A kind of cable quick drying apparatus easy to use
Technical field
The present invention relates to electrical equipment technical field, more particularly to a kind of cable quick drying apparatus easy to use.
Background technology
Current cable in process of production, has insulating barrier to need to be cooled down in clad, and cooling mostly uses water cooling,
But the moisture of water cooling has to all remove, it is ensured that the drying of cable could carry out the processing and preservation of subsequent step.
Existing cable dries the method all using drying, and drying technique is difficult to completely eliminate moisture, accordingly, it would be desirable to which a kind of more go
Can effectively realize the equipment being completely dried of cable.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
The content of the invention
The cable rapid draing easy to use of above-mentioned technical problem can be effectively solved it is an object of the invention to provide a kind of
Equipment.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:
A kind of cable quick drying apparatus easy to use, the cable quick drying apparatus easy to use includes bottom
Plate, the first drying device above the bottom plate, the blowning installation on the left of first drying device, positioned at described
Collection device above first drying device, the plumbing installation on the right side of the collection device, under the plumbing installation
The first roller devices, the second drying device on the right side of first roller devices and positioned at first roller devices of side
Second roller devices of lower section, the bottom plate is provided with the first support block being disposed below, under first support block
The first roller and the first support on the left of it of side, first drying device include the first framework, are contained in described the
The first spring in one framework, the first screen pack below first spring, below first screen pack
Radiating frame, it is contained in the heating rod of the radiating inframe and the second screen pack on the left of the radiating frame, air blowing dress
Put including the first pipeline, the first blower fan being arranged on first pipeline, the first valve, the collection device includes the second frame
Body, the 3rd framework above the second framework, the first sponge block being contained in the second framework and positioned at described
Cam above first sponge block, the plumbing installation include second pipe, be arranged on the second pipe the second blower fan,
Second valve, the second support below second blower fan, the 3rd support on the right side of the second support, positioned at institute
The first cross bar below second support is stated, first roller devices include the first montant, are arranged at the first montant lower end
The second roller, the second montant on the right side of first montant and the 4th support below second montant, institute
Stating the second drying device includes the 4th framework, the 3rd roller being contained in the 4th framework, is arranged at the 3rd roller
On bristle, second roller devices include first support bar, be arranged in the first support bar the second cross bar, be located at
Second support bar above second cross bar, the 4th roller being arranged in the second support bar, positioned at described first
It is the 3rd support bar on the left of strut, the 5th roller for being arranged at the 3rd post upper, right positioned at the 3rd support bar
The 3rd cross bar and the 4th cross bar on the left of the 3rd support bar of side.
First support block is provided with two, and the cross section of first support block is in isosceles trapezoid, first support
The upper surface of block is fixedly connected with the lower surface of the bottom plate, and the lower surface of first support block is provided with the first groove, described
First roller is provided with two, and first roller is in cylinder, first roller be contained in first groove and with institute
State the first support block axle and turn connection, the first support is L-shaped, the lower end of the first support and the left surface of the bottom plate are consolidated
Fixed connection, the upper end of the first support is in vertical shape.
First framework is in hollow cuboid, and the upper surface of the lower surface and the bottom plate of first framework is fixed
Connection, some first through hole of first framework provided with surface disposed thereon and the second through hole positioned at its left surface, institute
The first spring is stated provided with two, first spring is in vertical shape, and the upper end of first spring is interior with first framework
Surface is fixedly connected, and the lower end of first spring is fixedly connected with the upper surface of first screen pack, first filtering
Net is in cuboid and horizontal positioned, and the side of first screen pack and the inner surface of first framework are slidably connected, described
The frame that radiates is in hollow cuboid, and the lower surface of the radiating frame is fixedly connected with the inner surface of first framework, and described the
Two screen packs are in cuboid and place vertically, the lower surface of second screen pack and left surface and the interior table of first framework
Face is fixedly connected.
The upper end of first pipeline is directed at second through hole and is fixedly connected with the left surface of first framework, institute
The upper end for stating first support is fixedly connected with first blower fan.
The second framework is in hollow cuboid, the lower surface of the second framework and the upper surface of first framework
Be fixedly connected, the second framework is provided with the third through-hole through its left and right surface, first sponge block in cuboid and
Horizontal positioned, the side of first sponge block is fixedly connected with the inner surface of the second framework, and the 3rd framework is in sky
Heart shaped, the cross section of the 3rd framework is in isosceles trapezoid, the lower surface of the 3rd framework and the upper table of the second framework
Face is fixedly connected, and the upper surface of the 3rd framework is provided with fourth hole, the cam be contained in the 3rd framework and with
The 3rd framework axle turns connection.
The left end of the second pipe is directed at the fourth hole and is fixedly connected with the upper surface of the 3rd framework, institute
State that the first cross bar is horizontal, the left end of first cross bar is fixedly connected with the right surface of the 3rd framework, described second
Support is L-shaped, and the lower end of the second support is fixedly connected with the upper surface of first cross bar, the upper end of the second support
It is fixedly connected with the 3rd support, the 3rd support is L-shaped, the lower end of the 3rd support is horizontal, the described 3rd
The upper end of support is fixedly connected with second blower fan.
First montant in cuboid and it is vertical place, the lower end of first montant is provided with the second groove, described the
The right-hand member of one cross bar is fixedly connected with the left surface of first montant, lower end and first montant of the 3rd support
Left surface is fixedly connected, and second roller is in cylinder, second roller be contained in second groove and with it is described
First montant axle turns connection, and the 4th support is in zigzag, the left end of the 4th support and the right surface of first montant
It is fixedly connected, second montant is in vertical shape, and the lower end of second montant is fixedly connected with the 4th support, described the
The upper end of two montants is fixedly connected with the second pipe.
4th framework is in hollow shape, and the cross section of the 4th framework is in be set in isosceles trapezoid, the 4th framework
There are the fifth hole and some 6th through holes positioned at its lower surface on surface disposed thereon, the 6th through hole is provided with several,
The right-hand member of the second pipe is directed at the fifth hole and is fixedly connected with the upper surface of the 4th framework, described 4th
The right-hand member of frame is fixedly connected with the left surface of the 4th framework, and the 3rd roller is in cylinder, the 3rd roller and institute
State the 4th framework axle and turn connection, the bristle is provided with several and is evenly distributed on the 3rd roller, the bristle and institute
The 3rd roller is stated to be fixedly connected.
The first support bar is provided with two, and the first support bar is in cuboid and vertical placement, first support
The lower end of bar is fixedly connected with the upper surface of the bottom plate, and second cross bar is in cuboid and horizontal positioned, and described second is horizontal
Bar is located between the first support bar, and the end of second cross bar is fixedly connected with the side of the first support bar, institute
Second support bar is stated in cuboid and vertical placement, the lower end of the second support bar and the upper surface of second cross bar are fixed
Connection, the upper end of the second support bar is provided with the 3rd groove, and the 4th roller is in cylinder, and the 4th roller is contained in
Turn to be connected in 3rd groove and with the second support bar axle, the 3rd support bar is in cuboid and vertical placement, institute
The lower end for stating the 3rd support bar is fixedly connected with the upper surface of the bottom plate, and the upper end of the 3rd support bar is recessed provided with the 4th
Groove, the 5th roller is in cylinder, the 5th roller be contained in the 4th groove and with the 3rd support bar axle
Turn connection, the 3rd cross bar is in cuboid and horizontal positioned, the left end of the 3rd cross bar and the right side of the 3rd support bar
Surface is fixedly connected, and the right-hand member of the 3rd cross bar is fixedly connected with the left surface of the first support bar, the 4th cross bar
In cuboid and horizontal positioned, the left end of the 4th cross bar is fixedly connected with the right surface of first framework, and the described 4th
The right-hand member of cross bar is fixedly connected with the left surface of the 3rd support bar.
After adopting the above technical scheme, the invention has the advantages that:
Present invention cable quick drying apparatus easy to use is simple in construction, easy to use, cable can be carried out quick
Effective to dry, drying efficiency is high and quick, can improve the efficiency of cable processing, and can realize that cable is automatic
It is mobile so that drying process can automate progress, hand labor intensity is substantially reduced, operating efficiency is improved.
Brief description of the drawings
The embodiment of the cable quick drying apparatus easy to use to the present invention makees further below in conjunction with the accompanying drawings
Explanation:
Fig. 1 is the structural representation of present invention cable quick drying apparatus easy to use;
Embodiment
As shown in figure 1, present invention cable quick drying apparatus easy to use includes bottom plate 1, positioned at the top of bottom plate 1
The first drying device 2, the blowning installation 3 positioned at the left side of first drying device 2, on first drying device 2
The collection device 4 of side, the plumbing installation 5 positioned at the right side of collection device 4, the first rolling positioned at the lower section of plumbing installation 5
Wheel apparatus 6, the second drying device 7 positioned at the right side of first roller devices 6 and positioned at the lower section of the first roller devices 6
Second roller devices 8.
As shown in figure 1, the bottom plate 1 is in cuboid and horizontal positioned, the bottom plate 1 is provided with first be disposed below
Support block 11, the first roller 12 and the first support 13 on the left of it positioned at the lower section of the first support block 11.Described
One support block 11 is provided with two, and the cross section of first support block 11 is in isosceles trapezoid, the upper table of first support block 11
Face is fixedly connected with the lower surface of the bottom plate 1, and the lower surface of first support block 11 is provided with the first groove 111, and described the
One groove 111 is in semicylinder shape.First roller 12 is provided with two, and first roller 12 is in cylinder, described first
Roller 12 is contained in first groove 111 and turns to be connected with the axle of the first support block 11 so that first roller 12
It can be rotated in first groove 111.The first support 13 is L-shaped, lower end and the bottom of the first support 13
The left surface of plate 1 is fixedly connected, and the upper end of the first support 13 is in vertical shape.
As shown in figure 1, first drying device 2 includes the first framework 21, be contained in first framework 21 the
One spring 22, the first screen pack 23 positioned at the lower section of the first spring 22, the radiating positioned at the lower section of the first screen pack 23
Frame 24, the heating rod 25 being contained in the radiating frame 24 and the second screen pack 26 positioned at the left side of radiating frame 24.It is described
First framework 21 is in hollow cuboid, and the lower surface of first framework 21 is fixedly connected with the upper surface of the bottom plate 1, institute
Some first through hole 211 of first framework 21 provided with surface disposed thereon and the second through hole positioned at its left surface are stated, it is described
First through hole 211 is square and communicated with the inside of first framework 21, and second through hole is rounded and with described first
The inside of framework 21 is communicated.First spring 22 is provided with two, and first spring 22 is in vertical shape, first spring 22
Upper end be fixedly connected with the inner surface of first framework 21, the lower end of first spring 22 and first screen pack 23
Upper surface be fixedly connected, so as to be played a supporting role to first screen pack 23.First screen pack 23 is in cuboid
And horizontal positioned, the side of first screen pack 23 and the inner surface of first framework 21 are slidably connected so that described
One screen pack 23 can be moved up and down.The radiating frame 23 is in hollow cuboid, and the cross section of the radiating frame 23 is in inversion
Concave shape, the lower surface of the radiating frame 23 is fixedly connected with the inner surface of first framework 21, and the radiating frame 23 is adopted
It is made of Heat Conduction Material.The heating rod 25 is electrically connected with the power supply so that the heating rod 25 can produce heat.Described
Two screen packs 26 are in cuboid and vertical placement, the lower surface of second screen pack 26 and left surface and first framework 21
Inner surface be fixedly connected, second screen pack 26 blocks second through hole.
As shown in figure 1, the blowning installation 3 includes the first pipeline 31, the first wind being arranged on first pipeline 31
Machine 32, the first valve 33.The upper end of first pipeline 31 be aligned second through hole and with the left-handed watch of first framework 21
Face is fixedly connected so that the inside of first pipeline 31 is communicated with the inside of first framework 21.First blower fan 32
It is electrically connected with the power supply so that extraneous air can be pumped into first pipeline 31 by first blower fan 32, described
The upper end of first support 13 is fixedly connected with first blower fan 32.First valve 33 is used to control first pipeline 31
The flow of interior gas.
As shown in figure 1, the collection device 4 includes second framework 41, the 3rd frame positioned at the top of second framework 41
Body 42, the first sponge block 43 being contained in the second framework 41 and the cam 44 positioned at the top of the first sponge block 43.
The second framework 41 is in hollow cuboid, and the lower surface of the second framework 41 and the upper surface of first framework 21 are consolidated
Fixed connection, the second framework 41 is provided with the third through-hole through its left and right surface, cable can through third through-hole and with
The second framework 41 is slidably connected so that cable can be moved left and right.First sponge block 43 is put in cuboid and level
Put, the side of first sponge block 43 is fixedly connected with the inner surface of the second framework 41.3rd framework 42 is in sky
Heart shaped, the cross section of the 3rd framework 42 is in isosceles trapezoid, lower surface and the second framework 41 of the 3rd framework 42
Upper surface be fixedly connected so that the inside of the 3rd framework 42 is communicated with the inside of the second framework 42, the described 3rd
The upper surface of framework 42 be provided with fourth hole 421, the fourth hole 421 it is rounded and with the inside phase of the 3rd framework 42
It is logical.The cam 44 is contained in the 3rd framework 42 and turns to be connected with the axle of the 3rd framework 42 so that the cam 44
It can be rotated in the 3rd framework 42, the cam 44 and motor connection drive the cam 44 to rotate, when cam 44 revolves
When turning, the cam 44 can be acted against on first sponge block 43 so that first sponge block 43 can be with up-down vibration.
As shown in figure 1, the plumbing installation 5 includes second pipe 51, the second wind being arranged on the second pipe 51
Machine 53, the second valve 52, the second support 55 positioned at the lower section of second blower fan 53, the positioned at the right side of second support 55
Three supports 56, the first cross bar 54 positioned at the lower section of second support 55.The left end alignment the described 4th of the second pipe 51
Through hole 421 and it is fixedly connected with the upper surface of the 3rd framework 42 so that the inside of the second pipe 51 and the described 3rd
The inside of framework 42 is communicated.Second blower fan 53 is electrically connected with the power supply so that second blower fan 53 can be by described
Air in three frameworks 42 is pumped into the second pipe 51.Second valve 52 is used to control in the second pipe 51
The flow of gas.First cross bar 54 is horizontal, the left end of first cross bar 54 and the right table of the 3rd framework 42
Face is fixedly connected.The second support 55 is L-shaped, and the lower end of the second support 55 and the upper surface of first cross bar 54 are consolidated
Fixed connection, the upper end of the second support 55 is fixedly connected with the 3rd support 56.3rd support 56 is L-shaped, described
The lower end of 3rd support 56 is horizontal, and the upper end of the 3rd support 56 is fixedly connected with second blower fan 53.
As shown in figure 1, first roller devices 6 include the first montant 61, are arranged at the lower end of the first montant 61
Second roller 62, the second montant 64 positioned at the right side of the first montant 61 and the 4th positioned at the lower section of the second montant 64
Frame 63.First montant 61 is provided with the second groove 611, institute in cuboid and vertical placement, the lower end of first montant 61
The second groove 611 is stated in rectangular-shape, the right-hand member of first cross bar 54 is fixedly connected with the left surface of first montant 61,
The lower end of 3rd support 56 is fixedly connected with the left surface of first montant 61.Second roller 62 is in cylinder,
Second roller 62 is contained in second groove 611 and turns to be connected with the axle of the first montant 61 so that described second
Roller 62 can be rotated in second groove 611, and second roller 62 is acted against on cable, second roller 62 with
Motor connection, drives second roller 62 to rotate.4th support 63 be in zigzag, the left end of the 4th support 63 with
The right surface of first montant 61 is fixedly connected.Second montant 64 be in vertical shape, the lower end of second montant 64 with
4th support 63 is fixedly connected, and the upper end of second montant 64 is fixedly connected with the second pipe 51, so as to institute
Second pipe 51 is stated to play a supporting role.
As shown in figure 1, second drying device 7 includes the 4th framework 71, be contained in the 4th framework 71 the
Three rollers 73, the bristle 74 being arranged on the 3rd roller 73.4th framework 71 is in hollow shape, the 4th framework 71
Cross section be in isosceles trapezoid, the 4th framework 71 provided with surface disposed thereon fifth hole 711 and positioned at its following table
Some 6th through holes 712 in face, the fifth hole 711 is rounded and is communicated with the inside of the 4th framework 71, and described
Six through holes 712 are provided with several, and the 6th through hole 712 is rounded and is communicated with the inside of the 4th framework 71, and described the
The right-hand member of two pipelines 51 is directed at the fifth hole 711 and is fixedly connected with the upper surface of the 4th framework 71 so that described
The inside of second pipe 51 is communicated with the inside of the 4th framework 71, right-hand member and the 4th framework of the 4th support 63
71 left surface is fixedly connected.3rd roller 73 is in cylinder, and the 3rd roller 73 turns with the axle of the 4th framework 71
Connection so that the 3rd roller 73 can the 4th framework 71 internal rotating, the 3rd roller 73 and motor connect
Connect, drive the 3rd roller 73 to drive.The bristle 74 is provided with several and is evenly distributed on the 3rd roller 73, institute
Bristle 74 is stated to be fixedly connected with the 3rd roller 73.The lower surface of 4th framework 71 is slidably connected with cable, and described
Six through holes 712 are located at the top of cable.
As shown in figure 1, second roller devices 8 include first support bar 81, are arranged in the first support bar 81
The second cross bar, the second support bar 82 above second cross bar, be arranged in the second support bar 82 the 4th
Roller 83, the 3rd support bar 84 positioned at the left side of the first support bar 81, be arranged at the upper end of the 3rd support bar 84 the
Five rollers 85, the 3rd cross bar 86 positioned at the right side of the 3rd support bar 84 and the 4th positioned at the left side of the 3rd support bar 84
Cross bar 87.The first support bar 81 is provided with two, and the first support bar 81 is in cuboid and vertical placement, described first
The lower end of strut 81 is fixedly connected with the upper surface of the bottom plate 1, and the upper end of the first support bar 81 is slidably connected with cable,
So as to be played a supporting role to cable.Second cross bar is in cuboid and horizontal positioned, and second cross bar is located at described the
Between one support bar 81, the end of second cross bar is fixedly connected with the side of the first support bar 81.Described second
Strut 82 connects in cuboid and vertical placement, the lower end of the second support bar 82 and the upper surface fixation of second cross bar
Connect, the upper end of the second support bar 82 is provided with the 3rd groove 821, and the 3rd groove 821 is in rectangular-shape.4th rolling
Wheel 83 is in cylinder, and the 4th roller 83 is contained in the 3rd groove 821 and turns to connect with the axle of second support bar 82
Connect so that the 4th roller 83 can be rotated in the 3rd groove 821, and the 4th roller 83 is acted against on cable,
Cable is played a supporting role.3rd support bar 84 is in cuboid and vertical placement, the lower end of the 3rd support bar 84
It is fixedly connected with the upper surface of the bottom plate 1, the upper end of the 3rd support bar 84 is provided with the 4th groove 841, and the described 4th is recessed
Groove 841 is in rectangular-shape.5th roller 85 is in cylinder, and the 5th roller 85 is contained in the 4th groove 841
And turn to be connected with the axle of the 3rd support bar 84 so that the 5th roller 85 can rotate in the 4th groove 841, institute
State the 5th roller 85 to act against on cable, cable is played a supporting role.3rd cross bar 86 be in cuboid and horizontal positioned,
The left end of 3rd cross bar 86 is fixedly connected with the right surface of the 3rd support bar 84, the right-hand member of the 3rd cross bar 86 with
Left surface positioned at the first support bar 81 in left side is fixedly connected.4th cross bar 87 is described in cuboid and horizontal positioned
The left end of 4th cross bar 87 is fixedly connected with the right surface of first framework 21, the right-hand member of the 4th cross bar 87 and described the
The left surface of three support bars 84 is fixedly connected.
As shown in figure 1, present invention cable quick drying apparatus easy to use is in use, first by cable through the
Third through-hole in two frameworks 41, and the space through the roller 85 of the second roller 62 and the 5th so that the second roller
62 and the 5th roller 85 act against on cable, then cause cable through the lower surface and first support bar 81 of the 4th framework 71
Upper surface and the right side for extending to the 4th framework 71.Then start heating rod 25, it is produced heat, and then heat is passed through
Radiating frame 24 is dispersed into the inside of the first framework 21.When temperature reaches certain value, start the first blower fan 32 so that extraneous sky
Gas is entered in first pipeline 31, opens the first valve 33 so that the air in the first pipeline 31 enters described first
In framework 21, and by the filtering of second screen pack 26, it can be heated, made after being contacted with the gas after heating
It reaches suitable temperature.Then the air after heating enters by first through hole 211 again after the filtering of the first screen pack 23
Enter into the second framework 41, then the cable in second framework 41 can be dried, due to the first sponge block 43
Set so that the air after heating can be rested in second framework 41 as far as possible so that cable and the air contact of heating
Time is longer, and drying effect is preferable.Then start the second blower fan 53, and open the second valve 52, so as to by second framework
Air in 41 is pumped into the 3rd framework 42, and by the filtering of the first sponge block 43, then in the 3rd framework 42
Air is entered in the second pipe 51.When the impurity on the first sponge block 43 is more, it can start and be connected with cam 44
Motor so that cam 44 rotates, so cause the first sponge block 43 vibrate, impurity thereon is shaked off.Enter described
The gas after heating in two pipelines 51 is entered in the 4th framework 71, now starts the electricity being connected with the 3rd roller 73
Machine so that the 3rd roller 73 rotates, the bristle 74 is rotated with, and bristle 74 can adsorb the impurity in air.Then the 4th
Gas in framework 71 after heating discharges the 4th framework 71 by the 6th through hole 712, can be to electricity then with conductive cable contacts
Cable is dried again, so that hot-air is fully used, saves the energy., can be with during cable is dried
Start the motor being connected with the second roller 62 so that the rotate counterclockwise of the second roller 62, and then cable is moved to the right, from
And automatically whole cable can be dried, reduce hand labor intensity.So far, present invention cable easy to use is quick
Drying equipment is finished using process description.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those skilled in the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be covered
Within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.