CN106762875B - A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method - Google Patents

A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method Download PDF

Info

Publication number
CN106762875B
CN106762875B CN201710046185.3A CN201710046185A CN106762875B CN 106762875 B CN106762875 B CN 106762875B CN 201710046185 A CN201710046185 A CN 201710046185A CN 106762875 B CN106762875 B CN 106762875B
Authority
CN
China
Prior art keywords
hydraulic oil
valve
spill valve
oil pump
cooler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710046185.3A
Other languages
Chinese (zh)
Other versions
CN106762875A (en
Inventor
任彦
黄葆华
刘双白
张德利
崔彦亭
王维萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710046185.3A priority Critical patent/CN106762875B/en
Publication of CN106762875A publication Critical patent/CN106762875A/en
Application granted granted Critical
Publication of CN106762875B publication Critical patent/CN106762875B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/02Systems essentially incorporating special features for controlling the speed or actuating force of an output member
    • F15B11/028Systems essentially incorporating special features for controlling the speed or actuating force of an output member for controlling the actuating force
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B1/00Installations or systems with accumulators; Supply reservoir or sump assemblies
    • F15B1/02Installations or systems with accumulators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/08Servomotor systems without provision for follow-up action; Circuits therefor with only one servomotor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/20Fluid pressure source, e.g. accumulator or variable axial piston pump
    • F15B2211/205Systems with pumps
    • F15B2211/20576Systems with pumps with multiple pumps

Abstract

The present invention provides a kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method, which includes:Hydraulic oil container, two accumulators, two coolers, hydraulic cylinder, switching solenoid valve, becomes load ratio spill valve, loads spill valve, ratio spill valve and a plurality of pipeline surely two hydraulic oil pumps;Two hydraulic oil pumps are arranged in the hydraulic oil container, are equipped with outlet non-return valve in the exit of two hydraulic oil pumps;Hydraulic oil pump is separately connected positive interaction room and reaction room by two-way oil supply pipe;Two accumulators are separately positioned on two oil supply pipes, are equipped with delivery valve in accumulator entrance, exit is equipped with pressure maintaining valve;Switching solenoid valve, change load ratio spill valve, load spill valve is arranged on the oil returning tube between hydraulic oil pump and positive interaction room surely, becomes load ratio spill valve for switching and loads spill valve surely;Ratio spill valve is arranged on the oil returning tube between hydraulic oil pump and reaction room;Two oil returning tubes are connected with hydraulic tank after converging through cooler.

Description

A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method
Technical field
The present invention relates to thermal power generating technology field more particularly to a kind of thermal power plant's coal pulverizer hydraulic oil system and its start and stop Control method.
Background technique
The existing coal pulverizer hydraulic oil system of thermal power plant mainly by motor, gear pump, ratio spill valve, overflow valve, change To valve, multiple hydraulic cylinders, flow control valve, check valve, cooler, filter, pressure transmitter etc. and oil cylinder accumulator group Deng composition.Each hydraulic cylinder pulls stiffness-strengthened story by pull rod respectively, and the coal of feeder outlet is fallen in by central coal conduit On intermediate mill, the grinding roller being connected on loading frame applies pressure to the coal seam on mill, and coal pulverizer hydraulic oil is to become load system System, the hydraulic grinding forces of this system be it is adjustable, can be adjusted to corresponding best grinding forces under different operating conditions, pass through change The input of proportional pressure control valve electric signal is adjusted, and when coal quality changes or meets quick variation, grinding forces can be fast Velocity modulation section, hydraulic loaded coal pulverizer have better service condition.But existing thermal power plant is in coal pulverizer hydraulic oil system full cut-off Under state, the automatic starting of coal pulverizer hydraulic oil system cannot achieve, it also can not be under coal pulverizer hydraulic oil system operating status Realize that coal pulverizer hydraulic oil system is automatically stopped, and when coal pulverizer hydraulic oil system startup program is run to a certain step, If the step sequence condition is unsatisfactory for, the operation of startup program can not be continued.That is, the operation and stopping of existing coal pulverizer hydraulic oil system It is required to human intervention, this considerably increases workloads and human cost, and if cannot start or stop in time coal pulverizer Hydraulic oil system then will affect unit normal operation.
Summary of the invention
In order to solve the above technical problems, the embodiment of the invention provides a kind of thermal power plant's coal pulverizer hydraulic oil system and its opening Stop control method.
One aspect of the present invention provides a kind of thermal power plant's coal pulverizer hydraulic oil system, thermal power plant's coal pulverizer hydraulic oil system System includes:Hydraulic oil container, the first hydraulic oil pump, the second hydraulic oil pump, the first accumulator, the second accumulator, the first cooler, Two coolers, switching solenoid valve, become load ratio spill valve, load spill valve, ratio spill valve and a plurality of pipe surely hydraulic cylinder Road;
First hydraulic oil pump and the second hydraulic oil pump are arranged in the hydraulic oil container, in going out for two hydraulic oil pumps It is respectively equipped with hydraulic oil pump outlet non-return valve at mouthful, is equipped with contact pipeline in the oil outlet of the outlet non-return valve;Described first Hydraulic oil pump is separately connected the positive interaction room and reaction room of the hydraulic cylinder by two-way oil supply pipe, and the hydraulic cylinder passes through The grinding roller of connecting rod connection coal pulverizer;First accumulator and the second accumulator are separately positioned on two-way oil supply pipe, in institute The inlet for stating the first accumulator and the second accumulator is respectively equipped with delivery valve, first accumulator and the second accumulator it is logical A pressure maintaining valve is respectively equipped with to the exit of oil returning tube;
The switching solenoid valve, become load ratio spill valve, surely load spill valve setting first hydraulic oil pump with On the first oil returning tube between hydraulic cylinder positive interaction room, the switching solenoid valve is for switching the change load ratio spill valve And spill valve is loaded surely;Second between first hydraulic oil pump and hydraulic cylinder reaction room is arranged in the ratio spill valve On oil returning tube;After first oil returning tube and the second oil returning tube converge, first cooler through being connected in parallel, Two coolers are connect with the hydraulic oil container;It is electronic that entrance is respectively equipped at the both ends of first cooler, the second cooler Door and outlet electrically operated gate;
The exit for becoming load ratio spill valve, loading spill valve surely is equipped with a positive force oil return non-return valve, The exit of the ratio spill valve is equipped with a reaction force oil return non-return valve.
Another aspect of the present invention additionally provides a kind of thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method, the thermoelectricity Factory's coal pulverizer hydraulic oil system start-up and shut-down control method includes:
Judge whether that the first cooler entrance electrically operated gate and outlet electrically operated gate have been opened, and the second cooler entrance electrically operated gate It has been closed with outlet electrically operated gate;If not, issuing the instruction opened the first cooler entrance electrically operated gate and export electrically operated gate, and close It closes the second cooler entrance electrically operated gate and exports the instruction of electrically operated gate;
If the first cooler entrance electrically operated gate and outlet electrically operated gate have been opened, and the second cooler entrance electrically operated gate It has been closed with outlet electrically operated gate, has judged whether that the first accumulator delivery valve and the second accumulator delivery valve have been opened;If first Accumulator delivery valve and/or the second accumulator delivery valve are not opened, are issued and are opened the first accumulator delivery valve and the confession of the second accumulator The instruction of oil valve;
If the first accumulator delivery valve and the second accumulator delivery valve have been opened, judge whether the first hydraulic oil pump It has been turned on;If first hydraulic oil pump is inactive, the instruction of the first hydraulic oil pump of starting is issued;
If first hydraulic oil pump has been turned on, judge whether to have thrown hydraulic oil pump interlocking;If not throwing hydraulic oil pump Interlocking issues the instruction for throwing hydraulic oil pump interlocking;
If having thrown hydraulic oil pump interlocking, judge whether that switching solenoid valve has charged;If the non-band of switching solenoid valve Electricity is emitted to the instruction that the switching solenoid valve powers on, and loads spill valve surely with investment;
If the switching solenoid valve has charged, judge whether that positive force is invariable, and coal pulverizer hydraulic oil system It works normally;
If positive force is invariable, and coal pulverizer hydraulic oil system works normally;Judge whether that switching solenoid valve loses Electricity;If the non-power loss of switching solenoid valve, switching solenoid valve power down instructions are issued;
If switching solenoid valve power loss, judge whether to become the load ratio spill valve automatic gear of coal feeding amount, and The ratio spill valve automatic gear of coal feeding amount;If becoming load ratio spill valve and/or the non-coal feeding amount automatic transmission of ratio spill valve Position, the instruction of the automatic gear of load ratio spill valve coal feeding amount will be become by issuing, and by the automatic gear of ratio spill valve coal feeding amount Instruction;
If the change load ratio spill valve automatic gear of coal feeding amount, and ratio spill valve also coal feeding amount automatic transmission Position judges whether that the size of positive force and reaction force follows coal amount to change and change, and coal pulverizer hydraulic oil system works Normally.
The beneficial effect of the embodiment of the present invention is:Thermal power plant's coal pulverizer hydraulic oil system provided in an embodiment of the present invention and Its start-up and shut-down control method can realize oneself of coal pulverizer hydraulic oil system under thermal power plant's coal pulverizer hydraulic oil system full cut-off state Dynamic starting;Under thermal power plant's coal pulverizer hydraulic oil system operating status, being automatically stopped for coal pulverizer hydraulic oil system is realized;And Artificial judgement is taken into account, the leapfrog operation of thermal power plant's coal pulverizer hydraulic oil system programed logic may be implemented, work as process control Whether the service condition of a certain step of logic is that when meeting to cause step sequence that can not carry out, Rule of judgment can artificially can ignore simultaneously Leapfrog movement is operated, continues the operation of programed logic until starting finishes.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of thermal power plant of embodiment of the present invention coal pulverizer hydraulic oil system;
Fig. 2 is the Booting sequence schematic diagram of thermal power plant of embodiment of the present invention coal pulverizer hydraulic oil system;
Fig. 3 is the stopping flow diagram of thermal power plant of embodiment of the present invention coal pulverizer hydraulic oil system.
Appended drawing reference
1. 2. second hydraulic oil pump of the first hydraulic oil pump
3. 4. second hydraulic oil pump outlet non-return valve of the first hydraulic oil pump outlet non-return valve
5. switching solenoid valve 6. becomes load ratio spill valve
7. loading 8. positive force oil return non-return valve of spill valve surely
9. 10. reaction force oil return non-return valve of ratio spill valve
11. 12. first accumulator pressure maintaining valve of the first accumulator delivery valve
13. 14. second accumulator pressure maintaining valve of the second accumulator delivery valve
15. 16. first cooler entrance electrically operated gate of hydraulic cylinder
17. 18. first cooler outlet electrically operated gate of the first cooler
19. 20. second cooler of the second cooler entrance electrically operated gate
21. 22. hydraulic oil container of the second cooler outlet electrically operated gate
23. 24. second accumulator of the first accumulator
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, the embodiment of the invention provides a kind of thermal power plant's coal pulverizer hydraulic oil system, which is mainly wrapped It includes:Hydraulic oil container 22, the first hydraulic oil pump 1, the second hydraulic oil pump 2, the first accumulator 23, the second accumulator 24, first are cooling Device 17, the second cooler 20, hydraulic cylinder 15, switching solenoid valve 5, change load ratio spill valve 6, load spill valve 7, ratio are overflow surely Oil valve 9 and a plurality of pipeline.
Wherein, the first hydraulic oil pump 1 and the second hydraulic oil pump 2 are arranged in hydraulic oil container 22, in two hydraulic oil pumps Exit be respectively equipped with the first hydraulic oil pump outlet non-return valve 3 and the second hydraulic oil pump outlet non-return valve 4, in the first hydraulic oil The oil outlet of pump discharge non-return valve 3 and the second hydraulic oil pump outlet non-return valve 4 is equipped with contact pipeline.First hydraulic oil pump 1 passes through Two-way oil supply pipe is separately connected the positive interaction room and reaction room of hydraulic cylinder 15, and hydraulic cylinder 15 connects coal pulverizer by connecting rod Grinding roller, to drive grinding roller to do work.First accumulator 23 and the second accumulator 24 are separately positioned on two-way oil supply pipe, first The inlet of accumulator 23 and the second accumulator 24 is respectively equipped with accumulator delivery valve 11 and 13, also, in the first accumulator 23 And second accumulator 24 lead to the exit of oil returning tube and be respectively equipped with an energy-storing pressure-stabilizing valve 12 and 14.
Switching solenoid valve 5, become load ratio spill valve 6, surely load spill valve 7 setting the first hydraulic oil pump 1 with it is hydraulic On the first oil returning tube between the positive interaction room of cylinder 15, wherein switching solenoid valve 5 becomes load ratio spill valve 6 for switching And spill valve 7 is loaded surely.Second between the first hydraulic oil pump 1 and the reaction room of hydraulic cylinder 15 is arranged in ratio spill valve 9 On oil returning tube.After first oil returning tube and the second oil returning tube converge, the first cooler 17, second through being connected in parallel is cooling Device 20 is connect with hydraulic oil container 22.The first cooler entrance electrically operated gate 16 and first is respectively equipped at the both ends of the first cooler 17 Cooler outlet electrically operated gate 18 is similarly also respectively equipped with the second cooler entrance electrically operated gate at the both ends of the second cooler 20 19 and the second cooler outlet electrically operated gate 21.
In addition, becoming load ratio spill valve 6, loading the exit of spill valve 7 surely equipped with a positive force oil return non-return valve 8, a reaction force oil return non-return valve 10 is equipped in the exit of ratio spill valve 9.
As shown in Figure 1, being additionally provided with other necessary pipelines, valve in power plant boiler fuel system of the embodiment of the present invention And related thermal technology's measuring point etc..For example, pressure-measuring-pointTemperature pointAnd liquid level measuring point
Coal pulverizer is by the active force between grinding roller and mill come grinding powder coal in the process of running, in response to Grinding demand under different load, different coal amounts, needs to apply different size of active force to grinding roller.Utilize the embodiment of the present invention Thermal power plant's coal pulverizer hydraulic oil system of offer can be applied to hydraulic cylinder positive force and anti-in coal pulverizer operational process Active force is ultimately applied on grinding roller, to respond demand of the coal pulverizer under different load to positive and negative active force.
First hydraulic oil pump 1 or the second hydraulic oil pump 2 take oily boosting from hydraulic oil container 22, are divided into two-way and send to hydraulic cylinder 15 positive interaction room and reaction room, forms hydraulic positive force and reaction force, is ultimately applied to grinding roller, meet different load Under coal pulverizer active force demand.
Wherein, positive force one routes the first hydraulic oil pump 1 (or second hydraulic oil pump 2) and pumps out, by the first hydraulic oil Pump discharge non-return valve 3 (or second hydraulic oil pump outlet non-return valve 4), send to the positive force room of hydraulic cylinder 15;Positive force oil For pressure by determining load spill valve 7 and becoming load ratio spill valve 6 to adjust on oil return line, their aperture determines oil return Amount, so as to adjust charge oil pressure, the switching between them is determined by the electrification and power loss of switching solenoid valve 5.Wherein, when When coal pulverizer hydraulic oil system operates normally, switching solenoid valve 5 is generally in power failure state, this time-varying loads ratio spill valve 6 Conducting, when becoming load ratio 6 failure of spill valve, switching solenoid valve 5 is powered on, and is loaded spill valve 7 surely and is connected.Reaction force is all the way It is pumped out by the first hydraulic oil pump 1 (or second hydraulic oil pump 2), by the first hydraulic oil pump outlet non-return valve 3 (or the second hydraulic oil Pump discharge non-return valve 4), it send to the reaction-force chamber of hydraulic cylinder 15;Reaction-force oil pressure passes through the ratio oil spilling on oil return line Valve 9 is adjusted.Two-way oil feed line is both provided with accumulator, and the effect of accumulator is to stablize oil pressure.Two-way oil return line converge to After one piece, hydraulic oil container 22 is back to by a pair of of cooler group.Cooler group a preparation and a use, cooler conducting side pass through cooling water Oil return heat is taken away.
Above-mentioned the first hydraulic oil pump 1 and the second hydraulic oil pump 2 mutual backup under normal circumstances such as only puts into a liquid When pressure oil pump is not able to satisfy hydraulic system pressure, two hydraulic oil pumps can be put into simultaneously.
In one embodiment, above-mentioned thermal power plant's coal pulverizer hydraulic oil system further includes:Coal pulverizer hydraulic oil system program Control logic operation button A1, hydraulic oil pump interlocking throw standby button A2, manual confirmation and load spill valve button A3 working properly surely And manual confirmation becomes load ratio spill valve button A4 working properly.Above-mentioned button for example can be set in distributed AC servo system system On the control panel of system.
Using above-mentioned block push button, equipment interlocking can be automatically engaged.After interlocking investment, if wherein a certain equipment is jumped When lock, another equipment can rapid interlocked startup, maintain system normal operation.For example, when standby button is thrown in hydraulic oil pump interlocking After A2 is pressed, if the first hydraulic oil pump 1 trips, the second hydraulic oil pump 2 can rapid interlocked startup.
The embodiment of the invention also provides a kind of start-up and shut-down control method of thermal power plant's coal pulverizer hydraulic oil system, the start and stop controls The executing subject of method processed can be computer system or dcs.As shown in Fig. 2, the start-up and shut-down control method is main Include the following steps:
Step S101, judge whether that 1. the first cooler entrance electrically operated gate 16 and the first cooler outlet electrically operated gate 18 are It opens, 2. and the second cooler entrance electrically operated gate 19 and the first cooler outlet electrically operated gate 21 have been closed.If above-mentioned two condition Have that a condition is unsatisfactory for or two conditions are all unsatisfactory for, then carry out step S102, issues and open the first cooler entrance electricity The instruction of dynamic door 16 and the first cooler outlet electrically operated gate 18, and close the second cooler entrance electrically operated gate 19 and the second cooler Export the instruction of electrically operated gate 21.If the first cooler entrance electrically operated gate 16 and the first cooler outlet electrically operated gate 18 have been opened, And second cooler entrance electrically operated gate 19 and the second cooler outlet electrically operated gate 21 closed, carry out step S103.
Step S103, judge whether that the first accumulator delivery valve 11 and the second accumulator delivery valve 13 have been opened.If two A accumulator delivery valve has one to be not switched on or two are not switched on, then carries out step S104, issues and opens the confession of the first accumulator The instruction of oil valve 11 and the second accumulator delivery valve 13.If two accumulator delivery valves have been opened, step S105 is carried out.
Step S105, judge whether that the first hydraulic oil pump 1 has been turned on.If the first hydraulic oil pump 1 is inactive, walked Rapid S106 issues the instruction of the first hydraulic oil pump 1 of starting.If the first hydraulic oil pump 1 has been turned on, step S107 is carried out.
Step S107, judge whether to have thrown hydraulic oil pump interlocking.If not throwing hydraulic oil pump interlocking, step is carried out S108 issues the instruction for throwing hydraulic oil pump interlocking.If having thrown hydraulic oil pump interlocking, step S109 is carried out.
The purpose of step S107-S108 be investment hydraulic oil pump interlocking, investment interlocking after, when encounter system pressure it is low or When one hydraulic oil pump tripping, meeting another hydraulic oil pump of automatic linkage maintains system oil pressure to stablize.
Step S109, judge whether that switching solenoid valve 5 has charged.If switching solenoid valve 5 does not charge, step is carried out S110 is emitted to the instruction that switching solenoid valve 5 powers on, and loads spill valve 7 surely to put into.If switching solenoid valve 5 has charged, throw After entering load spill valve 7 investment surely, step S111 is carried out.
Step S111, judge whether that 1. positive force is invariable, 2. and coal pulverizer hydraulic oil system works normally.Such as After fruit investment loads spill valve 7 surely, positive force is invariable, and coal pulverizer hydraulic oil system works normally, and carries out step S112。
Step S112, judge whether the power loss of switching solenoid valve 5.If the non-power loss of switching solenoid valve 5, carries out step S113 issues 5 power down instructions of switching solenoid valve.If the power loss of switching solenoid valve 5 carries out step S114.
2. and ratio spill valve 9 step S114, judge whether 1. to become the automatic gear of coal feeding amount of load ratio spill valve 6, The automatic gear of coal feeding amount.If becoming the perhaps automatic gear of the non-coal feeding amount of ratio spill valve 9 or two of load ratio spill valve 6 The non-automatic gear of coal feeding amount of spill valve then carries out step S115, and the 6 automatic gear of coal feeding amount of load ratio spill valve will be become by issuing Instruction, and by the instruction of the automatic gear of 9 coal feeding amount of ratio spill valve.If becoming load ratio spill valve 6 coal feeding amount and ratio The example spill valve 9 automatic gear of coal feeding amount, then carry out step S116.
Step S116, judge whether that the size of 1. positive force and reaction force follows coal amount to change and change, 2. and grind Coal machine hydraulic oil system is working properly.If above-mentioned two condition meets simultaneously, terminate.
Start-up and shut-down control method shown in Fig. 2 is used to control the starting of thermal power plant's coal pulverizer hydraulic oil system, therefore shown in Fig. 2 Start-up and shut-down control method is referred to as the starting step of thermal power plant's coal pulverizer hydraulic oil system.
In one embodiment, the enabled condition of starting step sequence is:1. cooling water system operates normally;2. in hydraulic oil container 22 Liquid level it is normal.That is, needing to prejudge the first cooling hydrophone and the second cooler of thermal power plant before carrying out step S101 Whether normal operation and whether the liquid level in hydraulic oil container 22 is normal, under the case where above-mentioned two condition meets simultaneously, Coal pulverizer hydraulic oil system is allowed to start.
The embodiment of the present invention also provides a kind of start-up and shut-down control method of thermal power plant's coal pulverizer hydraulic oil system, the start-up and shut-down control The executing subject of method can be computer system or dcs.As shown in figure 3, the start-up and shut-down control method is mainly wrapped Include following steps:
Step S201, it is automatic to judge whether that change load ratio spill valve 6 and ratio spill valve 9 have released coal amount.If Becoming load ratio spill valve 6 and/or ratio spill valve 9, not release coal amount automatic, then carries out step S202, issues to release and becomes load Ratio spill valve 6 and 9 coal amount of ratio spill valve automatically instruct.If becoming load ratio spill valve 6 and ratio spill valve 9 It is automatic to release coal amount, carries out step S203.
Step S203, judge whether to have released hydraulic oil pump interlocking.If not releasing hydraulic oil pump interlocking, step is carried out S204 issues the instruction for releasing hydraulic oil pump interlocking.If having released hydraulic oil pump interlocking, step S205 is carried out.
Step S205, judge whether that the first hydraulic oil pump 1 and the second hydraulic oil pump 2 are out of service.If the first liquid Pressure oil pump 1 and/or the second hydraulic oil pump 2 be not out of service, then carries out step S206, issues the first hydraulic oil pump 1 out of service With the instruction of the second hydraulic oil pump 2.
Start-up and shut-down control method shown in Fig. 3 is used to control the stopping of thermal power plant's coal pulverizer hydraulic oil system, therefore the start and stop of Fig. 3 Control method is properly termed as the stopping step of thermal power plant's coal pulverizer hydraulic oil system.
In one embodiment, the enabled condition of stopping step sequence is:Coal pulverizer is out of service.That is, carrying out step S201 Before, it needs to prejudge coal pulverizer and run whether it has stopped, only in the case where coal pulverizer is out of service, just allow to stop Only.
Fig. 2 and start-up and shut-down control method shown in Fig. 3 are the journey of moderate heat of embodiment of the present invention power plant coal hydraulic oil system Sequence control logic.Following functions may be implemented using the programed logic:In thermal power plant's coal pulverizer hydraulic oil system full cut-off Under state, the automatic starting of coal pulverizer hydraulic oil system is realized;Under thermal power plant's coal pulverizer hydraulic oil system operating status, realize Coal pulverizer hydraulic oil system is automatically stopped;When thermal power plant's coal pulverizer hydraulic oil system startup program is run to a certain step, item Part is unsatisfactory for, if artificially judging, the condition be can ignore that, can carry out the operation that leapfrog movement continues startup program manually, until The starting of coal pulverizer hydraulic oil system finishes.
Each step in start-up and shut-down control method shown in Fig. 2 and Fig. 3, first judges whether feedback receives, and continues if receiving In next step;If do not received, instruction is issued, waits to be feedback receive.When not receiving due feedback signal, process control is patrolled The step can be rested on by collecting, and wait worker operation.Power plant operations staff can find the current operation step unreceived feedback signal of sequence, Artificially judge whether unreceived feedback signal influences continuing to execute for program programed logic.If the feedback signal does not influence Present procedure control logic continues, and operations staff can operate the execution that leapfrog movement continues programed logic;If The feedback signal influences continuing for present procedure control logic, then operations staff can not meet according to each found Feedback signal, targetedly go investigation problem, until receive the feedback signal, continue to execute programed logic.
By the start-up and shut-down control method in Fig. 2 and Fig. 3, can under thermal power plant's coal pulverizer hydraulic oil system full cut-off state, Realize the automatic starting of coal pulverizer hydraulic oil system;Under thermal power plant's coal pulverizer hydraulic oil system operating status, coal pulverizer is realized Hydraulic oil system is automatically stopped.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Specific embodiment is applied in the present invention, and principle and implementation of the present invention are described, above embodiments Explanation be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, According to the thought of the present invention, there will be changes in the specific implementation manner and application range, in conclusion in this specification Appearance should not be construed as limiting the invention.

Claims (4)

1. a kind of thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method, which is characterized in that thermal power plant's coal pulverizer is hydraulic Oil system, including:Thermal power plant's coal pulverizer hydraulic oil system includes:Hydraulic oil container, the first hydraulic oil pump, the second hydraulic oil Pump, the first accumulator, the second accumulator, the first cooler, the second cooler, hydraulic cylinder, switching solenoid valve, change load ratio are overflow Oil valve loads spill valve, ratio spill valve, a plurality of pipeline, coal pulverizer hydraulic oil system programed logic operation button, liquid surely Pressure oil pump interlocking throws standby button, manual confirmation and loads spill valve button working properly and manual confirmation change load ratio spill valve surely Button working properly;
First hydraulic oil pump and the second hydraulic oil pump are arranged in the hydraulic oil container, in the exit of two hydraulic oil pumps It is respectively equipped with hydraulic oil pump outlet non-return valve, is equipped with contact pipeline in the oil outlet of the outlet non-return valve;Described first is hydraulic Oil pump is separately connected the positive interaction room and reaction room of the hydraulic cylinder by two-way oil supply pipe, and the hydraulic cylinder passes through connecting rod Connect the grinding roller of coal pulverizer;First accumulator and the second accumulator are separately positioned on two-way oil supply pipe, described The inlet of one accumulator and the second accumulator is respectively equipped with delivery valve, and first accumulator and the second accumulator lead to back The exit of oil-piping is respectively equipped with a pressure maintaining valve;
The switching solenoid valve, become load ratio spill valve, surely load spill valve setting first hydraulic oil pump with it is hydraulic On the first oil returning tube between cylinder positive interaction room, the switching solenoid valve is for switching the change load ratio spill valve and determining Load spill valve;The second oil return between first hydraulic oil pump and hydraulic cylinder reaction room is arranged in the ratio spill valve On pipeline;It is first cooler through being connected in parallel, second cold after first oil returning tube and the second oil returning tube converge But device is connect with the hydraulic oil container;The both ends of first cooler, the second cooler be respectively equipped with entrance electrically operated gate and Export electrically operated gate;
The exit for becoming load ratio spill valve, loading spill valve surely is equipped with a positive force oil return non-return valve, described The exit of ratio spill valve is equipped with a reaction force oil return non-return valve;
Thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method includes:
Judge whether that the first cooler entrance electrically operated gate and the first cooler outlet electrically operated gate have been opened, and the second cooler entrance Electrically operated gate and the second cooler outlet electrically operated gate have been closed;The first cooler entrance electrically operated gate and first is opened if not, issuing The instruction of cooler outlet electrically operated gate, and close the finger of the second cooler entrance electrically operated gate and the second cooler outlet electrically operated gate It enables;
If the first cooler entrance electrically operated gate and the first cooler outlet electrically operated gate have been opened, and the second cooler entrance Electrically operated gate and the second cooler outlet electrically operated gate have been closed, and judge whether the first accumulator delivery valve and the second accumulator delivery valve Open;If the first accumulator delivery valve and/or the second accumulator delivery valve are not opened, issues and open the first accumulator delivery valve And second accumulator delivery valve instruction;
If the first accumulator delivery valve and the second accumulator delivery valve have been opened, judge whether that the first hydraulic oil pump has opened It is dynamic;If first hydraulic oil pump is inactive, the instruction of the first hydraulic oil pump of starting is issued;
If first hydraulic oil pump has been turned on, judge whether to have thrown hydraulic oil pump interlocking;If not throwing hydraulic oil pump interlocking, Issue the instruction for throwing hydraulic oil pump interlocking;
If having thrown hydraulic oil pump interlocking, judge whether that switching solenoid valve has charged;If the switching solenoid valve does not charge, hair The instruction powered on out to the switching solenoid valve loads spill valve with investment surely;
If the switching solenoid valve has charged, judge whether that positive force is invariable, and coal pulverizer hydraulic oil system is normal Work;
If positive force is invariable, and coal pulverizer hydraulic oil system works normally;Judge whether switching solenoid valve power loss;Such as The non-power loss of switching solenoid valve described in fruit issues switching solenoid valve power down instructions;
If switching solenoid valve power loss, judge whether to become the load ratio spill valve automatic gear of coal feeding amount, and ratio The spill valve automatic gear of coal feeding amount;If becoming load ratio spill valve and/or the automatic gear of the non-coal feeding amount of ratio spill valve, hair The instruction of the automatic gear of load ratio spill valve coal feeding amount will be become out, and by the instruction of the automatic gear of ratio spill valve coal feeding amount;
If the change load ratio spill valve automatic gear of coal feeding amount, and the ratio spill valve also automatic gear of coal feeding amount, Judge whether that the size of positive force and reaction force follows coal amount to change and change, and the work of coal pulverizer hydraulic oil system is just Often.
2. thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method according to claim 1, which is characterized in that the fire Power plant coal hydraulic oil system start-up and shut-down control method further includes:
It is automatic to judge whether that change load ratio spill valve and ratio spill valve have released coal amount;If becoming load ratio spill valve And/or not release coal amount automatic for ratio spill valve, issues to release and becomes load ratio spill valve and ratio spill valve coal amount is automatic Instruction;
If it is automatic that the change load ratio spill valve and ratio spill valve have released coal amount, judge whether to have released hydraulic oil Pump interlocking;If not releasing hydraulic oil pump interlocking, the instruction for releasing hydraulic oil pump interlocking is issued;
If having released hydraulic oil pump interlocking, judge whether that the first hydraulic oil pump and the second hydraulic oil pump are out of service;Such as First hydraulic oil pump and/or the second hydraulic oil pump described in fruit be not out of service, issues the first hydraulic oil pump out of service and second The instruction of hydraulic oil pump.
3. thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method according to claim 1, which is characterized in that judging Whether the first cooler entrance electrically operated gate and the first cooler outlet electrically operated gate have been opened, and the second cooler entrance electrically operated gate and Before second cooler outlet electrically operated gate has been closed, thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method further includes:
Judge whether the first cooler and the second cooler normal operation, and the liquid level in hydraulic oil container is normal;
If first cooler and the second cooler normal operation, and the liquid level in hydraulic oil container would be normal, then judges whether First cooler entrance electrically operated gate and outlet electrically operated gate have been opened, and the second cooler entrance electrically operated gate and outlet electrically operated gate are It closes.
4. thermal power plant's coal pulverizer hydraulic oil system start-up and shut-down control method according to claim 2, which is characterized in that judging Whether change load ratio spill valve and ratio spill valve released coal amount it is automatic before, thermal power plant's coal pulverizer hydraulic oil system System start-up and shut-down control method further include:
Judge whether that coal pulverizer is out of service;
If coal pulverizer is out of service, then judges whether that becoming load ratio spill valve and ratio spill valve has released coal amount certainly It is dynamic.
CN201710046185.3A 2017-01-22 2017-01-22 A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method Active CN106762875B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710046185.3A CN106762875B (en) 2017-01-22 2017-01-22 A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710046185.3A CN106762875B (en) 2017-01-22 2017-01-22 A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method

Publications (2)

Publication Number Publication Date
CN106762875A CN106762875A (en) 2017-05-31
CN106762875B true CN106762875B (en) 2018-11-27

Family

ID=58943718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710046185.3A Active CN106762875B (en) 2017-01-22 2017-01-22 A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method

Country Status (1)

Country Link
CN (1) CN106762875B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113713957B (en) * 2021-08-12 2022-11-29 杭州意能电力技术有限公司 Self-starting control method for pulverizing system of medium-speed roller type coal mill configured for thermal power generating unit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2875588Y (en) * 2006-02-22 2007-03-07 长春发电设备有限责任公司 Medium speed coal mill
CN203196691U (en) * 2013-02-16 2013-09-18 四川皇龙智能破碎技术股份有限公司 Roller type medium-speed mill
CN104863912A (en) * 2014-11-06 2015-08-26 山东泰安煤矿机械有限公司 Liquid control system for buddle jig
CN204755431U (en) * 2015-06-15 2015-11-11 南通市南方润滑液压设备有限公司 Refrigerated coal of brazing grinds immediately and becomes loading hydraulic system
CN205371114U (en) * 2016-02-02 2016-07-06 北京电力设备总厂有限公司 Coal pulverizer hydraulic loading system
CN206409448U (en) * 2017-01-22 2017-08-15 华北电力科学研究院有限责任公司 A kind of thermal power plant's coal pulverizer hydraulic oil system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62138902U (en) * 1986-02-24 1987-09-02

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2875588Y (en) * 2006-02-22 2007-03-07 长春发电设备有限责任公司 Medium speed coal mill
CN203196691U (en) * 2013-02-16 2013-09-18 四川皇龙智能破碎技术股份有限公司 Roller type medium-speed mill
CN104863912A (en) * 2014-11-06 2015-08-26 山东泰安煤矿机械有限公司 Liquid control system for buddle jig
CN204755431U (en) * 2015-06-15 2015-11-11 南通市南方润滑液压设备有限公司 Refrigerated coal of brazing grinds immediately and becomes loading hydraulic system
CN205371114U (en) * 2016-02-02 2016-07-06 北京电力设备总厂有限公司 Coal pulverizer hydraulic loading system
CN206409448U (en) * 2017-01-22 2017-08-15 华北电力科学研究院有限责任公司 A kind of thermal power plant's coal pulverizer hydraulic oil system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于贝叶斯网络的中速磨煤机液压系统可靠性分析;高新功;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20151231(第12期);第14-17页,图2-1和图2-2 *

Also Published As

Publication number Publication date
CN106762875A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN102252312B (en) Full-process automatic control system for supercritical unit water supply system
CN103791485B (en) Optimal control method of water supply system of thermal power generating unit
US20170159570A1 (en) Pressure regulating device for a gas supply system of a gas turbine plant
CN102734276B (en) Load sensing electric proportion hydraulic control system and engineering machinery
CN101483078B (en) Nuclear power plant, water level control method and system for steam generator
RU2647288C1 (en) Method for automatic control of technological process for supply of gas condensate into main condensate line
CN106762875B (en) A kind of thermal power plant's coal pulverizer hydraulic oil system and its start-up and shut-down control method
CN106871492B (en) A kind of group control system of earth source heat pump
CN102482867A (en) Control system for hybrid construction machinery
CN201723978U (en) Automatic water power balancing device for industrial circulating water pipe grid
CN104613460B (en) Pressure water supply system and start and stop method thereof in gas power station
CN103939362A (en) Systems And Methods For Providing Override Control For A Feedwater Pump Recirculation Valve
CN105807803B (en) Gas power station closed cooling water system and its start-up and shut-down control method
CN104832222B (en) Steam turbine generator unit jacking oil and barring system and start and stop control method thereof
CN110467145A (en) A kind of petroleum vapor recovery on-line monitoring system and monitoring method
CN106247739B (en) A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method
CN104634023A (en) Fluid flow control system and variable flow control method
CN206409448U (en) A kind of thermal power plant's coal pulverizer hydraulic oil system
CN105258106B (en) The shared load of feed pump subtracts system and method soon between a kind of different units unit
CN102864808A (en) Excavator intelligent control hydraulic system and control method thereof
CN104613462B (en) Gas power station high-pressure feed water system and start and stop method thereof
CN206514329U (en) A kind of power plant boiler fuel system
CN202787371U (en) Intelligent control hydraulic system of excavator
CN205822351U (en) A kind of novel non-negative pressure network pressure-superposition water supply equipment
CN207990591U (en) A kind of preposition pump control system of feed pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant