CN106247739B - A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method - Google Patents

A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method Download PDF

Info

Publication number
CN106247739B
CN106247739B CN201610862578.7A CN201610862578A CN106247739B CN 106247739 B CN106247739 B CN 106247739B CN 201610862578 A CN201610862578 A CN 201610862578A CN 106247739 B CN106247739 B CN 106247739B
Authority
CN
China
Prior art keywords
electrically operated
operated gate
pump
cooler
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610862578.7A
Other languages
Chinese (zh)
Other versions
CN106247739A (en
Inventor
任彦
何振宇
李朋
刘邦泉
梅隆
张德利
庞春凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610862578.7A priority Critical patent/CN106247739B/en
Publication of CN106247739A publication Critical patent/CN106247739A/en
Application granted granted Critical
Publication of CN106247739B publication Critical patent/CN106247739B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/02Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating liquids, e.g. brine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D29/00Arrangement or mounting of control or safety devices
    • F25D29/001Arrangement or mounting of control or safety devices for cryogenic fluid systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Sewage (AREA)
  • Control Of Non-Positive-Displacement Pumps (AREA)

Abstract

The present invention provides a kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control methods, the system includes: industrial pond, first industry cooling water pump, second industry cooling water pump, third industry cooling water pump, first solidifying pump cooler, second solidifying pump cooler, the solidifying pump cooler of third, seal oil vacuum pump cooler, air compressor chillers, first feed pump fore pump cooler, second feed pump fore pump cooler, first starting furnace feed pump cooler, second starting furnace feed pump cooler, boiler water circulating pump cooler, moisturizing electrically operated gate, moisturizing regulating valve, recycle regulating valve, water main pipe electrically operated gate, water main pipe is vented electrically operated gate and return water main pipe electrically operated gate.The present invention can realize the automatic starting of industrial cooling circulating water system under industrial cooling circulating water system full cut-off state;Under industrial cooling circulating water system operating status, being automatically stopped for industrial cooling circulating water system is realized;Artificial judgement is taken into account, realizes the leapfrog operation of the system program control logic.

Description

A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method
Technical field
The present invention relates to thermal power plant's industrial colling technology, especially with regard to a kind of thermal power plant's industrial cooling circulating water system and Its start-up and shut-down control method.
Background technique
The major function of thermal power plant's industrial cooling circulating water system is as the Important Auxiliary equipment of thermal power plant provides successive, high-quality Cooling water, take away the heat generated during subsidiary engine equipment operation, and the moisturizing as recirculated water tower basin, make up it is a part of because Recirculated water evaporates the water taken away.But the industrial cooling circulating water system of existing thermal power plant cannot achieve industry under full cut-off state The automatic starting of cooling water system;Also oneself of industrial cooling circulating water system can not be realized under industrial cooling circulating water system operating status It is dynamic to stop;Also, when industrial cooling circulating water system startup program is carried out to a certain step, if the step sequence condition is unsatisfactory for, it can not make Startup program continues.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control sides Method.
One aspect of the present invention provides a kind of thermal power plant's industrial cooling circulating water system, thermal power plant's industrial cooling circulating water system packet It includes: industrial pond, the first industry cooling water pump, the second industry cooling water pump, third industry cooling water pump, the first solidifying pump cooling Device, the second solidifying pump cooler, the solidifying pump cooler of third, sealing oil vacuum pump cooler, air compressor chillers, the first water supply Pump fore pump cooler, the second feed pump fore pump cooler, the first starting furnace feed pump cooler, the second starting furnace feed pump Cooler, moisturizing electrically operated gate, moisturizing regulating valve, recycling regulating valve, water main pipe electrically operated gate, supplies boiler water circulating pump cooler Jellyfish pipe is vented electrically operated gate and return water main pipe electrically operated gate;
The moisturizing electrically operated gate, moisturizing regulating valve are arranged in the moisturizing pipeline of the industrial pond, wherein the moisturizing Regulating valve is arranged on the pipeline between moisturizing electrically operated gate and industrial pond;
The first industry cooling water pump, the second industry cooling water pump and third industry cooling water pump are connected in parallel, and It is connect respectively by pipeline with the outlet at bottom of the industrial pond, in the first industry cooling water pump, the second industry cooling The both ends of water pump and third industry cooling water pump are respectively equipped with entrance electrically operated gate and outlet electrically operated gate;
Water main pipe electricity is disposed in industry cooling exit of pump main pipe to the pipeline between recirculated water return pipe Dynamic door, water main pipe are vented electrically operated gate, the solidifying pump cooler of first be connected in parallel, the second solidifying pump cooler, the solidifying pump cooling of third Device, sealing oil vacuum pump cooler, air compressor chillers, the first feed pump fore pump cooler, the second feed pump are preposition Pump cooler, the first starting furnace feed pump cooler, the second starting furnace feed pump cooler and boiler water circulating pump cooler, return water Main pipe electrically operated gate;Wherein, in the described first solidifying pump cooler, the second solidifying pump cooler, the solidifying pump cooler, Seal Oil vacuum of third Pump cooler, air compressor chillers, the first feed pump fore pump cooler, the second feed pump fore pump cooler, first Starting furnace feed pump cooler, second starting furnace feed pump cooler, boiler water circulating pump cooler both ends be respectively equipped with entrance Electrically operated gate and outlet electrically operated gate;
It is described recycling regulating valve be arranged in industry cooling exit of pump main pipe to the industrial pond upper opening it Between pipeline on.
In one embodiment, the water all the way in the industrial pond successively pass through the first industry cooling water pump and/or Second industry cooling water pump and/or third industry cooling water pump, water main pipe electrically operated gate enter the described first solidifying pump cooler, the Before two solidifying pump coolers, the solidifying pump cooler of third, sealing oil vacuum pump cooler, air compressor chillers, the first feed pump It is cooling to set pump cooler, the second feed pump fore pump cooler, the first starting furnace feed pump cooler, the second starting furnace feed pump Device and boiler water circulating pump cooler, the water flowed out from each cooler successively pass through the return water main pipe, return water main pipe electrically operated gate Into recirculated water return pipe.
In one embodiment, the water all the way in the industrial pond successively passes through the first industry cooling water pump and/or second Industry cooling water pump and/or third industry cooling water pump, recycling regulating valve return to the industrial pond.
In one embodiment, the water all the way in the industrial pond successively pass through the first industry cooling water pump and/or Second industry cooling water pump and/or third industry cooling water pump, water main pipe electrically operated gate are vented electrically operated gate from the water main pipe Discharge.
In one embodiment, thermal power plant's industrial cooling circulating water system further include: industrial cooling circulating water system process control is patrolled Collect operation button, industry cooling water pump block push button, manual confirmation system exhaust completing button and manual confirmation industrial colling System can be with stop button.
Another aspect of the present invention additionally provides a kind of thermal power plant's industrial cooling circulating water system start-up and shut-down control method, the thermal power plant Industrial cooling circulating water system start-up and shut-down control method includes:
Judge whether that moisturizing electrically operated gate has been opened, and moisturizing regulating valve has been thrown automatically, and the entrance of the first industry cooling water pump Electrically operated gate and outlet electrically operated gate, the entrance electrically operated gate of the second industry cooling water pump and outlet electrically operated gate, third industry cooling water pump Entrance electrically operated gate and outlet electrically operated gate opened, and it is the entrance electrically operated gate of the first solidifying pump cooler and outlet electrically operated gate, second solidifying The entrance electrically operated gate and outlet electrically operated gate of the entrance electrically operated gate and the solidifying pump cooler of outlet electrically operated gate, third that pump cooler have been opened, And it seals the entrance electrically operated gate of oil vacuum pump cooler and exports electrically operated gate and opened, and the entrance of air compressor chillers is electronic Door and outlet electrically operated gate have been opened, and the entrance electrically operated gate of the first feed pump fore pump cooler and outlet electrically operated gate, the second water supply The entrance electrically operated gate and outlet electrically operated gate for pumping fore pump cooler have been opened, and the entrance of the first starting furnace feed pump cooler is electronic Door and outlet electrically operated gate, the entrance electrically operated gate of the second starting furnace feed pump cooler and outlet electrically operated gate have been opened, and furnace water recycles The entrance electrically operated gate and outlet electrically operated gate for pumping cooler have been opened, and water main pipe electrically operated gate has been closed, and return water main pipe electrically operated gate is It opens, and recycles regulating valve and opened;If not, issuing the instruction for opening moisturizing electrically operated gate, and moisturizing regulating valve is thrown automatically Instruction, and open the entrance electrically operated gate of the first industry cooling water pump and the entrance electricity of outlet electrically operated gate, the second industry cooling water pump Dynamic door and the instruction for exporting electrically operated gate, the entrance electrically operated gate of third industry cooling water pump and outlet electrically operated gate, and unlatching first are solidifying Pump the entrance electrically operated gate of cooler and the entrance electrically operated gate and outlet electrically operated gate, third of outlet electrically operated gate, the second solidifying pump cooler The instruction of the entrance electrically operated gate and outlet electrically operated gate of solidifying pump cooler, and open the entrance electrically operated gate of sealing oil vacuum pump cooler And the instruction of outlet electrically operated gate, and open the entrance electrically operated gate of air compressor chillers and export the instruction of electrically operated gate, and open Open the entrance electrically operated gate of the first feed pump fore pump cooler and the entrance of outlet electrically operated gate, the second feed pump fore pump cooler Electrically operated gate and the instruction for exporting electrically operated gate, and open the entrance electrically operated gate of the first starting furnace feed pump cooler and export electronic The instruction of door, the entrance electrically operated gate of the second starting furnace feed pump cooler and outlet electrically operated gate, and open boiler water circulating pump cooling The entrance electrically operated gate of device and the instruction for exporting electrically operated gate, and the instruction of water main pipe electrically operated gate is closed, and open return water main pipe electricity The instruction of dynamic door, and open the instruction of recycling regulating valve;
If so, judging whether that the outlet electrically operated gate of the first industry cooling water pump has been closed;If first industry The outlet electrically operated gate of cooling water pump is not closed, is issued and is closed the first industry cooling exit of pump electrically operated gate instruction;
If the outlet electrically operated gate of the first industry cooling water pump has been closed, judge whether the first industry cooling water pump It has been turned on, and the outlet electrically operated gate of the first industry cooling water pump has been opened;If the first industry cooling water pump is inactive And/or first the outlet electrically operated gate of industry cooling water pump do not open, issue the instruction for starting the first industry cooling water pump, and open Open the instruction of the first industry cooling exit of pump electrically operated gate;
If the first industry cooling water pump has been turned on, and the outlet electrically operated gate of the first industry cooling water pump is It opens, judges whether the water main pipe electrically operated gate is in non-closed state;If the water main pipe electrically operated gate, which is in, closes shape State issues the instruction for opening one predetermined time of water main pipe electrically operated gate;
If the water main pipe electrically operated gate is in non-closed state, whether the water main pipe exhaust electrically operated gate is judged It opens;If the water main pipe exhaust electrically operated gate is not opened, the instruction for opening the water main pipe exhaust electrically operated gate is issued;
If water main pipe exhaust electrically operated gate has been opened, judge whether industrial cooling circulating water system is completed exhaust;
If exhaust is completed in the industrial cooling circulating water system, judge whether the water main pipe exhaust electrically operated gate has closed; If the water main pipe exhaust electrically operated gate is not closed, the instruction for closing the water main pipe exhaust electrically operated gate is issued;
If the water main pipe exhaust electrically operated gate has been closed, judge whether water main pipe electrically operated gate standard-sized sheet, and institute Recycling regulating valve is stated to have closed;If the non-standard-sized sheet of the water main pipe electrically operated gate and/or recycling regulating valve are not closed, issues and open The instruction of the water main pipe electrically operated gate, and close the instruction of the recycling regulating valve;
If water main pipe electrically operated gate standard-sized sheet, and the recycling regulating valve would be closed, and judges that industrial colling supplies Whether jellyfish pipe outlet pressure is greater than preset pressure value;
If the industrial colling water main pipe outlet pressure is greater than the preset pressure value, judge whether to have put into work The interlocking of industry cooling water pump;If not putting into the interlocking of industry cooling water pump, the instruction of investment industry cooling water pump interlocking is issued.
In one embodiment, thermal power plant's industrial cooling circulating water system start-up and shut-down control method further include:
Judge whether to have dropped out the interlocking of industry cooling water pump, if not exiting the interlocking of industry cooling water pump, work is exited in sending The instruction of industry cooling water pump interlocking;
If having dropped out the interlocking of industry cooling water pump, judge whether the first industry cooling water pump, the second industry cooling water pump And third industry cooling water pump is out of service;If the first industry cooling water pump is not out of service, and/or second is industrial Cooling water pump is not out of service, and/or third industry cooling water pump is not out of service, issues the first industrial colling out of service The instruction of pump, the second industry cooling water pump and third industry cooling water pump;
If the first industry cooling water pump, the second industry cooling water pump and third industry cooling water pump stop transporting Row, judges whether that moisturizing electrically operated gate has been closed, and moisturizing regulating valve has dropped out automatic gear;If the moisturizing electrically operated gate is not closed And/or moisturizing regulating valve does not exit automatic gear, issues the instruction for closing moisturizing electrically operated gate, and to exit moisturizing regulating valve automatic Instruction.
In one embodiment, thermal power plant's industrial cooling circulating water system start-up and shut-down control method further include:
Judge whether the water level in industrial pond is higher than preset water level;
If the water level in the industrial pond is higher than the preset water level, judge whether that moisturizing electrically operated gate has been opened, and mends Water regulating valve has been thrown automatically, and the entrance electrically operated gate of the first industry cooling water pump and outlet electrically operated gate, the second industry cooling water pump Entrance electrically operated gate and outlet electrically operated gate, the entrance electrically operated gate of third industry cooling water pump and outlet electrically operated gate opened, and first The entrance electrically operated gate and outlet electrically operated gate of solidifying pump cooler, the entrance electrically operated gate of the second solidifying pump cooler and outlet electrically operated gate, the The entrance electrically operated gate and outlet electrically operated gate of three solidifying pump coolers have been opened, and are sealed the entrance electrically operated gate of oil vacuum pump cooler and gone out Mouth electrically operated gate has been opened, and the entrance electrically operated gate of air compressor chillers and outlet electrically operated gate have been opened, and the first feed pump is preposition Entrance electrically operated gate and outlet electrically operated gate, the entrance electrically operated gate of the second feed pump fore pump cooler and the outlet for pumping cooler are electronic Door has been opened, and the entrance electrically operated gate of the first starting furnace feed pump cooler and outlet electrically operated gate, the second starting furnace feed pump are cooling The entrance electrically operated gate and outlet electrically operated gate of device have been opened, and the entrance electrically operated gate of boiler water circulating pump cooler and outlet electrically operated gate are It opens, and water main pipe electrically operated gate has been closed, and return water main pipe electrically operated gate has been opened, and recycles regulating valve and opened.
In one embodiment, thermal power plant's industrial cooling circulating water system start-up and shut-down control method further include:
Judge whether that manual confirmation can stop industrial cooling circulating water system;If manual confirmation can stop industrial colling System judges whether to have dropped out the interlocking of industry cooling water pump.
In one embodiment, it is 4m that the moisturizing regulating valve, which throws automatic setting value, and the predetermined time is 10s, described Preset pressure value is 0.2MPa.
In one embodiment, the preset water level is 3m.
The beneficial effect of the embodiment of the present invention is: thermal power plant's industrial cooling circulating water system provided in an embodiment of the present invention and its Start-up and shut-down control method can realize opening automatically for industrial cooling circulating water system under thermal power plant's industrial cooling circulating water system full cut-off state It is dynamic;Under thermal power plant's industrial cooling circulating water system operating status, being automatically stopped for industrial cooling circulating water system is realized;And it takes into account artificial The leapfrog operation of thermal power plant's industrial cooling circulating water system programed logic may be implemented, when a certain step of programed logic in judgement Service condition be to meet to lead to walk sequence when can not carry out, can artificially whether Rule of judgment can be ignored and to operate leapfrog dynamic Make, continues the operation of programed logic until starting finishes.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of thermal power plant of embodiment of the present invention industrial cooling circulating water system;
Fig. 2 is the flow diagram of thermal power plant of embodiment of the present invention industrial cooling circulating water system start-up and shut-down control method;
Fig. 3 is the flow diagram of thermal power plant of embodiment of the present invention industrial cooling circulating water system start-up and shut-down control method.
Drawing reference numeral
1. 2. first industry cooling exit of pump electrically operated gate of the first industry cooling pump entrance electrically operated gate
3. 4. second industry cooling exit of pump electrically operated gate of the second industry cooling pump entrance electrically operated gate
5. 6. third industry cooling exit of pump electrically operated gate of third industry cooling pump entrance electrically operated gate
7. 8. industrial colling of industrial colling water main pipe electrically operated gate recycles regulating valve
9. industrial colling water main pipe is vented 10. industrial colling moisturizing electrically operated gate of electrically operated gate
11. the solidifying pump cooler entrance electrically operated gate of industrial colling moisturizing regulating valve 12. first
13. the first solidifying solidifying pump cooler entrance electrically operated gate of pump cooler outlet electrically operated gate 14. second
15. the second solidifying solidifying pump cooler entrance electrically operated gate of pump 16. third of cooler outlet electrically operated gate
17. the solidifying pump cooler outlet electrically operated gate 18. of third seals oil vacuum pump cooler entrance electrically operated gate
19. sealing 20. air compressor chillers entrance electrically operated gate of oil vacuum pump cooler outlet electrically operated gate
21. it is electronic that air compressor chillers export 22. first feed pump fore pump cooler entrance of electrically operated gate Door
23. 24. second feed pump fore pump cooler entrance of the first feed pump fore pump cooler outlet electrically operated gate is electronic Door
25. it is electronic that the second feed pump fore pump cooler outlet electrically operated gate 26. first starts furnace feed pump cooler entrance Door
27. it is electronic that the first starting furnace feed pump cooler outlet electrically operated gate 28. second starts furnace feed pump cooler entrance Door
29. the second starting 30. boiler water circulating pump cooler entrance electrically operated gate of furnace feed pump cooler outlet electrically operated gate
31. the solidifying pump cooler of boiler water circulating pump cooler outlet electrically operated gate 32. first
33. the second solidifying solidifying pump cooler of pump 34. third of cooler
35. sealing 36. air compressor chillers of oil vacuum pump cooler
37. 38. second feed pump fore pump cooler of the first feed pump fore pump cooler
39. the first starting furnace feed pump cooler 40. second starts furnace feed pump cooler
41. 42. industrial colling return water main pipe electrically operated gate of boiler water circulating pump cooler
43. 44. second industry cooling water pump of the first industry cooling water pump
45. 46. industrial pond of third industry cooling water pump
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, this is the embodiment of the invention provides a kind of structural schematic diagram of thermal power plant's industrial cooling circulating water system System includes: industrial pond 46, the first industry cooling water pump 43, the second industry cooling water pump 44, third industry cooling water pump 45, One solidifying pump cooler 32, second is solidifying to pump the solidifying pump cooler 34 of cooler 33, third, sealing oil vacuum pump cooler 35, air pressure Contracting machine cooler 36, the first feed pump fore pump cooler 37, the second feed pump fore pump cooler 38, first start furnace water supply It pumps cooler 39, second and starts furnace feed pump cooler 40, boiler water circulating pump cooler 41, moisturizing electrically operated gate 10, moisturizing adjusting Valve 11, recycling regulating valve 8, water main pipe electrically operated gate 7, water main pipe exhaust electrically operated gate 9 and return water main pipe electrically operated gate 42.
Moisturizing electrically operated gate 10, moisturizing regulating valve 11 are arranged in the moisturizing pipeline of industrial pond 46, wherein moisturizing regulating valve 11 are arranged between moisturizing electrically operated gate and industrial pond.
First industry cooling water pump 43, the second industry cooling water pump 44 and third industry cooling water pump 45 are connected in parallel, and And it is connect respectively by pipeline with the outlet at bottom of industrial pond 46.The both ends of the first industry cooling water pump 43 be respectively equipped with into Mouth electrically operated gate 1 and outlet electrically operated gate 2 are similarly respectively equipped with 3 He of entrance electrically operated gate at the both ends of the second industry cooling water pump 44 Electrically operated gate 4 is exported, is respectively equipped with entrance electrically operated gate 5 and outlet electrically operated gate 6 at the both ends of third industry cooling water pump 45.
Water main pipe electricity is disposed in industry cooling exit of pump main pipe to the pipeline between recirculated water return pipe Dynamic door 7, water main pipe are vented electrically operated gate 9, and the solidifying pump cooler 33 of the solidifying pump cooler 32, second of first be connected in parallel, third are solidifying Pump cooler 34, sealing oil vacuum pump cooler 35, air compressor chillers 36, the first feed pump fore pump cooler 37, Second feed pump fore pump cooler 38, first start furnace feed pump cooler 39, second start furnace feed pump cooler 40 and Boiler water circulating pump cooler 41 and return water main pipe electrically operated gate 42.Wherein, in the first solidifying solidifying pump cooling of pump cooler 32, second The solidifying pump cooler 34 of device 33, third, sealing oil vacuum pump cooler 35, air compressor chillers 36, the first feed pump are preposition Pump cooler 37, the second feed pump fore pump cooler 38, first starting furnace feed pump cooler 39, second starts furnace feed pump Cooler 40, boiler water circulating pump cooler 41 both ends be respectively equipped with entrance electrically operated gate 12~30 (even-numbered within the scope of this) And outlet electrically operated gate 13~31 (odd numbered within the scope of this), as shown in Figure 1.
Industry cooling exit of pump main pipe is arranged in the pipe between the upper opening of industrial pond 46 in recycling regulating valve 8 On road.
As shown in Figure 1, being additionally provided with other necessary pipelines, valve in thermal power plant of embodiment of the present invention industrial cooling circulating water system Door and related thermal technology's measuring point etc..
The major function of thermal power plant's industry cooling water system provided in an embodiment of the present invention is mentioned to the Important Auxiliary equipment of thermal power plant For continuously, the cooling water of high-quality, take away the heat generated during subsidiary engine equipment operation, and as recirculated water tower basin Moisturizing, make up a part because recirculated water evaporates the water taken away.Water source of the industrial pond 46 as industrial cooling circulating water system, Processed water of the moisturizing from chemical potassium permanganate composites.Industry cooling water pump 43 (or industry cooling water pump 44, industry cooling water pump 45) industrial colling is boosted, supplies each subsidiary engine user as cooling water via water main pipe, the cooling water for carrying heat returns Water is back to recirculated water return water main pipe via return water main pipe, finally flows into recirculated water tower basin.Industry cooling in the embodiment of the present invention Cooler in water system specifically includes that 3 solidifying pump coolers, 1 sealing oil vacuum pump cooler, 1 air compressor are cold But device, 2 pre feedwater pump coolers, 2 starting furnace feed pump coolers and 1 boiler water circulating pump cooler.It is cold in industry But the initial start stage of water pump when not yet establishing system pressure, needs to close water main pipe electrically operated gate 7, walks recirculating line, The excessive motor supercurrent for causing industry cooling water pump of flow can be prevented in this way.Recirculating line is being walked just in industry cooling water pump Chang Hou, it is pico- to open water main pipe electrically operated gate 7, and water main pipe exhaust electrically operated gate 9 is opened, it fills the water and is vented to system, wait be vented Pipe flow out solid stream of water and there is no air discharge when, can standard-sized sheet water main pipe electrically operated gate 7, built to entire industrial cooling circulating water system Vertical pressure.The return water of industrial cooling circulating water system enters recirculated water return pipe, enters recirculated water tower basin as a part of moisturizing, belongs to Open-loop design.Therefore, it is necessary to constantly carry out moisturizing to industrial pond 46, water level in water pool is automatically adjusted by moisturizing tune valve.
In one embodiment, the water all the way in industrial pond 46 successively passes through the first industry cooling water pump 43 (or the second work Industry cooling water pump 44 or third industry cooling water pump 45), that water main pipe electrically operated gate 7 enters the first solidifying pump cooler 32, second is solidifying Pump the solidifying pump cooler 34 of cooler 33, third, sealing oil vacuum pump cooler 35, air compressor chillers 36, the first water supply Pump fore pump cooler 37, the second feed pump fore pump cooler 38, first starting furnace feed pump cooler 39, second starts furnace Feed pump cooler 40 and boiler water circulating pump cooler 41, the water flowed out from each cooler successively pass through return water main pipe, return water Main pipe electrically operated gate 42 enters recirculated water return pipe.First industry cooling water pump 43, the second industry cooling water pump 44 and third industry The usually interlocking of cooling water pump 45 uses, for example, if industry cooling water system can be guaranteed by only opening the first industry cooling water pump 43 System operates normally, then other two industry cooling water pump is then used as spare, in the first industry cooling 43 failure of water pump or is System power output comes into operation when increasing.
Water all the way in industrial pond 46 successively pass through the first industry cooling water pump 43 (or the second industry cooling water pump 44, Or third industry cooling water pump 45), recycling regulating valve 8 return to industrial pond 46.
In addition, the water all the way in industrial pond 46 successively passes through the first industry cooling water pump 43 (or the second industrial colling Pump 44 or third industry cooling water pump 45), water main pipe electrically operated gate 7, from water main pipe exhaust electrically operated gate 9 be discharged, by system In gas discharge.When carrying out water filling exhaust, keep starting current excessive to prevent from only starting an industrial colling, it can also be with Start two industry cooling water pumps simultaneously, or also can star all three industry cooling water pumps.
Above-mentioned thermal power plant's industrial cooling circulating water system further includes four buttons: industrial cooling circulating water system programed logic behaviour Make button A1, industry cooling water pump block push button A2, manual confirmation system exhaust completing button A3 and manual confirmation industry cooling Water system can be with stop button A4.
Using industry cooling water pump block push button A2 can by the first industry cooling water pump 43, the second industry cooling water pump 44 and The interlocking of third industry cooling water pump 45 is got up, this three industry cooling water pump mutual backup are made.For example, if only putting into operation Two industry cooling water pumps 44 can be such that system operates normally, and the first industry cooling water pump 43 is spare as first, third industry Cooling water pump 45 is spare as second.So when system is run, if cooling water needed for each cooler increases and only leans on the second work When industry cooling water pump 44 is unable to satisfy, the first industry cooling water pump 43 and third industry cooling water pump 45 are according to pre-set Logic is locked, the first industry cooling water pump 43 is first put into, if system operation can be met after the first industry cooling water pump 43 of investment It is required that then third industry cooling water pump 45 is not required to come into operation;If still can not after the first industry cooling water pump 43 of investment Meet system service requirement, then just needing to put into third industry cooling water pump 45.
The embodiment of the invention also provides a kind of start-up and shut-down control method of Cooling Water From Thermal Power Plants system, the start-up and shut-down control methods Executing subject can be the systems such as computer or DCS.As shown in Fig. 2, the start-up and shut-down control method includes:
3. and first step S101, judge whether that 1. moisturizing electrically operated gate 10 has been opened, 2. and moisturizing regulating valve 11 has been thrown automatically, The entrance electrically operated gate 1 of industry cooling water pump 43 and outlet electrically operated gate 2, the entrance electrically operated gate 3 of the second industry cooling water pump 44 and go out Mouth electrically operated gate 4, the entrance electrically operated gate 5 of third industry cooling water pump 45 and outlet electrically operated gate 6 have been opened, and 4. and first coagulates pump cooler 32 entrance electrically operated gate 12 and the solidifying entrance electrically operated gate 14 for pumping cooler 33 of outlet electrically operated gate 13, second and outlet electrically operated gate 15, The entrance electrically operated gate 16 and outlet electrically operated gate 17 of the solidifying pump cooler 34 of third have been opened, and 5. and seal entering for oil vacuum pump cooler 35 6. and the entrance electrically operated gate 20 of air compressor chillers 36 and outlet electrically operated gate mouthful electrically operated gate 18 and outlet electrically operated gate 19 have been opened, 21 have opened, 7. and before the entrance electrically operated gate 22 of the first feed pump fore pump cooler 37 and outlet electrically operated gate 23, the second feed pump The entrance electrically operated gate 24 and outlet electrically operated gate 25 for setting pump cooler 38 have been opened, and 8. and first starts entering for furnace feed pump cooler 39 Mouth electrically operated gate 26 and outlet electrically operated gate 27, second start the entrance electrically operated gate 28 and outlet electrically operated gate 29 of furnace feed pump cooler 40 It has been opened that, 9. and the entrance electrically operated gate 30 of boiler water circulating pump cooler 41 and outlet electrically operated gate 31 have been opened, and 10. and water main pipe is electronic Door 7 has closed,And return water main pipe electrically operated gate 42 has been opened,And recycling regulating valve 8 has been opened.If had in above-mentioned 12 conditions Any one condition is unsatisfactory for, or has multiple conditions to be unsatisfactory for, then carries out step S102, is issued and is opened moisturizing electrically operated gate 10 Instruction, and moisturizing regulating valve 11 is thrown into automatic instruction, and open the entrance electrically operated gate 1 and outlet of the first industry cooling water pump 43 The entrance of electrically operated gate 2, the entrance electrically operated gate 3 of the second industry cooling water pump 44 and outlet electrically operated gate 4, third industry cooling water pump 45 The instruction of electrically operated gate 5 and outlet electrically operated gate 6, and open the entrance electrically operated gate 12 and outlet electrically operated gate of the first solidifying pump cooler 32 13, the entrance electrically operated gate of the entrance electrically operated gate 14 of the second solidifying pump cooler 33 and the solidifying pump cooler 34 of outlet electrically operated gate 15, third 16 and outlet electrically operated gate 17 instruction, and open sealing oil vacuum pump cooler 35 entrance electrically operated gate 18 and outlet electrically operated gate 19 Instruction, and open air compressor chillers 36 entrance electrically operated gate 20 and export electrically operated gate 21 instruction, and open first The entrance electrically operated gate 22 of feed pump fore pump cooler 37 and outlet electrically operated gate 23, the second feed pump fore pump cooler 38 enter Mouthful electrically operated gate 24 and the instruction for exporting electrically operated gate 25, and open the first starting furnace feed pump cooler 39 entrance electrically operated gate 26 and It exports electrically operated gate 27, second to start the entrance electrically operated gate 28 of furnace feed pump cooler 40 and export the instruction of electrically operated gate 29, and opens It opens the entrance electrically operated gate 30 of boiler water circulating pump cooler 41 and exports the instruction of electrically operated gate 31, and close water main pipe electrically operated gate 7 Instruction, and open return water main pipe electrically operated gate 42 instruction, and open recycling regulating valve 8 instruction.If in step S101 What the electrically operated gate of the unlatching was originally opened, then it can ignore the open command received in step S102;If step What the electrically operated gate that should be closed in S101 was originally closed, then it can ignore the out code received in step S102, under Together.If above-mentioned 13 conditions all meet, step S103 is carried out.
In one embodiment, it is 4m that moisturizing regulating valve 11, which throws automatic setting value, i.e., when the water level in industrial pond 46 is lower than The moisturizing into pond when 4m.
Step S103, judge whether the outlet electrically operated gate 2 of the first industry cooling water pump 43 has closed.If the first industry cooling The outlet electrically operated gate 2 of water pump 43 is not closed, is issued and is closed the first industry cooling exit of pump electrically operated gate 2 instruction (step S104).Such as The outlet electrically operated gate 2 of the first industry cooling of fruit water pump 43 has been closed, and step S105 is carried out.
Step S105, judge whether that the first industry cooling water pump 43 has been turned on, and the outlet of the first industry cooling water pump 43 Electrically operated gate 2 has been opened.If the first industry cooling water pump 43 is inactive and/or the outlet electrically operated gate 2 of the first industry cooling water pump 43 It does not open, issues the instruction of the first industry cooling water pump 43 of starting, and open the instruction of the first industry cooling exit of pump electrically operated gate 2 (step S106).If the first industry cooling water pump 43 has been turned on, and the outlet electrically operated gate 2 of the first industry cooling water pump 43 is It opens, carries out step S107.
Step S107, judge whether water main pipe electrically operated gate 7 is in non-closed state, it is " non-closed state " described herein Refer to inwhole closed states.If water main pipe electrically operated gate 7 is in close state, issues and open water main pipe electrically operated gate 7 The instruction (step S108) of one predetermined time.If water main pipe electrically operated gate 7 is in non-closed state, step S109 is carried out.
Normally, the above-mentioned predetermined time is taken as 10s, can open water main pipe electrically operated gate 7, makes it at non-closing shape State.
Step S109, judge whether water main pipe exhaust electrically operated gate 9 has been opened.If water main pipe exhaust electrically operated gate 9 is not opened, Issue the instruction (step S110) for opening water main pipe exhaust electrically operated gate 9.If water main pipe exhaust electrically operated gate 9 has been opened, carry out Step S111.
Step S111, judge whether industrial cooling circulating water system is completed exhaust.If the industrial cooling circulating water system is completed Exhaust carries out step S112.
Step S112, judge whether water main pipe exhaust electrically operated gate 9 has closed.If water main pipe exhaust electrically operated gate 9 is not closed, Issue the instruction (step S113) for closing water main pipe exhaust electrically operated gate 9.If water main pipe exhaust electrically operated gate 9 has been closed, carry out Step S114.
Step S114, judge whether the standard-sized sheet of water main pipe electrically operated gate 7, and recycle regulating valve 8 and closed.If for jellyfish The non-standard-sized sheet of pipe electrically operated gate 7 and/or recycling regulating valve 8 are not closed, are issued the instruction for opening water main pipe electrically operated gate 7 and are closed and follow again The instruction (step S115) of ring regulating valve 8.If the standard-sized sheet of water main pipe electrically operated gate 7, and recycle regulating valve 8 and closed, it carries out Step S116.
Step S116, judge whether industrial colling water main pipe outlet pressure is greater than preset pressure value.If industry is cold But water water main pipe outlet pressure is greater than above-mentioned preset pressure value, carries out step S117.
In one embodiment, above-mentioned preset pressure value is 0.2MPa, when industrial colling water main pipe outlet pressure is big When 0.2MPa, that is, it can reach the pressure of industrial cooling circulating water system normal operation.
Step S117, judge whether to have put into the interlocking of industry cooling water pump.If not putting into the interlocking of industry cooling water pump, hair The instruction (step S118) of investment industry cooling water pump interlocking out.
Start-up and shut-down control method described in Fig. 2 is used to control the starting of thermal power plant's industrial cooling circulating water system, therefore shown in Fig. 2 opens Stop control method is properly termed as the starting step sequence of thermal power plant's industrial cooling circulating water system.
Step S103~step S106 purpose is starting industry cooling water pump, and cooling water is made to walk recirculating line.Step The purpose of rapid S107~step S113 is the aperture by controlling water main pipe electrically operated gate 7;To surpass when preventing cooling water pump from running Electric current, while filling the water and being vented to industrial cooling circulating water system.It is used in step S114~step S118 in verifying industry cooling water system After pressure of uniting is normal, the interlocking of industry cooling water pump is put into.
In one embodiment, the enabled condition of starting step sequence is: the water level in industrial pond 46 is higher than preset water level.Usually Ground, the preset water level are 3m.I.e. before carrying out step S101, need to prejudge whether the water level in industrial pond 46 is higher than When 3m, just allow to start when water level is higher than 3m.
The embodiment of the invention also provides a kind of start-up and shut-down control method of thermal power plant's industrial cooling circulating water system, the start-up and shut-down control The executing subject of method can be the systems such as computer or DCS.As shown in figure 3, the start-up and shut-down control method includes:
Step S201, judge whether to have dropped out the interlocking of industry cooling water pump.If not exiting the interlocking of industry cooling water pump, hair The instruction (step S202) of industry cooling water pump interlocking is exited out.If having dropped out the interlocking of industry cooling water pump, step is carried out S203。
Step S203, judge whether the first industry cooling water pump 43, the second industry cooling water pump 44 and third industry cooling Water pump 45 is out of service.If the first industry cooling water pump 43, the second industry cooling water pump 44 and third industry cooling water pump There is any one water pump not out of service in 45, or not out of service there are two water pump, very three water pumps are not out of service, Then issue the instruction of the first industry cooling water pump 43, the second industry cooling water pump 44 and third industry cooling water pump 45 out of service (step S204).If the first industry cooling water pump 43, the second industry cooling water pump 44 and third industry cooling water pump 45 stop It only runs, carries out step S205.
Step S205, judge whether that moisturizing electrically operated gate 10 has been closed and moisturizing regulating valve 11 has dropped out automatic gear.If mended Water electrically operated gate 10 is not closed and/or moisturizing regulating valve 11 does not exit automatic gear, issues the instruction for closing moisturizing electrically operated gate 10, and move back The automatically instruction (step S206) of moisturizing regulating valve 11 out.
Start-up and shut-down control method shown in Fig. 3 is used to control the stopping of industrial cooling circulating water system, therefore start-up and shut-down control shown in Fig. 3 Method can also become the stopping step of thermal power plant's industrial cooling circulating water system.
In one embodiment, stop the enabled condition of step sequence are as follows: manual confirmation can stop industrial cooling circulating water system.If Manual confirmation can stop industrial cooling circulating water system, then manual confirmation industrial cooling circulating water system can be with the shape of stop button A3 State is just to allow to stop when pressing.
Fig. 2 and start-up and shut-down control method shown in Fig. 3 are the program of thermal power plant's industrial cooling circulating water system in the embodiment of the present invention Control logic.Following functions may be implemented using the programed logic: under thermal power plant's industrial cooling circulating water system full cut-off state, Realize the automatic starting of industrial cooling circulating water system;Under thermal power plant's industrial cooling circulating water system operating status, industrial colling is realized System is automatically stopped;When the startup program of thermal power plant's industrial cooling circulating water system is run to a certain step, condition is unsatisfactory for, if people To judge that the condition can be ignored, then the operation that leapfrog movement continues startup program can be carried out manually, until industrial colling System starting finishes.
Each step of start-up and shut-down control method shown in Fig. 2 and Fig. 3, first judge feedback whether receive, if receiving after It is continuous to carry out in next step;If do not received, received etc. to be feedback.When not receiving due feedback signal, programed logic The step can be rested on, manual operation is waited.Power plant operations staff can find the current operation step unreceived feedback signal of sequence, people To judge whether unreceived feedback signal influences continuing to execute for program programed logic.If the feedback signal does not influence to work as Preceding programed logic continues, and operations staff can operate the execution that leapfrog movement continues programed logic;If should Feedback signal influences continuing for present procedure control logic, then operations staff can be unsatisfied according to each found Feedback signal targetedly goes investigation problem, until receiving the feedback signal, continues to execute programed logic.
It, can be in thermal power plant's industrial cooling circulating water system full cut-off state by start-up and shut-down control method shown in Fig. 2 and Fig. 3 Under, realize the automatic starting of industrial cooling circulating water system;Under thermal power plant's industrial cooling circulating water system operating status, industry cooling is realized Water system is automatically stopped.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Specific embodiment is applied in the present invention, and principle and implementation of the present invention are described, above embodiments Explanation be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, According to the thought of the present invention, there will be changes in the specific implementation manner and application range, in conclusion in this specification Appearance should not be construed as limiting the invention.

Claims (11)

1. a kind of thermal power plant's industrial cooling circulating water system, which is characterized in that thermal power plant's industrial cooling circulating water system includes: industry water Pond, the first industry cooling water pump, the second industry cooling water pump, third industry cooling water pump, the first solidifying pump cooler, the second solidifying pump The solidifying pump cooler of cooler, third, sealing oil vacuum pump cooler, air compressor chillers, the first feed pump fore pump are cold But device, the second feed pump fore pump cooler, the first starting furnace feed pump cooler, the second starting furnace feed pump cooler, furnace Water-circulating pump cooler, moisturizing electrically operated gate, moisturizing regulating valve, recycling regulating valve, water main pipe electrically operated gate, water main pipe exhaust Electrically operated gate and return water main pipe electrically operated gate;
The moisturizing electrically operated gate, moisturizing regulating valve are arranged in the moisturizing pipeline of the industrial pond, wherein the moisturizing is adjusted Valve is arranged on the pipeline between moisturizing electrically operated gate and industrial pond;
The first industry cooling water pump, the second industry cooling water pump and third industry cooling water pump are connected in parallel, and respectively It is connect by pipeline with the outlet at bottom of the industrial pond, in the first industry cooling water pump, the second industry cooling water pump And the both ends of third industry cooling water pump are respectively equipped with entrance electrically operated gate and outlet electrically operated gate;
Water main pipe electrically operated gate is disposed in industry cooling exit of pump main pipe to the pipeline between recirculated water return pipe, Water main pipe is vented electrically operated gate, the solidifying pump cooler of first be connected in parallel, the second solidifying pump cooler, the solidifying pump cooler of third, close Oil sealing vacuum pump cooler, air compressor chillers, the first feed pump fore pump cooler, the second feed pump fore pump are cooling Device, the first starting furnace feed pump cooler, the second starting furnace feed pump cooler and boiler water circulating pump cooler, return water main pipe electricity Dynamic door;Wherein, cooling in the described first solidifying pump cooler, the second solidifying pump cooler, the solidifying pump cooler of third, sealing oil vacuum pump Device, air compressor chillers, the first feed pump fore pump cooler, the second feed pump fore pump cooler, the first starting furnace Feed pump cooler, second starting furnace feed pump cooler, boiler water circulating pump cooler both ends be respectively equipped with entrance electrically operated gate And outlet electrically operated gate;
Industry cooling exit of pump main pipe is arranged between the upper opening of the industrial pond in the recycling regulating valve On pipeline;
Thermal technology's measuring point is additionally provided in thermal power plant's industrial cooling circulating water system.
2. thermal power plant's industrial cooling circulating water system according to claim 1, which is characterized in that in the industrial pond all the way Water is successively by the first industry cooling water pump and/or the second industry cooling water pump and/or third industry cooling water pump, water supply It is cold that main pipe electrically operated gate enters the described first solidifying pump cooler, the second solidifying pump cooler, the solidifying pump cooler of third, sealing oil vacuum pump But device, air compressor chillers, the first feed pump fore pump cooler, the second feed pump fore pump cooler, the first starting Furnace feed pump cooler, the second starting furnace feed pump cooler and boiler water circulating pump cooler, the water flowed out from each cooler Successively enter recirculated water return pipe by the return water main pipe, return water main pipe electrically operated gate.
3. thermal power plant's industrial cooling circulating water system according to claim 2, which is characterized in that in the industrial pond all the way Water successively passes through the first industry cooling water pump and/or the second industry cooling water pump and/or third industry cooling water pump, recycling are adjusted Section valve returns to the industrial pond.
4. thermal power plant's industrial cooling circulating water system according to claim 3, which is characterized in that in the industrial pond all the way Water is successively by the first industry cooling water pump and/or the second industry cooling water pump and/or third industry cooling water pump, water supply Main pipe electrically operated gate, from water main pipe exhaust electrically operated gate discharge.
5. thermal power plant's industrial cooling circulating water system according to claim 1, which is characterized in that thermal power plant's industrial colling System further include: industrial cooling circulating water system programed logic operation button, industry cooling water pump block push button, manual confirmation system System exhaust completing button and manual confirmation industrial cooling circulating water system can be with stop buttons.
6. a kind of thermal power plant's industrial cooling circulating water system start-up and shut-down control method, applied to described in any one of claim 1-5 Thermal power plant's industrial cooling circulating water system, which is characterized in that thermal power plant's industrial cooling circulating water system start-up and shut-down control method includes:
Judge whether that moisturizing electrically operated gate has been opened, and moisturizing regulating valve has been thrown automatically, and the entrance of the first industry cooling water pump is electronic Door and outlet electrically operated gate, the entrance electrically operated gate of the second industry cooling water pump and outlet electrically operated gate, third industry cooling water pump enter Mouth electrically operated gate and outlet electrically operated gate have been opened, and the entrance electrically operated gate of the first solidifying pump cooler and outlet electrically operated gate, the second solidifying pump are cold But the entrance electrically operated gate and outlet electrically operated gate of the entrance electrically operated gate of device and the solidifying pump cooler of outlet electrically operated gate, third have been opened, and close The entrance electrically operated gate of oil sealing vacuum pump cooler and outlet electrically operated gate have been opened, and the entrance electrically operated gate of air compressor chillers and Outlet electrically operated gate has been opened, and before the entrance electrically operated gate of the first feed pump fore pump cooler and outlet electrically operated gate, the second feed pump Set pump cooler entrance electrically operated gate and outlet electrically operated gate opened, and first starting furnace feed pump cooler entrance electrically operated gate and Outlet electrically operated gate, the entrance electrically operated gate of the second starting furnace feed pump cooler and outlet electrically operated gate have been opened, and boiler water circulating pump is cold But the entrance electrically operated gate of device and outlet electrically operated gate have been opened, and water main pipe electrically operated gate has been closed, and return water main pipe electrically operated gate has been opened, and Recycling regulating valve has been opened;If not, issuing the instruction for opening moisturizing electrically operated gate, and moisturizing regulating valve is thrown into automatically instruction, And open the first industry cooling water pump entrance electrically operated gate and outlet electrically operated gate, the entrance electrically operated gate of the second industry cooling water pump and Electrically operated gate, the entrance electrically operated gate of third industry cooling water pump and the instruction for exporting electrically operated gate are exported, and opens the first solidifying pump cooling The entrance electrically operated gate and outlet electrically operated gate of device, the entrance electrically operated gate of the second solidifying pump cooler and the solidifying pump of outlet electrically operated gate, third are cold But the instruction of the entrance electrically operated gate of device and outlet electrically operated gate, and open the entrance electrically operated gate and outlet of sealing oil vacuum pump cooler The instruction of electrically operated gate, and open the entrance electrically operated gate of air compressor chillers and export the instruction of electrically operated gate, and open first The entrance electrically operated gate and outlet electrically operated gate, the entrance electrically operated gate of the second feed pump fore pump cooler of feed pump fore pump cooler And the instruction of outlet electrically operated gate, and open the entrance electrically operated gate and outlet electrically operated gate, second of the first starting furnace feed pump cooler Start the entrance electrically operated gate of furnace feed pump cooler and export the instruction of electrically operated gate, and opens the entrance of boiler water circulating pump cooler Electrically operated gate and the instruction for exporting electrically operated gate, and the instruction of water main pipe electrically operated gate is closed, and open the finger of return water main pipe electrically operated gate It enables, and opens the instruction of recycling regulating valve;
If so, judging whether that the outlet electrically operated gate of the first industry cooling water pump has been closed;If first industry cooling The outlet electrically operated gate of water pump is not closed, is issued and is closed the first industry cooling exit of pump electrically operated gate instruction;
If the outlet electrically operated gate of the first industry cooling water pump has been closed, judge whether that the first industry cooling water pump has opened It is dynamic, and the outlet electrically operated gate of the first industry cooling water pump has been opened;If the first industry cooling water pump it is inactive and/or The outlet electrically operated gate of first industry cooling water pump is not opened, issues the instruction for starting the first industry cooling water pump, and open institute State the instruction of the first industry cooling exit of pump electrically operated gate;
If the first industry cooling water pump has been turned on, and the outlet electrically operated gate of the first industry cooling water pump has been opened, and is sentenced Whether the water main pipe electrically operated gate of breaking is in non-closed state;If the water main pipe electrically operated gate is in close state, hair The instruction of one predetermined time of water main pipe electrically operated gate is opened out;
If the water main pipe electrically operated gate is in non-closed state, judge whether the water main pipe exhaust electrically operated gate has been opened; If the water main pipe exhaust electrically operated gate is not opened, the instruction for opening the water main pipe exhaust electrically operated gate is issued;
If water main pipe exhaust electrically operated gate has been opened, judge whether industrial cooling circulating water system is completed exhaust;
If exhaust is completed in the industrial cooling circulating water system, judge whether the water main pipe exhaust electrically operated gate has closed;If The water main pipe exhaust electrically operated gate is not closed, and the instruction for closing the water main pipe exhaust electrically operated gate is issued;
If water main pipe exhaust electrically operated gate has been closed, judge whether water main pipe electrically operated gate standard-sized sheet, and it is described again Circulating regulation valve has closed;If the non-standard-sized sheet of the water main pipe electrically operated gate and/or recycling regulating valve are not closed, issue described in opening The instruction of water main pipe electrically operated gate, and close the instruction of the recycling regulating valve;
If water main pipe electrically operated gate standard-sized sheet, and the recycling regulating valve would be closed, and judges industrial colling for jellyfish Whether pipe outlet pressure is greater than preset pressure value;
If the industrial colling water main pipe outlet pressure is greater than the preset pressure value, judge whether to have put into industrial cold But water pump interlocks;If not putting into the interlocking of industry cooling water pump, the instruction of investment industry cooling water pump interlocking is issued.
7. thermal power plant's industrial cooling circulating water system start-up and shut-down control method according to claim 6, which is characterized in that the thermoelectricity Factory's industrial cooling circulating water system start-up and shut-down control method further include:
Judge whether to have dropped out the interlocking of industry cooling water pump, if not exiting the interlocking of industry cooling water pump, it is cold that industry is exited in sending But the instruction of water pump interlocking;
If having dropped out the interlocking of industry cooling water pump, judge whether the first industry cooling water pump, the second industry cooling water pump and the Three industry cooling water pumps are out of service;If the first industry cooling water pump is not out of service, and/or the second industry cooling Water pump is not out of service, and/or third industry cooling water pump is not out of service, sending the first industry cooling water pump out of service, The instruction of second industry cooling water pump and third industry cooling water pump;
If the first industry cooling water pump, the second industry cooling water pump and third industry cooling water pump are out of service, sentence Disconnected whether moisturizing electrically operated gate has been closed, and moisturizing regulating valve has dropped out automatic gear;If the moisturizing electrically operated gate is not closed and/or is mended Water regulating valve does not exit automatic gear, issues the instruction for closing moisturizing electrically operated gate, and exit moisturizing regulating valve and automatically instruct.
8. thermal power plant's industrial cooling circulating water system start-up and shut-down control method according to claim 6, which is characterized in that the thermoelectricity Factory's industrial cooling circulating water system start-up and shut-down control method further include:
Judge whether the water level in industrial pond is higher than preset water level;
If the water level in the industrial pond is higher than the preset water level, judge whether that moisturizing electrically operated gate has been opened, and moisturizing tune Section valve has been thrown automatically, and the entrance electrically operated gate of the first industry cooling water pump and export electrically operated gate, the second industry cooling water pump enters Mouthful electrically operated gate and outlet electrically operated gate, the entrance electrically operated gate of third industry cooling water pump and outlet electrically operated gate have been opened, and the first solidifying pump The entrance electrically operated gate and outlet electrically operated gate of cooler, the entrance electrically operated gate of the second solidifying pump cooler and outlet electrically operated gate, third are solidifying The entrance electrically operated gate and outlet electrically operated gate for pumping cooler have been opened, and seal the entrance electrically operated gate and outlet electricity of oil vacuum pump cooler Dynamic door has been opened, and the entrance electrically operated gate of air compressor chillers and outlet electrically operated gate have been opened, and the first feed pump fore pump is cold But the entrance electrically operated gate of device and outlet electrically operated gate, the entrance electrically operated gate of the second feed pump fore pump cooler and outlet electrically operated gate It opens, and the entrance electrically operated gate of the first starting furnace feed pump cooler and outlet electrically operated gate, the second starting furnace feed pump cooler Entrance electrically operated gate and outlet electrically operated gate have been opened, and the entrance electrically operated gate of boiler water circulating pump cooler and outlet electrically operated gate have been opened, and Water main pipe electrically operated gate has been closed, and return water main pipe electrically operated gate has been opened, and is recycled regulating valve and opened.
9. thermal power plant's industrial cooling circulating water system start-up and shut-down control method according to claim 7, which is characterized in that the thermoelectricity Factory's industrial cooling circulating water system start-up and shut-down control method further include:
Judge whether that manual confirmation can stop industrial cooling circulating water system;If manual confirmation can stop industry cooling water system System judges whether to have dropped out the interlocking of industry cooling water pump.
10. thermal power plant's industrial cooling circulating water system start-up and shut-down control method according to claim 6, which is characterized in that the benefit It is 4m that water regulating valve, which throws automatic setting value, and the predetermined time is 10s, and the preset pressure value is 0.2MPa.
11. thermal power plant's industrial cooling circulating water system start-up and shut-down control method according to claim 8, which is characterized in that described pre- If water level is 3m.
CN201610862578.7A 2016-09-28 2016-09-28 A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method Active CN106247739B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610862578.7A CN106247739B (en) 2016-09-28 2016-09-28 A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610862578.7A CN106247739B (en) 2016-09-28 2016-09-28 A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method

Publications (2)

Publication Number Publication Date
CN106247739A CN106247739A (en) 2016-12-21
CN106247739B true CN106247739B (en) 2019-01-29

Family

ID=57611026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610862578.7A Active CN106247739B (en) 2016-09-28 2016-09-28 A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method

Country Status (1)

Country Link
CN (1) CN106247739B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107120886B (en) * 2017-05-18 2022-09-09 华电电力科学研究院有限公司 Automatic cooling system for thermal power plant and use method thereof
CN113280555A (en) * 2021-04-13 2021-08-20 华电电力科学研究院有限公司 Cooling water system of thermal power plant and cooling water adjusting method
CN113483272A (en) * 2021-07-10 2021-10-08 湖南华菱湘钢节能发电有限公司 Generator and fan combined circulating water system
CN113944616B (en) * 2021-09-29 2023-08-08 华能巢湖发电有限责任公司 Control method of water supply pump of thermal power plant

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201071782Y (en) * 2007-03-30 2008-06-11 银虹科技(深圳)有限公司 Complementary energy recovery utilization device used for industrial cycle water
CN203552714U (en) * 2013-11-22 2014-04-16 中广核工程有限公司 Nuclear power plant device cooling water system
CN105134307A (en) * 2015-09-21 2015-12-09 山东电力建设第一工程公司 Water cooling system for thermal power plant
CN105806012A (en) * 2014-12-31 2016-07-27 国家电网公司 Circulating cooling water system for gas-fired thermal power plant and start and stop control method of circulating cooling water system
CN105807803A (en) * 2014-12-31 2016-07-27 国家电网公司 Closed-type cooling system for fuel gas thermal power plant, and starting/stopping control method for closed-type cooling system
CN206094720U (en) * 2016-09-28 2017-04-12 华北电力科学研究院有限责任公司 Industrial cooling water system of thermal power plant

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014092079A (en) * 2012-11-05 2014-05-19 Chugoku Electric Power Co Inc:The Cooling water supplying system in stopped power generation unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201071782Y (en) * 2007-03-30 2008-06-11 银虹科技(深圳)有限公司 Complementary energy recovery utilization device used for industrial cycle water
CN203552714U (en) * 2013-11-22 2014-04-16 中广核工程有限公司 Nuclear power plant device cooling water system
CN105806012A (en) * 2014-12-31 2016-07-27 国家电网公司 Circulating cooling water system for gas-fired thermal power plant and start and stop control method of circulating cooling water system
CN105807803A (en) * 2014-12-31 2016-07-27 国家电网公司 Closed-type cooling system for fuel gas thermal power plant, and starting/stopping control method for closed-type cooling system
CN105134307A (en) * 2015-09-21 2015-12-09 山东电力建设第一工程公司 Water cooling system for thermal power plant
CN206094720U (en) * 2016-09-28 2017-04-12 华北电力科学研究院有限责任公司 Industrial cooling water system of thermal power plant

Also Published As

Publication number Publication date
CN106247739A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN106247739B (en) A kind of thermal power plant's industrial cooling circulating water system and its start-up and shut-down control method
CN106705490B (en) The control method and device and heat pump unit water system of heat pump unit water system
CN104317281B (en) Energy-saving and water-saving device for distributed control over industrial circulating water and control method thereof
CN106246247B (en) A kind of thermal power plant's Turbo-generator Set lubricating oil system and its start-up and shut-down control method
CN106979584A (en) Computer room team control intelligent control method in central air-conditioning monitoring system
CN106704212A (en) Undisturbed switching control method for standby pump of electrically-driven feed pumps
CN104791022B (en) Gas power station axle envelope and vacuum system and on off control method thereof
CN104632600A (en) Control method for minimum flow recirculation valve of water feed pump
CN105807803B (en) Gas power station closed cooling water system and its start-up and shut-down control method
CN105806012B (en) Gas power station recirculating cooling water system and its start-up and shut-down control method
CN106253581B (en) Thermal power plant's Generator Stator Cooling water system and its start-up and shut-down control method
CN205841771U (en) Thermal power plant's electromotor double-flow se al oil
CN106168372B (en) A kind of thermal power plant's electrically driven feed pump system and its start-up and shut-down control method
CN106237684B (en) A kind of thermal power plant's high pressure fireresistant oil system and its start-up and shut-down control method
CN206094720U (en) Industrial cooling water system of thermal power plant
CN205842177U (en) Thermal power plant's electromotor single-flow seal oil
CN106051169B (en) Thermal power plant's generator double-flow se al oil and its start-up and shut-down control method
CN106088214B (en) A kind of enlargement method of power plant cycle water system
CN106015898B (en) Thermal power plant's generator single-flow seal oil and its start-up and shut-down control method
CN204478003U (en) Gas power station two drags a unit steam vapour system
CN206514329U (en) A kind of power plant boiler fuel system
CN206545946U (en) A kind of thermal power plant's primary air system
CN204492900U (en) Gas power station shaft seal and vacuum system
CN107269500B (en) Deep cooling pumping system and its start-up and shut-down control method
CN104613464A (en) Gas thermal power plant one-dragging-one set condensate system and start and stop method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant