CN106760890A - Pedestal and the integrated anti-theft base station using the pedestal - Google Patents
Pedestal and the integrated anti-theft base station using the pedestal Download PDFInfo
- Publication number
- CN106760890A CN106760890A CN201710111194.6A CN201710111194A CN106760890A CN 106760890 A CN106760890 A CN 106760890A CN 201710111194 A CN201710111194 A CN 201710111194A CN 106760890 A CN106760890 A CN 106760890A
- Authority
- CN
- China
- Prior art keywords
- pedestal
- chassis body
- base station
- support post
- steel tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2238—Sockets or holders for poles or posts to be placed on the ground
- E04H12/2246—Sockets or holders for poles or posts to be placed on the ground filled with water, sand or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
The present invention relates to technical field of communication equipment, more particularly to pedestal and using the pedestal integrated anti-theft base station, the pedestal includes chassis body and at least one support post for being detachably connected with base station iron tower, the support post runs through the chassis body, bottom is in contact with chassis body bottom surface, top separates with the chassis body top surface, the cavity for filling filler is provided with the chassis body, described filler is the soil of compacting, using soil as filler, the filling concrete of dell need not down be dug and prepare pedestal, concrete etc. need not be carried and prepare material, reduce the lower operation for digging dell during pedestal is built, reduce manpower and materials and the consuming of time, operation is simpler, gather materials on the spot, reduce resource cost, the scope of application is wider.
Description
Technical field
The present invention relates to technical field of communication equipment, more particularly to pedestal and the integrated anti-theft base station using the pedestal.
Background technology
In recent years, developing rapidly with telecommunications, the quantity of communication base station is sharply increased, and communication base station is typically by dividing
The computer room two parts for opening up support meanss and the place apparatus of the installation antenna put are constituted, support meanss can be steel tower or other
Supporting construction, steel tower mainly has the steel tower of circumferentially closed shaft-like pipe tower and frame structure, in order to ensure the normal work of steel tower,
Need to set steel tower on a horizontal ground, so these steel towers are when setting up, typically foundation ditch can be dug in subsurface, in foundation ditch
Middle setting reinforcing bar, the keeper such as foundation bolt, and cement injection mortar, after forming armored concrete after natural curing certain hour
Pedestal, using base supports steel tower.
But, due to said base when setting, it is necessary to more reinforcing bar, concrete and water for modulating concrete
Deng other materials, causing the setting of pedestal needs the more manpower and materials of consuming and time carry out the carrying of material, prepare and base
The lower digging in hole, meanwhile, according to the characteristic of base station, common base station iron tower is generally required and is arranged on mountain top or hillside higher,
Traffic is very inconvenient, causes the carrying of material very inconvenient, and massif structure has more hard stone, is made to foundation ditch is deep-cut
Into more difficulty, it is unfavorable for the build of base station.
In sum, need badly at present and want a kind of technical scheme, the pedestal for solving existing base station iron tower builds cumbersome, needs
More manpower and materials and the time is expended, and deep-cuts the more difficult technical problem of foundation ditch.
The content of the invention
It is an object of the invention to:Pedestal for existing base station iron tower builds cumbersome, it is necessary to expend more people
Power material resources and time, and deep-cut the more difficult technical problem of foundation ditch, there is provided it is a kind of to deep-cut the less base of foundation ditch, consumptive material
Seat and the integrated anti-theft base station using the pedestal.
To achieve these goals, the technical scheme that the application is used for:
Pedestal, including chassis body and at least one support post for being detachably connected with base station iron tower, the support are stood
Post runs through the chassis body, and bottom is in contact with chassis body bottom surface, and top separates with the chassis body top surface, the frame
It is provided with frame body and filler is filled with cavity, the cavity.
Pedestal of the invention, by using the chassis body of frame structure as the agent structure of the pedestal of base station iron tower,
Structure is simpler, it is not necessary to which the lower filling concrete of dell that digs prepares pedestal, it is only necessary in the chassis body it is filling be computed after
Deng quality materialses, chassis body can be loaded using different types of filler, you can lead to support post according to on-site actual situations
Cross the filler being filled in chassis body to be fixed, the chassis body for being filled with filler is used as pedestal, reduce base
Seat lower operation for digging dell during building, reduces manpower and materials and the consuming of time, simultaneously as between pedestal and ground not
Needs are attached fixation so that can be according to the position of actual conditions mobile foundation adapting to support post and base station iron on pedestal
The link position of tower, and change the position of base station iron tower in use, using more convenient, the scope of application is wider.
Preferably, described filler is the soil of compacting.Using the soil of compacting as filler so that need not carry mixed
Solidifying soil etc. prepares material, it is not necessary to carry out concrete curing, it is only necessary to which scene is adopted material and carries out compacting of the soil in chassis body,
Operation is relatively simple, gathers materials on the spot, it is not necessary to carries out canned in chassis body using armored concrete and conserves, farthest
The a dead lift expense and material preparation expense that pedestal needs of building are reduced, resource cost is reduced, base station is reduced and is set up process consuming
Manpower and materials and the time.
Preferably, the chassis body includes some connection sections, mutually removably connect between the connection sections
Connect.The chassis body being made up of connection sections, can carry out Assembling connection, prepare more convenient, and carry more convenient, reduce
The consuming of manpower and materials and time during transport of materials, being highly suitable for the road inconvenient area such as mountain area carries out base station iron
Use when tower is set up.
Preferably, at least one connection sections is hollow pipe, the through hole in the hollow pipe runs through the framework
Main body, the support post runs through the hollow pipe.Using hollow pipe as the mechanism of limitation support post position, make to fill out
During material compacting, because the position of hollow pipe is fixed so that the position through the support post of hollow pipe is fixed, that is, ram
The pressure of real soil does not interfere with the position of support post, makes support post position stabilization, convenient to be connected with base station iron tower.
Preferably, chassis body side wall is provided with the baffle plate for stopping soil spilling, the baffle plate and framework
Main body is removably connected.The setting of baffle plate, soil is blocked in the cavity of chassis body, it is ensured that in chassis body cavity
Soil is compacted closely so that pedestal weight is met use requirement in the case where base size is reduced, can support larger chi
Very little base station iron tower, simultaneously as baffle plate is removably connected with chassis body, can remove baffle plate after the completion of pedestal preparation,
Recycling, further reduces the material that pedestal expends in itself, economizes on resources, and reduces pedestal and prepares and takes.
Preferably, be provided with some reinforcing plates in the cavity, the reinforcing plate perpendicular to chassis body bottom surface, by institute
State cavity and be divided into some accommodating chambers, filler is filled with each described accommodating chamber.By reinforcing plate by chassis body
Cavity be divided into some accommodating chambers, not only make to be filled with the chassis body overall structure stabilization of filler, be not likely to produce and topple over, protect
The stabilization of card pedestal, and then ensure the stabilization of base station iron tower, simultaneously as the setting of reinforcing plate, makes pedestal overall weight increase weight,
Pedestal is further set to place stabilization, it is ensured that the stabilization of base station iron tower.
Preferably, described strengthen top surface of the plate top surface less than chassis body, bottom surface is coplanar with the bottom surface of chassis body.Will
Reinforcing plate is highly set below the structure of chassis body top surface, makes pedestal near the weight of the side on ground than base top surface one
Side is big, further makes base construction stabilization, is difficult to topple over, meanwhile, reinforcing plate can highly be set relatively low according to actual conditions,
Make to form the base for gentle support pedestal in base bottom, further make base construction stabilization, be difficult to topple, it is ensured that pedestal
Monolithic stability.
Preferably, the chassis body bottom is provided with base plate, the base plate removably connects with the chassis body
Connect.Being arranged on the base plate of chassis body bottom makes base bottom surface more smooth, even if pedestal is placed on relatively soft soil, pedestal
Also can place steady, be easier to tamp filler, facilitate the build of pedestal.
Preferably, the support post runs through the base plate, the support post bottom is connected with limited block, the limit
Position block is arranged on the bottom base plate, is removably connected with the base plate.The limited block of support post bottom and base plate are connected
Connect, support post is set relatively steady, support post is limited in framework by the setting with chassis body stable connection, and limited block
In main body, when filling tamped is carried out, support post can be fixed using the gravity of pedestal easier, it is to avoid used
The position of support post changes or is disconnected with chassis body in journey, further makes pedestal overall structure stabilization, with base station iron
The support post position stabilization of tower connection, convenient support base station iron tower.
Integrated anti-theft base station, including at least one pedestal as described above and the steel tower master being arranged on the pedestal
Body, is provided with computer room in the steel tower main body, the steel tower main body is removably connected with the support post on the pedestal, institute
The bottom surface and the top surface of the pedestal for stating computer room separate.
Integrated anti-theft base station of the invention, by way of being connected with steel tower main body using computer room, forms integrated form knot
Structure, structure is more succinct, using the weight of the computer room being arranged in steel tower main body, makes base station bottom weight gain, it is ensured that steel tower master
The Stability Analysis of Structures of body, is difficult to be affected by the external environment and topple, it is ensured that the normal operation of base station, meanwhile, using as described above
Pedestal, makes that foundation ditch need not be deep-cut, and reduction is deep-cut the operation of foundation ditch, sets up integrated anti-theft base station of the invention and be easier to,
Consumptive material is less, it is not necessary to the construction material such as concrete, it is adaptable to set up base station in areas such as the bad hillside mountain areas of road conditions condition,
Set up process and expend less manpower and materials and the time, it is applied widely, economize on resources, meanwhile, it is simultaneously right by pedestal and computer room
Steel tower main body carries out counterweight, farthest ensures the stable operation of base station.
Preferably, be provided with least one connecting rod between the pedestal and steel tower main body, described connecting rod one end with
Steel tower main body is removably connected, and the other end is removably connected with the chassis body top surface.Further added using connecting rod
Connection between strong basis seat and steel tower main body, makes base station overall structure more stable, is difficult to topple, and is further ensured that the entirety of base station
Stable operation.
Preferably, being provided with 30 ° of angle M, M > between the connecting rod and the chassis body top surface.In connecting rod
Angle is set between chassis body, makes to form triangular structure between pedestal, steel tower main body, connecting rod, structure is relatively stablized,
Base station overall structure is set relatively to stablize, it is ensured that the normal operation of base station.
In sum, by adopting the above-described technical solution, the beneficial effect of pedestal of the invention is:
1., by using the chassis body of frame structure as the agent structure of the pedestal of base station iron tower, structure is simpler, is not required to
Under dig the filling concrete of dell and prepare pedestal, it is only necessary in the chassis body it is filling be computed after wait quality materialses, you can
Support post is fixed by the filler being filled in chassis body, the chassis body for being filled with filler is made as pedestal
With, the lower operation for digging dell during pedestal is built is reduced, reduce manpower and materials and the consuming of time;
2nd, due to fixation need not be attached between pedestal and ground so that can according to the position of actual conditions mobile foundation with
The link position of support post and base station iron tower on pedestal is adapted to, and changes the position of base station iron tower in use, used
More convenient, the scope of application is wider;
The beneficial effect of pedestal other embodiment of the invention is:
Using the soil of compacting as filler so that concrete etc. need not be carried and prepare material, it is not necessary to carry out concrete and support
Shield, it is only necessary to which material is adopted at scene, soil is inserted in chassis body and tamped, and is gathered materials on the spot, operation relatively simply, at utmost
Reduce build pedestal need a dead lift expense and material prepare expense, reduce resource cost, reduce base station set up process consumption
The manpower and materials taken and time;
The beneficial effect of integrated anti-theft base station of the invention is:
Using pedestal as described above, make that foundation ditch need not be deep-cut, the operation of foundation ditch is deep-cut in reduction, prevents integrated form of the invention
Robber sets up base station and is easier to, and consumptive material is less, it is not necessary to the construction material such as concrete, it is adaptable on the bad hillside mountain of road conditions condition
Base station is set up in the areas such as area, and process of setting up expends less manpower and materials and the time, applied widely, economizes on resources.
Brief description of the drawings
Fig. 1 is the structural representation of pedestal of the invention;
Fig. 2 is the structural representation at another visual angles of Fig. 1;
Fig. 3 is the structural representation of integrated anti-theft base station of the invention.
Reference
1- pedestals, 11- chassis bodies, 2- support posts, 21- limited blocks, 3- cavitys, 4- reinforcing plates, 5- connection sections, 51- is empty
Heart pipeline, 6- base plates, 7- baffle plates, 8- steel tower main bodys, 9- computer rooms, 10- connecting rods.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with accompanying drawing and specific implementation
Example, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used to explain this hair
It is bright, it is not intended to limit the present invention.
Embodiment 1
As shown in Figure 1-2, pedestal 1, including chassis body 11 and three support posts for being detachably connected with base station iron tower
2, the support post 2 runs through the chassis body 11, and bottom is in contact with the bottom surface of chassis body 11, top and the framework master
The top surface of body 11 separates, and is provided with the chassis body 11 and filler is filled with cavity 3, the cavity 3.
The pedestal of the present embodiment, by using the chassis body 11 of frame structure as the main body of the pedestal 1 of base station iron tower
Structure, structure is simpler, it is not necessary to which the lower filling concrete of dell that digs prepares pedestal 1, it is only necessary to the filling warp in chassis body 11
Quality materialses are waited after calculating, chassis body 11 can be loaded using different types of filler according to on-site actual situations, you can will
Support post 2 is fixed by the filler being filled in chassis body 11, makes to be filled with the chassis body 11 of filler as base
Seat 1 is used, and reduces the lower operation for digging dell during pedestal 1 is built, and reduces manpower and materials and the consuming of time, meanwhile, by
Fixation need not be attached between pedestal 1 and ground so that can be according to the position of actual conditions mobile foundation 1 adapting to base
The link position of support post 2 and base station iron tower on seat 1, and change the position of base station iron tower in use, using more square
Just, the scope of application is wider, can prepare different shape knot according to the concrete structure of base station iron tower and the specific weight of base station iron tower
The chassis body 11 of structure, sets the suitable number of support post 2 of footing with base station iron tower in chassis body 11, and filling is different
The filler of type, makes the pedestal 1 of the present embodiment be adaptable to such as different shape such as three pipe towers, single-pipe tower, polygon tower, knot
The support of structure, the base station iron tower of weight, the scope of application is wider.
Preferably, described filler is the soil of compacting.Using the soil of compacting as filler so that coagulation need not be carried
Soil etc. prepares material, it is not necessary to carry out concrete curing, it is only necessary to which scene is adopted material and carries out compacting of the soil in chassis body 11,
Operation is relatively simple, gathers materials on the spot, it is not necessary to carries out canned in chassis body 11 using armored concrete and conserves, at utmost
Reduce build pedestal 1 need a dead lift expense and material prepare expense, reduce resource cost, reduce base station 1 set up process
The manpower and materials of consuming and time, simultaneously as the mobility of soil is smaller, more conveniently can be entered by applying stressed form
Row compacting, it is not necessary to being fully sealed for the internal cavities 3 of chassis body 11, can also realize the compacting of soil, make the preparation of pedestal 1 more
Convenient, the structural requirement to chassis body 11 is relatively low, and the build for further reducing base station iron tower expends.
Preferably, the chassis body 11 includes some connection sections 5, mutually dismountable between the connection sections 5
Connection, at least one connection sections 5 is hollow pipe 51, and the through hole in the hollow pipe 51 vertically runs through institute simultaneously
Top surface and the bottom surface of chassis body 11 are stated, the support post 2 runs through the hollow pipe 51.The frame being made up of connection sections 5
Frame body 11, can carry out Assembling connection, prepare more convenient, carry more convenient, reduce manpower thing during transport of materials
Power and the consuming of time, are highly suitable for the use that the road inconvenient area such as mountain area carries out when base station iron tower is set up, meanwhile,
Support post 2 is limited in hollow pipe 51, during making filling tamped, through the position of the support post 2 of hollow pipe 51
Fixation is put, that is, the pressure for tamping soil does not interfere with the position of support post 2, make the position of support post 2 stabilization, convenient and base station
Steel tower is connected, and the height of hollow pipe 51 can be set to be only below the top surface of support post 2 according to actual conditions, makes hollow
Pipeline 51 is supported the stabilization of column 2 from the outer surface of support post 2, farthest ensures the Stability Analysis of Structures of support post 2,
It is convenient to be attached with base station iron tower.
Preferably, some reinforcing plates 4 are provided with the cavity 3, the reinforcing plate 4 perpendicular to the bottom surface of chassis body 11,
The cavity 3 is divided into some accommodating chambers, filler is filled with each described accommodating chamber.By reinforcing plate 4 by framework
Cavity 3 in main body 11 is divided into some accommodating chambers, not only makes to be filled with the overall structure of chassis body 11 stabilization of filler, is difficult
Generation is toppled over, it is ensured that the stabilization of pedestal 1, and then ensures the stabilization of base station iron tower, simultaneously as the setting of reinforcing plate 4, makes pedestal
1 overall weight increases weight, and pedestal 1 is placed stabilization, it is ensured that the stabilization of base station iron tower.
Preferably, less than the top surface of chassis body 11, bottom surface is total to the top surface of the reinforcing plate 4 with the bottom surface of chassis body 11
Face.The height of reinforcing plate 4 is set below the structure of the top surface of chassis body 11, makes pedestal 1 near the weight ratio of the side on ground
The top surface side of pedestal 1 is heavier, further makes base construction stabilization, is difficult to topple over, meanwhile, can be according to actual conditions, by reinforcing plate 4
Highly set relatively low, make to form the base for gentle support pedestal 1 in the bottom of pedestal 1, further make the Stability Analysis of Structures of pedestal 1,
It is difficult to topple, it is ensured that the monolithic stability of the structure of pedestal 1.
Embodiment 2
As Figure 1-3, the pedestal 1 of the present embodiment is identical with the structure of embodiment 1, and difference is:The side wall of the chassis body 11
The baffle plate 7 for stopping soil spilling is provided with, the baffle plate 7 is removably connected with chassis body 11.
The pedestal of the present embodiment, due to the setting of baffle plate 7, soil is blocked in the cavity 3 of chassis body 11, it is ensured that frame
Soil in the cavity 3 of frame body 11 is compacted closely so that meeting the weight of pedestal 1 in the case where the size of pedestal 1 is reduced makes
With requiring, the base station iron tower of large-size can be supported, simultaneously as baffle plate 7 is removably connected with chassis body 11, can be in base
Seat 1 removes baffle plate 7 after the completion of preparing, and makes not needing baffle plate 7 to stop during the use of pedestal 1, reuses baffle plate 7, further
The material that pedestal 1 itself expends is reduced, is economized on resources, reduced pedestal 1 and prepare and take.
Preferably, the bottom of the chassis body 11 is provided with base plate 6, and the base plate 6 is detachable with the chassis body 11
Connection.Being arranged on the base plate 6 of the bottom of chassis body 11 makes the bottom surface of pedestal 1 more smooth, even if pedestal 1 is placed on relatively soft soil
On the ground, pedestal 1 can also be placed steadily, be easier to tamp filler, facilitate setting up for pedestal 1.
Preferably, the support post 2 runs through the base plate 6, and the bottom of the support post 2 is connected with limited block 21, institute
State limited block 21 and be arranged on the bottom of the base plate 6, be removably connected with the base plate 6.By the limited block of the bottom of support post 2
21 are connected with base plate 6, set support post 2 relatively steady, and the setting with the stable connection of chassis body 11, and limited block 21 will be propped up
Support column 2 is limited in chassis body 11, when filling tamped is carried out, easier can will support vertical using the gravity of pedestal 1
Post 2 is fixed, it is to avoid the position of support post 2 changes or is disconnected with chassis body 11 during use, further makes
The overall structure of pedestal 1 stabilization, the position of support post 2 being connected with base station iron tower is fixed, and facilitates pedestal 1 to support base station iron tower.
Embodiment 3
As Figure 1-3, integrated anti-theft base station, including at least one pedestal as described above 1 and be arranged on the pedestal 1
Steel tower main body 8, be provided with computer room 9 in the steel tower main body 8, the support post 2 on the steel tower main body 8 and the pedestal 1
Dismountable connection, the bottom surface of the computer room 9 separates with the top surface of the pedestal 1.
The integrated anti-theft base station of the present embodiment, by way of being connected with steel tower main body 8 using computer room 9, is formed integrated
Formula structure, structure is more succinct, using the weight of the computer room 9 being arranged in steel tower main body 8, makes base station bottom weight gain, it is ensured that
The Stability Analysis of Structures of steel tower main body 8, is difficult to be affected by the external environment and topple, it is ensured that the normal operation of base station, meanwhile, using as above
Described pedestal 1, makes that foundation ditch need not be deep-cut, and reduction is deep-cut the operation of foundation ditch, takes the integrated anti-theft base station of the present embodiment
If being easier to, consumptive material is less, it is not necessary to using construction materials such as concrete, it is only necessary to adopt material and carry out the chassis body of pedestal 1 in scene
11 live filler filling, it is adaptable to set up base station in areas such as the bad hillside mountain areas of road conditions condition, set up process expend compared with
It is few manpower and materials and time, applied widely, economize on resources, meanwhile, steel tower main body 8 is carried out simultaneously by pedestal 1 and computer room 9
Counterweight, farthest ensures the stable operation of base station, it is necessary to when setting up base station, be carried out to scene after connection sections 5 is split
Chassis body 11 is assembled into, filling and is tamped soil in the cavity 3 of chassis body 11, then by steel tower main body 8 and pedestal 1
It is attached.
Preferably, at least one connecting rod 10, the connecting rod 10 1 are provided between the pedestal 1 and steel tower main body 8
End is removably connected with steel tower main body 8, and the other end is removably connected with the top surface of the chassis body 11.Using connecting rod 10
Further strengthen the connection between pedestal 1 and steel tower main body 8, make base station overall structure more stable, be difficult to topple, be further ensured that
The monolithic stability operation of base station.
Preferably, 30 ° of angle M, M > is provided between the connecting rod 10 and the top surface of the chassis body 11.In connection
Angle is set between bar 10 and chassis body 11, makes to form triangular structure between pedestal 1, steel tower main body 8, connecting rod 10,
Structure is relatively stablized, and base station overall structure is relatively stablized, it is ensured that the normal operation of base station.
Above example is only used to illustrate the present invention and not limit technical scheme described in the invention, although this explanation
With reference to the above embodiments to present invention has been detailed description, but the present invention is not limited to above-mentioned specific embodiment party to book
Formula, thus it is any the present invention is modified or equivalent, and all do not depart from the technical scheme of the spirit and scope of invention
And its improve, it all should cover in scope of the presently claimed invention.
Claims (10)
1. pedestal, it is characterised in that:Including chassis body(11)At least one branch for being used to be detachably connected with base station iron tower
Support column(2), the support post(2)Through the chassis body(11), bottom and chassis body(11)Bottom surface is in contact, top
End and the chassis body(11)Top surface separates, the chassis body(11)Inside it is provided with cavity(3), the cavity(3)Inside fill out
Filled with filler.
2. pedestal as claimed in claim 1, it is characterised in that:The chassis body(11)Including some connection sections(5), institute
State connection sections(5)Between mutually dismountable connection.
3. pedestal as claimed in claim 2, it is characterised in that:At least one connection sections(5)It is hollow pipe(51), it is described
Hollow pipe(51)Interior through hole runs through the chassis body(11), the support post(2)Through the hollow pipe(51).
4. pedestal as claimed in claim 3, it is characterised in that:The chassis body(11)Side wall is provided with for stopping soil
The baffle plate of spilling(7), the baffle plate(7)With chassis body(11)Dismountable connection.
5. pedestal as claimed in claim 4, it is characterised in that:The cavity(3)Inside it is provided with some reinforcing plates(4), it is described
Reinforcing plate(4)Perpendicular to chassis body(11)Bottom surface, by the cavity(3)It is divided into some accommodating chambers, each described receiving
Filler is filled with chamber.
6. pedestal as claimed in claim 5, it is characterised in that:The chassis body(11)Bottom is provided with base plate(6), it is described
Base plate(6)With the chassis body(11)Dismountable connection.
7. pedestal as claimed in claim 6, it is characterised in that:The support post(2)Through the base plate(6), the branch
Support column(2)Bottom is connected with limited block(21), the limited block(21)It is arranged on the base plate(6)Bottom, with the base plate
(6)Dismountable connection.
8. integrated anti-theft base station, it is characterised in that:Including at least one pedestal as described in claim 1-7 any one
(1)Be arranged on the pedestal(1)On steel tower main body(8), the steel tower main body(8)On be provided with computer room, the steel tower master
Body(8)With the pedestal(1)On support post(2)Dismountable connection, the computer room(9)Bottom surface and the pedestal(1)
Top surface separate.
9. integrated anti-theft base station as claimed in claim 8, it is characterised in that:The pedestal(1)With steel tower main body(8)Between
It is provided with least one connecting rod(10), the connecting rod(10)One end and steel tower main body(8)Dismountable connection, the other end with
The chassis body(11)Top surface is removably connected.
10. integrated anti-theft base station as claimed in claim 9, it is characterised in that:The connecting rod(10)With the framework master
Body(11)30 ° of angle M, M > is provided between top surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710111194.6A CN106760890B (en) | 2017-02-28 | 2017-02-28 | Base and integrated anti-theft base station adopting same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710111194.6A CN106760890B (en) | 2017-02-28 | 2017-02-28 | Base and integrated anti-theft base station adopting same |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760890A true CN106760890A (en) | 2017-05-31 |
CN106760890B CN106760890B (en) | 2022-05-17 |
Family
ID=58959697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710111194.6A Active CN106760890B (en) | 2017-02-28 | 2017-02-28 | Base and integrated anti-theft base station adopting same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760890B (en) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2105960A1 (en) * | 1995-02-03 | 1997-10-16 | Comunicaciones Y Sonido S A | Transportable and portable mobile telephone and/or cellular access base station |
US20090044482A1 (en) * | 2007-01-30 | 2009-02-19 | Tooman Norman L | Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation |
CN201339197Y (en) * | 2008-12-10 | 2009-11-04 | 姚攀峰 | Self-pressure tower tube base |
CN101614082A (en) * | 2009-07-08 | 2009-12-30 | 汤国江 | Counter weight type communication iron tower |
CN201534977U (en) * | 2009-11-05 | 2010-07-28 | 徐州九鼎建设集团有限公司 | Bolt connection circumferential box-shaped prefabricated assembly type concrete tower crane foundation |
CN101914999A (en) * | 2010-08-19 | 2010-12-15 | 电联工程技术有限公司 | Communication device for fast integrating integrative machine room |
KR20110013832A (en) * | 2009-08-03 | 2011-02-10 | 김금자 | A post for a rode-lamp exchange equipments |
KR101066030B1 (en) * | 2011-01-27 | 2011-09-20 | 조영석 | Pillar and hand hole cover apparatus for easy adjusting hight and gradient |
CN202187365U (en) * | 2011-07-21 | 2012-04-11 | 胥传明 | Detachable tower footing |
CN103696611A (en) * | 2013-12-03 | 2014-04-02 | 新安县电业公司 | Base structure for steel tube tower |
CN203924095U (en) * | 2014-06-13 | 2014-11-05 | 江苏省电力设计院 | A kind of desert area transmission line of electricity assembling type steel structure sandbox gravity type foundation |
CN104674837A (en) * | 2015-02-26 | 2015-06-03 | 石健 | Connection structure and connection method of draught fan foundation and draught fan tower barrel |
CN105155572A (en) * | 2015-10-20 | 2015-12-16 | 中国科学院武汉岩土力学研究所 | Cast-in-place pre-stressed anchor cable draught fan foundation system and construction method thereof |
CN105926998A (en) * | 2016-06-13 | 2016-09-07 | 德阳市恒达灯具制造有限公司 | Integrated type antitheft base station |
CN205954662U (en) * | 2016-07-25 | 2017-02-15 | 浙江八方电信有限公司 | Steel frame basis of communication tower |
CN206487209U (en) * | 2017-02-28 | 2017-09-12 | 德阳市恒达灯具制造有限公司 | A kind of pedestal and the integrated anti-theft base station using the pedestal |
-
2017
- 2017-02-28 CN CN201710111194.6A patent/CN106760890B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2105960A1 (en) * | 1995-02-03 | 1997-10-16 | Comunicaciones Y Sonido S A | Transportable and portable mobile telephone and/or cellular access base station |
US20090044482A1 (en) * | 2007-01-30 | 2009-02-19 | Tooman Norman L | Wind turbine installation comprising an apparatus for protection of anchor bolts and method of installation |
CN201339197Y (en) * | 2008-12-10 | 2009-11-04 | 姚攀峰 | Self-pressure tower tube base |
CN101614082A (en) * | 2009-07-08 | 2009-12-30 | 汤国江 | Counter weight type communication iron tower |
KR20110013832A (en) * | 2009-08-03 | 2011-02-10 | 김금자 | A post for a rode-lamp exchange equipments |
CN201534977U (en) * | 2009-11-05 | 2010-07-28 | 徐州九鼎建设集团有限公司 | Bolt connection circumferential box-shaped prefabricated assembly type concrete tower crane foundation |
CN101914999A (en) * | 2010-08-19 | 2010-12-15 | 电联工程技术有限公司 | Communication device for fast integrating integrative machine room |
KR101066030B1 (en) * | 2011-01-27 | 2011-09-20 | 조영석 | Pillar and hand hole cover apparatus for easy adjusting hight and gradient |
CN202187365U (en) * | 2011-07-21 | 2012-04-11 | 胥传明 | Detachable tower footing |
CN103696611A (en) * | 2013-12-03 | 2014-04-02 | 新安县电业公司 | Base structure for steel tube tower |
CN203924095U (en) * | 2014-06-13 | 2014-11-05 | 江苏省电力设计院 | A kind of desert area transmission line of electricity assembling type steel structure sandbox gravity type foundation |
CN104674837A (en) * | 2015-02-26 | 2015-06-03 | 石健 | Connection structure and connection method of draught fan foundation and draught fan tower barrel |
CN105155572A (en) * | 2015-10-20 | 2015-12-16 | 中国科学院武汉岩土力学研究所 | Cast-in-place pre-stressed anchor cable draught fan foundation system and construction method thereof |
CN105926998A (en) * | 2016-06-13 | 2016-09-07 | 德阳市恒达灯具制造有限公司 | Integrated type antitheft base station |
CN205954662U (en) * | 2016-07-25 | 2017-02-15 | 浙江八方电信有限公司 | Steel frame basis of communication tower |
CN206487209U (en) * | 2017-02-28 | 2017-09-12 | 德阳市恒达灯具制造有限公司 | A kind of pedestal and the integrated anti-theft base station using the pedestal |
Also Published As
Publication number | Publication date |
---|---|
CN106760890B (en) | 2022-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635120B (en) | Circular deep foundation ditch is without Construction of Supporting structure and construction method | |
CN204590038U (en) | A kind of permanent foundation pit supporting construction | |
CN109386050A (en) | A kind of multi-layer combined type house structure | |
CN109403341A (en) | A kind of compound gravity retaining wall structure of soft clay area ultra-deep foundation pit and its engineering method | |
CN111441343A (en) | Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application | |
CN102864796B (en) | Construction spreading foundation adaptive to filled ground settlement and construction method | |
CN109252542B (en) | Tree root pile light retaining wall for road widening and construction method thereof | |
CN206487209U (en) | A kind of pedestal and the integrated anti-theft base station using the pedestal | |
CN212001036U (en) | Soft soil karst foundation reinforced structure | |
CN202730796U (en) | Existing retaining wall rib plate type unloading reinforcing structure | |
CN210529713U (en) | Deep foundation pit supporting structure | |
CN106760890A (en) | Pedestal and the integrated anti-theft base station using the pedestal | |
CN206220558U (en) | Old City Wall door opening ruggedized construction | |
CN110685287A (en) | Double-row pile foundation pit supporting system with drainage ditch and retaining wall and construction method | |
CN207513292U (en) | Cement pole and cabinet based Joint body | |
CN214784021U (en) | Be suitable for assembled steel gabion protection view wall on highway side slope | |
CN114482594A (en) | Construction method for retaining support of historical landscape civil-improvement commercial building structure | |
CN109779283B (en) | Improved construction method for adding basement to existing pile foundation building | |
CN108221948A (en) | A kind of method for processing foundation | |
CN208907225U (en) | A kind of double-row pile foundation pit enclosure structure of arch arrangement | |
CN106522576B (en) | Old City Wall door opening reinforcement means and ruggedized construction | |
CN205676917U (en) | A kind of steel frame basis of tower mast structure | |
CN207436068U (en) | A kind of new prefabricated two walls unification foundation pit system | |
CN219344255U (en) | Masonry structure of wall body of enclosure outside building main body | |
CN109296252B (en) | Cement pole and cabinet foundation combination and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |