CN106758822A - A kind of cast-in-place bracket of assembly concrete connects wall node - Google Patents
A kind of cast-in-place bracket of assembly concrete connects wall node Download PDFInfo
- Publication number
- CN106758822A CN106758822A CN201611037073.3A CN201611037073A CN106758822A CN 106758822 A CN106758822 A CN 106758822A CN 201611037073 A CN201611037073 A CN 201611037073A CN 106758822 A CN106758822 A CN 106758822A
- Authority
- CN
- China
- Prior art keywords
- node
- reinforced concrete
- wall
- concrete wall
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Connect wall node the invention discloses a kind of cast-in-place bracket of assembly concrete, the bracket connects wall node and includes shelf bracket, upper even wall node, lower even wall node, reinforced concrete wall, wherein:The upper even mast node is made up of pull bar and upper shear connector, and pull bar is pre-buried or communicates through reinforced concrete wall, and the upper force-transmitting seat of shelf bracket is closely connected with reinforced concrete wall by pull bar, upper shear connector be embedded in reinforced concrete wall body it is interior and with the bottom closing contact of upper force-transmitting seat;The lower even wall node is made up of anchoring piece and lower shear connector, and anchoring piece is anchored in reinforced concrete wall body, and the lower force-transmitting seat of shelf bracket is connected by anchoring piece with concrete wall, lower shear connector be embedded in reinforced concrete wall body it is interior and with the bottom closing contact of lower force-transmitting seat.The present invention uses assembling type node, and scene has the advantages that clear and definite stress, materials province, steady quality, security reliability is strong, constructing operation is convenient, beautiful appearance using exempting to be connected by the way of welding.
Description
Technical field
The invention belongs to technical field of bridge construction, it is related to a kind of cast-in-place bracket of assembly concrete to connect wall node.
Background technology
Building higher high up in the air, because separation is higher from the ground, sets side using molded armored concrete facade more
Bracket forms construction operation platform, part building of encorbelmenting of being constructed on this platform bracket.
Because bracket bearing capacity is big, economical rationality, the large structure such as current Bridge High-pier top surface continuous beam 0# blocks is encorbelmented portion
Divide and constructed using the method.
Because of bracket, stress clearly, is at present difficult have optimization space again in itself, only the connecting node of bracket and wall, because receiving
Power is complicated, and current common practice is difficult to accomplish that optimization is processed, and there is the excessive waste of materials of safety stock more, or because of construction technology
It is larger Deng limitation potential safety hazard.
Now widely used node mode has two kinds:One kind is that one kind is to utilize shaped steel using crab-bolt class power transmission node
Weld or be hinged with support Deng built-in fitting in component.Above two technical scheme is only merely using pre-buried steel construction structure in concrete
Part node, is allowed to bear shearing, pressure or pulling force that bracket is transmitted etc., it is impossible to give full play to various material stress advantages, component
Stress is complicated, so that the complicated heaviness of structure, and live labor content is big, and precision and quality are difficult to ensure that.
The content of the invention
Connect wall node it is an object of the invention to provide a kind of cast-in-place bracket of assembly concrete, it is existing using assembling type node
Field is connected by the way of welding is exempted from embedded structure thing wall, makes full use of compressive property, the steel-concrete combined structure of concrete
Shear behavior, reinforcing pull rod(Screw rod, bolt etc.)Tensile property, need not be cut off during node installation wall or bridge pier reinforcing bar and
Cut its formwork for placing, have the advantages that stress clearly, materials province, steady quality, security reliability be strong, constructing operation is convenient.
The purpose of the present invention is achieved through the following technical solutions:
A kind of cast-in-place bracket of assembly concrete connects wall node, including shelf bracket, upper even wall node, lower even wall node, reinforcing bar
Concrete wall, wherein:
The upper even mast node is used to bear horizontal pull and vertical shear, is made up of pull bar and upper shear connector, pull bar it is pre-buried or
Reinforced concrete wall is communicated through, the upper force-transmitting seat of shelf bracket draws by the way that pull bar and reinforced concrete wall are closely connected for bearing level
Power, upper shear connector is embedded in reinforced concrete wall body and is used to undertake vertically cut at node with the bottom closing contact of upper force-transmitting seat
Power;
The lower even wall node is used to bear horizontal pressure force and vertical shear, is made up of anchoring piece and lower shear connector, anchoring piece anchor
Gu in reinforced concrete wall body, the lower force-transmitting seat of shelf bracket is connected to bear horizontal thrust by anchoring piece and concrete wall, under
Shear connector is embedded in reinforced concrete wall body and is used to undertake vertical shear at node with the bottom closing contact of lower force-transmitting seat.
The invention has the advantages that:
1st, in addition to cast-in-place concrete, all components are factory process, and element structure is simple, and low cost, high precision, quality have guarantor
Card;
2nd, various primary structure member distincts, stress clearly, is convenient for force analysis optimization design;
3rd, live people's power cooperation crane, it is only necessary to which the small instruments and tools such as hand hammer, spanner can complete prefabricated member in-site installation, without
Site Welding, quick and easy for installation, node installation of embedded parts need not cut off existing bridge pier(Wall)Deng works stress cage bar and
Template;
4th, construction finishes component and removes simple, and wall is without exposed metal accessory, and concrete structure outward appearance is clean and tidy;
When load-bearing support body the 5th, being set suitable for reinforced concrete structure side, used as even wall stress node.
6th, upper node and lower node two types node use assembled, and after each joints are decomposed, each part holds
Load different loads, mechanical model is clear, is easy to be checked and optimization design by calculating and experiment.
7th, the present invention uses assembling type node, upper lower node to undertake vertical shear using shearing resistance built-in fitting, and upper node is adopted
Horizontal pull is born with pull bar, lower node bears horizontal pressure force using Pressure Block by wall, take full advantage of various material stress
Can advantage:Concrete structure resistance to compression, high-strength steel bar tension, steel-concrete combined structure shearing resistance, at utmost save material usage.
8th, the present invention, using assembling type node, makes at node several component respectively by assembled according to joints condition
Each part of node undertakes respectively, and part stress clearly, easily establishes mathematical analysis model and accurate to its by load test
Analysis and checking, ensure that quality avoids live manufacturing deficiency using batch production processing.
9th, the assembling type node has universal promotional value in terms of economy, security, operability etc..
Brief description of the drawings
Fig. 1 pours schematic diagram for 0# block merogenesis;
Fig. 2 is the stereogram of 0# blocks cantilever segment lower section bracket;
Fig. 3 is shelf bracket stress model schematic diagram.
Specific embodiment
Technical scheme is further described below in conjunction with the accompanying drawings, but is not limited thereto, it is every to this
Inventive technique scheme is modified or equivalent, without deviating from the spirit and scope of technical solution of the present invention, all should be covered
In protection scope of the present invention.
As shown in Fig. 2 the cast-in-place bracket of assembly concrete that the present invention is provided connects wall node includes shelf bracket, Shang Lianqiang
Node, lower even wall node, reinforced concrete wall 7, shelf bracket are connected by upper even wall node and lower even wall node with reinforced concrete wall 7
Connect, wherein:
The upper even wall node is used to bear horizontal pull and vertical shear, is made up of pull bar 1, upper shear connector 3, the high-strength spiral shell
Line pull bar 1 is pre-buried or communicates through reinforced concrete wall 7, and high-strength thread 1 is by the upper force-transmitting seat 2 and reinforced concrete wall of shelf bracket
Body 7 is closely connected for bearing horizontal pull, and upper shear connector 3 is embedded in reinforced concrete wall 7 and closely connected with the bottom of upper force-transmitting seat 2 connects
Touch for undertaking vertical shear.
The lower even wall node is used to bear horizontal pressure force and vertical shear, is made up of anchoring piece 5 and lower shear connector 6, institute
State anchoring piece 5 to be anchored in reinforced concrete wall 7, the lower force-transmitting seat 4 of shelf bracket is connected by anchoring piece 5 with reinforced concrete wall 7
Horizontal thrust is born, lower shear connector 6 is embedded in reinforced concrete wall 7 and is used to undertake perpendicular with the bottom closing contact of lower force-transmitting seat 4
To shearing.
Example of the present invention be the cast-in-place beam portion 0# blocks of certain rigid frame-continuous girder top of bridge pier, beam section 15m long, width 10.5m, 10.5m high,
Concrete always just measures 778.0m3.Casting platform is formed using pier-side bracket and template system, method construction reinforced bar beams of concrete is built using mould
Section(Fig. 1).
Concreting supports the concrete of part of encorbelmenting using bracket(Beam body cantilever segment 4.5m long on pier-side bracket,
Concrete square amount 119.8m3)And construction loads.Shelf bracket structure uses assembled structure, rod member to be formed using the weldering of shaped steel group,
Each rod member of shelf bracket is connected by bolt and steel pin.Single pole part is lightweight, convenient assembly, dismounting and transport, while shelf bracket
With versatility, can carry out repeatedly falling to use.
As shown in figure 3, shelf bracket composition rod portion stress in each portion is clear and definite in itself:Horizon bar, montant and brace are except certainly
The outer vertical direction that bears of weight concentrates construction loads and lateral wind load, and transmission load is connected with bridge pier by upper lower node;On
Lower two companies wall node, upper node bears to horizontal pull in metope and shears straight up, and lower node bears the outside water of metope
Horizontal sliding power and shear straight up.
Claims (1)
1. a kind of cast-in-place bracket of assembly concrete connects wall node, it is characterised in that the cast-in-place bracket of assembly concrete connects wall
Node is made up of shelf bracket, upper even wall node, lower even wall node, reinforced concrete wall, wherein:
The upper even mast node is used to bear horizontal pull and vertical shear, is made up of pull bar and upper shear connector, pull bar it is pre-buried or
Reinforced concrete wall is communicated through, the upper force-transmitting seat of shelf bracket draws by the way that pull bar and reinforced concrete wall are closely connected for bearing level
Power, upper shear connector is embedded in reinforced concrete wall body and is used to undertake vertical shear with the bottom closing contact of upper force-transmitting seat;
The lower even wall node is used to bear horizontal pressure force and vertical shear, is made up of anchoring piece and lower shear connector, anchoring piece anchor
Gu in reinforced concrete wall body, the lower force-transmitting seat of shelf bracket is connected to bear horizontal thrust by anchoring piece and concrete wall, under
Shear connector is embedded in reinforced concrete wall body and is used to undertake vertical shear with the bottom closing contact of lower force-transmitting seat.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611037073.3A CN106758822A (en) | 2016-11-23 | 2016-11-23 | A kind of cast-in-place bracket of assembly concrete connects wall node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611037073.3A CN106758822A (en) | 2016-11-23 | 2016-11-23 | A kind of cast-in-place bracket of assembly concrete connects wall node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106758822A true CN106758822A (en) | 2017-05-31 |
Family
ID=58971946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611037073.3A Pending CN106758822A (en) | 2016-11-23 | 2016-11-23 | A kind of cast-in-place bracket of assembly concrete connects wall node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106758822A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114086473A (en) * | 2021-11-10 | 2022-02-25 | 中铁四局集团第五工程有限公司 | High pier cast-in-place beam support and construction method thereof |
CN114508233A (en) * | 2022-03-28 | 2022-05-17 | 广西航务建设工程有限公司 | Construction method of adjustable bracket for inverted cone shell water tower construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201473892U (en) * | 2009-09-08 | 2010-05-19 | 中铁九局集团有限公司 | Supporting device for pouring of concrete of No.0 block of continuous beam cantilever |
US8522381B1 (en) * | 2010-09-07 | 2013-09-03 | OCCI, Inc. | System and method for bridge pier replacement |
CN204023411U (en) * | 2014-07-04 | 2014-12-17 | 中铁二局股份有限公司 | Novel assembled bracket bracket construction equipment |
CN104328737A (en) * | 2014-09-25 | 2015-02-04 | 安徽省新路建设工程集团有限责任公司 | Connecting construction method of suspended-cast box girder triangular bracket fastener connecting construction method |
CN204510019U (en) * | 2015-04-03 | 2015-07-29 | 安徽省公路桥梁工程有限公司 | A kind of ramp down angle tall pier and thin wall calf support |
-
2016
- 2016-11-23 CN CN201611037073.3A patent/CN106758822A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201473892U (en) * | 2009-09-08 | 2010-05-19 | 中铁九局集团有限公司 | Supporting device for pouring of concrete of No.0 block of continuous beam cantilever |
US8522381B1 (en) * | 2010-09-07 | 2013-09-03 | OCCI, Inc. | System and method for bridge pier replacement |
CN204023411U (en) * | 2014-07-04 | 2014-12-17 | 中铁二局股份有限公司 | Novel assembled bracket bracket construction equipment |
CN104328737A (en) * | 2014-09-25 | 2015-02-04 | 安徽省新路建设工程集团有限责任公司 | Connecting construction method of suspended-cast box girder triangular bracket fastener connecting construction method |
CN204510019U (en) * | 2015-04-03 | 2015-07-29 | 安徽省公路桥梁工程有限公司 | A kind of ramp down angle tall pier and thin wall calf support |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114086473A (en) * | 2021-11-10 | 2022-02-25 | 中铁四局集团第五工程有限公司 | High pier cast-in-place beam support and construction method thereof |
CN114508233A (en) * | 2022-03-28 | 2022-05-17 | 广西航务建设工程有限公司 | Construction method of adjustable bracket for inverted cone shell water tower construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912190A (en) | Dry type joggle frame structure | |
CN101586328B (en) | Anchor ear angle-table bracket building method for bridge sidespan closure segment construction | |
CN102852244B (en) | Detachable self-resetting type energy-dissipation coupling beam | |
CN106567458B (en) | Assembled steel-is mixed to combine Beam-post Frame Structure system | |
CN106368348B (en) | A kind of superposed type compound shear wall with two benches stress characteristic | |
CN204370562U (en) | A kind of frame structure, frame structure body | |
CN102168405A (en) | Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge | |
CN104499567A (en) | Frame structure, frame structure assembly and prefabricating and constructing methods of frame structure assembly | |
CN105239726A (en) | Prefabricated steel-reinforced concrete combined special-shaped energy-dissipating column | |
CN106758822A (en) | A kind of cast-in-place bracket of assembly concrete connects wall node | |
CN210947142U (en) | Assembled concrete structure post roof beam connecting steel node | |
Jagadish et al. | A study on bracing systems on high rise steel structures | |
CN209686602U (en) | A kind of connection structure of steel plate shear force wall and floor | |
CN204266370U (en) | Prefabricated SRC-S-RC post beam shear wall supports floor assembling system | |
CN202023298U (en) | Roof truss-sectioned roof girder structure capable of being hoisted by cross type tower crane | |
CN202227585U (en) | Steel plate concrete shear wall coupling beam with studs arranged at anchor ends | |
CN113338687B (en) | Connecting node structure of special-shaped column and I-shaped steel beam and node safety monitoring method | |
CN203334643U (en) | Tower crane standard knot and structural steel combination high-altitude large-span operation frame device | |
CN109680812A (en) | A kind of connection structure and connection method of steel plate shear force wall and floor | |
CN104018586A (en) | Connecting device for steel structure column and steel structure column | |
CN209228054U (en) | Large cantilever combined type anchors Bailey beam operation platform | |
CN210562653U (en) | Assembled structure connecting piece | |
CN211114417U (en) | Novel steel-concrete composite beam structure of tensile shear | |
CN111335459A (en) | Prefabricated hinged frame supporting system | |
CN204139414U (en) | Composite plate trussed construction unit and structure thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |