CN106759431A - A kind of hanging type steel platform foundation of tower crane - Google Patents

A kind of hanging type steel platform foundation of tower crane Download PDF

Info

Publication number
CN106759431A
CN106759431A CN201611042713.XA CN201611042713A CN106759431A CN 106759431 A CN106759431 A CN 106759431A CN 201611042713 A CN201611042713 A CN 201611042713A CN 106759431 A CN106759431 A CN 106759431A
Authority
CN
China
Prior art keywords
reinforcing bar
tower crane
steel platform
concrete
hanging type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611042713.XA
Other languages
Chinese (zh)
Other versions
CN106759431B (en
Inventor
田翀
杨啸磊
李悦光
胡从柱
蔡伟
罗诚兴
姚卫苍
郭发强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201611042713.XA priority Critical patent/CN106759431B/en
Publication of CN106759431A publication Critical patent/CN106759431A/en
Application granted granted Critical
Publication of CN106759431B publication Critical patent/CN106759431B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

The present invention is applied to technical field of building construction, there is provided the girder steel platform on a kind of hanging type steel platform foundation of tower crane, including multiple concrete columns and its top surface.Concrete column includes the reinforcing bar of concrete and its inside, interior encloses reinforcing bar and peripheral reinforcing bar.Inside enclose, peripheral reinforcing bar encloses located at the inside and outer peripheral edge of reinforcing bar respectively, both bottoms are stretched into the main stress component of building.Hanging type steel platform foundation of tower crane of the invention, improves live lifting component efficiency;Concrete column is poured simultaneously with original structure concrete, and concrete column is holistic stress system with former xoncrete structure, and concrete floor one-time-concreting is completed, and reduces the secondary human and material resources for pouring and financial resources input, and saved the construction period.Solve architecture basics to have constructed completion, need to reinstall tower crane in inside configuration carries out the problem of lifting component.Avoid destruction of the former xoncrete structure built-in profile steel to former design node, it is to avoid the reserved opening on concrete floor.

Description

A kind of hanging type steel platform foundation of tower crane
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of hanging type steel platform foundation of tower crane.
Background technology
The installation of venue class engineering steel construction, often carries out structure using tower crane or movable hoisting equipment as hoisting machinery Part is lifted.
When being lifted using tower crane, tower crane is generally located on building foundation base plate, i.e. concrete tower crane foundation form, In the flat arm tower crane of bottom of foundation ditch, its standard knot is typically both needed to pass through top concrete floor basis instrument, therefore is mixed on top During solidifying soil concrete floor slab placement, tower crane peripheral region concrete floor need to be reserved, after tower crane is removed, after being carried out to reserved opening Pour.So, concrete floor need to carry out it is secondary pour, be unfavorable for saving the construction period, and need to put into substantial amounts of people Power, material resources are with financial resources.
And the project lifted using movable hoisting equipment, often relate to concrete floor on large scale equipment and make Industry, concrete structure reinforcement is costly, and construction risk is larger.
Tower crane is arranged on ground concrete structure floor, floor can be prevented effectively from using hanging type tower crane form Reserved opening, and the substantial amounts of human and material resources of concrete structure reinforcement and financial resources input, particularly with the item of duration epitonos Mesh, the application of this technology can play vital effect to saving the duration, improving lifting efficiency.Hanging type tower crane steel platform base The design of plinth, first has to find out the main stress member position such as concrete shear force wall, post or girder of building by design drawing, According to on-site hoisting working condition requirement, steel platform foundation of tower crane column is arranged on main stress component.Concrete main stress structure Often stress is complicated for part node location, and reinforcing bar is densely distributed, according to shear wall or concrete column built-in profile steel as tower crane base Plinth column, certainly will will cut off main stress reinforcing bar, stress form at destruction origin node, and need to be redesigned by designing institute.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of hanging type saved the duration, improve on-site hoisting efficiency Steel platform foundation of tower crane.
The present invention is achieved in that a kind of hanging type steel platform foundation of tower crane, including girder steel platform and multiple coagulations Native column, the girder steel stage+module is on the top surface of the concrete column;The concrete column include concrete and Be embedded at the reinforcing bar of the inside concrete, it is interior enclose reinforcing bar and peripheral reinforcing bar, it is described in enclose reinforcing bar and enclose located at the reinforcing bar Inside, the peripheral reinforcing bar is enclosed located at the outer peripheral edge of the reinforcing bar;Stretch into the bottom that reinforcing bar and peripheral reinforcing bar are enclosed in described In the main stress component of building.
Further, the reinforcing bar includes support frame and bearing platform, and the bearing platform is fixed on the top of support frame as described above On face, two sides of the bearing platform are provided with stiffener, and the girder steel platform includes some girder steels, some girder steel phases Mutually it is fixedly connected, forms described girder steel platform, the girder steel is welded to connect by steel cushion block with reinforcing bar top steel plate.
Further, the lower flange of the girder steel platform is by the steel cushion block and the reinforcing bar weld all around.
Further, support frame as described above is cross-shaped steel.
Further, some girder steels include some girders and some secondary beams, some girders enclose be set as it is hollow Framework, some secondary beams are fixedly connected on the lower portion;Also, the position for fixing tower crane fixed supporting leg is set In the girder and the link position of secondary beam.
Further, the steel plate for fixing tower crane fixed supporting leg, the steel plate and institute are provided with the girder steel platform Girder steel platform weld all around is stated to fix.
Further, the concrete column described in each is provided with a diagonal brace, one end of the diagonal brace with it is described Reinforcing bar welding, the other end is connected by embedded part with the main stress component of building.
Further, enclose the top of reinforcing bar in described and the reinforcing bar is welded.
Further, the top bending of the peripheral reinforcing bar forms crotch.
Further, the hanging type steel platform foundation of tower crane includes the concrete column described in four, two therein Concrete column is fixed on the concrete column of building, and the concrete that other two concrete columns are fixed on building is cut On power wall.
Compared with prior art, beneficial effect is the present invention:Hanging type steel platform foundation of tower crane of the invention, improves Live lifting component efficiency;Enclosed in concrete column and peripheral reinforcing bar is stretched into inside building former xoncrete structure, mixed Solidifying soil column is with original structure concrete while pouring, it is ensured that the concrete column of steel platform foundation of tower crane is with former xoncrete structure Holistic stress system.Solve architecture basics to have constructed completion, need to reinstall tower crane in inside configuration carries out lifting component Problem.Concrete column is seated on former xoncrete structure, it is to avoid former xoncrete structure built-in profile steel is to former design node Destruction, it is to avoid concrete floor pre-arranged hole mouthful that be around tower crane, concrete floor one-time-concreting is completed, reduced secondary Human and material resources and the financial resources input for pouring, and saved the construction period.
Brief description of the drawings
One or more embodiments are illustrative by the picture in corresponding accompanying drawing, these exemplary theorys The bright restriction not constituted to embodiment, the element with same reference numbers label is expressed as similar element in accompanying drawing, removes It is non-to have especially statement, the figure not composition limitation in accompanying drawing.
Fig. 1 is a kind of schematic top plan view of hanging type steel platform foundation of tower crane provided in an embodiment of the present invention.
Fig. 2 is the schematic top plan view that the steel platform basis shown in Fig. 1 is fixed on building main stress component.
Fig. 3 is the elevational schematic view that the steel platform basis shown in Fig. 1 is fixed on building main stress component.
Fig. 4 is the schematic front view of the concrete column shown in Fig. 3.
Fig. 5 is schematic cross-sectional views of the Fig. 4 along A-A hatching lines.
Fig. 6 is the schematic front view that the concrete column shown in Fig. 3 is fixed by diagonal brace.
Specific embodiment
In order that the technical problems to be solved by the invention, technical scheme and beneficial effect become more apparent, below tie Drawings and Examples are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only It is used to explain the present invention, is not intended to limit the present invention.
As shown in Figures 1 to 4, it is a preferred embodiment of the invention, a kind of hanging type steel platform foundation of tower crane, including steel Liangping platform 1 and multiple concrete columns 2, girder steel platform 1 are installed on the top surface of concrete column 2.Concrete column 2 includes Concrete 21 and the reinforcing bar 22 being embedded inside concrete 21, interior enclose reinforcing bar 23 and peripheral reinforcing bar 24.
Fig. 5 is referred to, reinforcing bar 23 is inside enclosed and is enclosed located at the inside of reinforcing bar 22, peripheral reinforcing bar 24 is enclosed located at the periphery of reinforcing bar 22 Edge;Stretch into the main stress component 200 of building, i.e. former xoncrete structure in the bottom for inside enclosing reinforcing bar 23 and peripheral reinforcing bar 24 It is interior.The top and reinforcing bar 22 for inside enclosing reinforcing bar 23 are welded;The top bending of peripheral reinforcing bar 24 forms crotch.
Reinforcing bar 22 includes support frame 221 and bearing platform 222, and bearing platform 222 is fixed on the top surface of support frame 221, can Selection of land, support frame 221 is cross-shaped steel, and it has four orthogonal wing plates 2211, four lateral cross sections of wing plate 2211 Be shaped as cross, the side plate 2212 vertical with wing plate 2211 is further fixed on the lateral surface of wing plate 2211.
Two sides of bearing platform 222 are provided with the spaced stiffener 2221 of polylith.Some girder steels interfix company Connect, form girder steel platform 1, specifically, some girder steels include some girders 11 and some secondary beams 12, and some girders 11 enclose and are set as Hollow framework, some secondary beams 12 are fixedly connected on lower portion;Also, the position for fixing tower crane fixed supporting leg is arranged at The link position of girder 11 and secondary beam 12.Preferably, girder 11 is made using day shaped steel, secondary beam 12 is made using H profile steel, from And ensure the rigidity and intensity requirement of girder steel platform 1 in tower crane operation.Girder 11 is folded in the stiffener of the side of bearing platform two Between 2221, so that stiffener 2221 can play position-limiting action to girder 11.
The steel plate 3 for fixing tower crane fixed supporting leg is welded with girder steel platform 1, steel plate 3 is consolidated with the weld all around of girder steel platform 1 Fixed, fixed supporting leg 301 and the weld all around of steel plate 3 of tower crane 300 are fixed.By the fixed structure, tower crane 300 can be avoided from being directly welded in On girder steel, heat damage was caused to girder steel, meanwhile, can efficiency increase forced contact area, optimization joints form.
In the present embodiment, hanging type steel platform foundation of tower crane includes four concrete columns 2, and two concrete therein stand Post 2 is fixed on the concrete column of building, and other two concrete columns 2 are fixed on the concrete shear force wall of building On.Fig. 6 is referred to, each concrete column 2 is provided with a diagonal brace 4, and one end and the reinforcing bar 22 of diagonal brace 4 are welded, another End is connected by embedded part 400 with the main stress component 200 of building.Firm cushion block 5, firm cushion block 5 are welded with the top surface of reinforcing bar 22 The lower flange weld all around of top surface and girder steel platform 1.Also, the size of the firm cushion block 5 is meeting live stage+module operating space On the basis of, can have small to the greatest extent, make the stress form of the node as close possible to being hinged.
The hanging type steel platform foundation of tower crane of the present embodiment, improves live lifting component efficiency;Concrete column 2 it is interior Enclose reinforcing bar 23 and peripheral reinforcing bar 24 is stretched into inside building former xoncrete structure, concrete column 2 and original structure concrete Pour simultaneously, it is ensured that the concrete column 2 of steel platform foundation of tower crane is holistic stress system with former xoncrete structure.Solve Architecture basics have been constructed completion, and need to reinstall tower crane 300 in inside configuration carries out the problem of lifting component.Concrete column 2 It is seated on former xoncrete structure, it is to avoid destruction of the former xoncrete structure built-in profile steel to former design node, it is to avoid be Concrete floor pre-arranged hole mouthful around tower crane 300, concrete floor one-time-concreting is completed, and reduces the secondary manpower for pouring, thing Power and financial resources put into, and have saved the construction period.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of hanging type steel platform foundation of tower crane, it is characterised in that described including girder steel platform and multiple concrete columns Girder steel stage+module is on the top surface of the concrete column;The concrete column includes concrete and is embedded at described mixed The internal reinforcing bar of solidifying soil, it is interior enclose reinforcing bar and peripheral reinforcing bar, it is described interior to enclose reinforcing bar and enclose located at the inside of the reinforcing bar, the periphery Reinforcing bar is enclosed located at the outer peripheral edge of the reinforcing bar;Stretch into the main stress of building in the bottom that reinforcing bar and peripheral reinforcing bar are enclosed in described In component.
2. hanging type steel platform foundation of tower crane as claimed in claim 1, it is characterised in that the reinforcing bar include support frame and Bearing platform, the bearing platform is fixed on the top surface of support frame as described above, and two sides of the bearing platform are provided with stiffener, institute Stating girder steel platform includes some girder steels, and some girder steels are mutually permanently connected, and forms described girder steel platform, and the girder steel leads to Firm cushion block is crossed to be welded to connect with the reinforcing bar.
3. hanging type steel platform foundation of tower crane as claimed in claim 2, it is characterised in that the lower flange of the girder steel platform leads to The steel cushion block is crossed with the reinforcing bar weld all around.
4. hanging type steel platform foundation of tower crane as claimed in claim 2, it is characterised in that support frame as described above is cross-shaped steel.
5. hanging type steel platform foundation of tower crane as claimed in claim 2, it is characterised in that some girder steels include some masters Beam and some secondary beams, some girders are enclosed and are set as hollow framework, and some secondary beams are fixedly connected in the framework Portion;Also, the position for fixing tower crane fixed supporting leg is arranged at the link position of the girder and secondary beam.
6. the hanging type steel platform foundation of tower crane as described in any one in claim 1 to 5, it is characterised in that the girder steel The steel plate for fixing tower crane fixed supporting leg is provided with platform, the steel plate is fixed with the girder steel platform weld all around.
7. the hanging type steel platform foundation of tower crane as described in any one in claim 1 to 5, it is characterised in that each institute The concrete column stated is provided with a diagonal brace, and one end of the diagonal brace is welded with described reinforcing bar, and the other end passes through embedded part It is connected with the main stress component of building.
8. the hanging type steel platform foundation of tower crane as described in any one in claim 1 to 5, it is characterised in that enclosed in described Welded with the reinforcing bar on the top of reinforcing bar.
9. the hanging type steel platform foundation of tower crane as described in any one in claim 1 to 5, it is characterised in that the periphery The top bending of reinforcing bar forms crotch.
10. the hanging type steel platform foundation of tower crane as described in any one in claim 1 to 5, it is characterised in that described hanging Formula steel platform foundation of tower crane includes the concrete column described in four, and two concrete columns therein are fixed on the mixed of building On solidifying earth pillar, two concrete columns in addition are fixed on the concrete shear force wall of building.
CN201611042713.XA 2016-11-22 2016-11-22 A kind of hanging type steel platform foundation of tower crane Active CN106759431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611042713.XA CN106759431B (en) 2016-11-22 2016-11-22 A kind of hanging type steel platform foundation of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611042713.XA CN106759431B (en) 2016-11-22 2016-11-22 A kind of hanging type steel platform foundation of tower crane

Publications (2)

Publication Number Publication Date
CN106759431A true CN106759431A (en) 2017-05-31
CN106759431B CN106759431B (en) 2019-11-26

Family

ID=58975223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611042713.XA Active CN106759431B (en) 2016-11-22 2016-11-22 A kind of hanging type steel platform foundation of tower crane

Country Status (1)

Country Link
CN (1) CN106759431B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045861A (en) * 2021-11-24 2022-02-15 北京市第三建筑工程有限公司 Tower crane foundation connecting structure capable of transferring force to existing column and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201534978U (en) * 2009-08-31 2010-07-28 中建三局第三建设工程有限责任公司 Steel platform foundation of tower crane
CN201826325U (en) * 2010-10-15 2011-05-11 中国建筑第四工程局有限公司 Foundation structure of tower crane
CN204530747U (en) * 2015-04-07 2015-08-05 浙江庞源机械工程有限公司 A kind of underground infrastructures of head tower machine platform
CN206376272U (en) * 2016-11-22 2017-08-04 中建钢构有限公司 A kind of hanging type steel platform foundation of tower crane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201534978U (en) * 2009-08-31 2010-07-28 中建三局第三建设工程有限责任公司 Steel platform foundation of tower crane
CN201826325U (en) * 2010-10-15 2011-05-11 中国建筑第四工程局有限公司 Foundation structure of tower crane
CN204530747U (en) * 2015-04-07 2015-08-05 浙江庞源机械工程有限公司 A kind of underground infrastructures of head tower machine platform
CN206376272U (en) * 2016-11-22 2017-08-04 中建钢构有限公司 A kind of hanging type steel platform foundation of tower crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114045861A (en) * 2021-11-24 2022-02-15 北京市第三建筑工程有限公司 Tower crane foundation connecting structure capable of transferring force to existing column and construction method thereof

Also Published As

Publication number Publication date
CN106759431B (en) 2019-11-26

Similar Documents

Publication Publication Date Title
CN206376272U (en) A kind of hanging type steel platform foundation of tower crane
CN206581626U (en) A kind of adjustable assembled supporting construction
KR20110080499A (en) Apparatus of constructing bridge and method of constructing bridge by using the same
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN105002930A (en) Beam column joint structure constructed through steel annular plate and method of beam column joint structure
CN106759431A (en) A kind of hanging type steel platform foundation of tower crane
CN101839063B (en) Movable steel base for constructing prefabricated beam and standard joint thereof
CN208167484U (en) The steel construction overline bridge being easily installed
CN208884808U (en) Combine prefabricated panel and laminated floor slab structure
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN102191866A (en) Device and method for removal construction of vertical posts positioned on lower part of large-span net rack
CN203383563U (en) Fast assembled communication iron tower
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN103883124B (en) The method for designing of crab-bolt stock
CN105019655B (en) A kind of construction method of casting concrete beam
CN208965579U (en) A kind of non-console mode lattice tower crane platform
CN205100604U (en) Tower room integration basic station
CN106168036A (en) A kind of contrary sequence method fall modular system and fall mould method
CN207436065U (en) Suspension device
CN206625460U (en) Triangle component frame
CN108316119A (en) The steel construction overline bridge being easily installed
KR101296814B1 (en) Upper pressing type support building method
CN217536682U (en) Pier top operation platform that precast beam erect
CN204690594U (en) A kind of simple and easy door frame of the Slidable for the installation of framing type steel box-girder crossbeam
CN109441088A (en) A kind of steel construction job platform for super high-rise building core tube construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co., Ltd

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp. Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.