CN106780125A - A kind of acquisition abnormity urgency level computational methods based on monthly power consumption - Google Patents

A kind of acquisition abnormity urgency level computational methods based on monthly power consumption Download PDF

Info

Publication number
CN106780125A
CN106780125A CN201611125040.4A CN201611125040A CN106780125A CN 106780125 A CN106780125 A CN 106780125A CN 201611125040 A CN201611125040 A CN 201611125040A CN 106780125 A CN106780125 A CN 106780125A
Authority
CN
China
Prior art keywords
power consumption
user
factor
influence
electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611125040.4A
Other languages
Chinese (zh)
Other versions
CN106780125B (en
Inventor
徐川子
盛文虎
楼洁妮
吴磊
孙晓毓
何功
赵宋君
朱涛
吕韵
蒋峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611125040.4A priority Critical patent/CN106780125B/en
Publication of CN106780125A publication Critical patent/CN106780125A/en
Application granted granted Critical
Publication of CN106780125B publication Critical patent/CN106780125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of acquisition abnormity urgency level computational methods based on monthly power consumption, belong to electrical equipment technical field.There are the acquisition abnormity urgency level computational methods of technology, it is impossible to quick and precisely judge the urgency level of each abnormity point, cause some urgent abnormal conditions to solve in time, lack a kind of science, reasonable, accurate technical scheme.The present invention determines the factor of influence of influence urgency first, standard electricity consumer is then set up, factor of influence the urgency to standard electricity consumer is converted to, and then computation model is set up to factor of influence, set up the relational expression on unitary variant, amount of calculation and complexity are effectively simplified, complicated solution, systematization, it is hierarchical, simplify, there is provided a kind of practicable technical scheme, more perfect solves urgency computational problem.

Description

A kind of acquisition abnormity urgency level computational methods based on monthly power consumption
Technical field
The present invention relates to a kind of acquisition abnormity urgency level computational methods based on monthly power consumption, belong to power equipment skill Art field.
Background technology
Currently in the whole country, the failure produced by the acquisition system of electric power is substantially all beyond local O&M strength, various regions Square office is also that the acquisition system normal operating devices total effective rate in its range of management is examined, it is impossible to ensure armamentarium Can effective gathered data.Current system maintenance work management is in the extensive stage, exist resource use it is unreasonable, it is impossible to it is quick Accurately judge the urgency level of each abnormity point, cause some urgent abnormal conditions to solve in time, and then more serious feelings Condition occurs.Abnormal urgency level judges to rely primarily on the experience of people and subjective estimation to carry out distribute leaflets treatment that this method is present Very big not scientific and randomness, lacks a kind of science, reasonable, accurate technical scheme.
For drawbacks described above present in currently available technology, it is necessary to be researched and developed in fact, solution exists in the prior art Defect.
The content of the invention
It is different it is an object of the invention to provide a kind of science, reasonable, accurate electricity consumption collection for the defect of prior art The computational methods of normal urgency level, more science and accurately judge the urgency level of each abnormity point, are follow-up accurate to send work There is provided basis so that resource is more reasonably utilized.
To achieve the above object, the technical scheme is that:
A kind of acquisition abnormity urgency level computational methods based on monthly power consumption, comprise the following steps:
The first step, primarily determines that the factor of influence of acquisition abnormity urgency
The factor of influence of acquisition abnormity urgency is determined by electric power operational system expert discussion, the factor of influence includes the moon Equal power consumption;
Second step, the data of collecting circuit runtime
The data include collection in worksite data and trouble ticket dispatch data, are related to one section of the various users in multiple regions Power consumption in time, and then power consumption to high-volume user carries out fluction analysis;
3rd step, sets up standard electricity consumer
Standard electricity consumer is to put down the moon that all types of user is counted on the basis of the actual electricity consumption situation for extracting most of user Equal power consumption, then according to the electricity consumer average electricity of the most types of user as standard electricity consumer power consumption, have an impact because Finally all conversion is standard electricity consumer for influence of the son to urgency;
4th step, the analyzing influence factor simultaneously sets up model
Urgency factor of influence judgment models are exactly, by the existing service data of system, data to be carried out according to the influence of each factor Analysis, then show when result shows factor of influence and final result in the presence of obvious paradigmatic relation or continuous should by this because Number counts urgency calculating, then shows that the factor is counted into urgency calculates when result is discrete discontinuous;
5th step, according to computation model, determines the precedence of abnormality processing, and circuit runtime is safeguarded.
The factor of influence of influence urgency is determined first, standard electricity consumer is then set up, and factor of influence is converted to mark The urgency of quasi- electricity consumer, and then computation model is set up to factor of influence, the relational expression on unitary variant is set up, effectively simplify Amount of calculation and complexity, complicated solution, systematization is hierarchical, simplifies, there is provided a kind of practicable skill Art scheme, more perfect solves urgency computational problem.
Further, monthly power consumption is observed when user's electricity lacks the impact analysis method of acquisition abnormity urgency level During mistake, if platform area line loss can be caused to fluctuate, if causing fluctuation, need monthly power consumption as the shadow for influenceing urgency The factor is rung, if do not fluctuated, need not.
Further, directly with user the moon power consumption as input, can cause the factor influence fluctuate it is excessive, therefore Need to be divided user month power consumption by certain interval and platform area is classified according to capacity, and count a certain year Platform area is public to become power consumption and the public change of respective volume lower resident, non-resident single-phase, non-resident three-phase charge condition.
Further, if using only electricity as emergency value unit, the numeric ratio for finally calculating is larger, then Determine that the user is in the specific distributed area of statistics according to the actual moon power consumption of user, finally determine that the user is N number of Standard electricity consumer.
Further, it is standard family electricity separation with resident and non-resident single-phase meter user month power consumption:It is less than It is 1 family standard family equal to 200 kilowatt hours, is 2 family standard families more than 200 kilowatt hours and less than or equal to 1000 kilowatt hours, is more than 1000 kilowatt hours are 3 family standard families.
Further, the equivalent standard amount r (x of the actual moon power consumption of useri):
g(xi) it is the power consumption for specifying user's current moon, XiIt is i-th user of electric energy meter.
Further, factor of influence also includes:Abnormal lasting, distance are checked meter number of days, electric energy meter value of utility.
Further, the computation model of aberrant continuation number of days is set up, each household is divided per daily power consumption standard deviation degree Whether analysis, the daily power consumption fluctuation for analyzing user is gentle, can be by exception if the daily power consumption fluctuation of most of user is gentle The electricity that continuous dayses are lost calculates the factor as urgency level, if the daily power consumption fluctuation of most of user is larger not The electricity that aberrant continuation number of days can be lost calculates the factor as urgency level.
Further, electricity=aberrant continuation number of days that aberrant continuation number of days is lost is multiplied by the flat of the specified user current moon Equal daily power consumption, specify user's current moon power consumption need to refer to user's upper one year with month power consumption, upper one month with Electricity and first three daily power consumption,
Computing formula is as follows:
Further, set up distance to check meter the computation model of day number of days, statistics continues the N days electric energy meter numbers without meter reading data Distribution situation, analysis failure ammeter and the relation of continuous dayses, are determined to process the number of days M of most failure ammeters.
Compared with prior art, the invention has the advantages that:
The present invention determines the factor of influence of influence urgency first, then sets up standard electricity consumer, and factor of influence is changed It is the urgency to standard electricity consumer, and then computation model is set up to factor of influence, set up the relational expression on unitary variant, has Effect simplifies amount of calculation and complexity, and complicated solution, systematization is hierarchical, simplifies, there is provided one kind conscientiously may be used Capable technical scheme, more perfect solves urgency computational problem.
The present invention provides a kind of science, the more computational methods of reasonable, accurate electricity consumption acquisition abnormity urgency level, science Accurately judge the urgency level of each abnormity point, accurate send work to provide basis for follow-up so that the more rational profit of resource With.
Brief description of the drawings
Fig. 1 is influencing factors analysis flow chart of the present invention;
Fig. 2 becomes power consumption, public change lower resident, non-resident charge condition for the public varying capacity classification of the present invention and public affairs;
Fig. 3 is resident, non-resident (single, three-phase) charge condition under the corresponding public affairs varying capacity of the present invention;
Fig. 4 is the line loss stability bandwidth tables of data that public affairs of the invention become lower single household resident, non-resident electricity missing causes;
Fig. 5 is the line loss stability bandwidth broken line graph that public affairs of the invention become lower single household resident, non-resident electricity missing causes;
Fig. 6 is low pressure resident daily power consumption standard deviation curves figure of the present invention;
Fig. 7 is the non-resident user's daily power consumption standard deviation curves figure of low pressure of the present invention;
Fig. 8 is that the present invention continues the N days electric energy meter distributed number statistical forms without recording electric energy meter data;
Fig. 9 is that the present invention continues the N days electric energy meter number distribution maps without recording electric energy meter data
Figure 10 is that the present invention occurs the meter of intermittent defect by geographic classification statistical form (I types concentrator);
Figure 11 is that the present invention occurs the meter of intermittent defect by geographic classification statistical chart (I types concentrator);
Figure 12 is that the present invention occurs the user of intermittent defect by geographic classification statistical form (II types concentrator);
Figure 13 is that the present invention occurs the user of intermittent defect by geographic classification statistical form (II types concentrator);
Figure 14 is that the present invention occurs the user of intermittent defect by electric energy meter producer categorised statistical form (I types concentrator);
Figure 15 is that the present invention occurs the user of intermittent defect by concentrator producer categorised statistical form (I types concentrator);
Figure 16 is that the present invention occurs the user of intermittent defect by electric energy meter producer categorised statistical form (II types concentrator);
Figure 17 is that the present invention occurs the user of intermittent defect by concentrator producer categorised statistical form (II types concentrator);
Figure 18 is each fault type statistical form of I type concentrators that the present invention occurs intermittent defect;
Figure 19 is each fault type statistical chart of I type concentrators that the present invention occurs intermittent defect;
Figure 20 is each fault type statistical form of II type concentrators that the present invention occurs intermittent defect;
Figure 21 is the failure electric energy meter number and handling duration statistical form of different faults patterns affect of the present invention;
Figure 22 is the failure electric energy meter number and handling duration statistical chart of different faults patterns affect of the present invention;
Figure 23 is II types collector of the present invention mounting electric energy meter distributed number statistics;
Figure 24 is that II types collector of the present invention mounts electric energy meter distributed number figure.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Conversely, the present invention covers any replacement done in spirit and scope of the invention being defined by the claims, repaiies Change, equivalent method and scheme.Further, in order that the public has a better understanding to the present invention, below to of the invention thin It is detailed to describe some specific detail sections in section description.Part without these details for a person skilled in the art Description can also completely understand the present invention.
A kind of acquisition abnormity urgency level computational methods based on monthly power consumption, comprise the following steps:
The first step, primarily determines that the factor of influence of acquisition abnormity urgency
The factor of influence of acquisition abnormity urgency is determined by electric power operational system expert discussion, the factor of influence includes the moon Equal power consumption.
Second step, the data of collecting circuit runtime
The data include collection in worksite data and trouble ticket dispatch data, are related to one section of the various users in multiple regions Power consumption in time, and then power consumption to high-volume user carries out fluction analysis.
3rd step, sets up standard electricity consumer
For accurate evaluation factor of influence, it is necessary to set standard electricity consumer.Standard electricity consumer is to extract most of user The monthly average power consumption of all types of user is counted on the basis of actual electricity consumption situation, is then put down according to the electricity consumer of the most types of user Used as standard electricity consumer power consumption, finally all conversion is standard electricity consumer to equal electricity for influence of all factors of influence to urgency.
The abnormal urgency level of current system judges that relying primarily on the experience of people and subjectivity estimates to carry out distribute leaflets treatment, this There is very big not scientific and randomness in the method for kind.In order that the judgement for obtaining abnormal urgency can be more scientific and can be measured, Present invention introduces standard electricity consumer concept, finally all conversion is standard electricity consumer to the influence by all factors of influence to urgency. And during actual O&M, on the one hand abnormal urgency factor of influence is more and belongs to different type, on the other hand complete There is the Different Effects factor each place in the range of state, and various factors there is also difference to final urgency influence size, it is difficult to be System grasps all factors of influence comprehensively at the very start, there is addition, the possibility deleted and change.Therefore, using standard electricity consumer Concept, finally all conversion is standard electricity consumer to the influence by all factors of influence to urgency.Standard electricity consumer is to extract greatly The monthly average power consumption of all types of user is counted on the basis of the actual electricity consumption situation of certain customers, then according to the most types of user Electricity consumer average electricity as standard electricity consumer power consumption.
4th step, the analyzing influence factor simultaneously sets up model
As shown in figure 1, on the one hand due in the whole country each region acquisition system specific requirement is had differences, in addition one Aspect acquisition abnormity urgency factor of influence is a lot, thus each region need according to its actual conditions judge each influence because Whether son should count urgency calculating.Urgency factor of influence judgment models are exactly to have service data by system, according to Each factor influence carries out data analysis, when result shows that factor of influence has obvious paradigmatic relation or continuous with final result Shi Ze shows that the factor is counted into urgency calculates, and then showing when result is discrete discontinuous should not be by the factor meter Enter urgency calculating.
Set up the computation model of monthly power consumption, monthly power consumption to the impact analysis method of acquisition abnormity urgency level, Observation is when user's electricity is lacked, if platform area line loss can be caused to fluctuate, if causing fluctuation, needs to make monthly power consumption To influence the factor of influence of urgency, if do not fluctuated, need not.
Analyze influence degree of the monthly power consumption to acquisition abnormity urgency level, directly with user the moon power consumption as defeated Enter, the influence fluctuation of the factor can be caused excessive, it is therefore desirable to user month power consumption is divided by certain interval.By platform area Classified according to capacity, and counted that a certain annual platform area is public to become power consumption and respective volume is public becomes lower resident, non-resident (single-phase, three-phase) charge condition.
Specific statistical analysis process is as described below, and the Ge Tai areas of a certain region 242402 are classified according to capacity, And count the public change power consumption in a certain annual platform area and the public change of respective volume lower resident, non-resident (single-phase, three-phase) charge condition.
As Figure 2-3, with 250 kilovolt-amperes and following resident's electricity is 100 kilowatt hours or so, 315 kilovolt-amperes and More than single-phase user be its 2 times or so, 250 kilovolt-amperes and following non-resident three-phase meter be its 3 times or so, 315 kilovolt-amperes and with Upper non-resident three-phase meter is its 10 times or so.
If using only electricity as emergency value unit, the numeric ratio for finally calculating is larger, it is necessary to converted, Determine that the user is in the specific distributed area of statistics according to the actual moon power consumption of user, finally determine that the user is N number of Standard electricity consumer.
From Fig. 4-5, when single-phase user's electricity is lacked, the line loss fluctuation of platform area will be caused in 0.6%-0.7%, When one it is non-occupy three-phase user electricity and lack when, the fluctuation of platform area line loss will be caused 3.5% or so.Therefore, monthly power consumption energy Enough factors of influence as influence urgency.
With resident and non-resident single-phase meter user month power consumption (200,000 are less than or equal to as standard family electricity separation Watt-hour) it is 1 family standard family, (more than 200 kilowatt hours and less than or equal to 1000 kilowatt hours) are 2 family standard families, (are more than 1000 kilowatts When) it is 3 family standard families.
The equivalent standard amount r (x of the actual moon power consumption of useri):
g(xi) it is the power consumption for specifying user's current moon, XiIt is i-th user of electric energy meter
Factor of influence also includes:Abnormal lasting, distance are checked meter number of days, electric energy meter value of utility, intermittent defect.
Set up the computation model of aberrant continuation number of days
Each household is analyzed per daily power consumption standard deviation degree, whether the daily power consumption fluctuation for analyzing user is gentle, such as The gentle electricity that can be then lost aberrant continuation number of days of daily power consumption fluctuation of the most of user of fruit is calculated as urgency level The factor, the electricity that can not be lost aberrant continuation number of days if the daily power consumption fluctuation of most of user is larger is used as urgent Degree calculates the factor.
Certain January 10000 family resident and non-resident daily power consumption data are collected, are calculated per daily power consumption standard deviation, And arrange from small to large, show that curve map is as shown in Figure 6.Determine that number of users of its electric standard deviation less than 17 accounts for sum 92%, it is the flex point of standard deviation curves figure.
Likewise, it is non-resident to select 10000 families immediately in a certain region, calculate per daily power consumption standard deviation, and from small To longer spread, show that curve map is as shown in Figure 7.Determine that number of users of its electric standard deviation less than 17 accounts for sum 88.75%, it is the flex point of standard deviation curves figure.
From Fig. 6 and Fig. 7, assert that 90% or so the average daily electricity fluctuation of user is small, therefore, aberrant continuation number of days can As the factor of influence of influence urgency.
The odd-numbered day loss monitoring electricity that the present invention is caused using the per day electricity within month as failure number of days.It is abnormal The electricity that continuous dayses are lost=aberrant continuation number of days is multiplied by the average daily power consumption of the specified user current moon, specifies user to work as The power consumption of the preceding moon needs to refer to user's upper one year with month power consumption, a upper month power consumption and first three daily power consumption.
Computing formula is as follows:
More accurately to estimate the moon power consumption of specified user, increase the lunar calendar Gregorian calendar, temperature humidity over the years influence, this use Family year increases by the factor to affect of power consumption etc. on a year-on-year basis.
The emergency value formula of Abnormal lasting is as follows:
Distance is set up to check meter the computation model of day number of days
The meter reading data of example of checking meter day is mostly important in the middle of one month, and shortage of data will cause manual metering within this day, make Cost is obtained to improve.Nearer apart from next day of checking meter, abnormality processing urgency is higher.Accordingly, it would be desirable to check meter day number of days of distance is made To influence the factor of influence of urgency.
Statistics continues the relation of the N days electric energy meter number distribution situations without meter reading data, analysis failure ammeter and continuous dayses, It is determined to process the number of days M of most failure ammeters.Data are counted using section statistical, counts a certain section Still unrecovered abnormal electric energy meter in time, record continues the N days electric energy meter number distribution situations without meter reading data.
It can be seen that the failure ammeter user for continuing 2 days to 8 days accounts for the 59.06% of total failare number of users from Fig. 8-9, will Nearly 60%, continue 9 days to the 21 days users without recording electric energy meter data and account for the 30.72% of total failare number of users, nearly 30%, continue 22 days and above accounting 10.22%, nearly 10%.
Find out from analyze data, nearly 60% acquisition abnormity can all be processed within 8 day time, so selection 8 is heaven-made It is threshold value, the factor influence that threshold values is exceeded apart from number of days is 0, apart from number of days, smaller treatment emergency value is bigger in threshold values.
Distance day number of days abnormality processing urgency computation model of checking meter is as follows:
Set up the computation model of intermittent defect
Specific aim analysis is carried out by operational system data, when result shows that factor of influence has substantially pass with final result Then show that the factor is counted into urgency calculates, and should then show when result is discrete discontinuous when system or continuous The factor is counted urgency and calculated by this.
Producer according to concentrator type, region, concentrator carries out statistics failure electric energy meter quantity, electric energy meter number respectively Amount.Calculate same concentrator type, the electrical energy meter fault rate of different geographical.Calculate same concentrator type, different manufacturers Electrical energy meter fault rate.Analyze whether various electrical energy meter fault rates have discrete feature, if various electrical energy meter fault rates have Discrete type, the factor of influence that the factor is exported not as emergency value, conversely, the influence that exports as emergency value of the factor because Son.
Found in the seminar of optimization collection O&M closed loop management system and basic unit's investigation process, presently, there are meter reading data The intermittent phenomena for cutting in and out, i.e., failure is gathered for single meter but the phenomenon that can voluntarily recover without manpower intervention compared with For obvious.Quantitative analysis is carried out to meter reading data situation:1 representative is checked meter successfully, and 0 representative is checked meter unsuccessfully, the group of its meter reading data Be combined into 101 ..., 1001 ..., 10001 ....Phenomenon occurs repeatedly in such failed subs criber in one month be 101 ..., 1001 ..., 10001 ..., 100001 ... combined situation.
Certain January is collected, certain region 24907294 family low-voltage customer whole month meter reading data is analysis sample, i.e., one month Inside at least occur three times and the above 101 ..., the user of 1001 ..., 10001 ..., 100001 ... combined situations are according to collection Middle device type, region are counted.
As shown in figs. 10-11, calculating analysis is carried out to data:There is the meter collection event of intermittent defect in I type concentrators Barrier rate average value is 5.49%, and the standard deviation value of the dispersion degree in sign group between individuality is 0.0107.
Likewise, the single meter under the II type concentrators of the intermittent defect occurred for certain January gathers fault rate Counted by region,
As illustrated by figs. 12-13, data are carried out calculating analysis analysis:The meter that intermittent defect occur in II type concentrators is adopted Collection fault rate average value is 2.73%, and the standard deviation value of the dispersion degree in sign group between individuality is 0.0071.
Understood according to Figure 10-13, it is necessary to reference station area lines branch quantity, extend when analyzing different types of concentrator Region area, live power utilization environment and line style.I type concentrators occur intermittent defect meter gather fault rate apparently higher than II type concentrators, main cause is many, wide, live power utilization environment complexity in extension region of low-voltage platform area lines branch etc., is caused low Piezoelectricity powerline carrier communication is unstable, and II type concentrator downlink communications are mainly RS485 twisted-pair communications, therefore more steady It is fixed, but for same type concentrator, intermittent defect occurrence rate is relatively stable.
There is the user's inventory under 3 times, 5 times, the 6 times and 7 times I type concentrators of intermittent defect continuing with one month to press Electric energy meter producer is counted, it is found that failure focuses primarily upon Shenzhen Spacefight Techrise Electronics Co., Ltd, Shenzhen section land, Hangzhoupro State Haixing County, the western power in Hangzhou, Zhejiang Maxwell, but this five installation numbers of electric energy meter producer are also very big, further calculate this five Individual electric energy meter producer breaks down ratio, substantially 0.227% or so, as shown in figure 14.
Similarly, we have been also carried out statistics to terminal producer, it is found that failure focuses primarily upon Jiangsu light one, Hangzhou torch China Tech Skill, Skyworth, Jiangsu Linyang Electronics Co., Ltd., Qingdao GaoKe Communications Technology Co., Ltd., equally, this five terminal producers Installation number it is also very big, further calculate the ratio that breaks down of this five terminal producers, substantially 0.247% or so, As shown in figure 15.
For the user's inventory under 4 times, 5 times, the 6 times and 7 times II type concentrators of intermittent defect of an appearance in month by electricity Can table counted, find failure focus primarily upon electric energy meter producer for Hangzhou Haixing County, De Lixi, the positive Thailand in Zhejiang, the western power in Hangzhou, Zhejiang Maxwell, but this five installation numbers of electric energy meter producer are also very big, further calculate this five electric energy meter producers and occur Failure ratio, substantially 0.061% or so, as shown in figure 16.
Similarly, we have been also carried out statistics to terminal producer, find failure focus primarily upon eight reach, Jiangsu Lin Yang electronics shares Part Co., Ltd, Hangzhou torch China Tech skill, Hangzhou torch China Tech, the skill of Jiangsu light one, equally, this five installation numbers of terminal producer It is very big, further calculate this five terminal producers and break down ratio, substantially 0.055% or so, as shown in figure 17.
It is seen from the above data that intermittent defect is not presented aggregation effect (as by meter producer, terminal factory Family, Distribution Area, concentrator type etc.), in the presence of certain discrete feature.
Continue type (101 ..., 1001 ..., 10001 ..., the 100001 ...) quantity and ratio to there is each failure Example is counted.As depicted in figures 18-20, either I types concentrator or II type concentrators, occur 3 times within one month and the above between The concentrator fault type of having a rest property failure is concentrated mainly in 101,1001 both types, the automatic intermittence recovered in three days Failure accounts for more than the 90% of intermittent defect total quantity.
Intermittent defect is not presented aggregation effect (such as meter producer, terminal producer, terminal type, Area distribution Deng), there is the automatic intermittent defect accounting more than 90% recovered in certain discrete feature, and three days, therefore collection O&M Troubleshooting time limit in closed loop management can not characterization failure treatment complexity, therefore the factor is defeated not as emergency value The factor of influence for going out.
Set up under terminal and mount the computation model of electric energy meter value of utility
The number of faults and handling duration system of the whole acquisition abnormities influence produced on certain time period in current acquisition system Meter analysis.
As shown in fig. 21-22, there is problem one:The electric energy meter number of one fault type influence is more, then processing priority Higher, the sequence of troubleshooting benefit should be:Completely without data under I type concentrators>I types terminal is with main website without communication>II types are concentrated Device is completely without data>II types terminal is with main website without communication>Ammeter is completely without data under collector>N days without recording electric energy meter data, according to place Reason urgency level is successively decreased arrangement, and the process limited should be incremented by principle, but in I types concentrator and main website without communicating and N days no datas Two classes occur in that the average treatment time limit declines obvious trend extremely, illustrate there is problem.
There is problem two:Ammeter distribution proportion is mounted under II type collectors under electric energy meter
As shown in figs. 23-24, it can be seen that the situation of II type collector 1 piece of electric energy meter of carry account for 94.91%.According to Data result is investigated and analysed, due to grass-roots unit and do not know about the type calculating be mounting 2 pieces of electric energy meters and the above II type collector exceptions, blindness thinks that the II types collector mounting electric energy meter overwhelming majority is 1 piece of electric energy meter, causes maintenance positive Property is not high.Value of utility is exported in O&M to be needed to consider carry failure electric energy meter number, and not exclusively mounts electric energy meter under terminal Number, can not otherwise reach the maximization of O&M effectiveness.
To sum up analysis is, it is necessary to using electric energy meter quantitative utility value as the factor of influence of influence urgency is mounted under terminal, be System can judge its priority, overall utility value mould by analyzing each treatment lower value of utility summation of faulty ammeter of work order Type is as follows:
Y (emergency value)=∑ f (xi) (i represents the 1st after collecting ... the electric energy meter of n)
xiIt is i-th user of electric energy meter, f (xi) represent i-th electric energy meter user urgency
Set up total acquisition abnormity urgency level computation model
By the acquisition abnormity urgency level influencing factors analysis to existing collection, come for single meter emergency value Say mainly there is " distance check meter number of days ", " Abnormal lasting " and " monthly average power consumption ", " electric energy meter value of utility " four directions at present Face rings, and " intermittent defect " does not occur direct relation, therefore the factor does not consider.The emergency value of abnormal work order is the work order Comprising failure ammeter emergency value it is cumulative.Total acquisition abnormity urgency level computation model is:
Y (emergency value)=∑ f (xi) (i represents the 1st after collecting ... the electric energy meter of n)
f(xi)=j (xi)+s(xi), wherein:
Thus total emergency value of single table is obtained, the precedence for instructing abnormality processing enables to daily collection Maintenance work is shot the arrow at the target, and reaches the effect got twice the result with half the effort.
5th step, according to computation model, determines the precedence of abnormality processing, and circuit runtime is safeguarded.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption, it is characterised in that comprise the following steps:
The first step, primarily determines that the factor of influence of acquisition abnormity urgency
The factor of influence of acquisition abnormity urgency is determined by electric power operational system expert discussion, the factor of influence includes monthly use Electricity;
Second step, the data of collecting circuit runtime
The data include collection in worksite data and trouble ticket dispatch data, are related to a period of time of the various users in multiple regions Interior power consumption, and then power consumption to high-volume user carries out fluction analysis;
3rd step, sets up standard electricity consumer
Standard electricity consumer is that the monthly average that all types of user is counted on the basis of the actual electricity consumption situation for extracting most of user is used Electricity, then according to the electricity consumer average electricity of the most types of user as standard electricity consumer power consumption, all factors of influence pair Finally all conversion is standard electricity consumer for the influence of urgency;
4th step, the analyzing influence factor simultaneously sets up model
Urgency factor of influence judgment models are exactly, by the existing service data of system, data point to be carried out according to the influence of each factor Analysis, then showing when result shows factor of influence with final result in the presence of obvious paradigmatic relation or continuous should be by the factor Urgency calculating is counted, then shows that the factor is counted into urgency calculates when result is discrete discontinuous;
5th step, according to computation model, determines the precedence of abnormality processing, and circuit runtime is safeguarded.
2. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 1, its feature exists In monthly power consumption is observed when user's electricity is lacked, if can cause the impact analysis method of acquisition abnormity urgency level The line loss fluctuation of platform area, if causing fluctuation, needs using monthly power consumption as the factor of influence for influenceing urgency, if do not had Fluctuation, then need not.
3. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 2, its feature exists In, directly with user the moon power consumption as input, can cause the factor influence fluctuate it is excessive, it is therefore desirable to user month is used Electricity is divided by certain interval is classified platform area according to capacity, and counts the public change power consumption in a certain annual platform area And the public change of respective volume lower resident, non-resident single-phase, non-resident three-phase charge condition.
4. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 3, its feature exists In, if using only electricity as emergency value unit, the numeric ratio for finally calculating is larger, then according to user's actual moon Power consumption determines that the user is in the specific distributed area of statistics, finally determines that the user is N number of standard electricity consumer.
5. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 4, its feature exists In being standard family electricity separation with resident and non-resident single-phase meter user a month power consumption:It is less than or equal to 200 kilowatt hours 1 family standard family, is 2 family standard families more than 200 kilowatt hours and less than or equal to 1000 kilowatt hours, more than 1000 kilowatt hours for 3 families are marked Quasi- family.
6. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 5, its feature exists In the equivalent standard amount r (x of the actual moon power consumption of useri):
g(xi) it is the power consumption for specifying user's current moon, XiIt is i-th user of electric energy meter.
7. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 6, its feature exists In factor of influence also includes:Abnormal lasting, distance are checked meter number of days, electric energy meter value of utility.
8. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 7, its feature exists In, the computation model of aberrant continuation number of days is set up, each household is analyzed per daily power consumption standard deviation degree, analyze the day of user Whether power consumption fluctuation is gentle, can be lost aberrant continuation number of days if the daily power consumption fluctuation of most of user is gentle Electricity calculates the factor as urgency level, can not be by aberrant continuation number of days if the daily power consumption fluctuation of most of user is larger The electricity for being lost calculates the factor as urgency level.
9. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 8, its feature exists In the electricity that aberrant continuation number of days is lost=aberrant continuation number of days is multiplied by the average daily power consumption of the specified user current moon, refers to The power consumption for determining user's current moon needs to refer to user's upper one year with month power consumption, a upper month power consumption and first three is daily Electricity,
Computing formula is as follows:
10. a kind of acquisition abnormity urgency level computational methods based on monthly power consumption as claimed in claim 9, its feature exists In, to set up distance and check meter the computation model of day number of days, statistics continues the N days electric energy meter number distribution situations without meter reading data, analyzes Failure ammeter and the relation of continuous dayses, are determined to process the number of days M of most failure ammeters.
CN201611125040.4A 2016-12-08 2016-12-08 method for calculating abnormal collection emergency degree based on average monthly power consumption Active CN106780125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611125040.4A CN106780125B (en) 2016-12-08 2016-12-08 method for calculating abnormal collection emergency degree based on average monthly power consumption

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611125040.4A CN106780125B (en) 2016-12-08 2016-12-08 method for calculating abnormal collection emergency degree based on average monthly power consumption

Publications (2)

Publication Number Publication Date
CN106780125A true CN106780125A (en) 2017-05-31
CN106780125B CN106780125B (en) 2019-12-06

Family

ID=58881843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611125040.4A Active CN106780125B (en) 2016-12-08 2016-12-08 method for calculating abnormal collection emergency degree based on average monthly power consumption

Country Status (1)

Country Link
CN (1) CN106780125B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109165874A (en) * 2018-09-21 2019-01-08 国网天津市电力公司电力科学研究院 A kind of work order urgency level analysis method and system based on platform area electricity consumption
CN109389295A (en) * 2018-09-21 2019-02-26 国网天津市电力公司电力科学研究院 A kind of work order urgency level analysis method and system based on platform area number of users
CN113554268A (en) * 2021-06-10 2021-10-26 合肥工业大学 Method and system for selecting power utilization strategy for balancing peak valley and light and vigorous seasons
CN113552528A (en) * 2021-06-29 2021-10-26 国网上海市电力公司 Transformer substation bus unbalance rate abnormity analysis method based on improved genetic algorithm
CN114325088A (en) * 2021-12-10 2022-04-12 国网湖南省电力有限公司 System and method for automatically measuring and calculating electric quantity during metering fault period

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5204001B2 (en) * 2009-02-18 2013-06-05 株式会社東芝 Abnormal sign judgment device for input electricity quantity
CN103744047A (en) * 2013-12-23 2014-04-23 国家电网公司 Method for locating out-of-tolerance electric-energy meters in operation
CN104123600A (en) * 2014-08-14 2014-10-29 国家电网公司 Electrical manager's index forecasting method for typical industry big data

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5204001B2 (en) * 2009-02-18 2013-06-05 株式会社東芝 Abnormal sign judgment device for input electricity quantity
CN103744047A (en) * 2013-12-23 2014-04-23 国家电网公司 Method for locating out-of-tolerance electric-energy meters in operation
CN104123600A (en) * 2014-08-14 2014-10-29 国家电网公司 Electrical manager's index forecasting method for typical industry big data

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109165874A (en) * 2018-09-21 2019-01-08 国网天津市电力公司电力科学研究院 A kind of work order urgency level analysis method and system based on platform area electricity consumption
CN109389295A (en) * 2018-09-21 2019-02-26 国网天津市电力公司电力科学研究院 A kind of work order urgency level analysis method and system based on platform area number of users
CN113554268A (en) * 2021-06-10 2021-10-26 合肥工业大学 Method and system for selecting power utilization strategy for balancing peak valley and light and vigorous seasons
CN113554268B (en) * 2021-06-10 2024-03-15 合肥工业大学 Method and system for selecting electricity utilization strategies in balanced peak-valley and light-heavy seasons
CN113552528A (en) * 2021-06-29 2021-10-26 国网上海市电力公司 Transformer substation bus unbalance rate abnormity analysis method based on improved genetic algorithm
CN114325088A (en) * 2021-12-10 2022-04-12 国网湖南省电力有限公司 System and method for automatically measuring and calculating electric quantity during metering fault period
CN114325088B (en) * 2021-12-10 2023-09-05 国网湖南省电力有限公司 Automatic measuring and calculating system and method for electric quantity during metering fault period

Also Published As

Publication number Publication date
CN106780125B (en) 2019-12-06

Similar Documents

Publication Publication Date Title
CN106780125A (en) A kind of acquisition abnormity urgency level computational methods based on monthly power consumption
CN106154209B (en) Electrical energy meter fault prediction technique based on decision Tree algorithms
CN106771862B (en) A kind of acquisition abnormity fault point polymerization that grid is combined with space length
CN105915398B (en) Rural power grid fault based rapid detection and power restoration system and concentrator detection method thereof
CN106803125B (en) A kind of acquisition abnormity urgency level calculation method based on the conversion of standard electricity consumer
CN107144764B (en) User voltage sag accident detection method based on ammeter data
CN110346661B (en) Method and system for automatically inspecting abnormal user voltage
CN110571925B (en) Method for analyzing power quality by using data of power distribution network monitoring terminal
CN113032454A (en) Interactive user power consumption abnormity monitoring and early warning management cloud platform based on cloud computing
CN111191966B (en) Power distribution network voltage disqualification period identification method based on space-time characteristics
CN106600114A (en) Multi-dimensional quality evaluation method of collection operation and maintenance system
CN110276511A (en) A kind of line change relationship anomalous discrimination method based on electricity and line loss relevance
WO2018209913A1 (en) Distribution network station area power shortage prediction method based on voltage quality
CN113189418B (en) Topological relation identification method based on voltage data
CN109948877A (en) A kind of accurate analysis method of electricity consumption behavior based on anomalous event combination
CN106814268A (en) A kind of big data analysis method based on intermittent defect
CN114742488B (en) Main transformer operation risk assessment method and system
CN106682817A (en) Acquisition abnormity emergency degree judgment method
CN115270974A (en) Intelligent electricity stealing detection system based on big data analysis
CN106711998B (en) A kind of acquisition abnormity urgency level calculation method based on Abnormal lasting
CN103018611A (en) Non-invasive load monitoring method and system based on current decomposition
CN105974220A (en) Residential community power load identification system
CN105158610B (en) A kind of screening processing method of transformer state warning data dubious value
CN113112136A (en) Comprehensive evaluation method and system for reliability of power distribution network
CN110942236B (en) Abnormal user identification method for comprehensive power failure record and power consumption data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant