CN106747001A - A kind of porous pavement system and its construction method - Google Patents

A kind of porous pavement system and its construction method Download PDF

Info

Publication number
CN106747001A
CN106747001A CN201611217227.7A CN201611217227A CN106747001A CN 106747001 A CN106747001 A CN 106747001A CN 201611217227 A CN201611217227 A CN 201611217227A CN 106747001 A CN106747001 A CN 106747001A
Authority
CN
China
Prior art keywords
slag
concrete
coarse aggregate
cement
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611217227.7A
Other languages
Chinese (zh)
Other versions
CN106747001B (en
Inventor
汪海龙
刘国威
韩甲兴
陆珺
朱李俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mcc Environment Engineering Technology Co Ltd
MCC Baosteel Technology Services Co Ltd
Original Assignee
Shanghai Mcc Environment Engineering Technology Co Ltd
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mcc Environment Engineering Technology Co Ltd, MCC Baosteel Technology Services Co Ltd filed Critical Shanghai Mcc Environment Engineering Technology Co Ltd
Priority to CN201611217227.7A priority Critical patent/CN106747001B/en
Publication of CN106747001A publication Critical patent/CN106747001A/en
Application granted granted Critical
Publication of CN106747001B publication Critical patent/CN106747001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/14Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/12Mortar-bound paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/142Mixtures or their components, e.g. aggregate
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving
    • E01C7/145Sliding coverings, underlayers or intermediate layers ; Isolating or separating intermediate layers; Transmission of shearing force in horizontal intermediate planes, e.g. by protrusions, by inlays
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00284Materials permeable to liquids
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to technical field of concrete, more particularly to a kind of porous pavement system and its construction method.The porous pavement system, including cement stabilized macadam, substrate concrete and facing concrete, the preparing raw material of the cement stabilized macadam include siccative and water, and the siccative is counted by weight, including following components:The weight portion of cement 140~160, the weight portion of aggregate chips 180~200, the weight portion of coarse aggregate 1400~1600;The preparing raw material of every cube of substrate concrete includes:Cement 360kg, 850~1300kg of regenerated coarse aggregate, 205~820kg of slag, 138~152kg of water;The preparing raw material of every cubic metre of facing concrete includes:Cement 400kg, 144~716kg of regenerated coarse aggregate, 1025~1845kg of slag, 143~157kg of water.The porous pavement system has suitable intensity on the whole, and using after 7 months, permeability rate is still 100%.

Description

A kind of porous pavement system and its construction method
Technical field
The present invention relates to technical field of concrete, more particularly to a kind of porous pavement system and its construction method.
Background technology
Cement stabilized macadam (hereinafter referred to as water is steady) is to make aggregate with graded broken stone, using a number of Binder Materials and The space of enough grey volume of slurry filler aggregates, paves compacting by embedded squeezing principle.Its compactness is close to packing, and intensity is main By the embedded squeezing lock knot principle between rubble, while there is enough grey volume of slurry to come the space of filler aggregate.Its early strength is high, and And intensity increases with age and form quickly plate body, thus with intensity higher, impervious degree and frost resistance are preferable.The steady cement of water Consumption is generally compound 4%-5%, and the unconfined compressive strength of 7 days is high compared with other roadbed materials up to 3.5-4.5mpa.Water Chance rain is not muddy after surely surviving, and surface is solid, is the preferable base material of high class pavement.
Current steel slag permeable concrete is constituted permeable using blotter, pervious concrete basic unit, pervious concrete surface layer Road System.But lack certain rigidity only with blotter, the supporting degree to whole permeable system is not high, it is impossible to play Good Undertaking effect.
The content of the invention
The shortcoming of prior art in view of the above, it is an object of the invention to provide a kind of porous pavement system and its applies Work method.
In order to achieve the above objects and other related objects, the present invention is adopted the following technical scheme that:
The first aspect of the present invention, there is provided a kind of porous pavement system, including cement stabilized macadam, substrate concrete and face Layer concrete, the preparing raw material of the cement stabilized macadam includes siccative and water, and the siccative is counted by weight, including following Component:The weight portion of cement 140~160, the weight portion of aggregate chips 180~200, the weight portion of coarse aggregate 1400~1600;Every cube of basic unit The preparing raw material of concrete includes:Cement 360kg, 850~1300kg of regenerated coarse aggregate, 205~820kg of slag, water 138~ 152kg;The preparing raw material of every cubic metre of facing concrete includes:Cement 400kg, 144~716kg of regenerated coarse aggregate, slag 1025~1845kg, 143~157kg of water.
When prepared by cement stabilized macadam, the siccative component in the raw material than water first carries out metering mixing, then with water Mix, carry out extrusion forming, you can prepare the cement stabilized macadam.The addition of the water is appropriate.It is preferred that Ground, the water is running water.
Preferably, in the preparing raw material of the cement stabilized macadam, the cement is to meet GB 175-2007 requirements The class g cements of P.O 42.5 or slag clinker-free cement.The slag clinker-free cement, 28d intensity is 37.6Mpa, and its component is de- Sulphur gypsum 15wt%, steel-making slag powder 10wt%, regeneration aggregate micro mist 30wt%, slag powders 45wt%.
Preferably, in the preparing raw material of the cement stabilized macadam, the aggregate chips is the continuous level in certain particle size range With aggregate chips, the specific standards on grade in continuous grading refer to JGJ 52-2006 Perlato Sictlla substandards, people in the art Member rule of thumb can choose the standard close with required particle size range as reference.
Preferably, the grain size≤5mm of the aggregate chips, clay content≤3wt%, clod content≤1wt%.
Preferably, in the preparing raw material of the cement stabilized macadam, the particle diameter of the coarse aggregate is 5~20mm of size.
Preferably, the coarse aggregate includes slag and regenerated coarse aggregate, is counted based on the cumulative volume of coarse aggregate, the steel The percent by volume of slag is 60~90%, and the percent by volume of the regenerated coarse aggregate is 10~40%.
Preferably, the slag is the slag of the qualified stability for meeting GB/T 24175-2009, and the free oxidation of slag Calcium content<3%, carry out boiling process soundness test by GB/T 1346-2011 qualified.The slag is purchased from marine smelting ring Border engineering science and technology Co., Ltd.
The slag is the continuous grading slag in certain particle size range, and the specific standards on grade in continuous grading can With reference to JGJ52-2006 Perlato Sictlla substandards, those skilled in the art rule of thumb can choose close with required particle size range Standard is used as reference.Preferably, the grain size of the slag is 5~20mm.
Preferably, the regenerated coarse aggregate is the concrete regenerated coarse aggregate for meeting GB/T 25177-2010 requirements.
It is further preferred that the regenerated coarse aggregate is selected from I classes regenerated coarse aggregate, II classes regenerated coarse aggregate or Group III again Any one in raw coarse aggregate.The grain size of the regenerated coarse aggregate is 5~20mm.
Preferably, can also contain rubble in the coarse aggregate, be counted based on the cumulative volume of coarse aggregate, the body of the rubble Product percentage≤15%.
Preferably, the rubble is that nominal particle diameter is more than 5mm's as obtained by natural rock or cobble through broken, screening Rock particles.
Further, the rubble is the rubble for meeting JGJ 52-2006 requirements.The particle diameter of the rubble is 5~20mm. Appropriate rubble is added in coarse aggregate, it is possible to increase the stability of the cement stabilized macadam for preparing.
Preferably, in the preparing raw material of the substrate concrete and facing concrete, the cement is to meet GB 175- The 2007 desired class g cements of P.O 42.5 or slag clinker-free cement.The slag clinker-free cement, 28d intensity is 37.6Mpa, Its component is desulfurated plaster 15wt%, steel-making slag powder 10wt%, regeneration aggregate micro mist 30wt%, slag powders 45wt%.
Preferably, in the preparing raw material of the substrate concrete and facing concrete, the regenerated coarse aggregate is to meet GB/ The concrete regenerated coarse aggregate of T 25177-2010 requirements.The regenerated coarse aggregate is selected from I classes regenerated coarse aggregate, II classes and regenerates Any one in coarse aggregate or Group III regenerated coarse aggregate.
Preferably, the grain size of regenerated coarse aggregate is 5~19mm in the substrate concrete.In the facing concrete The grain size of regenerated coarse aggregate is 5~10mm.
Preferably, in the preparing raw material of the substrate concrete and facing concrete, the slag is to meet GB/T The slag of the qualified stability of 24175-2009, and slag free calcium oxide content<3%, boiled by GB/T 1346-2011 Cooking method soundness test is qualified.
The slag is the continuous grading slag in certain particle size range, and the specific standards on grade in continuous grading can With reference to JGJ 52-2006 Perlato Sictlla substandards, those skilled in the art rule of thumb can choose close with required particle size range Standard is used as reference.
Preferably, the grain size of slag is 3~15mm in the substrate concrete.Slag in the facing concrete Grain size is 3~10mm.
Preferably, in the preparing raw material of the substrate concrete and facing concrete, pin, sheet-like particle contain in the slag Amount≤15wt%, clay content≤1wt%, clod content≤0.5wt%.
Preferably, in the preparing raw material of the substrate concrete and facing concrete, the slag is electric furnace roller slag.
Preferably, in the preparing raw material of the substrate concrete and facing concrete, the water is running water.
The second aspect of the present invention, there is provided the construction method of foregoing porous pavement system, including step:
(1) by after each component is measured by weight in the siccative in the preparing raw material of cement stabilized macadam, it is put into stirring Stirring in machine, uniform mixing, adds uniform stirring after water;Place to that will construct moistens, and then will mix Cement stabilized macadam gel material is poured at construction, starts to pave, levelling, is rolled, and obtains cement stabilized macadam;
(2) when cement stabilized macadam starts to pave, the regeneration in the preparing raw material of substrate concrete is weighed according to proportioning Coarse aggregate and slag, first add suitable quantity of water to water;By the regenerated coarse aggregate and slag of gained, mixer is put into, adds appropriate water, Stir;Cement is placed into, remaining water is added, stirred, the substrate concrete gel material for mixing;By what is rolled Directly put on cement stabilized macadam mix substrate concrete gel material, pave, it is levelling, roll, obtain substrate concrete;
(3) when substrate concrete starts to pave, the regeneration weighed according to proportioning in the preparing raw material of facing concrete is thick Aggregate and slag, first add suitable quantity of water to water;By the regenerated coarse aggregate and slag of gained, mixer is put into, adds appropriate water, stirred Mix uniform;Cement is placed into, remaining water is added, stirred, the facing concrete gel material for mixing;In the base for rolling Directly put on layer concrete mix facing concrete gel material, pave, it is levelling, roll, obtain facing concrete;
(4) after the completion of constructing, cover immediately, conserve.
Preferably, in step (2), the regenerated coarse aggregate and steel in the preparing raw material of substrate concrete are weighed according to proportioning Slag, first adds 8~12kg water to water in every cubic metre of substrate concrete;By the regenerated coarse aggregate and slag of gained, stirring is put into Machine, adds the water of 65~75kg in every cubic metre of substrate concrete, stir.
Preferably, in step (3), the regenerated coarse aggregate and steel in the preparing raw material of facing concrete are weighed according to proportioning Slag, first adds 8~12kg water to water in every cubic metre of substrate concrete;By the regenerated coarse aggregate and slag of gained, stirring is put into Machine, adds the water of 65~75kg in every cubic metre of facing concrete, stir.
Preferably, in step (4), watering is conserved on time daily.
The third aspect of the present invention, there is provided application of the foregoing porous pavement system in city and field of road construction.
As described above, compared with prior art, the invention has the advantages that:
Porous pavement system of the invention, cement stabilized macadam is applied to road cushion, can be with the permeable coagulation on its upper strata Soil layer forms homogeneous effect, plays good " ground " effect, significantly improves the support to pervious concrete, and then improve it Intensity, improves its practical effect (resistance to compression effect);Substrate concrete and blinding concrete have good compressive property and Pervious function;So that porous pavement system has suitable intensity on the whole, and using after 7 months, permeability rate is still 100%. Additionally, using integral construction method, reducing the engineering time, efficiency is improved.
Specific embodiment
Embodiments of the present invention are illustrated below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages of the invention and effect easily.The present invention can also be by specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from Various modifications or alterations are carried out under spirit of the invention.
It should be clear that process equipment not specific dated in the following example or device using conventional equipment in the art or Device.
In addition, it is to be understood that one or more method and steps mentioned in the present invention do not repel before and after the combination step Can also there is other method step or other method step can also be inserted between the step of these are specifically mentioned, unless separately It is described;It should also be understood that the combination annexation between one or more the equipment/devices mentioned in the present invention is not repelled Can also exist before and after the unit equipment/device other equipment/device or two equipment/devices specifically mentioning at these it Between can also insert other equipment/device, unless otherwise indicated.And, unless otherwise indicated, the numbering of various method steps is only Differentiate the convenient tool of various method steps, rather than to limit the ordering of various method steps or limiting enforceable model of the invention Enclose, being altered or modified for its relativeness is of the invention enforceable when being also considered as in the case of without essence change technology contents Category.
In embodiment unless otherwise specified, the preparing raw material of cement stabilized macadam uses following raw material:
Using the class g cements of P.O 42.5 for meeting GB 175-2007 requirements, supplier is that granary conch cement is limited to cement A Responsible company.
Cement B uses slag clinker-free cement, and 28d intensity is 37.6Mpa, and its component is desulfurated plaster 15wt%, slag Powder 10wt%, regenerated coarse aggregate micro mist 30wt%, slag powders 45wt%.
Grain size≤the 5mm of aggregate chips, clay content≤3wt%, clod content≤1wt%.
The particle diameter of coarse aggregate is 5~20mm.The coarse aggregate includes slag and regenerated coarse aggregate, the volume hundred of the slag Divide than being 60~90%.The slag is the slag of the qualified stability for meeting GB/T 24175-2009, and the free oxidation of slag Calcium content<3%, carry out boiling process soundness test by GB/T 1346-2011 qualified.The slag is purchased from upper marine smelting environment Engineering science and technology Co., Ltd.The regenerated coarse aggregate meets GB/T 25177-2010 requirements.Can also contain in the coarse aggregate broken Stone, is counted based on the cumulative volume of coarse aggregate, and percent by volume≤15% of the rubble, the rubble meets JGJ 52- 2006 require.Rubble be originate from Hubei confuse water 5~20mm rubble.
7d unconfined compressive strengths are the steady intensity index of water general in industry,《JTG F80/1-2004 highway engineering matter Amount first civil engineering of check evaluation criterion》.
28d compression strength for concrete universal performance index, only as Technical Reference, not as the steady performance of water according to According to,《GB/T 50107-2010 Standard for inspection and assessment of strength of concrete》.
In embodiment unless otherwise specified, the preparing raw material of substrate concrete and facing concrete uses the following raw material:
Using the class g cements of P.O 42.5 for meeting GB 175-2007 requirements, supplier is that granary conch cement is limited to cement A Responsible company;
Cement B uses slag clinker-free cement, and 28d intensity is 37.6Mpa, and its component is desulfurated plaster 15wt%, slag Powder 10wt%, regeneration aggregate micro mist 30wt%, slag powders 45wt%;
The regenerated coarse aggregate is the concrete regenerated coarse aggregate for meeting GB/T 25177-2010 requirements.The regeneration Coarse aggregate is selected from any one in I classes regenerated coarse aggregate, II classes regenerated coarse aggregate or Group III regenerated coarse aggregate, regenerated coarse aggregate From the municipal works Materials Co., Ltd of Shanghai assist million.
Slag is the electric furnace roller slag of generation in species abundance in Baosteel in Shanghai steelmaking process, and steel slag particle has certain grade;The steel Slag is the slag of the qualified stability for meeting GB/T 24175-2009, and slag free calcium oxide content<3%, by GB/T It is qualified that 1346-2011 carries out boiling process soundness test;Pin, sheet-like particle content≤15wt% in the slag, clay content≤ 1wt%, clod content≤0.5wt%.
28d compression strength is pressed《GB/T 50107-2010 Standard for inspection and assessment of strength of concrete》.
Coefficient of permeability is pressed《CJJ/T 135-2009 water-permeable cement concrete pavement technique codes》.
Embodiment 1
The porous pavement system of the present embodiment, including cement stabilized macadam, substrate concrete and facing concrete.
Fetched water respectively according to parts by weight cement-stabilizing broken stone preparation siccative component:Cement B 150kg, aggregate chips 200kg, 5 ~20mm coarse aggregate 1400kg, are put into uniform stirring 10 ± 2 minutes in mixer;Then add water appropriate, then uniform stirring 10 ± 2 Minute;Place to that will construct is moistened, and the cement stabilized macadam gel material that then will be mixed is poured at construction, is started Pave, it is levelling, roll, obtain cement stabilized macadam.Coarse aggregate in the present embodiment includes slag and regenerated coarse aggregate, slag Percent by volume is 60%, and the percent by volume of regenerated coarse aggregate is 40%.
The preparing raw material of every cube of substrate concrete includes:Cement A 360kg, 5~19mm regenerated coarse aggregates 1000kg, 3 ~15mm slag 615kg, water 140kg.When cement stabilized macadam starts to pave, the preparation of substrate concrete is weighed according to proportioning Regenerated coarse aggregate and slag in raw material, first add 8~12kg water to water in every cubic metre of substrate concrete, it is saturated with water Point;By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg is added in every cubic metre of substrate concrete Water, stirs 20~30s;Cement is placed into, remaining water is added, 40~60s, the substrate concrete gel material for mixing is stirred; Directly put on the cement stabilized macadam that will be rolled mix substrate concrete gel material, pave, it is levelling, roll, obtain base Layer concrete.
The preparing raw material of every cubic metre of facing concrete includes:Cement A 400kg, 5~10mm regenerated coarse aggregates 430kg, 3~10mm slag 1435kg, water 150kg.When substrate concrete starts to pave, facing concrete is weighed according to proportioning Preparing raw material in regenerated coarse aggregate and slag, first add 8~12kg water to water in every cubic metre of facing concrete, inhale it Full moisture;By waterishlogged regenerated coarse aggregate and slag, mixer is put into, add 65 in every cubic metre of facing concrete~ 75kg water, stirs 20~30s;Cement is placed into, remaining water is added, 40~60s, the facing concrete gel for mixing is stirred Material;Directly put on the substrate concrete for rolling mix facing concrete gel material, pave, it is levelling, roll, obtain face Layer concrete.
Should be covered with wet gunnysack or plastic sheeting immediately after the completion of construction, moisture content is not evaporated, and on time daily Watering is conserved twice, no less than 7d.
After testing, the porous pavement system of the present embodiment, the 7d unconfined compressive strength 6.7Mpa of cement stabilized macadam, 28d compression strength 7.8Mpa.The 28d compression strength of basic unit is 21.8Mpa, coefficient of permeability 3.5 × 10-2cm/s.The 28d of surface layer resists Compressive Strength is 26.3Mpa, coefficient of permeability 2.5 × 10-2cm/s。
Because single regeneration aggregate pervious concrete intensity is too low, 28d intensity is less than 10Mpa, without using effect. Using after 7 months, permeability rate is 98% to the pervious concrete performance of clean steel slag.And the porous pavement system of the present embodiment is on the whole With suitable intensity, and using after 7 months, permeability rate is still 100%.
Embodiment 2
The porous pavement system of the present embodiment, including cement stabilized macadam, substrate concrete and facing concrete.
Fetched water respectively according to parts by weight cement-stabilizing broken stone preparation siccative component:Cement B 150kg, aggregate chips 200kg, 5 ~20mm coarse aggregate 1400kg, are put into uniform stirring 10 ± 2 minutes in mixer;Then add water appropriate, then uniform stirring 10 ± 2 Minute;Place to that will construct is moistened, and the cement stabilized macadam gel material that then will be mixed is poured at construction, is started Pave, it is levelling, roll, obtain cement stabilized macadam.Coarse aggregate in the present embodiment includes slag and regenerated coarse aggregate, slag Percent by volume is 40%, and the percent by volume of regenerated coarse aggregate is 60%.
The preparing raw material of every cube of substrate concrete includes:Cement B 360kg, 5~19mm regenerated coarse aggregates 850kg, 3~ 15mm slag 820kg, water 152kg.When cement stabilized macadam starts to pave, the preparation for weighing substrate concrete according to proportioning is former Regenerated coarse aggregate and slag in material, first add 8~12kg water to water in every cubic metre of substrate concrete, it is saturated with moisture; By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg water is added in every cubic metre of substrate concrete, stirred Mix 20~30s;Cement is placed into, remaining water is added, 40~60s, the substrate concrete gel material for mixing is stirred;To roll Directly put on the cement stabilized macadam crossed mix substrate concrete gel material, pave, it is levelling, roll, obtain basic unit coagulation Soil.
The preparing raw material of every cube of facing concrete includes:Cement A 400kg, 5~10mm regenerated coarse aggregates 144kg, 3~ 10mm slag 1845kg, water 143kg.When substrate concrete starts to pave, the preparation for weighing facing concrete according to proportioning is former Regenerated coarse aggregate and slag in material, first add 8~12kg water to water in every cubic metre of facing concrete, it is saturated with moisture; By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg water is added in every cubic metre of facing concrete, stirred Mix 20~30s;Cement is placed into, remaining water is added, 40~60s, the facing concrete gel material for mixing is stirred;Rolling Directly put on the substrate concrete crossed mix facing concrete gel material, pave, it is levelling, roll, obtain facing concrete.
Should be covered with wet gunnysack or plastic sheeting immediately after the completion of construction, moisture content is not evaporated, and on time daily Watering is conserved twice, no less than 7d.
After testing, the porous pavement system of the present embodiment, the 7d unconfined compressive strengths 6.1Mpa of cement stabilized macadam.Base The 28d compression strength of layer is 20.8Mpa, coefficient of permeability 3.6 × 10-2cm/s.The 28d compression strength of surface layer is 26.9Mpa, permeable Coefficient 2.2 × 10-2cm/s。
Because single regeneration aggregate pervious concrete intensity is too low, 28d intensity is less than 10Mpa, without using effect. Using after 7 months, permeability rate is 98% to the pervious concrete performance of clean steel slag.And the porous pavement system of the present embodiment is on the whole With suitable intensity, and using after 7 months, permeability rate is still 100%.
Embodiment 3
The porous pavement system of the present embodiment, including cement stabilized macadam, substrate concrete and facing concrete.
Fetched water respectively according to parts by weight cement-stabilizing broken stone preparation siccative component:Cement A 140kg, aggregate chips 180kg, 5 ~20mm coarse aggregates 1550kg;Then add water appropriate, then uniform stirring 10 ± 2 minutes;Place to that will construct moistens, Then the cement stabilized macadam gel material that will be mixed is poured at construction, starts to pave, levelling, is rolled, and obtains cement stabilizing broken Stone.Coarse aggregate in the present embodiment includes slag and regenerated coarse aggregate, and the percent by volume of slag is 60%, regenerated coarse aggregate Percent by volume is 40%.Coarse aggregate in the present embodiment includes slag, regenerated coarse aggregate and rubble, the percent by volume of slag It is 70%, the percent by volume of regenerated coarse aggregate is 15%, the percent by volume of rubble is 15%.
The preparing raw material of every cube of substrate concrete includes:Cement B 360kg, 5~19mm regenerated coarse aggregates 1300kg, 3 ~15mm slag 205kg, water 138kg.When cement stabilized macadam starts to pave, the preparation of substrate concrete is weighed according to proportioning Regenerated coarse aggregate and slag in raw material, first add 8~12kg water to water in every cubic metre of substrate concrete, it is saturated with water Point;By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg is added in every cubic metre of substrate concrete Water, stirs 20~30s;Cement is placed into, remaining water is added, 40~60s, the substrate concrete gel material for mixing is stirred; Directly put on the cement stabilized macadam that will be rolled mix substrate concrete gel material, pave, it is levelling, roll, obtain base Layer concrete.
The preparing raw material of every cube of facing concrete includes:Cement A 400kg, 5~10mm regenerated coarse aggregates 716kg, 3~ 10mm slag 1025kg, water 157kg.When substrate concrete starts to pave, the preparation for weighing facing concrete according to proportioning is former Regenerated coarse aggregate and slag in material, first add 8~12kg water to water in every cubic metre of facing concrete, it is saturated with moisture; By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg water is added in every cubic metre of facing concrete, stirred Mix 20~30s;Cement is placed into, remaining water is added, 40~60s, the facing concrete gel material for mixing is stirred;Rolling Directly put on the substrate concrete crossed mix facing concrete gel material, pave, it is levelling, roll, obtain facing concrete.
Should be covered with wet gunnysack or plastic sheeting immediately after the completion of construction, moisture content is not evaporated, and on time daily Watering is conserved twice, no less than 7d.
After testing, the porous pavement system of the present embodiment, the 7d unconfined compressive strengths 6.6Mpa of cement stabilized macadam.Base The 28d compression strength of layer is 20.3Mpa, coefficient of permeability 4.2 × 10-2cm/s.The 28d compression strength of surface layer is 26.8Mpa, permeable Coefficient 2.3 × 10-2cm/s。
Because single regeneration aggregate pervious concrete intensity is too low, 28d intensity is less than 10Mpa, without using effect. Using after 7 months, permeability rate is 98% to the pervious concrete performance of clean steel slag.And the porous pavement system of the present embodiment is on the whole With suitable intensity, and using after 7 months, permeability rate is still 100%.
Embodiment 4
The porous pavement system of the present embodiment, including cement stabilized macadam, substrate concrete and facing concrete.
Fetched water respectively according to parts by weight cement-stabilizing broken stone preparation siccative component:Cement A 160kg, aggregate chips 180kg, 5- 20mm coarse aggregate 1600kg, then add water appropriate, then uniform stirring 10 ± 2 minutes;Place to that will construct moistens, so The cement stabilized macadam gel material that will be mixed afterwards is poured at construction, starts to pave, levelling, is rolled, and obtains cement stabilized macadam. Coarse aggregate in the present embodiment includes slag and regenerated coarse aggregate, and the percent by volume of slag is 90%, the body of regenerated coarse aggregate Product percentage is 10%.
The preparing raw material of every cube of substrate concrete includes:Cement B 360kg, 5~19mm regenerated coarse aggregates 1100kg, 3 ~15mm slag 500kg, water 140kg.When cement stabilized macadam starts to pave, the preparation of substrate concrete is weighed according to proportioning Regenerated coarse aggregate and slag in raw material, first add 8~12kg water to water in every cubic metre of substrate concrete, it is saturated with water Point;By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg is added in every cubic metre of substrate concrete Water, stirs 20~30s;Cement is placed into, remaining water is added, 40~60s, the substrate concrete gel material for mixing is stirred; Directly put on the cement stabilized macadam that will be rolled mix substrate concrete gel material, pave, it is levelling, roll, obtain base Layer concrete.
The preparing raw material of every cube of facing concrete includes:Cement A 400kg, 5~10mm regenerated coarse aggregates 300kg, 3~ 10mm slag 1500kg, water 150kg.When substrate concrete starts to pave, the preparation for weighing facing concrete according to proportioning is former Regenerated coarse aggregate and slag in material, first add 8~12kg water to water in every cubic metre of facing concrete, it is saturated with moisture; By waterishlogged regenerated coarse aggregate and slag, mixer is put into, 65~75kg water is added in every cubic metre of facing concrete, stirred Mix 20~30s;Cement is placed into, remaining water is added, 40~60s, the facing concrete gel material for mixing is stirred;Rolling Directly put on the substrate concrete crossed mix facing concrete gel material, pave, it is levelling, roll, obtain facing concrete.
Should be covered with wet gunnysack or plastic sheeting immediately after the completion of construction, moisture content is not evaporated, and on time daily Watering is conserved twice, no less than 7d.
After testing, the porous pavement system of the present embodiment, the 7d unconfined compressive strengths 7.1Mpa of cement stabilized macadam.Base The 28d compression strength of layer is 20.1Mpa, coefficient of permeability 4.0 × 10-2cm/s.The 28d compression strength of surface layer is 27.3Mpa, permeable Coefficient 2.0 × 10-2cm/s。
Because single regeneration aggregate pervious concrete intensity is too low, 28d intensity is less than 10Mpa, without using effect. Using after 7 months, permeability rate is 98% to the pervious concrete performance of clean steel slag.And the porous pavement system of the present embodiment is on the whole With suitable intensity, and using after 7 months, permeability rate is still 100%.
As can be seen here, porous pavement system of the invention, has the advantage that:(1) cement stabilized macadam due to slag and The addition of regenerated coarse aggregate, two kinds of the mutual superimposed of material make steady layer of water produce the effect tempered toughness with gentleness, with good rigidity, Compressive property is good, and good supporting role can be played to whole porous pavement system.(2) with slag and regeneration aggregate as main material Material is mixed with substrate concrete and facing concrete, and on the one hand the carrying out of regeneration aggregate can be recycled, and on the other hand may be used Improve the workability of slag:The concrete of clean steel slag is too hard, and workability is bad, and the water imbibition of regeneration aggregate will than slag It is good, can slowly discharge moisture out in construction, concrete coagulation (initial set of extension concrete and final setting time) is prevented, can be with The extension engineering time.Additionally, being mixed by both of selection differences particle size range, collaboration, superposition, produce hard and soft mutually The special-effects such as phase Ji.For the different requirement of basic unit, surface layer etc. in road, basic unit based on regeneration aggregate, with macropore effusion For the purpose of water;Surface layer based on slag, by performance, it is attractive in appearance for the purpose of.Ensure the persistence of water permeability.(3) current Shanghai etc. Big city is due to the transformation of newly-built and old building, and building waste is very huge.The present invention is to advocate sponge urban construction in country Under overall situation, the extensive application to building waste, according to there is good realistic meaning.
In sum, the present invention effectively overcomes various shortcoming of the prior art and has high industrial utilization.
The above-described embodiments merely illustrate the principles and effects of the present invention, not for the limitation present invention.It is any ripe The personage for knowing this technology all can carry out modifications and changes under without prejudice to spirit and scope of the invention to above-described embodiment.Cause This, those of ordinary skill in the art is complete with institute under technological thought without departing from disclosed spirit such as Into all equivalent modifications or change, should be covered by claim of the invention.

Claims (10)

1. a kind of porous pavement system, including cement stabilized macadam, substrate concrete and facing concrete, the cement stabilizing are broken The preparing raw material of stone includes siccative and water, and the siccative is counted by weight, including following components:The weight of cement 140~160 Part, the weight portion of aggregate chips 180~200, the weight portion of coarse aggregate 1400~1600;The preparing raw material of every cube of substrate concrete includes: Cement 360kg, 850~1300kg of regenerated coarse aggregate, 205~820kg of slag, 138~152kg of water;Every cubic metre of surface layer is mixed The preparing raw material for coagulating soil includes:Cement 400kg, 144~716kg of regenerated coarse aggregate, 1025~1845kg of slag, water 143~ 157kg。
2. porous pavement system according to claim 1, it is characterised in that the cement stabilized macadam, substrate concrete In the preparing raw material of facing concrete, the cement is the class g cements of P.O 42.5 or slag for meeting GB 175-2007 requirements Clinker-free cement.
3. porous pavement system according to claim 1, it is characterised in that the preparing raw material of the cement stabilized macadam In, the grain size≤5mm of the aggregate chips, clay content≤3wt%, clod content≤1wt%.
4. porous pavement system according to claim 1, it is characterised in that the preparing raw material of the cement stabilized macadam In, the particle diameter of the coarse aggregate is 5~20mm of size.
5. porous pavement system according to claim 1, it is characterised in that the preparing raw material of the cement stabilized macadam In, the coarse aggregate includes slag and regenerated coarse aggregate, is counted based on the cumulative volume of coarse aggregate, the volume basis of the slag Than being 60~90%, the percent by volume of the regenerated coarse aggregate is 10~40%.
6. porous pavement system according to claim 1, it is characterised in that can also contain rubble in the coarse aggregate, with Counted based on the cumulative volume of coarse aggregate, the percent by volume of the slag is 60~90%, the volume hundred of the regenerated coarse aggregate Divide than being 10~40%, percent by volume≤15% of the rubble.
7. the porous pavement system according to claim 5 or 6, it is characterised in that the slag is to meet GB/T 24175- The slag of 2009 qualified stability, and slag free calcium oxide content<3%, carry out boiling process peace by GB/T 1346-2011 Qualitative test is qualified;The regenerated coarse aggregate is the concrete regenerated coarse aggregate for meeting GB/T 25177-2010 requirements;When containing When having rubble, the rubble is the rubble for meeting JGJ 52-2006 requirements.
8. porous pavement system according to claim 1, it is characterised in that the substrate concrete and facing concrete In preparing raw material, the regenerated coarse aggregate is the concrete regenerated coarse aggregate for meeting GB/T 25177-2010 requirements;The base The grain size of regenerated coarse aggregate is 5~19mm in layer concrete;The grain size of regenerated coarse aggregate in the facing concrete It is 5~10mm;The slag is the slag of the qualified stability for meeting GB/T 24175-2009, and slag free calcium oxide contains Amount<3%, carry out boiling process soundness test by GB/T 1346-2011 qualified;The particle diameter chi of slag in the substrate concrete Very little is 3~15mm;The grain size of slag is 3~10mm in the facing concrete.
9. the construction method of the porous pavement system according to any one of claim 1~8, including step:(1) it is cement is steady Determine after each component in the siccative in the preparing raw material of rubble measures by weight, be put into stirring in mixer, uniform mixing, then Add uniform stirring after water;Place to that will construct moistens, and the cement stabilized macadam gel material that then will be mixed falls Enter at construction, start to pave, it is levelling, roll, obtain cement stabilized macadam;(2) when cement stabilized macadam starts to pave, according to Proportioning weighs the regenerated coarse aggregate and slag in the preparing raw material of substrate concrete, first adds suitable quantity of water to water;By the regeneration of gained Coarse aggregate and slag, are put into mixer, add appropriate water, stir;Cement is placed into, remaining water is added, stirring is equal Substrate concrete gel material that is even, mixing;The substrate concrete for mixing directly is put on the cement stabilized macadam that will be rolled Gel material, pave, it is levelling, roll, obtain substrate concrete;(3) when substrate concrete starts to pave, according to proportioning weighing face Regenerated coarse aggregate and slag in the preparing raw material of layer concrete, first add suitable quantity of water to water;By the regenerated coarse aggregate and steel of gained Slag, is put into mixer, adds appropriate water, stirs;Cement is placed into, remaining water is added, stirred, mixed Facing concrete gel material;Directly put on the substrate concrete for rolling mix facing concrete gel material, pave, look for Put down, roll, obtain facing concrete;(4) after the completion of constructing, cover immediately, conserve.
10. the porous pavement system described in any one of claim 1~8, in the application of city and field of road construction.
CN201611217227.7A 2016-12-26 2016-12-26 A kind of porous pavement system and its construction method Active CN106747001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611217227.7A CN106747001B (en) 2016-12-26 2016-12-26 A kind of porous pavement system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611217227.7A CN106747001B (en) 2016-12-26 2016-12-26 A kind of porous pavement system and its construction method

Publications (2)

Publication Number Publication Date
CN106747001A true CN106747001A (en) 2017-05-31
CN106747001B CN106747001B (en) 2019-11-08

Family

ID=58926181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611217227.7A Active CN106747001B (en) 2016-12-26 2016-12-26 A kind of porous pavement system and its construction method

Country Status (1)

Country Link
CN (1) CN106747001B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034767A (en) * 2017-06-26 2017-08-11 湖南顺天建设集团有限公司 A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN108316090A (en) * 2017-12-27 2018-07-24 河南科技大学 A kind of afforestation anti-ponding ecological pavement and preparation method
CN109293296A (en) * 2018-09-07 2019-02-01 长安大学 A kind of prefabricated section containing coral sand, which is led, seeps loaded filter and preparation method
CN110004796A (en) * 2019-05-08 2019-07-12 安徽中益新材料科技有限公司 A kind of self-luminous road surface structure and its construction method
CN111233391A (en) * 2020-01-16 2020-06-05 苏州望意阳环保科技有限公司 Preparation method of steel fiber permeable pavement
CN112374836A (en) * 2020-12-01 2021-02-19 中冶宝钢技术服务有限公司 Cement stabilized macadam gel material and preparation method and application thereof
CN113149582A (en) * 2021-04-07 2021-07-23 长泰县华信混凝土有限公司 Preparation method of ecological pervious concrete
CN113529528A (en) * 2021-07-30 2021-10-22 广西交科集团有限公司 Full-granularity asphalt pavement structure for finely utilizing steel slag
CN113550191A (en) * 2020-04-24 2021-10-26 国川国际建设有限公司 Outdoor ground and laying method thereof
CN113718578A (en) * 2021-08-04 2021-11-30 郑佳艳 Old cement concrete additional paving modification method
CN114657835A (en) * 2022-03-28 2022-06-24 中建八局检测科技有限公司 Deep-silt geological environment-friendly temporary road structure and construction method thereof
CN115490460A (en) * 2022-10-14 2022-12-20 南京赛仕瑞道路工程技术有限公司 Fluorescence permeable pavement surface course, fluorescence permeable pavement and brick that permeates water

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2266523A (en) * 1992-04-29 1993-11-03 Redland Technology Ltd Concrete building products
JP2007204974A (en) * 2006-01-31 2007-08-16 Takenaka Komuten Co Ltd Cement-solidified soil composition
CN101880996A (en) * 2009-05-07 2010-11-10 中冶天工上海十三冶建设有限公司 Cement-stabilizing broken stone used for highway subgrade
CN103541288A (en) * 2013-09-29 2014-01-29 机械工业第三设计研究院 High-performance environment-friendly permeable brick and production method thereof
CN205062603U (en) * 2015-10-08 2016-03-02 广东博意建筑设计院有限公司 Road surface structure suitable for residence community
CN205152745U (en) * 2015-11-11 2016-04-13 华南理工大学 Combined type long -life cement road surface structure
CN106245482A (en) * 2016-08-29 2016-12-21 唐健发 A kind of construction technology on water-permeable brick road surface

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2266523A (en) * 1992-04-29 1993-11-03 Redland Technology Ltd Concrete building products
JP2007204974A (en) * 2006-01-31 2007-08-16 Takenaka Komuten Co Ltd Cement-solidified soil composition
CN101880996A (en) * 2009-05-07 2010-11-10 中冶天工上海十三冶建设有限公司 Cement-stabilizing broken stone used for highway subgrade
CN103541288A (en) * 2013-09-29 2014-01-29 机械工业第三设计研究院 High-performance environment-friendly permeable brick and production method thereof
CN205062603U (en) * 2015-10-08 2016-03-02 广东博意建筑设计院有限公司 Road surface structure suitable for residence community
CN205152745U (en) * 2015-11-11 2016-04-13 华南理工大学 Combined type long -life cement road surface structure
CN106245482A (en) * 2016-08-29 2016-12-21 唐健发 A kind of construction technology on water-permeable brick road surface

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107034767A (en) * 2017-06-26 2017-08-11 湖南顺天建设集团有限公司 A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN108316090A (en) * 2017-12-27 2018-07-24 河南科技大学 A kind of afforestation anti-ponding ecological pavement and preparation method
CN108316090B (en) * 2017-12-27 2020-04-14 河南科技大学 Water accumulation preventing ecological pavement for landscaping and preparation method
CN109293296A (en) * 2018-09-07 2019-02-01 长安大学 A kind of prefabricated section containing coral sand, which is led, seeps loaded filter and preparation method
CN110004796A (en) * 2019-05-08 2019-07-12 安徽中益新材料科技有限公司 A kind of self-luminous road surface structure and its construction method
CN111233391A (en) * 2020-01-16 2020-06-05 苏州望意阳环保科技有限公司 Preparation method of steel fiber permeable pavement
CN113550191A (en) * 2020-04-24 2021-10-26 国川国际建设有限公司 Outdoor ground and laying method thereof
CN113550191B (en) * 2020-04-24 2023-02-24 国川国际建设有限公司 Outdoor ground and laying method thereof
CN112374836A (en) * 2020-12-01 2021-02-19 中冶宝钢技术服务有限公司 Cement stabilized macadam gel material and preparation method and application thereof
CN113149582A (en) * 2021-04-07 2021-07-23 长泰县华信混凝土有限公司 Preparation method of ecological pervious concrete
CN113529528A (en) * 2021-07-30 2021-10-22 广西交科集团有限公司 Full-granularity asphalt pavement structure for finely utilizing steel slag
CN113718578A (en) * 2021-08-04 2021-11-30 郑佳艳 Old cement concrete additional paving modification method
CN114657835A (en) * 2022-03-28 2022-06-24 中建八局检测科技有限公司 Deep-silt geological environment-friendly temporary road structure and construction method thereof
CN115490460A (en) * 2022-10-14 2022-12-20 南京赛仕瑞道路工程技术有限公司 Fluorescence permeable pavement surface course, fluorescence permeable pavement and brick that permeates water
CN115490460B (en) * 2022-10-14 2023-09-08 南京赛仕瑞道路工程技术有限公司 Fluorescent permeable pavement surface layer, fluorescent permeable pavement and permeable brick

Also Published As

Publication number Publication date
CN106747001B (en) 2019-11-08

Similar Documents

Publication Publication Date Title
CN106747001B (en) A kind of porous pavement system and its construction method
Roy et al. Effect of partial replacement of cement by silica fume on hardened concrete
Patankar et al. Mix design of fly ash based geopolymer concrete
Nath et al. Effect of GGBFS on setting, workability and early strength properties of fly ash geopolymer concrete cured in ambient condition
Man et al. Engineering properties and microstructure analysis of magnesium phosphate cement mortar containing bentonite clay
Wankhede et al. Effect of fly ash on properties of concrete
CN106830816B (en) A kind of cement stabilized macadam for pervious concrete
CN104844082B (en) Mix permeable concrete and the production method thereof of industrial residue
Raju et al. Effect of using glass powder in concrete
Güneyisi et al. Permeation Properties of Self-Consolidating Concretes with Mineral Admixtures.
CN103553375B (en) Composite soil curing agent and preparation and application thereof
Segura et al. Influence of recycled limestone filler additions on the mechanical behaviour of commercial premixed hydraulic lime based mortars
CN108238746A (en) A kind of pervious concrete and preparation method thereof
Kabeer et al. Experimental investigation on utilization of dried marble slurry as fine aggregate in lean masonry mortars
JP2016065417A (en) Quality management method of cast-in-place porous concrete
CN108751865A (en) Body refuse soil regeneration baking-free brick and preparation method thereof more than a kind of
CN107879681A (en) A kind of concrete slurry, alkali-activated carbonatite lightweight rubber regeneration concrete and preparation method thereof
Raghavendra et al. Controlled Low-Strength Materials Using Bagasse Ash and Fly Ash.
CN106699079B (en) A kind of steel slag collaboration recycled aggregate pervious concrete
JP6464417B2 (en) Method for manufacturing cast-in-place porous concrete
JP6292904B2 (en) Method for manufacturing cast-in-place porous concrete
CN103979888A (en) Rapid soil curing agent and preparation method thereof
JP6347514B2 (en) Method for manufacturing cast-in-place porous concrete
JP6646777B1 (en) Cement-based porous pavement material
Salman et al. The mechanical properties of Lime Concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant