CN106742974A - Cram packer and refuse treatment plant - Google Patents
Cram packer and refuse treatment plant Download PDFInfo
- Publication number
- CN106742974A CN106742974A CN201710048831.XA CN201710048831A CN106742974A CN 106742974 A CN106742974 A CN 106742974A CN 201710048831 A CN201710048831 A CN 201710048831A CN 106742974 A CN106742974 A CN 106742974A
- Authority
- CN
- China
- Prior art keywords
- compartment
- control panel
- bar portion
- wheel
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65F—GATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
- B65F3/00—Vehicles particularly adapted for collecting refuse
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65F—GATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
- B65F3/00—Vehicles particularly adapted for collecting refuse
- B65F3/24—Vehicles particularly adapted for collecting refuse with devices for unloading the tank of a refuse vehicle
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65F—GATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
- B65F3/00—Vehicles particularly adapted for collecting refuse
- B65F2003/006—Constructional features relating to the tank of the refuse vehicle
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Handcart (AREA)
Abstract
The invention provides a kind of cram packer and refuse treatment plant, belong to the realm of building construction, including compartment, walking mechanism and controlling organization, compartment has first open and the second open, bottom of the walking mechanism installed in compartment;Controlling organization includes two control panels being hinged on the enclosing in compartment, two control panels are open with respect to being closed in compartment rotation process or opening second, controlling organization also includes support wheel, motor and wire spool, support wheel is articulated with a control panel, two bottoms of control panel can be pushed against in support wheel rotation process, for limiting rotation of two control panels relative to compartment, motor is arranged on compartment, wire spool is installed with the output shaft of motor, wire spool is used for winding draught line, and draught line is connected on support wheel.The cram packer is easy to operate when in use, uses manpower and material resources sparingly.
Description
Technical field
The present invention relates to the realm of building construction, in particular to a kind of cram packer and refuse treatment plant.
Background technology
At present, in building construction process, substantial amounts of building waste can be produced, when processing these rubbish, is needed
First rubbish to be put together, it is general using cremate treatment.During transport of refuse, because architectural environment is complicated, adopt substantially
Promote transport vehicle to be conveyed with workman, during rubbish is conveyed after correct position, incline transport vehicle, rubbish is poured out.
Inventor has found that cram packer at least has the disadvantage that in traditional building construction process under study for action:
After by garbage transporting to correct position, rubbish is poured out from compartment by the way of toppling over, operation inconvenience, rubbish
During rubbish, rubbish is easily deposited in compartment, cleaning inconvenience;Operation is wasted time and energy, and labour intensity is big.
The content of the invention
It is an object of the invention to provide a kind of cram packer, to improve, traditional transport bassinet structure is single, operating cost
When laborious, the problem for toppling over inconvenience of rubbish.
It is an object of the invention to provide a kind of refuse treatment plant, to improve, traditional transport bassinet structure is single, operation
Waste time and energy, the problem for toppling over inconvenience of rubbish.
What embodiments of the invention were realized in:
Based on above-mentioned first purpose, the invention provides a kind of cram packer, including compartment, walking mechanism and control
Mechanism, wherein:
The bottom that the top in the compartment has the first opening, the compartment has the second open, walking mechanism peace
Mounted in the bottom in the compartment, the enclosing with the compartment is fixedly connected;The controlling organization includes being hinged on the compartment
Two control panels on enclosing, close or open described second and open in two relatively described compartment rotation processes of the control panel
Mouthful, the controlling organization also includes support wheel, motor and wire spool, and the end away from its wheel body of the support wheel is hinged
Its end being hinged with the control panel can be pushed against two in a control panel, the support wheel rotation process
The bottom of the control panel, for limiting rotation of two control panels relative to the compartment, the motor is arranged on the car
On railway carriage or compartment, the wire spool is installed with the output shaft of the motor, the wire spool is used for winding draught line, the traction
Line is connected on the support wheel.
In preferred embodiments of the present invention, the compartment includes two side plates being oppositely arranged, two control panels
Two bottom avris of the side plate are separately mounted to, the avris away from the corresponding side plate of each control panel is installed
There is sealing strip.
In preferred embodiments of the present invention, the support wheel also includes wheel shaft and support bar, the one of the support bar
End is provided with the wheel shaft, and the wheel body is rotated and is installed on the wheel shaft, the end away from the wheel shaft of the support bar
Portion is hinged on control panel described in, the hinge axes of the support bar and the control panel parallel to the control panel with it is described
The hinge axes of enclosing, the end being hinged with the control panel of the support bar also has abutting portion, and the support bar is rotated
During, the abutting portion is pushed against on another control panel.
In preferred embodiments of the present invention, the base surface for not being hinged the control panel of the support bar sets limited location
Groove, the stopper slot includes groove bottom wall and connects the groove sidewall of the groove bottom wall, and the groove sidewall is set to inclined-plane, the groove
The side of the notch away from the stopper slot of side wall inclines towards the center of the groove bottom wall;It is corresponding, the abutting
Portion has end face and the side face being connected with the end face, and the side face is the inclined-plane being engaged with the groove sidewall.
In preferred embodiments of the present invention, the walking mechanism includes four mounting rods and installed in peace every described
The universal wheel of the end of bar is filled, four mounting rods set at four angles of same rectangle and around the support wheel respectively
Put.
In preferred embodiments of the present invention, the mounting rod be expansion link, the mounting rod include the first bar portion and
Second bar portion, first bar portion is inserted into second bar portion, and the bottom of first bar portion is provided with the universal wheel,
The end away from first bar portion of second bar portion is arranged on the enclosing;Second bar portion and first bar
Hydraulic ram assemblies are set between portion, are slided relative to first bar portion for ordering about second bar portion, second bar portion
Restricted second bar portion is set between first bar portion and slips away described first along the direction away from first bar portion
The position-limit mechanism of bar portion.
In preferred embodiments of the present invention, the position-limit mechanism includes the first annular projection and the second annular projection, institute
The first annular projection is stated installed in one end away from the universal wheel of first bar portion, second annular projection is arranged on
One end of the close described universal wheel of second bar portion, second annular projection be located at first annular projection with it is described
Between universal wheel, and first annular projection is located on the sliding path of second annular projection.
In preferred embodiments of the present invention, the cram packer also includes resetting-mechanism, and the resetting-mechanism is installed
Between the compartment and the support wheel, make the support wheel that there is the rotation towards the direction for pushing against the control panel to become
Gesture.
In preferred embodiments of the present invention, the controlling organization also includes two drag-lines, every one end of the drag-line
The side away from articulated position of the control panel is connected, the other end is located at the outside in the compartment, and position through the enclosing
The end of the drag-line of the outside in the compartment is provided with draw ring.
Based on above-mentioned second purpose, the invention provides a kind of refuse treatment plant, including described cram packer.
The beneficial effect of the embodiment of the present invention is:
In sum, a kind of cram packer is the embodiment of the invention provides, its is simple and reasonable, is easy to manufacture to add
Work, install with it is easy to use, meanwhile, the cram packer is easy to operate when in use, it is not necessary to incline transport vehicle with regard to energy
Enough to pour out the rubbish in compartment, and rubbish is difficult to remain in compartment, the cleaning of rubbish is more thorough, it is to avoid repeatedly incline
Oblique transport vehicle carrys out troublesome operation during thorough cleaning rubbish, uses manpower and material resources sparingly.It is specific as follows:
The cram packer that the present embodiment is provided, walking mechanism is provided with the bottom in compartment, and walking mechanism drives compartment
Motion, motion is convenient.The first opening is provided with the top of compartment, the bottom in compartment is provided with the second opening, it is spacious second
The door that two fans are made up of two control panels is installed at mouthful, two control panels are respectively hinged on the enclosing in compartment, two controls
Plate can be rotated relative to enclosing, and then opened or closed the second opening, during practical operation, two control panels are rotated and closed
The second opening is closed, meanwhile, support wheel is installed at an avris for control panel, after the second open closing, support wheel is supported on
One end support of the lower section of control panel, i.e. support wheel on the ground, is played a part of to support compartment, support together with walking mechanism
One end away from ground of wheel is pushed against on control panel, limits rotation of two control panels relative to enclosing, and support wheel is served
Locking two effects of control panel, now, from the first open-mouth to compartment in place rubbish, rubbish will not fall from the second open-mouth
Go out.In transportation, support wheel is moved together with walking mechanism, after correct position is moved to, operates motor, motor to drive
Around being located on wire spool, draught line is connected on support wheel draught line, and then support wheel is rotated relative to control panel, support wheel
Towards the direction motion for abutting in control panel, ground is left in the end of support wheel, and rubbish is under gravity by two control panels
Open, rubbish can be dropped out from the second open-mouth, it is not necessary to incline compartment, i.e., need not be incited somebody to action using power during rubbish is unloaded
Tilting of car body, saves substantial amounts of manpower, reduces labour intensity, and the unloading of rubbish is more reasonable.
The refuse treatment plant that the present embodiment is provided includes above-mentioned cram packer, all excellent with cram packer
Point.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be attached to what is used needed for embodiment
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, thus be not construed as it is right
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the structure chart of the cram packer of the embodiment of the present invention;
Fig. 2 is the lateral view of the cram packer of the embodiment of the present invention;
Fig. 3 is A-A in this Fig. 2 to sectional view;
Abutting portions and the matching chart of control panel of the Fig. 4 for the cram packer of the embodiment of the present invention;
Fig. 5 is the sectional view of the mounting rod of the cram packer of the embodiment of the present invention.
Icon:100- compartments;110- first is open;120- second is open;130- enclosings;200- walking mechanisms;
210- mounting rods;The bar portions of 211- first;The bar portions of 212- second;213- hydraulic ram assemblies;220- universal wheels;300- is controlled
Mechanism;310- support wheels;311- support bars;312- wheel bodies;313- abuttings portion;314- inclined-planes;320- motors;
330- wire spools;340- control panels;341- stopper slots;342- groove bottom walls;343- groove sidewalls;350- draught lines;400-
Resetting-mechanism;500- drag-lines;600- draw rings;700- tensioning apparatus;710- elastic components;720- pushes against wheel.
Specific embodiment
After by garbage transporting to correct position, rubbish is poured out from compartment by the way of toppling over, operation inconvenience, rubbish
During rubbish, rubbish is easily deposited in compartment, cleaning inconvenience;Operation is wasted time and energy, and labour intensity is big.
In consideration of it, designer of the present invention devises a kind of cram packer and refuse treatment plant, by changing rubbish
The structure of transport vehicle, when rubbish is unloaded, it is not necessary to incline car body, greatly reduce labour intensity.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention, rather than whole embodiments.Present invention implementation generally described and illustrated in accompanying drawing herein
The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed
The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiment in the present invention, this area is common
The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model of present invention protection
Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined in individual accompanying drawing, then it need not be further defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, the instruction such as term " " center ", " on ", D score, " interior ", " outward "
Orientation or position relationship are that, based on orientation shown in the drawings or position relationship, or the invention product is usually put when using
Orientation or position relationship, are for only for ease of the description present invention and simplify and describe, rather than indicate or imply signified device or
Element with specific orientation, with specific azimuth configuration and operation, therefore must be not considered as limiting the invention.This
Outward, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that indicating or implying relative importance.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ",
" installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or one
The connection of body ground;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to indirect by intermediary
It is connected, can is two connections of element internal.For the ordinary skill in the art, can be with concrete condition understanding
State term concrete meaning in the present invention.
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases
Mutually combination.
Cram packer embodiment
Refer to Fig. 1-Fig. 5, present embodiments provide a kind of cram packer, including compartment 100, walking mechanism 200 with
And controlling organization 300, the bottom that the top in compartment 100 has the first opening 110, compartment 100 has the second opening 120, walking
Mechanism 200 is arranged on the bottom in compartment 100, is fixedly connected with the enclosing 130 in compartment 100;Controlling organization 300 includes being hinged on car
Two control panels 340 on the enclosing 130 in railway carriage or compartment 100, two control panels 340 are closed or opened with respect in the rotation process of compartment 100
Open the second opening 120, controlling organization 300 also includes support wheel 310, motor 320 and wire spool 330, support wheel 310 away from
The end of its wheel body 312 is articulated with a control panel 340, and it is hinged with control panel 340 in the rotation process of support wheel 310
End can be pushed against two bottoms of control panel 340, for limiting rotation of two control panels 340 relative to compartment 100, electricity
Machine 320 is arranged on compartment 100, and wire spool 330 is installed with the output shaft of motor 320, and wire spool 330 leads for winding
Lead 350, draught line 350 is connected on support wheel 310.It is preferably arranged to, axis and support wheel 310 and the control of motor 320
The diameter parallel that plate 340 is hinged is set.
The cram packer that the present embodiment is provided, walking mechanism 200, walking mechanism 200 are provided with the bottom in compartment 100
Compartment 100 is driven to move, motion is convenient.The top in compartment 100 is provided with the first opening 110, is set in the bottom in compartment 100
There is the second opening 120, the door that two fans are made up of two control panels 340, two control panels 340 are installed at second open 120
Be respectively hinged on the enclosing 130 in compartment 100, two control panels 340 can be rotated relative to enclosing 130, so open or
The second opening 120 is closed, during practical operation, two control panels 340 is rotated and the second opening 120 is closed, meanwhile, in a control
Support wheel 310 is installed, after the second open 120 closing, support wheel 310 is supported under control panel 340 at the avris of making sheet 340
One end support of side, i.e. support wheel 310 on the ground, is played a part of to support compartment 100, support together with walking mechanism 200
One end away from ground of wheel 310 is pushed against on control panel 340, limits rotation of two control panels 340 relative to enclosing 130,
Support wheel 310 serves two effects of control panel 340 of locking, now, from first open 110 to placing rubbish in compartment 100
Rubbish, rubbish will not be dropped out from second open 120.In transportation, support wheel 310 is moved together with walking mechanism 200, when
After moving to correct position, motor 320, motor 320 is operated to drive draught line 350 around being located on wire spool 330, draught line 350
It is connected on support wheel 310, and then support wheel 310 is rotated relative to control panel 340, support wheel 310 is towards abutting in control
Ground is left in the direction motion of plate 340, the end of support wheel 310, and rubbish under gravity opens two control panels 340,
Rubbish can be dropped out from second open 120, it is not necessary to incline compartment 100, i.e., power need not be utilized during rubbish is unloaded
By tilting of car body, substantial amounts of manpower is saved, reduce labour intensity, the unloading of rubbish is more reasonable.
In reality processing, compartment 100 is processed as cube shape, first open 110 and second open 120 is rectangular opening,
Enclosing 130 is that the rectangular slab that four head and the tail are sequentially connected is constituted, meanwhile, control panel 340 is processed as rectangular slab, each control panel
340 side is hinged on be oppositely arranged two rectangular slabs of enclosing 130.Obviously, for the ease of transport, in compartment 100
On catch bar is installed, constructor's operation catch bar is easy to promote whole compartment 100 to be moved under the drive of walking mechanism 200.
Simultaneously as some granulated garbages are small or rubbish in have moisture, in order to avoid polluting environment in transportation, in two controls
The both sides away from articulated position that the control panel of sealing strip, i.e., two 340 is provided with the sealing of making sheet 340 are connected by sealing strip
Connect, during reality processing, one sealing strip is installed in each avris, two control panels 340 are turned to closes the second opening 120
Behind position, two sealing strips are combined closely in squeezed state.
Fig. 3 is referred to, the cram packer that the present embodiment is provided, the unlatching of two control panels 340 relies on the gravity of rubbish
Realize, and the closing of two control panels 340 is solid by the supporting role of support wheel 310, is preferably arranged to, support wheel 310 is also
Including wheel shaft and support bar 311, one end of support bar 311 is provided with wheel shaft, and wheel body 312 is rotated and is installed on wheel shaft, is propped up
The end away from wheel shaft of strut 311 is hinged on a control panel 340, and support bar 311 is parallel with the hinge axes of control panel 340
In control panel 340 and the hinge axes of enclosing 130, the end being hinged with control panel 340 of support bar 311 also has abutting portion
313, in the rotation process of support bar 311, abutting portion 313 is pushed against on another control panel 340.During reality processing, two control panels
340 hinge axes are located parallel to the both sides of the traffic direction of cram packer, and support wheel 310 is in rotating opening control panel
When 340, support wheel 310 is moved towards near the bottom surface direction of connected control panel 340, and the smooth opening of control panel 340 is entered
And the second opening 120 is opened, rubbish smoothly falls, it is not necessary to incline car body, greatly reduces labour intensity.Further,
Support wheel 310 is arranged on the medium position of the edge parallel to hinge lines of control panel 340.
Fig. 4 is referred to, when support wheel 310 is supported on 340 bottom of control panel, support wheel 310 is together with walking mechanism 200
Motion, support wheel 310 needs to be contacted with ground, therefore, in order to ensure the support effect of support wheel 310, and then ensure that second opens
The closing effect of mouth 120, is preferably arranged to, and the base surface of the control panel 340 of non-hinged support bar 311 is provided with stopper slot 341,
Stopper slot 341 includes the groove sidewall 343 of groove bottom wall 342 and connection groove bottom wall 342, and groove sidewall 343 is set to inclined-plane 314, groove
The side of the notch away from stopper slot 341 of sidewall 34 3 inclines towards the center of groove bottom wall 342;It is corresponding, abutting portion
313 have end face and the side face being connected with the end face, and side face is the inclined-plane 314 being engaged with groove sidewall 343.Abutting portion 313
Matching relationship with stopper slot 341 is good, and when coordinating with stopper slot 341, abutting portion 313 transports towards stopper slot 341 in abutting portion 313
Dynamic, when the inclined-plane 314 in abutting portion 313 is contacted with the groove sidewall 343 being obliquely installed of stopper slot 341, groove sidewall 343 has guiding
Effect, is easy to abutting portion 313 to be clamped in stopper slot 341.Further, set mutual on stopper slot 341 and abutting portion 313
The magnet of attraction, increased the bonding strength in abutting portion 313 and control panel 340, and the abutting effect of support wheel 310 more preferably, is used
It is safer.During reality processing, the abutting portion 313, abutting portion 313 are set in the end away from wheel body 312 of support bar 311
It is the structure of the end face that support bar 311 is protruded along the axis direction of support bar 311.
Fig. 2 and Fig. 3 is referred to, further, cram packer also includes resetting-mechanism 400, and resetting-mechanism 400 is arranged on
Between compartment 100 and support wheel 310, make support wheel 310 that there is the rotation trend towards the direction for pushing against control panel 340.Rubbish
After completion of discharge, motor 320 is operated so that elongated around the draught line 350 being located on wire spool 330, now, resetting-mechanism 400
Order about support wheel 310 to rotate, the bottom of control panel 340 can be pushed against, realize the closing of the second opening 120, be easy to turn next time
Fill out rubbish.Resetting-mechanism 400 preferably uses one end of back-moving spring, back-moving spring to be arranged on control panel 340, and the other end is installed
On support bar 311, back-moving spring is inclined to set with control panel 340, it is clear that the control panel 340 that back-moving spring is installed is branch
The control panel 340 that strut 311 is hinged.Additionally, setting resetting-mechanism 400, resetting-mechanism 400 has support wheel 310 all the time
Abutting portion 313 is pushed against the power on control panel 340, it is ensured that in rubbish course of conveying, support wheel 310 be difficult arbitrarily rotation,
The closing of the second opening 120 is relatively reliable, does not interfere with the transfer efficiency of rubbish.Further, resetting-mechanism 400 has two,
Support wheel 310 is located at two centres of resetting-mechanism 400, better reduction.In this scenario, become to ensure draught line 350
In growth process, the situation of knotting is less prone to, or be less prone to because of the situation that relaxed state is wrapped on rubbish, in walking
Tensioning apparatus 700 is installed, tensioning apparatus 700 includes elastic component 710 and pushes against wheel 720, one end peace of elastic component 710 in structure
In walking mechanism 200, the other end is provided with abutting wheel 720, pushes against wheel 720 and is located at wire spool 330 and support wheel 310 and leads
Between the link position of lead 350, the wheel face for pushing against wheel 720 is pushed against on draught line 350, is remained draught line 350 and is opened
Tight state.
Fig. 1 and Fig. 2 is referred to, further, walking mechanism 200 includes four mounting rods 210 and installed in every peace
The universal wheel 220 of the end of bar 210 is filled, four mounting rods 210 are located at four angles of same rectangle and around support wheel respectively
310 are set, and in order to improve overall structural strength, strengthening frame, motor 320, elastic component are provided between adjacent mounting rod 210
710 are all arranged on corresponding mounting bracket.Walking mechanism 200 is simple and reasonable, does not interfere with the installation of support wheel 310 and turns
It is dynamic, do not interfere with the rotation of control panel 340 yet.It is preferably arranged to, mounting rod 210 is expansion link, mounting rod 210 includes the first bar
The bar portion 212 of portion 211 and second, the first bar portion 211 is inserted into the second bar portion 212, and the bottom of the first bar portion 211 is provided with ten thousand
To wheel 220, the end away from the first bar portion 211 of the second bar portion 212 is arranged on enclosing 130;Second bar portion 212 and the first bar
Hydraulic ram assemblies 213 are set between portion 211, are slided relative to the first bar portion 211 for ordering about the second bar portion 212, the second bar portion
212 and first set restricted second bar portion 212 between bar portion 211 and are slipped away the first bar portion along the direction away from the first bar portion 211
211 position-limit mechanism.In rubbish uninstall process, due to the amount of rubbish it is more when, rubbish is difficult all to fall in the compartment 100
Go out, therefore, hydraulic ram assemblies 213 are adjusted, the second bar portion 212 is moved relative to the first bar portion 211, and then make 100 liters of compartment
Height, increases the spatial area of second open 120 and ground, and rubbish is dropped out and more facilitated.
Refer to Fig. 5, position-limit mechanism includes the first annular projection and the second annular projection, the first annular projection is arranged on the
One end away from universal wheel 220 of one bar portion 211, the second annular projection is arranged on the close universal wheel 220 of the second bar portion 212
One end, the second annular projection is located between the first annular projection and universal wheel 220, and the first annular projection is convex positioned at the second ring-type
On the sliding path for rising.Position-limit mechanism simple structure, is easy to processing.
Fig. 3 is referred to, controlling organization 300 also includes two drag-lines 500, every one end connection control panel 340 of drag-line 500
The side away from articulated position, the other end is located at the outside in compartment 100 through enclosing 130, and positioned at the outside in compartment 100
The end of drag-line 500 is provided with draw ring 600.By pulling draw ring 600, control panel 340 is closed, it is easy to operate.
Drag-line 500 is located at the medium position of the edge parallel to its hinge lines direction of control panel 340 with the link position of control panel 340, draws
It is dynamic more laborsaving.Hole is offered on enclosing 130, is easy to drag-line 500 to pass, the end for passing enclosing 130 in drag-line 500 is set
There is draw ring 600, it is to avoid drag-line 500 is retracted into enclosing 130, convenient and reliable operation.
Refuse treatment plant embodiment
A kind of refuse treatment plant, including the cram packer that above-described embodiment is provided are present embodiments provided, is also included
Cover plate and burner, burner are arranged in compartment 100, and cover plate is hinged at first open 110, and rubbish can be cremated
Unload again afterwards, the treatment of rubbish is much sooner.
The preferred embodiments of the present invention are these are only, is not intended to limit the invention, for those skilled in the art
For member, the present invention can have various modifications and variations.All any modifications within the spirit and principles in the present invention, made,
Equivalent, improvement etc., should be included within the scope of the present invention.
Claims (10)
1. a kind of cram packer, it is characterised in that including compartment, walking mechanism and controlling organization, wherein:
The bottom that the top in the compartment has the first opening, the compartment has the second opening, and the walking mechanism is arranged on
The bottom in the compartment, the enclosing with the compartment is fixedly connected;The controlling organization includes being hinged on the enclosing in the compartment
On two control panels, close or open described second open in two relatively described compartment rotation processes of the control panel,
The controlling organization also includes support wheel, motor and wire spool, and the end away from its wheel body of the support wheel is articulated with
One control panel, its end being hinged with the control panel can be pushed against two institutes in the support wheel rotation process
The bottom of control panel is stated, for limiting rotation of two control panels relative to the compartment, the motor is arranged on the compartment
On, the wire spool is installed with the output shaft of the motor, the wire spool is used for winding draught line, the draught line
It is connected on the support wheel.
2. cram packer according to claim 1, it is characterised in that the compartment includes two sides being oppositely arranged
Plate, two control panels are separately mounted to two bottom avris of the side plate, each control panel away from corresponding
The avris of the side plate is provided with sealing strip.
3. cram packer according to claim 1, it is characterised in that the support wheel also includes wheel shaft and support
Bar, one end of the support bar is provided with the wheel shaft, and the wheel body is rotated and is installed on the wheel shaft, the support bar
End away from the wheel shaft is hinged on control panel described in, the hinge axes of the support bar and the control panel parallel to
The hinge axes of the control panel and the enclosing, the end being hinged with the control panel of the support bar also has and pushes against
Portion, in the support bar rotation process, the abutting portion is pushed against on another control panel.
4. cram packer according to claim 3, it is characterised in that be not hinged the control panel of the support bar
Base surface is provided with stopper slot, and the stopper slot includes groove bottom wall and connects the groove sidewall of the groove bottom wall, the groove sidewall
Inclined-plane is set to, the side of the notch away from the stopper slot of the groove sidewall is inclined towards the center of the groove bottom wall
Tiltedly;Corresponding, the abutting portion has end face and the side face being connected with the end face, and the side face is to match with the groove sidewall
The inclined-plane of conjunction.
5. the cram packer according to claim any one of 3-4, it is characterised in that the walking mechanism includes four
Mounting rod and the universal wheel installed in the end of mounting rod every described, four mounting rods are respectively positioned at same rectangle
Set at four angles and around the support wheel.
6. cram packer according to claim 5, it is characterised in that the mounting rod is expansion link, the mounting rod
Including the first bar portion and the second bar portion, first bar portion is inserted into second bar portion, the bottom of first bar portion
The universal wheel is installed, the end away from first bar portion of second bar portion is arranged on the enclosing;Described
Hydraulic ram assemblies are set between two bar portions and first bar portion, for ordering about second bar portion relative to first bar portion
Slide, restricted second bar portion is set between second bar portion and first bar portion along away from first bar portion
Slip away the position-limit mechanism of first bar portion in direction.
7. cram packer according to claim 6, it is characterised in that the position-limit mechanism include the first annular projection and
Second annular projection, first annular projection is arranged on one end away from the universal wheel of first bar portion, described the
Two annular projections are arranged on one end of close the described universal wheel of second bar portion, and second annular projection is positioned at described the
Between one annular projection and the universal wheel, and first annular projection is located at the sliding path of second annular projection
On.
8. the cram packer according to claim any one of 3-4, it is characterised in that the cram packer also includes
Resetting-mechanism, the resetting-mechanism is arranged between the compartment and the support wheel, makes the support wheel have towards abutting
The rotation trend in the direction of the control panel.
9. cram packer according to claim 1, it is characterised in that the controlling organization also includes two drag-lines, often
One end of drag-line described in root connects the side away from articulated position of the control panel, and the other end is located at described through the enclosing
The outside in compartment, and the end of the drag-line positioned at the outside in the compartment is provided with draw ring.
10. a kind of refuse treatment plant, it is characterised in that including the garbage transporting according to claim any one of 1-9
Car.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710048831.XA CN106742974A (en) | 2017-01-22 | 2017-01-22 | Cram packer and refuse treatment plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710048831.XA CN106742974A (en) | 2017-01-22 | 2017-01-22 | Cram packer and refuse treatment plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106742974A true CN106742974A (en) | 2017-05-31 |
Family
ID=58943247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710048831.XA Pending CN106742974A (en) | 2017-01-22 | 2017-01-22 | Cram packer and refuse treatment plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106742974A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1331641A (en) * | 1971-12-15 | 1973-09-26 | Powell W N Powell A F | Self unloading trailer |
JPH092603A (en) * | 1995-06-21 | 1997-01-07 | Kaisui Maren:Kk | Industrial waste carriage container |
CN203512499U (en) * | 2013-09-12 | 2014-04-02 | 中国建筑第七工程局有限公司 | Waste cart used during building construction |
CN203844752U (en) * | 2014-05-14 | 2014-09-24 | 中国庆华能源集团有限公司 | Bottom-dump mining car |
CN204137693U (en) * | 2014-10-08 | 2015-02-04 | 浙江大学 | A kind of building waste transport trolley |
CN106081420A (en) * | 2016-07-28 | 2016-11-09 | 陆应根 | A kind of bulky refuse bucket of band conveyer belt |
-
2017
- 2017-01-22 CN CN201710048831.XA patent/CN106742974A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1331641A (en) * | 1971-12-15 | 1973-09-26 | Powell W N Powell A F | Self unloading trailer |
JPH092603A (en) * | 1995-06-21 | 1997-01-07 | Kaisui Maren:Kk | Industrial waste carriage container |
CN203512499U (en) * | 2013-09-12 | 2014-04-02 | 中国建筑第七工程局有限公司 | Waste cart used during building construction |
CN203844752U (en) * | 2014-05-14 | 2014-09-24 | 中国庆华能源集团有限公司 | Bottom-dump mining car |
CN204137693U (en) * | 2014-10-08 | 2015-02-04 | 浙江大学 | A kind of building waste transport trolley |
CN106081420A (en) * | 2016-07-28 | 2016-11-09 | 陆应根 | A kind of bulky refuse bucket of band conveyer belt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211114666U (en) | Wall plastering machine for building | |
CN215471980U (en) | Two-way moving material distribution trolley | |
CN206395233U (en) | A kind of discharge box suitable for long range cableway transport | |
CN106742974A (en) | Cram packer and refuse treatment plant | |
CN216612458U (en) | Frame is transported to old and useless matrix of self-discharging formula | |
CN110255338A (en) | A kind of adaptive floor intelligence feeding feeding lifting device and application method | |
CN205293805U (en) | Easy -to -draw formula hopper | |
CN206374739U (en) | A kind of discharge box suitable for complex road condition long range cableway transport | |
CN214593150U (en) | Device capable of efficiently loading and transferring seedling-raising pot | |
CN213228770U (en) | Shallow is transported to cement | |
CN211141285U (en) | Cement promotes conveying equipment for cement manufacture | |
CN208544724U (en) | The continuous vertical handling apparatus of dregs in a kind of vertical shaft | |
CN209082383U (en) | Road cone vehicle recycles jack | |
CN209536387U (en) | A kind of material transferring device of efficient quick | |
CN208394394U (en) | A kind of screw conveyor for chemical granule raw material | |
CN110203428A (en) | Oatmeal bottle placer | |
CN209257211U (en) | A kind of precuring kiln with heat-proof device | |
CN206243601U (en) | A kind of rotating turret for plastic grain blanking system | |
CN209082381U (en) | Road cone vehicle magazine feed mechanism | |
CN213228763U (en) | Material transporting cart for constructional engineering | |
CN219631894U (en) | Commercial concrete processing and blanking equipment | |
CN217436943U (en) | Feeding equipment in cement component production | |
CN114873114B (en) | Rotatory transfer device of mouth rubbish is put in to intelligent rubbish room and rubbish room | |
CN217323087U (en) | Material conveying equipment | |
CN217597393U (en) | Concrete distributing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |