CN106777994A - A kind of external hydraulic pressure upon tunnel lining evaluation method - Google Patents

A kind of external hydraulic pressure upon tunnel lining evaluation method Download PDF

Info

Publication number
CN106777994A
CN106777994A CN201611197179.XA CN201611197179A CN106777994A CN 106777994 A CN106777994 A CN 106777994A CN 201611197179 A CN201611197179 A CN 201611197179A CN 106777994 A CN106777994 A CN 106777994A
Authority
CN
China
Prior art keywords
factor
factors
evaluation
collection
water pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611197179.XA
Other languages
Chinese (zh)
Inventor
赵万强
阳军生
罗禄森
郑长青
马青
喻渝
张永平
陶伟明
张峥
何昌国
匡亮
刘鹤冰
赵辉雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201611197179.XA priority Critical patent/CN106777994A/en
Publication of CN106777994A publication Critical patent/CN106777994A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of external hydraulic pressure upon tunnel lining evaluation method, effectively to solve the problems, such as that existing method is difficult to apply to Practical Project.Comprise the following steps:The influence factor and the evaluation result rank for water pressure of water pressure are set, set of factors U and evaluate collection V is set up;Single factor test in the set of factors U is judged relative to the degree of membership of each grade in opinion rating V, fuzzy evaluating matrix R is set up;Each factor in the set of factors U is compared two-by-two, judgment matrix C is set up according to significance level, and the weight sets A of each factor in set of factors U is solved according to judgment matrix C;Using blurring mapping B=A × R, obtain fuzzy evaluation results B, B and obtain evaluation result collection B ' through normalized, according to maximum membership grade principle, take B ' and concentrate the evaluation result rank in evaluate collection V corresponding to the maximum as output result.

Description

A kind of external hydraulic pressure upon tunnel lining evaluation method
Technical field
The present invention relates to a kind of method of tunnel external water pressure fuzzy evaluation, more particularly to a kind of outer hydraulic pressure of tunnel-liner Power evaluation method.
Background technology
Karst features account for 15% on earth, and China Karst distribution is very wide.With Chinese transportation infrastructure construction Fast development, increasing mountain tunnel is built in karst area.Due to the effect of karst region hydraulic pressure high, it is ensured that liner structure Long-term safety and durability are a problems hanged for a long time and do not solve.Tunnel causes liner structure to ftracture, damage due to hydraulic pressure high The disease such as bad happens occasionally.Beijing-Guangzhou Railway south mountain tunnel part jetting, washes upside down abutment wall.Three Gorges are bypassed the dam site high speed Ji Jiapo tunnels heavy rain Afterwards, lining cutting is born hydraulic pressure high and is ftractureed.Lining cutting water pressure is the principal element for influenceing Karst Tunnel liner structure security, in view of Hydraulic pressure high causes the case of tunnel-liner disease to happen occasionally, and lining cutting water pressure influence factor is numerous, it is therefore necessary to carry out The research of Karst Area tunnel-liner distribution of water pressure feature, analyzes the influence factor of lining cutting water pressure, studies lining cutting hydraulic pressure The regularity of distribution of power.
Substantially there are 3 kinds of situations in foreign countries to tunnel external water pressure value disunity at present:(1) discount coefficient method;(2) full water Head method;(3) may maximum head value.During domestic tunnel-liner water pressure calculation, railway and traffic department do not make also Determine unified standard, mostly referring still to hydraulic tunnel design specification and correlation experience method, domestic external hydraulic pressure upon tunnel lining meter Calculation method mainly has following 5 kinds:(1) discount coefficient method;(2) analytic-numerical method;(3) theoretical analysis;(4) Analysis of The Seepage method; (5) hydrogeochemistry method.Any of the above method belongs to semi-analytic method mostly, but geology is in itself a complexity Structure, influence external water pressure on lining influence factor is more, it is difficult to which quantitative analysis goes out external water pressure on lining, and above method applies to reality Still there is certain difficulty in the engineering of border, the problem has become this area engineers urgent problem.
The content of the invention
It is difficult effectively to solve existing method it is an object of the invention to provide a kind of external hydraulic pressure upon tunnel lining evaluation method To apply to the problem of Practical Project.
The technical scheme that present invention solution above-mentioned technical proposal is taken is as follows:
A kind of external hydraulic pressure upon tunnel lining evaluation method of the invention, comprises the following steps:
(1) influence factor and the evaluation result rank for water pressure of water pressure are set, set of factors U and evaluation is set up Collection V;
(2) single factor test in the set of factors U is judged relative to the degree of membership of each grade in opinion rating V, is built Vertical fuzzy evaluating matrix R;
(3) each factor in the set of factors U is compared two-by-two, judgment matrix C is set up according to significance level, and according to judgement Matrix C solves the weight sets A of each factor in set of factors U;
(4) using blurring mapping B=A × R, fuzzy evaluation results B, B are obtained and obtains evaluation result collection through normalized B ', according to maximum membership grade principle, take B ' and concentrate the evaluation result rank in evaluate collection V corresponding to the maximum to be tied as output Really.
The present invention by being input into the influence factor and the evaluation result for water pressure of water pressure, set up set of factors U and Evaluate collection V;Single factor test in set of factors U is judged, fuzzy evaluating matrix R is set up;Each factor in set of factors is compared two-by-two Compared with, judgment matrix C is set up according to significance level, according to judgment matrix C, set up factorial power sets A;Using blurring mapping B=A × R, obtains fuzzy evaluation results B, B and obtains evaluation result collection B ' through normalized, according to maximum membership grade principle, that is, takes B ' collection The evaluation result rank in evaluate collection V corresponding to middle the maximum is output as being evaluated the evaluation result classification of object.
The beneficial effects of the invention are as follows judge so as to carrying out external hydraulic pressure upon tunnel lining by each factor in tunnel Fuzzy evaluation, finally advises to tunnel water handling way choice;In the environment of complex geologic conditions, to rich water karst External hydraulic pressure upon tunnel lining carries out Assessment for classification, gives the guarded drainage mode of recommendation, is the design and fortune of tunnel lining structure The judgement of battalion's phase external water pressure size provides important references.
Specific embodiment
Embodiments of the invention are described in detail below.
A kind of external hydraulic pressure upon tunnel lining evaluation method of the invention, comprises the following steps:
The influence factor and the evaluation result rank for water pressure of water pressure are set, set of factors U and evaluate collection is set up V。
Determine the influence factor of water pressure, set up set of factors U, set of factors U includes:Geological structure, country rock permeability, karst The supply of water, the excretion of karst water, the big factor of vertical distribution 5 of karst water.Wherein, geological structure includes to oblique, anticline and breaks Layer three types;Country rock permeability includes strong, the weak Three Estate of neutralization;The supply of karst water is divided into bad and good;Karst water Excretion include the upper point of release, the lower point of release and without the point of release;The vertical distribution of karst water includes horizontal runoff zones and vertically oozes Stream band.
Size according to water pressure sets up evaluate collection V, as shown in the table:
Rank Implication
It is low 0~0.5MPa of water pressure
In 0.5~1.5MPa of water pressure
It is high 1.5~3MPa of water pressure
It is high More than water pressure 3MPa
Single factor test in the set of factors U is judged relative to the degree of membership of each grade in opinion rating V, mould is set up Paste Evaluations matrix R.
With expert survey, to single factor test u in set of factors UiMake simple element evaluation, from factor uiHave the judge object in mind To opinion rating v in evaluate collection VjDegree of membership be rij, obtain factor uiSingle factor evaluation collection ri
ri=(ri1, ri2..., ri4);
A total Evaluations matrix R is constructed from each factor of set of factors
Wherein, rijRepresent from factor uiHaving the judge object in mind can be evaluated as grade viDegree of membership, i.e. rijRepresent because Plain uiIn opinion rating viOn frequency distribution.R is carried out into nondimensionalization treatment, will its normalization it is met Σ rij=1.
With expert survey, Tunnel Engineering field associated specialist is engaged, statistical analysis is carried out to result, determine each factor Degree of membership.If n expert is had, from factor uiHave the judge object in mind and be evaluated as grade viTotal m expert, then Factor uiIn opinion rating vjOn frequency distribution be m/n, then the degree of membership r of the factorij=m/n.
Each factor in the set of factors U is compared two-by-two, judgment matrix C is set up according to significance level, and according to judging square Battle array C solves the weight sets A of each factor in set of factors U.
Each factor in set of factors is compared two-by-two, according to significance level, judgment matrix C is set up:
Wherein, cijRepresent from factor i and factor j relative to the significance level of evaluation objective, c is determined with analytic hierarchy process (AHP)ij Value.
Scale Implication
1 I and the factors of j two are of equal importance
3 I factors are somewhat more important than j factor
5 I factors are substantially more important than j factor
7 I factors are strongly more important than j factor
9 I factors are more extremely important than j factor
2,4,6,8 The intermediate value of above-mentioned two adjacent importance degree
It is reciprocal Factor i compares to obtain bij with j, then factor j compares to obtain bji=1/bij with i
To reflect significance level of each factor relative to evaluation objective, a flexible strategy a is assigned to each factori, set up Factorial power sets A, and meet ∑ ai=1:
A={ a1 a2 a3 a4 a5};
Consistency check is carried out to judgment matrix C makes it meet consistency ration CR < 0.1, when consistency ration is unsatisfactory for When, result now may occur logicality mistake, should be to the element of judgment matrix C is checked and repaiied according to analytic hierarchy process (AHP) Just, expert's questionnaire should be again done if necessary, when need to meet Consistency Ratio CR < 0.1 and be unsatisfactory for, can all be processed in this way, It is aftermentioned to be not repeated.
According to CA=ymaxThe eigenvalue of maximum y of A calculating matrix CmaxWith its corresponding characteristic vector A, the component of A be with The weight of corresponding 5 factors of set of factors U.
4th, using blurring mapping B=A × R, fuzzy evaluation results B, B are obtained and obtains evaluation result collection through normalized B ', according to maximum membership grade principle, take B ' and concentrate the evaluation result rank in evaluate collection V corresponding to the maximum to be tied as output Really.
.Using blurring mapping B=A × R, fuzzy evaluation results B is obtained.Do not go together with reflecting in Evaluations matrix R and be evaluated Which evaluation result grade object belongs to from single factor analysis.Carried out with the factorial power sets A rows different to Evaluations matrix R comprehensive Close, can obtain being evaluated object and analyzing on the whole which evaluation result grade, as fuzzy evaluation results collection B belonged to.
Evaluation result B is normalized and obtains evaluation result collection B ', it is met Σ bi=1, biIt is the power of B ' Number;
Combining assessment result set B ', according to maximum membership grade principle, take biEvaluation in evaluate collection V corresponding to middle the maximum As a result rank is used as output result.
According to the different guarded drainage mode of evaluation result classification selection.If solution cavity scale is big, water pressure is " high, height " Level, using releasing the processing mode that can be depressured.Releasing energy voltage drop method can significantly cut down water pressure, typically also be carried out by drain cavern Sluice;If solution cavity small scale, water pressure for " in " level, using the processing mode of " slip casting+row leads ".Country rock is reduced by slip casting Infiltration coefficient, play plugging function, penetrate into the ponding of lining cutting behind and discharged by exhaust system;If water pressure is " low " Level, and surface settlement control is strict, water resource needs strict protection, it is contemplated that use full block up design.Tunnel is set using full closure Timing, underground water is blocked in lining cutting behind completely, it is impossible to discharged;Above-mentioned all guarded drainage modes can be all arranged at mode using complete Reason, makes liner structure bear the water pressure of very little, but water resource loss is more, need to use with caution.
Embodiment:
The large-scale molten chamber of water-enriched filling type is developed at D tunnels X, positioned at synclinal structure band, molten chamber section is Triassic system Daye group ash Rock, country rock permeability is strong." molten chamber at X " and the aqueous crack in top, pipeline communication, directly receive the supply of top underground water, ground Lower water supply is good.Earth's surface is water paddy dam karst valley at this, more than tunnel absolute altitude develops the strong point of release.The molten chamber section is located at rock Molten horizontal runoff zones, karst intense development.
Design, construction, R&D institution's person skilled 20 are chosen, the size to the tunnel water pressure is commented Valency.Evaluation result is as shown in the table:
Project It is low In It is high It is high
Geological structure 3 5 6 6
Country rock permeability 1 2 7 10
Karst water feeds 1 2 8 9
Karst water is drained 2 4 6 8
Karst water vertical zoning 2 2 7 9
Counted according to evaluation result, calculate degree of membership, and then determine fuzzy evaluating matrix R.
Compare each factor two-by-two, according to its relative importance degree, with reference to upper table, Judgement Matricies C.
The corresponding characteristic vector of eigenvalue of maximum is calculated, and through consistency check, and meet Consistency Ratio CR < 0.1, Weight sets A, A=(0.06,0.14,0.27,0.24,0.29) can so be tried to achieve.
Blurring mapping B=A × R is carried out, and is obtained after normalized, B '=(0.082,0.133,0.349,0.436).
According to maximum membership grade principle, D tunnels " molten chamber at X ", tunnel water pressure is assessed as high level.
D tunnels " molten chamber at X " section karst intense development, water pressure evaluation result is " high " level, it is contemplated that need protecting field Lower water resource, is processed, to reduce water pressure, it is ensured that construction safety using energy voltage drop method is released.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (5)

1. a kind of external hydraulic pressure upon tunnel lining evaluation method, comprises the following steps:
(1) influence factor and the evaluation result rank for water pressure of water pressure are set, set of factors U and evaluate collection V is set up;
(2) single factor test in the set of factors U is judged relative to the degree of membership of each grade in opinion rating V, sets up mould Paste Evaluations matrix R;
(3) each factor in the set of factors U is compared two-by-two, judgment matrix C is set up according to significance level, and according to judgment matrix C solves the weight sets A of each factor in set of factors U;
(4) using blurring mapping B=A × R, fuzzy evaluation results B, B are obtained and obtains evaluation result collection B ', root through normalized According to maximum membership grade principle, take B ' and concentrate the evaluation result rank in evaluate collection V corresponding to the maximum as output result.
2. a kind of external hydraulic pressure upon tunnel lining evaluation method as claimed in claim 1, it is characterised in that step (2) bag Include:
With expert survey, to single factor test u in set of factors UiMake simple element evaluation, from factor uiThe judge object is had in mind to commenting Opinion rating v in valency collection VjDegree of membership be rij, obtain factor uiSingle factor evaluation collection ri
ri=(ri1, ri2..., ri4);
A total Evaluations matrix R is constructed from each factor of set of factors:
R = r 11 r 12 r 13 r 14 r 21 r 22 r 23 r 24 r 31 r 32 r 33 r 34 r 41 r 42 r 43 r 44 r 51 r 52 r 53 r 54
Wherein, rijRepresent from factor uiHaving the judge object in mind can be evaluated as grade viDegree of membership, i.e. rijExpression factor ui Opinion rating viOn frequency distribution.R is carried out into nondimensionalization treatment, will its normalization it is met ∑ rij=1.
3. a kind of external hydraulic pressure upon tunnel lining evaluation method as claimed in claim 1, it is characterised in that step (3) bag Include:
Each factor in set of factors is compared two-by-two, according to significance level, judgment matrix C is set up:
C = c 11 c 12 c 13 c 14 c 15 c 21 c 22 c 23 c 24 c 25 c 31 c 32 c 33 c 34 c 35 c 41 c 42 c 43 c 44 c 45 c 51 c 52 c 53 c 54 c 55 :
Determine c with analytic hierarchy process (AHP)ijValue;
A flexible strategy α is assigned to each factori, factorial power sets A is set up, and meet ∑ ai=1:
A={ a1 a2 a3 a4 a5};
Consistency check is carried out to judgment matrix C makes it meet consistency ration CR < 0.1, according to CA=ymaxA calculating matrix C Eigenvalue of maximum ymaxWith its corresponding characteristic vector A, the component of A is the weight of 5 factors corresponding with set of factors U.
4. a kind of external hydraulic pressure upon tunnel lining evaluation method as claimed in claim 1, it is characterised in that step (4) bag Include:
Using blurring mapping B=A × R, fuzzy evaluation results B is obtained;
Evaluation result B is normalized and obtains evaluation result collection B ', it is met Σ bi=1, biIt is the flexible strategy of B ';
Combining assessment result set B ', according to maximum membership grade principle, take biEvaluation result in evaluate collection V corresponding to middle the maximum Rank is used as output result.
5. a kind of external hydraulic pressure upon tunnel lining evaluation method as claimed in claim 1, it is characterised in that selected according to evaluation result Select correspondence guarded drainage mode as follows:Solution cavity scale is big, and water pressure is " high, high " level, using releasing the processing mode that can be depressured;It is molten Hole small scale, water pressure for " in " level, using the processing mode of " slip casting+row leads ";Water pressure is " low " level, is set using full closure Meter.
CN201611197179.XA 2016-12-22 2016-12-22 A kind of external hydraulic pressure upon tunnel lining evaluation method Pending CN106777994A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611197179.XA CN106777994A (en) 2016-12-22 2016-12-22 A kind of external hydraulic pressure upon tunnel lining evaluation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611197179.XA CN106777994A (en) 2016-12-22 2016-12-22 A kind of external hydraulic pressure upon tunnel lining evaluation method

Publications (1)

Publication Number Publication Date
CN106777994A true CN106777994A (en) 2017-05-31

Family

ID=58900417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611197179.XA Pending CN106777994A (en) 2016-12-22 2016-12-22 A kind of external hydraulic pressure upon tunnel lining evaluation method

Country Status (1)

Country Link
CN (1) CN106777994A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670217A (en) * 2018-11-30 2019-04-23 中南大学 The weight analysis method and computer system of tunnel aerodynamic loading influence factor
CN110766313A (en) * 2019-10-18 2020-02-07 山东电工电气集团有限公司 Cable tunnel comprehensive state evaluation method based on operation and maintenance system
CN111927718A (en) * 2020-08-20 2020-11-13 国电联合动力技术有限公司 Optimizing method and device for transmission chain of wind generating set
CN115994494A (en) * 2022-11-21 2023-04-21 长江三峡勘测研究院有限公司(武汉) Method and system for estimating diving high external water pressure of multilayer slowly-inclined rock-soil body deep-buried tunnel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949895A (en) * 2010-08-20 2011-01-19 江苏大学 Method for identifying fine crack impact signal of metal deep drawing part
CN104361460A (en) * 2014-11-20 2015-02-18 江苏物联网研究发展中心 Road service level evaluation method adopting fuzzy synthetic evaluation method
CN104504293A (en) * 2015-01-14 2015-04-08 南京理工大学 Method for evaluating thermal explosion risk of material by fuzzy comprehensive evaluation method
CN105488241A (en) * 2015-09-07 2016-04-13 国网山西省电力公司 Method for evaluating influence and damage of goafs on power transmission lines

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949895A (en) * 2010-08-20 2011-01-19 江苏大学 Method for identifying fine crack impact signal of metal deep drawing part
CN104361460A (en) * 2014-11-20 2015-02-18 江苏物联网研究发展中心 Road service level evaluation method adopting fuzzy synthetic evaluation method
CN104504293A (en) * 2015-01-14 2015-04-08 南京理工大学 Method for evaluating thermal explosion risk of material by fuzzy comprehensive evaluation method
CN105488241A (en) * 2015-09-07 2016-04-13 国网山西省电力公司 Method for evaluating influence and damage of goafs on power transmission lines

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
夏才初,主编;: "《和谐地球上的水工岩石力学 2010年8月第1版 》", 31 August 2010, 同济大学出版社 *
姚乐,: "复合地层土压平衡盾构掘进适应性评价", 《中国优秀硕士学位论文全文数据库工程科技II辑(月刊)》 *
武汉铁路局宜万铁路工程建设指挥部,主编;: "《宜万铁路工程总结 2013年12月第1版》", 31 December 2013, 西南交通大学出版社 *
王建宇,著;: "《隧道工程的技术进步 2004年3月第1版》", 31 March 2004, 中国铁道出版社 *
陆怡,: "模糊综合评价方法及其在风险分析中的应用", 《江苏工业学院学报》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670217A (en) * 2018-11-30 2019-04-23 中南大学 The weight analysis method and computer system of tunnel aerodynamic loading influence factor
CN109670217B (en) * 2018-11-30 2023-04-18 中南大学 Weight analysis method for tunnel aerodynamic load influence factors and computer system
CN110766313A (en) * 2019-10-18 2020-02-07 山东电工电气集团有限公司 Cable tunnel comprehensive state evaluation method based on operation and maintenance system
CN110766313B (en) * 2019-10-18 2024-01-26 山东电工电气集团有限公司 Cable tunnel comprehensive state evaluation method based on operation and maintenance system
CN111927718A (en) * 2020-08-20 2020-11-13 国电联合动力技术有限公司 Optimizing method and device for transmission chain of wind generating set
CN115994494A (en) * 2022-11-21 2023-04-21 长江三峡勘测研究院有限公司(武汉) Method and system for estimating diving high external water pressure of multilayer slowly-inclined rock-soil body deep-buried tunnel
CN115994494B (en) * 2022-11-21 2024-06-11 长江三峡勘测研究院有限公司(武汉) Method and system for estimating diving high external water pressure of multilayer slowly-inclined rock-soil body deep-buried tunnel

Similar Documents

Publication Publication Date Title
CN104898183B (en) Heavy rain urban waterlogging modelling evaluation method
CN106777994A (en) A kind of external hydraulic pressure upon tunnel lining evaluation method
Wu et al. Evaluation and zoning of groundwater hazards in Pingshuo No. 1 underground coal mine, Shanxi Province, China
CN103995947A (en) Improved coal seam floor water inrush vulnerability evaluation method
Yang et al. Risk assessment model of tunnel water inrush based on improved attribute mathematical theory
CN105275471A (en) Method for determining surface mine exploiting limit
ASLI et al. Non-Revenue Water (NRW) and 3d hierarchical model for landslide
CN113570226A (en) Method for evaluating occurrence probability grade of tunnel water inrush disaster in fault fracture zone
Atharinafi et al. Land use change and its impacts on surface runoff in rural areas of the upper citarum watershed (case study: Cirasea subwatershed)
Li et al. The optimal framework and model to balance underground coal mining and cropland protection in Jining, eastern China
Meng et al. Risk assessment of shield tunnel construction in karst strata based on fuzzy analytic hierarchy process and cloud model
CN105718648B (en) Watershed Scale underground water transports blocking priority acccess control limited region dividing method to surface water nitrogen
CN110245833A (en) A kind of Development in Nature Reserve construction project Ecological Evaluation method and its system
Kang et al. Construction and optimization of the Saihanba ecological network
CN105631155A (en) Reservoir-induced earthquake probability calculation method
CN105005649A (en) Potential underground water distribution mapping method
Hsieh et al. Ground-water flow model for the Spokane valley-Rathdrum prairie aquifer, Spokane County, Washington, and Bonner and Kootenai Counties, Idaho
CN104750936A (en) GIS (Geographic Information System)-based urban hydrological run-off calculating method and system
Bi et al. Establishing a Clean‐quality Indicator System for Evaluating Reclaimed Land in the Antaibao Opencast Mine Area, China
Sun et al. Risk assessment of water inrush in karst tunnels based on fuzzy comprehensive evaluation considering misjudgment losses: a case study
Yu et al. Dynamic Risk Assessment of Karst Tunnel Collapse Based on Fuzzy‐AHP: A Case Study of the LianHuaShan Tunnel, China
CN106991521A (en) A kind of tunnels and underground engineering slip casting effect grade evaluation method and system
CN101561359A (en) Grading method for gas tunnel
Naseri et al. Evaluation of groundwater resources potential using analytical hierarchy process (AHP) and remote sensing geographic information system (GIS), a case study: Garmsar’s catchment basin
CN105205328A (en) Geological dynamical environment evaluating method based on generalized fractal dimensions and characteristic parameters

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531