snow with application of heat, where tool is installed on disk, and rotates about axis of line |
CN101510678A (en) * | 2008-09-22 | 2009-08-19 | 张福生 | Aerial cable de-icing machine capable of being coated ice-sticking ice resistance agent |
US20100243631A1 (en) * | 2009-03-24 | 2010-09-30 | Tung Minh Huynh | Power Line De-Icing Apparatus |
CN105048389A (en) * | 2015-09-22 | 2015-11-11 | 武汉大学 | Cable deicing device based on self-propagating reaction |
CN105826890A (en) * | 2016-04-26 | 2016-08-03 | 成都科创佳思科技有限公司 | Novel power line deicer |
-
2016
- 2016-12-09 CN CN201611131899.6A patent/CN106786300B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2001063715A1 (en) * | 2000-02-22 | 2001-08-30 | HYDRO-QUéBEC | Remote-operated trolley for inspection and intervention for a live electrical power grid in operation and ice removing equipment |
DE102007037558A1 (en) * | 2007-08-09 | 2009-06-10 | Borys Tashlyk | High voltage electric current line cleaning device, has rollers for progressively moving device along line, and cutting tool for removing ice and snow with application of heat, where tool is installed on disk, and rotates about axis of line |
CN101510678A (en) * | 2008-09-22 | 2009-08-19 | 张福生 | Aerial cable de-icing machine capable of being coated ice-sticking ice resistance agent |
US20100243631A1 (en) * | 2009-03-24 | 2010-09-30 | Tung Minh Huynh | Power Line De-Icing Apparatus |
CN105048389A (en) * | 2015-09-22 | 2015-11-11 | 武汉大学 | Cable deicing device based on self-propagating reaction |
CN105826890A (en) * | 2016-04-26 | 2016-08-03 | 成都科创佳思科技有限公司 | Novel power line deicer |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107181229A (en) * | 2017-06-14 | 2017-09-19 | 深圳市安思科电子科技有限公司 | A kind of efficient power cable deicing equipment |
CN107181229B (en) * | 2017-06-14 | 2018-10-23 | 上海申远高温线有限公司 | A kind of efficient power cable deicing equipment |
CN107910841A (en) * | 2017-11-02 | 2018-04-13 | 国家电网公司 | Remove the snow deicing equipment |
CN108296225A (en) * | 2017-12-14 | 2018-07-20 | 国网江苏省电力公司泰州市姜堰区供电公司 | A kind of snow-removing device for power equipment |
CN108325892A (en) * | 2018-01-29 | 2018-07-27 | 宋森 | A kind of power equipment device for expelling ice and snow |
CN112072526A (en) * | 2020-09-07 | 2020-12-11 | 李逢香 | Outdoor switch board surface snow remove device |
CN112260201A (en) * | 2020-11-01 | 2021-01-22 | 杨友明 | Machinery field is with novel transmission line deicing equipment |
Also Published As
Publication number | Publication date |
---|---|
CN106786300B (en) | 2018-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106786300B (en) | A kind of power equipment ice-snow clearing device | |
CN106786302B (en) | A kind of power line cables ice-removing and snow-cleaning equipment for power domain | |
CN107999199B (en) | A kind of efficient coal mine Special crushing method | |
CN106583296B (en) | A kind of plate dedusting equipment for drying for field of furniture | |
CN105758146A (en) | Efficient ore drying device | |
CN106099711A (en) | A kind of novel high-pressure power cabinet | |
CN105790140B (en) | A kind of electric equipment cabinet mounting seat | |
CN106057378B (en) | A kind of cable quick drying apparatus easy to use | |
CN106711907A (en) | Efficient transmission line deicing equipment used in machinery field | |
CN107120935A (en) | A kind of cleaning and drying equipment for stem folium herbs | |
CN106393222A (en) | Rotary cutting type chip-less plastic pipe cutting system | |
CN105476045B (en) | A kind of vegetable cleaning device | |
CN106091608A (en) | A kind of adverse current air inducing forage drier | |
CN106024213B (en) | A kind of cable drying equipment | |
CN203991453U (en) | A kind of diode cleaning device | |
CN105752891B (en) | A kind of miniature hanging apparatus of multifunctional building | |
CN106012470B (en) | Fabric cleaner is used in one kind weaving | |
CN105937844A (en) | Multifunctional organic fertilizer drying device | |
CN206572893U (en) | A kind of drying system of Chinese medicinal granule | |
CN105903717A (en) | High-efficiency separating device for ores and sludge | |
CN106216304A (en) | A kind of agricultural seed cleaning-drying processing means | |
CN105932575B (en) | A kind of high-tension electricity cabinet | |
CN207256616U (en) | A kind of environmentally friendly plastic grain raw material process equipment of field of machinery automation | |
CN205505632U (en) | Efficient ore drying device | |
CN204053290U (en) | A kind of circular weld joint automatic welding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Yu Yilong Inventor after: He Yiqi Inventor before: Yu Yilong |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180403 Termination date: 20191209 |