CN106777655A - The equivalent computational methods and device for adopting thickness rate in overhead transmission line coal mine gob - Google Patents

The equivalent computational methods and device for adopting thickness rate in overhead transmission line coal mine gob Download PDF

Info

Publication number
CN106777655A
CN106777655A CN201611137014.3A CN201611137014A CN106777655A CN 106777655 A CN106777655 A CN 106777655A CN 201611137014 A CN201611137014 A CN 201611137014A CN 106777655 A CN106777655 A CN 106777655A
Authority
CN
China
Prior art keywords
equivalent
thickness
transmission line
soil layer
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611137014.3A
Other languages
Chinese (zh)
Other versions
CN106777655B (en
Inventor
马维青
贾志义
赵晓龙
穆昭玺
夏丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huada Tianyuan (beijing) Electric Technology Co Ltd
State Grid Corp of China SGCC
Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Huada Tianyuan (beijing) Electric Technology Co Ltd
State Grid Corp of China SGCC
Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huada Tianyuan (beijing) Electric Technology Co Ltd, State Grid Corp of China SGCC, Yangquan Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical Huada Tianyuan (beijing) Electric Technology Co Ltd
Priority to CN201611137014.3A priority Critical patent/CN106777655B/en
Publication of CN106777655A publication Critical patent/CN106777655A/en
Application granted granted Critical
Publication of CN106777655B publication Critical patent/CN106777655B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Abstract

A kind of equivalent computational methods and device for adopting thickness rate in overhead transmission line coal mine gob, including:Calculate the equivalent thickness of each geotechnical stratified of above goaf;The equivalent thickness that overlying rock-soil layer is respectively layered

Description

The equivalent computational methods and device for adopting thickness rate in overhead transmission line coal mine gob
Technical field
The invention belongs to overhead transmission line Disaster Prevention Design and protection field, it is related to a kind of overhead transmission line colliery mined out The equivalent computational methods and device for adopting thickness rate in area.
Background technology
Electric power pylon is extremely sensitive to the surface movement and deformation that exploitation causes, and the exploitation of subterranean coal can cause the shifting of earth's surface Dynamic and deformation, the security of ultra-high-tension power transmission line will be by extreme influence.But goaf earth's surface deformation how is evaluated to top The influence degree of newly-built transmission line of electricity, is always the problem being not yet fully solved both at home and abroad.
At present, domestic and foreign scholars typically adopt the size of thickness rate by tradition, that is, the buried depth in coal seam is exploited with it Whether the size of the ratio of thickness, the influence degree to earth's surface deformation is divided, and proposed suitably to stand according to the grade for dividing Tower and take the suggestion of structural measure.However, because all there is significant area in the thickness and property of different regions overlying rock-soil layer Not, the simple buried depth with coal seam and the earth's surface deformation extent in the ratio in judgement goaf of its thickness, are theoretically unsound. The same numerical value for adopting thickness rate, may correspond to entirely different geological condition, it is impossible to the order of severity of the actual earth's surface deformation of reflection, Even result in serious misjudgment.Therefore, adopt thickness rate to assess goaf earth's surface deformation to earth's surface power transmission line according to traditional The influence degree on road, carries out planning, construction and the determination of running technology scheme of coal mine gob overhead transmission line, exists tight The potential safety hazard of weight.
The content of the invention
For the problem that above-mentioned prior art is present, a kind of overhead transmission line coal mine gob of present invention offer is equivalent to adopt The computational methods and device of thickness rate, the method calculate theoretical according to fully, it is considered to comprehensively, reliable results, can be on reasonable consideration The influence degree that overlying strata the thickness of the layer and property deform to earth's surface, can exactly reflect the serious journey of actual earth's surface deformation Degree, can be conducive to transmission line of electricity by way of goaf earth's surface deformation danger evaluate, can aid in colliery Goaf overhead transmission line reasonably plans, build and running technology scheme determination, the safety tool to ensureing transmission line of electricity There is an important directive significance and reference value, what the device can rapidly and accurately calculate coal mine gob adopts thickness rate, can reflect Go out the order of severity of actual earth's surface deformation.
To achieve these goals, the present invention provides a kind of equivalent calculating for adopting thickness rate in overhead transmission line coal mine gob Method, comprises the following steps:
Step one:According to the property and thickness of overlying rock-soil layer, calculate above goaf each geotechnical stratified it is equivalent Thickness;
Step 2:The equivalent thickness that overlying rock-soil layer is respectively layeredCumulative summation is carried out, overlying rock-soil layer is tried to achieve and is corresponded to The equivalent total thickness of reference fluid;
Step 3:The equivalent total thickness of working thickness and overlying rock-soil layer according to coal seam, calculates the equivalent of goaf and adopts thickness rate.
As a kind of preferred, the equivalent thickness of each geotechnical stratified of above goaf in the step oneComputing formula be:
Wherein:QkTo be selected as the assessment of rock properties coefficient of the rock-soil layer of reference fluid in overlying rock-soil layer;
QiIt is i-th layer of assessment of rock properties coefficient of rock-soil layer in overlying rock-soil layer;
hiIt is i-th layer of depth of stratum of rock-soil layer in overlying rock-soil layer.
As a kind of preferred, equivalent total thickness of the overlying rock-soil layer corresponding to reference fluid in the step 2Calculating Formula is:
As one kind preferably, goaf is equivalent in the step 3 adopts thickness rateComputing formula be:
Wherein:B is the thickness of seam mining.
The loess in overlying rock-soil layer preferably, in the step one is selected as reference fluid, the rock of loess as a kind of Property evaluation coefficient be 1.0.
Further include, the goaf being calculated as reference fluid using loess is equivalent to adopt thickness rateIt is located at respectivelyWithIn the range of when, represent earth's surface deformation locates respectively for the influence degree of transmission line of electricity In serious, medium and slight Three Estate.
When the equivalent result of calculation for adopting thickness rate shows that earth's surface deformation belongs to serious to the influence degree of transmission line of electricity, this is adopted Dead zone should not carry out the construction of transmission line of electricity;It is mined out at this when earth's surface deformation belongs to medium to the influence degree of transmission line of electricity When area carries out transmission line construction, structure and construction resistance to deformation measure should be taken;When influence journey of the earth's surface deformation to transmission line of electricity When degree belongs to slight, when the goaf carries out the construction of transmission line of electricity, special measure can not be taken.
As a kind of preferred, the measure of structure and construction resistance to deformation is taken to refer specifically to:Improve line walking frequency, carry out power transmission line The deformation in line and displacement monitoring on road.
To achieve these goals, the present invention also provides a kind of overhead transmission line coal mine gob the equivalent meter for adopting thickness rate Device is calculated, including:
Equivalent thickness computing module, for property and thickness according to overlying rock-soil layer, calculates each of above goaf The equivalent thickness of geotechnical stratified;
Equivalent total thickness computing module, for the equivalent thickness for being respectively layered overlying rock-soil layerCumulative summation is carried out, is tried to achieve Overlying rock-soil layer corresponds to the equivalent total thickness of reference fluid;
It is equivalent to adopt thickness rate computing module, for the working thickness according to coal seam and the equivalent total thickness of overlying rock-soil layer, meter Calculate the equivalent of goaf and adopt thickness rate.
Further, described device is further included:
Output module, for adopting thickness rate when the goaf being calculated as reference fluid using loess is equivalentWhen, output The goaf is not suitable for building the conclusion of transmission line of electricity;WhenWhen, needed when exporting the goaf transmission line construction Take the conclusion of structure and construction resistance to deformation measure;WhenWhen, output is adapted to build the conclusion of transmission line of electricity in the goaf.
The present invention is based on goaf formation geology data, with the common loess in coal mine gob as reference fluid, with lithology Evaluation coefficient is conversion foundation, and the actual (real) thickness of the DIFFERENT SOIL layer in the overlying rock-soil layer of goaf is scaled into standard first is situated between The equivalent thickness of matter, then carries out the equivalent thickness of above goaf rock-soil layer cumulative summation and obtains goaf overlying rock-soil layer Equivalent total thickness, that is, working seam equivalent depth, then by overlying rock-soil layer equivalent total thickness divided by coal mining thickness, Thickness rate is adopted so as to obtain the equivalent of the goaf.On this basis, with loess as reference fluid, it is proposed that evaluate transmission line of electricity The earth's surface in approach goaf deforms the judge index of the order of severity.The computational methods, it calculates theoretical according to fully, it is considered to complete Face, reliable results are easy to use, and result of calculation is more fitted the requirement of engineering design, is capable of reasonable consideration overlying rock-soil layer The influence degree that thickness and property deform to earth's surface, can exactly reflect the order of severity of actual earth's surface deformation, be easy to push away Wide application, with wide applicability.The method can also be conducive to transmission line of electricity by way of goaf earth's surface deformation Danger is evaluated, and be can aid in coal mine gob overhead transmission line and is reasonably planned, builds and running technology scheme Determination, to ensure transmission line of electricity safety there is important directive significance and reference value.The device can be counted rapidly and accurately Calculate coal mine gob adopts thickness rate, can reflect the order of severity of actual earth's surface deformation.
Specific embodiment
The invention will be further described below.
Movement and deformation of the property of overlying rock-soil layer to earth's surface have important influence, that is, are considering to adopt thickness rate to frame During the influence of the stability of empty transmission line of electricity earth's surface, it is necessary to consider the thickness and property of overlying rock-soil layer.So, the present invention will not Connatural overlying rock-soil layer conversion is certain soil layer or rock stratum as reference fluid, by thickness rate of adopting alleged at present, conversion Be unified thickness rate of adopting, i.e., it is equivalent to adopt thickness rate, the influence degree that goaf geological conditions deforms to earth's surface can be more reacted, with this As the important evidence of the planning of overhead transmission line, construction and the determination of running technology scheme.
A kind of equivalent computational methods for adopting thickness rate in overhead transmission line coal mine gob, comprise the following steps:
Step one:Calculate the equivalent thickness of each geotechnical stratified of above goafIts computing formula is:
Wherein:QkTo be selected as the assessment of rock properties coefficient of the rock-soil layer of reference fluid in overlying rock-soil layer, in reality During calculating, selection loess is reference fluid, and its assessment of rock properties coefficient is 1.0;
QiIt is i-th layer of assessment of rock properties coefficient of rock-soil layer in overlying rock-soil layer;
hiIt is i-th layer of depth of stratum of rock-soil layer in overlying rock-soil layer, unit is m;
For i-th layer of rock-soil layer conversion is the equivalent thickness after reference fluid in overlying rock-soil layer, unit is m;
Table 1:Layering assessment of rock properties coefficient
Step 2:The equivalent thickness that overlying rock-soil layer is respectively layeredCumulative summation is carried out, overlying rock-soil layer is tried to achieve and is corresponded to The equivalent total thickness of reference fluid, its computing formula is:
Wherein:Equivalent total thickness for goaf overlying rock-soil layer relative to reference fluid, unit is m;
Step 3:The equivalent total thickness of working thickness and overlying rock-soil layer according to coal seam, calculates the equivalent of goaf and adopts Thickness rate, its computing formula is:
Wherein:Thickness rate is adopted for goaf is equivalent;
B is the thickness of seam mining, and unit is m.
The goaf that is calculated as reference fluid using loess is equivalent to adopt thickness rateIt is located at respectively WithIn the range of when, represent earth's surface deformation be respectively at for the influence degree of transmission line of electricity it is serious, medium and slight Three Estate.
When the equivalent result of calculation for adopting thickness rate shows that earth's surface deformation belongs to serious to the influence degree of transmission line of electricity, this is adopted Dead zone should not carry out the construction of transmission line of electricity;It is mined out at this when earth's surface deformation belongs to medium to the influence degree of transmission line of electricity When area carries out transmission line construction, necessary structure and construction resistance to deformation measure should be taken, improve line walking frequency, it is conditional to answer Carry out the deformation in line and displacement monitoring of transmission line of electricity;When earth's surface deformation belongs to slight to the influence degree of transmission line of electricity, When the goaf carries out the construction of transmission line of electricity, special measure can not be taken.
The present invention proposes the influence journey that a kind of thickness and property for being capable of reasonable consideration overlying rock-soil layer deforms to earth's surface Degree the equivalent computational methods for adopting thickness rate, it is possible to accordingly to transmission line of electricity by way of goaf earth's surface deformation danger enter Row is evaluated, and to determine the planning of overhead transmission line, build and running technology scheme, the safety to ensureing transmission line of electricity has weight The directive significance and reference value wanted.
Instantiation is named to illustrate the concrete operation step of computational methods of the present invention:
Embodiment 1:The basic preservation situation of the overlying rock-soil layer of certain goaf coal-face is as shown in table 1, mine coal Thickness degree is 11.0m.Now need by calculating the equivalent influence degree adopted thickness rate, evaluate to transmission line of electricity at this, and propose Whether can be in the suggestion of construction circuit herein.
Table 2:Each hierarchy parameters of overlying rock-soil layer
1. the equivalent thickness of each rock-soil layer of above goaf is calculated
Using loess as reference fluid, the actual (real) thickness of each layer rock-soil layer of overlying rock-soil layer is scaled corresponding to standard The equivalent thickness of medium.
By actual (real) thickness, the lithology factor parameter substitution formula of each layering in table 2Be calculated each layer etc. Effect thicknessAs shown in table 3.
2. the equivalent total thickness of overlying rock-soil layer is calculated
Each layer equivalent thickness that will be tried to achieve successively adds up downwards from earth's surface, by formulaAbove goaf is tried to achieve to own The accumulation equivalent total thickness of rock-soil layerAs shown in table 3.
From table 3, actual gross thickness of the goaf overlying rock-soil layer of position is 333.5m at this, and corresponds to standard The equivalent total thickness of medium loess is 401.8m.
Table 3:Each layering loess equivalent thickness relatively
3. calculate that goaf is equivalent adopts thickness rate
According to the method for patent of the present invention, by formulaEquivalent adopt thickness rate in the goaf for calculating position at this
Corresponding, if with traditional computational methods, the goaf is calculated with each rock-soil layer actual (real) thickness Thickness rate of adopting should beThe safe range for allowing to build transmission line of electricity is exceeded.
4. the evaluation of the goaf earth's surface deformation to the influence degree of transmission line of electricity is carried out
From above-mentioned result of calculation, according to the computational methods of patent of the present invention, its is equivalent, and to adopt thickness rate be 35.6, between adopting Thickness rate is between 35 and 120.Judge accordingly, the deformation of its earth's surface belongs to General Influence degree, can build in this place Electric power pylon, but necessary anti-deformation structure and technical measures should be taken.
The calculating of above-mentioned example shows, using Related Computational Methods of the invention, in that context it may be convenient to be calculated various multiple Thickness rate value is adopted in goaf under miscellaneous geological conditions, and its calculating process is simple, readily appreciates grasp.Particularly, the present invention will be various Rock-soil layer is all reduced to a kind of reference fluid, and the goaf correlation subsidence being easy under different regions, different geological conditions is seen Comprehensive Comparison and relevant power layout of roads, design and the contrast of operating experience, summary and the popularization and application of data are surveyed, is The problem that many experiences during current goaf circuit is designed are difficult to the technical standard for rising to unified is solved, goaf transmission of electricity is improved The scientific and technological level of the planning, design and operation of circuit, there is provided one kind effectively researchs and analyses means and method.
The overlying rock in typical goaf, is mainly made up of the representativeness rock such as loess, sandstone, silt or the soil body. Applicant uses FLAC 3D finite element softwares, establishes the depression analysis model of a large amount of typical case goafs Rock And Soil, analyzes on ground The main earth's surface deformation index such as sinking, deflection ratio, tilting value is expressed after lower seam mining.Research is shown, is made with loess It is reference fluid, equivalent when overlying rock adopts thickness rateDuring less than 35, the earth's surface deformation features for showing noncontinuity are sunk more The rate of falling into is larger, and depression tomography easily occurs in the boundary position in goaf and non-goaf, this explanation, when equivalent thickness rate of adopting is less than 35 When, earth's surface deformation is violent, belongs to hazardous location, should avoid building electric power pylon herein;Equivalent when overlying rock adopts thickness rateDuring more than 120, the degree very little of the earth's surface deformation of above goaf, the earth's surface near the zone boundary of goaf is also without obvious Unfavorable earth's surface deformation, this explanation when it is equivalent adopt thickness rate more than 120 when, the earth's surface deformation in goaf will not be to the peace of electric power pylon Cause to have a strong impact on entirely, can normally build electric power pylon;Equivalent when overlying rock adopts thickness rateWhen, goaf There is the deformation such as certain sinking, inclination, but earth's surface deformation shows good continuity, and deflection ratio is also smaller, goaf Periphery earth's surface is no that steps sudden destruction of surface occurs by being influenceed also very little, now, as long as taking certain arranging Apply, such as bottom composite protective plate basis is set, foundation bolt and supporting correction righting measure etc. is lengthened, it is possible to is effective Solve earth surface cracks, surface subsidence and earth's surface and incline the adverse effect brought to steel tower, therefore, equivalent when overlying rock adopts thickness ThanWhen, it is feasible to be erected power transmission lines in above goaf, but should be carried out with reference to specific orographic condition Supporting structure and technical measures, further improves the security of electric power pylon.
Based on same inventive concept, present invention also offers a kind of equivalent thickness rate of adopting in overhead transmission line coal mine gob Computing device, including:
Equivalent thickness computing module, for property and thickness according to overlying rock-soil layer, calculates each of above goaf The equivalent thickness of geotechnical stratified;
Equivalent total thickness computing module, for the equivalent thickness for being respectively layered overlying rock-soil layerCumulative summation is carried out, is asked Obtain the equivalent total thickness that overlying rock-soil layer corresponds to reference fluid;
It is equivalent to adopt thickness rate computing module, for the working thickness according to coal seam and the equivalent total thickness of overlying rock-soil layer, meter Calculate the equivalent of goaf and adopt thickness rate.
Further, described device may further include:
Output module, for adopting thickness rate when the goaf being calculated as reference fluid using loess is equivalentWhen, it is defeated Go out the conclusion that the goaf is not suitable for building transmission line of electricity;WhenWhen, when exporting the goaf transmission line construction The conclusion of structure and construction resistance to deformation measure need to be taken;WhenWhen, output is adapted to build transmission line of electricity in the goaf Conclusion.
What the device can rapidly and accurately calculate coal mine gob adopts thickness rate, can reflect the serious of actual earth's surface deformation Degree.
The measure for taking structure and construction resistance to deformation can specifically include:Improve line walking frequency, carry out transmission line of electricity Deformation in line and displacement monitoring.
The present invention is based on goaf formation geology data, by the actual thickness of the DIFFERENT SOIL layer in the overlying rock-soil layer of goaf Degree is scaled the equivalent thickness of reference fluid, and the equivalent thickness of above goaf rock-soil layer then is carried out into cumulative summation is adopted The equivalent total thickness of dead zone overlying rock-soil layer, that is, working seam equivalent depth, then by the equivalent total thickness of overlying rock-soil layer Degree adopts thickness rate divided by coal mining thickness so as to obtain the equivalent of the goaf.On this basis, it is proposed that evaluate power transmission line road The earth's surface in footpath goaf deforms the judge index of the order of severity.Being capable of overlying strata on reasonable consideration using scheme provided by the present invention The influence degree that the thickness of the layer and property deform to earth's surface, reflects the order of severity of actual earth's surface deformation exactly, is easy to Popularization and application, with wide applicability.And, also help to transmission line of electricity by way of goaf earth's surface deformation danger Property is evaluated, contribute to coal mine gob overhead transmission line reasonably to plan, build and running technology scheme determination, it is right Ensureing the safety of transmission line of electricity has important directive significance and reference value.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the application can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.And, the application can be used and wherein include the computer of computer usable program code at one or more The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) is produced The form of product.
The application is the flow with reference to method, equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram are described.It should be understood that every first-class during flow chart and/or block diagram can be realized by computer program instructions The combination of flow and/or square frame in journey and/or square frame and flow chart and/or block diagram.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced for reality by the instruction of computer or the computing device of other programmable data processing devices The device of the function of being specified in present one flow of flow chart or multiple one square frame of flow and/or block diagram or multiple square frames.
These computer program instructions may be alternatively stored in can guide computer or other programmable data processing devices with spy In determining the computer-readable memory that mode works so that instruction of the storage in the computer-readable memory is produced and include finger Make the manufacture of device, the command device realize in one flow of flow chart or multiple one square frame of flow and/or block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented treatment, so as in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Any modification made within god and principle, equivalent and improvement etc., should be included within the scope of the present invention.

Claims (10)

1. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob, it is characterised in that comprise the following steps:
Step one:According to the property and thickness of overlying rock-soil layer, the equivalent thickness of each geotechnical stratified of above goaf is calculated;
Step 2:The equivalent thickness that overlying rock-soil layer is respectively layeredCumulative summation is carried out, overlying rock-soil layer is tried to achieve corresponding to standard The equivalent total thickness of medium;
Step 3:The equivalent total thickness of working thickness and overlying rock-soil layer according to coal seam, calculates the equivalent of goaf and adopts thickness rate.
2. the equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 1, its feature It is, the equivalent thickness of each geotechnical stratified of above goaf in the step oneComputing formula be:
Wherein:QkTo be selected as the assessment of rock properties coefficient of the rock-soil layer of reference fluid in overlying rock-soil layer;
QiIt is i-th layer of assessment of rock properties coefficient of rock-soil layer in overlying rock-soil layer;
hiIt is i-th layer of depth of stratum of rock-soil layer in overlying rock-soil layer.
3. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 1, it is special Levy and be, overlying rock-soil layer corresponds to the equivalent total thickness of reference fluid in the step 2Computing formula be:
H ‾ = Σ i = 1 n h ‾ i .
4. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 1, it is special Levy and be, goaf is equivalent in the step 3 adopts thickness rateComputing formula be:
Wherein:B is the thickness of seam mining.
5. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 2, it is special Levy and be, select the loess in overlying rock-soil layer as reference fluid in the step one, the assessment of rock properties coefficient of loess is 1.0。
6. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 5, it is special Levy and be, further include:The goaf that is calculated as reference fluid using loess is equivalent to adopt thickness rateIt is located at respectivelyWithIn the range of when, represent earth's surface deformation locates respectively for the influence degree of transmission line of electricity In serious, medium and slight Three Estate.
7. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 6, it is special Levy and be, when the equivalent result of calculation for adopting thickness rate shows that earth's surface deformation belongs to serious to the influence degree of transmission line of electricity, this is adopted Dead zone should not carry out the construction of transmission line of electricity;When earth's surface deformation belongs to medium to the influence degree of transmission line of electricity, adopted at this When dead zone carries out transmission line construction, structure and construction resistance to deformation measure need to be taken;When influence of the earth's surface deformation to transmission line of electricity When degree belongs to slight, when the goaf carries out the construction of transmission line of electricity, it is not required to take special measure.
8. equivalent computational methods for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 7, it is special Levy and be, the measure for taking structure and construction resistance to deformation is referred specifically to:Improve line walking frequency, carry out the online change of transmission line of electricity Shape and displacement monitoring.
9. the equivalent computing device for adopting thickness rate in a kind of overhead transmission line coal mine gob, it is characterised in that including:
Equivalent thickness computing module, for property and thickness according to overlying rock-soil layer, calculates each ground of above goaf The equivalent thickness of layering;
Equivalent total thickness computing module, for the equivalent thickness for being respectively layered overlying rock-soil layerCumulative summation is carried out, overlying is tried to achieve Rock-soil layer corresponds to the equivalent total thickness of reference fluid;
Equivalent to adopt thickness rate computing module, for the working thickness according to coal seam and the equivalent total thickness of overlying rock-soil layer, calculating is adopted The equivalent of dead zone adopts thickness rate.
10. the equivalent computing device for adopting thickness rate in a kind of overhead transmission line coal mine gob according to claim 7, it is special Levy and be, further include:
Output module, for adopting thickness rate when the goaf being calculated as reference fluid using loess is equivalentWhen, output should Goaf is not suitable for building the conclusion of transmission line of electricity;WhenWhen, need to be adopted when exporting the goaf transmission line construction Take the conclusion of structure and construction resistance to deformation measure;WhenWhen, output is adapted to build the conclusion of transmission line of electricity in the goaf.
CN201611137014.3A 2016-12-12 2016-12-12 Method and device for calculating equivalent mining thickness ratio of coal mine goaf of overhead transmission line Active CN106777655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611137014.3A CN106777655B (en) 2016-12-12 2016-12-12 Method and device for calculating equivalent mining thickness ratio of coal mine goaf of overhead transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611137014.3A CN106777655B (en) 2016-12-12 2016-12-12 Method and device for calculating equivalent mining thickness ratio of coal mine goaf of overhead transmission line

Publications (2)

Publication Number Publication Date
CN106777655A true CN106777655A (en) 2017-05-31
CN106777655B CN106777655B (en) 2020-07-17

Family

ID=58875409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611137014.3A Active CN106777655B (en) 2016-12-12 2016-12-12 Method and device for calculating equivalent mining thickness ratio of coal mine goaf of overhead transmission line

Country Status (1)

Country Link
CN (1) CN106777655B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112881170A (en) * 2021-01-11 2021-06-01 中国矿业大学 Method for calculating actual mining thickness of underground coal gasification

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6778127B2 (en) * 2001-03-28 2004-08-17 Larry G. Stolarczyk Drillstring radar
CN105488241A (en) * 2015-09-07 2016-04-13 国网山西省电力公司 Method for evaluating influence and damage of goafs on power transmission lines

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6778127B2 (en) * 2001-03-28 2004-08-17 Larry G. Stolarczyk Drillstring radar
CN105488241A (en) * 2015-09-07 2016-04-13 国网山西省电力公司 Method for evaluating influence and damage of goafs on power transmission lines

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柳剑锋: "煤矿采空区对输电线路塔基稳定性的影响", 《电力勘测设计》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112881170A (en) * 2021-01-11 2021-06-01 中国矿业大学 Method for calculating actual mining thickness of underground coal gasification
CN112881170B (en) * 2021-01-11 2021-10-26 中国矿业大学 Method for calculating actual mining thickness of underground coal gasification

Also Published As

Publication number Publication date
CN106777655B (en) 2020-07-17

Similar Documents

Publication Publication Date Title
Xu et al. Discrete element modeling of strata and surface movement induced by mining under open-pit final slope
CN103150421B (en) Utilize displacement monitoring to determine the method for friction pile stake position and critical depth simultaneously
KR101642951B1 (en) GIS-based real time earthquake prediction method
CN105260575A (en) Roadway surrounding rock deformation predicting method based on neural network
CN104452836A (en) Monitoring and early warning method of the stability of a foundation pit supporting structure
CN104674819A (en) Informatized construction method of high expressway slope
Cao et al. Risk assessment of fault water inrush during deep mining
CN108842821B (en) Calculation method for reasonable buried depth of submarine tunnel constructed by drilling and blasting method
CN113958366B (en) Dynamic quantitative early warning method for impact risk based on vibration-stress double-field monitoring
CN110159347B (en) Dynamic disaster monitoring and early warning method for deep high-stress hard roof stope
CN106503329A (en) Anti-liquefaction Judgment Method for Stone Column Composite Foundation based on excess pore water pressure ratio
CN104763464B (en) Predicting method of filling coal mining ground surface deformation based on continuous curved beam rock stratum structure
CN109405880A (en) A kind of superficial part goaf earth's surface combines monitoring and pre-warning system and method with underground
Su et al. Stability prediction and optimal angle of high slope in open-pit mine based on two-dimension limit equilibrium method and three-dimension numerical simulation
CN104564069B (en) The dynamic settlement prediction in a kind of ground based on square mesh method and reclamation method
CN108021763A (en) A kind of old goaf residual settlement Forecasting Methodology
CN106971269B (en) Induced earthquake risk assessment method based on probability distribution in CO2 injection process
Li et al. Prediction model of fracture depth and water inrush risk zoning in deep mining coal seam floor
CN103823992A (en) Dimension analysis-based metal mine goaf overlaying strata caving height prediction method
Zhu et al. Simulation analysis of influencing factors of subsidence based on mining under huge loose strata: a case study of Heze mining area, China
CN105926643B (en) A kind of multi-step cover type refuse dump and its construction method
CN102736123A (en) Forecasting method of ground collapse induced by constructing on upper half-section of circular shallow-buried tunnel
CN105040632B (en) Place based on Finn model anti-liquefaction Design process of refinement method
Jeromel et al. An analysis of the geomechanical processes in coal mining using the Velenje mining method
CN106777655A (en) The equivalent computational methods and device for adopting thickness rate in overhead transmission line coal mine gob

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant