CN106765823A - A kind of energy-saving air processing equipment - Google Patents

A kind of energy-saving air processing equipment Download PDF

Info

Publication number
CN106765823A
CN106765823A CN201710177225.8A CN201710177225A CN106765823A CN 106765823 A CN106765823 A CN 106765823A CN 201710177225 A CN201710177225 A CN 201710177225A CN 106765823 A CN106765823 A CN 106765823A
Authority
CN
China
Prior art keywords
section
circulation
electric
shaped valve
entrance point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710177225.8A
Other languages
Chinese (zh)
Other versions
CN106765823B (en
Inventor
林礼建
温承坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjing Pengfei New Energy Technology Co ltd
Original Assignee
Fuzhou Pengfei Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Pengfei Refrigeration Equipment Co Ltd filed Critical Fuzhou Pengfei Refrigeration Equipment Co Ltd
Priority to CN201710177225.8A priority Critical patent/CN106765823B/en
Publication of CN106765823A publication Critical patent/CN106765823A/en
Application granted granted Critical
Publication of CN106765823B publication Critical patent/CN106765823B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/22Means for preventing condensation or evacuating condensate
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/30Arrangement or mounting of heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/10Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
    • F24F8/117Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using wet filtering
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Atmospheric Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Air Conditioning Control Device (AREA)
  • Central Air Conditioning (AREA)

Abstract

The present invention relates to a kind of energy-saving air processing equipment, including air intake unit, exhaust fan unit and outer machine;The air intake unit is arranged in sequence with fresh-air fan section, evaporator section, air intake initial effect filtering section, surface cooling section, auxiliary bringing-up section, condensing units section, air intake medium efficiency filtration section and auxiliary humidification section by fresh inlet end to the fresh air port of export;The exhaust fan unit includes washing spray section;The evaporator section bottom sets cistern, in washing spray section water inlet end, spray section electric T-shaped valve is set, the entrance point of spray section electric T-shaped valve first connects water supply, the entrance point of spray section electric T-shaped valve second connects the cistern of evaporator section bottom by pipeline, and the spray section electric T-shaped valve port of export connects shower;So as to provide water source for washing spray section, condensation water resource is made full use of.

Description

A kind of energy-saving air processing equipment
Technical field
The present invention relates to air-treatment field, more particularly to a kind of energy-saving air processing equipment.
Background technology
Air handling system be intended to provide the indoor activity space of people controllable, comfortable and healthy air ambient or Person provides specific air ambient condition to the activity such as storage, process, equipment operation.The major control of air adjustment includes Air quality, air themperature, air humidity and wind speed etc..
The control ratio of air quality relatively from however effective method is that room air is put using outdoor fresh air Change or dilute, namely suction outdoor fresh air, indoor exhaust air is discharged, outdoor high humidity fresh air dehumidify and is typically removed using condensation Wet, the moisture in air can be condensed on condenser coil, obtain condensed water, and existing airhandling equipment typically will be above-mentioned cold Solidifying water is directly drained, and in actual use, for the outdoor environment of high humility, outdoor fresh air is dehumidified for a long time, is obtained The condensation water quantity for obtaining is larger, if certain cost rationally using the condensed water of the part can be saved, for example, the part Condensed water can be used for but condensation water quantity is difficult to control, it is necessary to can just produce condensed water to the long-time dehumidifying of high humidity fresh air, if outward Portion's air humidity is relatively low, and the accumulation of condensed water is difficult to stabilization, is used therefore, it is difficult to be directly used in other segment bodies.
The content of the invention
The technical problems to be solved by the invention are:A kind of energy-saving air processing equipment is provided, by evaporator section bottom Cistern is set up, the condensed water in cistern is selectively delivered to washing spray section by the water level according to cistern, is water washing spray Drench section and water source is provided, solve in existing airhandling equipment, condense the problem of water resource waste.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of energy-saving air processing equipment, including Air intake unit, exhaust fan unit and outer machine;
The air intake unit is arranged in sequence with fresh-air fan section, air intake primarily efficient filter by fresh inlet end to the fresh air port of export In section, first circulation exhausting section, evaporator section, second circulation exhausting section, surface cooling section, auxiliary bringing-up section, condensing units section, air intake Effect fillter section and auxiliary humidification section;
The exhaust fan unit is arranged in sequence with air draft initial effect filtering section, washing spray by air draft entrance point to wind exhausting outlet end Section, the 3rd circulation and stress section, oxidation sterilizing section, activated carbon fillter section and exhaust fan section;
The outer machine includes compressor, the refrigerant low pressure stage of connection compressor and refrigerant high pressure section, the refrigerant Low pressure stage is provided with refrigerant low-voltage interface, and the refrigerant high pressure section is provided with refrigerant high pressure interface;
The evaporator section bottom sets cistern, and spray section electric T-shaped valve is set in washing spray section water inlet end, described Spray section electric T-shaped valve connects master controller, and the entrance point of spray section electric T-shaped valve first connects water supply, institute State the cistern that the entrance point of spray section electric T-shaped valve second connects evaporator section bottom by pipeline, the spray section electric three passes Valve outlet end connects shower, and the shower is provided with washing spray pump, and the cistern is provided with liquid level sensor, the liquid level Sensor includes high water level liquid level sensor and low water level liquid level sensor, and the liquid level sensor connects master controller, institute State columns base and the valve controlled by master controller is provided with the pipeline connecting place.
The beneficial effects of the present invention are:The present invention relates to a kind of energy-saving air processing equipment, by evaporator section bottom Cistern is set up, the condensed water in cistern is selectively delivered to washing spray section by the water level according to cistern, is water washing spray Drench section and water source is provided, realize the water supply of washing spray section and evaporator section condenses the automation of water process, not only solve evaporation The problem of Duan Lengning water process, the water source needed for also saving washing spray.
Brief description of the drawings
Fig. 1 is a kind of structural representation of energy-saving fresh air device of the specific embodiment of the invention;
Fig. 2 is a kind of concrete structure schematic diagram of energy-saving fresh air device of the specific embodiment of the invention;
Fig. 3 is a kind of outer machine structural representation of energy-saving fresh air device of the specific embodiment of the invention;
Label declaration:
1st, air intake unit;11st, fresh-air fan section;12nd, air intake initial effect filtering section;
13rd, first circulation exhausting section;131st, first circulation reclaims coil pipe;14th, evaporator section;141st, evaporation coil;142nd, electricity Sub- pressure-reducing valve;15th, second circulation exhausting section;
151st, second circulation reclaims coil pipe;16th, surface cooling section;17th, bringing-up section is aided in;
18th, condensing units section;181st, condensing units coil pipe;182nd, condensing units straight trip pipe;19th, medium air filtration Section;110th, auxiliary humidification section;111st, primary retirn air mouthful;
112nd, secondary returning air port;2nd, exhaust fan unit;21st, air draft initial effect filtering section;
22nd, spray section is washed;23rd, the 3rd circulation and stress section;24th, oxidation sterilizing section;
25th, activated carbon fillter section;26th, exhaust fan section;3rd, outer machine;31st, compressor;32nd, refrigerant high pressure interface; 33rd, refrigerant low-voltage interface.
Specific embodiment
It is to describe technology contents of the invention, the objects and the effects in detail, below in conjunction with implementation method and coordinates attached Figure is explained.
The design of most critical of the present invention is:A kind of energy-saving air processing equipment is provided, is additionally arranged at the bottom of by evaporator section Condensed water in cistern is selectively delivered to washing spray section by cistern, the water level according to cistern, is washing spray section Water source is provided, condensation water resource is made full use of.
Refer to Fig. 1 to Fig. 3, a kind of energy-saving air processing equipment, including air intake unit 1, exhaust fan unit 2 and outer machine 3;
The air intake unit 1 is imitated as at the beginning of fresh inlet end to the fresh air port of export is arranged in sequence with fresh-air fan section 11, air intake Fillter section 12, first circulation exhausting section 13, evaporator section 14, second circulation exhausting section 15, surface cooling section 16, auxiliary bringing-up section 17, cold Solidifying heat-recovery section 18, air intake medium efficiency filtration section 19 and auxiliary humidification section 110;
The exhaust fan unit 2 is arranged in sequence with air draft initial effect filtering section 21, washing by air draft entrance point to wind exhausting outlet end Spray section 22, the 3rd circulation and stress section 23, oxidation sterilizing section 24, activated carbon fillter section 25 and exhaust fan section 26;
The outer machine 3 includes compressor 31, the refrigerant low pressure stage of connection compressor 31 and refrigerant high pressure section, the system Cryogen low pressure stage is provided with refrigerant low-voltage interface 33, and the refrigerant high pressure section is provided with refrigerant high pressure interface 32;
The bottom of the evaporator section 14 sets cistern, and spray section electric T-shaped valve is set in washing spray section 22 water inlet end, The spray section electric T-shaped valve connects master controller, and the entrance point of spray section electric T-shaped valve first connects running water Source, the entrance point of spray section electric T-shaped valve second connects the cistern of the bottom of evaporator section 14, the spray section by pipeline The electric T-shaped valve port of export connects shower, and the shower is provided with washing spray pump, and the cistern is provided with liquid level sensor, The liquid level sensor includes high water level liquid level sensor and low water level liquid level sensor, the liquid level sensor connection center control Device processed, the columns base is provided with the valve controlled by master controller with the pipeline connecting place.
The use of above-mentioned energy-saving fresh air device:Outdoor high humidity fresh air is pumped into by above-mentioned fresh-air fan section 11, by entering After the filtering of wind initial effect filtering section 12, heat exchange is carried out into first circulation exhausting section 13 and first circulation exhausting section 13, then By evaporator section 14, due to the port of export of the entrance point of evaporation coil 141 connection condensing units coil pipe 181, condensing units coil pipe High-pressure refrigerant in 181 is evaporated under reduced pressure by decompressor when evaporation coil 141 is entered and absorbed heat, and makes the temperature of evaporation coil 141 Degree is reduced, the moment of evaporation coil 141 condensation of the contact with moisture low temperature in outdoor high humidity fresh air, so as to reach the work of fresh air dehumidification Second circulation exhausting section 15 is gone successively to, fresh air and after surface cooling section 16 carries out heat exchange, into auxiliary bringing-up section 17 and condensation Heat-recovery section 18, heats fresh air, and because the air after dehumidifying and evaporation coil 141 have carried out heat exchange, air themperature is less than Interior, the condensing units coil pipe in condensing units section 18 are entered back into after temperature is, it is necessary to be heated to preference temperature needed for indoor What is be passed through in 181 is high-pressure refrigerant after being compressed by compressor 31, because the compression refrigerant of compressor 31 releases substantial amounts of heat, Therefore the refrigerant temperature in this section is high, enters by the Duan Shiyu condensing units coil pipe 181 by the fresh air after the supercooling that dehumidifies Row heat exchange, is warmed to room temperature, then further filtering and auxiliary humidification section 110 process laggard entering the room by medium efficiency filtration section 19 It is interior.
Indoor exhaust air is tentatively filtered by the air draft initial effect filtering section 21 of exhaust fan unit 2 to waste gas, then by washing The harmful substances such as spray section 22, the amine gone in removing exhaust gas, nitrogen, then it is further by oxidation sterilizing section 24, activated carbon fillter section 25 It is outdoor by the discharge of exhaust fan section 26 after filtering;When water level did not had high water level liquid level sensor in cistern, center control Device control valve is opened, meanwhile, spray section the first entrance point of electric T-shaped valve is closed in master controller control, opens spray section electricity The dynamic entrance point of triple valve second, so as to connect cistern and shower, is supplied water, effectively using evaporator section from cistern to shower 14 condensed waters collected;When water level is less than low water level liquid level sensor in cistern, master controller control valve is closed, together When, spray section the second entrance point of electric T-shaped valve is closed in master controller control, opens spray section the first import of electric T-shaped valve End, so as to be supplied water from running water pipe to shower.
The beneficial effects of the present invention are:Realize washing spray section 22 supply water and evaporator section 14 condensation water process from Dynamicization, not only solves the problems, such as that evaporator section 14 condenses water process, the water source needed for also saving washing spray.
In above-mentioned energy-saving air processing equipment, the columns base is shaped as funnel-form.Columns base shape is set Funnel-form is calculated as, is conducive to cistern draining and periodic cleaning.
In above-mentioned energy-saving air processing equipment, the low water level liquid level sensor is arranged on cistern madial wall, described low Water level liquid level sensor is higher than cistern bottom 10-20cm.Low water level liquid level sensor is positioned above cistern bottom 10-20cm Position, prevent low water level liquid level sensor signal delay from causing retaining to drain the spray section brought and supply water and interrupt.
In above-mentioned energy-saving air processing equipment, the high water level liquid level sensor is arranged on cistern madial wall, the height Water level liquid level sensor is less than cistern top 10-20cm.The water for avoiding high water level liquid level sensor signal delay from causing overflows.
In above-mentioned energy-saving air processing equipment, the He of condensing units coil pipe 181 is installed in the condensing units section 18 Condensing units straight trip pipe 182;
Bottom in the condensing units section 18 is provided with the first electric T-shaped valve, the first electric T-shaped valve entrance point Refrigerant high pressure interface 32 is connected by pipeline, the first electric T-shaped valve first outlet end connects condensing units coil pipe 181 entrance points, the first electric T-shaped valve second outlet end connection condensing units straight trip entrance point of pipe 182, the condensation The port of export of the heat recovery coil 181 connection condensing units straight trip entrance point of pipe 182;
Evaporation coil 141 is installed, condensing units straight trip pipe 182 port of export passes through pipeline in the evaporator section 14 The connection entrance point of evaporation coil 141, the connection of the condensing units straight trip port of export of pipe 182 and the entrance point of evaporation coil 141 Place is provided with device for drying and filtering and electronics pressure-reducing valve 142, and the port of export of the evaporation coil 141 connects refrigerant low pressure and connects by pipeline Mouth 33.
The first electric T-shaped valve is introduced in condensing units section 18, whether can be needed to heat corresponding tune according to outdoor fresh air The first electric T-shaped valve is saved, when fresh air needs heating by the section, controls high-pressure refrigerant to enter by the first electric T-shaped valve Enter condensing units coil pipe 181 carries out heat exchange with fresh air, when fresh air need not be heated by the section, by first electronic three Port valve controls high-pressure refrigerant directly to discharge condensation by condensing units straight trip pipe 182 without condensing units coil pipe 181 Heat-recovery section 18, makes high-pressure refrigerant not carry out heat exchange with fresh air, above-mentioned energy-saving air processing equipment is applied to different rings Fresh air handing under border.
In above-mentioned energy-saving air processing equipment, the first circulation exhausting section 13 includes that first circulation reclaims coil pipe 131, institute State second circulation exhausting section 15 and reclaim coil pipe 151 and second circulation recovery straight trip pipe including second circulation, the described 3rd loops back Receiving section 23 includes the 3rd circulation and stress coil pipe;First circulation recovery coil pipe 131, the second circulation recovery coil pipe 151, second follow Loopback is received inside straight trip pipe and the 3rd circulation and stress coil pipe filled with ethylene glycol liquid;The 3rd circulation and stress coil pipe is provided with second Glycol solution pump.
The second circulation reclaims straight trip pipe port of export connection second circulation and reclaims the port of export of coil pipe 151;Described second follows Top in ring exhausting section 15 is provided with the second electric T-shaped valve, and the second electric T-shaped valve entrance point connects the 3rd by pipeline Circulation and stress coil outlets end, the second electric T-shaped valve first outlet end connection second circulation reclaims the entrance point of coil pipe 151, The second electric T-shaped valve second outlet end connection second circulation reclaims straight trip pipe entrance point;
The first circulation reclaims the entrance point of coil pipe 131 and connects the second circulation recovery port of export of coil pipe 151 by pipeline;
The 3rd circulation and stress coil pipe entrance point connects first circulation and reclaims the port of export of coil pipe 131 by pipeline.
Coil pipe is reclaimed by setting multiple-effect circulation, effectively using waste gas in exhaust fan unit 2 and the temperature difference in Fresh air handling units, The thermal source of exhaustion section is set to be fully used, further energy saving;Second electronic three is set in second circulation exhausting section 15 Port valve, controls whether ethylene glycol liquid in the section and fresh air carries out heat exchange by the second electric T-shaped valve, is conducive to according to not New air temperature is adjusted with environment, the Fresh air handing for making above-mentioned energy-saving air processing equipment be applied under varying environment.
In above-mentioned energy-saving air processing equipment, the energy-saving fresh air system also includes automatic control system, the automatic control System processed include for control the work of each segment body master controller, the frequency controller of compressor 31 of connection master controller, Humiture presetting module and it is arranged on first temperature sensor and the first humidity sensor at fresh inlet end, enters installed in air draft The second temperature sensor and the second humidity sensor, the proportional electrovalve on Surface cooling coil and humidifier section switch at mouth end Controller, the frequency controller of the compressor 31, the first temperature sensor, the first humidity sensor, second temperature sensor, Two humidity sensors, the first electric T-shaped valve, the second electric T-shaped valve, proportional electrovalve and humidifier section switch controller connect respectively Master controller is connect, by the temperature and humidity in the default room of humiture presetting module, master controller is according to default temperature Angle value and humidity value, and the first temperature sensor, the first humidity sensor, second temperature sensor, the second humidity sensor The warm and humid angle value for reading, automatically adjusts the working condition of each segment body.
Because the temperature and humidity of different regions, the outdoor fresh air of Various Seasonal has very big difference, by default interior Required temperature, fresh air humiture that master controller can be monitored according to the first temperature sensor and the first humidity sensor with Preset value is compared, the valve of each segment body of Intelligent adjustment and the frequency of the compressor 31 of outer machine 3, so that intelligently in control room Humiture, controls the humiture stability of air intake on the basis of energy saving, makes the error of EAT and preset value<0.5- 1℃。
Embodiment 1
Refer to Fig. 1 to Fig. 3, a kind of energy-saving air processing equipment, including outer machine 3, air intake unit 1 and exhaust fan unit 2;
The air intake unit 1 has as follows structurally and functionally:
The air intake unit 1 is imitated as at the beginning of fresh inlet end to the fresh air port of export is arranged in sequence with fresh-air fan section 11, air intake Fillter section 12, first circulation exhausting section 13, evaporator section 14, second circulation exhausting section 15, surface cooling section 16, auxiliary bringing-up section 17, cold Solidifying heat-recovery section 18, air intake medium efficiency filtration section 19 and auxiliary humidification section 110;
The fresh-air fan section 11 is used to for extraneous fresh air to be pumped into air inlet fan group 1;
The air intake initial effect filtering section 12 is used to tentatively filter fresh air;
The surface cooling section 16 connects central air conditioner system, for the regulation of new air temperature;
The first circulation exhausting section 13, second circulation exhausting section 15, the 3rd circulation and stress section 23 are interconnected, for arranging Heat recycles in blower fan group 2 and air intake unit 1;
The evaporator section 14 is used for the cool-down dehumidification of fresh air, and the condensing units section 18 and auxiliary bringing-up section 17 are used for new The heating of wind;The air intake medium efficiency filtration section 19 is used for the further filtering of fresh air;The humidifier section is used to adjust the wet of fresh air Degree.
The exhaust fan unit 2 has as follows structurally and functionally:
The exhaust fan unit 2 is arranged in sequence with air draft initial effect filtering section 21, washing by air draft entrance point to wind exhausting outlet end Spray section 22, the 3rd circulation and stress section 23, oxidation sterilizing section 24, activated carbon fillter section 25 and exhaust fan section 26;
The air draft initial effect filtering section 21, washing spray section 22 are used to go the harmful substances such as the amine, the nitrogen that contain in removing exhaust gas; The oxidation sterilizing section 24, activated carbon fillter section 25 and exhaust fan section 26 are used for the purification of waste gas.
The outer machine 3 has as follows structurally and functionally:
The outer machine 3 includes compressor 31, the refrigerant low pressure stage of connection compressor 31 and refrigerant high pressure section, the system Cryogen low pressure stage is provided with refrigerant low-voltage interface 33, and the refrigerant high pressure section is provided with refrigerant high pressure interface 32;
1st, the concrete structure explanation of above-mentioned energy-saving air processing equipment:
Condensing units coil pipe 181 and condensing units straight trip pipe 182 are installed in the condensing units section 18;
The entrance point of condensing units coil pipe 181 is arranged on the bottom in condensing units section 18, and the condensation heat is returned The closing quotation port of export of pipe 181 is arranged on the bottom in condensing units section 18, and the bottom in condensing units section 18 is provided with the One electric T-shaped valve, the first electric T-shaped valve entrance point connects refrigerant high pressure interface 32, first electricity by pipeline The dynamic entrance point of triple valve first outlet end connection condensing units coil pipe 181, the first electric T-shaped valve second outlet end connects Connect the condensing units straight trip entrance point of pipe 182, the port of export of the condensing units coil pipe 181 connection condensing units straight trip pipe 182 entrance points, the port of export of condensing units coil pipe 181 is provided with unidirectional two-port valve;
Evaporation coil 141 is installed in the evaporator section 14, the entrance point of the evaporation coil 141 is arranged in evaporator section 14 Top, the port of export of the evaporation coil 141 is arranged on the bottom in evaporator section 14, and the condensing units straight trip pipe 182 goes out Mouth end connects the entrance point of evaporation coil 141, the condensing units straight trip port of export of pipe 182 and evaporation coil 141 by pipeline The junction of entrance point is provided with device for drying and filtering and electronics pressure-reducing valve 142, and the port of export of the evaporation coil 141 is connected by pipeline Refrigerant low-voltage interface 33.
The first circulation exhausting section 13 includes that first circulation reclaims coil pipe 131, and the second circulation exhausting section 15 includes Second circulation reclaims coil pipe 151 and second circulation reclaims straight trip pipe, and the 3rd circulation and stress section 23 includes the 3rd circulation and stress Coil pipe;The first circulation reclaims coil pipe 131, second circulation and reclaims coil pipe 151, second circulation recovery straight trip pipe and the 3rd circulation Reclaim inside coil pipe filled with ethylene glycol liquid;The 3rd circulation and stress coil pipe is provided with ethylene glycol solution pump.
The second circulation reclaims the top that the entrance point of coil pipe 151 is arranged in second circulation exhausting section 15, described second The port of export of circulation and stress coil pipe 151 is arranged on the bottom in second circulation exhausting section 15, and the second circulation reclaims straight trip pipe and enters Mouth end is arranged on the top in second circulation exhausting section 15, and the second circulation reclaims straight trip pipe port of export connection second circulation and returns The closing quotation port of export of pipe 151;The second circulation reclaims the port of export of coil pipe 151 and is provided with check valve, the second circulation exhausting section 15 Interior top is provided with the second electric T-shaped valve, and the second electric T-shaped valve entrance point connects the 3rd and loops back closing quotation by pipeline The pipe port of export, the second electric T-shaped valve first outlet end connection second circulation reclaims the entrance point of coil pipe 151, second electricity Dynamic triple valve second outlet end connection second circulation reclaims straight trip pipe entrance point;
The first circulation reclaims the bottom that the entrance point of coil pipe 131 is arranged in first circulation exhausting section 13, described first The entrance point of circulation and stress coil pipe 131 connects second circulation and reclaims the port of export of coil pipe 151 by pipeline;The first circulation recovering tray The port of export of pipe 131 is arranged on the top in first circulation exhausting section 13;
The 3rd circulation and stress coil outlets end is arranged on the bottom in the 3rd circulation and stress section 23, the 3rd circulation Reclaim coil pipe entrance point and the first circulation recovery port of export of coil pipe 131 is connected by pipeline;
The surface cooling section 16 includes the Surface cooling coil in surface cooling section 16, and the Surface cooling coil is connected to central air-conditioning System, plays a part of the new air temperature of regulation;
The setting height(from bottom) of the air intake unit 1 is less than exhaust fan unit 2;The fresh air port of export of the air intake unit 1 is by pipe Road connects the top in room, and the top connection fresh air exit in the room sets high efficiency particulate air filter, the row of the exhaust fan unit 2 Wind inlet end connects the bottom in room by pipeline.
The refrigerant high pressure section is to coil in the refrigerant high pressure coil pipe of the interior of outer machine 3, by installing in outer machine 3 Internal cooling fan radiates to refrigerant high pressure coil pipe, and the outer machine 3 also includes being arranged on refrigerant high pressure coil pipe The chilling spray pipe in portion, the chilling spray water inlet tube end sets the outer electric T-shaped valve of machine 3, and the electric T-shaped valve of outer machine 3 connects Connect master controller, the first entrance point of electric T-shaped valve of the outer machine 3 connection water supply, the electric T-shaped valve of outer machine 3 the Two entrance points connect the cistern of the bottom of evaporator section 14, the connection cooling spray of the electric T-shaped valve port of export of the outer machine 3 by pipeline Shower pipe, the chilling spray pipe is provided with chilling spray pump, and the cistern is provided with liquid level sensor, and the liquid level sensor includes High water level liquid level sensor and low water level liquid level sensor, the liquid level sensor connect master controller, the cistern bottom Portion is provided with the valve controlled by master controller with the pipeline connecting place;
When water level did not had high water level liquid level sensor in cistern, central controller controls valve is opened, meanwhile, center Outer the first entrance point of electric T-shaped valve of machine 3 is closed in controller control, opens outer the second entrance point of electric T-shaped valve of machine 3, so that even Logical cistern and chilling spray pipe, are supplied water from cistern to chilling spray pipe, the condensed water effectively collected using evaporator section 14;When When water level is less than low water level liquid level sensor in cistern, master controller control valve is closed, meanwhile, master controller control Close outer the second entrance point of electric T-shaped valve of machine 3, open outer the first entrance point of electric T-shaped valve of machine 3, thus from running water pipe to Chilling spray pipe supplies water, and realizes the water supply of the chilling spray pipe of outer machine 3 and evaporator section 14 condenses the automation of water process, not only solves Evaporator section 14 of having determined condenses the problem of water process, the water source needed for also saving the water-cooled of outer machine 3.
Present invention additionally comprises automatic control system, the automatic control system includes the center for controlling each segment body work Controller, the connection frequency controller of compressor 31 of master controller, humiture presetting module and it is arranged on fresh inlet end First temperature sensor and the first humidity sensor, the second temperature sensor installed in air draft entrance point and the second humidity sensor Device, the proportional electrovalve on Surface cooling coil and humidifier section switch controller, the frequency controller of the compressor 31, first Temperature sensor, the first humidity sensor, second temperature sensor, the second humidity sensor, the first electric T-shaped valve, the second electricity Dynamic triple valve, spray section electric T-shaped valve, the electric T-shaped valve of outer machine 3, proportional electrovalve and humidifier section switch controller connect respectively Master controller is connect, by the temperature and humidity in the default room of humiture presetting module, master controller is according to default temperature Angle value and humidity value, and the first temperature sensor, the first humidity sensor, second temperature sensor, the second humidity sensor The warm and humid angle value for reading, automatically adjusts the working condition of each segment body.
2nd, use of the above-mentioned energy-saving air processing equipment under different new wind environments:
Because the temperature and humidity of different regions, the outdoor fresh air of Various Seasonal has very big difference, by default interior Required temperature, fresh air humiture that master controller can be monitored according to the first temperature sensor and the first humidity sensor with Preset value is compared, the valve of each segment body of Intelligent adjustment and the frequency of the compressor 31 of outer machine 3;
1) by taking the outdoor fresh air of winter low temperature low humidity as an example:
Assuming that the humiture of outdoor fresh air is less than preset value, therefore master controller controls the compressor 31 of outer machine 3 to close, So as to evaporator section 14 does not work;Because the Surface cooling coil in surface cooling section 16 connects central air conditioner system, by central air conditioner system Other mode of heatings such as electrical heating in the heating combination auxiliary bringing-up section 17 of surface cooling section 16 are heated to fresh air, master controller Correspondingly control the first electric T-shaped valve, the second electric T-shaped valve and proportional electrovalve pre- to reach to control heat exchanger effectiveness If temperature, and control humidifier section to humidify fresh air by master controller, to reach suitable humidity;
2) by taking the outdoor fresh air of summer high temperature high humidity as an example:
Assuming that the humiture of outdoor fresh air is less than preset value, therefore the TEMP that master controller is set according to fresh air section The humiture that device and humidity sensor are monitored adjusts the frequency of the outer compressor 31 of machine 3 with the difference of preset value, so that by steaming Hair 14 pairs of fresh airs of section dehumidify, and dehumidification process, new air temperature is greatly reduced, then correspondingly controls first by master controller Electric T-shaped valve, the second electric T-shaped valve and proportional electrovalve to control heat exchanger effectiveness, so as to reach suitable temperature, this When master controller control humidifier section close, without being humidified to fresh air.
3) in case of outdoor fresh air temperature is 36 DEG C:
Assuming that the temperature that the first temperature sensor monitors are arrived is 36 DEG C, the temperature that second temperature sensor is detected is 23- 25 DEG C, now, master controller controls the first electric T-shaped valve first outlet end to open, and control the first electric T-shaped valve second goes out Mouth end is closed, so that condensing units coil pipe 181 connects refrigerant high pressure interface 32, master controller control second electronic three Port valve first outlet end is opened, and the second electric T-shaped valve second outlet end of control is closed, so that second circulation reclaims coil pipe 151 In ethylene glycol enter circulate state;Now, by entering the after the roughing efficiency air filter filtering of air intake initial effect filtering section 12 One circulation and stress section 13, the heat exchange of coil pipe 131 is reclaimed by with first circulation, and new air temperature is down to 26 DEG C, now first circulation The temperature for reclaiming the entrance point of coil pipe 131 is 17-23 DEG C, by after heat exchange, first circulation reclaims the temperature of the port of export of coil pipe 131 It is 24-28 DEG C;
Evaporator section 14 is flowed through by the fresh air after first circulation exhausting section 13, passed through by condensing units section 18 in the section The high-pressure refrigerant for coming, is depressurized before evaporation coil 141 is entered by electronics pressure-reducing valve 142, evaporation endothermic, so that fresh air is passed through When crossing this section, moisture therein is condensed in the outer wall of evaporation coil 141, and so as to reach the purpose of fresh air dehumidification, condensed water is along disk Pipe flow to the cistern of the bottom of evaporator section 14, and 12 DEG C are down to by the new air temperature after the dehumidifying of evaporator section 14;
Second circulation exhausting section 15 is continued flow through by the fresh air after the dehumidifying of evaporator section 14, now second circulation reclaims coil pipe At 21-23 DEG C, by after heat exchange, the temperature that second circulation reclaims the port of export of coil pipe 151 is down to 17- to the temperature of 151 entrance points 21 DEG C, and fresh air rises to 17 DEG C by temperature after the section;
Continue to flow to surface cooling section 16 by the fresh air after second circulation exhausting section 15, surface cooling section 16 is by master controller control Proportional electrovalve, to control the temperature of surface cooling section 16, so as to carry out heat exchange with corresponding fresh air, to reach suitable new wind-warm syndrome Degree;
Auxiliary bringing-up section 17 and condensing units section 18, condensing units disk are continued flow through by the fresh air after surface cooling section 16 The high-pressure refrigerant after being compressed by compressor 31 is accessed in pipe 181, due to refrigerant compression heat release, with higher temperature, is entered Fresh air in condensing units coil pipe 181 with this section carries out heat exchange, the supercooling fresh air by dehumidifying is heated, to reach The suitable temperature in room, to meet the temperature requirements of part room needs, in auxiliary bringing-up section 17 using electrical heating or other add Hot mode carries out auxiliary heating to fresh air, further controls new air temperature;
Enter room after the fresh air after heating continues flow through air intake medium efficiency filtration section 19 and other segment bodies;
The waste gas discharged by room enters exhaust fan unit 2, passes sequentially through initial effect filtering section and washing spray section 22, it is assumed that warp The EGT crossed after washing spray section 22 is at 18-21 DEG C;
Waste gas after washing spray section 22 continues flow through the 3rd circulation and stress section 23, enters with the 3rd circulation and stress coil pipe Temperature rises to 25-29 DEG C after row heat exchange, and the temperature of the 3rd circulation and stress coil pipe entrance point in this section is 24-28 DEG C, the 3rd The temperature at circulation and stress coil outlets end is 21-23 DEG C;
By the waste gas after the 3rd circulation and stress coil pipe continue through oxidation sterilizing section 24, activated carbon fillter section 25 etc. other Segment body heel row is to outdoor.
Embodiment 2
On the basis of embodiment 1, cistern is set in the bottom of evaporator section 14, spray is set in washing spray section 22 water inlet end Section electric T-shaped valve is drenched, the spray section electric T-shaped valve connects master controller, and the spray section electric T-shaped valve first enters Mouth end connection water supply, the entrance point of spray section electric T-shaped valve second passes through the retaining that pipeline connects the bottom of evaporator section 14 Pond, the spray section electric T-shaped valve port of export connects shower, and the shower is provided with washing spray pump, and the cistern sets There is liquid level sensor, the liquid level sensor includes high water level liquid level sensor and low water level liquid level sensor, and the liquid level is passed Sensor connects master controller, and the columns base is provided with the valve controlled by master controller with the pipeline connecting place;
When water level did not had high water level liquid level sensor in cistern, master controller control valve is opened, meanwhile, center Spray section the first entrance point of electric T-shaped valve is closed in controller control, opens spray section the second entrance point of electric T-shaped valve, so that Connection cistern and shower, are supplied water from cistern to shower, the condensed water effectively collected using evaporator section 14;Work as cistern When middle water level is less than low water level liquid level sensor, master controller control valve is closed, meanwhile, spray is closed in master controller control Section the second entrance point of electric T-shaped valve is drenched, spray section the first entrance point of electric T-shaped valve is opened, so that from running water pipe to spray Pipe supply water, realize washing spray section 22 supply water and evaporator section 14 condense water process automation, not only solve evaporator section The problem of 14 condensation water process, the water source needed for also saving washing spray.
Embodiment 3
A kind of energy-saving air processing equipment according to embodiment 1, sets up primary retirn air mouthful 111 after evaporator section 14, Secondary returning air port 112 is set up after condensing units section 18;Accordingly, secondary return air system is set up in exhaust fan 26 back segments of section System, the secondary return air system include be connected to exhaust fan section 26 after backwind tube, the backwind tube include return air supervisor, by Exhaust duct and secondary returning airduct of return air main vessel branches, the primary retirn air pipe connection primary retirn air mouthful 111 are described secondary Backwind tube connecting secondary return air inlet 112;Shunting is provided with the shunting of the primary retirn air pipe, secondary returning airduct and return air supervisor Valve, the wind flow of the primary retirn air pipe shunting is the 30% of return air main manage-style flow, and it is distinguished and admirable that the secondary returning airduct is shunted Measure is the 70% of return air main manage-style flow;
Bottom in the washing spray section 22 is provided with cyclic water tank, and the cyclic water tank is arranged along waste gas approach axis and connected Multiple showers are connected to, the shower extends to the top in washing spray section 22, and the shower is connected with feeding spraying pump, The shower is provided with multiple atomizers.
Explosive box is additionally provided with the washing spray section 22, acid solution is housed in the explosive box, the explosive box leads to Feed pipe connection cyclic water tank is crossed, the feed pipe is provided with water check valve, is provided with the cyclic water tank for controlling water check valve to open The controlling pH device for opening or closing.
Because indoor temperature and humidity reaches default suitable degree, the humiture of the waste gas discharged by exhaust fan unit 2 and room Interior suitable humiture is closer to, and by secondary return air, effectively using indoor temperature and humidity, reduces the inlet of outdoor fresh air, or Realize the circulation of room air, reduce due to the humiture of outdoor fresh air it is excessive with the difference of default humiture caused by the energy Waste, correspondingly improve exhaust fan unit 2, the nuisance such as amine, nitrogen fully gone in removing exhaust gas by the improvement for washing spray section 22 Matter, to reach the requirement that return air is utilized.
In sum, the present invention relates to a kind of energy-saving air processing equipment, cistern, root are additionally arranged at the bottom of by evaporator section The condensed water in cistern is delivered to washing spray section according to the water level selectivity of cistern, for washing spray section provides water source, Realize the water supply of washing spray section and evaporator section condenses the automation of water process, not only solve evaporator section condensation water process Problem, the water source needed for also saving washing spray.Because the temperature and humidity of different regions, the outdoor fresh air of Various Seasonal has There is very big difference, the temperature needed for by presetting interior, master controller can be passed according to the first temperature sensor and the first humidity Fresh air humiture and the preset value that sensor is monitored are compared, the frequency of the valve of each segment body of Intelligent adjustment and outer machine compressor Rate, so as to intelligently control indoor temperature and humidity, controls the humiture stability of air intake on the basis of energy saving, makes into wind-warm syndrome The error of degree and preset value<0.5-1℃.
Embodiments of the invention are the foregoing is only, the scope of the claims of the invention is not thereby limited, it is every to utilize this hair The equivalents that bright specification and accompanying drawing content are made, or the technical field of correlation is directly or indirectly used in, similarly include In scope of patent protection of the invention.

Claims (7)

1. a kind of energy-saving air processing equipment, it is characterised in that including air intake unit, exhaust fan unit and outer machine;
The air intake unit by fresh inlet end to the fresh air port of export be arranged in sequence with fresh-air fan section, air intake initial effect filtering section, Imitated in first circulation exhausting section, evaporator section, second circulation exhausting section, surface cooling section, auxiliary bringing-up section, condensing units section, air intake Fillter section and auxiliary humidification section;
The exhaust fan unit by air draft entrance point to wind exhausting outlet end be arranged in sequence with air draft initial effect filtering section, washing spray section, 3rd circulation and stress section, oxidation sterilizing section, activated carbon fillter section and exhaust fan section;
The outer machine includes compressor, the refrigerant low pressure stage of connection compressor and refrigerant high pressure section, the refrigerant low pressure Section is provided with refrigerant low-voltage interface, and the refrigerant high pressure section is provided with refrigerant high pressure interface;
The evaporator section bottom sets cistern, and spray section electric T-shaped valve, the spray are set in washing spray section water inlet end Section electric T-shaped valve first entrance point connection water supply, the entrance point of spray section electric T-shaped valve second is connected by pipeline The cistern of evaporator section bottom, the spray section electric T-shaped valve port of export connects shower, and the shower is provided with water washing spray Pump is drenched, the cistern is provided with liquid level sensor, and the liquid level sensor includes high water level liquid level sensor and low water level liquid level Sensor, the liquid level sensor connects master controller, and the columns base is provided with by center with the pipeline connecting place The valve of controller control.
2. energy-saving air processing equipment according to claim 1, it is characterised in that the columns base is shaped as funnel Shape.
3. energy-saving air processing equipment according to claim 1, it is characterised in that the low water level liquid level sensor is set In cistern madial wall, the low water level liquid level sensor is higher than cistern bottom 10-20cm.
4. energy-saving air processing equipment according to claim 1, it is characterised in that the high water level liquid level sensor is set In cistern madial wall, the high water level liquid level sensor is less than cistern top 10-20cm.
5. energy-saving air processing equipment according to claim 1, it is characterised in that be provided with the condensing units section Condensing units coil pipe and condensing units straight trip pipe;
Bottom in the condensing units section is provided with the first electric T-shaped valve, and the first electric T-shaped valve entrance point is by pipe Road connects refrigerant high pressure interface, and the first electric T-shaped valve first outlet end connects condensing units coil pipe entrance point, institute State the first electric T-shaped valve second outlet end connection condensing units straight trip pipe entrance point, the condensing units coil outlets end Connection condensing units straight trip pipe entrance point;
Evaporation coil is installed, the condensing units straight trip pipe port of export connects evaporation coil by pipeline in the evaporator section Entrance point, the condensing units straight trip pipe port of export is provided with device for drying and filtering and electronics with the junction of evaporation coil entrance point Pressure-reducing valve, the evaporation coil port of export connects refrigerant low-voltage interface by pipeline.
6. energy-saving air processing equipment according to claim 1, it is characterised in that the first circulation exhausting section includes the One circulation and stress coil pipe, the second circulation that the second circulation exhausting section includes reclaims coil pipe and second circulation reclaims straight trip pipe, institute Stating the 3rd circulation and stress section includes the 3rd circulation and stress coil pipe;The first circulation reclaims coil pipe, second circulation and reclaims coil pipe, the Filled with ethylene glycol liquid inside two circulation and stress straight trip pipe and the 3rd circulation and stress coil pipe;Set on the 3rd circulation and stress coil pipe There is ethylene glycol solution pump;
The second circulation reclaims straight trip pipe port of export connection second circulation and reclaims the coil pipe port of export;The second circulation exhausting section Interior top is provided with the second electric T-shaped valve, and the second electric T-shaped valve entrance point connects the 3rd and loops back closing quotation by pipeline The pipe port of export, the second electric T-shaped valve first outlet end connection second circulation reclaims coil pipe entrance point, and described second is electronic Triple valve second outlet end connection second circulation reclaims straight trip pipe entrance point;
The first circulation reclaims coil pipe entrance point and connects the second circulation recovery coil pipe port of export by pipeline;
The 3rd circulation and stress coil pipe entrance point connects first circulation and reclaims the coil pipe port of export by pipeline.
7. the energy-saving air processing equipment according to claim 5 or 6, it is characterised in that the energy-saving air processing equipment Also include automatic control system;
The automatic control system includes master controller, the compressor of connection master controller for controlling each segment body work Frequency controller, humiture presetting module and be arranged on fresh inlet end the first temperature sensor and the first humidity sensor, Installed in second temperature sensor and the second humidity sensor, the proportional electrovalve on Surface cooling coil of air draft entrance point With humidifier section switch controller;
It is the compressor frequency controller, the first temperature sensor, the first humidity sensor, second temperature sensor, second wet During degree sensor, the first electric T-shaped valve, the second electric T-shaped valve, proportional electrovalve and humidifier section switch controller are connected respectively Heart controller;
By the temperature and humidity in the default room of humiture presetting module, master controller is according to default temperature value and humidity Value, and the reading of the first temperature sensor, the first humidity sensor, second temperature sensor, the second humidity sensor is warm and humid Angle value, automatically adjusts the working condition of each segment body.
CN201710177225.8A 2017-03-23 2017-03-23 Energy-saving air treatment equipment Active CN106765823B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710177225.8A CN106765823B (en) 2017-03-23 2017-03-23 Energy-saving air treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710177225.8A CN106765823B (en) 2017-03-23 2017-03-23 Energy-saving air treatment equipment

Publications (2)

Publication Number Publication Date
CN106765823A true CN106765823A (en) 2017-05-31
CN106765823B CN106765823B (en) 2023-04-07

Family

ID=58966843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710177225.8A Active CN106765823B (en) 2017-03-23 2017-03-23 Energy-saving air treatment equipment

Country Status (1)

Country Link
CN (1) CN106765823B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649875A (en) * 2019-03-04 2019-04-19 福建德普柯发电设备有限公司 A kind of wall-hanging frozen products insulated container generating set with air cleaning unit
CN112539532A (en) * 2020-12-07 2021-03-23 青岛海尔空调器有限总公司 Fresh air conditioner and control method and equipment thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2896105Y (en) * 2006-03-23 2007-05-02 胡建平 Air-conditioner condensed water automatic treatment device
CN201531959U (en) * 2009-08-03 2010-07-21 广州海呈空调技术有限公司 Heat recovery constant temperature and moisture air conditioning unit
CN102494372A (en) * 2011-12-21 2012-06-13 南京五洲制冷集团有限公司 Double-cold source full fresh air dehumidifier and control method thereof
CN104815512A (en) * 2015-05-27 2015-08-05 成都虹华环保科技股份有限公司 Circulating water-washing type waste gas treatment device
CN204665596U (en) * 2015-05-29 2015-09-23 北京网电盈科科技发展有限公司 Direct-expansion type heat-recycling air treatment device
CA2877249A1 (en) * 2015-01-08 2016-07-08 Christopher Henningsen Variable effectiveness heat recovery ventilator
CN206572695U (en) * 2017-03-23 2017-10-20 福州鹏飞制冷设备有限公司 A kind of energy-saving air processing equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2896105Y (en) * 2006-03-23 2007-05-02 胡建平 Air-conditioner condensed water automatic treatment device
CN201531959U (en) * 2009-08-03 2010-07-21 广州海呈空调技术有限公司 Heat recovery constant temperature and moisture air conditioning unit
CN102494372A (en) * 2011-12-21 2012-06-13 南京五洲制冷集团有限公司 Double-cold source full fresh air dehumidifier and control method thereof
CA2877249A1 (en) * 2015-01-08 2016-07-08 Christopher Henningsen Variable effectiveness heat recovery ventilator
CN104815512A (en) * 2015-05-27 2015-08-05 成都虹华环保科技股份有限公司 Circulating water-washing type waste gas treatment device
CN204665596U (en) * 2015-05-29 2015-09-23 北京网电盈科科技发展有限公司 Direct-expansion type heat-recycling air treatment device
CN206572695U (en) * 2017-03-23 2017-10-20 福州鹏飞制冷设备有限公司 A kind of energy-saving air processing equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
江萍: "《建筑设备自动化》", 31 January 2016, 中国建材工业出版社 *
顾民立: "《纺织工业空气调节》", 30 September 1993, 纺织工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649875A (en) * 2019-03-04 2019-04-19 福建德普柯发电设备有限公司 A kind of wall-hanging frozen products insulated container generating set with air cleaning unit
CN112539532A (en) * 2020-12-07 2021-03-23 青岛海尔空调器有限总公司 Fresh air conditioner and control method and equipment thereof

Also Published As

Publication number Publication date
CN106765823B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN106679002B (en) A kind of dehumidification by condensation and the compound Fresh air handing device and method of solution dehumidification
CN203785130U (en) Circulating water wet film humidification system
CN107307683A (en) A kind of diffusion absorbing cultural relics display case constant humidity control system with self-watering function
CN105180317B (en) Fresh air energy-saving processing system and method in temperature and humidity independent processing air conditioning system
CN104864536B (en) Efficient energy-saving multi-stage heat and humidity treatment air conditioning device and treatment method thereof
CN106885308A (en) A kind of heat-pump-type heat recovery fresh air purifies dehumidifying integrated machine
CN106801949A (en) A kind of energy-saving fresh air processing equipment
CN205332428U (en) Novel divide family formula radiation air conditioning unit
CN206683108U (en) A kind of energy-saving fresh air device
CN107560061A (en) A kind of method and apparatus using air conditioner condensation water management humiture
CN107062442A (en) A kind of energy-saving air processing system
CN106679003A (en) Energy-saving fresh air device
CN108019827A (en) A kind of High Temperature Heat Pump Dehumidification Dryer and its dehumanization method
CN106765823A (en) A kind of energy-saving air processing equipment
CN111059726A (en) Dehumidifier control method and device, storage medium and dehumidifier
CN204853780U (en) Fresh air energy-saving processing system in temperature and humidity independent processing air conditioning system
CN207849601U (en) Data center module recovery efficient Cooling Air-conditioning System
CN207849600U (en) A kind of energy-efficient data center module Cooling Air-conditioning System
CN206572702U (en) A kind of energy-saving air processing system with secondary return air
CN206669890U (en) A kind of heat-pump-type heat recovery fresh air purifies dehumidifying integrated machine
CN206572695U (en) A kind of energy-saving air processing equipment
CN106801969A (en) A kind of energy-saving fresh air system
CN206572655U (en) A kind of energy-saving fresh air processing equipment
CN106813349A (en) A kind of energy-saving air processing system with secondary return air
CN206609076U (en) A kind of energy-saving air processing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240321

Address after: 350000, 2nd Floor, Building 3, Zhonghang New Village, No. 10 Lane 35 Yingji Road, Gudong Street, Gulou District, Fuzhou City, Fujian Province

Patentee after: China Energy Green Construction Co.,Ltd.

Country or region after: China

Address before: Unit 105, Building 9, Shuxiangda, No. 126 Baima Middle Road, Shanghai Street, Taijiang District, Fuzhou City, Fujian Province, 350000

Patentee before: FUZHOU PENGFEI REFRIGERATION EQUIPMENT Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240415

Address after: Room 1, 2, 3, and 4, 5th floor, and Room 5, 3rd floor, East, Building 1, Fujian Torch High tech Entrepreneurship Park, 611 Industrial Road, Gulou District, Fuzhou City, Fujian Province, 350001

Patentee after: Zhongjing Pengfei New Energy Technology Co.,Ltd.

Country or region after: China

Address before: 350000, 2nd Floor, Building 3, Zhonghang New Village, No. 10 Lane 35 Yingji Road, Gudong Street, Gulou District, Fuzhou City, Fujian Province

Patentee before: China Energy Green Construction Co.,Ltd.

Country or region before: China